Loading...
PZC Packet 050311Memorandum To: Planning and Zoning Commission Initials From: Jared Barnes, Planner I Thru: Sally Vecchio, Director of Community Development Date: April 29, 2011 Re: Retaining Wall at 20 Nottingham Road Summary Craig Snowdon, Snowdon Hopkins, is requesting a modification to an approval condition for an approved design. At their November 16, 2010 meeting the Planning and Zoning Commission approved a final design with the condition that, "(5) Stone veneer will be removed and replaced with a uniform keystone block wall (matching adjacent walls) across the back of the property." Due to the difficulties of construction of an engineered MSE wall in front of the stone veneer wall, Craig Snowdon is requesting a modification to the site plan that would leave the existing boulder retaining wall in place and build a separate MSE wall to the west. Policy Review From the engineered drawing provided, it appears that there is enough space on the property to construct the MSE wall as designed. There also appear to be alternative solutions that are possible and could achieve the PZC condition of approval. A Right -of -Way permit may be necessary if the construction of the wall requires work that extends beyond the property line. As outlined in Attachment B, The applicant is requesting relief from the condition of approval. Exhibit A: Meeting Minutes from November 16, 2010 PZC Meeting B: Letter from Applicant dated April 29, 2011 C: Photographs of the existing stone veneer wall D: Plan Sets Town of Avon Planning & Zoning Commission Meeting Minutes for November 16, 2010 O Avon Town Council Chambers Meetings are open to the public Avon Municipal Building / One Lake Street AY R A D O I. Call to Order The meeting was called to order at 5:OOpm. II. Roll Call All Commissioners were present. III. Additions & Amendments to the Agenda There were no additions or amendments to the agenda. IV. Conflicts of Interest Commissioners Green and Prince disclosed potential or perceived conflicts with Item VI, and decided to refrain from review. V. Consent Agenda • Approval of the October 19, 2010 Meeting Minutes Action: Commissioner Green moved to approve the consent agenda, with Commissioner Anderson seconding the motion. The motion passed with a 6-0 vote. Commissioner Struve abstained due to his absence from the October 19, 2010 meeting. VI. Master Sign Program The Ascent Property Location: Lot 1, Chateau St. Claire / 38390 Highway 6 & 24 Applicant/ Owner. Brian Wilson, Real Capital Solutions Description: The Master Sign Program (MSP) proposes two monument signs, one real estate sign, seven light pole banner signs, three directional sales center signs, and five parking signs. All signs will be temporary with the exception of the monument signs. Discussion: Jared Barnes presented the sign program on behalf of staff, and reiterated the recommended conditions of approval. Landscaping must be provided at the freestanding sign, and the temporary real estate sigh would need to be removed either: 1) before all sales are complete; or 2) within 2 years. Lissa Tyler, representing the owner, addressed the commission's questions regarding the 30 day timeframe. Commissioner Goulding questioned if the 2 year timeframe is actually "temporary," and also the material appropriateness of the vinyl banners. Discussions related to the temporary freestanding real estate sign ensued. Action: Commissioner Roubos moved to approve the MSP with the following conditions: 1. The application be revised to include a landscape plan that provides landscaping around the base of the monument signs and freestanding real estate sales sign; 2. The Real Estate Sales sign be approved for a time period of thirty (30) days from date of sale; 3. All temporary signs must come back to the PZC for review and approval no later than November 16, 2011, or removed; and, 4. All parking signs shall be deemed "temporary signs." Commissioner Struve seconded the motion. There was no further discussion and the vote passed 4-1, with Commissioner Goulding opposing. VII. Final Design New Commercial Structure Property Location: Lot 67, Block 1, Benchmark at Beaver Creek / 40 Nottingham Road Applicant: Dominic Mauriello, MPG / Owner: Jim Pavelich, GPI, LLC Description: The proposal is to demolish the existing Pizza Hut building and replace it with a new structure which is to contain a restaurant and a retail space with a second -story back-of- house/storage area for the primary restaurant and retail uses. Discussion: Commissioner Goulding asked staff if internal landscaping must be provided. Matt Gannett explained that given the existing conditions with the shared access, the project still meets the zoning requirements. Commissioner Goulding also asked if anything was located on the neighboring Lot 4. Mr. Gannett responded that this property is reserved for future road improvements. Commissioner Green wanted to see light fixtures and the color board. Dominic Mauriello, Sherry Dorward, and Craig Snowden all presented a PowerPoint presentation to the Commission. The Commission was in general support of the design as revised since sketch review, with some minor comments including: inadequacy of the drainage swale, dumpster design and location, landscaping improvements on Lot 4, "gateway" property, railing design, rooftop equipment design and location, and the new proposed clipped hip roof design. The Commission asked the architect what his preference would be on the clipped vs. non -clipped roof option. The architect......... Other comments included the consistency of the keystone retaining wall behind the parking area, and the necessity of an on-site mockup. Action: Commissioner Green motioned to approve the final design application, including the following finding: 1. The proposed application adheres to the applicable Town of Avon Residential. Commercial, and Industrial Design Guidelines as further detailed in the staff report dated November 12, 2010. And subject to the following conditions: 1. PZC will review all rooftop mechanical penetrations (including screening details) prior to the issuance of a building permit; 2. If for any reason applicant is unable to obtain enough stone from the existing building and the stone changes, the revised stone must come back to PZC for review and approval; 3. An appropriately scaled on-site mockup, showing all materials and finishes, must be approved by PZC for final approval of materials and colors; and, 4. The Applicant will work with staff to address and reduce the bear attracting plant species identified on the Landscape Plan. Commissioner Struve seconds the motion. There was discussion on the motion. Commissioner Patterson suggested adding a condition related to the coordinated landscaping improvements to Lot 4. Commissioner Goulding also suggested adding a condition that the moss rock retaining wall across the back of the property be consistent in materials. 5. Stone veneer will be removed and replaced with a uniform keystone block wall (matching adjacent walls) across the back of the property Signs are not approved and a formal sign application is required. While not added as a condition of approval, Commissioner Green strongly encouraged Staff to work with the applicant at the appropriate timing to embellish the landscaping for Lot 4. All Commissioners were in favor of the motion and it passed unanimously. VIII. Other Business Final Design Extension Property Location: Lot 7, Western Sage / 5771 Wildridge Road Applicant: / Owner: Buzz Reynolds, The Reynolds Corporation Description: An application for a one year extension to a Final Design approval for Lot 7, Western Sage. Discussion: Goulding questioned the 2 -year timeframe and its reasoning. Action: Commissioner Green moved to approve the one year extension for Lot 7. The motion was seconded by Commissioner Patterson, and it passed unanimously. • Commissioner Prince updated on the Commission with his recent Village at Avon DRB meeting. The Village DRB approved a sign for the new Verizon store at Traer Creek Plaza. It was noted that the building did not have a Master Sign Program. He also mentioned that the Home Depot property has been targeted for better upkeep and less clutter. • Sally Vecchio reminded the Commission that the new Development Code is not active and Staff will be coming back with revised applications and checklists for PZC review. IX. Adjourn The meeting was adjourned at 6:43pm C2-1 A -- Chris ree Chairperson P I S uve, ecretary Snowdon and Hopkins • Architects, P.C. Jared Barnes, Planner Town of Avon P.O. Box 975 Avon, Colorado 81620 April 29, 2011 Re: 20 Nottingham Road, Lot 67, Block 1, Benchmark at Beaver Creek, Avon Dear Jared: The applicant, GPI, LLC, requests that the Design Review Board reconsider one of their conditions of approval that requires construction of a keystone block wall in front of an existing 7 -foot tall stone veneered wall on the project site. In consultation with the project structural engineer, the contractor, and the manufacturer of the concrete block, we have found that the new segment of block wall cannot be constructed snugly to the stone veneer wall as anticipated. Because it would exceed four feet in height to fully screen the existing wall, the block wall would have to be engineered with geotextile fabric between multiple lifts of backfill behind the new wall. This would necessitate a separation of at least 6 feet between the walls for constructability. Elimination of the block wall segment in front of the existing wall would: • Provide for better management of drainage from the slope above; • Avoid the removal of an existing 20+ -foot tall spruce tree, which is not on the applicant's property (landscape contractor does not feel the tree can be successfully transplanted); • Avoid loss of needed snow storage space; • Avoid excessive cutting into the steep fill slope between the wall and Swift Gulch Road; • Allow the new block wall to remain less than four feet in height, which means that over - excavation and installation of geotextile fabric would not be necessary; • Break up what would otherwise be a 255' length of block wall; • Avoid encroachment of wall construction onto adjacent property. The existing stone wall, approximately 32 feet long, is an attractive and well engineered feature on the site. It would provide a desirable break between two very long sections of concrete block wall, the existing portion of which (on the adjacent site) is a massive feature exceeding ten feet in height. The concrete block and existing stone veneer are compatible in coloring. The stone veneer on the new building will be as close a match as possible to that of the existing wall, so we do not feel that the existing wall will seem out of place. We appreciate your willingness to consider this request at the next DRB meeting so as not to cause the contractor undue delay in site work. Sincerely, Craig N. Snowdon AIA Snowdon and Hopkins — Architects, P.C. PO Box 3340 • Vail, Colorado 81658 • Phone: 970 - 476 - 2201 • Fax: 970 - 476 - 7491 r-. s 4f 4RI,VOW�ftw Amok ti 'fig• ``' r,�,;. (R.C.K VARIE5) X7515 Existing Spruce 1 SPR 7 CGA OW 6. 0' 0 _ BOLO'- o 17 RHU-A —7505 n in N 41°17'44" -mow storage (SEED) - Keystone block wall 65.41' Keystone block wall to overlap existing stone — - veneer wall- - /99 / LOT 6-7 0.517 ACRES 0020 O Existing Spruce — 3 CGA T V 7520 �'s7s TO -W-7-.3' E B W 0:94_ Existing stone veneer wall ---------- \ TOW 7.1' E BOW 0.39' (E) Wall location \ required by supplier due to height required to cover existing stone wall- _ _ 41°12'32'tw 20.68 I 10.45' I PARTIAL LANDSCAPE/SITE PLAN '' NORTH - Existing keystone block wall Requested elimination of proposed keystone block wall r6uired by Town of Avon 7Eistfing Spruce woube eliminated by proposed wall LXA W U LU w 00 H Q Q U Q W J 00 OC U r Q Z = U > < Z J m LL H- ~ c~o Z Z I- 0 N J H 0 0 0 0 N 0, N R d a E Z 0 0 LXA 1 RETAINING WALL PROFILE NOTES: 1" = 10, 1. RE: TO SHEET RW1.0 FOR GENERAL NOTES & DETAILS. 2. REFER TO SITE GRADING PLANS FOR TOP OF WALL & BOT. OF WALL LOCATIONS. 3. GEOGRID LENGTHS SHOWN SHALL BE CONSISTENT w/ ALL LAYERS. 4. REFER TO APPROPRIATE WALL SECTIONS FOR CONSTRUCTION DETAILS. 