TC Res. No. 2006-36 APPROVING AND ACCEPTING THE IMPROVEMENTSTOWN OF AVON, COLORADO RESOLUTION NO. 06-36 Series of 2006 A RESOLUTION APPROVING AND ACCEPTING THE IMPROVEMENTS INSTALLED AND CONSTRUCTED IN ACCORDANCE WITH THE SUBDIVISION IMPROVEMENTS AGREEMENT - FOR THE - WESTERN SAGE PUD AND ESTABLISHING WARRANTY PERIOD FOR THE PUBLIC IMPROVEMENTS WHEREAS, the Town of Avon entered into a SUBDIVISION IMPROVEMENTS AGREEMENT, dated April 26, 2005, with Jay K. Peterson in connection with the approval of the Final Plat for Western Sage PUD, Lots 1-8; and WHEREAS, said Agreement established certain public improvements to be constructed Jay K. Peterson in conjunction with said subdivision; and WHEREAS, said Agreement established requirements for the provision of collateral to assure completion of the Subdivider Improvements in accordance with the Agreement and the subsequent release of the collateral upon completion and the stipulated- warranty period; and WHEREAS, said Improvements were substantially complete as of September 12, 2006; and WHEREAS, all required documentation for approval and acceptance of the Improvements has been submitted as of September 12, 2006. NOW, THEREFORE BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF AVON, that: 1. The public improvements required to be constructed in conjunction with the Western Sage PUD were substantially complete as of September 12, 2006, in accordance with the SUBDIVISION IMPROVEMENTS AGREEMENT and the stipulated 'one-year warranty period for said improvements shall extend to September 12, 2007. 2. The public improvements are hereby approved and accepted by the Town of Avon with the exception of items of warranty work, which are identified during the warranty period, which items shall have a warranty period, which extends for one year from the, date of satisfactory correction of the warranted item. 3. Warranty work on public improvements will be secured by a Letter of Credit dated August 23, 2006, issued to the Town of Avon in the amount of $ 19,187.40 in accordance with the Subdivision Improvements Agreement. ADOPTED THIS I d.11!~ DAY OF ATTEST: r, I: IsFAI. ,r Pa w envy, To erk I®LORRO y 2006. TOWN COUNCIL TOWN OF AVON, COLORADO Ronald C. Wolfe, Mayor Resolution No. 06-36 V@A, Filing 2 SIA Final Memo To: Honorable Mayor and Town Council Thru: Larry Brooks, Town Manager From: Norman Wood, Town Engineer Jeffrey Schneider, Engineer H Date: September 1, 2006 Re: Resolution No. 06-36, A Resolution Approving and Accepting the Public Improvements Installed and Constructed in Accordance with the Subdivision Improvements Agreement for the Western Sage Planned Unit Development (PUD) and Establishing Warranty Period for the Public Improvements Summary: Jay K. Peterson, subdivider of the Western Sage PUD has submitted all required documentation for approval and acceptance of the public improvements required by the Subdivision Improvements Agreement (SIA) (attached Item 2) for the Western Sage PUD. These improvements generally consist of drainage facilities and utilities required to access and serve the Western Sage PUD, which involves eight single-family lots. Five of the single- family lots are accessed from a private drive originating at the cul-de-sac on Longsun Lane. Resolution No. 06-36, Series of 2006 (attached Item 1) approves and accepts the public .-improvements and establishes- the warranty period in conformance with the SIA. The Resolution further allows the initiation of the warranty period with any warranty work secured by a Letter of Credit dated August 23, 2006, issued to Jay K. Peterson in the amount of $19,178.40 (attached Item 3) in accordance with the SIA. The letter of credit expires on October 1, 2007. We recommend approval of Resolution No. 06-36, Series of 2006, A Resolution Approving and Accepting the Public Improvements Installea and Constructed in Accordance with the Subdivision Improvements Agreement for the Western Sage Planned Unit Development (PUD) and Establishing Warranty Period for the Public Improvements. V i Discussion: In conjunction with the approved final plat for the Western Sage PUD, Lots 1-8, a resubdivision of Lots 54, 55, 89, and 90, Block 4, Wildridge Subdivision, consisting of 7.1 acres, Jay K. Peterson, the subdivider, entered into a Subdivision Improvements Agreement with the Town. Through the SIA, the town can make provisions for completion of public improvements as depicted by the plans approved by the Town dated February 28, 2005. Per the SIA, the subdivider is to provide collateral in the 'amount of one hundred and ten percent (110%) of the estimated cost of completion of public improvements. This is shown on Exhibit B of the SIA. _ Public Improvements generally included storm drainage, publicly owned utilities (water & sewer), 'and shallow utilities including gas, cable, electric, and telephone. It is also important that the subdivider provide documentation that the installer of the improvements has been paid in ' full for all work completed on : site. " The subdivider has satisfactorily fulfilled the requirements set forth in the SIA Supplemental, documentation verifying satisfactory completion of the improvements is attached as follows: