Loading...
TC Res. No. 2002-10TOWN OF AVON RESOLUTION NO. 02-10 SERIES OF 2002 A RESOLUTION REVISING FEE SCHEDULE "A" PERTAINING. TO FEES FOR BUILDING; MECHANICAL, PLUMBING, GRADING AND ELECTRICAL PERMITS, TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, the Town Council has enacted ordinances establishing standards relating to the issuance of permits for building, mechanical, plumbing, electrical and grading work in the Town of Avon; and. WHEREAS, the Town Council wishes to establish this Fee Schedule "A" setting the fees for such permits. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF AVON, COLORADO: Section 1. The Town Council hereby adopts the following Schedule A, setting fees for issuance of building, mechanical, plumbing, electrical and grading permits. Section 2. SCHEDULE A 1. Plan Review Fees: The plan review fee for building, commercial plumbing and commercial mechanical permits shall be 65% of the permit fee associated with the work. 2. Building Permit Fees: (a) Applicant shall provide construction valuation for all new, construction and remodeling projects on the building permit application. All new construction, additions, and remodels shall also be computed for value of construction using cost per square foot as shown in the latest edition of the Building Standards Magazine as published ,by the International Conference of Building Officials by computing the Colorado factor and then the local factor of 135%. Building permit shall be based on the greater of the two construction valuations. (b) Once the value has been established, then the fee will be determined as set forth in the latest adopted edition of the Uniform Building Code, Table 1- A Building Permit Fees. LACouncil\Resolutions\2002\Res 02-10 Revised building fees(Rev).doc 3. Mechanical Permit Fees: (a) New Work. As part of a new building, the mechanical permit fees shall be fifteen percent (15%) of the building permit fee, and shall be collected with the building permit fee. The actual permit will not be issued until the owner or responsible party representing the mechanical contractor has signed the applicable permit and it is on file at the Town of Avon Community Development Department. (b) Other Work. For other work, the fee shall be based upon the actual value of the work, and calculated as in the latest adopted edition of the Uniform Building'Code, Table 1-A Building Permit Fees. 4. Plumbing Permit Fees: (a) New Work. As part of a new building, the plumbing permit fees shall be fifteen percent (15%) of the building permit fee, and shall be collected with the building permit fee. The actual permit will not, be issued until the owner or responsible party. representing the plumbing contractor has signed the applicable permit and it is on file at the Town of Avon Community Development Department.. . (b) Other Work. For other work, the fee shall be based. upon the actual value of the work, and calculated as in the latest adopted edition of the Uniform Building Code, Table 1-A Building PermitFees. 5. Grading Permit and Grading Plan Review Fees: All grading permit fees and grading plan review fees shall be as shown in the latest adopted version of the Uniform Building Code, Table A-33(A) and A- 33(B). 6. Electrical Permit Fees: An Electrical Plan Review Fee for Commercial Projects will be assessed at sixty- five percent (65%) of ten percent (10%) of value established as set forth in Section 2A above. All other electrical permit fees are administered by the State of Colorado Electrical Board in accordance with the C.R.S., Section 12-23-77. 7. Additional Fees: The following specific fees shall be collected for the applicable permits: (a) Re-inspection fees for all trades when a correction has not been made prior to recalling the inspection $100.00 LACouncil\Resolutions\2002\Res 02-10 Revised building fees(Rev).doc (b) For removal or demolition of a building, per inspection $ 50.00 (c) Inspections outside of normal business hours $ 75.00 d) Plan Review Fees for 15` Building of a group of identical buildings. A Plan Review Fee for the 1 S` building shall be based upon the value and fee as set forth in Sections 1, 2A and 2B, above. For, each additional building, either a minimum plan review fee of $50.00lhr for in-house review or the actual cost plus an administrative fee_ in the amount of thirty-five percent (35%) for contract review. ADOPTED THIS V _DAY OF e.