5. L = EMBEDMENT LENGTH FOR GEOGRID REINFORCEMENT MEASURED FROM FACE OF THE WALL, 6, ALL STATION DIMENSIONS & TOP OF WALL (T.O.W.) & BOTTOM OF WALL (B.O.W.) ELEVATIONS MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION & ORDERING MATERIAL. OUR OFFICE MUST BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. NOTE: RETAINING WALL PROFILES ARE FOR GRAPHICAL REPRESENTATION ONLY. CONTRACTOR TO VERIFY TOP OF WALL (T.O.W.) & BOT. OF WALL (B.O.W.) ELEVATIONS COORDINATE w/ FINISH GRADES AS SHOWN ON THE SITE GRADING &/OR SITE DEVELOPMENT PLANS. t . '• x'7214 ,;moi koll --N 'I,- 10 NO 4 O :> �1W po o Hw w� CL DATE a > PERMIT 04/20/11 APPROX. LOCATION OF EXISTING CAST -IN-PLACE cn v [Yl eel v Z CONCRETE RETAINING WALL LOCATED BEHIND J JOB NO. 110004 Q DRAWNBY: DD o CHECKED BY: JTN z NEW MSE RETAINING WALL D- Lo r-� a to In ti a Vi yrs N a to oo a In N a In a a I.n a N Lq u7 � T.O.W. cc a to O I")d- N') to :n M � 00 as tV rn N a oO N N T.O.W. o .- 7502.17 0 0 0 o a o KEYSTONE o o ± { ± } 7507.50 COMPAC CAP n 1 n n U) n n n KEYSTONE COMPAC n UNITS, TYP. n n n n UNITS, TYP. W1. 7510.00 _... , - -- --- - - -- -, ---- .------ --_ _ -- -- ---- -r __ - - - r- - - ; -- -- - -- -- - -- - -, - -- ---- -- ____,_ -- ---- -- -- --- 7510.00 ! f f FINISH GRADE I I W1, ! ' ! f d T.Q.W., ! TYP. I r ! ! f z 7505A0 ----r-----s_____.r-----.-----.-.___�.__.___--,--__-.-., ! I f I : , 7505.00 7500.00 4- — ---a ---- s I I -----+------•----- I I ---- +----�--- ! I -�-_ _,-- - ! J 05 - ____; ----a- -------- ;----+----- - -- f :FINISH GRADE @ fB.O. ., tYP. --- - --- -- - - - -i - - 7500.00 7495.00 -----! _.____. L_-.._---_..l_---•---1..-._.-_..!_____� __.----_.�.----.-----t---- -_i _.__.._1._.___._....---_-_._t-...__-----i--.-----1_-._ LEVELING ®BOT. ---i-------.t.-__._._�._-----.-t---._ _..___-.- :_.-.---!_____-._____ __._-_.._---------=--- APPROX. LOCATION OF 7495.00 PAD o GEOSYNTHE11C (GEOGRID) OF WALL NOT SHOWN. REINFORCEMENT, RE: TYP. EXISTING RETAINING DETAILS SHEET RW1.1 WALL, LOCATE NEW C) WALL @ EXISTING L = 5'-0" w/ GRAVEL BACKFILL OR NO GEOGRID REQ'D L = 4'-0" L = 5'-0" L = W -O" L = 7'-0" L = 6'-0" w/ ON-SITE BACKFILL B.O.W. B.O.W. 7500.50 7499,83 START WALL END WALL STA. 0+00.00 STA. 1+26.42 1 RETAINING WALL PROFILE NOTES: 1" = 10, 1. RE: TO SHEET RW1.0 FOR GENERAL NOTES & DETAILS. 2. REFER TO SITE GRADING PLANS FOR TOP OF WALL & BOT. OF WALL LOCATIONS. 3. GEOGRID LENGTHS SHOWN SHALL BE CONSISTENT w/ ALL LAYERS. 4. REFER TO APPROPRIATE WALL SECTIONS FOR CONSTRUCTION DETAILS. 5. L = EMBEDMENT LENGTH FOR GEOGRID REINFORCEMENT MEASURED FROM FACE OF THE WALL, 6, ALL STATION DIMENSIONS & TOP OF WALL (T.O.W.) & BOTTOM OF WALL (B.O.W.) ELEVATIONS MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION & ORDERING MATERIAL. OUR OFFICE MUST BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. NOTE: RETAINING WALL PROFILES ARE FOR GRAPHICAL REPRESENTATION ONLY. CONTRACTOR TO VERIFY TOP OF WALL (T.O.W.) & BOT. OF WALL (B.O.W.) ELEVATIONS COORDINATE w/ FINISH GRADES AS SHOWN ON THE SITE GRADING &/OR SITE DEVELOPMENT PLANS. t . '• x'7214 ,;moi koll --N 'I,- 10 NO 4 O :> �1W po o Hw w� CL v z z w U-1 z w cr0 s z 0 cyJ 0 0- 0- :z 0- z w LLJ I— 3 cn ZD W :z rz ti 0 W 0 z L, I -- CD z ISSUE DATE a > PERMIT 04/20/11 cr- cn v [Yl eel v Z v z z w U-1 z w cr0 s z 0 cyJ 0 0- 0- :z 0- z w LLJ I— 3 cn ZD W :z rz ti 0 W 0 z L, I -- CD z ISSUE DATE a > PERMIT 04/20/11 cr- cn J JOB NO. 110004 Q DRAWNBY: DD o CHECKED BY: JTN z RW2.Q D- 0 Memorandum To: Planning and Zoning Commission Initials From: Jared Barnes, Planner I Thru: Sally Vecchio, Director of Community Development Date: April 29, 2011 Re: Mountain Montessori School Expansion Review Summary A Special Review Use (SRU) was approved for the Mountain Montessori School located at 77 Metcalf Road by the Planning and Zoning Commission on September 7, 2010 (Resolution 10-04, Exhibit B). As a condition of approval, the PZC is required to review any enlargement to the pre-school. The Applicant, represented by Todd Goulding of CDA, is requesting a minor amendment to the SRU approval to: 1) Increase the size of the space occupied by the school from 1,553 sf to 2,361 sf; 2) Increase student enrollment from 20 students to 40 students; and, 3) Expand drop off/pick up times by 20 minutes in the morning and 45 minutes in the afternoon. Policy Review The property where Mountain Montessori is located is zoned Light Industrial and Commercial (IC). A SRU permit for the school was originally approved in 2004, and has since been re -approved one time, in 2010. The Town has never received any complaints concerning this use. SRU approvals are only valid for 2 years unless approved by Council Ordinance (Avon Development Code, §7.26.090(f), Expiration and Preliminary Review). Accordingly, the Applicant has agreed to reduce the approval period of the SRU to 2 years, and instead will request an amendment to the IC zone district to allow a Pre-school/Nursery School to be permitted as a by -right use in the district. The Applicant expects to make this application later this year. Zoning Review Parking. The expanded pre-school facility will require five (5) off-street parking spaces. The property has a total of 46 off-street parking spaces; 34 of which accommodate the existing offices in the building and 3 which accommodate the existing warehouse space. (See Exhibit A). Traffic. The additional 20 students and increased drop-off pick up times proposed by the Applicant will not create a negative traffic impact on Metcalf Road or Nottingham Road. Both roads operate at a Level of Service A at all times, and the potential increase of 20 vehicles at this location will have no impact on that service level. The Applicant, however, must contain the drop-off/pick-up activities on the property at all times. Vehicle stacking on Nottingham or Metcalf Roads will be considered a violation of the SRU. Review Criteria A minor amendment is subject only to review and approval by the Director. The Director may however refer the application to the PZC if the amendment may result in material changes to the approved application. In this case, the SRU approval required referral to the PZC if the pre-school proposed an increase in the size of the facility. The changes proposed do not increase the building size or the square footage of non-residential uses within the building. The property can accommodate the parking requirements for the larger pre-school, and additional traffic generated by the increased enrollment will have no effect on the Nottingham Road and Metcalf Road Levels of Services. Moreover, the Applicant's agreement to reduce the expiration period from 10 yrs to 2 years, and instead pursue an amendment to the IC zone district to allow the use by -right, is a preferable approach to continuing this use on this property. Staff supports the proposed changes to the Mountain Montessori SRU conditional upon: 1) Traffic, parking and vehicle stacking related to the drop-off and pick-up activities of the school shall be entirely contained on the property. 2) The SRU shall expire 2 years after the date of approval. 3) Student enrollment is limited to 40 students. 4) The size of the school is limited to 2,361 sq. ft. Recommended Motion Staff recommends approving Resolution 11-04, to allow an increase in the size of the pre-school facility, student enrollment, and the drop off/pick up hours of the Mountain Montessori Pre-school. Exhibit A: Letter from Applicant dated April 19, 2011 B: Approved Resolution 10-04 C: Resolution 11-04 oil Construction & Exhibit Development Memorandur__ Advisors DATE: April 19, 2011 TO: Town of Avon Planning & Zoning Commissioners TOA Planning Staff FROM: Todd Goulding RE: Mountain Montessori Preschool SRU Revision Mountain Montessori Preschool is requesting a revision to the existing SRU approved September 7, 2010 to allow an expansion into an adjacent space. Although the existing SRU does not specify a number of students, condition #1 stated; "The use shall not be enlarged without prior review and approval from the Planning and Zoning Commission" Proposed Expansion * Pickup and drop off times will be increased to handle the additional traffic and mitigate impact to tenants, adjacent properties and Metcalf road. History of Mountain Montessori • A preschool is not listed as an allowed use or a special review use within the IC zone district. At the time of the original application the Community Development Director made a zoning interpretation that the preschool was compatible with other uses within the Property. • The uses within the preschool property and surrounding areas have not changed since the original application. • Sept 2004 — P&Z approved an SRU for 5 years o There were no complaints during the 5 years. • Sept 2010 — P&Z approved an SRU for 10 years o There have been no complaints to date. Current Proposed Exterior Changes - None Student Enrollment 20 40 Square Footage 1,583sf 2,361sf Drop Off Timing 8:20am-8:40am 8:00am-8:40am Pick Up Timing* 3:15 m-3:45 m 3:15 m-4:30 m * Pickup and drop off times will be increased to handle the additional traffic and mitigate impact to tenants, adjacent properties and Metcalf road. History of Mountain Montessori • A preschool is not listed as an allowed use or a special review use within the IC zone district. At the time of the original application the Community Development Director made a zoning interpretation that the preschool was compatible with other uses within the Property. • The uses within the preschool property and surrounding areas have not changed since the original application. • Sept 2004 — P&Z approved an SRU for 5 years o There were no complaints during the 5 years. • Sept 2010 — P&Z approved an SRU for 10 years o There have been no complaints to date. Review Criteria - 7.16.100 (e) The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations; The applicant is proposing to continue the existing approved use. 2. The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use -specific standards in the Development Code; The applicant is not proposing to change the use, but rather expand the preschool. 3. The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics; The proposed expansion will not affect scale, site design or operating characteristics, other than those identified below. 4. Any significant adverse impacts (including but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts) anticipated to result from the use will be mitigated or offset to the maximum extent practicable; Lighting, noise, odors, and dust are not impacted by the proposed SRU. The proposed change to the hours of operation will not have an impact to tenants in the building, nor adjacent neighbors. Increases in traffic will be handled by a commensurate increase in the drop off and pick up time slots. 5. Facilities and services (including sewage and waste disposal, water gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development, and The facilities and services outlined above exist today and have enough capacity to handle the expansion. 6. Adequate assurances of continuing maintenance have been provided. Not applicable to this application. OPw*1 yu*AV MIS puna M019 LLOO [� o IapOtuau IaAa7 AaMO I JIB'43W LL Iapomag uossa;uo1V uiujunoW a ` OZ9199pu91n3'9pny peoanv N( > a O Q gapowag 10na7 aamOl RR3;9W LL gapomag uossajUOW atelanoW w 14 99 $ e �� fl �� �g' • � � d b3 � 3 � � :���€ ��! g• fie! $ � ,� � � 3 � ,� {� g p3p ;yy{ 99 99 g � epEpE 3 � ¢ @9 !$ 6 Pg$•C e E � e � Y � � 0 0 0 00 0' 0 0 0 0 u ozvie °nvm� bonv n-a�o y C ,.