Loading...
TC Resolution 24-11 Approving The Updated Community Development Fee ScheduleA Avon C O L O R A 0 0 RESOLUTION 24-I1 APPROVING THE UPDATED COMMUNITY DEVELOPMENT FEE SCHEDULE WHEREAS, the Avon Town Council ("Council") may enact and update fee schedules involved with all application processes as stipulated in Chapter 7 and Chapter 15 of the Avon Municipal Code; and, WHEREAS, Council has determined that a revised fee schedule is necessary so that the fees more accurately the actual cost incurred by the Town of Avon for various Development applications adopt fees that reflect the cost of labor and fee practices of the Community Development Department; and, WHEREAS, the fee schedule was last adopted by Council by Resolution 20-35 Community Development Fee Schedule; and WHEREAS, Council finds that the adoption of a fee schedule which more accurately reflects the actual costs incurred by the Town for development application review under the Avon Development Code will promote the health, safety and general welfare of the Town of Avon. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN OF AVON that the Avon Town Council adopts the updated Community Development Fee Schedule attached hereto as Exhibit A, which shall supersede in its entirety the Community Development Fee Schedule adopted by Resolution 20-35. ADOPTED March 26, 2024, by the AVON TOWN COUNCIL Attest: Amy Phillips, Mayor Resolution Form — 2024 March 26, 2024 Page 1 of I Miguel Jau0gqf Casanueva, Tow N OF AVp� .SENL: n ,ovon Exhibit A to Resolution 24-11 Community Development Department 100 Mikaela Way PO Box 975 Avon, Colorado 81620 Community Development Fee Schedule — Last Updated March 26, 2024 Planning Division Fees: Flat Fee Applications* Planning Application Type Flat Fee Development Plan Review Fees Minor Development Plan $250 Major Development Plan (outside of Town Core) $750 Sign Fees Sign — Minor Plan $100 Master Sign Program: Minor Amendment $250 Master Sign Program $500 Subdivision Fees Minor Subdivision (i.e. duplex split, lot consolidation, etc.) $500 Minor Subdivision — Condominium $500* - *Plus outside/3rd party surveyor fees Subdivision Exemption $500 Miscellaneous Planning Application Fees Pre -Application Review No Charge Alternative Equivalent Compliance $250 Development Bonus (Stand -Alone Application) $750 Development Bonus (if combined with another application) $325 Landscaping $100 (waived if substantial water reduction) Rezoning $1,500 Special Review Use $750 Temporary Use $250 Variance $1,000 Zoning Determination $100 *Extension to a development plan approval shall incur a fee of % of the development plan review fee Q Planning Division Fees: Pass -Through Applications (per Avon Municipal Code 7.04.100) Planning Application Type Deposit Required* Development Plan Review Major Development Plan (within town core) $1,500 PUD Amendment (Minor) $650 PUD — Major $1,350 Subdivision Major Subdivision — Preliminary $1,350 Major Subdivision — Final $1,350 Miscellaneous 1041 Permit Annexation $5,000 Annexation $3,500 Appeal $500 Code Text Amendment $1,000 Comprehensive Plan Amendment $2,000 Location, Character, Extent $1,000 Vested Property Rights $2,500 *Per Section 7.04.100 of Avon Municipal Code, pass -through accounts are estimates. Unused balances will be returned, and in some cases additional fees may be incurred. Final fees are based on the hourly rate of the Staff member working on the application (see table below). Development approval will be considered void if fees ore not paid in a timely manner. STAFF HOURLY RATES Director/Town Engineer $140/hour Building Official $120/hour Senior Planner/Planning Manager/Project Engineer $120/hour Planner II/Engineer II $100/hour Planner I/Engineer I $90/hour GIS Analyst $80/hour Permit Technician $60/hour Miscellaneous Administrative Fee $25/hour Town Attorney $260/hour (direct invoicing) NOTES: - Public Notification rates for newspaper and mailing (if applicable) will be at cost to Town. - Legal invoices will be routed directly to Applicants 2 BUILDING DIVISION FEES Building, Plumbing, and Mechanical Permit Fees* Total Valuation* Permit Fee $1.00 - $500 $50.00 $501 - $2,000 $50.00 for the first $500 plus $3.40 for each additional $100 or fraction thereof, to and including $2,000 $2,001 - $25,000 $76.25 for the first $2,000 plus $15.50 for each additional $1,000 or fraction thereof, to and including $25,000 $25,001- $50,000 $391.75 for the first $25,000 plus $11.15 for each additional $1,000 or fraction thereof, to and including $50,000 $50,001- $100,000 $710 for the first $50,000 plus $7.75 for each additional $1,000 or fraction thereof, to and including $100,000 $100,001- $500,000 $1095 for the first $100,000 plus $6.20 for each additional $1,000 or fraction thereof, to and including $500,000 $500,001- $1,000,000 $3,560 for the first $50,000 plus $5.25 for each additional $1,000 or fraction thereof, to and including $1,000,000 $1,000,001 and up $6,170 for the first $1,000,000 plus $4.05 for each additional $1,000 or fraction thereof *Valuation means total labor and materials cost. Building Permit Fees Continued* Building Plan Review" 65% of Building Permit Fee Plumbing Permit (with Building Permit) 15% of Building Permit Fee Mechanical Permit (with Building Permit) 15% of Building Permit Fee Plumbing or Mechanical Plan Review (with Building Permit)" 65% of Plumbing or Mechanical Permit Fee Solar PV Fee Flat fee of $500 for Residential, $1,000 for Commercial Re -Inspection Fee $100 After the fact Permit Fee 2X Total Permit Fee Plan Review Fee at Submittal" May be due at time of application submittal at the discretion of the Building Official Planning Department Review May be due at time of application submittal at the discretion of the Building Official Water Tap Fee Per Avon Municipal Code section 13.08.040 Eagle River Fire Protection District Emergency Impact Fee Per Avon Municipal Code Section 3.40.100 Exterior Enerizv Offset Fees Per Avon Municipal Code Section 15.27 *The Building Official approves all final fee determinations. Some fees may be waived depending on the scope of work. **All plan review fees are non-refundable regardless of whether or not a permit is issued or withdrawn *** Electrical Permits and Fees are administered by the Colorado Department of Regulatory Agencies