Loading...
TC Resolution 23-03 Revising the Fee Schedule for Construction Work Within the Public Right-of-WayA Avon COLORADO RESOLUTION 23-03 A RESOLUTION REVISING THE FEE SCHEDULE FOR CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY, TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, the Town of Avon, Colorado (the "Town") is a home rule municipality and political subdivision of the State of Colorado (the "State") organized and existing under a home rule charter (the "Charter") pursuant to Article XX of the Constitution of the State; and WHEREAS, the Town Council may enact and update fee schedules to accurately reflect the cost of labor and overhead involved with all application processes as stipulated in Avon Municipal Code Titl� 12 (Streets, Sidewalks and Public Places); and i WHEREAS, the Town Council wishes to update the Town of Avon Right -of -Way Use Fee Schedule setting the fees for applications received for work on or after April 15, 2023. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN OF AVON that the Avon Town Council hereby as follows: The Town Council hereby adopts the following Town of Avon Right -of -Way Use Fee Schedule as set forth and incorporated herein as "Exhibit A to Resolution 23-03", establishing fees for application processing and review of construction work within public ways. ADOPTED March 14, 2023 by the AVON TOWN COUNCIL rX�By: Attest: LMY Pl illips, Mayor Miguel Jauregui Resolution 23-03 March 14, 2023 Page I of 1 tk Of qVQ� 7 � A L Town ri EXHIBIT A TO RESOLUTION 23-03 TOWN OF AVON RIGHT-OF-WAY USE FEE SCHEDULE 2023 BASE PERMIT USE FEES Temporary contractor parking or staging (if not accompanied by a building permit) Extra field inspection Independent Inspection/Testing/Report Review Stop work/Late application Lane/Trail Closures EXCAVATION / CUT FEES Driveway Installation/Paving (if not accompanied by a building permit) Cuts to asphalt or concrete road pavements Cuts to brick pavers, decorative concrete, or other special surface Sidewalk panel work Cuts to non -paved surface, road prism, landscaping Utility Bore Pit (Landscaped Area) Utility Bore Pit (Paved Section) Utility Bore Pit (Native Grass) Bore Length Ditch Re-grading/Restoration Curb and gutter cuts/repair Conduit Fees Purchase Fiber Optic Conduit if Required Fiber Optic Pull Boxes Fiber Optic Markers $250 $100 each parcel frontage $75/hour $75/hour $250/occurrence $1/LF/day, each lane $75 each $150/LF or $6/SF, whichever is less $150/LF or $6/SF, whichever is less $101SF $25/LF or $6/SF, whichever is less $6/SF $10/S F $2/SF $11LF $1/LF $3/LF $1.75/LF $631/18"x24" box $1,108/24"x36" box $10/Marker NOTES A. Public Works administers the ROW Use Permit program under AMC 12.04; authority to establish fees is set forth in ACM 12.04.110(a) and (b). B. ROW Use Permits are administered annually on a per -parcel basis; a separate permit must be obtained for each impacted parcel or parcel frontage each calendar year. C. The base permit fee includes grading of one storm ditch, one (1) temporary unpaved driveway installation, and up to 2 site inspections by Public Works staff. D. Excavation cut fees cover cost for daily monitoring, inspection of compaction and restoration, review of (1) set of test cylinder break reports for new pavement, degradation fee, and management of surety deposit. E. A surety is required for all excavation and pavement cuts in the public ROW in accordance with AMC 12.04.280. This surety must take the form of cash deposit or a letter of credit from a local bank, unless the applicant is under contract with the Town to perform work related to a bonded construction contract. EXHIBIT A TO RESOLUTION 23-03 The Public Works Director, or his/her designated administrator, will set the amount of surety which must be at least $2,000 in accordance with AMC 12.04.280. F. Temporary contractor parking or staging in the public ROW may be allowed on a case -by -case basis with an approved parking and traffic control plan. Fee covers cost for daily monitoring and coordination with Avon Police Department staff. G. Lane, sidewalk, or trail closures within the public ROW may be allowed on a case -by -case basis with an approved traffic control plan. Fee covers cost for daily monitoring and notification to public and emergency services. H. The Applicant is responsible for all restoration of the work area to the satisfaction of the Town. I. The issuance of a stop work order or discovery of work started without a permit is cause for additional fees.