During the Planning Commission and Town Council work sessions on the Commercial Zone
Districts and Bonus Density guidelines, staff requested guidance on three issues: 1) the
appropriate baseline Floor Area Ratio (FAR) to be assigned to each of the commercial zone
districts; 2) whether the Bonus Development formulas and related public benefits represented
the Town's current policies and long-range goals; and 3) how to address parking requirements
in the Town Core.
This memo addresses the FAR requirements and development bonus formulas.
Floor Area Ratio
As proposed, the commercial zone district development standards include a Floor Area Ratio
(FAR) requirement along with residential density, building height, setbacks and lot coverage
requirements (Table 1).
FAR is a measurement of the bulk of a structure on a site. It is calculated by adding the area of
each floor of the structure and dividing that number by the total area of the lot. While FAR sets
the basic parameters for the building, it also allows the developer to make choices about the
distribution of the building mass on the site. The Avon Comprehensive Plan recommends using
FAR as a way to minimize the standardization of building heights and break up building bulk.
The baseline FAR for commercial zone districts should permit development density consistent
with permitted density under the existing zoning ordinance. According to the Design Test
results (Table 2), the lot -by -lot FAR in the Town Core ranges between a 1:1 FAR on the Chapel
Sq. site to a 2.7:1 FAR on the Sheraton site (at build out). The Avon 21 PUD proposed a 3.6:1
FAR, which was rejected as too large for the site.
Using these parameters, one option is to set the baseline FAR at 2:1 in the Town Center Zone
District. Under this scenario, three of the five Design Test projects could be built at the same
density as provided under the PUD with development bonuses for additional building height and
dwelling units. The Sheraton PUD and Avon 21 PUD would require bonus density as well as
additional building height and dwelling units.
Under 2:1 FAR scenario, the Town would receive community benefits in exchange for increased
entitlements for housing, building height and density without creating a disincentive for
development that meets or exceeds the typical FAR in the Town Core.
TABLE 2
DESIGN TEST RESULTS
Dwelling Units:
Height: 27 ft
The Seasons
1.25:1
79'
103
Dwelling Units: 6
Avon Center
2:1
97'
55
Dwelling Units: 2
Height: 17 ft
Avon 21
3.6:1
110'
237
Dwelling Units: 73
Height: 30 ft
FAR: 389,021 sf
The Sheraton
2.7:1
100'
239
Dwelling Units: 142
Height: 20 ft
FAR: 29,211 sf
Town Council and PZC members should consider the range of FARs in Town Core and provide
direction on establishing a development density that best represents the current conditions with
increased entitlements for housing, density and building height.
Development Bonus for Public Capital Improvements
§7.20.100 Development Bonus Requirements of the Avon Development Code permits
payment -in -lieu of dedications or direct public capital improvements for nearly all potential
Development Bonuses. The charts below illustrate the potential Development Bonus which may
result from a $1,000,000 public capital improvement or payment -in -lieu. NOTE that a payment -
in -lieu would be required to be placed into a separate capital improvement fund for the
designated public benefit.
Table 3 uses an average estimated cost
which is based on the building plans for
project. There are many more variables
cost. The following charts are intended
Multiplier."
per square foot for new construction of $234/sq.ft.
the most recent large scale mixed-use commercial
associated with property development which affect
to illustrate the potential effect of the "Percentage
The Percentage Multiplier adjusts the formula so that the resulting Development Bonus provides
an appropriate incentive for the public capital improvement. The Development Code currently
proposes a Percentage Multiplier of 85%. The Development Bonus resulting from a Percentage
Multiplier of 50% and 25% is also provided to illustrate the effect of adjusting the Percentage
Multiplier. A lower Percentage Multiplier provides a greater incentive for a Development
Bonus.
Table 3 also illustrates the cost to the developer who seeks a Development Bonus for a public
capital improvement. In addition to incurring the cost of the public capital improvement, the
developer must also incur the cost of additional construction to realize the value of the
Development Bonus (but does not incur additional land costs). The total cost per square foot for
additional development should be considered against the potential market value for real estate.
If the market value of real estate is sufficiently higher than the total cost for additional
development, then a developer should have the incentive to seek a Development Bonus
through a Public Capital Improvement.
Policy direction is requested regarding the appropriate Percentage Multiplier.
TABLE 3
DEVELOPMENT BONUS CALCULATION
Development Bonus language for
Public Capital Improvements:
Cost of [public improvement] /
[the average estimated cost per sq ft of finished construction for
the property 859,'o] =
additional square footage
Hypothetical Example
Cost of Public Improvement
$1,000,000.00
$1,000,000.00
$1,000,000.00
Est. Cost / Sq.Ft. of Finished
Construction
$234.00
$234.00
$234.00
Percentage Multiplier
85%
50%
25%
Estimated Cost x Percentage Multiplier
$198.90
$117.00
$58.50
Additional Development Bonus Sq Ft
5,028 sq.ft.
8,547 sq.ft.
17,094 sq.ft.
DEVELOPER'S TOTAL COST FOR DEVELOPMENT BONUS
Cost of Public Improvement
$1,000,000.00
$1,000,000.00
$1,000,000.00
Cost to Construct Additional Sq Ft
$1,176,470.59
$2,000,000.00
$4,000,000.00
Total Cost
$2,176,470.59
$3,000,000.00
$5,000,000.00
Total Cost/Sq Ft for Additional
Development
$432.90
$351.00
$292.50
TABLE 1: SUMMARY OF REVISIONS TO COMMERCIAL ZONE DISTRICTS
NEIGHBORHOOD COMMERCIAL (NC)
Purpose: To provide sites for commercial uses and services for the principal benefit of the residents of the community.
Permitted Uses: Commercial Uses and Accessory Apartments.
DISTRICT STANDARDS
CURRENT CODE
NEW CODE
Minimum Lot Size
7,500 sf
3,000 sf
Building Height
35 ft
35 ft: duplex
38 ft: TH, MF, commercial
Front: 25ft
Front: 1 Oft residential/0 ft commercial
Building Setbacks
Side: 7.5 ft
Side: 7.5 ft/ 25ft corner lots
Rear: 10 ft
Rear: 10 ft
Max Site Coverage
50%
60%
Max Density
7.5 du/acre
7.5 du/acre
1:1 FAR
MIXED USE COMMERCIAL (MU)
Purpose: To group and connect places used for work, shopping, education, recreation with residential uses.
Permitted Uses: Commercial, Office, Townhomes, Condominiums, Apartments
DISTRICT STANDARDS
CURRENT CODE
NEW CODE
Minimum Lot Size
43,560 sf
3.000 sf
Building Height
60 ft
35 ft: SF and duplex
60 ft: TH, MF, commercial
Front: 25ft
Front: 10 ft
Building Setbacks
Side: 7.5 ft
Side: 7.5 SF, duplex/0 ft TH, MF, commercial
Rear: 10 ft
Rear: 10 ft residential/5 ft commercial
Max Site Coverage
50%
80%: SF and duplex
70%: TH, MF, commercial
Max Density
20 du/acre
20 du/acre
60 lodge units/acre
1.5:1 FAR
TOWN CENTER (TC)
Purpose: To provide sites for a variety of uses including lodging, commercial and office in a predominately pedestrian environment.
Design standards distinguish is area from others in town.
Permitted Uses: Lodging, Commercial, Office, Townhomes, Condominiums, Apartments
DISTRICT STANDARDS
CURRENT CODE
NEW CODE
Minimum Lot Size
30,000 sf
3,000 sf: residential
Building Height
80 ft
80 ft
Front: 25 ft
Front: 1 Oft residential/0 ft commercial
Building Setback
Side: 7.5 ft
Side: 7.5 ft/25 ft corner lots
Rear: 10 ft
Rear: 10 ft
Max Coverage
50%
80%
Max Density
30 du/acre
30 du/acre
90 lodge units/acre
2:1 to 3:1 FAR"" to be determined
LIGHT INDUSTRIAL & COMMERCIAL EMPLOYMENT (IC)
Purpose: To provides sites for light industrial and mfg uses, wholesale outlets, warehousing and sales offices
Permitted Uses: Light industrial, Commercial, Warehousing, Accessory Apts.
DISTRICT STANDARDS
CURRENT CODE
NEW CODE
Minimum Lot Size
21,780 sf
21,780 sf
Building Height
48 ft
48 ft
Front: 25 ft
Front: 25 ft
Building Setbacks
Side: 7.5 ft
Side: 7.5 ft/ 25 ft corner lots
Rear: 1 Oft
Rear: 10 ft
Max Site Coverage
50%
50%
Max Density
4 accessory unit/property by special review use
4 accessory units/property by special review use
MEMORANDUM
To Planning and Zoning Commission and Town Council
Fr Sally Vecchio, Ass't Town Mgr, Community Development
Date April 15, 2010
RE Commercial Zoning, Bonus Density, PUDs and Parking
Response to Work Session Comments
The PZC and Town Council held work sessions on the proposed commercial zone districts and
bonus density regulations in the new Land Development Code on April 6, 2010 and April 13,
2010 to provide an opportunity for members of both bodies and the community to review the
proposed changes and discuss policy issues related to the revisions.
Staff has organized the comments received during those work sessions into topic areas and
provided written responses. Comments related to the commercial design standards are included
at the end of this memorandum and will be addressed during the next series of work sessions
on the Development and Design Standards.
Residential Density
1. Is residential density calculated by SFEs in the same manner as we do today?
RESPONSE: Yes, SFEs will be calculated using the same formula provided in Title 13 (Public
Services) of the Municipal Code (Table 1). Each lot in Town has been allocated Single Family
Equivalents (SFEs) based on its existing zoning. If development exceeds the SFE allocation,
the developer must provide sufficient water rights to accommodate the additional SFEs needed.
SFE calculations are completed during zoning approval and re -verified at building permit
issuance. Under the proposed Development Bonus Requirements, a developer will calculate the
SFEs required for additional residential density and provide evidence of sufficient water rights
for the higher density before the Town will consider the request for additional density.
TABLE 1
SINGLE FAMILY EQUIVALENT CALCULATIONS
1. Dwelling Units less than 3,000 square ft= 1SFE
2. Dwelling Units over 3,000 sf: (actual sf) x 1 SFE = SFE/Unit
(3,000 sf)
3. Efficiency room (studio with kitchen) = .50 SFE
4. Hotel room (studio without kitchen) = 35 SFE
2. Was the density for Sheraton derived from number of keys or from number of units?
RESPONSE: Residential density for the Sheraton PUD was calculated by the number of
dwelling units not keys. For example, a timeshare unit with 1 efficiency lock -off was calculated
as 1.33 dwelling units not 2 units.
1IPage
3. Increase potential development bonus for density (i.e. residential units per acre). Water &
parking are a priority and the final dwelling unit number is not significant. For Sheraton and
Avon 21, the number of dwelling units was not the issue but those developments should be
parked.
RESPONSE: The number of allowed dwelling units/acre is related to allocated water rights for
commercial properties (30 du/acre). Given the significant range in the size of dwelling units in
the commercial zone districts, the number of dwelling units does not necessarily affect the
massing or density of the building (measured in FAR). Staff however does recommend that
some residential density cap be maintained to ensure that each development include a mix of
uses. A residential density bonus of 50% to 70% above the 30du/acre would result in a
potential density of 45 — 51 dwelling units per acre.
COMMERCIAL DEVELOPMENT STANDARDS
4. Small residential redevelopment opportunities should be looked at.
RESPONSE: The Mixed Commercial Zone District and the Neighborhood Commercial District
both permit single use development (such as an apartment or townhouse project), if it can be
demonstrated that adjacent properties will provide a complementary diversity of uses. The
Town Center District requires a mix of uses within each development in order to achieve the
Comprehensive Plan goal to create development patterns that increase opportunities for more
pedestrian trips and connectivity within the commercial core.
5. How would Avon 21 be able to provide residential on the ground floor? The requirement to
front a public street doesn't make sense for Avon 21 on Avon Road given the grade differential?
RESPONSE: Commercial should be required on ground floor along designated streets to
implement Avon Comprehensive Plan. Market conditions should prevail on remainder of
building.
6. What is deemed "retail" for ground floor?
RESPONSE: Retail uses are a subset of commercial uses. Commercial uses may include
offices, hotel lobbies, restaurants, and personal services uses such as a dry cleaner. Retail use
means a business primarily characterized by the sale of goods or merchandise to the local
public and tourists for personal, household or business consumption, and rendering of services
incidental to the sale of such goods.
7. Mixed-use and more commercial on bottom floor needs to be more integrated. More density
should equal more commercial space to support the Town (i.e. Sheraton).
RESPONSE: Commercial viability goes hand in hand with traffic, which relates to critical mass
of residences and accommodations. Implementing the Comprehensive Plan primarily means
establishing ground floor commercial on the designated streets. Market conditions should
prevail on the remainder of building.
8. Should a minimum and maximum commercial ratio be implemented to assure proper mix?
RESPONSE: Commercial should be required on ground floor along designated streets to
implement Comprehensive Plan. Market conditions should prevail on remainder of building. If
the market actually produced exclusively commercial, office, retail, and hotel projects in the
Town Core, Avon would realize extraordinary excess revenues. This scenario is extremely
unlikely to occur.
2 1 P a g e
9. Look into Alternative Equivalent Compliance to ensure it is available for allowing the
flexibility of permitting non-commercial uses on the ground floor where appropriate.
RESPONSE: "Mixed-use zoning" allows maximum flexibility except that Commercial uses
should be required on ground floor along designated streets to implement the Comprehensive
Plan. The scope of alternative equivalent compliance will be an important topic for the next
round of work sessions related to development and design standards.
PARKING
10. The Town needs to focus on a publicly financed parking structure.
RESPONSE: The proposed Code includes the ability to establish parking districts and public
parking facilities in the Town Core area. The Town is actively discussing a potential ballot
question this November which would generate financing to construct public parking garages.
The current Town comprehensive plan, and east and west town center plans envision public
parking garages. Additional planning related to public parking garages would provide valuable
information and detail; however, the code can only go as far as permitting parking districts and
permitting parking requirements to be satisfied in part by cash -in -lieu for public parking garages.
11. The Town should be stringent on parking requirements, but still provide options for
developers.
RESPONSE: A mixed-use commercial development can be granted a 15% reduction in its
parking requirements, with a parking study supporting the reduction. A pay -in -lieu program
could allow a development to provide some of its parking requirements in an off-site public
parking garage. The Town Manager will provide additional remarks on this topic at the TC/PZC
joint meeting.
BONUS DENSITY
12. LEED Certification is a problem due to the timing of getting development certified at least 1
year after construction. More prescriptive measures, such as those from the International
Green Construction Code or other building permit review items should be considered.
RESPONSE: If the policy direction is to implement the Green Code, then the development
bonus for LEED certification could be deleted. .
13. Staff need to provide more clarification on the types of public benefits that the developer
could offer in exchange for a development bonus.
