Loading...
PZC Res. No. 1999-07J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc TOWN OF AVON PLANNING & ZONING COMMISSION RESOLUTION NO. 99-7 SERIES OF 1999 A RESOLUTION RECOMMENDING TO THE TOWN COUNCIL OF THE TOWN OF AVON APPROVAL OF THE SUITES @ AVON CENTER PUD DEVELOPMENT PLAN ON LOT B, AVON CENTER AT BEAVER CREEK SUBDIVISION, TOWN OF AVON, EAGLE COUNTY, COLORADO HEREAS, Shapiro Development Company has applied for approval of the Suites @ Avon Center PUD Development Plan for Lot B, Avon Center at Beaver Creek Subdivision. HEREAS, after notices required by law, a public hearing was held by the Planning & Zoning Commission of the Town of Avon, at which time the applicant and the public were given an opportunity to express their opinions and present certain information and reports regarding the proposed PUD Development Plan, and HEREAS, pursuant to Section 17.20.110.H. of the Avon Municipal Code, the Planning & Zoning Commission has considered the following design criteria: 1. Conformity with the Avon comprehensive plan goals and objectives; 2. Conformity and compliance with the overall design theme of the Town, the sub-area design recommendations and design guidelines adopted by the Town; 3. Design compatibility with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and orientation; 4. Uses, activity, and density which provide a compatible, efficient, and workable relationship with surrounding uses and activity; 5. Identification and mitigation or avoidance of natural and/or geologic hazards that affect the property upon which the PUD is proposed; 6. Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community; W W W J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc 7. A circulation system designed for both vehicles and pedestrians addressing on and off-site traffic circulation that is compatible with the Town transportation plan; 8. Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function; 8. Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the PUD. The phasing plan shall clearly demonstrate that each phase can be workable, functional and efficient without relying upon completion of future project phases; 9. Adequacy of public services such as sewer, water, schools, transportation systems, roads, parks, and police and fire protection; 10. That the existing streets and roads are suitable and adequate to carry anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD. OW, THEREFORE, BE IT RESOLVED, THAT the Planning & Zoning Commission hereby recommends to the Town Council of the Town of Avon, Eagle County, Colorado to approve the Suites @ Avon Center PUD Development Plan on Lot B, Avon Center at Beaver Creek Subdivision, with the following conditions: 1. The applicant will enter into a Master Deed Restriction Agreement with the Town of Avon for six on-site deed restricted affordable employee housing units. 2. The resubdivision vacating the existing property line between Lots A and B, Avon Center at Beaver Creek Subdivision and reestablishing a new property line between these lots in accordance with this development plan be approved by the Town of Avon. 3. The pedestrian connection walkway between the Pedestrian Mall and West Beaver Creek Boulevard will approved at Final Design, and be established as an easement. 4. A traffic-demand management program will be established by the owner to encourage commuting employees to use transit and other alternative transportation modes. 5. A parking management plan will be established by the owner to limit to short term use the surface parking area while encouraging use of the structured parking area. 6. The owner will establish a snow removal program. 7. The owner will participate, either directly or through the Metropolitan District, in the Avon Pedestrian Mall master planning, construction, and maintenance. 8. A solar study will be provided for Final Design Review to examine shadow effects upon public spaces, and to help determine appropriate locations for streetscape furniture, landscaping and public spaces. 9. Appropriate language will be added to the Suites @ Avon Center Development Guide stating that, “Development of the Suites @ Avon Center PUD shall conform to the standards outlined above. Elements not specifically addressed in this Guide shall be governed by Title 17 of the Avon Municipal Code.” N J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc ADOPTED THIS 2nd DAY OF FEBRUARY, 1999 Signed: _____________________________________ Date: ___________________ Chris Evans, Chair Attest: _____________________________________ Date: ___________________ Sue Railton, Secretary