Item 4 Marcin Engineering Final Acceptance- May 23, 2006 -Letter with Corrective Action Items and August "4, 2006 Letter Accepting Corrections Item 5 Water Main Final Acceptance - Eagle River Water and Sanitation District Item 6 Sewer Main Final Acceptance - Eagle River Water and Sanitation District Item 7 Shallow Utility Documentation - Gas, Electric, Phone, Cable Item 8 Proof of Payment for Public Improvements - The Reynolds Corporation Based upon this, documentation, we recommend approval and acceptance of the public improvements in accordance with the SIA by the adoption of Resolution No. 06-36, Series of 2006. Recommendation: Approve Resolution No' 06-36, Series of 2006, A Resolution Approving and Accepting the Public Improvements Installed and Constructed in Accordance with the.-Subdivision:. Improvements Agreement for the Western Sage Planned Unit Development (PUD) and Establishing Warranty Period for Public Improvements. Proposed Motion: I move to approve Resolution No. 06-36, Series of 2006, A Resolution. Approving and Accepting the Public Improvements Installed and Constructed in Accordance with the Subdivision Improvements Agreement for the Western Sage Planned Unit Development (PUD) and Establishing Warranty Period for Public Improvements. C:\Docume= And Setungs\Nwood\L.ocal SeI69ATemporuy Intemet Files\OLK23\Res 06-36 Sia Memo.DOC Y Attachments: Item 1 - Resolution No. 06-36, Series of 2006 Item .2 - Subdivision Improvements Agreement Item 3 - Letter of Credit for Warranty Period Item 4 - Marcin Engineering - Final Inspection Documentation Item 5 - Water Main Final Inspection Documentation Item 6 - : Sewer Main Final Inspection Documentation Item 7 - Shallow Utility Documentation (Electric, Gas, Cable, Phone) Item 8 - Proof of General Contractor Payment for Public Improvements Town Manager Comments: r C:\Do~ And SetdngsW wood\L 1 Settings\Temporary Intemet Files\OLK23\Res 06-36 Sia Memo.DOC 3 tfem- 1 TOWN OF AVON RESOLUTION NO. 06-36 Series of 2006 A RESOLUTION APPROVING AND ACCEPTING THE IMPROVEMENTS INSTALLED AND CONSTRUCTED IN ACCORDANCE WITH THE SUBDIVISION IMPROVEMENTS AGREEMENT-FOR THE WESTERN SAGE PUD AND ESTABLISHING WARRANTY, PERIOD FOR THE PUBLIC IMPROVEMENTS WHEREAS, the Town of Avon entered into a SUBDIVISION IMPROVEMENTS AGREEMENT, dated April 26, 2005, with Jay K. Peterson in connection with the approval of the Final Plat for Western Sage PUD, Lots 1-8; and WHEREAS, said Agreement established certain public improvements to be constructed Jay K. Peterson in conjunction with said subdivision; and WHEREAS, said Agreement established requirements for the provision of collateral to assure completion of the Subdivider Improvements in accordance with the Agreement and the subsequent release of the collateral upon completion and the stipulated warranty period; and WHEREAS, said Improvements were substantially complete as of September 12, 2006; and WHEREAS, all required documentation for approval and acceptance of the Improvements has been submitted as of September 12, 2006. NOW, THEREFORE BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF AVON, that: 1. , The public improvements required to be constructed in_ conjunction with the Western Sage PUD were substantially complete as of September 12, 2006, in accordance with the SUBDIVISION IMPROVEMENTS AGREEMENT and the stipulated one-year warranty period for said improvements shall extend to September 12, 2007. 2. The public improvements are hereby approved and accepted by the Town of Avon with the exception of items of warranty work, which are identified during the warranty period, which items shall have a warranty period, which extends for one year from the date of satisfactory correction of the warranted item. 3. Warranty work on public improvements will be secured by a Letter of Credit dated August 23, 2006, issued to Jay K. Peterson in the amount of $ 19,187.40 in accordance with the Subdivision Improvemep A Q\Documents And Settings\Nwood\Local Settings\Temporary Internet Files\OLK23\Res 06-36 Sia Completion.Doc ADOPTED THIS DAY OF , 2006. TOWN COUNCIL TOWN OF AVON, COLORADO Ronald C. Wolfe, Mayor ATTEST: Pa! w McKenny, Clerk C:\Documents And Settings\Nwood\L.ocal Settings\Tempomry Internet Files\OLK23\Res 06-36 Sia Completion.Doc /1617,4 -;;1- WESTERN SAGE PUD SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made and entered into this a10tday of Je&L- , 2005, is by and among Jay K. Peterson ("Subdivider"), and the Town of Avon, a Colorado municipality, by and through its Council (the "Town"). RECITALS WHEREAS, the Subdivider, in connection with the approval of the final plat for the Western Sage PUD, Lots I - 8, consisting of 7.1 acres, a resubdivision of Lots 54, 55, 89 and 90, Block 4, Wildridge Subdivision, Town of Avon, Eagle County, Colorado (the "Subdivision'), desires to enter into a Subdivision Improvements Agreement ("Agreement") with the Town as provided for by Section 16.24. 