RESPONSE: §7.20.100 Development Bonus Requirements allows development bonuses to be
awarded for the following public benefits: (1) Attainable Housing; (2) LEEDs Certification [may
be deleted]; (3) Public Parking or Transit Contribution [eg. Contribution towards public parking
garage in excess of parking requirements, dedication and improvement of bus stop]; (4)
Pedestrian Enhancements [eg. Public plaza, off-site pedestrian connection]; (5) Streetscape
Enhancement [eg. Main Street art]; (6) Civic Facility [eg. Any land or space which provides a
public service for the general public]; and, (7) Water Rights Dedication above the required
dedication amount.
14. How does the process ensure that the Town receives the desired public plazas as outlined
in the District Plans?
RESPONSE: If a developer is requesting additional density or dwelling units beyond what is
permitted by -right, he will have to provide the type of public benefits described in the
Development Bonus Regulations. The amount of additional density or dwelling units requested
3 1 P a g e
by the developer will determine the size of the public benefit required, such as a public plaza.
The size and location of public plazas in the Town Core will be guided District Plans.
***For additional discussion on the development bonus formulas, please see the attached
memo on FAR and Bonus Density calculations.
15. Bonus density analysis should be presented for: 1) Riverfront, 2) Red House, 3) Buck
Creek, and 4) Chateau St. Claire and several commercial sites along Nottingham Rd.
RESPONSE: Please see attached design tests.
PUDs
16. Do PUDs allow density increases?
RESPONSE: No, not as currently presented. The modified PUD is an overlay district that
would allow the developer to modify the location and configuration of development on the site.
The development standards, including density, building height and permitted uses would be
dictated by the underlying zone district. Additional density would be permitted pursuant to the
guidelines and standards established in the Development Bonus Regulations
17. What zone district replaces an existing PUD after it expires?
RESPONSE: If the approval of a planned unit development expires the Town Council or
property -owner may initiate an amendment of the Town's Official Zoning Map to eliminate the
approved PUD plan and return the land to the zoning district in which it is located. If there was
no original zone district, the Town would select an appropriate zone district based on the
recommendations from the Town's Comprehensive Plan.
GENERAL COMMENTS
18. How are we addressing phasing if PUD is not used?
RESPONSE: It depends on the project. Public improvements shall be required up front (before
construction on private improvements begins or before Certificates of Occupancy are issued).
Any project which proposes to phase public improvements or which requests public financial
incentives will then be subject to a development agreement and phasing plan. The Code as
written provides Council with the discretion to determine appropriate phasing. However, the
default is that no project is required to be phased because all projects are required to construct
all public improvements up front and no project is entitled to public financial subsidies.
19. Is there guidance to property owner and staff when rezoning?
RESPONSE: Applications for rezoning are reviewed by the Community Development staff for
appropriateness based upon availability of water, wastewater and other utility services,
compatibility with surrounding land uses and environmental factors such as steep slopes or
flood plains. The Comprehensive Plan's land use map recommends future land uses in the
Town and provides guidance for future zoning requests.
DESIGN STANDARDS
1. Site plan review should not be divorced from building design review process.
2. Standards such as being required to front a street are more of a requirement for a
metropolitan area with a grid street plan
3. Form based codes are good, but the code can't be so overly prescriptive that it precludes
great architecture.
411'�i
ADDDITION DESIGN TESTS (ATTACHEMENT A)
Chateau St. Claire
Existing Conditions
Residential High (RH)
Site Coverage:
21%
70%
FAR:
1.26:1
N/A
Dwelling Units:
49
48
Dwelling Units/Acre:
20.2
19.79
Max. Height:
74'/ 84'
60'
Parking:
120
118
Notes: Without zoning PUD, this property
would fit into the RH zone district except for height.
Lot 4 (Lodge)
Red House
Buildout Conditions
Lots 5, 6, 7
Residential Medium (RM)
Site Coverage:
21%
50%
FAR:
N/A
N/A
Dwelling Units:
15
21.6
Dwelling Units/Acre:
10.41
10.41
Max. Height:
48'
48'
Parking:
36
34
Open Space
.31 acres
.369 acres
Notes: Without PUD, no setback encroachment would be permitted. The open space on the
river would still be acquired through the standard Open Space requirements as follows: (8.2 acres
x 15 units x 3 persons per unit) / 1000 persons= 0.369 acres. Unit sizes would likely be larger if
not capped from 1, 700 — 2,300 square feet.
Notes: The Riverfront Project could have been developed under the TC Zone District Standards
with a bonus for additional density and dwelling units, with discrete portions of the upper levels of
the Lot 2 building height impacted.
Riverfront
Existing Conditions
Site Coverage:
25% of the entire 18.9 acres
Site Coverage:
50%
FAR
Sq. Ft.
Height
Lot 1 (TSE)
2.27:1
130,000
105'
Lot 2 (Westin)
2:1
365,000
135'
Lot 3 (TSW)
3.25:1
105,000
105'
Lot 4 (Lodge)
95'
Lots 5, 6, 7
TBD
TBD
90'/55'/55'
Dwelling Units:
456 units
Dwelling Units/Acre:
43.27
Notes: The Riverfront Project could have been developed under the TC Zone District Standards
with a bonus for additional density and dwelling units, with discrete portions of the upper levels of
the Lot 2 building height impacted.
Notes: This property could fit into RL, RM, and RH when calculating density, but the RM and RH
are required to meet the height. A PUD would have to be approved to allow for exemptions from
the road standards. he PUD could also be used for clustering of development and protection of
wetlands.
Buck Creek
Existing Conditions
Residential High (RH)
Site Coverage:
50%
70%
FAR:
N/A
N/A
Dwelling Units:
46
315
Dwelling Units/Acre:
2.9
20
Max. Height:
42'/ 55'
60'
Parking:
N/A
N/A
Notes: This property could fit into RL, RM, and RH when calculating density, but the RM and RH
are required to meet the height. A PUD would have to be approved to allow for exemptions from
the road standards. he PUD could also be used for clustering of development and protection of
wetlands.
Staff Report - Final Design Plan
April 20, 2010 Planning & Zoning Commission meeting
Report Date
Legal Description
Zoning
Address
Prepared By
Summary
April 16, 2010
Lot 1, Riverfront Subdivision
Planned Unit Development (PUD)
42 Riverfront Lane " f
Matt Pielsticker, Planner II
The Applicant, Aleksandr Sheykhet of OS Architecture, has submitted a revised Final Design
application for the 'Timeshare East` project, located on Lot 1 of the Riverfront Subdivision (the
Project). The siting and building design of the Project are consistent with the building
placements and forms approved with the Riverfront Planned Unit Development (PUD). The
materials, colors, and finishes are to match the Timeshare West project on Lot 3, Riverfront
PUD.
The purpose of this Final Design review is to determine the conformity of the Project with the
applicable design review considerations, and also to agree on the acceptability of the changes
made to the Project since the January 19, 2010 Work Session. Staff is recommending that the
Planning and Zoning Commission approve this Project based on compliance with the Riverfront
Design Standards and PUD zoning standards.
Process
At its August 18, 2008 meeting, the Commission reviewed a Sketch Design for the Project.
After taking feedback into consideration, a Final Design application was reviewed at the
Commission's November 18, 2008 meeting. The Planning and Zoning Commission tabled the
Final Design Application based on the negatively perceived east building elevations and the lack
of architectural variety.
Approximately one year later, the applicant resubmitted revised drawings. The Commission
reviewed the revised submittal at their December 15, 2009 meeting. The revised submittal
again met resistance; it was decided to hold a Work Session to discuss different design options
to address the concerns again raised with the east building elevations and the general
inconsistencies with the design. A Work Session was held at the January 19, 2010 Planning
and Zoning Commission meeting to review design studies provided by the applicant.
The applicant received direction at the Work Session and has now resubmitted an entire new
Final Design plan for review and approval. The specific comments received at the Work
Session were tabulated by the applicant and the course of action to either address or not
address each issue was summarized in a Memorandum to Staff — attached as Exhibit B to this
Staff Report.
At the April 20, 2010 meeting the applicant is seeking Final Design approval for the revised
submittal, dated March 19, 2010. The design meets the intent of the Riverfront Design
Standards and all applicable design review criteria. If approved by the Commission, this design
plan will be valid for two (2) years from the date of the meeting, whereby the property owner will
be able to submit a building permit application no later than April 20, 2012.
Property Description
The Property is a 1.6695 acre parcel on the east end of the Riverfront Subdivision, fronted by
Riverfront Lane. The topography of the site has been modified several times, most recently last
summer when the site was re -graded after being utilized for construction staging for the Westin
and Timeshare West projects. The topography is generally flat and sloping down towards the
river. The grade differential between Riverfront Lane near the proposed northern building
entrance down to the riverfront recreation path is approximately 12 feet.
The Westin Riverfront Hotel and Spa is located immediately to the west of the Project,
Riverfront Lane wraps the north and east sides of the Project, and the ECO Recreation path
borders the south side of the Project. The limits of disturbance encompass the entire lot, and
even extend beyond the property lines with covered walkways during construction to protect the
existing sidewalk on the north and east side of the Project.
Policy Analysis
The Riverfront PUD was reviewed and found to be in accordance with the Goals and Policies of
the Comprehensive Plan. During PUD review the applicant voluntarily applied the then draft
plan goals and policies against the proposed Riverfront PUD, and it was found to be in
conformance.
The Confluence District (District 3) is intended to facilitate an extension of the Town Center with
a "significant residential/lodging component... and direct transit connection access to Beaver
Creek Village and create a connection with the Eagle River."
Planning Principles germane to this application include:
• Design Architecture to be significant form all sides (no front or back), maximize solar
exposure, protect views, and break up building bulk.
• Parking areas, trash containers, and loading or service areas should be screened
and/or buffered from the river corridor.
• Preserve and enhance public access to the existing linear park along the riverbank.
Connections from this path to both the Town Center and !Nottingham Park must be
created in an ecologically sensitive manner as a key natural amenity.
• Create a vibrant mix of uses and creative use of recreation and open space to allow
a unique river experience.
• Develop a vibrant mix of uses consisting of bed -base development and supporting
commercial development.
• Recognize the Confluence District as the most valuable property in Town Limits and
should be developed at its most optimal level.
The Planning Principles explain the development pressure that the site experiences, and the
true value that this Project brings to the Town. Aside from providing obvious public benefits to
the Town (i.e. gondola connection to the resort, dedication of the Riverfront Park parcel), the
architecture of the Project was always envisioned to be imperative as viewed from all
orientations. How this project interacts with the Eagle River side of the development is
important, and that is why the Building Riverside is downscaled to its current size.
Planning Analysis
The Project will be highly visible from several neighboring properties, public ways, and the
Eagle River. In the context with the rest of the Riverfront Village, the massing, height, and
architectural style are appropriate. The building orientation has been slightly changed since
PUD approval to conform to the prescribed building setbacks.
The proposed building materials and colors are identical to those applied to the Timeshare West
building on Lot 3 of the Riverfront Subdivision. Some material applications have changed and
new windows have been added to break up the east elevation of Building East. The
architectural style, massing, height, orientation to street and quality of materials is consistent
with the previous submittal and is appropriate as viewed from neighboring properties. The
following is an analysis of the planning review items:
Allowed use:
A timeshare lodge use located on Lot 1 is consistent with the approved Riverfront PUD.
According to the PUD Development Plan, "Standard Commercial; Incidental Commercial;
Residential/Lodging; Lodging Support Uses; Temporary Uses and Facilities; Public Uses" are all
uses allowed by right, and "Theaters; Churches; other Temporary Facilities" are listed as
Special Review Uses.
Timeshare, vacation ownership, and fractional fee ownership uses are enumerated allowed
uses for 'Residential/Lodging' in the Development Standards; therefore, this proposal is in
conformance with the PUD.
Density:
In total, the PUD allows for up to 456 dwelling units. The Timeshare East Project contains 74
"Dwelling Units", and the two buildings collectively measure approximately 195,000 gross
square feet. This calculation includes both underground structured parking levels (P1 & P2).
The Floor Area Ratio (FAR) for all above ground building square footage of this Project is
approximately 2.27:1.
For the purpose of density calculations, a Dwelling Unit is "one (1) or more rooms, including
cooking facilities, intended or designed for occupancy by a family or guests independent of
other families or guests, or (2) An aggregate of Accommodation Units provided as follows a.
Three (3) Accommodation Units shall be counted as one (1) Dwelling Unit, b. Two (2)
Accommodation Units in association with a dwelling unit shall be counted as one dwelling
unit."
Lot Coverage and Site Desi n:
The Applicant is proposing .71 acres of lot coverage for the Project, which is consistent with the
coverage limitation approved by the PUD. The maximum building lot coverage allowed under
the Riverfront PUD is 25% of the entire 18.5 -acre site, or 4.63 acres.
While there have been some minor changes to the site design since Sketch Design and most
recently the Work Session in January, the shape and orientation of the building footprints are
nearly identical with the approved PUD Development Plan. The two buildings are now
connected with an arcade, separated by a gateway feature.
Setbacks:
There is a front ten foot (10') building setback from the Riverfront Lane Right -of -Way, and a zero
(0') side yard setback. All buildings within the Riverfront Subdivision shall be setback from the
river the more restrictive of the following: 1) seventy five feet (75') from the Mean Annual High
Water Mark, or 2) the northern property line of Tract A - the "River Park" parcel.
As submitted with the March 19, 2010 submittal, the Project encroaches into two setbacks: 1)
Setback from Tract A, and 2) Right -of -Way setback. There is a 2' roof overhang encroachment
into the Tract A setback for Building Riverside. This encroachment is permissible. According to
the PUD Development Plan, encroachments for "porches, decks, overhangs, and eaves" are
permissible subject to design review approval. This type of encroachment has been permitted
on other properties in this subdivision and the Commission determined this encroachment to be
acceptable during their last review.
The other encroachment is for two roof overhangs. One overhang is for the newly designed
entrance to the east side of Building East, and the other encroachment is for the front (north)
building entrance. Pursuant to the direction received from the Planning and Zoning Commission
at the January 19, 2010 Work Session, it was the applicant's understanding that the PUD
allowed for up 3' aerial encroachments into this 10' Right -of -Way setback.
The PUD does permit up to a 3' aerial encroachment into this setback, however, this is limited to
one portion of the Westin hotel on Lot 2. Instead of pursuing a PUD Amendment application,
the applicant has submitted revised exhibits (Exhibit C to this Staff Report) to demonstrate
revised roof plans to address bringing the building into conformance with this setback.
_Easements:
There are several easements on this Lot, including: multiple Utility Easements, Utility, Drainage
and Path Easement, temporary construction easements, and a Parking Facility Easement.
Building Hei. hc�t:.
The maximum building height permitted on Lot 1 is 105' for Building East, and 45' for Building
Riverside. This design is in compliance with the prescribed maximum height requirements. The
Building East measures approximately 9$' tall and the Building Riverside is approximately 45' 5"
as proposed.
