Loading...
PZC Packet 031720_______________________________________________________________________________ MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING, CALL TOWN PLANNER DAVID MCWILLIAMS AT 970-748-4023 OR EMAIL CMCWILLIAMS@AVON.ORG WITH ANY SPECIAL REQUESTS. 1 AVON PLANNING AND ZONING COMMISSION MEETING AGENDA TUESDAY, MARCH 17, 2020 MEETING BEGINS AT 5:00 PM AVON TOWN HALL, 100 MIKAELA WAY, AVON, CO 1. CALL TO ORDER AND ROLL CALL 2. APPROVAL OF AGENDA 3. DISCLOSURE OF ANY CONFLICTS OF INTEREST RELATED TO AGENDA ITEMS 4. BUSINESS ITEMS 4.1. MJR20001, MAJOR DESIGN PLAN FOR A PROPOSED TOWNHOME PROJECT ON PARCEL C BASECAMP, 38359 US 6 (DOMINIC MAURIELLO & TOWN PLANNER DAVID MCWILLIAMS) PUBLIC HEARING 4.2. MNR20007, MINOR DEVELOPMENT PLAN FOR PROPOSED PEDESTRIAN IMPROVEMENTS ON AVON ROAD UNDER I- 70 (TOWN PLANNER DAVID MCWILLIAMS) PUBLIC HEARING 4.3. CONSENT AGENDA 4.3.1. APPROVAL OF MARCH 3, 2020 MEETING MINUTES 4.3.2. APPROVAL OF RECORD OF DECISION – MJR20002 & AEC20001 4.3.3. APPROVAL OF RECORD OF DECISION – SGN20002 5. STAFF UPDATES 6. ADJOURN AVON PLANNING AND ZONING COMMISSION MEETING MINUTES TUESDAY MARCH 3, 2020 AVON TOWN HALL, 100 MIKAELA WAY, AVON, CO 1. CALL TO ORDER AND ROLL CALL Chairperson Lindsay Hardy called the regular meeting to order at 5:01 p.m. A roll call was taken, and Planning Commission members present were Rebecca Smith, Jared Barnes, Steve Nusbaum, and Alex Dammeyer. Also present were Town Planner David McWilliams and Planning Director Matt Pielsticker. 2. CONFLICTS OF INTEREST No conflicts of interest were disclosed. 3. APPROVAL OF AGENDA The agenda was unanimously approved. 4. BUSINESS ITEMS 4.1. MAJOR DEVELOPMENT PLAN & ALTERNATIVE EQUIVALENT COMPLIANCE - 5085 WILDRIDGE ROAD EAST – PUBLIC HEARING File: MJR20001 &AEC20001 Applicant: Jeff Manley Location: Lot 3 Wildridge Point Subdivision Summary: The applicant presented a new single-family house proposal. Public Comment: David Strandjord commented on the project. Action: Commissioner Barnes motioned to approve the AEC with the following findings: 1. The proposed application was reviewed pursuant to §7.16.120, Alternative Equivalent Compliance; 2. The proposed alternatives achieve the intent of §7.28.050(e) Landscaping Units, and §7.28.090(d)(4), Roofs, to the same or better degree than the subject standard; 3. The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard; 4. The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard; and 5. The proposed alternative imposes no greater impacts on adjacent properties than would occur through compliance with the specific requirements of the Code. 6. The proposed alternative landscape design responds to the native hillside design better than the landscaping standard; 7. The proposal alternative for roof height and pitch minimizes site disturbance better than meeting the standard; and 8. The continuous grade in excess of 45% makes meeting the roof height and pitch requirements difficult. Commissioner Nusbaum seconded the motion and it carried unanimously 5-0. Action: Commissioner Barnes motioned to approve the MJR application with the following findings and conditions: Findings: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, AVON PLANNING AND ZONING COMMISSION MEETING MINUTES TUESDAY MARCH 3, 2020 AVON TOWN HALL, 100 MIKAELA WAY, AVON, CO §7.16.090(f), Design Review. The design meets the development and design standards established in the Avon Development Code; 2. The application is complete; 3. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. The demand for public services or infrastructure exceeding current capacity is mitigated by the application; and 6. The design relates the development to the character of the surrounding community. Condition: 1. ILCs are required to confirm building height, location and footprint. Commissioner Nusbaum seconded the motion and it carried unanimously 5-0. 4.1 SIGN PLAN – AVON ROAD RAILROAD BRIDGE – PUBLIC HEARING File: SGN20002 Applicant: Town of Avon Summary: Proposed LED sign on the railroad bridge. Public Comment: None Action: Commissioner Dammeyer motioned to approve the item with the following findings and conditions: Findings: 1. The application is complete; 2. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 3. The application was reviewed pursuant to §7.16.160(f), Sign Plan. The application meets the sign standards established in the Avon Development Code; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. No extra demand for public services is made by the application; 6. The design relates the development to the character of the surrounding community; 7. The application allows individuality and promotes the expectation of attractive sign appearance; 8. Compliance with the policies and application criteria ensure sensitive use of the signs; and 9. Current code language for digital displays does not prohibit the proliferation of digital displays for non-governmental use. Conditions: 1. Any sign use that is less strict than the policies and application criteria defined in Attachment 2 requires review by PZC; and 2. Town Council should consider a code text amendment limiting the use of digital signs. Commissioner Barnes seconded the motion and it carried 3-2 with Commissioners Smith and Hardy voting in opposition. AVON PLANNING AND ZONING COMMISSION MEETING MINUTES TUESDAY MARCH 3, 2020 AVON TOWN HALL, 100 MIKAELA WAY, AVON, CO 4.2 APPROVAL OF CONSENT AGENDA Commissioner Barnes motioned to approve the consent agenda. Commissioner Nusbaum seconded the motion and it passed unanimously 5-0. 5. OTHER BUSINESS Staff discussed updates with various planning applications. 6. ADJOURN There being no further business before the Commission, Commissioner Barnes moved to adjourn the meeting. The time was 7:00 p.m. These meeting minutes are only a summary of the proceedings of the meeting. They are not intended to be comprehensive or to include each statement, person speaking or to portray with complete accuracy. The most accurate records of the meeting are the audio of the meeting, which is housed in the Town Clerk' s office. RESPECTFULLY SUBMITTED: David McWilliams, Town Planner APPROVED: Lindsay Hardy, Chairperson __________________________________ PZC Record of Decision: #SGN20002 Page 1 of 1 PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF DECISION: March 3, 2020 TYPE OF APPLICATION: Minor Sign Plan PROPERTY LOCATION: Avon Road Railroad Bridge/ Block 2 Benchmark at Beaver Creek Subdivision FILE NUMBER: SGN20002 APPLICANT: Town of Avon This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.160(c): DECISION: Approval of the sign plan with the following findings and condition: FINDINGS: 1. The application is complete; 2. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 3. The application was reviewed pursuant to §7.16.160(f), Sign Plan. The application meets the sign standards established in the Avon Development Code; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. No extra demand for public services is made by the application; 6. The design relates the development to the character of the surrounding community; 7. The application allows individuality and promotes the expectation of attractive sign appearance; 8. Compliance with the policies and application criteria ensure sensitive use of the signs; and 9. Current code language for digital displays does not prohibit the proliferation of digital displays for non-governmental use. CONDITIONS: 1. Any sign use that is less strict than the policies and application criteria defined in Attachment 2 requires review by PZC; and 2. Town Council should consider a code text amendment limiting the use of digital signs. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ PZC Chairperson PZC Record of Decision: #MJR20002 & #AEC20001 Page 1 of 2 PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF DECISION: March 3, 2020 TYPE OF APPLICATION: Major Development Plan & Alternative Equivalent Compliance PROPERTY LOCATION: Lot 3 Wildridge Point Subdivision FILE NUMBER: MJR20002 & AEC20001 APPLICANT: Jeff Manley CASE AEC20001: This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.120(b): DECISION: Approval of the application with the following findings: FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.120, Alternative Equivalent Compliance; 2. The proposed alternatives achieve the intent of §7.28.050(e) Landscaping Units, and §7.28.090(d)(4), Roofs, to the same or better degree than the subject standard; 3. The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard; 4. The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard; and 5. The proposed alternative imposes no greater impacts on adjacent properties than would occur through compliance with the specific requirements of the Code. 6. The proposed alternative landscape design responds to the native hillside design better than the landscaping standard; 7. The proposal alternative for roof height and pitch minimizes site disturbance better than meeting the standard; and 8. The continuous grade in excess of 45% makes meeting the roof height and pitch requirements difficult. CASE MJR20002: This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.080(c): DECISION: Approval of the development plan with the following findings and condition: FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, §7.16.090(f), Design Review. The design meets the development and design standards established in the Avon Development Code; 2. The application is complete; 3. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; PZC Record of Decision: #MJR20002 & #AEC20001 Page 2 of 2 5. The demand for public services or infrastructure exceeding current capacity is mitigated by the application; and 6. The design relates the development to the character of the surrounding community. CONDITION: 1. ILCs are required to confirm building height, location and footprint. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ PZC Chairperson March 17, 2020 PZC Meeting – 38359 US 6 Townhouses 1 Aerial view of the property with Lot C in red and the entire Lot 1 in green. TO: Planning and Zoning Commission FROM: David McWilliams, AICP, Town Planner RE: MJR20001 Major Development Plan Public Hearing Parcel C Basecamp / 38359 Highway 6 DATE: March 12, 2020 STAFF REPORT OVERVIEW: This staff report contains one application for consideration by the PZC: Major Development Plan with Design Review for a townhome project on the property. SUMMARY OF REQUEST: Representing the property owner, Red House Avon LLC, Dominic Mauriello of MPG ("Applicant") is proposing a design plan ("Application") for five (5) townhome units to be located on the final building pad (Parcel C) of the site. The Applicant has submitted a Major Design and Development application, and review by Planning and Zoning is required with a public hearing. The project was phased, and currently includes: Building A contains four (4) units, Building B contains five (5). The lot is accessed with a westbound turn lane off Highway 6 with right-in, right-out access. Additionally, right-in, right-out access is provided from Avon Road. Development Standards for the property are generally limited to those approved as part of the PUD zoning; however, some standards from the Avon Development Code apply for materials, colors, and townhome design. PUBLIC NOTICE: Notice of the public hearing was published in the March 6, 2020 edition of the Vail Daily in accordance with Sec. 7.16.020(d) of the Avon Municipal Code (AMC). Mailed notice is not required for this application type. PROPERTY DESCRIPTION: The entire Lot 1 (which Parcel C is part of) is 1.13 acres, located at the intersection of Avon Road and Highway 6. The property is bordered on the north by the Eagle River, on the east by Beaver Creek, on the south by Highway 6, and on the west by Avon Road. The Eagle Valley Regional bike path borders the west and south sides of the project, crossing the two driveway access points. As mentioned, there are already nine (9) units on the property and Parcel C has already been subdivided in anticipation of development. The property was annexed in 2009 and obtained PUD zoning for 15 townhomes at the same time. Subsequently, an application for all 15 units (in three buildings, two of which were built) was approved in summer 2016. Upon constructing the first two phases, the developer found a need for additional parking and reduced massing, as demonstrated by this plan. A unit was eliminated from the north side of Parcel C on the PUD through an administrative process, and now PZC is instructed to review the updated design for compliance with applicable regulations. PLANNING ANALYSIS Lot Coverage, Setback and Easements: Lot 1 will have 37% building site coverage, which complies with the maximum 50% allowed by the PUD. The proposed structure is in compliance with the setbacks and easements (Sheet PZC-6.3). Building Height: The maximum building height permitted for this property is 48 feet. The applicant is proposing a maximum building height of 48 feet according to the development plans. The height must be verified during the building March 17, 2020 PZC Meeting – 38359 US 6 Townhouses 2 process with foundation and framing Improvement Location Certificates (ILC). Parking: The PUD parking requirement is two (2) spaces per unit, and four (4) guest spaces, for a total of 32 required parking spaces. The applicant has provided 14 spaces for this application, for a total of 36 on-site spaces. That is, with one fewer units, fewer spaces are required. Snow Storage: The total development driveway area is 8,503 square feet of surface with 2,362 square feet of storage. Snow storage for Parcel C is proposed on either side of the new parking area as well as between some of the driveway areas. DESIGN STANDARDS ANALYSIS: Landscaping: L ot 1 already contains extensive landscaping. Parcel C requires additional plantings to finish the project and by in large the planting plan has not changed extensively. At the time of last approval, irrigation plans (including hydrozones) were not required to be included in plan sets. Staff suggests a condition of approval that an irrigation plan is