� G4 z ti Ppowag Iaea7 aamoZ 31e3;aN LL japomag uossa;QoW malanoW n ; o�� Plan Summary Table Lot 22, Block 1 - Benchmark at Beaver Creek Subdivision 77 Metcalf Road, Avon, CO 81620 REVISED - April 27 2011 showing current usage Owner: BBG Holding Corp PO Box 8266, Avon 970-845-0466 Building Code: 2003 IBC Fire District: Eagle Rive Fire Protection District Occupancies: B (Offices) E (Pre -School) Warehouse Construction: Type V, Non -Rated Fully Sprinklered Current Zoning: I/C - Industrial / Commercial Site Area Summary Lot Size: 39,026 5FArea > 40% Slope: 2,854 5F (7.3%) Bldg. Lot Coverage: 6,466 SF (16.5%) Paved Area: 18,990 5F (48.7%) Total Imperv. Area: 25,456 SF (65.2%) Landscaped Area: 13,570 5F (34.8%) Snow Storage: 3,640 5F (19%) Summary of B Occupancy (Office) Allowances - Increased for Fire Sprinkler Floor Area (GLFA) Summary Vt Floor Per Zoning Per 2003 IBC Proposed Total Height: 48 feet 60 feet < 41 feet Stories Allowed: Within height limit 3 stories 3 stories Floor Area per Floor: 19,513 5F per floor 18,000 SF per floor I" Floor = 2,626 SF Internal Circulation: 357 SF 235 SF 557 SF 2"d Floor = 5,648 SF 3rd Floor = 6,466 SF Total Floor Area: 19,513 5F per floor 54,000 SF 14,740 SF Floor Area (GLFA) Summary Vt Floor 2"d Floor 3rd Floor Total B (Office): 1,988 5F 4,042 SF 5,900 5F 11,930 SF E (Pre -School): 1,707 SF 0 5F 0 SF 1,707 SF Warehouse: 1,401 SF 818 SF 0 SF 2,219 SF Internal Circulation: 357 SF 235 SF 557 SF 1,149 SF Parking Calculation Summary Office Pre -School Warehouse Per Avon Code: 3 / 1,000 5F GLFA 2 / 1,000 5F GLFA 1 / 800 SF GLFA * 11,930 SF * 1,707 SF *2,219 5F 36 (35.79) Spaces 4 (3.41) Spaces 3 (2.77) Spaces Required Parking: 43 Spaces Existing Parking: 46 Spaces Including 1 HC Space Plan Summary Table Lot 22, Block 1 - Benchmark at Beaver Creek Subdivision 77 Metcalf Road, Avon, CO 81620 REVISED - April 27 2011 with Expanded Pre -School Owner: BBG Holding Corp PO Box 8266, Avon 970-845-0466 Building Code: 2003 IBC Fire District: Eagle Rive Fire Protection District Occupancies: B (Offices) E (Pre -School) Warehouse Construction: Type V, Non -Rated Fully Sprinklered Current Zoning: I/C - Industrial / Commercial Site Area Summary Lot Size: 39,026 SFArea > 40% Slope: 2,854 SF (7.3%) Bldg. Lot Coverage: 6,466 SF (16.5%) Paved Area: 18,990 SF (48.7%) Total Imperv. Area: 25,456 SF (65.2%) Landscaped Area: 13,570 SF (34.8%) Snow Storage: 3,640 SF (19%) Summary of B Occupancy (Office) Allowances - Increased for Fire Sprinkler Floor Area (GLFA) Summary 1'' Floor Per Zoning Per 2003 IBC Proposed Total Height: 48 feet 60 feet < 41 feet Stories Allowed: Within height limit 3 stories 3 stories Floor Area per Floor: 19,513 SF per floor 18,000 SF per floor I" Floor = 2,626 SF Internal Circulation: 357 SF 235 SF 557 SF 2nd Floor = 5,648 SF 3rd Floor = 6,466 SF Total Floor Area: 19,513 5F per floor 54,000 SF 14,740 SF Floor Area (GLFA) Summary 1'' Floor 2nd Floor 3'd Floor Total B (Office): 1,237 SF 4,042 SF 5,900 SF 11,930 SF E (Pre -School): 2,458 5F 0 SF 0 SF 1,707 SF Warehouse: 1,401 SF 818 SF 0 SF 2,219 5F Internal Circulation: 357 SF 235 SF 557 SF 1,149 5F Parking Calculation Summary Office Pre -School Warehouse Per Avon Code: 3 / 1,000 SF GLFA 2 / 1,000 SF GLFA 1 / 800 5F GLFA * 11,179 SF * 2,458 5F *2,219 SF 34 (33.54) Spaces 5 (4.91) Spaces 3 (2.77) Spaces Required Parking: 42 Spaces Existing Parking: 46 Spaces Including 1 HC Space 110 iW[IlaMM PLANNING & ZONING COMMISSION RESOLUTION NO. 10-04 A RESOLUTION APPROVING A SPECIAL REVIEW USE PERMIT TO PERMIT MOUNTAIN MONTESSORI PRESCHOOL IN SUITE 102 ON LOT 22, BLOCK 1, BENCHMARK AT BEAVER CREEK, TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, Mountain Montessori, has applied for a Special Review Use (SRU) permit to operate a Montessori preschool as described in the application dated July 30, 2010; WHEREAS, a public hearing has been held by the Planning & Zoning Commission of the Town of Avon on September 7, 2010, pursuant to notices required by law, at which time the applicant and the public were given an opportunity to express their opinions and present certain information and reports regarding the proposed SRU application; WHEREAS, at their public hearing held on September 7, 2010, the Planning & Zoning Commission voted to approve Resolution No. 10-04 thereby approving the subject Special Review Use permit with two conditions; and WHEREAS, the Planning & Zoning Commission of the Town of Avon has considered the following review considerations, as required by the Avon Municipal Code section 17.48.040: A. Whether the proposed use otherwise complies with all requirements imposed by the zoning code; and B. Whether the proposed use is in conformance with the town comprehensive plan; and C. Whether the proposed use is compatible with adjacent uses. D. Whether the proposed use provides evidence of compliance with the Public Purpose provisions outlined in the Avon Municipal Code. NOW, THEREFORE, BE IT RESOLVED, that the Planning & Zoning Commission of the Town of Avon, Colorado, hereby approves a SRU permit for Mountain Montessori Preschool, as described in the application dated July 30, 2010; and as stipulated in Title 17, Avon Municipal Code, located in suite 102 on Lot 22, Block 1, Benchmark at Beaver Creek Subdivision, Town of Avon, Eagle County, Colorado. SUBJECT TO THE FOLLOWING CONDITIONS: The use shall not be enlarged without prior review and approval from the Planning and Zoning Commission; and 2. The use is approved for a ten (10) year period to be re -reviewed no later than September 7`h, 2020. ADOPTED THIS 7`h DAY OF SEPTEMBER, 2010 At Secretary:it Struve Date: / o N col yL,El] W., ALys] ►1 PLANNING & ZONING COMMISSION RESOLUTION NO. 11-04 A RESOLUTION APPROVING A MINOR AMDENDMENT TO A SPECIAL REVIEW USE PERMIT TO PERMIT MOUNTAIN MONTESSORI PRESCHOOL AN EXPANSION OF SUITE 101 ON LOT 22, BLOCK 1, BENCHMARK AT BEAVER CREEK, TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, Mountain Montessori, has applied for a minor amendment to a Special Review Use (SRU) permit to operate a Montessori preschool as described in the application dated April 19, 2011; WHEREAS, the Planning & Zoning Commission of the Town of Avon approved the SRU permit through Resolution 10-04 on September 7, 2010; WHEREAS, the condition of approval, as stated in Resolution 10-04, requires the Planning & Zoning Commission to review any expansion of the area; WHEREAS, at their regularly scheduled meeting held on May 3, 2011, the Planning & Zoning Commission voted to approve Resolution No. 11-04 thereby approving the minor amendment to the SRU permit with two conditions; and, WHEREAS, the Planning & Zoning Commission of the Town of Avon has considered the following review considerations, as required by the Avon Municipal Code section 7.16.020(g): (1) Any change to any permit or other form of approval that was originally subject only to administrative review and was approved by the Director, provided such change would not have disqualified the original application from administrative review under this Development Code had it been requested at that time; and provided that the minor amendment does not result in an increase of more than ten percent (1001o) in the amount of square footage of a land use or structure and does not result in a change in the types of uses in the project. (2) Correction of any errors caused by mistakes that do not materially alter the substance of the development plan or plat as represented to the Council. (3) A Change to an approved design which results in a ten percent (10%) or less increase to building height; adjustments to building footprints, access and parking configurations which are less than ten (10) feet; alterations to the landscaping plan or drainage plan which substantially comply with the original approval; and, changes to doors, windows, roofs, or building articulation which are less than two (2) feet and which do not alter or diminish the overall design character as approved; as are all determined by the Director. (4) Changes to an approved development application which do not result in: (i) An increase in the approved number of dwelling units; (ii) An increase in the amount of square footage of a non-residential land use or structure; (iii)A change in the housing mix or use mix ratio; or, (iv)A change in the character of the development. NOW, THEREFORE, BE IT RESOLVED, that the Planning & Zoning Commission of the Town of Avon, Colorado, hereby approves a minor amendment to the SRU permit for Mountain Montessori Preschool, as described in the application dated April 19, 2011; and as stipulated in Title 7, Avon Municipal Code, for 2,361 square feet located in Unit 101 on the ground floor of the building located on Lot 22, Block 1, Benchmark at Beaver Creek Subdivision, Town of Avon, Eagle County, Colorado. SUBJECT TO THE FOLLOWING CONDITIONS: 1. The use shall not be enlarged without prior review and approval from the Planning and Zoning Commission; 2. The use is approved and must be re -reviewed no later than May 3rd, 2013; All traffic, parking, and vehicle stacking related to the drop-off and pick- up activities of the school shall be entirely contained on the property; 4. Student enrollment is limited to 40 students; and, The size of the school is limited to 2,361 square feet. ADOPTED THIS 3rd DAY OF MAY, 2011 Signed: Date: Chair: Chris Green Attest: Date: Secretary: Scott Prince Staff Report — Special Review Use AVON May 3, 2011 Planning & Zoning Commission Meeting C 0 1, 0 R A D 0 Date April 27, 2011 Legal Description Lot 1, Filing 1, Village at Avon Zoning Planned Unit Development (PUD) Address Not Assigned - East Beaver Creek Boulevard Prepared By Matt Pielsticker, Planner II Summary of Request The Public Service Company of Colorado (PSCo), dba Xcel Energy, is proposing to utilize two areas for temporary construction staging purposes on the north and south side of East Beaver Creek Boulevard near the intersection of Post Boulevard. The staging areas will support construction of the Edwards -Meadow Mountain Natural Gas Pipeline Project (the Project), a new 7.92 mile 16 -inch natural gas transmission pipeline and associated facilities located partially within the Town of Avon. The Project was the subject of 1041 Permit that was approved by the Avon Town Council on April 12, 2011. The staging areas will be used on a temporary basis during the construction of the Project, currently anticipated to begin on May 16, 2011 and ending on September 30, 2011. The staging areas will be utilized for temporary storage and stockpiling of construction materials, including: • A maximum of 3,000 feet of pipeline at any time, with deliveries of pipeline to be staged throughout the construction timeframe; • Up to four covered and closed portable metal containers (approximately 40 feet long, 8 feet wide, and 8 feet tall) to hold valves, fittings, and other miscellaneous pipeline materials; • Limited parking for employees; and • A trailer to serve as a temporary construction office. Improvements to the staging area will be limited to grading, with temporary buildings, fencing, and storage structures. After construction, all materials would be removed and the site will be restored to its prior condition. The operation of the staging area will be limited to the hours of construction stipulated in the 1041 Permit: 7am to 7pm Mon -Sat, and 9am to 6pm Sundays and Holidays. Work will be suspended for several special events and three (3) four-day holiday weekends. Process The staging areas are located on Lot 1 of the Village (at Avon) PUD. The PUD requires temporary outdoor storage on Lot 1 to be reviewed by the Town as a Special Review Use. In addition, the staging area must receive design approval from the Traer Creek Metro District Design Review Board. Property Description The northern staging parcel, referred to as "TUA Parcel", is approximately eight (8) acres in size and is unimproved. This parcel will be enclosed with a temporary fence and will include a modular trailer/construction office, employee parking, laydown area for pipes, and storage of various pipeline parts in four (4) shipping containers. This parcel is bordered by a ditch to the north, Post Boulevard to the east, East Beaver Creek Boulevard to the south, and the recycling center to the west. The Applicant is proposing one point of access into this staging area, which will require a Right -of -Way permit from the Town's Public Works Department. THE V4.RAOE (aLAVON) Flume 1 RE 7987 TUA PARCEL LOT 1 3M,826&F. p8f8 AC.}IM. •� I 7±4.40' NSW44DWE j +� N11'1 LOT 1 ` lac• 217.18' � f % EAST BEAVERCREEKBLVD. \ (ROAD EsLtt.S LS L4 C2 N120ILIV UTIL7TV ESMT 6 1 R£D8795007 4 I T <4 iii � AL3 L7 Cal t .gym. I.- 8 LINE, LOT 6 Ngo LINE TABLE?gy,_. uxalTr N LINE ESL4T § LENGTH ��"6y RON 79.0087 �Gs CURVE TAKE L2 N64.22'OOWy o � OMe RA"W DELTA I LENGTH GHIREA4i1410 ICyORD L3 268.181 7 l L4 C!528.4'R' 48"48'38' 404.24' $W537M 394A5° LS 864'33'OWE 8.00' POINT OF BEGINNWG C2 86.93• S8' W 84.42' 82r=rW I 80.78' N85 -27100"E 18.83 SE CORNER LOT 1 03 86.37 U4"- 6&14' Ne5'34'27'R 1 84.87 C4 449187 18'4316' 148.75' NBi` 1'18 Y.