100 of the Avon Municipal Code, as amended (the "Code"); and WHEREAS, pursuant to the Code, the Town desires to make reasonable provisions for completion of certain public improvements ("Improvements") as depicted on the plans approved by the Town for the Western Sage PUD, dated February 28, 2005, ("Approved Plans") and as set forth in Exhibit A attached hereto and incorporated herein by reference; and WHEREAS, the Subdivider is responsible for the completion of the public improvements ("Improvements"). AGREEMENT NOW THEREFORE, in consideration of the following mutual covenants, conditions and promises, the parties hereby agree as follows: 1. Final Plat Approval. The Town agrees that upon compliance with all other conditions of approval, and subject to the terms and conditions of this Agreement, the Final Plat of The Western Sage PUD ("Subdivision") shall be promptly filed for recording with the Office of the Eagle County Clerk and Recorder. 2. Completion of Work. (a) Performanc e. Subdivider agrees to furnish all equipment, labor and material necessary to perform and complete, in a good and workmanlike manner, all improvements and work incidental thereto assigned as set forth as depicted on the Approved Pans and as set forth in Exhibit A. Subdivider further agrees that he will be responsible f or all costs of Improvements as assigned. Said work shall be performed in accordance with the Approved Plans. Subdivider agrees to commence construction of Improvements prior to the issuance of a building permit for any lot in the subdivision and to complete the Improvements prior to the issuance of a Certificate of Occupancy for any building on any lot in the Subdivision. Commencement of construction of Improvements C:':Documems An, SeWngs,'N wood',LocaI Setungs',Temporary Intemet FdestOLK23'Subdivider Improvement Agreemcnt.DOC shall be deemed to mean the award and execution of contracts for the construction of the Improvements' as depicted on Exhibit A. (b) Inspection Procedures. (1) All work shall be done under the inspection procedures and standards established by the Town and/or Holy Cross Electric, Eagle River Water and Sanitation District, Excel Energy, Qwest Communications, Comcast ("Utilities"), as applicable and shall be subject to the reasonable satisfaction of the Town and applicable Utilities. All work shall not be deemed complete until, the reasonable approval and acceptance of the Improvements by the Town and/or the Utilities. Such inspections by the Town and/or Utilities shall not relieve the-Subdivider or his agents. from any responsibility or obligation to assure that all work is completed in conformance with all standards, plans and specifications as submitted to and previously approved by the Town and Utilities. (2) Cost of Inspections. The cost, if any, of such inspections, by Town employees, or an independent third party-inspector,.shall be paid by the Subdivider and subject to the, limitations set forth in parag aph,8 below. (3) Notice of Non-Compliance. In'the event that the Town through its inspectors reasonably determines that the Improvements are not in compliance with the Approved Plans, it shall give written notice of such non-compliance ("Notice of Non-Compliance") to the Subdivider. The Notice of Non'-Compliance shall include a narrative describing the unsatisfactory construction work-with specific ` reference to the applicable construction plans and specifications. The Notice of Non- Compliance must be provided to the Subdivider within two (2) working days of the date of the inspection. 3. Security for Completion of Improvements. (a) Security. . To secure completion of the Improvements, the - Subdivider hereby agrees to secure the respective obligations under this Agreement with collateral in accordance with Section 16.24.100 of the Code. Collateral. shall be one or a combination of the following: cash, its equivalent or irrevocable letter of credit ("Collateral"). 4. Subdivider Improvements- (a) Security for Completion of Public Improvements. Subdivider shall deliver to the Town an irrevocable letter of credit issued by a reputable financial institution or other Collateral consistent with Section 16.24. 100 of the Code in an arnotlnt equal to one hundred and ten percent (110%) of the estimated costs of completion of the 'Improvements as set forth on Exhibit B. The irrevocable letter of credit or other Collateral shall be delivered to the Town prior to, or concurrently with, recordation of the Final Plat for the Subdivision. C:lp uments Any'. enings,\wood'Local Settings',Temporary Internet Files~OLk23!Subdivider Improvement Agreernent.DOC (b) Progress Payments on Sub divider's Improvements. Upon completion of itemized improvements for which cost estimates have been set forth in Exhibit B and upon receipt of the Certifications as specified in paragraph 7 below verifying that itemized portions of the Improvements have been completed, the amount of Collateral may be reduced periodically provided, however, that in no event will any such reduction cause the amount of remaining collateral to be less than an amount equal to one hundred and ten percent (I 10%) of the estimated costs of completion of all remaining improvements. Capon completion of all work related to the Improvements and the Town's and Utility's acceptance of the Improvements, the entire amount of remaining collateral less those amounts described in paragraph 6 below, shall be promptly released. (c) Default by Subdivider. In the event of a default in whole or in part by Subdivider, the Town shall be authorized to draw on the letter of credit or other collateral for the purpose of undertaking completion or remediation work on the Subdividers Improvements after providing thirty (30) days' advance written notice of default and providing an opportunity during such period for Subdivider to cure the default. The Town shall be entitled to draw on such letter of credit or other collateral by Resolution of the Town Council stating (i) that Subdivider is in default, and (ii) the funds are required in order to complete or correct work on the Subdivider's Improvements. 