Parking:
Based on the residential condominium unit type, a ratio of 1.5 parking spaces per residential
unit is required for this Project. Based on 74 units, the total required parking for this Project is
111 spaces. There are 134 stalls provided on the two levels of parking. As required by the
PUD, the underground parking structure on Lot 1 is connected underground to Lot 2 and will be
jointly managed.
Parking has been provided in accordance with the PUD. As outlined above, the parking
provided exceeds that required, and there will be joint management of all on-site parking for
Lots 1, 2, and 3. Loading facilities for Timeshare West and East are also provided on the
Westin Hotel property.
Landscaping:
The design character of the proposed Landscape Plan (Sheets L1 — L7) is a continuation of the
Riverfront Master Landscape Plan, containing a mix of native plant species of varying heights.
All plant material is tolerant to the local climate, consistent with neighboring approvals, and
appropriate for the project. The Landscape Plan maximizes the minimal amount of space
afforded for such.
Lighting:
Pursuant to the Outdoor Lighting Ordinance, all light fixtures that exceed the luminosity of a 60 -
watt incandescent bulb (or 1000 lumens) must meet the definition of "full cut-off', per the Avon
Municipal Code.
Staff has determined that the FS2, wall mounted sconce fixture, is non-compliant with the
Outdoor Lighting Ordinance. A revised fixture consistent with the Lighting Ordinance must be
provided for Staff review and approval prior to building permit issuance.
All other lighting is acceptable and in compliance with the Outdoor Lighting Ordinance. All of
the proposed light fixture locations and specifications are shown on Sheets E1.EO1 and
Ell. E01 a.
Engineering Analysis
Please refer to Attachment D for a full list of Engineering Department comments for the
proposed development at Lot 1, Riverfront Subdivision. Since the site is nearly entirely
developed, there is limited grading or site layout work to review. The primary concerns lie with
the proposed pull-out on Riverfront Lane adjacent to the east side. Prior plan set submittals
never officially proposed this change to the public right-of-way. The proposed pull-out is a
safety hazard as it does not meet the minimum 115 -foot stopping sight distance according to the
American Association of State Highway and Transportation Officials (AASHTO) publication A
Policy on Geometric Design of Highways and Streets, 2004. Staff also feels that the operation
of the pull-out will likely create an unsafe U-turn condition from guests entering from Avon Road
and utilizing the pull-out directly.
Other issues encountered during Engineering Department review include the lack of a
Stormwater Management Plan, Lot Setback encroachments (covered under Planning Analysis),
and landscaping shown interfering with fire hydrant clearance specifications.
Numerous minor comments are also shown on Attachment D, such as utility coordination, other
agency approval, encroachments into adjacent lots and rights of way, et cetera. The minor
comments do not greatly affect the site plan and should not be considered at the Final Design
phase. However, the comments must be addressed prior to any permit issuance since those
items affect the construction of the proposed development.
Design Review
The Project is governed by the site-specific Riverfront Design Standards, which were adopted
as part of the Riverfront PUD amendment. The expressed intent of the standards is to create
high quality architectural design through the use of varied roof forms, wall plane articulation, and
quality building materials. Attached to this report as Exhibit A for reference is a copy of the
Riverfront Design Standards.
How this building interacts with the public spaces it surrounds is important given its prominent
location at the "front door' of the Riverfront development. These buildings will be highly visible
from many locations in the Town Core, including from Avon Road.
In addition to the Riverfront Design Standards, the Commission must consider the following
general review criteria from the Town of Avon Residential Commercial and industrial Design
Review Guidelines:
1. The conformance with setbacks, massing, access, land use and other provisions of
the Zoning Code;
2. The general conformance with Goals and Policies of the Town of Avon
Comprehensive Plan, and any sub -area plan which pertains;
3. Whether adequate development rights exist for the proposed improvements;
4. General conformance with the Design Review Guidelines;
5. The compatibility of proposed improvements with site topography, to minimize site
disturbance, orient with slope, step building with slope, and minimize benching or
other significant alteration of existing topography;
6. The appearance of proposed improvements as viewed from adjacent and
neighboring properties and public ways, with respect to architectural style, massing,
height, orientation to street, quality of materials, and colors
7. The objective that no improvement be so similar or dissimilar to others in the vicinity
that monetary or aesthetic values will be impaired; and
8. The general conformance of the proposed improvements with the adopted Goals,
Policies and Programs for the Town of Avon.
Attached to this report are the Riverfront Design Standards. These standards include various
general design criteria, such as:
Criteria II.C.1.a, which requires "rustic materials common in mountain towns and/or a
more contemporary interpretation of these materials. "
Criteria III.C.1.d "Colors should be complementary to the site, and be comprised of
greens, grays, golds, browns, and other earth -tone hues...."
Criteria III.A.5 - Primary roofs will have pitches ranging 4:12 to 8:12. Secondary roofs,
where pitched, shall be a minimum of 2:12.
In addition to some of the more general design review criteria, this Project appears to be in full
compliance with the following, site specific guidelines:
Criteria III.A.4 — "The middles of buildings will be more visually subtle, but broken by
primary and secondary elevation features and material accents that help to avoid
monotonous facades. On any given elevation of Lot 180% of the vertical wall area will
be permitted to be within the same plan, with a minimum of 2 -foot offset for plane
changes...stacked decks and balconies will be considered plane changes."
Criteria I I I.A.7 - Relatively small roof overhangs are encouraged for buildings on Lots I
and 3, which are visually and compositionally related to the Hotel. At these locations the
minimum roof overhang permitted shall be six inches.
Staff Recommendation
Staff recommends APPROVAL of this Final Design application for Lot 1, Riverfront Subdivision,
subject to the conditions and corresponding findings listed in this report.
Recommended Motion
"I move to approve this Final Design application for the Project on Lot 1, Riverfront Subdivision,
with the following conditions:
1. The building materials, colors, and finishes will precisely match those constructed
on Lot 3, Riverfront Subdivision, including but not limited to the following:
Exterior stone veneer:
Material:
"Westin Blend Natural Stone Veneer" by Gallegos Corp.
Application:
Dry stacked on drain board
Size and lay-up:
Titus Tile
Size:
*Rectangular pieces 6"-20"
Color:
*Controlled random pattern
Location:
.Longer dimension of each rock to be horizontal
LVR:
Earth tone, Less than 60
Exterior Stone Accent:
Material:
"Westin Blend Natural Stone Veneer" by Gallegos Corp.
Application:
Sills, copings, ledgers
Size:
4"-6" High
LVR:
Less than 60
Wood Siding:
Material:
Cedar
Location:
River building
Finish:
Semi -transparent stain 60% sepia by Sherwin Williams or equal
Size:
12" nominal
LVR:
18% estimated
Metal panels:
Manufacturer:
Berriage
Material:
Flat seam metal wall panels, 24 GA Galvalume
Color:
LG Slate Gray
Location:
Main entry, east entrances, accent roofs
LVR:
0.09 (0.00-1.00)
Primary Roofing:
Manufacturer:
Ecostar
Material:
Rubber (EPDM)
Name:
Titus Tile
Size:
21 "w x 301
Color:
Blend, Earth Green, Federal Gray
Location:
Primary High Roof
LVR: Not Available
Secondary Roofing:
Manufacturer:
Berriage
Material:
Flat seam metal Roof, 24 GA Galvalume
Color:
LG Slate Gray
Location:
Main entry, east entrances, accent roofs
LVR:
0.09 (0.00-1.00)
Board Siding Horizontal:
Manufacture:
James Hardie Siding Products
Material:
Fiber Cement Siding
Application:
Horizontal siding Finish:
Color:
SW 7046 Anonymous
LVR:
20% estimated
Texture:
Smooth
Board Panels:
Manufacture:
James Hardie Products
Material:
Fiber Cement Board
Application:
TSE attic level main Body
Color:
SW 7046 Anonymous
LVR:
20% estimated
Texture:
Smooth
Storefront Windows:
Material:
Aluminum Storefront by Vistawall or equal
Trim:
Wood, Mahagony, Stained
Finish:
Powder coat, custom mix to match AW Brown MM3115 by
Sierra Pacific
LVR:
12-18% estimated
Aluminum Clad Wood
Doors and Window:
Manufacture:
Sierra Pacific or equal
Material:
Wood Aluminum Clad
Finish:
Powder coat, AW Brown MM3115 by Sierra Pacific
LVR: 20% estimated
Metal railings:
Manufacture:
Puma Steel or equal
Finish:
Powder coat
Applications:
Metal railings
Color:
Black Bean SW 6006
LVR:
Less than 60%
Miscellaneous Metals:
Material:
Sheet metal 24 GA, hammed, jointed per SMACNA
Color:
LG Slate Gray by Berriage
Applications:
Flashing, belly band, horizontal trim
LVR:
0.09 (0.00-1.00)
Cement Plaster Main Body:
Manufacture:
EI Ray Stucco
Applications:
Exterior walls (field color), chimneys
Finish:
Finish coat
Color:
BUFF (SW, Quiver Tan # 6151)
Texture:
Limestone 1 Fine
LVR:
41%
Cement Plaster Accent:
Manufacture:
EI Ray Stucco
Applications:
Attic Story
Finish:
Finish coat
Color 2:
BROWN (SW Enduring Bronze # 7055)
Texture:
Limestone 1 Fine
LVR:
20%
7
2. The Construction Staging Plan is not approved and will require additional
information prior to the issuance of ANY grading or building permits for Lot 1.
3. All Engineering Comments from Jeffrey Schneider's Memorandum, dated April
14, 2010, attached hereto as Exhibit D, must be addressed.
4. No setback encroachments will be permitted in the 10' Right -of -Way setback.
5. The two car pullout zone adjacent to Riverfront Lane is not approved.
6. The "FS2" light fixture on plan sheet E1.101a is not approved. The lighting plan
will be updated for staff approval at the time of building permit submittal with a
compliant fixture.
7. The Riverfront ECO trail must remain open throughout construction, with
protective measures installed with the approval of the Public Works Director as
necessary.
Pursuant to the following FINDINGS:
1. The application is in compliance with the Riverfront Design Standards, approved
as Exhibit A to Ordinance 06-03.
2. The application complies with the Riverfront PUD, and all applicable zoning standards
from Title 17 of the Avon Municipal Code.
3. The design plan is in conformance with review criterion #1 - #8, as outlined in staff's
report — dated April 12, 2010.
Exhibits
A: Riverfront Design Standards
B: Memorandum from the Applicant, dated March 19, 2010
C: Narrative & Exhibits to address Setback encroachments, dated April 15, 2010
D: Engineering Comments, dated April 14, 2010
E: Riverfront PUD Development Plan (Ordinance 06-03)
F: Photographs of the Property and Timeshare West
G: Reduced Plans
8
Exhibit A
RIVERFRONT VILLAGE
Avon, Colorado
DESIGN STANDARDS
February 14, 2006
X. Vision Statement for Riverfront Village
A. Scope of Design Standards
1) The following Design Standards for Riverfront Village have been established to
ensure the overall quality and compatibility of the Village with the Town of Avon
and its riverfront site. In general these Standards shall apply to all buildings and
plaza areas within Riverfront Village, with the exception of the Hotel building, or as
otherwise noted.
2) An important aspect of the Riverfront Village vision is responsible care for the
environment and sustainability of the architecture and landscape. To this end, best
efforts will be made to meet the principles set forth in the LEED (Leadership in
Energy and Environmental Design) Green Building System for the Hotel. In
addition, all other buildings within the Village will be designed with sensitivity to the
sustainability aspects of site and architectural design.
B. Architectural Theme
1) Riverfront Village represents an important interface between the Town of Avon
and Beaver Creek Ski Resort. It is envisioned as a lively gathering place connecting
the river, mountain and town- a pedestrian friendly environment where townspeople
and guests can stroll from Avon's western Town Center, through the resort retail
plaza, to ride the gondola up to the mountain or to step down to the river.
2) The village is situated on the seam between the town and the mountain
landscape and should therefore strike a balance between the two environments,
creating an architectural expression that captures both alpine and townscape
traditions. To achieve this balance, the architecture shall take advantage of materials
inherent to successful mountain resort architecture—such as stone, wood, and other
natural materials, combined with more contemporary materials such as stucco, metal,
and recycled products.
3) The Architectural Theme will also feature the use of large areas of glass, clean
building forms based on pure geometries, strong, simple but honest detailing (not
overly rustic, "heavy," or overstated), and the bolder proportions appropriate to the
larger scale of the Town.
C. Design of Public Spaces
Riverfront Village February 14, 2006
Design Standards Page 1 of 6
paving materials, landscaping, and sensitive spatial planning. Spatial planning shall
include components that reinforce the connectivity of the Town to the River, and
avoid elements that act as barriers to this connection, such as planter walls that block
pedestrian flow, landscaping that screens the visual connection between Town and
River, etc.
D. Pedestrian orientation
1) A pedestrian corridor, connecting the town to a retail plaza with gondola, will
gracefully transition from the plaza to the riverfront promenade by way of a staircase
and stepped terraces merging with the natural landscape. This transition will avoid
barriers from the Town to the River, and include elements which reinforce this
connection, including similar paving materials, wide pedestrian ways that encourage
movement, active signage and wayftnding, and a gracious grand stair with oversized
treads and minimal risers.
2) Pathways shall also create a network within the Village itself, linking the different
buildings along the length of the site and providing pedestrian access to defined
access/gathering points along the River. The Plaza and pathways within Riverfront
Village should encourage a pedestrian -friendly environment.
E. View Corridors
1) A primary southern view corridor to the mountains shall be maintained from the
eastern railroad crossing through the public plaza to help reinforce the connection
between the Town and the ski mountain.
2) An east -west view corridor along the Eagle River will also be maintained through
the preservation of a 75 -foot river setback throughout most of the site, with limited
minor encroachments as allowed in the development plan. In addition, the
Riverfront Park will act as a natural corridor along the river edge portion of the
Village and act to enhance this view corridor.
F. The Natural Environment
1) The Eagle River is a primary amenity for the Town of Avon and Riverfront
Village. Links to the River shall be developed as special pedestrian ways to help
activate this wonderful amenity.
2) The 75 -foot river setback will be largely left in its natural state, and certain
defined river access and gathering points should be created along the linear riverfront
path.
3) In general, additional plantings within the river setback will be riparian in
character and relate to plantings indigenous to river edge environments. More
formal planting areas -- such as small sections of lawn, however, axe encouraged at
special gathering and access points to highlight these more formal features. Formal
plantings featuring annuals are not permitted within the 75 -foot setback.
4) In an effort to enhance the natural environment, site walls and site walkways
should become more "organic" as they approach the river edge portion of the
Riverfront Village February 14, 2006
Design Standards Page 2 of 6
Village. Any walls installed south of the bike path shall be limited to boulder
walls. Accessibility shall be considered when designing walkways.
II. Site and Village Guidelines
A. Primary Building Entries
1) Primary building entries shall be emphasized as welcoming portals through
careful attention to massing, scale, and materials. This will ensure that Riverfront
Village will not turn its back to Avon. Portals will be scaled to encourage pedestrian
movement through them—and avoid overwhelming or diminutive massing—and
they will be treated with .materials that enhance this experience. The front doors of
buildings should be treated in interesting ways, either through the use of glass or
special designs and materials that provide interest to these special areas of each
building.
