07-21-2005 ELAM CONSTRUCTION INC AVON ROAD PARKING LOT - 2005 STREET IMPROVEMENTS CONTRACT CHANGE ORDER 008-)*U~wuX Memo To: Honorable Mayor and Town Council Thru: Larry Brooks, Town Manager From: Norman Wood, Town Engineer Jeffrey Schneider, Engineer II Date: July 21, 2005 Re: Avon Road Parking Lot - 2005 Street Improvements Contract Change Order 008 Summary: During construction activities at the Avon Road Parking Lot, Located on Tracts E and F, Block 2, Benchmark at Beaver Creek, numerous issues arose causing redesign and rerouting of the storm sewer portion of the project. The major complication with storm sewer installation is based on the original design utilizing a 24" diameter storm sewer line running beneath the sidewalk adjacent to Avon Road. Since the retaining wall footers from the railroad separated grade crossing were installed differently than indicated in the project files on which the design was based, the 24" line will not fit down the sidewalk, and the storm sewer line must enter the roadway. Discussion: Change Order 008 includes the addition of bid items related to the rerouting of the storm sewer onto Avon Road. These line items include, for example, sawcutting, removing, and replacing asphalt in the roadway, curb and gutter removal and replacement, and additional manholes and traffic control. Change order 008 is attached as Item 1. It should be noted that efforts will be made to avoid removal and replacement of curb and gutter during storm sewer installation in Avon Road, but with the presence of a gas line running parallel to the proposed 36" HDPE storm sewer pipe, the need may arise to remove the curb and gutter. In addition, all efforts were made by staff and the design finn to avoid cutting and excavating the newly paved roadway. Placing the 36" storm sewer pipe is the most implementable solution as determined by staff and the project engineers. Since the design changes have resulted in minor construction delays, and the new storm sewer results in much slower production while excavating and installing storm sewer pipe in Avon CADocuments And Settings\Nwood\Local Senings\remporary Intemet Files\01-K23\Change Order 008 Memo.Doc Road, Elam Construction has requested that the contract time be changed to end on September 3, 2005 instead of August 5, 2005. In all likelihood, the project will be complete and operational prior to September 3, with the exception of minor items. Financial Implications: Change Order 008 as presented increases Phase I of the Avon Road Parking Lot project from $139,100 to $204,898.50, resulting in a net increase of 565,798.50 in the construction contract with Elam Construction, Inc. The total contract value of the 2005 Street Improvement Contract, the contract under which the parking lot construction is fiinded, will change from 51,062,503.70 (pending approval of Change Order 007) to $1,128,302.20. Recommendation: Staff recommends approval of Change Order 008 to the 2005 Street Improvements contract with Elam Construction, authorizing the addition of 565,798.50 to the contract with Elam Construction, Inc. for construction resulting from the modified design of the