Loading...
Work Release for Harry A Nottingham Park East Improvements Redesign DocuSign Envelope ID:CBBDOA1E-34D8-4D31-A666-10FCC2872811 ZEHREN AND ASSOCIATES Work Release for Professional Design Services August 3, 2023 Updated August 18,2023 Eric Heil,Town Manager/Jim Horsley, Project Engineer Town of Avon, Post Office Box 975, Avon, CO 81620 Email: eheil@avon.org and ihorslev@avon.org/ Phone: 970-748-4009 RE: Harry A. Nottingham Park—East Park Improvements Re-design Zehren and Associates, Inc. Project No: 2021.2859.04 Dear Eric and Jim. Thank you for the opportunity for Zehren and Associates to submit this fee proposal to assist the Town of Avon with the re-design of the East Park Improvements at the Harry A. Nottingham Park(herein referenced as the 'Park'). The bid received in January 2023 for the complete scope of the project including new restrooms was significantly more than the allocated project budget. As a result,the bid was rejected and over the past several months the Town Council and staff have been re-considering options and alternate uses for the redevelopment of the East Park area. Recently,the idea for a 'Skate Plaza' has emerged as a potential compatible use for the East Park, in partnership with a proposal by the Avon Skate Coalition with strong support from the skateboard and wheeled sports community. A majority of Town Council is in support of studying the possibility for a 'Skate Plaza'. Town staff has been directed by the Town Council to conduct a conceptual design process to analyze the potential of the East Park site to include a Skate Plaza use, in conjunction with several park elements of the previous design for the project. Given Zehren and Associates involvement as the lead consultant for the original project design,the Town has requested a proposal from the firm to conduct a 'Request for Proposals' (RFP)to solicit proposals from qualified skatepark designer. The goal is to retain the conceptual design services of a reputable and experienced skatepark designer to work alongside the Zehren and Associates team to study the possibility of a Skate Plaza as part of a revised design for the East Park area. The proposed scope of work and associated fee estimate reflects a Request for Proposal process to be conducted by Zehren and Associates to select and retain a skatepark designer, and a Conceptual and Schematic design phase of work coordinated between the selected skate park designer and the Zehren and Associates team. Working together,the skatepark designer and Zehren and Associates will study the possibility for a Skate Plaza to be integrated into the design with elements of the previous design and provide approximate cost of adding a Skate Plaza to the project. At the conclusion of the effort, it is anticipated the Town Council will decide to include or exclude the Skate Plaza from the project. Based on this decision,the Zehren and Associates team will provide an updated scope of work and fees for the remainder of the design and documentation phases, and if the project advances into construction in 2024. ARCHITECTURE• PLANNING• LANDSCAPE• INTERIORS P.O.BOX 1976,Avon,CO 81620. 970.949.0257•www.zehren.com DocuSign Envelope ID:CBBDOA1E-34D8-4D31-A666-10FCC2872811 L ZEHREN AND ASSOCIATES PROGRAM The updated program for the site and landscape improvements to be studied alongside the Skate Plaza include: 1. Seating Wall along the north of the site, interfacing with the existing walkway. 2. Pre-fabricated restrooms (BOXX Modular or similar). 3. Signage (to match existing monuments). 4. Electrical service and MDC relocation to SW corner of site, as well new site and parking lot lights. 5. Undergrounding powerlines along UPRR tracks. 6. Water infrastructure (water stub to approximate pre-fabricated restrooms location) 7. Sanitary sewer(stub service to approximate pre-fabricated restrooms location). 8. Seating boulders 9. Picnic tables, bike racks,trash, and recycling receptacles. 10. Access ramp from west parking to the field, where stairs are located. 