2) Massing of entries shall relate to the overall massing of the buildings but be
presented as special forms different than typical building bays. Sensitivity to scale
should be considered when transitioning from the overall larger building mass to the
more intimate scale of the pedestrian visitor. Designers are encouraged to use
materials in interesting ways at primary building entries to reinforce their unique role
as part of the building and as part of the overall Village stteetscape.
B. Solar Access
1) A solar access study shall be required for buildings exceeding 3 stories in height.
These studies will convey shading impacts at summer and winter solstice Gun 21 and
Dec 21), and at vernal and autumnal equinox (Mar 21 and Sept 21).
C. Site Materials and Colors
1. Plaza materials
a) Rustic materials common in mountain towns and/or a more contemporary
interpretation of these materials such as cut stone pavers, colored concrete pavers,
and stained or colored concrete slabs are appropriate to the Village. Colors shall be
complementary to the site and its architecture, avoiding bright or brilliant hues that
distract from the pedestrian experience.
2. Site walls
a) Site walls shall make use of more contemporary materials such as colored
concrete masonry, stained concrete, board -formed concrete, and similar materials, in
colors complementary to the site and its buildings. Site walls shall relate to plaza
materials and building bases to help visually merge the ground plane around the site.
D. Site Signage – Design, materials, and colors
1) Site signage shall be designed to help animate the plaza and be consistent and
compatible with the design and materiality of the buildings. Site lighting will also be
used to enhance the pedestrian experience at the Plaza level.
Riverfxont Village February 14, 2006
Design Standards Page 3 of 6
III.Architectural Design Guidelines
A. Building Form and Massing
1) In general the form and massing within Riverfront Village will follow the intent
of the Town of Avon Design Guidelines by incorporating form articulation to avoid
the monolithic. However, specific buildings within the Village shall be subject to less
or more stringent requirements relative to building form and massing as identified
within this document to form a coherent, pleasant composition for the entire
neighborhood. 2) Smaller masses, such as portions of the building or elements such
as porte cocheres, etc, will be used to break up the apparent size of larger building
forms. Smaller masses positioned in front of large masses will be used to reduce the
visual dominance of the larger forms.
3) The development of building bases will help to tie together individual buildings
within the Village and will also tie the Village to its riverfront site. Site walls, and
other site features shall relate to building bases in a way that reinforces visual
connectivity to the ground plane. The plaza and gondola terminal, with its
cantilevered structure will stand out as an elevated element from the south, drawing
people up from the river.
4) In general the middles of buildings will be more visually subtle, but broken by
primary and secondary elevation features and material accents that help to avoid
monotonous facades. On any given elevation at Lots 1, 3, and 4, 80 percent of the
vertical wall area will be permitted to be within the same plane, with a minimum of
2 -foot offset for plane changes. Vertical forms comprised of stacked decks and
balconies will be considered plane changes. At Lots 5, 6, and 7, 70 percent of the
vertical wall area will be permitted to be within the same plane.
5) The roofscape of Riverfront Village is also critical to the success of the
neighborhood and its relationship to the Town of Avon. The visual coherency of
the Village should be reinforced through the use of similar roofing materials and
colors throughout the Village, helping to knit the individual buildings together when
seen from, the Gondola or Beaver Creek above.
6) Pitched roofs expressive of an alpine tradition and the incorporation of dormers,
shed roofs and chimney forms, should be employed. Primary roofs will have pitches
ranging from a minimum of 4:12 to a maximum of 8:12. Secondary roofs—such as
at dormers, porte cocheres, building protrusions, and similar additive forms—may be
flat, but only if they are finished in materials similar in quality to roof or wall
materials on the building, such as pavers, colored stone, etc. When secondary roofs
are pitched roofs, the minimum pitch required shall be 2:12. Flat roofs are not
permitted for primary roof forms. Ideally flat roofs should be developed as terraces
and other functional spaces.
7) Given the modern alpine character of the architecture at Riverfront Village,
relatively small roof overhangs are encouraged for buildings on Lots 1 and 3, which
are visually and compositionally related to the Hotel. At these locations the
minimum roof overhang permitted shall be six inches. At other locations within
Riverfront Village the minimum roof overhang shall be 24 inches for primary roofs
and 12 inches at secondary dormers.
Riverfront Village February 14, 2006
Design Standards Page 4 of 6
S) To help ensure that roof ridges for the Village remain interesting and contribute
to the overall success of building massing, uninterrupted ridgelines shall be avoided.
To this end, roof ridgelines are limited to 150 feet before a change in height
(elevation above sea level) is required. These breaks (elevation changes) shall run
horizontally for at least 10% of the overall building ridge length before returning to
the prior elevation. Overall building ridge length is defined as the sum of all primary
ridge lengths for the entire building.
B. Building Height
1) Building heights for the Riverfront Village will be restricted to the heights
described in the approved Development Plan, as measured according to the Town of
Avon Code. Architectural features such as chimneys, cupolas, and other similar
elements will not be included when calculating maximum building height.
2) In addition, the percentage of ridge height allowed at the maximum allowable
building height for any given building will be litnited to 25% of the overall building
ridge length. Overall building ridge length is defined as the sum of all primary ridge
lengths for the entire building.
3) The maximum height for building facades fronting the Public Plaza will be
limited to 75 feet from the Plaza elevation. The only exception to this facade height
limitation shall be for the western facade of the central tower of the hotel, which
shall be permitted to be as tall as 100 ft. from Plaza elevation. This central tower
facade may run horizontally for up to 60 feet along the plaza.
4) The minimum horizontal setback required for building facades exceeding the
maximum height for building facades fronting the Public Plaza will be 2 feet from
the building facade fronting the Public Plaza. This shall only apply to the central
tower portion of the Hotel.
5) The minimum setback required for maximum allowable height per the
Development Standards from the Public Plaza will be 60 feet from building facade
fronting the Plaza
C. Exterior Materials, Detailing, and Colors
1. Materials and colors for walls and roofs at Riverfront Village will have a Light
Reflective Value (LRV) not exceeding 60%.
a) Materials inherent to the mountains, including stone and wood, will be used at
lower levels of buildings in areas of direct pedestrian interface, as well as metals.
These materials should be used in refreshing ways within the Village, reinterpreted
for the urban nature of Avon towards a "mountain modern" character.
b) Stucco conveys mass in a subtle, "quiet" way and is therefore a recommended
material for building middles and tops. However, building accents comprised of
non -stucco materials, such as metal, wood and cement materials replicating wood,
shall be allowed in building middles and tops to help provide interest, except as
prohibited by Codes. When used, stucco shall be carefully detailed to ensure
longevity when it comes near the ground plane at building walls.
Riverfront Village February 14, 2006
Design Standards Page 5 of 6
c) Roof materials will include rubber shingles, asphalt shingles and other materials
suitable for mountain environments. Standing seam metal shall not be used for
primary roof planes, but may be used for small and/or special roof features such as
shed dormers, retail roof forms, Porte cocheres, and other selective roof elements.
d) In general, colors used within the Village should be complementary to the site,
and be comprised of greens, grays, golds, brooms, and other earth -tone hues.
However, due to the desire for a highly activated retail experience at the Plaza level,
the colors used along the retail edges of the Public way may be more vibrant and
active in nature.
2. Minimum window area at plaza level
a) At a minimum, 50% of the 1" level of building facades facing the plaza from the
east and the west shall be glass. For this calculation the plaza shall be deemed to
begin at the northwest corner of the hotel and the northeast corner of timeshare
west and shall terminate at the east -west plane where the staircase down to the river
begins. This calculation shall exclude the gondola terminal, control booth and public
restrooms.
Riverfront Village February 14, 2006
Design Standards Page 6 of 6
MEMORANDUM
Exhibit B
Studio Obermeier Sheykhet Inc.
1580 Lincoln Street Suite 200
Denver, Colorado 80203
Phone 303.327.4600 fax 303.327.4605
(Project: Westin Riverfront Resort & Spa, Gate: MIARCH 19, 2010
TSE and TSR for
Starwood Vacation Ownership
Prepared Ey: Studio OS #Project # l Meeting 0606.12
File M 2.1.1
FINAL DESIGN SUBMITTAL #3
REVISION SUMMARY
Pa8060fi.01 WRRWdminisimttonlOorreapondencelOutpoing%Lelte 8 M.m.%Tow[ OF AVONSMIRR_Matf_Pielallcker 10_0318 TSER_REVISIONSAwl
P$Z Comment from 12.15.2009
Item#
and 01.19.2010 based on
proposed Solution
Notes
Submittal dated 11. 16.2009 and
sketches dated 01x19.2010
i.
TSE North fagade generally
Refer to the Revise 3D drawings that show
A4.02
and TSE North entry and
entire north fagade of TSE
A4,03
tower to be illustrated in 3D.
A4.04
2.
TSE East elevation to be
A. Changed (lowered) main roof pitch
Revise
revised to serve as the main
to reduce building profile and improve
drawings:
entry into the village.
proportions from 8:12 to 6:12 matching
A1.10
TSW.
A1.20
B. Connected buildings with arcade and
composite
gateway into courtyard with sculpture on
second level
the entry axis.
A2.E03
C. Wrapped building facades and coroners
A2.E04
with arcade elements consisting of stone,
A2.E09
cedar, metal roofing reminiscent of retail
All A4.'�
base's treatment.
drawings.
D. Added 3 -story stone element near TSE
east entry to brake monotony of the wall.
E. Stepping of stone at both buildings' east
facades is supported. by `stepping' in the
height of landscaping elements.
3.
General exterior materials
Natural stone wainscot is at the same
application: more thoughtful
level on each building with the
approach in stone veneer
following exceptions
application recommended.
- North entry at on TSE
- Stucco accent towers
- North stair and east entry at TSR.
- TSR: east wall
4.
Drop off and the round
Civil documents were engineered and
Revised
Pa8060fi.01 WRRWdminisimttonlOorreapondencelOutpoing%Lelte 8 M.m.%Tow[ OF AVONSMIRR_Matf_Pielallcker 10_0318 TSER_REVISIONSAwl
na®e a of 3
planter is located in the
updated.
documents
ROW. PW and applicant to
The proposed drop off area located on
include
coordinate approval during
the west side of Riverfront Drive,
following sheet:
permitting stage.
between Building East and Building
® C2.01
Riverside, will accommodate the
0 02.61
temporary parking of two typical
passenger vehicles. Primary use of drop
off is for passenger loading and
unloading involving guests staying in the
TSE and TSR buildings. Parking signage
to be installed stating that vehicles are
not permitted to remain in the drop off
area longer than 15 minutes.
The assumed length of each typical
passenger vehicle is 19'. The geometry
of the drop off area has been designed
such that vehicles can safely enter and
exit the area without touching the curb
I
and also such that the vehicles are
completely out of the drive lane of
Riverfront Drive. It is understood that.
this drop-off will be used mainly for
passenger vehicles.
So
Areal encroachment to be
Proposed design is compliant with the
A 2.E03
limited to 3'-0" maximum.
requirement. Refer to drawings for
dimensioned graphic illustration of the 3
encroachments.
Landscaping documents
Revised documents comply the
Revised
comments: plant material
recommendations. Landscape documents
Drawings:
specified needs some
now include planting details, paving details,
L1.00
refinement in placements and
railing for amenities enclosure.
L2.00
more variety is sizes. More
L4.00
trees on the NE corner.
L5.00
Higher percentage of
L6.00
c',,rcrgrews. Distribute
L7.00
planting weight more evenly
(example: specify 2",3",4"
caliper aspens for more
organic appearance of the
composition).
More information on the
hardscape types in the
courtyard is requested.
Standard fence details were
requested.
na®e a of 3
bo
Exterior lighting appears too
Applicant utilized the lighting package and
Revised
industrial. Refine placements
placement techniques that are installed on
Drawings:
and specification. Utilize
TSW.
ELE01
Confluence village standards.
EL E01 a
io
Construction shoring
Applicant intends to repeat TSW experience.
technique and regulatory
Engineered shoring documents will be
approval process was
developed by PE working for the Design -
questioned.
build contractor. Such documents will be
submitted to the building department for
review and approval. The differed submittal
will be processed as outlined in the building
code. Town's approval of the differed
submittal will be obtained prior to the
commencement of the shoring wall
construction. Anticipated Construction
technique includes gahnite concrete wall and
R -bar soil nails.
Staging and Phasing plan
Logistics plan will be treated as a differed
updates requested. Closure
submittal and provided by the selected
of the bike pass during
general contractor for PW and building
construction is
inspector's review and approval. GC will be
recommended. Delivery
responsible for securing approval for the
sequence shall be timed.
updated logistics plan PRIOR to issuance of
Flaggers shall be available
permit for construction.
full time.
9.
Temporary parking
Parking previsions during construction will
previsions during
be updated upon finalization of the timeline
construction where
for the project execution. Detailed
questioned. Agreements with
information on the parking as well as
adjacent property owners to
required agreements with adjacent property
be submitted to ToA.
owners will be part of the differed submittal
outlined in the item above. SVO/selected
GC to develop updated logistics plan
inclusive of parking previsions and submit to
ToA for review and approval PRIOR to
issuance of permit for construction.
END OF DOCUMENT
page 3 m 3
MEMORANDUM
Studio Obermeier Sheykhet Inc.
1580 Lincoln Street Suite 200
Denver, Colorado 80203
phone 303.327.4600 fax 303.327.4605
To: Mr. Matt Pielsticker
Company: Starwood Vacation Ownership
From: Aleksandr Sheykhet
Subject: Riverfront Timeshare East and
River Final Design Review
Exhibit
Attachments:
Exhibit C
Date: April 15, 2010
Project: Westin Riverfront Resort Time
Share East and River
Project #: 90606.01
File #f: 2.1.2
SKA- 777 rev.1 Via: Email
SKA-780 rev.1
S KA -782
DATED 04.15.10
Mr. Pielsticker,
We received correspondence from you dated 04.08.2010 informing our team that the roofs
overhang (areal) encroachments shown on the Time Share East building on the north and east
sides are not permissible. Your further informed us that to secure approval for such
encroachment we will have to amend PUD.
Upon further clarification during telephone call between you and me; and after coordination with
Starwood Vacation Ownership; our team would like to submit this letter and attached sketches as
an exhibit for your staff report. Said sketches illustrate compliance to all ROW setbacks and
remove all TSE areal encroachments previously shown in the Final Design Review documents
dated 03-19-2010.
Should conditional approval be granted to the project, and assuming attached sketches are part of
the exhibit illustrating approval's conditions, our team will incorporate revisions into documents
prior to submittal for building permit.
Please, let us know if you have more questions or concerns.
END OF MEMORANDUM
CC: Joe Gamb (SVO)
1 PA90606.01_V 1RR\Adminis[ration\Correspondence\OutgoinElLetler& Memo1TOWN OF AVOMWRR_Matt_Pielsticker_10_04_15 Encroachment.doc
0 E D I C A 7 E 0 T 0 D E S 1 0 N E X C E L L E N C E
PROD. NO.