° 146.p6` I C5 480.8(4 9'47'82° 78,55• N70'WWV I MW LW ETWBLE PO WTOF OOMhWAOE KNT LINE SEARING LENGTH 8ECORNERLOTI L1 S85' mm— 138.68' L2 314•IOWV 17.m7 The parcel of land on the south side of East Beaver Creek Boulevard is referred to as "TUA Parcel 2." This area will also be enclosed with a temporary fence and used as an alternate pipe laydown area. It is bordered by East Beaver Creek Boulevard to the north, Post Boulevard to the east, the Union Pacific Railroad right-of-way to the south, and vacant land and an aboveground facility to serve the gas line to the west. TUA Parcel 2 will also be accessed from East Beaver Creek Boulevard, directly across from the entrance to the TUA Parcel. A separate Right -of -Way permit will be required for this access point. Town of Avon Planning & Zoning Commission May 3, 2011 Meeting I THE VILLAGE (at AVON) FILING 1 REC#796007 LOT 1 � f EAST BEAVERCREEKBLVD. \ (ROAD EsLtt.S LS L4 C2 UTIL7TV ESMT 6 1 R£D8795007 4 T <4 0 810 200 t .gym. I.- reek SUNS. LOT1 LINE TABLE?gy,_. LINE 6EARAIG LENGTH ��"6y L1 N2S•4448-E 45,07 3 'Z L2 N64.22'OOWy 152.75' TUA PARCEL 2 73• L3 268.181 136.57 �es'.2270)+AL L4 NR5'27'00'F 115.14' LS 864'33'OWE 8.00' POINT OF BEGINNWG LB N85 -27100"E 18.83 SE CORNER LOT 1 Town of Avon Planning & Zoning Commission May 3, 2011 Meeting Planning Analysis Hours of Operation. Xcel will adhere to the hours of operated requested by the Town of Avon in the 1041 permit approval. Traffic Generation. Increased or delayed traffic may occur in the vicinity of the staging areas when deliveries are made, equipment is picked up, and when employees are moving to and from the temporary construction office. A single point of access to each staging area is proposed off of E Beaver Creek Blvd. The increase in traffic is not expected to be significant and will be transitory in nature, occurring only when vehicles are arriving and departing from the stating areas. Xcel is preparing a ROW permit for the Town of Avon, which will address when and where traffic control is needed. Lighting_ Lighting will be limited to porch -style lights on the office trailers. No nuisance impact due to lighting is anticipated. Noise. Construction of the Project may cause short-term unavoidable noise impacts at the staging areas. Construction activity will conform to the noise provisions of the Avon Municipal Code §8.24.085, Limitation of Construction Activity. In addition, the Applicant has recommended the following mitigation measures to reduce the potential for temporary noise impacts: 1.PSCo has established a Project website and hotline and will implement a complaint resolution program whereby residents can contact PSCo direction with their noise concerns. 2. Noise construction activity at the staging areas, which causes off-site annoyance as evidenced by the filing of a legitimate noise complete, would be restricted to daytime hours unless nighttime construction is requested by CDOT, Eagle County or the Town of Avon. 3. All equipment will have sound control devices no less effective than those provided on the original equipment; and 4. All internal combustion engines will be fitted with appropriate muffler systems. Odors. Odors related to the staging areas will be short-term, transient, and limited to the construction period. These odors are expected to be adequately dispersed by diurnal winds. Dust. Vegetation clearing, grading, operation of vehicles, and restoration activities in the staging areas may produce fugitive dust or exhaust emissions during the construction phase of the Project Mitigation measures include: 1. Construction vehicles and equipment would be shut off when not in use to limit the amount of exhaust emissions. 2. Dust suppression would be conducted during construction. Water for dust suppression would be obtained from sources approved by Eagle County and/or the Town prior to construction. Hazardous Materials. Excavated material or other construction material will not be stock piled or deposited near or on stream banks or water courses where they could be washed away by high water or storm runoff. No vehicle maintenance or fueling of vehicles will be conducted in the staging areas and no hazardous materials will be stored on site. Upon completion of construction the staging areas will be restored and construction material and debris removed. Water Quality. Earth -disturbing activities at the staging area will include grading and stockpiling. Sediment control and stockpile containment BMPs for these activities includes usage of erosion Town of Avon Planning & Zoning Commission May 3, 2011 Meeting and sediment control logs, silt fences, sweeping, temporary berms, vehicle tracking control, and inlet and culvert protection. Public Facilities. The temporary construction staging areas will not require sewage, waste disposal, water, gas, or electric services. Engineering Analysis The Engineering Department will issue a grading permit for this project as a condition of the 1041 permit. A cash security deposit will be required to ensure compliance with the Revegetation and Weed Management Plan, and Stormwater Management Plan, and any other conditions of the Grading Permit. Review Criteria A Special Review Use application must meet the criteria set forth in Sec. 7.16.100 of the Avon Development Code: (1) The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations; (2) The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use -specific standards in the Development Code; (3) The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics; (4) Any significant adverse impacts (including, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts) anticipated to result from the use will be mitigated or offset to the maximum extent practicable; (5) Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development; and (6) Adequate assurances of continuing maintenance have been provided. Recommendation Staff recommends approval of the Special Review Use application for temporary construction staging on two parcels of land located on Lot 1, Village at Avon Subdivision, with the following conditions: 1. Construction and excavation activity which produces audible noise shall be limited to between the hours of 9am and 6pm on Sundays, and between the hours of 7am and 7pm on all other days, pursuant to AMC, Section 8.24.085, Limitation of Construction Activity. Exceptions to these hours include: a. Twenty -Four (24) Hour boring activities related to the Avon Road & Post Boulevard intersections with Highway 6 & 24. b. The Town Manager may grant additional exceptions(s) to the above work hours. The grant of exception(s) may be conditioned upon compliance with rules and conditions as specified by the Town Manager, or his or her designee, to minimize impacts of the construction activities. c. Work will be suspended on: i. Sunday, July 3, Salute to the USA Fireworks ii. Saturday July 9, and Sunday July 10, Triple Bypass Bicycle Tour iii. Saturday, July 16, XTERRA Triathlon Town of Avon Planning & Zoning Commission May 3, 2011 Meeting iv. Saturday, July 23, Colorado River Ride (if any portion of work zone is operating west of Avon Road) v. Saturday, August 8, Bec-TRI Triathlon vi. Thursday, August 25, and Friday, August 26, U.S. Pro Cycling Challenge vii. Four (4) days for each three (3) day holiday weekend, including: Memorial Day, Fourth of July, Labor Day, Columbus Day. 2. A Grading permit, including full restoration plan and security deposit must be obtained from he Town prior to starting work. 3. A Right -of -Way permit must be obtained from the Public Works Department prior to accessing the properties for any work. 4. Approval from the Village (at Avon) Design Review Board must be provided to Staff prior to utilizing the sites for construction staging pursuant to this SRU approval. 5. Outdoor lighting for the temporary trailer(s) must conform to the Outdoor Lighting Ordinance and be fully downcast and shielded. This recommendation is based on the following findings: 1. The application is in general conformance with the review criteria for a SRU permit in §7.16.100(e), Special Review Use, Avon Development Code. 2. Conformance with the Revegetation and Weed Management Plan and Stormwater Management Plan will mitigate runoff concerns as well as noxious weed abatement. 3. Noise concerns will be mitigated by conforming to §8.24.085, Limitation of Construction Activity, Avon Municipal Code, and the conditions of the 1041 approval related to work hours. 4. Fugitive Dust will be mitigated with best management practices including but not limited to implementing recommended vehicle drive surface materials, and the use of water trucks as necessary. Exhibits A: Vicinity Map B: Application Materials (excluding Revegetation Plan & Stormwater Mangement Plan) Town of Avon Planning & Zoning Commission May 3, 2011 Meeting Exhibit A Legend F_d*&ds n MeaW* Marron radr,y F'Wffed Rw;e e 0er,b- m FBF,efal Smgifq Aee.a Transportation Mwlss eHigF y U S.Hohvay S'z.e Hghaay Cody ofLoc,421 Naad Juraa�ciiam ClyPat U&m OM Space StAa'V .9� or Sn�. Htb-z-Area e Land bmrcl U.S.Fcma Sauce --� Murcip i Bo- da} Town of Avon Planning & Zoning Commission May 3, 2011 Meeting < S Exhibit A Legend F_d*&ds n MeaW* Marron radr,y F'Wffed Rw;e e 0er,b- m FBF,efal Smgifq Aee.a Transportation Mwlss eHigF y U S.Hohvay S'z.e Hghaay Cody ofLoc,421 Naad Juraa�ciiam ClyPat U&m OM Space StAa'V .9� or Sn�. Htb-z-Area e Land bmrcl U.S.Fcma Sauce --� Murcip i Bo- da} Town of Avon Planning & Zoning Commission May 3, 2011 Meeting Exhibit B Edwards -Meadow Mountain Gas Pipeline Project Town of Avon Special Review Use Application April 2011 Prepared for: e;� XcelE, ergy� u PUdtOC 911VPCE COMPAoir 1123 West 3rd Avenue Denver, Colorado 80223 Prepared by: Q h l RA r I C:H I :.IN( 1099 18th Street, Suite 580 Denver, Colorado 80202 Avon Community Development Department One Lake Street Avo N POB 975 Avon, Colorado 81620 website: www.avon.org LAND DEVELOPMENT APPLICATION ❑ Comprehensive Plan Amendment ❑ Code Text Amendment ❑ Rezoning ❑ Administrative Subdivision ❑ Minor Subdivision ❑ Major Subdivision — Prelim Plan ❑ Major Subdivision — Final Plat ❑ Location, Character, & Extent Edwards -Meadow Mountain Gas ❑ Administrative PUD Amendment ❑ Preliminary PUD ❑ Final PUD ❑ Annexation ❑ Minor Development Plan ❑ Major Development Plan ❑ Major Development Plan (TC) ❑ Minor Amendment Traer Creek Staoinq Area ❑ Design Review X Special Review Use ❑ Variance ❑ Alt. Equivalent Compliance ❑ Right -of -Way Vacation ❑ Vested Property Right ❑ Sign Design ❑ 1041 Street Address: NW and SW corners of Beaver Creek Road/Post Blvd. Intersection. Map enclosed. Legal Description: Northern Area - NE 1/4 SW 1/4, Section 7, T5S R81W; Southern Area — SE 1/4 SW 1/4, Section 7, T5S R81W Parcel Number(s): 210307330001 Name: Public Service Company of Colorado, dba Xcel Energy: Richard 1. Grady, Supervisor, Right -of -Way and Permits Mailing address: 123 West 3rd Avenue City: Denver I State: CO ZIP Code: 80223 Phone: 303-571-3135 Email: Rick.grady@xcelenergy.com I Fax: 303-571-3101 Name: Traer Creek, LLC (Dan Leary, Trustee) Mailing address: PO Box 640 City: Vail State: CO Zip Code: 81658 Phone: 970-748-4987 or 970-949-6776 FEE PAID ► DATE RECEIVED Have you included the following? 