presented to staff for approval before building permit. Building Design, Building Materials and Colors: The proposed exterior building materials match the existing units’ design and are stucco (grey), wood siding (brown and tan), and metal. Colors were reviewed for conformance with Sec. 7.28.090(j)(4)(viii), Building Materials, and determined to comply with the design standards. Roof Material and Pitch: The roof material and pitch were reviewed for compliance with Sec. 7.28.090(d) (3) Roofs. Pitch is proposed at 4:12 and 6:12. Proposed material is shingle. Design Standards for Townhomes: The Avon Development Code ("ADC") contains specific review criteria for townhome construction. ADC Section 7.28.090(d)(6) contains the following guidance when reviewing townhome designs: Duplex, Townhome, and Multi-Family developments shall be designed in a manner that creates a single unified structure and site plan. Unified design shall include, but not be limited to, the use of compatible building materials, architectural style, scale, massing, detail, roof forms, and landscaping. While 'mirror image' units are not supported, the design intent should be one that creates a unified structure with enough variety and architectural interest to distinguish a duplex, townhome, or multi-family structure from a single family home. The design creates unified structures that can be differentiated from single units, with the use of detailing, massing, and the use of detailing to distinguish the individual units. Architectural interest is added with framed window bump outs, rich wood coloring and earth tone stucco. Exterior Lighting: Proposed lighting conforms with the Dark Sky Ordinance. There are two pole mounted "barn" lights, one near each vehicle entrance. Additionally, each unit contains a brushed aluminum wall mounted fixture matching the existing buildings on the front and rear of the buildings. MAJOR DEVELOPMENT PLAN & DESIGN REVIEW - REVIEW CRITERIA: § 7.16.080(f), Development Plan 1. Evidence of substantial compliance with the purpose of the Development Code as specified in §7.04.030, Purposes; Staff Response: The application generally complies with the applicable purposes outlined in the Development Code. Purpose (l) states, “Promote architectural design which is compatible, functional, practical and complimentary checking to Avon's sub-alpine environment”. 2. Evidence of substantial compliance with §7.16.090, Design Review; Staff Response: This Major Design and Development Plan Application should be assessed for compliance with the Design Review criteria of the Development Code, found below. The Design Review section seeks quality development and structures that are visually harmonious with the site and the surrounding vicinity. March 17, 2020 PZC Meeting – 38359 US 6 Townhouses 3 3. Consistency with the Avon Comprehensive Plan; Staff Response: The site is located in the Riverfront District (District 2 of the Comprehensive Plan), which states, “The District provides access to Beaver Creek Village, U.S. Highway 6, the Eagle River, and the Eagle Valley Trail. Planning and development of this District must incorporate these key assets.” No specific Planning Principles apply to this application. 4. Consistency with any previously approved and not revoked subdivision plat, planned development, or any other precedent plan or land use approval for the property as applicable; Staff Response: The application conforms with the accompanying requirements of the PUD zoning and the Development Code. Conformance with the building envelope and maximum elevation are confirmed with the application. 5. Compliance with all applicable development and design standards set forth in this Code, including but not limited to the provisions in Chapter 7.20, Zone Districts and Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development Standards; and Staff Response: The analysis contained in this staff report addresses all applicable Development Code standards. 6. That the development can be adequately served by city services including but not limited to roads, water, wastewater, fire protection, and emergency medical services. Staff Response: Staff referred the proposal to the Eagle River Water and Sanitation District (ERWSD) for compliance with the property’s’ water allocation and received no applicable comments. §7.16.090(f), Design Review: 1. The design relates the development to the character of the surrounding community; or, where redevelopment is anticipated, relates the development to the character of Avon as a whole; Staff Response: The application proposes a design that relates to the character of the surrounding community. 