04.15.2010
RE: A1.10.dwg
ARCHIUCTUR WRR SKAn3.dwg
WESTIN RESORT TIMESHARE
RIVERFRONT DRIVE
AVON, CO
90606.01 SCALE : 3/32" =1'-0"
Gt�Ntf�DSt'fET,c,�i �J/a �NG�aGMEIJT *�SKA-7U
DWG. NO. OPT icy)
IN
27'-3" 27'-3" 1� 7y2 13'-7/2" 26'-9" \
— I I
I � \
TO
CA zo go mtb�
VE6 ULE I I
Em
1LOBBY4. 1------ — —/� — \ —
I
— — — — i H2OG I— — — UNCIT TPE h UNIT TYPE F.
— — 1 — — 3104A EAST — — — Dim Z�1
L
� I UNIT TYPE UNIT TYPE
EASTEAST
I �
I 12 3 _ _ -
----
TRASH
• S 511�U9
TELECQM
77�
r m
o° I I I I do II C _
I II III L-- h, 4.12 \
o f
CORRIDOR _
F
' I i o ❑ _ _
I I I
I
° o I O°
I I
1
R OMS I a I
TI OO5►NGI�E 3* 3` I
LO �l
--- _--
GEN. STO. O.H.:321MP�6 I
HSKG
— — — — — _ 1209 I I
OUTDOOR FFE
UNIT TYPE UNIT TYPE
WESTIN RESORT TIMESHARE A,AIAIT G/1 CTn h
RIVERFRONT DRIVE
AVON, CO _
PRO]. NO. 90606.01 SCALE :3/32" =1'-0"
n,+ 11Y'll) A L MRE: X00 PLWO�4N EN6WACOMENTAl.10.dwgS KA.
RntnllECIURE WRR_SKA_772.dwg DWG. N0.
k
S KA
RF -V. �-
ISSUED AS:
RE: •
�w
Y �
W
=U
cn
W
Lu
LU =
U
LU ry.-
m
O Q
DATE:
01.16.10
PROJECT:
DESCRIPTION:
Wave
w:t_
DRA N BY:
Exhibit D
VON
C O L O R A D O
MEMORANDUM
To:
Matt Pielsticker
From:
Jeffrey Schneider
Cc:
Justin Hildreth, Sally Vecchio
Date:
April 14, 2010
Re:
Lot 1 Riverfront Subdivision Timeshare East Final Design
Below please find Engineering comments on the above -referenced project submittal
dated 3-19-10. The construction staging plans are considered to be conceptual at best and
must be resubmitted by the contractor prior to issuance of any permits for the site.
The following comments must be resolved as a condition to Final Design approval:
1. Sheet Al. 10 — A large pullout or drop-off zone is shown adjacent to Riverfront
Lane station 19+00. The construction of this pull -off is prohibited. According to
A Policy on Geometric Design of Highways and Streets, AASHTO, 2004, the
stopping sight distance for a 20mph roadway is 115 feet. Due to the curve in
Riverfront Lane and obstruction from building construction and landscaping,
adequate sight distance cannot be provided. The pull -offs may also create an
unsafe U-turn condition immediately east of Lot 1.
2. General — No Erosion Control or Stormwater Control Plan has been provided as
part of this submittal.
3. General — Roof overhangs and balconies are shown projecting into the lot setback
in several locations.
4. Sheet L2.00 — Dense landscaping is shown in the southeast corner of Lot 1 where
Sheet 2.61 shows a fire hydrant. Landscaping must be revised to accommodate
ERWSD fire hydrant clear space specifications.
The following comments must be resolved prior to issuance of ANY permits for the site:
1. General — Grading, stormwater infrastructure, and soil nails are shown
encroaching onto Lot 2 as part of this project. Permission from the Lot 2 property
owner must be obtained prior to permit issuance.
2. Sheet C0.00 — The topographic survey is outdated and does not reflect current site
topography or existing infrastructure.
3. Sheet C2.01 — Since the survey is inaccurate (comment 1) existing and proposed
contours shown on this sheet are meaningless, especially at the north edge of the
site.
4. Sheet C2.01 — The grading in the far southwest corner of the site (7422 contour)
should grade towards the inlet shown on the storm drain run along the property
line.
CADocuments and Settings\mpielsticker\Local Settings\Temporary Internet Files10LK36414-14-14 Lot 1 Timeshare East
Eng Comments Final (3).doc 1
5. Sheet C2.61 - Water, sewer, and shallow utility service line (gas, electric,
communications) connections to building are not shown.
6. Sheet C2.61 - The hydrant to be relocated near the north entrance to the north
building will require approval from ERWSD and ERFPD.
7. Sheet C2.61 - Roof drains are not shown tieing into the storm drainage system.
8. Sheet C2.61 - It appears that an additional sanitary sewer manhole and sewer line
will be installed within the public right of way on the east side of the site. This
must be approved by ERWSD. It also appears that the constructed service stub on
the northern site boundary will not be used. This may need to be abandoned per
ERWSD.
9. Sheet C2.61 - No drain for the swimming pool is shown.
10. Sheet C2.61 - Verify the slope of the proposed 18" RCP storm drainage on the
southeast corner of Lot 2. At 10 percent, the uphill manhole will likely be
extremely deep.
11. Sheet L1.00 - The notes refer to an Erosion Control Plan but no plan is provided.
12. Sheet L4.00 - The directional arrows on the "UD" (underdrain) appear to be
pointing the wrong direction.
13. Sheet Al. 10 - The "Flood Line" along the southern property boundary is
incorrectly labeled. The correct name is "75 -foot setback from mean annual high
water line."
14. Sheet E1.E01 - Electrical service/metering for the property is not shown.
15. Sheet GC -1.00 - The northern site perimeter shows a soil nail shoring wall. An
exhibit showing that the soil nails will not affect subsurface utilities must be
provided, as well as approval from all applicable utility companies that the soil
nails will not affect their ability to maintain their installations. Also, if the soil
nails encroach into the Riverfront Lane public right of way, approval from the
Director of Public Works will be required.
16. Sheet GC -1.00 - A detail of the vehicle tracking mat should be provided. A
CDOT-standard stabilized construction entrance is recommended.
17. Sheet GC -1.00 - Add "Soil Nails" to Note 20.
18. Sheet GC -1.00 - It appears that walkway covering and appropriate warning signs
are required for the ECO bike path along the southern property line during Phase
A.
19. Sheet GC -1.01 - Additional warning signage needs to be placed east and west of
the walkway cover on the bike path south of the project to alert path users in
advance of approaching the construction area.
20. Sheet GC -1.02 - Verify that the proposed use of Lot C as a temporary parking
area is allowable per zoning through Town of Avon Community Development.
21. Sheet GC -1.02 - If the use is determined to be allowable, the following must be
provided for Lot C: grading plan, striping plan, drainage plan, stormwater/erosion
control plan, and reclamation plan.
22. Sheet GC -1.02 - Access to the proposed Lot C parking area must be from
Benchmark Road. As shown it is using adjacent property (Lot B).
CADocuments and Settingslmpielsticker1ocal Settings7emporary Internet FileslOLKWMA-14-10 Lot 1 Timeshare East
Eng Comments Final (3).doc 2
ES
<c
:o
a
c
ri
v
0
0
0
0
N
N
N
M
r
Residential/Lodging Uses
1. Hotel rooms and suites;
2. Lodge rooms;
3. Condominiums;
4. Townhomes;
5. Time-share, vacation ownership, and fractional fee ownership; and
6. Accessory or incidental uses consistent with ResidentiallLodging Uses at the discretion of the Zoning Administrator.
1. Fitness facilities, locker rooms, reception, and related amenities and services;
2. Indoor and outdoor recreation (e.g. pools, Jacuzzis, game rooms);
3. Ski valet and storage;
4. Front desk and lobby;
5. Concierge, valet and bell service areas;
6. Business centers;
7. Housekeeping and laundry facilities;
8. Storage;
9. Mechanical rooms;
10. Restreoms;
11. Administrative spaces used by personnel providing Hotel/lodging services (e.g. reservations, accounting);
12. Maintenance facilities;
13. Meeting pre -function and support spaces; and
14. Other accessory or incidental uses consistent with Lodging Support Uses at the discretion of the Zoning Administrator
Standard Commercial Uses
1. Retail Stores;
2. Specialty Shops;
3. Restaurants, Bars and Cocktail Lounges;
4. Wellness Centers (such as physical therapy, medical);
5. Personal service shops;
6. Professional offices, including real estate brokerage and development offices;
7. Ski School Facilities;
8. Lift Ticket Sales Facilities;
9. Financial Institutions;
10. Offices; and
11. Other accessory or incidental uses consistent with Standard Commercial Uses at the discretion of the Zoning Administrator
Incidental Commercial Uses
1. Spa treatment rooms, spa retail, spa salon, and
2. Meetings and conference rooms;
1. Transportation facilities;
2. Public plazas;
3. Public restrooms; and
4. Public parks and walkways.
Temporary Facilities
1. Vacation Ownership/T ime Share sales centers of up to 7,000 square feet within the Hotel or Vacation Ownership/Time Share
buildings for up to ten years from the issuance of a Temporary Certificate of Occupancy of the first Vacation Ownership/Time
Share building;
2. 'Temporary facilities for real estate sales and development on Lot 5 for up to one year after the issuance of the Temporary
Certificate of Occupancy of the Hotel; and
3. Other temporary facilities are subject to Special Review Use.
Special Review Uses
1. Theatres;
2. Churches;
3. Bed and Breakfast lodges; and
4. Temporary facilities not approved (above) under Temporary Facilities.
t f 4
Five 5) spaces/1000 GLFA:
1. Retail Stores;
2. Specialty Shops;
3. Restaurants, Bars and Cocktail Lounges public spaces (excludes storage, kitchens and other
"back of house" spaces);
4. Wellness Centers (such as physical therapy, medical);
5. Personal service shops;
6. Professional offices, including real estate offices at the plaza level,
7. Ski School Facilities;
8. Lift 'Ticket Sales Facilities; and
9. Financial Institutions;
Four4 spaces Baer 9000 GLFA
1. Professional Offices/Offices, if any, on the fifth floor of the Hotel.
w2_(2) s aces_2er 1,000 GLFA
1. Spa treatment rooms, spa retail, spa salon; and
2. Meetings and conference roorns.
Hotel
1. One (1) space for each Accommodation Unit (as defined in the Development Agreement).
2. 1.2 spaces for each Dwelling Unit (as defined in the Development Agreement).
Vacation Ownership
1. .75 spaces per bedroom, maximum of 1.5 spaces per Residential Unit.
Condominiums and Townhomes other than a Hotel
1. 1.2 spaces per Residential Unit.
General:
1. Compact parking spaces shall not exceed ten percent (10%) of total parking for the entire
project.
2. Total required parking (as defined above) shall be reduced by 15% for facilities on Lots 1, 2
and 3 only.
3. Standard parking spaces on Lots 1 and 3 shall be a minimum width of 8'9", with standard
length of 18' and standard drive lane width of 24'.
°11P, 7
.:,
EXHIBITPUD DEVELOPMENT PLAN
ORDINANCE
06-03
1. This PUD Plan con'ta'ins the development standards and uses for the Riverfront PUD. Other uses and provisions of the Town of Avon Zoning Code not
specifically addressed herein, or in the related development agreement, shall apply to the Riverfront PUD.
2. Additional land uses determined to be similar to Standard Commercial Uses, Incidental Commercial Uses, Lodging Support Uses, and Residential/Lodging
Uses may to be approved by the zoning administrator;
3. Only Standard Commercial uses shall be subject to Gross Leaseable Floor Area ("GLFA") minimum and maximum restrictions;
4. Professional offices, including real estate offices, shall be limited to the two locations fronting the public plaza as depicted to the Planning and Zoning
Commission January 17, 2008. A temporary timeshare sales office will be permitted in the hotel and must be vacated within thirty (30) days of issuance of
Temporary Certificate of Occupancy for Building E (Lot 3). No additional plaza frontage space is permitted for use by professional and general office,
including financial institutions and real estate offices or residential units.
5. Office space above but not on the public plaza level may be converted to Residential/Lodging uses provided the maximum number of Dwelling Units is not
exceeded after such conversion. Required parking shall be recalculated after taking into account such conversion and any excess parking spaces may then
be individually deeded.
6. Minimum Standard Commercial shall be 20,000 GLFA, and maximum Standard Commercial shall be 40,000 GLFA. Additional Commercial GLFA exceeding
the PUD maximum may be approved for restaurant, bars, cocktail lounges and similar uses subject to a Special Review Use.
7. Maximum Residential Density shall be 456 Dwelling Units as defined in the Development Agreement.
8. Meeting space within the hotel shall be a minimum of 3,000 GLFA.
9. The minimum building setbacks shall be as follows:
a.. River: all buildings shall be setback the more restrictive of i) seventy five feet ('75') frorn the Mean Annual }-sigh Water Mark or fl) the northern
boundary line of 'Tract "A". Notwithstanding the foregoing, Lot '1"s minimum setback shall be the northern boundary line of Tract "A. Encroachments
for porches/decks/overhangs/eaves are permissible subject t0 design review approval as to specific, locations and dimensions.
b. Lot Lines: Buildings shall have a zero 'foot (0') setback from Internal lot lines. Buildings shall have a minimum twenty -foot (20') setback from Riverfrorrt
Subdivision perimeter lines. Notwithstanding the foregoing, Lot 7"s setback from its northern perimeter line shall be ten (10) feet.
c. Right -off -way: Buildings shall have a minimum setback of ten feet (110') from road right-of-ways. Subterranean encroachments shall be permitted into
this setback. Aerial enrroacliments (such as balconies and eaves) of up to three feet (3') shall be permitted into this setback for the northwest wing of
Building F only.
10. A fifty-five (55) foot view corridor through the public plaza adjacent to the proposed hotel as presented on the development plan and the final plat for
the Riverfront Subdivision shall remain unobstructed from the ground level upwards, with the exception of the gondola terminal. Minor encroachments
such as public restrooms, awnings, landscaping, overhangs, decks and railings shall be reviewed and may be approved through the design review
approval process.
11. Maximum Site Coverage = 25% of the 18.9 acre parcel.
12. A solar access study showing the effects of shading on adjacent buildings and outdoor spaces is required for all proposed buildings exceeding 3 stories in
height. Sun studies should be prepared on a site plan of a scale not less than 1" = 40' showing shadows at 10am and 3pm on March 21, June 21,
September 21, and December 21.
13. A parking management plan, generally consistent with recommendations outlined in the Walker Preliminary Parking Operations Plan dated December 5,
2005 shall be submitted and, after review and approval by the Zoning Administrator, be included as a subdivision plat note. The approved pian shall not be
changed without notification of the Town, and shall be enforceable by the Zoning Administrator.