1. Pre -application conference summary 2. Signed Fee Agreement 3. Dimensional Requirements Form 4. Submittal Requirements Email: danlearv�traercreek.com I Fax: Date: 14//,9/) 0 J APPLICATION # CASE MGR Exhibit B XcelEnergysm PUBLIC SERVICE COMPANY April 20, 2011 Matt Pielsticker Planner Town of Avon, Community Development P.O. Box 975 Avon, CO 81620 Exhibit B Right of Way & Permits 1123 West 3`d Avenue Denver, Colorado 80223 Telephone: 303.571.3135 Fax: 303.571.3826 rick.grady(d)xcelenerpy.com Re: Edwards—Meadow Mountain Gas Pipeline Special Use Review Application Dear Mr. Pielsticker: Public Service Company of Colorado (PSCo), dba Xcel Energy, is proposing to utilize two areas near the intersection of Beaver Creek Road and Post Boulevard roundabout (Attachment 1) for temporary staging areas. The staging areas would support construction of the Edwards -Meadow Mountain Natural Gas Pipeline Project (Project), a new 7.92 -mile 16 -inch natural gas transmission pipeline and associated facilities located partially within the Town of Avon. The pipeline and associated facilities are the subject of an Areas and Activities of State Interest (AASI) Permit (also referred to as a 1041 permit) that was approved by the Town Council of Avon on April 12, 2011. This Special Review Use Permit application covers only the temporary staging areas near the intersection of Beaver Creek Road and Post Boulevard, shown in Attachment 1. The staging areas would be used on a temporary basis only during the construction time period, currently anticipated to be May 16 through October 31, 2011. The staging areas would be utilized for the following temporary uses: • Stockpiling of a maximum of 3,000 feet of pipeline at any time, with deliveries of pipeline to be staged throughout the construction timeframe • Up to six covered and closed portable metal containers (approximately 40 feet long, 8 feet wide, and 8 feet tall) to hold valves, fittings, and other miscellaneous pipeline materials • Limited parking for employees • Two metal trailers to serve as a temporary construction offices Improvements to the staging areas would be limited to grading and installation of a chain-link fence around the perimeter of both sites. Existing contours are shown in Attachment 2. A site plan is provided in Attachment 3. No permanent buildings, lighting, fencing, or other structures would be constructed. After the construction timeframe, all materials would be removed and the site would be restored to its prior condition per the Project's Revegetation and Weed Management Plan (Attachment 4). The landowner of Matt Pielsticker Exhibit B Town of Avon Page 2 of 24 the land to be used for the staging areas is Traer Creek, LLC. Negotiations for an agreement between Traer Creek and PSCO for temporary use of the land are in the final stages. This Special Review Use Permit application is submitted pursuant the Town of Avon's Development Code § 7.16.100, which requires a permit and hearing procedure to approve uses allowed by special review. Special review uses are assigned for each zone category within the Town of Avon. The staging areas are in the Village at Avon PUD zone, in portions of planning areas H, I, and J (The Village (at Avon) PUD Development Plan Formal Amendment Number One map). According to The Village (at Avon) PUD Guide (1998), and confirmed by Matt Pielsticker on April 12, 2011: • "Building materials sales and lumber yard" is considered a Special Review Use for Planning Area H. • "Building materials sales and lumber yard" is considered a Use by Right for Planning Area I. • "Building materials sales and storage" is considered a Special Review Use for Planning Area J. The following sections provide responses to mandatory review criteria for Special Review Uses listed in the Town of Avon Development Code § 7.16. 1 00(e). 1. The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations; PSCo is proposing to build the proposed Project to meet rapidly growing needs in the Avon/Eagle- Vail region. The proposed Project is a system upgrade that would supply the demands currently served by an existing 6-, 8-, and 12 -inch natural gas transmission pipeline located in Eagle County. The existing pipeline was installed in 1972, and is currently the primary gas supply pipeline serving the communities of Avon, Minturn, and Vail, including the Vail, Beaver Creek, and Bachelor's Gulch Ski Areas. This pipeline also provides supply to communities in Summit, Grand Lake, and Chaffee Counties. Between 1970 and 2010, the population of Eagle County has increased 615 percent from 7,498 to 53,653. The Edwards Micropolitan Statistical Area as defined by the U.S. Census Bureau experienced a 20 percent increase in population between 2000 and 2010 (U.S. Census Bureau 2010).This existing growth as well as expected continued growth throughout these communities has provided the need for additional capacity. By helping to ensure a continued and reliable supply of natural gas to the Town of Avon and surrounding communities, the overall Project supports the vision identified in the Town of Avon Comprehensive Plan (Revised 2008): To provide a high quality of life, today and in the future, for a diversity of people and interests; and to promote their ability to live, work, visit, and recreation in the community. In the Comprehensive Plan, future use of the staging areas is identified as a mixture of Neighborhood Commercial, Regional Commercial, Residential High -Density, and Park. The definitions describing the intent of each land use designation are provided in the Comprehensive Plan: • Neighborhood Commercial—These areas are intended to provide neighborhood -focused retail and service uses (such as markets, childcare, restaurants, and cafes) that are conveniently located near and connected with surrounding residential neighborhoods. Matt Pielsticker Town of Avon Page 3 of 24 Exhibit B • Regional Commercial—The regional commercial areas are intended to serve both local and regional shoppers with a wide variety of commercial uses, including discount retailers, offices, supermarkets, and other similar uses. • Residential High Density—Areas designated for residential density are intended to provide sites for multifamily dwellings no less than 15 and no greater than 20 dwelling units per acre. • Parkland—Parks are intended to provide for the passive and active recreation needs of the community or region. Where possible, they should be located and designed to take advantage of natural features and amenities. Because the staging areas are currently vacant, would only be used temporarily, would be restored to prior condition after use, and it would not impact, deter, or preclude desired future uses of these areas, the proposed use is consistent with provisions of the Comprehensive Plan. PSCo has complied or is in the process of complying with all local, state, and federal regulations associated with the environmental review and permitting of the Project and all associated facilities, including the staging areas. PSCo would operate and decommission the temporary staging areas consistently with applicable state and federal regulations and the AASI permit granted by the Town of Avon. Table 2.2-1 in the AASI Permit application has been revised to update the status of approvals, grants, or permits necessary for the Project. Ta le Federal State of olorado and Local urisdiction Per it Approval oordination Re uire ents and Status Status as of April Agency Regulation Study Per it oordination Status Federal Agencies U.S. Department of Public Law (P.L.) 96-487 and Right -of -Way (ROW) Grant' PSCo submitted this application Agriculture, Forest Federal Register Notice 5-22-95 on February 9, 2011. ROW Grant Service (Forest expected to be issued by the end Service) of April 2011. U.S. Army Corps of Section 404 of the Clean Water Consultation with the USACE may PSCo received a response from Engineers (USACE) Act be required for potential impacts to the USACE that the Project will jurisdictional waters of the United not result in the discharge of States dredged or fill materials within waters of the United States and does not involve work in navigable waters of the United States. A permit is therefore not required. U.S. Fish and Wildlife Section 7 of the Endangered Consultation with the USFWS may Informal consultation with the Service (USFWS) Species Act be required for potential impacts to USFWS Western Colorado Bald and Golden Eagle threatened and endangered Ecological Service Field Office Protection Act species, bald and golden eagles, was conducted in October 2010 Migratory Bird Treaty Act and migratory birds to understand any potential Project -related impacts to lynx, or suitable lynx habitat, and federally listed plant species. Matt Pielsticker Town of Avon Page 4 of 24 Ta le Federal Stateof olorado and Local urisdiction Per it Approval oordination Re uire ents and Status Status as of April Exhibit B Agency Regulation Study Per it oordination Status State Agencies Colorado Public U.S. Code of Federal Inspection and monitoring activities PSCo is regulated by the Utilities Commission Regulations (CFR), Title 49 of intrastate gas pipeline systems Colorado PUC and CFR Title 49, (PUC) "Transportation," Parts 190-199. would be adhered to for 60105 Agreement with the U.S. construction and operation of the Department of Transportation Project. (DOT), Pipeline and Hazardous Materials Safety Administration (OPS) Colorado Oil and Gas Colorado Revised Statutes COGCC has broad statutory PSCo would adhere to all state Conservation (CRS) 34-60-106 (2)(d) authority with respect to impacts on regulations and statutes during Commission any air, water, soil, or biological construction and operation of the (COGCC) resources resulting from oil and Project. gas operations Colorado Division of CRS 33-1-101(1) Consultation with the CDOW to Informal consultation with Bill Wildlife (CDOW) Identify Special Status Species Andree (District Wildlife Manager) in November 2010 regarding potential of the Project to affect any state sensitive species or habitats. Colorado Department Clean Air Act and amendments, Land Development Permit PSCo submitted the Air Pollution of Public Health and various state laws and Application and Emission Notice (APEN) and Environment regulations for air quality Air Pollution Emission Notice or Application for a General (CDPHE) Air General Development Permit2 Construction Permit on February Pollution Control Division Fugitive Dust Control Plan 14, 2011. Tetra Tech spoke with Paul Rusher, CDPHE Air Pollution Division, on February 16, 2011. Since this is a general construction permit, the Project is considered covered once the application has been submitted to the Air Division. The Air Division will eventually issue a general construction permit to the permittee. Work can begin at any time after submission. CDPHE Water Clean Water Act, Safe Drinking Stormwater General Permit A Construction Stormwater Quality Control Water Act, various state laws and Application Management Plan was prepared Division regulations for water quality Stormwater Management Plan for the Project in November 2010. The stormwater management contractor, Olsson Associates, has filed a permit application for the Colorado Discharge Permit System (CDPS) General Permit for Stormwater Discharges. Matt Pielsticker Town of Avon Page 5 of 24 Ta le Federal Stateof olorado and Local urisdiction Per it Approval oordination Re uire ents and Status Status as of April Exhibit B Agency Regulation Study Per it oordination Status Permit No. COR -030000, effective July 1, 2007) authorizes stormwater discharges from construction activities that result in a total land disturbance of 1 acre or greater or if a project is less than an acre but part of a larger common plan of development. Colorado Office of Section 106 of the National Consultation for compliance with A Class I file search through the Archaeology and Historic Preservation Act state and federal historic Colorado Historic Society Office Historic Preservation Colorado Statutes Title 24, preservation requirements of Archaeology and Historical (OAHP) Article 80, Part 4 Preservation Cultural Records Colorado Statutes Title 24, online database (Compass) was Article 80, Part 13 conducted on December 7, 2010. The Class I file search report was provided to the State Historic Preservation Office for concurrence on February 25, 2011. The Class I file search report was also provided to CDOT for their review on March 8, 2011 for their review. Colorado Department Code of Colorado Regulations Utility/Special Use Permit Correspondence has been of Transportation (CCR) 601, 602, 603, 605, CRS Application ongoing throughout the Project to (CDOT) 43-1-225(1), various state and Traffic Control Plan facilitate CDOT approval of federal laws and regulations Route Survey permits to construct within the U.S. Highway 6 and U.S. Highway 24 ROW. PSCo submitted Standard Form 299 with the Forest Service on February 9, 2011. The Forest Service has entered into a Memorandum of Understanding (MOU) with the Bureau of Land Management (BLM), and CDOT to coordinate permitting