6. Warranty Period. The Improvements shall be warranted to be free from defects in workmanship or quality for a period of one (1) year after acceptance of all the work by the Town. In the event of any such defect, the Town may require Subdivider to correct the defect in material or workmanship. Ten percent (10%) of the total actual cost of completion of all Improvements shall be retained by the Town as collateral during such one (1) year period as a guaranty of performance of any work required pursuant to the above described warranty. In the event any corrective work is performed during the one-year warranty period then the warranty on said corrected work shall be extended for one year from the date on which it is completed. Collateral equal to 125% of the cost of any corrected work, as estimated by the Town, shall be retained by the Town or immediately paid to the Town by the Subdivider, if sufficient funds are not held by the Town, in accordance with Section 16.24.100, for a period of one year from the date of completion of the corrected work. Engineering Certification. Upon completion of portions of the improvements, Subdivider will cause his engineers (who shall be registered in the State of Colorado ; to certify in writing that the installation of the Improvements, or portions thereof as may be completed from time to time, have been completed in conformance with all standards, plans and specifications as submitted to and previously approved by the Town, or the pertinent utility supplier, as depicted on the Approved Plans. Inspection reports, test results and other supporting documentation shall be submitted with the certification. 8. Subdivision and Inspection Fees. Fees in accordance with the Town's Subdivision Regulations for the review of Preliminary Plans and Final Plats have been C:•Documents An:: Settvws Vvoo&Loca! Settmgs'Temporary Internet FIICs1ULKDkSubdtvtder Improvement Agreement.DOC Z J~ paid in full. Additional fees, if any, shall be paid by the Subdivider within thirty (30) days after delivery of written invoice for such fees to cover the cost of inspections by the Town. The fees, if any, will be based on direct (out-of-pocket) costs of the Town plus an administrative fee in the amount of fifteen (15%) percent of the direct costs, but in no event will the total amount of such additional fees exceed five percent (5%) of construction costs. 9. No Obligation of Town to Complete Improvements. Subdivider agrees that in the event it shall fail to perform its obligations as set forth herein, the Town shall be under no obligation to complete or perform any of the said Improvements or to issue permits for development within the Subdivision. 10. Non-Liability of Town; Indemnification. The Town shall not, nor shall any officer, agent, or employee thereof, be liable or responsible for any accident, loss or damage related to the work specified in this Agreement, nor shall the Town, nor any officer, agent or employee thereof, be liable for any persons or property injured by reason of the nature of said work. To the extent permitted by law, Subdivider hereby agrees to indemnify and hold harmless the Town, and any of its officers, agents and employees against any losses, claims, damages or liabilities to which the Town or any of its officers, agents or employees may become subject, because of any losses, claims, damages or liabilities (or actions in respect thereof) that arise out of, or are based upon, any acts or omissions in the performance of the obligations of Subdivider, as hereinbefore stated. Furthermore, the Subdivider shall reimburse the Town for any and all legal or other expenses reasonably incurred by the Town in connection with investigating or defending any such loss or claim. 11. Rights of Town in Event of Default. In the event that Subdivider defaults in whole or in part in the performance of this Agreement, and after the expiration of thirty (30) days after having given written notice to Subdivider of such default during which period of time the Subdivider fails to correct said default, the Town may, at its sole discretion, proceed with the construction or completion of the Improvements specified on Exhibit A. Al l such costs paid by the Town for such Improvements, together with all costs of personnel, equipment and other matters expended by the Town in furtherance of the construction responsibilities of Subdivider, shall be paid by Subdivider based upon the underlying responsibility for the Improvement in question. Any such costs relating to