14. The cumulative build -out of residential and commercial uses shall be submitted on each building permit application on a form acceptable to the Town, in
order to establish compliance with minimum commercial and maximum development standard requirements;
15. The property owner shall submit a master landscape and public plaza design plan for Lots 1-7, including Tract A, to be reviewed and approved by the
Planning and Zoning Commission prior to issuance of the first building permit for the hotel.
ERGLE COUNTY. CO 200615956
TERK J SIMONTON
221 Pgs: 3 04:53:66P1 06/15/2006
RED:IS
S31-00
111,11111
3G�1111111111111111111111111111
PUD Signature Blocks
Owner's Certificate
Know all men by these presents that being the sole owners in fee simple of all that real
property described as follows:
"Legal Description of all parcels included ire the PUD"
We agree'to develop the plan as depicted on this site plan.
By�,„
Owrt is fu "macre arnd address.
r 2170
a.rtlornaa P1
The foregoing s,rgnatures were acknowledged be ore �c his day of
_ t P 2006
My Commission expires..- 6 �' �� � - - gp"T✓
Witness my hand and seal
Notary Public
Town Certificate
This Planned Unit vel pmeni Plan anti the usos, zoning standards and densities are
appmvod Lao 1'he _ I'[JD, {!;)rd once els« by the Town Council of
theown of Avon, an ty of Eagtc, State of Colorado, thrs �� day of
_ 2006 for filhrg with the Clerk and Roo Idcr of the Counly of
E<agl .Said approval shall n no way obligate the Town of Avon for any i nprove7nexits
and approval of this site plan by the Town is a consent only and is not to be confused as
an approval of the technical correctness of this plan or any documentation relating there to.
WITNESS [MY HAND AND SEAL OF THE TOWN OF AVON:
TOWN COUNCIL OF THE TOWN OF AVON
Ronald C,,Wo1,fe, Mayor 3 l" If".- " ; _,
rP71
Attest: 12_
Patty cKenn , I'ownCler z�
Land Table
Lot -1-
-Lot 2
Lot
Lot
Lot
L of �
Lot
Standard
U
Standard
c
Residential
Residential
Residential
Z
Commercial;
Z
Commercial;
Lodging
Z
r`
Lodging
LL
Incidental
Incidental
Incidental
Uses;
Uses;
�Ind
Uses;
Permitted
Commercial;
Commercial;
Commercial;
Lodging
Lodging
�a
Lodging
Uses by
Residential
Lodging Uses;
Residential
Lodging
Residential
Support
Support
Support
Support
ES
<c
:o
a
c
ri
v
0
0
0
0
N
N
N
M
r
Residential/Lodging Uses
1. Hotel rooms and suites;
2. Lodge rooms;
3. Condominiums;
4. Townhomes;
5. Time-share, vacation ownership, and fractional fee ownership; and
6. Accessory or incidental uses consistent with ResidentiallLodging Uses at the discretion of the Zoning Administrator.
1. Fitness facilities, locker rooms, reception, and related amenities and services;
2. Indoor and outdoor recreation (e.g. pools, Jacuzzis, game rooms);
3. Ski valet and storage;
4. Front desk and lobby;
5. Concierge, valet and bell service areas;
6. Business centers;
7. Housekeeping and laundry facilities;
8. Storage;
9. Mechanical rooms;
10. Restreoms;
11. Administrative spaces used by personnel providing Hotel/lodging services (e.g. reservations, accounting);
12. Maintenance facilities;
13. Meeting pre -function and support spaces; and
14. Other accessory or incidental uses consistent with Lodging Support Uses at the discretion of the Zoning Administrator
Standard Commercial Uses
1. Retail Stores;
2. Specialty Shops;
3. Restaurants, Bars and Cocktail Lounges;
4. Wellness Centers (such as physical therapy, medical);
5. Personal service shops;
6. Professional offices, including real estate brokerage and development offices;
7. Ski School Facilities;
8. Lift Ticket Sales Facilities;
9. Financial Institutions;
10. Offices; and
11. Other accessory or incidental uses consistent with Standard Commercial Uses at the discretion of the Zoning Administrator
Incidental Commercial Uses
1. Spa treatment rooms, spa retail, spa salon, and
2. Meetings and conference rooms;
1. Transportation facilities;
2. Public plazas;
3. Public restrooms; and
4. Public parks and walkways.
Temporary Facilities
1. Vacation Ownership/T ime Share sales centers of up to 7,000 square feet within the Hotel or Vacation Ownership/Time Share
buildings for up to ten years from the issuance of a Temporary Certificate of Occupancy of the first Vacation Ownership/Time
Share building;
2. 'Temporary facilities for real estate sales and development on Lot 5 for up to one year after the issuance of the Temporary
Certificate of Occupancy of the Hotel; and
3. Other temporary facilities are subject to Special Review Use.
Special Review Uses
1. Theatres;
2. Churches;
3. Bed and Breakfast lodges; and
4. Temporary facilities not approved (above) under Temporary Facilities.
t f 4
Five 5) spaces/1000 GLFA:
1. Retail Stores;
2. Specialty Shops;
3. Restaurants, Bars and Cocktail Lounges public spaces (excludes storage, kitchens and other
"back of house" spaces);
4. Wellness Centers (such as physical therapy, medical);
5. Personal service shops;
6. Professional offices, including real estate offices at the plaza level,
7. Ski School Facilities;
8. Lift 'Ticket Sales Facilities; and
9. Financial Institutions;
Four4 spaces Baer 9000 GLFA
1. Professional Offices/Offices, if any, on the fifth floor of the Hotel.
w2_(2) s aces_2er 1,000 GLFA
1. Spa treatment rooms, spa retail, spa salon; and
2. Meetings and conference roorns.
Hotel
1. One (1) space for each Accommodation Unit (as defined in the Development Agreement).
2. 1.2 spaces for each Dwelling Unit (as defined in the Development Agreement).
Vacation Ownership
1. .75 spaces per bedroom, maximum of 1.5 spaces per Residential Unit.
Condominiums and Townhomes other than a Hotel
1. 1.2 spaces per Residential Unit.
General:
1. Compact parking spaces shall not exceed ten percent (10%) of total parking for the entire
project.
2. Total required parking (as defined above) shall be reduced by 15% for facilities on Lots 1, 2
and 3 only.
3. Standard parking spaces on Lots 1 and 3 shall be a minimum width of 8'9", with standard
length of 18' and standard drive lane width of 24'.
°11P, 7
.:,
EXHIBITPUD DEVELOPMENT PLAN
ORDINANCE
06-03
1. This PUD Plan con'ta'ins the development standards and uses for the Riverfront PUD. Other uses and provisions of the Town of Avon Zoning Code not
specifically addressed herein, or in the related development agreement, shall apply to the Riverfront PUD.
2. Additional land uses determined to be similar to Standard Commercial Uses, Incidental Commercial Uses, Lodging Support Uses, and Residential/Lodging
Uses may to be approved by the zoning administrator;
3. Only Standard Commercial uses shall be subject to Gross Leaseable Floor Area ("GLFA") minimum and maximum restrictions;
4. Professional offices, including real estate offices, shall be limited to the two locations fronting the public plaza as depicted to the Planning and Zoning
Commission January 17, 2008. A temporary timeshare sales office will be permitted in the hotel and must be vacated within thirty (30) days of issuance of
Temporary Certificate of Occupancy for Building E (Lot 3). No additional plaza frontage space is permitted for use by professional and general office,
including financial institutions and real estate offices or residential units.
5. Office space above but not on the public plaza level may be converted to Residential/Lodging uses provided the maximum number of Dwelling Units is not
exceeded after such conversion. Required parking shall be recalculated after taking into account such conversion and any excess parking spaces may then
be individually deeded.
6. Minimum Standard Commercial shall be 20,000 GLFA, and maximum Standard Commercial shall be 40,000 GLFA. Additional Commercial GLFA exceeding
the PUD maximum may be approved for restaurant, bars, cocktail lounges and similar uses subject to a Special Review Use.
7. Maximum Residential Density shall be 456 Dwelling Units as defined in the Development Agreement.
8. Meeting space within the hotel shall be a minimum of 3,000 GLFA.
9. The minimum building setbacks shall be as follows:
a.. River: all buildings shall be setback the more restrictive of i) seventy five feet ('75') frorn the Mean Annual }-sigh Water Mark or fl) the northern
boundary line of 'Tract "A". Notwithstanding the foregoing, Lot '1"s minimum setback shall be the northern boundary line of Tract "A. Encroachments
for porches/decks/overhangs/eaves are permissible subject t0 design review approval as to specific, locations and dimensions.
b. Lot Lines: Buildings shall have a zero 'foot (0') setback from Internal lot lines. Buildings shall have a minimum twenty -foot (20') setback from Riverfrorrt
Subdivision perimeter lines. Notwithstanding the foregoing, Lot 7"s setback from its northern perimeter line shall be ten (10) feet.
c. Right -off -way: Buildings shall have a minimum setback of ten feet (110') from road right-of-ways. Subterranean encroachments shall be permitted into
this setback. Aerial enrroacliments (such as balconies and eaves) of up to three feet (3') shall be permitted into this setback for the northwest wing of
Building F only.
10. A fifty-five (55) foot view corridor through the public plaza adjacent to the proposed hotel as presented on the development plan and the final plat for
the Riverfront Subdivision shall remain unobstructed from the ground level upwards, with the exception of the gondola terminal. Minor encroachments
such as public restrooms, awnings, landscaping, overhangs, decks and railings shall be reviewed and may be approved through the design review
approval process.
11. Maximum Site Coverage = 25% of the 18.9 acre parcel.
12. A solar access study showing the effects of shading on adjacent buildings and outdoor spaces is required for all proposed buildings exceeding 3 stories in
height. Sun studies should be prepared on a site plan of a scale not less than 1" = 40' showing shadows at 10am and 3pm on March 21, June 21,
September 21, and December 21.
13. A parking management plan, generally consistent with recommendations outlined in the Walker Preliminary Parking Operations Plan dated December 5,
2005 shall be submitted and, after review and approval by the Zoning Administrator, be included as a subdivision plat note. The approved pian shall not be
changed without notification of the Town, and shall be enforceable by the Zoning Administrator.
14. The cumulative build -out of residential and commercial uses shall be submitted on each building permit application on a form acceptable to the Town, in
order to establish compliance with minimum commercial and maximum development standard requirements;
15. The property owner shall submit a master landscape and public plaza design plan for Lots 1-7, including Tract A, to be reviewed and approved by the
Planning and Zoning Commission prior to issuance of the first building permit for the hotel.
ERGLE COUNTY. CO 200615956
TERK J SIMONTON
221 Pgs: 3 04:53:66P1 06/15/2006
RED:IS
S31-00
111,11111
3G�1111111111111111111111111111
PUD Signature Blocks
Owner's Certificate
Know all men by these presents that being the sole owners in fee simple of all that real
property described as follows:
"Legal Description of all parcels included ire the PUD"
We agree'to develop the plan as depicted on this site plan.
By�,„
Owrt is fu "macre arnd address.
r 2170
a.rtlornaa P1
The foregoing s,rgnatures were acknowledged be ore �c his day of
_ t P 2006
My Commission expires..- 6 �' �� � - - gp"T✓
Witness my hand and seal
Notary Public
Town Certificate
This Planned Unit vel pmeni Plan anti the usos, zoning standards and densities are
appmvod Lao 1'he _ I'[JD, {!;)rd once els« by the Town Council of
theown of Avon, an ty of Eagtc, State of Colorado, thrs �� day of
_ 2006 for filhrg with the Clerk and Roo Idcr of the Counly of
E<agl .Said approval shall n no way obligate the Town of Avon for any i nprove7nexits
and approval of this site plan by the Town is a consent only and is not to be confused as
an approval of the technical correctness of this plan or any documentation relating there to.
WITNESS [MY HAND AND SEAL OF THE TOWN OF AVON:
TOWN COUNCIL OF THE TOWN OF AVON
Ronald C,,Wo1,fe, Mayor 3 l" If".- " ; _,
rP71
Attest: 12_
Patty cKenn , I'ownCler z�
Land Table
Notes:
Actual building heights at various locations on each Lot shall be established
through the Town's design review approval process, based on the criteria
established in the Town of Avon's Residential, Commercial, and Industrial Design
Review Guidelines.
In all instances, the maximum allowable percentage of a building ridgeline to
be at Or near the maximum height shall be governed by the more restrictive
criteria of the Riverfront Design Standards and the Town of Avon Design
Review Guidelines.
Architectural Design and Massing: Final building design shall be established
through the Town's design review approval process, based on the criteria
established in the Town of Avon's Residential, Commercial, and Industrial Design
Review Guidelines.
ENGINEERING INC
EDWARDS BUSINESS CENTER + P.O. BOX 97
EDWARDS, COLORADO 81632
+ 970 926-3373 FAX 926-3390 +
Lot -1-
-Lot 2
Lot
Lot
Lot
L of �
Lot
Standard
Standard
Residential
Residential
Residential
Residential
Commercial;
Commercial;
Commercial;
Lodging
Lodging
Lodging
Lodging
Incidental
Incidental
Incidental
Uses;
Uses;
Uses;
Uses;
Permitted
Commercial;
Commercial;
Commercial;
Lodging
Lodging
Lodging
Lodging
Uses by
Residential
Lodging Uses;
Residential
Lodging
Residential
Support
Support
Support
Support
Lodging
Uses;
Uses;
Uses;
Uses;
Right
Lodging
Support Uses;
Uses;
Lodging
Uses;
Lodging
Temporary
Temporary
Temporary
Temporary
Uses and
Uses and
Uses and
Uses and
Temporary
Support
Support
Facilities;
Facilities;
Facilities;
Facilities;
Uses and
Uses;
Uses;
Public Uses
Public Uses
Public Uses
Public Uses
Facilities;
Temporary
Temporary
Public Uses
Uses and
Uses and
Facilities;
Facilities;
Public Uses
Public Uses
Special
Theatres;
Theatres;
Theatres`
Bed and
Bed and
W Bed and
Bed and
Churches;
Churches;
Churches;
Breakfast;
Breakfast;
Breakfast;
Breakfast;
Review
Other
Other
Other
Home
Home
Home
Home
Temporary
Temporary
Temporary
Occupation;
Occupation;
Occupation;
OccupationUses ;
Facilities;
Facilities;
Facilities;
Other
Other
Other
Other
Temporary
Temporary
Temporary
Temporary
Facilities;
Facilities;
Facilities;
Facilities;
105 maximum
135' maximurn
105' maximum
95' maximum
90' maximum
55' maximum
55' maximum
LffilrC�j�6
{Bldg. G) and
Height"
45' maximum
H)
(Bldg.
Notes:
Actual building heights at various locations on each Lot shall be established
through the Town's design review approval process, based on the criteria
established in the Town of Avon's Residential, Commercial, and Industrial Design
Review Guidelines.
In all instances, the maximum allowable percentage of a building ridgeline to
be at Or near the maximum height shall be governed by the more restrictive
criteria of the Riverfront Design Standards and the Town of Avon Design
Review Guidelines.