activities. The CDOT will issue the utility permit for the Project after all other agencies have issued necessary permits. The utility permit from the CDOT is expected to be issued prior to construction in early May 2011. Colorado State Board Constitution of the State of ROW Grant application for PSCo submitted a ROW Grant of Land Colorado, Article IX, Section 9 crossing state trust lands application to the Northwest Commissioners Colorado State Board of Land District office of the Colorado Commissioners Policy # 92-3 State Land Board on March 11, 2011. Matt Pielsticker Town of Avon Page 6 of 24 Ta le Federal Stateof olorado and Local urisdiction Per it Approval oordination Re uire ents and Status Status as of April Exhibit B Agency Regulation Study Per it oordination Status The District Manager of the State Land Board approved the ROW Grant application on March 28, 2011. PSCo expects to receive the signed ROW Grant from the Colorado State Board of Land Commissioners on May 6, 2011. agle ounty Local urisdictions Eagle County Eagle County Code Section 5- Special Use Permit Submitted to Eagle County for Planning Department 250 approval on January 21, 2011. CRS 30-28-110 and Section C of Location and Extent Permit Submitted to Eagle County for the Eagle County "Location and approval on January 21, 2011. Extent' Guide Eagle County Floodplain Development Permit PSCo expects to submit to Eagle Engineering County by April 20, 2011. Department Eagle County Permit to Construct in the Public PSCo expects to submit to Eagle Engineering Way County by April 22, 2011. Department Eagle County Building Permits PSCo would be replacing three Engineering buildings at regulator stations in Department unincorporated Eagle County. PSCo expects to submit building permit applications for these facilities by April 29, 2011. Town of Avon Regulations for Areas and 1041 Permit Approved with conditions, April Activities Designated as Matters 15, 2011. of State and Local Interest (Avon Municipal Code Section 7.40) Avon Municipal Code Section Permit for Construction Work within PSCo expects to file an 12.04.050 Public Ways for construction within application for Construction Work all public ROW and easements, within Public Ways by April 29, walkways and sidewalks, streets, 2011. roads, highways, and utility easements Avon Municipal Code Section Grading Permit If required for grading of a 7.28.070 (c)(2) staging area, PSCo expects to file an application for a Grading Permit for the staging area within the Town of Avon prior to construction. Private wnership Union Pacific n/a Utility Crossing Permit PSCo received a Utility Crossing Railroad Permit on March 28, 2011. (UPRR) The Forest Service has entered into an MOU with the BLM, CDOT, and Colorado State Land Board to coordinate activities affecting the state transportation system and lands administered by the Forest Service and BLM within the state of Colorado. Matt Pielsticker Town of Avon Page 7 of 24 2. The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use -specific standards in the Development Code; Planning Areas H and I are zoned "Neighborhood Center." The purpose of the Neighborhood Center zone is "To provide sites for a variety of neighborhood oriented commercial, residential, educational, recreational and service oriented use" (Town of Avon 1998). Planning Area J is zoned "Regional Commercial." The purpose of the Regional Commercial zone is "to provide sites for a variety of regionally -oriented commercial, residential, lodging and service oriented uses and activities in order to serve the needs of residents and guests of the Upper Eagle River Valley. Although the staging areas are zoned Neighborhood Center and Regional Commercial, the lots are currently vacant with no development onsite. Use of this land as temporary staging areas during the construction timeframe would not impact, deter, or preclude future uses provided for in the Neighborhood Center and Regional Commercial zones. Use of the land as a temporary staging area, therefore, is consistent with the purpose and intent of the zoning district. 3. The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics; Exhibit B Adjacent land uses include residential to the south/southwest, commercial to the east (Wal-Mart), and vacant land to the north/northwest. Hours of operation would be consistent with the overall hours of construction stipulated in the Town of Avon's AASI permit (pending receipt of final permit from CDOT) to avoid impacts to residential areas. Because use of the staging areas would be temporary with no permanent onsite development, the proposed use is compatible with adjacent land uses. 4. Any significant adverse impacts (including, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts) anticipated to result from the use would be mitigated or offset to the maximum extent practicable; Hours of Operation: Final work hours are pending decisions by other permitting agencies. PSCo will adhere to the hours of operation requested by the Town of Avon in the AASI Permit conditions detailed in a letter from the Town of Avon dated April 15, 2011: • Construction and excavation activity shall be limited to between the hours of 9 a.m. and 6 p.m. on Sundays and national holidays, and between the hours of 7 a.m. and 7 p.m. on all other days, pursuant to the Avon Municipal Code, Section 8.24.085, Limitation of Construction Activity. Approved exceptions to these hours are: o Twenty -Four (24) hour boring activities are permitted at the Avon Road and Post Boulevard intersections with U.S. Highways 6 and 24. o The Town Manager may grant additional exception(s) to the above work hours. The grant of exception(s) may be conditioned upon compliance with the rules and conditions as specified by the Town Manager, or his or her designee, to minimize impacts of the construction activities. • Work on the Project will be suspended on the following dates to accommodate previously scheduled special events: o Sunday July 3, Salute to the USA Fireworks o Saturday July 8, and Sunday July 10, Triple Bypass Bicycle Tour o Saturday, July 16, XTERRA Triathlon Matt Pielsticker Town of Avon Page 8 of 24 o Saturday, July 23, Colorado River Ride (if any portion of work zone is operating west of Avon Road) o Saturday, August 8, Bec-TRI Triathlon Exhibit B o Thursday, August 25, and Friday, August 26, U.S. Pro Cycling Challenge o Four days for each three-day holiday weekend, including Memorial Day, Fourth of July, Labor Day, and Columbus Day Traffic Generation: Increased or delayed traffic may occur in the vicinity of the staging areas when deliveries are made, equipment is picked up, and when employees are moving to and from the temporary construction office. A single point of access to each staging area is proposed off of East Beaver Creek Boulevard. The increase in traffic is not expected to be significant and will be transitory in nature, occurring only when vehicles are arriving and departing from the staging areas. PSCo is preparing a ROW use permit for the Town of Avon Public Works Department for areas of the Project within the Town of Avon where traffic will need to be controlled. A Method of Handling Traffic (MHT) plan was submitted with the AASI Permit application. This plan will be revised for specific areas within the Town of Avon with input from the Public Works Department and CDOT. Lighting: Lighting will be limited to porch -style lights on the office trailers. These lights are not anticipated to be different from other residential and commercial lights in the immediate area, and no nuisance impacts due to lighting are anticipated. Noise: Noise is considered a public nuisance if the maximum permissible noise levels are exceeded at a distance of 25 feet or more from the property line where the sound is originating from. The daytime and nighttime maximum permissible noise levels are provided according to zone in Table 2.8-4 as provided in the AASI Permit application. The noise limits given in Table 2.8-4 may be exceeded by 10 decibels on the A -weighted scale (dBA) for a period of no greater than 15 minutes within a one-hour period between 7:00 a.m. and 7:00 p.m. Periodic, impulsive, or shrill noises are considered a public nuisance when at a sound level of 5 dBA less than the noise limits in Table 2.8-4. In addition, the statute states that construction projects would be subject to the maximum permissible noise levels specified for industrial zones for the duration of the construction period. Ta le olorado a i u Per issi le Sound Levels y one one a i u Per issi le oise Level d A ayti a a p ightti e p a Residential 55 50 Commercial 60 65 Light Industrial 70 75 Industrial 80 85 Sound levels are expressed in A -weighted decibels (dBA), which compensates for the frequency response of the human auditory system. Construction of the proposed Project—and use of the staging areas—is anticipated to begin on May 16, 2011, with an in-service date of September 30, 2011. Major activities in the staging areas will include grading, installation of metal containers, delivery of materials, pick-up of materials for delivery Matt Pielsticker Town of Avon Page 9 of 24 to construction site, and operation of heavy trucks. Grading would occur within the staging areas for the pipe laydown areas, parts trailers, and office trailers. The remainder of the areas would not need to be graded. Excessive noise from the staging areas is expected to be transitory, occurring only during site construction and delivery/pick-up of construction materials. Other typical day-to-day activities such as employee parking would not cause significant noise. Estimated equipment types for each phase of construction are presented in Table 2.8-5 of the AASI Permit application, shown also below. The composite site noise level was evaluated at the edge of the 50 -foot ROW (edge of road on either side), considering all of the equipment operating simultaneously at maximum 100 percent load rating usage, to ensure a conservative screening level assessment. Equipment that could be expected to be used in the staging areas includes equipment listed in Phase 1 and pipe/material hauling trucks and crew trucks (Phase 2). Ta le Representative a i u LmaX onstruction oise Levels y onstruction Phase Conservatively assumes equipment a usage factor of 100 percent; i.e., all equipment operating concurrently at the maximum rated level. 2 The maximum sound level (Lmax) is used to quantify the maximum instantaneous sound pressure level generated by a source and is often used in establishing regulatory noise limits. Exhibit B a i u L a uip ent o posite oise Phase onstruction onstruction oise Level at Level at o Phase uip ent feet d A feet d A 1 Establishing Dump Truck 84 92 Laydown Areas Loader 80 Trackhoe 80 Motor Grader 85 Crew Truck 85 Service Truck 85 Inspection Vehicle 85 2 Pipeline Pipe/material Hauling Truck 88 94 Trenching, Truck and Lowboy Trailer 88 Welding and Crew Truck 85 Installation Sideboom 78 Horizontal Directional Drill 89 Welding Truck 74 X-ray Truck 55 3 Padding and Dump Truck 84 92 Backfilling Loader 80 Trackhoe 80 Crew Truck 85 Test Water Transport 85 2000 Gallon Water Truck 88 4 Re -grading and Motor Grader 85 92 Re -paving Reclamation Vehicle 85 Asphalt Paver 77 Crew Truck 85 Street Sweeper 80 Inspection Vehicle 85 Conservatively assumes equipment a usage factor of 100 percent; i.e., all equipment operating concurrently at the maximum rated level. 