the. Subdivider Improvements, which have not been reimbursed by Subdivider, shall be a lien on any property in the Subdivision owned by Subdivider at the time of default. Said lien may be foreclosed in the same manner as a mortgage and shall entitle the Town to add its costs and reasonable attorneys' fees in such foreclosure or other collection. Without limiting the foregoing, the Town may bring a mandatory injunction action against Subdivider co require installation and construction of the Improvements, if not constructed within the time limits described in this Agreement. If any such action is brought by the To« n. the Town shall be awarded its court costs and reasonable attorneys' fees. C:'.Docuincnts Aix! Scttings':NwoodLocal SeningsiTcmporary Internet Files%OLK23'Subdivider Improvement Agreement.DOC 4 f 12. Letter Certifying Completion and Final Acceptance of lmprOvements. When all Improvements have been completed and accepted by the Town, or the pertinent utility supplier, and the Warranty Period has expired, the Town agrees that it will issue a letter, after consultation with the pertinent utility supplier if necessary, in recordable form, certifying that all obligations of Subdivider under this Agreement have been satisfied. 13. Amendments. This Agreement may be amended from time to time, provided that such amendment is in writing and signed by all parties hereto. 14. Covenants Running with the Land. This Agreement and the obligations hereof shall be deemed to be covenants running with the land and shall be binding on the successors and assigns of the parties hereto. The parties hie_rae",ec j; TTEST` A Tow e *APPOVED AS TO FORM: ttorney this Agreement as of the date first above written. TOWN OF AVON, a Colorado Municipal Corporation rAl By: G- Mayor Jay K. Peterson By: Subdiv er C:tBtxumcnts Any SettingsAwood'd.ocai SettingslTemporary intcmct FifevOLK23`Subdividcr lmprovcment Agreement.DOC EXHIBIT A Western Sage Development Subdiviiion Improvements Agreement - APPROVED PLANS: Western Sage PUD Construction Drawings Wildridge, Town of Avon, Colorado February 2005' Sheets 1 through 9 Release-Date: ApriA1, 2005 ' Prepared by, Marcin Engineering LLC P.O. Box 1062 . Avon Colorado 81620 - C"Documents And SertinfsAwood''%Locai 5eInngs;Tcmporary Internet Res'~OLQRSubdrvsdcr Improvement Agreement.DOC 6 EXHIBITB Western Sate Development Subdivision Improvements Agreement PUBLIC IMPROVEMENTS CONSTRUCTION COST ESTIMATE Mobilization & Site Prep Water Main and Service Installation Sewer Main and Service Installation Shallow Utility Service Installation (Natural Gas, Cable TV, Telephone & Electric) Materials for Utility Installations Contingencies @ 15% Total Estimate&Cost $ 19,950 44,765 23,600 14,900 48,464 22 7 2 $ 1'14,431 Security Required per Subdivision Improvements Agreement (110%) $191,874 Cost Estimate and Security Amount Based on Proposal dated March 30, 2005: From: The Reynolds Corporation P.O. Box 738 Avon, CO 81620 To: Jay Peterson Suite 208 108 South Frontage Road _Vail, Colorado 81657 Project Reference: Western Sage PUD A Resubdivision of Lots 54, 55, 89 and 90, Block 4, Wildridge Avon, Colorado Project Engineers: Marcin Engineers, LLC P.O. Box 1062 Aeon, CO 81620 C•\Documcnts Any Scrtmis•Vwood+Lo.'ai SertinpS Temporary tntemet Fiies',OLK23 ;Subdivider Improvement Agrxment.DOC 1 V(P,Ar7 - 15 Benchmark Rd Avon, CO. 81620 (970) 949-5995 Wisffiar- Bank EXPECT ACTION IRREVOCABLE LETTER OF CREDIT #874 Effective Date: August 23, 2006 Expiration Date: October 1, 2007 To: Town of Avon Re: Jay K. Peterson Community Development 108 S. Frontage Road W. Suite 208 400 Benchmark Road Vail, CO 81657 Avon, CO 81620 ("Hereinafter refereed to as: (Beneficiary) Hereinafter referred to as: (Customer) Dear Town of Avon, We hereby open our Irrevocable Letter of Credit No 874 in favor of Beneficiary. It is available by drafts at sight drawn on WestStar Bank for any sum or sums not exceeded the lesser of "Nineteen Thousand One Hundred Eighty Seven dollars and 40/100 dollars ($19,187.40) or the total amount due under that specific Promissory Note Originally Dated August 23, 2006 from Jay K. Peterson, as hereinafter defined, and Beneficiary ("Promissory Note") for the account of Ja. K. Peterson ("Letter of Credit") Drafts under Letter of Credit must be accompanied by an affidavit, signed by Beneficiary stating that Jay K. Peterson has failed to make payments in accordance with the terms and conditions of the Promissory Note. Each draft must bear upon its face the clause, "Drawn under Letter of Credit No. 874 dated August 23, 2006, WestStar Bank, Avon, Colorado". Drafts under Letter of Credit must be presented to an officer of WestStar Bank at the following address of WestStar Bank between the hours of 9:00 a.m. and 3:00 p.m. Monday through Friday excluding Holidays: WestStar Bank 15 Benchmark Rd Avon, CO 81620 The amount of the draft, which is negotiated pursuant to this Letter of Credit, together with the date of negotiation, must be endorsed on the reverse side of the Letter of Credit. We hereby agree that drafts drawn under this Letter of Credit and in compliance with its terms, shall be promptly honored if presented at the counters of WestStar Bank as previously defined herein no later than 3:00T.M. Mountain Time October 1, 2007.. WestStar Bank represents and warrants to Beneficiary that full authority and power to issue this Letter of Credit in the total amount and for the period of time stated herein: said authority being pursuant to the laws of the United States, or to the State or territory which.governs the establishment and regulation of WestStar Bank, and the WestStar Bank's Charter, bylaws. and other applicable rules and regulations adopted pursuant thereto. "Phis credit is subject to the "Uniform Custom and Practice for Documentary Credits (1993 rev.), International Chamber of Commerce Publication No. 500". 