11. New revised plantings and irrigation (including trees, shrubs, grasses, seeding) 12. Pervious pathways (assumed to be crusher fines) Project elements to be eliminated from the previous over budget design dated January 2023 include: 1. New restroom and concessions building 2. Shade shelter structures 3. New bollard site lighting (concrete bases and wiring to be included in scope) 4. Hardscape paving (pavers, asphalt and concrete paving) 5. Roadway and parking lot re-grading and re-surfacing. SCOPE OF WORK The proposed scope of work and fees includes Zehren and Associates for project management,the Request for Proposals process to select and retain a skatepark designer, and Landscape Architecture and Civil Engineering conceptual and schematic design services to work with the selected skatepark designer to study a potential Skate Plaza as part of the project. The addition of a Skate Plaza and elimination of certain project elements will require reconfiguration of different areas of the plan. Conceptual options developed by the skatepark designer in coordination with Zehren and Associates will analyze the reconfiguration and revisions that are needed to the proposed design. If a preferred option emerges as part of the review process, it will taken through schematic design, in order to help identify additional details of the project and to quantify costs of adding a Skate Plaza to the project. The following scope of work is proposed by Zehren and Associates, structured into 3 major tasks: Task 1 Skatepark Designer Request for Proposals Process Task 2 Conceptual Design Task 3 Schematic Design Each task and sub-tasks is described in greater detail, and fee estimate and schedule is provided thereafter. ARCHITECTURE• PLANNING• LANDSCAPE• INTERIORS P.O.BOX 1976,Avon,CO 81620. 970.949.0257•www.zehren.com DocuSign Envelope ID:CBBDOA1E-34D8-4D31-A666-10FCC2872811 ZEHREN AND ASSOCIATES Task 1 Skatepark Designer Request for Proposals Process The goal of Task 1 is to conduct a Request for Proposals to select and retain a qualified skatepark designer to help the Town study a potential Skate Plaza as part of the East Park Improvements project. Following are the sub-tasks involved: a. Finalize draft of the Request for Proposals (RFP)with input from Town Staff and the Avon Skate Coalition. b. Organize supplementary materials to be part of the RFP process,including the prior design documents and site survey. c. Issue RFP directly to up to (7) skate park designers pre-selected by the Town of Avon and or the Avon Skate Coalition. d. Manage communication during the bid period (approximately 2 to 3 weeks) and coordinate responses to skatepark designers. e. Create a proposal evaluation matrix and assist the Town and Avon Skate Coalition in selecting a skate park designer. f. Communicate award to selected skatepark designer, and notice of selection to other participants in the RFP process. g. Amend Zehren's contract to include the selected skate park designer, or facilitate direct contract of the skatepark designer with the Town of Avon. h. Conduct two meetings with the Town of Avon during Task 1, a coordination meeting before the RFP is issued, and a proposal evaluation meeting after the proposals are received. Task 2 Conceptual Design The goal of Task 2 is to study conceptual design options for a skate plaza coordinated with the selected improvements of the prior design (as outlined in the Program section of this proposal), and to select a preferred conceptual design to study in greater detail in Task 3 Schematic Design. Following are the sub- tasks involved: a. Start-up meeting and preliminary design charrette with skatepark designer, Town Staff and Avon Skate Coalition to identify up to 3 different options for a Skate Plaza to develop in Task 2. b. Progress meeting to review conceptual design options for a Skate Plaza by skate park designer. c. Develop Concept Site Plans for other areas of the project that are not Skate Plaza and per the revised program, and to coordinate with the Skate Plaza concept options proposed by the skatepark designer. This work will be hand drawn over computer base maps. d. Work session with Town Council, CASE and Planning and Zoning Commission meeting to review and select a preferred skatepark concept. e. Conduct 3 meetings as part of Task 2, including the start-up design charrette,the progress review meeting, and the work session with Town Council. ARCHITECTURE• PLANNING• LANDSCAPE• INTERIORS P.O.BOX 1976,Avon,CO 81620. 