Architectural Design and Massing: Final building design shall be established
through the Town's design review approval process, based on the criteria
established in the Town of Avon's Residential, Commercial, and Industrial Design
Review Guidelines.
ENGINEERING INC
EDWARDS BUSINESS CENTER + P.O. BOX 97
EDWARDS, COLORADO 81632
+ 970 926-3373 FAX 926-3390 +
M
LU
Z
t
Z
M
0
I. Vision Statement for Riverfront Village
A. Scope of Design Standards
I) The following Design Standards for Riverfront Village have been established to ensure the overall qualityand compatibility ofthe Village with the Tc wn of Avon and its -tverfront site. In general these Standards shall apply to all buildings and plaza areas widish Riverfront Village, with d1e exception of the Hotel building, or as otherwise noted.
2) An important aspect of the Riverfront Village vision is responsible care for the environment and sustainability of the architecture ars landscape. - +
Village p d dscape. [ o this end, best efforts will be, made to meet the principles set forth in the Ll F;13 (Leadership ±n Luer and L;nviroiltnental Design) Green Building System for the Hotel., In o- -' designed - sensitivity . -
of site and architectural design. P g5 g) g ) Addition, all other buildings within the Village will be d signed with sen.stuy±ty to the sustaanabil ty Aspects
B. Architectural Theme
1) Riverfront Village represents an important inters -ace between the Town of Avon and Beaver Creek Ski Resort, It is envisions ,i g g
P d s a lively l,athertng place. connecting the aver, mountain and town- A, pedestrian friendly etivtrorinlc nt where townspeople and guests can stroll fmnl Avon's western - - :r . o- _ .�
1g w .0 n Tatvil Center, through the. resort retail }}laza, to ride. the. gondola up to the mountain or to sus down to the fiver,
2) The village is situated on the seam between the town and the mountain landsca e and should therefore strike a balance � expression ,
p
p between the, tti� o ens iromnents, creating attng <u1 architectural that captures azures both alpine and townscape traditions. I. a achieve this balance The architectures take � _ _ + - - - - , > -
I p p hall take of materials inherent nt _o successful mountain resort architecture -such as stone wood and other natural materials, combined wtt11
more contemporary tnctterials such as stucco, metal, and recycled products.
_ >
3) The Architectural Theme will also feature the use of large areas ol:- Mass clean building forms based of Lire. geometries, a a
g glass, g p g s, strong, simple detailing (tact creel} rustic, heavy," or overstated), arid the bolder proportions appropriate to the larger scats of rise Town.
C, Design of Public Spaces
1 A public plaza will be used to link the Town of Avon to the Ea de River. This link sh) - r ° :
p 1 >" t old be reinforced _n both a ph57sica-[ oats perceptual atual wa throu<rn the, use of Javzn niate�ials landscaping, arid v> spatial o- , .. i. > , , _
i 1 Y 1. g I g, ad sensitive slsaria_ plannuig. ;spatial. t.latin±ng 5ha11 uiclude- corn aor,etlts that reinforce tnu. eonrtectivt , of the Tawe to the P.± r= • � , , � , , .
luldscaping that screens the; visual connection between 'Town and Rivet, este. -
1 p cr, acid avoid elements that a t. as barriers to flus connection, such as tJiatltsr wolfs that bloc(, pedestrian 11ow,
D, Pedestrian orientation
1) A pedestrian corridor, connecting the town to a retail plaza with gondola, will gracefully ttansitian front the plana to fitriverfrant promenade b way of a staircase and stepped terraces merging with the natural landscape. This transition wt_1 avoid bar,._crs frovl the Town to the Diver, and include elements which reinforce
this connection including simzlarp< tving nlaterrals, wide pedestrian ways that encourage movcmc nt, activesignage send wayfinding, and a gracious grand stair -with oversized treads andminimal risers.
2) Pathways shall also create a network within the Village itself, linking the different buildingsalong the length f h= o -' � The Plaza g a g g 1a o the site and providing pedestrian access to defined access/gathering points along t}ae River. lhe. Plaza and pathways vv±filth Rtverfront Village should encourage ie pedestrian -friendly environment.
1-'1. View Corridors
1) A primary southern view corridor to the mountains shall be maintained from the eastern railroad crossing through the public plaza to help reinforce the connection between the Town and the ski mountain.
2) An east -west view corridor along the Eagle River will also be maintained -through the reservation of a 75 -foot river setback throughout r
Eagle g p o shout most of tI e site, with limited minor encroachments a„ Allowed in the development plats. In addition, the Riverfront Park will act as a natural corridor along the river edge portion of the Village and act to enhance this view corridor.
F. The Natural Inviroinnent
1) The Eagle River is a primary, ametrity for th.e']'own. of Avon and Riverfront Village. Links to the River shall be developed as special pedestrian ways to help activate this wonderful amenity,
2) The 75 -foot rivet setback will be largely left in. its natural state, and certain defined river access and gathering points should be created along the linear riverfi-ont path,
3) In general, additional plantings within the river setback will be riparian in character and relate to plantings indigenous to river edge environments. More form o __ 1 A :
p p � g g al planttr7., areas such as sinal sections of lawn, Ix)vvc vex, arc, encouraged at special gathering and access points to highlight these more forml features. Formal plantings featuring annuals are not permitted w±fln the
75 -feat setback.
4) In an effort to enhance the natural environment, site walls and site walkways should become more "organic" as they approach file river edge portion of the Village. Any walls installed south ofthe bike path shall be limited to boulder wails. Accessibility shall be considered when designing walkways.
It. Site and Village Guidelines
A, Primary Building Entries
1) Primary building entries shall be emphasized as welcoming portals through careful attention, to massing,scale, and materials. This will ensure that Riverfront Village will not turn its back to Avon. o
g Portals will be scaled to encourage pedestrian movement through them -and avoid overwhelming or diminutive massing -and they will be treated with materials that enhance this experience. The front doors of building>bs should be
treated in interesting ways, either through the use of glass or special designs and materials that provide .interest to these special areas of each building.
2) Massing of entries shall relate to the overall massing of the buildings but be presented asspecial forms different than typical building bays. Sensitivity to scale should be considered when tr-ansiuont;ng from the overall larger buildrtag mass to the more intimate scale of the pedestrian visitor. Designers are encouraged to use amatsnals u1 interest ng ways at primary building entries to reinforce their unique role as part of the
building and as part of the over-allVillagestreetsc.ape.
B. Solar Access
1) A solar access study shall be required for buildings exceeding 3 stories in height. 'Chess studies will convey shading impacts at summer and winter solstice (jun 21 and Dec 21), and at vernal and autumnal equinox (Mar- 21 and Sept 21).
C- Site Materials and Colors
1. Plaza materials
a) Rustic materials common in mountain towns and/or a mare contemporary interpretation of these materials such as cut stone pavers colored concrete avers and stained or colored t i i :
2. Site walls
1 p d co zcxetc slabs are appropriate to the Village. Colors shall be complementary to the site and its -architecture, avoiding bright or brilliant hues that distract from the pedestrian sxperienceat e le
a) Site walls shall make f a1 1
use o more contemporary maters s suc 1 as colored concrete masonry, stained concrete, board -formed concrete„ and similar materials, in colors complementary to the site Audits buildings. Site walls shall relate to plaza materials and building bases to help visually merge the ground plane around the site.
D, Site Signage - Design, materials, and colors
1) Site signage shall be designed to help animate the plaza and be consistent and compatible with the design and materiality of the buildings. Site lighting will also be used to enhance the pedestrian experience at the Plaza level.
III. Architectural Design Guidelines
A. Building Form and Massing
1) In general the forum and massing within Riverfront Village will follow, the intent of the Town of Avon Design Guidelines by incorporating
g g ) form articulation to Avoid the monolithic. However, specific buildings within the Village shall be subject to less or more stringent requirements relative 1 g �, ) g q c alive to building forth and massing as identified within this document to form a coherent pleasant composition for the entire neighborhood.
21 Smaller masses, such as portions of the building or elements such as ports cochsres, etc, will be used to break up the apparent size of larger building forms. Smaller masses positioned in front of lar<re masses will be used to reduce the � ' _ - _ o-=- ' �•
p P g d.
<. g p a c e visual doi,ltnanc e of the larger form,,.
3) The development of building bases Will het to tie together. individual buildin rs within the Village and will also tie the, Village to its riverfront i
p g �, g g site. Site Walls, and c)tlier site features snail relate to building bases in a way that reinforces visual connective. to the ground .Lane The o- will
4 I - - g Y connectivity gt p c plaza and gondola terminal, a>ith its cantilevered structure wil, stand out as an elevated element from the south cirav�nn people from the river,
) n general the middles of buildings w ll be more visually subtle, but broken b y . rima and secondary elevation features And material accents that help to avoid facades. - r = A - -will p p
} P rY } p monotonous fas<.dss. On any given elevation at Lots 1, 3, and 4, 80 percent of the vertical wall area, w±ll be permitted to be within the sameP lane, will a n1it1[munl of 2 -foot offset for plane changes. Vertical forms comprised • 'e
considered plane changes. At Lots 5, G, and 7, 7C) percent of the vertical. wall area -will be permitted to be within fife sans plane.
a >sed of stacked decks <L11d balconies Will o
5) The roofscape of Riverfront Village is also critical to the success of the nei glaborhood and its relationship to the Town of Avon The '
€, p visual coherency of fns Village should las reinforced fhtcntgh the use of snvlar rooting materials and colors throughout the Village, helping to knit the individual buildings Pitched roof,,; expressive of an alpine teats e shed Primary < g g g , 1 Z, nclividuaa bLtticl.ngs together When seen from the Gondola or Beaver Creek above.
1 } tradition and the incorporation of dormers, shed roofs and cbinine forms, should be employed. 1 rimar toots will have -)itches ranging from 2 - r' ?
y P y } g g a m.twnunl of 4.1_, to a maximum of 8.1<,. Secondary roofs -such as at dormers, x?rte cochsres butldirl arotrus±ons and similar additive forms- �, > t I . , , .> � _- , '
buildings such as > - 1 g 1 n ay b da_, but onl} if t e) are finished ,ti materials similar inqualityto root of wa, l materials on the
`, pavers, co ore stone, etc. When secondary roosts are pitched roofs; tl.c nittuniunl pitch required shall 1Je 2.1.2. Flat roots are trot permitted for primary roof farms. ideally flat roofs should be developed as terraces and other tLrncUona] s Jaces.
1
7) Given the modern a[ ine character of the architecture at l.Uvcrfiont Village, relatively small roof overhangs are encouraged for 1Lldng
s on mots 1 and 3, which are visually and cornpositionally strafed to the Hotel. At these locations L11e mtriimui t +_ o- _. 3 r
dormers.
p y n oof o er}lang 1J rruittsd shall be six inches. At other ioca:tions -within Riv rfrant Village the minimum roof overhang shall be 24 inches for primary roofs and 12 inches at secondary
8) To belp ensure that roof tidges for the Village rennaeznterestin,g a:rid contribute to the overall ll success of building lxng ass . g, uninterrupted rtdgcltnss shall be Avoided.
�
These -building
cidec. To this esic, r of+idgtith_s ate n±icd to 150 f,eta�for_ a. chasge±n height (elevation Above sea level) ±s required. brebreaks (c , anon changes) shall / of fi: overall ridge len gth bsfore returning to theprior ricradon,Overall building ridge length is defned as the swim ofall primary ridge lengths for the entire building.
B. Building Height
1 Building heights for the Riverfront Village will be restricted to the h 1 „ _ ,, � :
€, b g eigll.s described tri the. approved I�evcicJ-ullsut. I lam as tncasarul aceordinp to the fown. of Avon. C.ods.11tc1ute Architectural Features cupolas, �: .. " � _ - .. _ ., .. .
11 1. et al feature s such as cis-ttncieys, cupolas, rind other sitrttla:r elc nients will not be includedw11en e alculanrts; maxunwn buiklm,lx;i Irl.
2 In addition, the percentage of ridQC height allowed at the rt'taxinmrn allowableg g o b g
) I Yi <, g bLttldinl, height forany glVc.n bltild.trl€, Wlil. be 11mttU1 t0 25 �, ofthe overall building tidgc. length. OVeiallbuilding ridge. length1narY g is defined a.5 the SL1YT1 Oall primary 1ridge lengths for the ('.elites building.
3) The inaxirriutn height for building facades feoritnn' the Public 1.'laza will. [:>e limited to 75 fee f) _ Plaza : > , -, height . - _,. - - :
g t rc m th Plar•a elevation.
The, only exception to this facade het )ht ltinitatxon shall be for the western facade ol. ills central tower of the hotel, i . -, , i
I g otcl, whrch shall bc, permitted to be as tau as 100 f,. froth Plaza elevation. This central tower facade may t.uti horizontally for up to C>0 feet Along alar
4) The minimum horizontal setback required uired for building facades exceeding the nlaxinlum �i 4 Y 1 b plaza.
q g g height for building facades fronting the Public Placa will be 2. feet trona the building facade frontingthe Public Plaza. This shall only apply to the central. tower 1portion of the Hotel.
5) The rtiiriitnuarn setback required for maximum allowable height per the I7eveloprnertt Standards from the Public Plaza, will be GO feet from building fafade fronting the Plaza
C. Exterior Materials, Detailing, and Colors
1, Materials and colors for walls and roofs at Riverfront Village vvill have a Light Reflective Value (LRy7) not exceeding 60
A) Materials inherent to the mountains, including stone and wood, will be used at lower levels of buildings in areas of direct pedestrian interface a' -
;, p as as metals. These materials should be used in tetreshmg ways within the Village, reinterpreted for the urban names of Avon towards a"mountain modern" character.
b) Stucco conveys mass in a subtle, "quiet" way and is therefore a recommended material for building middles and tops. however, building accents comprised of non -stucco material- r ,
p g p s, such as metal, wood and cement materials repltcanng wood, shall be allowed m bwldxng middles and tops to help provide interest, except as prohibited by Codes. `Ul1et1 used, stucco shall be carefully detailed to ensure longevity when it comes
near the ground plane at building walls.
c) Roof materials will include rubber shingles, asphalt shingles and other materials suitable for mountain environments. Standingseam metal shall not be used for primary roof lanes but may be used for small and/or p p y /c special roof features such as shed dormers, retail roof forms, poste cochsres, and other selective roof elements.
d) In general, colors used within the Village should be complementary to the site, and be comprised of greens, grays, golds, browns, and other earth -tone hues. However, due to the desire for a highly activated retail experience at the 1<z
2. Minimum window area at plaza level
Plaza a level, the colors used along the retail edges of the Public way txlay be more vibrant and Active n nature.
a) At a minimum, 50% of the 1st level of building facades facing the plaza from the east and the west shall be glass. For this calculation thelaza shall be deemed to begin at the northwest corner of the hotel and the northeast IJ g coiner of timeshare west and shall terminate at the east -west plane where the staircase down to the river begins. This calculation shall exclude the gondola terminal, control booth and public restsooms.
o
cn
Lu
G
vA
� 4l
a
)
rk
M
LU
Z
t
Z
M
0
I. Vision Statement for Riverfront Village
A. Scope of Design Standards
I) The following Design Standards for Riverfront Village have been established to ensure the overall qualityand compatibility ofthe Village with the Tc wn of Avon and its -tverfront site. In general these Standards shall apply to all buildings and plaza areas widish Riverfront Village, with d1e exception of the Hotel building, or as otherwise noted.