'I? i;i;i ~i.. i!'•liu 1. 4, (;~t1„e',?r i,i;i~ i.t.c,J SEEM Letter of Credit #874 August 23,2006 Page 2 Should it be necessary for Beneficiary to file suit in an effortto enforce this Letter of Credit, WestStar Bank hereby waives all venue rights, and submits to the-jurisdiction of the District Court in and for the County of Eagle, State of Colorado. Si fly Acknowledged and'accepted on WestStar Bank , : Pet on Dan Godec, Regional President ; Credit Officer MARCIN ENGINEERING LLC August 4, 2006 Jay Peterson 108 S. Frontage Road West Suite 208 Vail, CO 81657 RE: Final Inspection of Western Sage PUD Infrastructure Improvements Dear Jay: Per your request, on July 28, 2006 Marcin Engineering made a site visit to verify the issues identified in the letter dated May 23, 2006 were corrected. Upon inspection, all of the issues appeared to be satisfactorily resolved. Please contact Marcin Engineering if you have any questions or concerns. Sincerely, MARCIN ENGINEERING LLC Thomas Marcin, P.E., P.L.S PO Box 1062. Avon Colorado 81620 (970) 748-0274 1 /1~0.q Z/ -a MARCIN ENGINEERING LLC May 23, 2006 Jay Peterson 108 S. Frontage Road West Suite 208 Vail, CO 81657 RE: Final Inspection of Western Sage, PUD Infrastructure Improvements RECEIVED JUN 0 6 2006 Community Development' Dear Jay: Per your request, on May 23, 2006 Marcin Engineering completed a cursoryreview or the Western Sage PUD infrastructure improvements. Based upon this inspection, the infrastructure improvements appear to be in general conformance with the plans and specifications with the following exceptions: The following items need to be addressed before construction is terminated: 1. The nylon reinforced jute mat at the outlet of the 18" culvert shall, be installed. 2. The ditch adjacent to the concrete retaining wall will be completed as indicated in the plans. 3. 'The slope over the new sewer main (adjacent to the hammer head in the road) shall be graded as indicated in the approved plans. .4. Gravel shoulders shall-be installed on both sides of the road per the approved' plans. Please contact Marcin Engineering if you have any questions or concerns. Sincerely. NMARCIN ENGINEERING LLC Thomas Marcin. P.E. ;RE n~ 492 z c '32 •'5-2:3-- all PO Box 1062, Avon Colorado 81620 (970) 748-0274 1 E s a f /14e)07 - 5- EAGLE RIVER W ATER & SANITATION DISTRICT 1W 646 Fares; Road • Vail, Cotorado 91657 (970) 476-7460 • FAY. (970) 476.4069 July 31, 2006 Mr. Jay Peterson 108 S. Frontage Rd. West, Suite 208 Vail, CO 81657 Reference: WESTERN SAGE WATER MAIN Dear Mr. Peterson: This letter is to inform you that the above-referenced Water Main has successfully completed all the items required for the District to grant Final Acceptance. The below listed items have been submitted and approved by the District and this Water Main is accepted as part of the District's system. 1. Construction Acceptance 2. Final Grade and Paving Inspection 3. As-Built Drawings 4. Easement Documentation 5. Certification of Costs 6. Bill of Sale 7. Final Inspection 8. Final Acceptance COMPLETED OCTOBER 6, 2005 COMPLETED JANUARY 17, 2006 COMPLETED JUNE 8, 2006 COMPLETED JUNE 24, 2006 COMPLETED JULY 31, 2006 COMPLETED JUNE 24, 2006 COMPLETED JANUARY 17, 2006 COMPLETED-JULY 8, 2006 Your two-year warranty time period for this Water Main began on the date of Construction Acceptance. If you have any questions or concerns, please contact me at 970/476-7480. Sincerely, Fred S. Haslee Regulations Administrator c: Project File Distribution & Collection Department FSH/mm W. IL VUd7E" iI'~ ~T~'ir't•TC QPEFc':0t.,S $ "MANAGEMENT, SER'V!CES F':%I mly.sRMS'.DE V \OTIF.FIN.4L.L.TR_2YR. DOC: July 31, 2006 EAGLE RIVER mfiWAAAW WATER & SANITATION DISTRICT W Mr. Jay Peterson 108 S. Frontage Rd. West, Suite 208 Vail, CO 81657 Reference: WESTERN SAGE SEWER MAIN Dear Mr. Peterson: 646 Forest Road • Vai;. Cciioradc 81657 1970)476 -7460 • F.4?' (9701476-4089 This letter is to inform you that-the above-referenced Sewer Main has successfully completed all the items required for the District to grant Final Acceptance. The below listed items have been submitted and - . approved by the District and this Sewer.Main is accepted as part of the District's system. . . 