Avon Road Parking Lot storm sewer. Proposed Motion: I move to approve Change Order 008, increasing the construction contract with Elam Construction, Inc. by $65,798.50 to the contract with Elam Construction, Inc. for construction resulting from the modified design of the Avon Road Parking Lot storm sewer. Town Manager Comments: dA,-Y Attachments: Item 1 Change Order 008 • Page 2 11^ i CHANGE ORDER Order No.: 008 Date: Agreement Date: April 15, 2005 NAME OF PROJECT: Town of Avon 2005 Street Improvements OWNER: Town of Avon CONTRACTOR: Elam Construction, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: In Phase I of the bid sheet for the Avon Road Parking Lot, Adjust Item 1.2, Surveying and Staking from 1 to 1.2 L.S. ($7,500.00 to $9,000.00) based on several design changes. Add Item 2.4, sawcut Avon Road asphalt, 185 LF at $8.00/LF. Add Item 2.5, Curb and Gutter Removal, 160 LF at $12.00/LF. Add Item 3.3, Asphalt removal and excavation in roadway, 2,000 SF at $4.00/SF. Add Item 3.4, Class 6 road base under roadway, 140 TN at $24.00/TN. Add Item 3.5, Asphalt replacement on roadway, 100 TN at $65.00/TN. Add Item 3.6, Curb and gutter replacement, 160 LF at $25.00/LF. Add Item 3.7, Reset pavers along sidewalk, 80 SF at $30.00/SF. Remove Item 4.3, Custom Manhole - 5 ft. dia. - Flat top and v-grate, 1 EACH at $5,000.00. Remove Item 4.4, Custom Manhole - 4 ft. dia. - Flat top, 1 EACH at $3,000. Add Item 4.4a, 5 ft. dia. Additional Manhole (Standard, 11.81' deep), 1 EACH at $5,500.00. Add Item 4.4b, 5 ft. dia. Additional Manhole (Standard, 5.2' deep), I EACH at 54,500.00. Add Item 4.4c, 6 ft. dia. Manhole (cast in place - tie into existing 42" storm sewer), 1 EACH at $12,500.00. Adjust Item 4.5b, 15-inch HDPE storm sewer, from 57 LF to 50 LF, at $110.00/LF. Remove item 4.5c, 24-inch HDPE storm sewer, 132 LF at $I 95.00/1-F. Adjust Item 4.5d, 36-inch HDPE storm sewer (onsite) from 324 LF to 349 LF, at $110.00/LF. Add Item 4.5e, 36-inch HDPE storm sewer (Avon Rd.), 130 LF at $245/LF. Add item 4.5f, 90 deg. elbow (I5-inch dia.), 1 EACH at $1,100.00. Add item 5.2, Additional traffic control for Avon Rd., 1 LS at $13,000.00. Exhibit A is an attached spreadsheet with cost breakdown. Justification: Significant field issues not apparent during the design phase of the project has led to the need to re-route the storm sewer for the Avon Road Parking Lot from the previous location of running down the sidewalk to excavating and placing the storm sewer in Avon Road. This change resulted in the above changes to the storm sewer construction bid. Change to CONTRACT PRICE: $ 65,798.50 Original CONTRACT PRICE: $ 1,068,560.70 Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $ 1,062,503.70 The CONTRACT PRICE due to this CHANGE ORDER will be increased by $ 65,798.50 The new CONTRACT PRICE including this CHANGE ORDER will be $ 1,128,302.20 Change to CONTRACT TIME: Construction period extended from August 5, 2005 to CO-1 1*15 September 3, 2005. APPROVALS REQUIRED: Approved by Engineer: Accepted by Contractor: Accepted and Approved by Owner: Federal Agency Approval (where applicable): CO-2 W CHANGE ORDER 008 EXHIBIT A PARKING LOT STORM