2) An important aspect of the Riverfront Village vision is responsible care for the environment and sustainability of the architecture ars landscape. - +
Village p d dscape. [ o this end, best efforts will be, made to meet the principles set forth in the Ll F;13 (Leadership ±n Luer and L;nviroiltnental Design) Green Building System for the Hotel., In o- -' designed - sensitivity . -
of site and architectural design. P g5 g) g ) Addition, all other buildings within the Village will be d signed with sen.stuy±ty to the sustaanabil ty Aspects
B. Architectural Theme
1) Riverfront Village represents an important inters -ace between the Town of Avon and Beaver Creek Ski Resort, It is envisions ,i g g
P d s a lively l,athertng place. connecting the aver, mountain and town- A, pedestrian friendly etivtrorinlc nt where townspeople and guests can stroll fmnl Avon's western - - :r . o- _ .�
1g w .0 n Tatvil Center, through the. resort retail }}laza, to ride. the. gondola up to the mountain or to sus down to the fiver,
2) The village is situated on the seam between the town and the mountain landsca e and should therefore strike a balance � expression ,
p
p between the, tti� o ens iromnents, creating attng <u1 architectural that captures azures both alpine and townscape traditions. I. a achieve this balance The architectures take � _ _ + - - - - , > -
I p p hall take of materials inherent nt _o successful mountain resort architecture -such as stone wood and other natural materials, combined wtt11
more contemporary tnctterials such as stucco, metal, and recycled products.
_ >
3) The Architectural Theme will also feature the use of large areas ol:- Mass clean building forms based of Lire. geometries, a a
g glass, g p g s, strong, simple detailing (tact creel} rustic, heavy," or overstated), arid the bolder proportions appropriate to the larger scats of rise Town.
C, Design of Public Spaces
1 A public plaza will be used to link the Town of Avon to the Ea de River. This link sh) - r ° :
p 1 >" t old be reinforced _n both a ph57sica-[ oats perceptual atual wa throu<rn the, use of Javzn niate�ials landscaping, arid v> spatial o- , .. i. > , , _
i 1 Y 1. g I g, ad sensitive slsaria_ plannuig. ;spatial. t.latin±ng 5ha11 uiclude- corn aor,etlts that reinforce tnu. eonrtectivt , of the Tawe to the P.± r= • � , , � , , .
luldscaping that screens the; visual connection between 'Town and Rivet, este. -
1 p cr, acid avoid elements that a t. as barriers to flus connection, such as tJiatltsr wolfs that bloc(, pedestrian 11ow,
D, Pedestrian orientation
1) A pedestrian corridor, connecting the town to a retail plaza with gondola, will gracefully ttansitian front the plana to fitriverfrant promenade b way of a staircase and stepped terraces merging with the natural landscape. This transition wt_1 avoid bar,._crs frovl the Town to the Diver, and include elements which reinforce
this connection including simzlarp< tving nlaterrals, wide pedestrian ways that encourage movcmc nt, activesignage send wayfinding, and a gracious grand stair -with oversized treads andminimal risers.
2) Pathways shall also create a network within the Village itself, linking the different buildingsalong the length f h= o -' � The Plaza g a g g 1a o the site and providing pedestrian access to defined access/gathering points along t}ae River. lhe. Plaza and pathways vv±filth Rtverfront Village should encourage ie pedestrian -friendly environment.
1-'1. View Corridors
1) A primary southern view corridor to the mountains shall be maintained from the eastern railroad crossing through the public plaza to help reinforce the connection between the Town and the ski mountain.
2) An east -west view corridor along the Eagle River will also be maintained -through the reservation of a 75 -foot river setback throughout r
Eagle g p o shout most of tI e site, with limited minor encroachments a„ Allowed in the development plats. In addition, the Riverfront Park will act as a natural corridor along the river edge portion of the Village and act to enhance this view corridor.
F. The Natural Inviroinnent
1) The Eagle River is a primary, ametrity for th.e']'own. of Avon and Riverfront Village. Links to the River shall be developed as special pedestrian ways to help activate this wonderful amenity,
2) The 75 -foot rivet setback will be largely left in. its natural state, and certain defined river access and gathering points should be created along the linear riverfi-ont path,
3) In general, additional plantings within the river setback will be riparian in character and relate to plantings indigenous to river edge environments. More form o __ 1 A :
p p � g g al planttr7., areas such as sinal sections of lawn, Ix)vvc vex, arc, encouraged at special gathering and access points to highlight these more forml features. Formal plantings featuring annuals are not permitted w±fln the
75 -feat setback.
4) In an effort to enhance the natural environment, site walls and site walkways should become more "organic" as they approach file river edge portion of the Village. Any walls installed south ofthe bike path shall be limited to boulder wails. Accessibility shall be considered when designing walkways.
It. Site and Village Guidelines
A, Primary Building Entries
1) Primary building entries shall be emphasized as welcoming portals through careful attention, to massing,scale, and materials. This will ensure that Riverfront Village will not turn its back to Avon. o
g Portals will be scaled to encourage pedestrian movement through them -and avoid overwhelming or diminutive massing -and they will be treated with materials that enhance this experience. The front doors of building>bs should be
treated in interesting ways, either through the use of glass or special designs and materials that provide .interest to these special areas of each building.
2) Massing of entries shall relate to the overall massing of the buildings but be presented asspecial forms different than typical building bays. Sensitivity to scale should be considered when tr-ansiuont;ng from the overall larger buildrtag mass to the more intimate scale of the pedestrian visitor. Designers are encouraged to use amatsnals u1 interest ng ways at primary building entries to reinforce their unique role as part of the
building and as part of the over-allVillagestreetsc.ape.
B. Solar Access
1) A solar access study shall be required for buildings exceeding 3 stories in height. 'Chess studies will convey shading impacts at summer and winter solstice (jun 21 and Dec 21), and at vernal and autumnal equinox (Mar- 21 and Sept 21).
C- Site Materials and Colors
1. Plaza materials
a) Rustic materials common in mountain towns and/or a mare contemporary interpretation of these materials such as cut stone pavers colored concrete avers and stained or colored t i i :
2. Site walls
1 p d co zcxetc slabs are appropriate to the Village. Colors shall be complementary to the site and its -architecture, avoiding bright or brilliant hues that distract from the pedestrian sxperienceat e le
a) Site walls shall make f a1 1
use o more contemporary maters s suc 1 as colored concrete masonry, stained concrete, board -formed concrete„ and similar materials, in colors complementary to the site Audits buildings. Site walls shall relate to plaza materials and building bases to help visually merge the ground plane around the site.
D, Site Signage - Design, materials, and colors
1) Site signage shall be designed to help animate the plaza and be consistent and compatible with the design and materiality of the buildings. Site lighting will also be used to enhance the pedestrian experience at the Plaza level.
III. Architectural Design Guidelines
A. Building Form and Massing
1) In general the forum and massing within Riverfront Village will follow, the intent of the Town of Avon Design Guidelines by incorporating
g g ) form articulation to Avoid the monolithic. However, specific buildings within the Village shall be subject to less or more stringent requirements relative 1 g �, ) g q c alive to building forth and massing as identified within this document to form a coherent pleasant composition for the entire neighborhood.
21 Smaller masses, such as portions of the building or elements such as ports cochsres, etc, will be used to break up the apparent size of larger building forms. Smaller masses positioned in front of lar<re masses will be used to reduce the � ' _ - _ o-=- ' �•
p P g d.
<. g p a c e visual doi,ltnanc e of the larger form,,.
3) The development of building bases Will het to tie together. individual buildin rs within the Village and will also tie the, Village to its riverfront i
p g �, g g site. Site Walls, and c)tlier site features snail relate to building bases in a way that reinforces visual connective. to the ground .Lane The o- will
4 I - - g Y connectivity gt p c plaza and gondola terminal, a>ith its cantilevered structure wil, stand out as an elevated element from the south cirav�nn people from the river,
) n general the middles of buildings w ll be more visually subtle, but broken b y . rima and secondary elevation features And material accents that help to avoid facades. - r = A - -will p p
} P rY } p monotonous fas<.dss. On any given elevation at Lots 1, 3, and 4, 80 percent of the vertical wall area, w±ll be permitted to be within the sameP lane, will a n1it1[munl of 2 -foot offset for plane changes. Vertical forms comprised • 'e
considered plane changes. At Lots 5, G, and 7, 7C) percent of the vertical. wall area -will be permitted to be within fife sans plane.
a >sed of stacked decks <L11d balconies Will o
5) The roofscape of Riverfront Village is also critical to the success of the nei glaborhood and its relationship to the Town of Avon The '
€, p visual coherency of fns Village should las reinforced fhtcntgh the use of snvlar rooting materials and colors throughout the Village, helping to knit the individual buildings Pitched roof,,; expressive of an alpine teats e shed Primary < g g g , 1 Z, nclividuaa bLtticl.ngs together When seen from the Gondola or Beaver Creek above.
1 } tradition and the incorporation of dormers, shed roofs and cbinine forms, should be employed. 1 rimar toots will have -)itches ranging from 2 - r' ?
y P y } g g a m.twnunl of 4.1_, to a maximum of 8.1<,. Secondary roofs -such as at dormers, x?rte cochsres butldirl arotrus±ons and similar additive forms- �, > t I . , , .> � _- , '
buildings such as > - 1 g 1 n ay b da_, but onl} if t e) are finished ,ti materials similar inqualityto root of wa, l materials on the
`, pavers, co ore stone, etc. When secondary roosts are pitched roofs; tl.c nittuniunl pitch required shall 1Je 2.1.2. Flat roots are trot permitted for primary roof farms. ideally flat roofs should be developed as terraces and other tLrncUona] s Jaces.
1
7) Given the modern a[ ine character of the architecture at l.Uvcrfiont Village, relatively small roof overhangs are encouraged for 1Lldng
s on mots 1 and 3, which are visually and cornpositionally strafed to the Hotel. At these locations L11e mtriimui t +_ o- _. 3 r
dormers.
p y n oof o er}lang 1J rruittsd shall be six inches. At other ioca:tions -within Riv rfrant Village the minimum roof overhang shall be 24 inches for primary roofs and 12 inches at secondary
8) To belp ensure that roof tidges for the Village rennaeznterestin,g a:rid contribute to the overall ll success of building lxng ass . g, uninterrupted rtdgcltnss shall be Avoided.
�
These -building
cidec. To this esic, r of+idgtith_s ate n±icd to 150 f,eta�for_ a. chasge±n height (elevation Above sea level) ±s required. brebreaks (c , anon changes) shall / of fi: overall ridge len gth bsfore returning to theprior ricradon,Overall building ridge length is defned as the swim ofall primary ridge lengths for the entire building.
B. Building Height
1 Building heights for the Riverfront Village will be restricted to the h 1 „ _ ,, � :
€, b g eigll.s described tri the. approved I�evcicJ-ullsut. I lam as tncasarul aceordinp to the fown. of Avon. C.ods.11tc1ute Architectural Features cupolas, �: .. " � _ - .. _ ., .. .
11 1. et al feature s such as cis-ttncieys, cupolas, rind other sitrttla:r elc nients will not be includedw11en e alculanrts; maxunwn buiklm,lx;i Irl.
2 In addition, the percentage of ridQC height allowed at the rt'taxinmrn allowableg g o b g
) I Yi <, g bLttldinl, height forany glVc.n bltild.trl€, Wlil. be 11mttU1 t0 25 �, ofthe overall building tidgc. length. OVeiallbuilding ridge. length1narY g is defined a.5 the SL1YT1 Oall primary 1ridge lengths for the ('.elites building.
3) The inaxirriutn height for building facades feoritnn' the Public 1.'laza will. [:>e limited to 75 fee f) _ Plaza : > , -, height . - _,. - - :
g t rc m th Plar•a elevation.
The, only exception to this facade het )ht ltinitatxon shall be for the western facade ol. ills central tower of the hotel, i . -, , i
I g otcl, whrch shall bc, permitted to be as tau as 100 f,. froth Plaza elevation. This central tower facade may t.uti horizontally for up to C>0 feet Along alar
4) The minimum horizontal setback required uired for building facades exceeding the nlaxinlum �i 4 Y 1 b plaza.
q g g height for building facades fronting the Public Placa will be 2. feet trona the building facade frontingthe Public Plaza. This shall only apply to the central. tower 1portion of the Hotel.
5) The rtiiriitnuarn setback required for maximum allowable height per the I7eveloprnertt Standards from the Public Plaza, will be GO feet from building fafade fronting the Plaza
C. Exterior Materials, Detailing, and Colors
1, Materials and colors for walls and roofs at Riverfront Village vvill have a Light Reflective Value (LRy7) not exceeding 60
A) Materials inherent to the mountains, including stone and wood, will be used at lower levels of buildings in areas of direct pedestrian interface a' -
;, p as as metals. These materials should be used in tetreshmg ways within the Village, reinterpreted for the urban names of Avon towards a"mountain modern" character.
b) Stucco conveys mass in a subtle, "quiet" way and is therefore a recommended material for building middles and tops. however, building accents comprised of non -stucco material- r ,
p g p s, such as metal, wood and cement materials repltcanng wood, shall be allowed m bwldxng middles and tops to help provide interest, except as prohibited by Codes. `Ul1et1 used, stucco shall be carefully detailed to ensure longevity when it comes
near the ground plane at building walls.
c) Roof materials will include rubber shingles, asphalt shingles and other materials suitable for mountain environments. Standingseam metal shall not be used for primary roof lanes but may be used for small and/or p p y /c special roof features such as shed dormers, retail roof forms, poste cochsres, and other selective roof elements.
d) In general, colors used within the Village should be complementary to the site, and be comprised of greens, grays, golds, browns, and other earth -tone hues. However, due to the desire for a highly activated retail experience at the 1<z
2. Minimum window area at plaza level
Plaza a level, the colors used along the retail edges of the Public way txlay be more vibrant and Active n nature.
a) At a minimum, 50% of the 1st level of building facades facing the plaza from the east and the west shall be glass. For this calculation thelaza shall be deemed to begin at the northwest corner of the hotel and the northeast IJ g coiner of timeshare west and shall terminate at the east -west plane where the staircase down to the river begins. This calculation shall exclude the gondola terminal, control booth and public restsooms.
iLU
2
z
z
FC
f;
G
Exhibit F
i
r
v ¢ 6
�
110
� r i
I
i m � --. 1 7 M
I
i d
iA4 "i
�; a^1't2� r' �., r .s � , r�'+�i'� x' F •' '.ray, ,a