2 The maximum sound level (Lmax) is used to quantify the maximum instantaneous sound pressure level generated by a source and is often used in establishing regulatory noise limits. Exhibit B Matt Pielsticker Town of Avon Page 10 of 24 The construction of the proposed Project may cause short-term unavoidable noise impacts at the staging areas. The noise impacts at receptors from construction would depend on the type of equipment used, the mode of operation of the equipment, the length of time the equipment is in use, the amount of equipment used simultaneously, and the distance between the sound source and receptor. All of these factors are expected to vary regularly throughout the construction period, making the calculation of a specific received sound level value at receptor locations difficult. Construction activity would conform to noise provisions of Avon Municipal Code Section 8.24.085 (Limitation of Construction Activity). The following recommended mitigation measures would reduce the potential for temporary adverse noise impacts: • PSCo has established a Project website and hotline and will implement a complaint resolution program whereby residents can contact PSCo directly with their noise concerns. Throughout Project construction and operation, PSCo would document, investigate, and attempt to resolve legitimate Project -related noise complaints. • Noisy construction activity at the staging areas, which causes offsite annoyance as evidenced by the filing of a legitimate noise complaint, would be restricted to daytime hours (i.e., 7:00 a.m. to 7:00 p.m.) unless construction during nighttime hours is requested by CDOT, Eagle County, or the Town of Avon. • All equipment would have sound -control devices no less effective than those provided on the original equipment. • All internal combustion engines would be fitted with appropriate muffler systems Odor: An odor is the property of a substance to stimulate chemical sense receptors that sample the air in and around a human or animal. Existing odors near the staging areas may include the odor of smoke from wood burning stoves or open burning, and exhaust from vehicles traveling along U.S. Highway 6. Odors due to use of the staging areas would be limited to the six-month construction period, and may include vehicle and equipment exhaust. These odor emissions are expected to be short-term and transient in nature, and would be adequately dispersed by diurnal winds. Dust: Impacts to air quality in the staging areas be short term, transient, and limited to the construction period of approximately six months. Vegetation clearing, grading, operation of vehicles, and restoration activities in the staging areas may produce fugitive dust or exhaust emissions during the construction phase of the Project. PSCo submitted an application for a General Construction Permit from the Colorado Department of Public Health and Environment (CDPHE) and prepared a Fugitive Dust Plan and Air Pollution Emission Notice (APEN) on February 14, 2011. Because this is a general permit, the Project is considered covered once the application has been submitted to CDPHE. The Air Pollution Control Division will eventually issue a General Construction Permit. Exhibit B Matt Pielsticker Town of Avon Page 11 of 24 Mitigation measures to protect air quality include: • Construction vehicles and equipment would be shut off when not in use to limit the amount of exhaust emissions. • Dust suppression would be conducted during construction. Water for dust suppression would be obtained from municipal sources approved by Eagle County and/or the Town of Avon prior to construction. Hazardous Materials: Construction activities would be performed by methods that prevent entrance or accidental spillage of solid matter, contaminants, debris, and other pollutants and wastes into flowing streams or dry watercourses, lakes, and underground water sources. Construction staging areas are located and arranged in a manner to preserve trees and vegetation. Excavated material or other construction materials would not be stockpiled or deposited near or on stream banks or other watercourse perimeters where they could be washed away by high water or storm runoff or could encroach upon stream banks. No vehicle maintenance or fueling of vehicles would be conducted in the staging areas. No hazardous materials would be stored on site. Upon completion of the construction, construction materials and debris would be removed from the site. Work areas would be re -graded, as required, so that surfaces would drain naturally, blend with the natural terrain, and be left in a condition that would facilitate natural revegetation. Disturbed areas where vegetation was removed by construction activities to an extent that it caused potential soil erosion would be treated with seedbed preparation techniques, re -seeded with an approved seed mixture, and mulched, if necessary, during the planting season per the Project's Revegetation and Weed Management Plan (Attachment 4). The Project Stormwater Management Plan (SWMP) (Attachment 5) further specifies the specific BMPs that would be employed to protect water resources from potential releases of hazardous materials or other contamination. No hazardous materials or fueling of vehicles would occur in the staging areas. Water Quality: Earth -disturbing activities at the staging areas will generally include grading and stockpiling. Sediment control and stockpile containment BMPs for these activities includes usage of erosion/sediment control logs, silt fence, sweeping, temporary berms, vehicle tracking control, inlet and culvert protection. Erosion Control BMPs may include surface roughening, mulch/mulch tackifier application, erosion control blankets, seeding and mulching, temporary slope drains and a vegetative buffer zone. Administrative controls would include phased construction to reduce the amount of open area at any given time and limiting the number of stockpiles. The movement of vehicles from disturbed areas to paved streets during all phases of construction activities can disturb area soils and contribute to sedimentation and erosion. Sediment control BMPs for these activities may include stabilized construction entrances (rock, geotextiles, or mud mats), street sweeping, and inlet and culvert protection. Exhibit B Matt Pielsticker Town of Avon Page 12 of 24 Potential water quality impacts to surface and ground water would be avoided through the use of stormwater protection BMPs listed in Table 2.13-2. PSCo would adhere to the Colorado construction stormwater permit and stormwater management plan requirements for this Project. The SWMP includes specific mitigation measures and BMPs that would be followed to protect surface water quality and to prevent erosion and is attached as Attachment 5. The CDPS General Permit allows the following non-stormwater discharges in combination with stormwater discharges associated with construction sites, provided that the non-stormwater component of the discharge is identified in the SWMP: • Discharges from fire -fighting activities • Natural springs • Landscape irrigation return flow • Discharges to the ground of concrete washout water from washing of tools and concrete mixer chutes are allowed under this SWMP, provided that the washout water is confined in a concrete washout area and does not leave the site as surface runoff or to surface waters and does not enter groundwater • Certain construction dewatering discharges The CDPHE Water Quality Control Division's General Permit for Stormwater Discharges from Construction Activities allows for dewatering of groundwater and stormwater to the ground surface to allow for infiltration on the site. No groundwater from construction dewatering would be discharged as surface runoff or to surface waters on the site. It is not anticipated that dewatering activities would be required during this Project. 5. Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) would be available to serve the subject property while maintaining adequate levels of service for existing development; and The temporary staging areas would not require sewage, waste disposal, water, gas, or electric service, nor would it burden police and fire protection services. 6. Adequate assurances of continuing maintenance have been provided. Exhibit B After the use of the land as a staging area, no maintenance would be required at the site except for revegetation. PSCo would monitor the staging areas, along with other areas of the proposed Project where vegetation would be disturbed, for revegetation and to manage for noxious weeds according to the Revegetation and Weed Management Plan developed for the Project (included as Appendix F in the AASI Permit application). Matt Pielsticker Town of Avon Page 13 of 24 Exhibit B If you have any questions concerning the response to your questions please do not hesitate to call myself or John MacDonald (Permitting Project Manager, Tetra Tech EC, Inc. ph: 970-206-4330, email: john.macdonald@tetratech.com). Sincerely, Richard J. Grady Public Service Company of Colorado Supervisor, Right of Way & Permits 303-571-3135 office rick.grady@xcelenergy.com Attachments (5): 1. Sheetmap 3 from AASI Permit Application, showing staging area locations 2. Existing Site Contours 3. Site Plan 4. Revegetation and Weed Management Plan 5. Stormwater Management Plan Shestmaps Sheetmap 3 Legend „_ White River - ® Edwards to Meadow Moanidn Facility "- National • ��� �� �--_"'-----<.- Forest I ® Mainline Isolation Valve (Approx. Location( Rrererted Route olisv bw on 0 • 'u � Sla9in9Area Transportation Interstate Highway ��_ ✓ — — U.S. Highway 8 State High-y Caunty or Lecel Road Rallroatl - Jurisdiction CItY Perk urban open space i State wldrre or Slate HabitatAre p State Lantl Board W Ij/ r p U.S. Forest S.,. Mu I, T w Pyp nlioun pal Bdary i ' L.� .4i+h.� WNla[oo der r_. Ilk is W, Ilk • ere 'a. -XI� r. ter, A" �n,ana., rr,Nr mn v yr witF � "e�� r Fort:. ,j},, 1 t.. 1 � "' A _ � # Ali �'. � �r�'137� ° • � ; '. y 3 �r . ..aais ...nrr r .p w..w ,A ..... rr L� ILS. _w --------------- ------------------ - — _ — X _ III I _ i I� _£ttJGL SOU ERS\ / \ EXISTING GR!\VEL PAAgNG I \NG 6R /- v v 1v /i 7REESAL • `� — EXSTINGOGI-\NA<i — BOULDERS EDGE OF ASPHALT a EExce slr� O elePxoxe w+ma� EasEM�. Qf wxoxox -EE l CONIFEROUS AND DEC TREES ALONG SLOPE eer��rr er eeaeeue J. w oo 2. TGWARDSTDMEAIOWMOUNTAII PIPELINE EDWARDS TO MEADOW MOUNTAIN PIPELINE EAGLE COUNTY, CO 18' PIPELINE PIPE LAYDOWN AREA EXISTING COMMONS ®' 0 0CMIMW • e X Y. X TRUCK TURNING MP A�q�. (GRAVEL �. SINGL B. DERS — " . F a a�� EDGE OF ASPHALT 1 � 1 \ � CONIFEROUS AND DECIDUOUS TREES ALONG SLOPE 1 'y :\ \\ t x 1 1 1 e..��x� ....aoeuo I *1 J • � 1 2 ♦ - ioo TO MEADOW MOUNTAIN PIPELINE EDWARDS TO MEADOW MOUNTAIN PIPELINE EAGLE COUNTY, 00 18' PIPELINE PIPE LAYDOWN AREA PROPOSED IMPROVEMENTS 1++50 az�ecNlaaom a To Planning and Zoning Commission Fr Sally Vecchio, Ass't Town Mgr/Community Development Date May 3, 2011 RE Public Hearing - Amendment to Title 7 — Avon Development Code Text Amendment To Establish Regulations for Temporary Uses Request Earlier this year, the Avon Town Council initiated an amendment to the Avon Development Code to establish regulations that would expand the town's scrutiny of temporary uses and special events in the town. The proposed regulations (attached as Resolution 11-05) allow for the establishment of certain temporary uses for limited duration, provided that such uses comply with general and specific review criteria. The proposed language is a text amendment to Title 7 and is subject to Title 7 Avon Development Code Zoning Text Amendments, §7.16.040(c) Review Criteria. Background The proposed regulations provide for several types of temporary uses: Temporary Uses and Structures for activities not already approved by permit, including activities that are not normally allowed in the zone district; Temporary Construction Activities, such as construction -material storage and employee parking for off-site construction activities; Temporary Outdoor Sales and Events; and Temporary Parking for Special Events or Other Purposes. Temporary uses, structures and construction activities that do not exceed ten (10) days in a calendar year and special events that do not exceed one hundred (100) persons in a single day may be approved by the Community Development Director. All other applications will be reviewed by the Planning and Zoning Commission (PZC). Permits for special events on public property (i.e., streets, sidewalks, public buildings, or public parks) will not be subject to these regulations unless the Town Council determines that such an event must apply for a temporary use permit, in which case Council shall also determine if such application should be processed administratively or before the PZC. The review criteria for considering temporary use applications is intended to ensure that such temporary uses or structures will not cause unreasonable negative impacts to properties, residents, business or public uses in the