1. Construction Acceptance ` COMPLETED DECEMBER 15, 2005 2. Final Grade-and Paving Inspection COMPLETED JANUARY 17, 2006 3. ' As=Built Drawings COMPLETED JUNE 8, 2006 4. -Easement Docnnientation COMPLETED JUNE 24, 2006 5. Certification of Costs COMPLETED JULY 31, 2006 6. Bill, of Sale COMPLETED JUNE 24, 2006 7. Final Inspection COMPLETED JANUARY 17, 2006 8. Final Acceptance COMPLETED JULY 31, 2006 Your two-year warranty time period for this Sewer Main began on the date of Construction Acceptance. If you have any questions or concerns, please contact me at 970/476-7480. Sincerely, Si4 .I- Fred S. Has-lee Regulations Administrator c: Project File Distribution & Collection Department FSH/mm law MANAGEMENT SERVIC U F.\IMD`SREGS\DE'vNO77F1F71..kUTR 2YR.DOC \e 'i r lam' toss F F~ 3799 HIGHMY 82-P.O. BOX 2150 O GLENWOOD SPRINGS, COLORADO 81802 t c (870) 945-5491 fAX (970) 9454081 y ~ d~ro3 ssO*a, T April 25, 2006 _Westem Sage Development ATTN: Mr. Jay Peterson 108 South Frontage Road West suite 108 Vail, CO 81657 RE Western Sage PUD - VVikMge Dear Jay: This fetter shall serve as Holy Cross Energy's fir* approval and acceptance of the primary elect improvements located in Western Sage PUD. ✓ HOOLLYY CROSS ENERGY Jeffrey P. Vroom Senior Engineering Technician _(970) 947-5425 direct line ivroom(Mholycross.com JPV. Electronic W/0#19210:49-38:VVESTERN SAGE PUD - VVILDRIDGE At.:, A Touchstone Encrg•°I Cooperative //4,, -;P,. Z Xcel Energy- October 7, 2005 Jay Peterson 108 South Frontage Road Suite 208 Vail,Colorado $1657 RE: Request for new Gas Service Service Address: Gas Main to serve 5201, 5203, 5205, 5207 & 5209 Longsun Lane, Avon Dear Mr. Peterson: P. 0. Box 1819 Silverthorne, Colorado 80498-1819 Thank you for requesting service to the above referenced location. As your primary contact person at Xcel Energy, I'm committed to providing the coordination and support needed to satisfy your energy needs and meet your project schedule. Based on the information you have provided and the service requirements requested, I have completed the engineering design and cost estimate to provide Gas Main. The cost to provide non-refundable Gas Main is $0.00. Xcel Energy, currently, does not provide trench and backfill in frost conditions. If this project is constructed during frost conditions, the customer is responsible for trench, backfill and compaction November l' through April 15'h is the period for denial of road cut permits from towns and counties. Xcel Energy will not be responsible for the repair or replacement costs resulting from damages to "Irrigation Systems" and/or other underground obstacles, which are not marked prior to beginning this installation. Xcel Energy will not be responsible for the repair andlor replacement of sod and.'or landscaping. This estimate is valid for 120'days from the date of your request or 60 days from the date of this letter (whichever extends further) and is subject to price increases thereafter. To minimize any possible delay in meeting your construction schedule, it is imperative brat you sign and return all agreements and return your construction payment promptly. Please have the party responsible for your job site coordination review the list of Standard Contingencies and proposed installation drawing and notify me of any problems in complying with these requirements. Please sign the enclosed Contingency List, Concurrence Drawing and Customer Provided Trench Agreement and return with your construction payment. Your response to this letter is imperative. Construction will not be scheduled nor will material be ordered until all documents and oavment have been received As your primary contact for this project i may be reached at 970-2624024 (office), or you may FAX information to me at 970-262-4038. Appointments are requested. Should you have any questions or concerns with regard to this information, please contact me at your earliest opportunity. We look forward to being your energy provider. Sind rely. ` Bo ' ectibician Dep tp t/Mountain Division a Page 2 i• Page I of') Jay Peterson From: "George Ruther' <GRuther@vailgov.com> To: <jkp@vail.net> Sent: Tuesday, August 01, 2006 8:58 AM Subject: Fwd: RE: Acceptance of Utility Improvements Jay- Comcast Cable Communications has accepted the shallow utiltiy improvemems as installed in the Western Sage PUD. On Monday, July 31 st John Farrell, a construction supervisor with Comcast, visited the site. Upon inspecting the improvements, Mr. Farrell has accepted the utiltity work on behalf of Comcast. I have forwarded to you Mr. Farrell's write response. Let me know if you need anything else. Thanks, George George Ruther, A1CP Chief of Planning Town of Vail (970) 479-2145 office (970) 376-2675 cell (970) 479-2452 fax gruther@vailgpv.com "Farrell, John" <Jahn_Farrell(ca cable.comcast.com> 07/31/2006 4:53 PM George. The conduits at the west end of Longsun Lane in Wildridge appear to have been installed to Comcast Cable Communications specifications. Thank you for including us in your planning. John Farrell Construction Supervisor-Eagle and Summit Counties Comcast Cable Communications - -----Original Message---- From: Dorcas, Bradley A Sent: Wednesday. July 26, 2006 3:45 PM To: Farrell, John Subject: FW: Acceptance of Utility Improvements 8/8/2006 Page 2 of 3 -----Original Message----- From: George Ruther [mailto:GRuther@vailgov.com] Sent: Friday, July 2l , 2006 3:46 PM To: Dorcas, Bradley A; Samuel.Tooley(rzgwest.com Cc: jkpr yail.net Subject: Acceptance of Utility Improvements