Loading...
TC Res. No. 1990-05RESOLUTION NO. 90-5 SERIES OF 1990 A RESOLUTION STATING THE COMMITMENT OF MATCHING LOCAL FUNDS FOR CONSTRUCTION OF SEPARATED RAILROAD GRADE CROSSING ON AVON ROAD WHEREAS, the Town Council has determined the current on- grade Avon Road/railroad crossing creates severe traffic congestion and is a major safety hazard to area residents and guests; and WHEREAS, preliminary engineering studies and cost estimates for construction of the separated grade crossing have been completed; and WHEREAS, the total estimated cost for construction of a separated grade crossing is $7,000,000.00; and WHEREAS, the Denver and Rio Grande Western Railroad, Beaver Creek Metropolitan District and Eagle County have also determined the current on-grade crossing creates severe traffic congestion and is a major safety hazard to area residents and guests. NOW, THEREFORE, BE IT RESOLVED, that the following local funds are hereby committed for the construction of a separated grade crossing: Town of Avon $1,460,000.00 (includes anticipated $300,000.00 grant from the Colorado Division of Local Affairs). Denver & Rio Grande Western Railroad $1,250,000.00 Beaver Creek Metropolitan District $ 400,000.00 Eagle County (in-kind services) $ 390,000.00 Total $3,500,000.00 0 BE IF FURTHER RESOLVED, that the Town of Avon hereby requests that the Colorado Department of Highways consider this commitment of local funds and provide the additional funding of $3,500,000.00 to complete construction of this separated grade crossing during 1991. Dated this 13th day of March, 1990. TOWN OF AVON, COLORADO ca OF if, 9 a E A L- Allan R. Nottingh , Mayor A atricia J(./Doyl'4r', To,G3n C -2-