vicinity, including: visual, noise, vibration, trash, hours of operation, traffic congestion, parking, and safety. Zoning Text Amendment Review Criteria A zoning text amendment must meet the criteria set forth in Section 7.16.040(c) of the Avon Development Code: 1. The text amendment promotes the health, safety, and general welfare of the Avon Community; 2. The text amendment promotes or implements the goals and policies of the Avon Comprehensive Plan; 3. The text amendment promotes or implements the purposes stated in this Development Code; or the text amendment is necessary or desirable to respond to changed conditions, new planning concepts, or other social or economic conditions. Analysis • The proposed regulations provide a reasonable regulatory framework for the management of temporary uses on private property and will help assure the protection of the public interest. • The Avon Comprehensive Plan encourages flexible zoning that allows more effective development, provides a benefit to the community, and is compatible with surrounding development. • The Avon Development Code promotes the planned and orderly use of land, buildings and opens space. Recommendation Staff recommends that Title 7 — Avon Development Code be amended to establish regulations for temporary uses. Attachments Resolution 11-05 Recommending Approval of Amendments to Title 7 of the Avon Municipal Code. 2 Attachment A TOWN OF AVON, COLORADO PLANNING COMMISSION RESOLUTION 11-05 SERIES OF 2011 A RESOLUTION RECOMMENDING APPROVAL OF AMENDMENTS TO TITLE 7 OF THE AVON MUNICIPAL CODE WHEREAS, the Town Council initiated an amendment to the text of the Town of Avon zoning code in accordance with Section 17.28.020 of the Avon Municipal Code; and WHEREAS, the Planning and Zoning Commission of the Town of Avon held a public hearing on May 3,2011 after posting notice of such hearing in accordance with the requirements of the Avon Municipal Code, and considered all comments provided before taking action to make a recommendation to the Town Council; and WHEREAS, it is the Planning and Zoning Commission's opinion that the health, safety and welfare of the citizens of the Town of Avon would be enhanced and promoted by the adoption of these text amendments to the Town of Avon zoning code; and WHEREAS, the Planning and Zoning Commission finds that the application to change the Development Code text meets the criteria set forth in Section 7.16.040(c) of the Avon Development Code. NOW THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission hereby recommends the that the Town Council of the Town of Avon approve the following amendments to Title 7 of the Avon Municipal Code: Section 1. Recitals Incorporated. The above and foregoing recitals are incorporated herein by reference and adopted as findings and determinations of the Town Council. Section 2 Amendment to Chapter 7.24 Use Regulations. Section 7.24.080 Temporary Uses and Structures is hereby repealed and reenacted in its entirety to read as follows: 7.24.080 Temporary Uses and Structures (a) Purpose. This Development Code allows for the establishment of certain temporary uses for limited duration, provided that such uses comply with the general and specific standards of this section. (b) Applicability. A Temporary Use permit is required for any temporary use or structure that may be allowed in each zone district as listed in Section 7.24.080 Temporary Uses and Structure unless such Temporary Use is an Exempt Temporary Use as defined in 7.24.080(g) Exemptions below. (c) Review Procedures. Applications for a temporary use permit shall follow the general review procedures set forth in §7.16.020, General Procedures and Requirements. Applications for temporary use permit may be initiated by the owner or lessee of the property for which a temporary use or structure is desired. A temporary use permit may be extended or renewed by applying for a new temporary use permit in accordance with the procedures and review criteria in this §7.24.080. (d) Review Authority. (1) Administrative temporary use permit. An administrative temporary use permit may be issued for any Temporary Use Permit as defined in 7.24.080(e) below provided that the temporary use or structure shall not exceed ten (10) days in calendar year and the temporary use shall not include events exceeding one hundred (100) persons in a single day. Administrative Temporary Use Permits shall not exceed one (1) year in duration. No notice or public hearing shall be required for Administrative Temporary Use Permits. The Director may determine that the character of the requested Minor Temporary Use requires review as a Major Temporary Use Permit. The decision of the Director may be appealed to the Town Council pursuant to §7.16.160, Appeal. (2) Temporary use permit. A temporary use permit may be issued by the PZC for any temporary use or structure not allowed as a use by right, or as an accessory use or special review use in the applicable zone district where the proposed temporary use or structure exceeds ten (10) days in a calendar year. The PZC shall review and render a decision on an application for a temporary use after conducting a public hearing. Mailed notice of the public hearing shall be provided in accordance with §7.16.020(d)(2). The decision of the PZC may be appealed to the Town Council pursuant to §7.16.160, Appeal. (e) Temporary Uses. The following uses shall be classified as temporary uses: (1) Temporary Structures. Temporary structures includes, but is not limited to, temporary real estate offices, construction trailers, classroom, office, model home, including manufactured or mobile units or similar portable structures. (2) Construction -related Activities (including construction trailers, storage of materials and equipment, and employee parking) for off-site construction activities that are not related to a building permit for the subject property. (3) Outdoor Sales or Events. The temporary outdoor display/sales of merchandise (e.g., parking lot or sidewalk sales); seasonal sales (e.g. (Christmas Trees, Halloween Pumpkins, Civic Group Merchandise); special events (e.g. fairs, festivals, or similar outdoor events, amusement rides, animal shows, arts and crafts exhibits, auctions, carnivals, circuses, concerts, fairs, festivals, flea markets, food events, and outdoor entertainment/sporting events, rodeos); and farmer's markets. (4) Temporary Parking for Special Events or Other Purposes. (5) Other. Other temporary uses of a similar nature as determined by the Director. 2 (f) Exemptions. The regulations in this section shall not apply to the following uses: (1) Construction activities located on a subject property, including the storage of construction materials and construction equipment and construction related parking associated with a valid building permit for such property; (2) Funeral processions; (3) Garage or estate sales; (4) Private parties for fewer than fifty (50) people; (5) Weddings of immediate family of the homeowner, not to exceed one -hundred and fifty (150) guests; (6) Regularly scheduled school events such as athletic events that use existing parking, traffic controls, and public safety support; (7) Natural disasters and emergencies, staging and assembly grounds; and (8) A governmental agency acting within the scope of its functions. (g) Permits for Special Events on Public Property. Permits for special events on any street, alley, sidewalk, public building, or public park shall not be subject to the procedures and standards in this Chapter 7.24.080 unless the Town Council determines by motion that a special event must apply for a temporary use permit, in which case Town Council shall also determine if such application should be processed administratively or by public hearing. Special events on public property shall otherwise be subject to the following provisions of the Avon Municipal Code, including but not limited to: (1) Alcoholic beverage permits (Chapter 5.08, Liquor Licenses); (2) Amplified Sound (Chapter 5.24, Amplified Sound Permits); (3) Public Parks and Special Event Areas (Chapter 9.40, Public Parks and Special Event Areas). (h) Review Criteria. The following review criteria are the basis for a decision on an application for a temporary use permit. (1) The temporary use or structure shall not cause unreasonable negative impacts to properties, residents, business or public uses in the vicinity, which cannot be mitigated through the imposition of conditions on such temporary use or structure, such negative impacts to consider include, but are not limited to: visual, noise, vibration, trash, hours of operation, traffic congestion, parking, safety, soil and vegetation disturbance, natural resource impacts and reasonable expectations of enjoyment of property based upon zone district designations and community planning documents; 3 (2) Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, roads and transportation, as applicable) will be available to serve the proposed temporary use or structure while maintaining adequate levels of service for existing development; (3) The temporary use shall comply with all applicable general and specific regulations of this Section, other Town ordinances, and state and federal law unless otherwise expressly stated; (4) The applicant has demonstrated that he or she possesses the requisite skills and experience to ensure that the particular activity will be conducted in a safe and orderly manner; (5) The temporary use or structure is not of a nature that will become impractical to ceases or remove over time; (6) Adequate plans or sureties are proposed to guarantee restoration of the property after the temporary use or structure ceases; (7) All temporary signs associated with the temporary use or structure shall be properly permitted pursuant to Chapter 15.28, Sign Code and removed when the activity ends or permit expires, whichever occurs first; (8) The temporary use or structure shall not violate any applicable conditions of approval that apply to a principal use on the site; (9) The temporary use regulations of this section do not exempt the applicant or operator from any other required permits, such as food service or building permits; (10) The temporary use or structure, including any associated parking and traffic circulation, shall not disturb sensitive or protected resources, including required buffers, 100 - year floodplains, and required landscaping and the applicant shall agree to restore all disturbed areas of the site to the condition that existed prior to the temporary use or structure; (11) Tents and other temporary structures shall be located so as not to interfere with the normal operations of any permanent use located on the property, shall be anchored, and meet the requirements of the building official, including fire rating; (12) Off-street parking shall be adequate to accommodate the proposed temporary use or an acceptable parking plan shall be approved with the temporary use or structure; (13) The temporary use will not result in excessive demands for police, ambulance, fire, or other essential public services which may negatively impact the capacity of existing public services provides to meet existing public service demands; (14) The size, nature, or location of the temporary use or structure is not reasonably likely to cause a clear and present danger of injury to persons and property; 4 (15) Another temporary use permit application has not been received prior in time or has already been approved for the same time and place requested by the applicant or so close in time and place to that required by the applicant that the issuance of both permits would case undue traffic congestion; and (16) The location of the temporary use or structure will not substantially interfere with any construction or maintenance work scheduled to take place upon Town streets; and (17) The temporary use or structure shall be for a duration which is appropriate considering the location, use, planned development and activities in the vicinity and impact on nearby properties; however, in no event shall a temporary use be granted for more than three (3) years. ADOPTED THIS 3rd DAY OF MAY, 2011 Signed: Chris Green, Chair Attest: Scott Prince, Secretary k,