PZC Minutes 091579RECORD OF PROCEEDINGS MINUTES OF DESIGN REVIEW BOAPD MEETING OF SEPTEM3ER 5, 1979 The regular meeting of the Design Review Board for the Town of Avon was held on September 5, 1979 at 7:30 P.M. in the Town Council Chambers of the Town of Avon in the Benchmark Shopping Center, Avon, Colorado. The meeting was called to order by Acting Chairman, John Wheeler. Board Members present were: Cynthia Jordan, Alice Alpi, Michael Blair, Thomas Landauer and John Wheeler. Absent were: Hugh Price and Kenneth Richards. the Chairman deferred the reading of the minutes until the end of the meeting in order for all members to have a chance to read them. Item #1. Balas Inves Block #1. File No. 79 -7 - Fritz Schmidt represented Balas Investment Company. Mr. Schmidt asked for final approval for building eight of the 16 units. James Guffey, architect, reported the following: 1) exterior material - semi -transparent stain, dark trim and light siding, and shake eaves. Diagonal siding was added and horizontal bands were removed from the plans. 2) The driveway plans were changed to include a center driveway as well as driveways on both ends of the project. Snow removal and parking appear to be adequate. Discussion ensued regarding the fireplace flues. Mr. Guffey stated he would name alternatives to stack enclosures. Conceptual approval with two items to be solved: the fireplace flues and final landscaping plans, was granted. Mr. Schmidt was told he can submit plans to the Building Department on condition a permit is not issued until the Board grants final approval on the plans and to get final approval, Mr. Schmidt must have the required items. Item #2. Sea Mountain Developers, Inc., Lot 4, Block #2, Fi Represented by Gregory Gage, Terry Erwin, Robert Jackson, Kenneth Hayes and Rick Larson. David Towbin, architect, presented the 30 unit condominiums. Exterior material dark cedar trim, natural cedar siding 1 X 4 tongue and groove joint and heavy cedar shake roofs. John Wheeler summarized the conditions: a solution for the driveway with concern for safety; special emphasis on drainage; landscaping appears very adequate, with sodded lawns; show as complete elevation as possible; use of contour lines for indicating topo; material seems acceptable; trash containers enclosed; show heights of finished buildings; fence around the jacuzi; exterior lighting adequate but not harsh. Conceptual approval was granted subject to preliminary plans with detail of the conditions mentioned. A motion by Tom Landauer was made to approve the August 15, 1979 minutes as presented, seconded by Cynthia Jordan and approved unanimously. -1- was held on September 5, 1919 at 7:30 P.M. in the down Council Chambers of the Town of Avon in the Benchmark Shopping Center, Avon, Colorado. The meeting was called to order by Acting Chairman, John Wheeler. Board Members present were: Cynthia Jordan, Alice Alpi, Michael Blair, Thomas Landauer and John Wheeler. Absent were: Hugh Price and Kenneth Richards. The Chairman deferred the reading of the minutes until the end of the meeting in order for all members to have a chance to read them. Item #1. Balas Investment Comoanv. Lot #6. Block #1. File No_ 79-7- rritz JCnmiat represent( -:a ti°las investment uompany. Mr. Scnmidt asked for final approval for building eight of the 16 units. James Guffey, architect, reported the following: 1) exterior material - semi -transparent stain, dark trim and light siding, and shake eaves. Diagonal siding was added and horizontal bands were removed from the plans. 2) The driveway plans were changed to include a center driveway as well as driveways on both ends of the project. Snow removal and parkin(., appear to be adequate. Discussion ensued regarding the fireplace flues. Mr. GufFey stated he would name alternatives to stack enclosures. Conceptual approval witn two items tc be solved: the fireplace flues and final landscaping Flans, was granted. Mr. Schmidt was told hi: can submit plans to the Building Department on condition a permit is not issued until the Board grants final approval on the plans and to get final approval, Mr. Schmidt must have the required items. Item #2, Sea Mountain Developers, Inc., Lot 4, Block #2, File No. Represented by Gregory Gage, Terry Erwin, Robert Jackson, Kenneth Hayes and Rick Larson. David Towbin, architect, presented the 30 unit condominiums. Exterior material dark cedar trim, natural cedar siding 1 X 4 tongue and groove joint and heavy cadar shake roofs. John Wheeler summarized the conditions: a solution for the driveway with concern for safety; special emphasis on drainage; landscaping appears very adequate, with sodded lawns; show as complete elevation as possible; use of contour lines for indicating topo; material seems acceptable; trash containers enclosed; show heights of finished buildings; fence around the jacuzi; exterior lighting adequate but not harsh. Conceptual approval was granted subject to preliminary plans with detail of the conditions mentioned. A motion by Tom Landauer was made to approve the August 15, 1979 minutes as presented, seconded by Cynthia Jordan and approved unanimously. -1- Item N3, Buck Creek Condominium Sign. Tom Landauer stepped down to present the sign. 2z feet X 3 feet, black lettering on bright yellow. "Buck Creek Association" will be changed to "Buck Creek Condominiums". The sign will be placed on a four foot high post next to the driveway. The Board approved the sign unanimously. There being no further business the meeting was adjourned at 10:00 P.M. Respectfully ubmitted: erre Sort an:I�d Approved: -2-