970.949.0257•www.zehren.com DocuSign Envelope ID:CBBDOA1E-34D8-4D31-A666-10FCC2872811 L ZEHREN AND ASSOCIATES Task 3 Schematic Design The goal of Task 3 is to refine the preferred concept plan selected in Task 2 to a greater level of detail. The plan will coordinate areas of the prior design related to utilities and infrastructure, circulation, landscape design, and overall place-making. A cost estimate for the Skate Plaza will be provided by the skate park designer in association with the schematic design for the Skate Plaza. Task 3 will culminate with a formal presentation to the Town Council at a regular scheduled meeting. Following are the sub-tasks involved: a. Work session with skatepark designer and civil engineer to review refinements to be made to preferred concept plan, and design opportunities for other park elements that are part of the design. b. Refine the Site Plans for other areas of the project that are not skate plaza, and per the revised program, and to coordinate with the preferred skate plaza concept selected in Task 2. This work will be drawn in Autocad over computer base maps. c. Review meeting with the Town staff and Avon Skate Coalition to review the schematic design and receive input prior to presenting formally to Town Council. d. Town Council, CASE and Planning and Zoning Commission meeting to review the schematic design plan and cost estimate for the skate plaza. e. Conduct 3 meetings as part of Task 3, including the work session, the progress review meeting with Town staff and the Avon Skate Coalition, and the work session with Town Council. f. Provide a scope of work and fees for next steps in the process if requested by Town Council and staff. SCHEDULE An approximate 90-day period of work based on an anticipated notice-to-proceed in mid-August of 2023 is assumed in this schedule. Based on this,the schedule anticipates completing the scope of work tentatively between mid-August and mid-November, inclusive of Town Council, PZC, and CASE reviews. Task 1: RFP for Skatepark Designer To be released Immediately(tentatively August 21, 2023). Proposals due by September 1, 2023 Review Proposals, Interview and Select Consultant by September 8, 2023 Task 2: Concept Design Initial Design Options by September 22, 2023 Comments by September 29, 2023 Revised Concept(s) by October 9, 2023 Meet week of October 9'for final comments *October 17 Review with PZC and CASE *October 24 Town Council Review Task 3: Schematic Design Complete November 14. *November 21 PZC Action on Schematic Design ARCHITECTURE• PLANNING• LANDSCAPE• INTERIORS P.O.BOX 1976,Avon,CO 81620. 970.949.0257•www.zehren.com DocuSign Envelope ID:CBBDOA1E-34D8-4D31-A666-10FCC2872811 ZEHREN AND ASSOCIATES PROFESSIONAL FEE ESTIMATE Task 1 Skatepark Designer Request for Proposals Process $ 3,750 Taak 2 Conceptual Design $ 6,500 Task 3 Schematic Design $ 5,500 Civil Engineering Support: $ 5,000 TOTAL $20,750 The fees quoted are for the Zehren team scope of work as outlined. 50% ($10,375) of the proposed Zehren team fee is specific to the skate park designer RFP and skate park related design tasks. Fees are proposed as allowances to be billed against on a time and materials basis per the progress of work by each discipline. These fees include the costs for only the consultants listed. The cost of the skatepark designer will be in addition to the fees listed. Additional work outside of the described Scope of Work will be performed as additional services only with pre-approval of the Town. A bill for our services and expenses will be sent monthly, and we ask that payment be made within 30 days of our billing. EXCLUSIONS The following services are excluded from the proposed phases of work: • Architecture, MEP, Geotechnical and Structural Engineering Services • Cost Estimation and Pre-construction services • Topographic Field Surveying and Drone Imagery • Three dimensional models and artistic perspective renderings (available upon request). CONTRACT TERMS The terms governing this contract shall be in accordance with the Town of Avon's Professional Services Agreement. Eric and Jim,thank you for your consideration in retaining our design services for the re- design of this project. Please feel free to call with any questions or concerns regarding the Scope of Work and this Work Release Proposal. Otherwise, if the terms of this Proposal are acceptable to you, please indicate your agreement with the terms of the letter by countersigning below and returning a copy to us. Again, we very much appreciate the opportunity to submit this proposal to continue to assist you and the Town of Avon for the East Park Improvements project._ Sincerely, r—DocuSigned by: . /23/2023 �14145930213745D... Pedro Campos, PLA/Principal Zehren and Associates, Inc. ,—DocuSigned by: AGREED TO BY(print name): 11'1eU,l,sflfid,V' 0413t1-3UU4L44L,E... TITLE/ENTITY: SIGNATURE/ DATE: 8/21/2023 ARCHITECTURE• PLANNING• LANDSCAPE• INTERIORS P.O.BOX 1976,Avon,CO 81620. 970.949.0257•www.zehren.com