~p ru-A v '2002. TOWN COUNCIL TOWN OF AVON, COLORADO 66y Yode N or T L:\Council\Resolutions\2002\Res 02-10 Revised building fees(Rev).doc Memo TO. Honorable Mayor and Town Council Thru: Bill Efting, Town Manager From:/~--nth Borne, Director of Community Development Norman Wood, Town Engineer Date February 20, 2002 Re: Resolution 02-10, A Resolution Revising .Fee Schedule "A" Pertaining to Fees. for Building, Mechanical, Plumbing, Grading, and Electrical Permits, Town of Avon, Eagle County, Colorado Summary In order to.update and clarify the building permit fee schedule, staff has revised the fee schedule to incorporate changes for the electrical inspections being performed by the State of Colorado Electrical Board, manufactured home inspections, and how fees are calculated. The fee schedule also, allows for duplicate or identical buildings to have a reduced fee after the initial permit and plan review. Proposed Motion I move to approve Resolution 02-10, A Resolution Revising Fee Schedule "A" Pertaining to Fees for Building, Mechanical, Plumbing, Grading, and Electrical Permits, Town of Avon, Eagle County, Colorado Town Manager Comments Attachments A. Resolution 02-10 Memo to Town Council, January 3, 2002 Page 1 of 1 Ordinance 02-01, Lot 25, Block 2; W'ildridge PUD Amendment TOWN OF AVON RESOLUTION NO. ' 02-10 SERIES OF 2002 A RESOLUTION REVISING FEE SCHEDULE "A" PERTAINING TO FEES FOR BUILDING, MECHANICAL, PLUMBING, GRADING AND ELECTRICAL PERMITS; TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, the Town.Council has enacted ordinances establishing standards relating to the issuance of permits for building, mechanical, plumbing, electrical and grading work in the Town of Avon; and WHEREAS, the Town Council wishes to establish this Fee Schedule ".`A" setting the fees for such permits. ` NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF AVON, COLORADO: Section 1. The Town Council hereby adopts the following Schedule A, setting fees for issuance of building, mechanical, plumbing, electrical and grading permits. Section 2. SCHEDULE A 1. Plan Review Fees: The plan review fee for building, commercial plumbing and commercial mechanical permits shall be 65% of the permit fee associated with the work. 2. Building Permit Fees: _ O -Applicant shall provide coiistructlon valuation for all now e'onst-mction and remodeling projects on the,building hermit application All'new construction, additions, and remodels shall also be computed for value of construction using cost per square foot as shown in the latest edition of the Building Standards Magazine as published by the International Conference of Building Officials by computing the Colorado factor and then the local factor of 135%. ~uf]Rtng permit shill be based on the ;greater of the t« o construction valuatiorls_ (b) Once the value.has been established, then the fee will be determined as set forth in the latest adopted edition of the Uniform Building Code, Table 1- A Building Permit Fees. LACouncil\Res0lutions\2002\Res 02-10 Revised building fees(Rev).doc 3. Mechanical Permit Fees: (a) New Work. As part of a new building, the mechanical permit fees shall be fifteen percent (15%) of the building permit fee, and shall be collected with the building permit fee. The actual permit will not be issued until the owner or responsible party representing the mechanical contractor has signed the applicable permit and it is on file at the Town of Avon Community Development Department. - (b) Other Work. For other work, the fee shall be based upon the actual value of the work, and calculated as in the latest adopted edition of the Uniform Building Code, Table 1-A Building Permit Fees. 4. _ Plumbing Permit Fees: (a) New Work. As part of a new building, the plumbing permit fees shall be fifteen percent (15%) of the building permit fee, and shall be collected with the building permit fee. The actual permit will not be issued until the owner or responsible party representing the plumbing contractor has signed the applicable permit and"it is on file at the Town of Avon Community Development Department. (b) Other Work. For other work, the fee shall be based upon the actual value of the work, and calculated as in the latest adopted edition of the Uniform. Building Code, Table 1-A Building Permit Fees. 5. Grading Permit and Grading Plan Review Fees: All grading permit fees and grading plan review fees shall be as shown in the latest adopted version of the Uniform Building Code, Table A-33(A) and A- 33(B). 6. Electrical Permit Fees: An Electrical Plan Review Fee for Commercial Projects will be assessed at sixty- five percent (65%) often percent (10%) of value established as set forth in Section 2A above. All other electrical permit fees are administered by the State of Colorado Electrical Board in accordance with the C.R.S., Section 12-23-77. 7. Additional Fees: The following specific fees shall be collected for the applicable permits: (a) Re-inspection fees for all trades when a correction has not been made prior to recalling the inspection $100.00 LACouncil\Resolutions\2002\Res 02-10 Revised building fees(Rev).doc (b) For removal_ or demolition of a building, per inspection $ 50.00' (c) Inspections outside of normal business hours $ 75.00 d) Plan Review Fees for V Building of a group of identical buildings: A Plan Review Fee for the l s` building shall be based upon the value and fee as set forth in Sections 2A and 2B above. For each additional building, either a minimum plan review fee of $50.00/hr for in-house review or the actual cost plus an administrative'fee in the amount of thirty-five percent (35%) for contract review. ADOPTED THIS DAY OF , 2002. TOWN COUNCIL TOWN OF AVON, COLORADO Judy Yoder, Mayor ATTEST: Town Clerk LACouncil\Resolutions\2002\Res 02-10 Revised building fees(Rev).doc