Gentlemen- As you will recall, shallow utility, construction plans for the Western Sage PUD, Lots 1-8, a resubdivision of Lots 54, 55, 89, & 90, Block 4, Wildrdige Subdivision, located in the Town of Avon; were submitted to; and approved by each of you as representatives for Comcast Cable and Qwest in April of 2005, respectively. Since granting your approval, the installation of the utiltiy improvements have been completed as noted' on the Shallow Utility Construction Plans. At this time, we are requesting the release of a Letter of Credit from the Town of Avon, pursuant to our Subdivision Improvements Agreement.. Prior to the release fo the Letter of Credit, the Town Engineer is requesting letters from the shallow utility providers (Comcast Cable and Qwest) certifying "that the conduit installation was performed per applicable utility providers standards". The purpose of my email is to request a written response from you verifying the following,-" that•the conduit installation was performed per applicable utility providers standards". Should you have any questions regrading my request, or if you would like to-schedule a time'to meet on site-to view the improvements, please do not hesitate to call me at 970 376-2675 or respond to this email. If you are able to accept the improvements as requested, simply respond to this email stating your acceptance. , Thank you in advance for your time. George Ruther (970) 376-2675 George Ruther. AICP Chief of Planning 8/8/2006 Town of Vail (970) 479-2145 office (970) 376-22675 cell (970) 479-2452 fax gruther.(%,vai 1.9ov.com Page 3 of 3 8/8/2006 Page 1 of 3 Jay Peterson From: "George Ruthef' <GRuther@vailgov.com> To: <jkp@vail.net> Sent: Thursday, August 03, 2006 8:16 AM Subject: Fwd: RE: Acceptance of Utility Improvements Jay- Below is a written response for Qwset Communications acknowledgin their acceptance of the shallow utilities installed at Western Sage. Thanks, George Ruther. AICP Chief of Planning Town of Vail (970) 479-2145 office (970) 376-2675 cell (970) 479-2452 fax ~vailgov.com gruther(d "Tooley, Samuel" <Samuel.Tooley;a;gwest.com> 08/02/2006 3:20 PM George, Yes. Qwest has accepted the conduit structure built with in the Western Sage PUD. Thanks. Sam Tooley Qwest Senior Design Engineer 970-468-6860 office 970-333-0085 wireless -----Original Message----- From: George Ruther [mailto:GRuther@vailgov.com] Sent: Friday. July 21. 2006 3:46 PM y To: Bradley_Dorcas~a cable.comcast.com; Tooley. Samuel Cc: jlcpanail.net Subject: Acceptance of Utility Improvements Gentlemen- As you will recall. shallow utility construction plans for the Western Sage PUD, Lots 1-8, a resubdivision of Lots 54. 55. 89, & 90. Block 4. Wildrdige Subdivision, located in the Town of Avon, were submitted to, 8/8,12006 and approved by each of you as representatives for Comcast Cable and Qwest in April of 2005, respectively. Since granting your approval, the installation of the utiltiy improvements have been completed as noted on the Shallow Utility Construction Plans. At this time, we are requesting the release of a Letter of Credit from the Town of Avon, pursuant to our Subdivision Improvements Agreement. Prior to the release fo the Letter of Credit, the Town Engineer is requesting letters from the shallow utility providers (Comcast Cable and Qwest) certifiying "that the conduit installation was performed per applicable utility providers standards". The purpose of my email is to request a written response from you verifying the following, "that the conduit installation was performed per applicable utility providers standards". Should you have any questions regrading my request, or if you would like to schedule a time to meet on site to view the improvements, please do not hesitate to call me at 970 376-2675 or respond to this email. If you are able to accept the improvements as requested, simply respond to this email stating your acceptance. Thank you in advance for your time. George Ruther (970) 376-2675 George Ruttier. A1CP Chief of Planning Town of Vail (970) 479-2145 office (970) 376-2675 cell (970) 479-2452 fax grutherr%vai lg o v. com This communication is the property of Qwest and may contain confidential or privileged information. i.,nauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication Page 2 of 3 818(2006 in error-,,please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. i Page 3 of 3 i 's 8/8/2006 /-/am B 07/30/2006 10:19 9707481102 THE REYNOLDS CORP PAGE 01 The Reynolds Corporation P.O. Boa 739 Avon, Colorado 91620 July 27, 2006 To whom it may concern, The Reynolds Corporation was contracted to const<w the redevelopment of lots 54,55,89,90, Block 4, property now known as the Western Sage Subdivision in the W'Bdridge Subdivision in Avon, Colorado. Under contract we constructed all the infrastrrrctm and roadway per plans and specification. All work as of the date above has been complete to the satisfaction of the developer. The Reynolds Corporation has been paid in fWl for all work and materials needed to complete the project If you have any finiher question please feet free to contact me on my cell phone 970-904-4226. Sincerely, The Reynolds Corporation Albert D. Reynolds l ideut i j 4 J