DRAINAGE L 1 AVON ROAD RIGHT-OF-WAY TOWN OF AVON, COLORADO PHASE I - STORM SEWER QUANTITY C.0.008 UNIT UNIT Bid Revised Cost QUANTITY PRICE COST COST Difference 1.0 GENERAL 1 1 L.S. $7 500.00 $7,500.00 $7,500.00 _ $0.00 1.1 Mobilization 1,2 Surveying and Staking 1 1.2 L.S. , $7,500.00 $7,500.00 $9,000.00 $1,500.00 iliti l U 1 1 L.S. $5,500.00 $5,500.00 $5,500.00 $0.00 es 1.3 Potho e t 2.0 DEMOLITION 1 Remove Existing Riprap 2 1 1 L.S. $5,000.00 $5,000.00 $5,000.00 $0.00 . 2 Remove Sidewalk for Stormwater Pipe 2 1,138 1,138 S.F. $5.50 $6,259.00 $6,259.00 $0.00 . 3 Remove Existing 24" End Section 2 1 1 L.S. $550.00 $550.00 $550.00 $0.00 . 4 Sawcut Avon Road asphalt 2 0 185 L.F. $8.00 $0.00 $1,480.00 $1,480.00 . l R d G tt 0 160 L.F. $12.00 $0.00 $1,920.00 _$1,920.00 emova u er 2.5 Curb an 3.0 ROADWAY 1 4- Inches - Class 6 Road Base Under Sidewalk 3 1,138 1,138 S.F. $1.00 $1,138.00 $1,138.00 $0.00 . 2 Concrete Sidewalk 3 1,138 1,138 S.F. $8.50 $9,67 .00 $9,673.00 $0.00 . 3 Asphalt removal and excavation in roadway 3 0 2,000 SF $4.00 $0.00 $8,000.00 $8,000.00 . 4 Class 6 road base under roadway 3 0 140 TN $24.00 $0.00 $3,360.00 $3,360.00 . 3.5 Asphalt replacement on roadway 0 100 TN $65.00 $0.00 $6,500.00 $6,500.00 6 Curb and Gutter Replacement 3 0 160 L.F. $2500 $0.00 $4,000.00 $4,000.00 . lk id l 0 80 SF $30.00 $0.00 $2,400.00 $2,400.00 ewa ong s 3.7 Reset pavers a 4.0 UTILITIES - STORM SEWER 1 1 EACH 750.00 $3 $3 750.00 $3,750.00 _ $0.00 4.1 Standard Manhole -5 Ft. Dia. 2 Custom Manhole - 5 Ft. Dia. - Flat Top & V-Grate 4 1 1 EACH , $4,500.00 , $4,500.00 $4,500.00 $0.00 . 3 Custom Manhole - 5 FL Dia. - Flat Top & Overflow 4 1 0 EACH $5,000.00 $5,000.00 $0.00 ($5,000.00)_ . 4 Custom Manhole - 4 FL Dia. - Flat Top 4 1 0 EACH $3,000.00 $3,000.00 $0.00 ($3,000.00) . Dia Additional Manhole (Standard)(11.81' deep) 0 4a 5 Ft 4 1 EACH $5,500.00 $0.00 $5,500.00 $5,500.00 . . Dia Additional Manhole (Standard)(5.2' deep) 4b 5 Ft 4 0 1 EACH $4,500.00 $0.00 $4,500.00 $4,500.00 . . 42" RCP) to existin ti i h l Di M 0 1 EACH $12,500.00 $0.00 $12,500.00 $12,500.00 g e- n o e ( a an 4.4c 6 Ft. 4.5 HDPE Storm Sewer 3 3 L F $110.00 $330.00 $330.00 $0.00 a. 12- inch 57 50 . . L F. $110.00 $6,270.00 $5,522.00 ($748.00) b. 15 - inch c 24 -inch 132 0 . L.F. $195.00 $25,740.00 $0.00 ($25,740.00) . d. 36 - inch (onsite) 324 349 L.F. $110.00 $35,640,00 $38,390.00 $2,750.00 36 - inch (Avon Rd.) e 0 130 L.F. $245.00 $0.00 $31,776.50 $31,776.50 . f. 90 deg. Elbow (15-inch dia.) 0 1 EACH $1,100.00 $0.00 $1,100.00 $1,100.00 4.6 Type 13 Inlet & V-Grate 1 1 EACH $4,000.00 $4,000.00 $4,000.00 $0.00 ti C 1 1 L.S. $550.00 $550.00 $550.00 $0.00 on onnec 4.7 Drop Box 5.0 TRAFFIC CONTROL 1 1 S L 600.00 $5 $5,600.00 $5,600.00 $0.00 5.1 Equipment and Personnel Control for Avon Rd ff l T dditi 0 1 . . L.S. , $13,000.00 $0.00 $13,000.00 $13,000.00 . ic ona ra 5.2 A 6.0 EROSION CONTROL 450 450 F L $3.00 $1,350.00 $1,350.00 $020 6.1 Silt Fence 62 10 ' Long, 12-Inch Dia. Sediment Control Logs 5 5 . . EACH $50.00 $250.00 $250.00 $0.00 PHASE I - TOTAL $139,100.00 $204,898.50 Change Order 008 Amount $65,798.50 2005 AVON STREET IMP. 7/21!2005 C.O. 8 breakdow-Is