Loading...
PZC Res. No. 1999-18J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc TOWN OF AVON PLANNING & ZONING COMMISSION RESOLUTION NO. 99-18 SERIES OF 1999 A RESOLUTION RECOMMENDING TO THE TOWN COUNCIL OF THE TOWN OF AVON APPROVAL OF A PLANNED UNIT DEVELOPMENT PLAN AND AMENDING THE DEVELOPMENT STANDARDS ESTABLISHED BY ORDINANCE 98-21, LOT C, AVON CENTER AT BEAVER CREEK SUBDIVISION, TOWN OF AVON, EAGLE COUNTY, COLORADO HEREAS, Vail Associates Investments Inc., owner of the Lot C, has applied for applied for approval of a Planned Unit Development Plan (PUD) and Amended Amended PUD Development Standards, as stipulated in Title 17 of the Avon Municipal Code; and HEREAS, a public hearing has been held by the Planning & Zoning Commission Commission of the Town of Avon, pursuant to notices required by law, at which which time the applicant and the public were given an opportunity to express their opinions and present certain information and reports regarding the proposed PUD Zoning and Development Plan application; and HEREAS, the Planning & Zoning Commission has reviewed and evaluated the evaluated the Development Plan according to the criteria Section 17.20.110, 17.20.110, subsections H and I, of the Avon Municipal Code; and HEREAS, upon satisfaction of the Planned Development Plan the Conditions Conditions herein including execution of an acceptable Development Agreement W W W W J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc Agreement by the Town Council of the Town of Avon, the Planning & Zoning Commission finds that: 1. The density, land uses and overall pattern of development conform to the Avon Comprehensive Plan goals and objectives. 2. The PUD Development Plan and Development Standards conform to the overall design theme of the town, the Subarea design recommendations and design guidelines; 3. The PUD Development Plan and Development Standards are compatible with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and orientation; 4. The PUD Development Plan and Development Standards propose a mix of uses, activity, and density which provide a compatible, efficient, and workable relationship with surrounding uses and activity; 5. The PUD Development Plan will identify and propose any necessary mitigation and/or avoidance of natural and/or geologic hazards that affect the property; 6. The development as represented by the PUD Development Plan and Development Standards appear to be designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community; 7. The project will incorporate a circulation system designed for both vehicles and pedestrians addressing on and off-site traffic circulation that is compatible with the town transportation plan and proposed downtown plan; 8. The PUD Development Plan and development standards propose functional and aesthetic landscaping and open space, and the PUD Development Plan will optimize and preserve natural features, recreation, views and function; 9. Phasing plans maintain a workable, functional and efficient relationship throughout the development of the PUD. The phasing plans clearly demonstrate that each phase can be workable, functional and efficient without relying upon completion of J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc future project phases based on the execution of an acceptable development agreement and ordinance conditions; 10. There are, or will be as needed, adequate public services including sewer, water, schools, transportation systems, roads, parks, and police and fire protection; OW, THEREFORE, BE IT RESOLVED, that the Planning & Zoning Commission hereby recommends to the Town Council of the Town of Avon, Colorado to approve the PUD Development Plan and amended development standards as depicted in Exhibit A, entitled Lot C Avon, Colorado PUD Development Plan dated December 14, 1999 as follows: a. Reducing the West Beaver Creek building Setback from 20 feet to 10 feet, reducing Benchmark Road building setback from 10 feet to 5 five feet, the establishment of an 8 foot underground parking setback. b. Allowance of non-habitable encroachments into the 10-foot setbacks. c. An exemption for 20 employee housing units from the maximum allowed density of 210 dwelling units, subject to the following conditions: I. General requirements and limitations: 1. The phasing plan as proposed does not comply with the Comprehensive Plan. The hotel and retail phase should be constructed with Phase 1A. 2. The two-bedroom time-share units constitute one dwelling unit and may not be further subdivided, sold, transferred, conveyed, leased, or sub- leased separately. 3. A complete landscaping plan and construction laydown plan will be required prior to issuance of a building permit for each phase of the project. 4. A common area with a fireplace is required on each floor of the employee Housing Project. 5. The parking structure will be designed for future access to the Sunroad ramp and Lot B. N J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc 6. All parking aisles are required to comply with the 24’0” width. 7. All of the encroachments proposed in the setbacks are non-habitable. The non-habitable encroachments are limited to balconies, porte-cochere, roof overhangs, awnings, and lower level roof structures. II. Streets and Streetscape: 8. All perimeter sidewalks throughout the project shall be a minimum of 8’0” width. 9. No columns or structural supports may either impede the 8’0” wide sidewalk clearance requirements or encroach into driveways or entrances. 10. All curbs along street and entrances must include 2’0” gutter pans in addition to the driving lanes. 11. All streetscape improvements will include furniture, fixtures, and lights per Town standards. 12. All street and streetscape improvements along West Beaver Creek Boulevard and Benchmark Road must be completed at the time of issuance of the first TCO for the project. 13. The final design and specifications for the bus stop will be required at design review. 14. All surface entries and loading entrances shall have a minimum vertical clearance of 13’6’. 15. All parking entrances from public roads shall have a 28’0” access width, which will include a 2’0” gutter pan on each side. 16. The fountain/seating area adjacent to the Town Center Mall must be complete at the time of issuance of the first TCO for the project. 17. The grading plan adjacent to the Town Center Mall is not approved and must be resolved at design review contemporaneous with the streetscape improvement plan with the first phase of development. J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc III. Required Agreements: 18. An Access Easement Agreement by Lot C for the benefit of Lot B executed prior to issuance of a building permit and approved by the Town of Avon. The Agreement must contain the following terms and conditions: i. A 39’0 access easement at Sunroad i.e, 19’5” on each property. ii. Reciprocity for access and storage during construction. iii. This Agreement will also set forth authorization for construction and management of the storm drainage facilities from Lot B. 19. An Agreement will be required prior to issuance of a building permit for the management, design and construction of the storm water detention and pollution control facilities proposed on Town property known as “Tract G, Benchmark at Beaver Creek Subdivision”. The PUD Development Plan in not an approval for the proposed use of Tract G for storm water and pollution control facilities. IV. Amendments to the PUD Development Plan: 20. The PUD Development Plan may be modified by reducing the number of time-share units to accommodate the required parking, additional retail space, employee housing, or hotel units without requiring a PUD Amendment. V. Final Design Review: 21. The accessibility and function of the trash and delivery areas is not approved. All aspects of the trash and delivery areas will be resolved and clarified at Design Review. 22. The architecture, construction details, final grading and drainage plans depicted in the PUD Development Plan are conceptual only. A separate process is required for refining and resolving the details for the project. J:\Planning & Zoning Commission\Resolutions\1999\Res 99-18 Lot C ACBC amend PUD.doc ADOPTED THIS 21h DAY OF DECEMBER, 1999 Signed: _____________________________________ Date: ___________________ Anne Fehlner, Chair Attest: _____________________________________ Date: ___________________ Greg Macik, Secretary