2. The design meets the development and design standards established in this Development Code; and Staff Response: The design is compliant with the development and design standards contained in the Development Code. 3. The design reflects the long- range goals and design criteria from the Avon Comprehensive Plan and other applicable, adopted plan documents. Staff Response: Applicable adopted plans include the Avon Comprehensive Plan and provisions of the PUD and Development Code. The design has been evaluated for conformance with these plans and staff has determined the proposed design meets the requirements. STAFF RECOMMENDATION FOR MJR20001: Staff recommends approval of the Major Development Plan for Parcel C Basecamp Subdivision, with the following findings and conditions: Findings: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, §7.16.090(f), Design Review. The design meets the development and design standards established in the Avon Development Code; 2. The application is complete; 3. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. The demand for public services or infrastructure exceeding current capacity is mitigated by the application; and 6. The design relates the development to the character of the surrounding community. Conditions: March 17, 2020 PZC Meeting – 38359 US 6 Townhouses 4 1. ILCs are required to confirm building height, location and footprint. 2. An irrigation Plan with hydrozones is required for approval before a building permit will be issued. RECOMMENDED MOTION: “I move to approve Case #MJR20001, an application for Major Design and Development Plan for Parcel C Basecamp Subdivision together with the findings of fact and condition outlined by Staff.” ATTACHMENT: A. Application Materials Thank you, David McWilliams 970-749-4023 / cmcwilliams@avon.org February 27, 2020 Matt Pielsticker, AICP Planning Director Town of Avon via email Re: DRB approval of Building C - Red House PUD aka Basecamp Dear Matt: Included with this letter is an application for Design Review approval of Building C. As you are aware, the number of units contained in Building C has been reduced from 6 dwelling units to 5 dwelling units. Additionally, 4 new parking spaces have been provided in the area where the unit was removed. These changes are being approved as an Administrative PUD Amendment to the Red House PUD. The applicant has provided plans and details for the new building. As is evident from the architecture of the two existing buildings located in the Red House PUD, the architecture of Building C is very consistent with the theme and materials of the existing buildings and ultimately consistent with the requirements of the PUD. A detailed landscape plan has also been provided. This plan ensures adequate screening of the revised building from the adjacent roadways. There are some minor encroachments into the sewer line easement, which have been reviewed and approved by ERWSD and which are consistent with the encroachments allowed on Building A. The applicant would like to be on the agenda for the March 17 with the Planning Commission if at all possible. Please let me know if you have any questions. My phone number is 970-376-3318. Sincerely, Dominic F. Mauriello, AICP Principal PO Box 4777 Eagle, Colorado 81631 970.376.3318 www.mpgvail.com Attachment A BASECAMP AVON ROAD, US HWY 6 AVON, COLORADO PLANNING AND ZONING COMMISSION SUBMITTAL FEBRUARY 27, 2020 Attachment A I. PROJECT INFORMATION PROJECT NAME:BASECAMP LOCATION:AVON, CO 359 DESIGN PROJECT # 15029 AUTHORITY HAVING JURISDICTION: TOWN OF AVON, COLORADO OWNER: GREGG CO BUILDING CODE:2015 IRC (and referencing 2015 IBC) Notes: Section R313 was repealed and section R313.1 was kept as part of the code: An automatic residential fire sprinkler system shall be installed in townhouses. Change to Table N11102 Climate Zone 6, Wood Framed wall R-Value, add R21 or 20+5 or 13+10 ENERGY CODE 2015 IECC FIRE CODE:2009 FIRE RESISTANCE DESIGN MANUAL ADOPTED STANDARDS: FROST DEPTH: 48 INCHES TO BOTTOM OF FOOTINGS SNOW LOAD: 75 LBS FOR ELEVATIONS BELOW 8,600 FEET GROUND SNOW LOAD: 75 LBS FOR ELEVATIONS BELOW 8,600 FEET SEISMIC DESIGN: 17B WINTER DESIGN TEMP: -20 DEGREES F WEATHERING: SEVERE AIR FREEZING INDEX: 2,500 MEAN ANNUAL TEMP: 40 DEGREES WIND SPEED: 115 MPG EXPOSURE CATEGORY: B, BUT MAY BE SITE SPECIFIC II. USE AND OCCUPANCY CLASSIFICATIONS 1. OCCUPANCY CLASSIFICATION A. PRIMARY OCCUPANCY:R2 B. INCIDENTAL USE AREA:MECH & STORAGE III. BUILDING LIMITATIONS 1. AREA OF PROPOSED BUILDING (GROSS AREA, NOT INCLUDING BALCONIES) BUILDING A GROUND LEVEL FOOTPRINT 3,862 SF SECOND FLOOR 4,136 SF THIRD FLOOR 3,996 SF BUILDING A TOTAL (4 UNITS)11,644 SF AVERAGE UNIT FOOTPRINT FOR BUILDING A 935 SF AVERAGE A-UNIT TOTAL SQUARE FEET 2,911 SF BUILDING B GROUND LEVEL FOOTPRINT 4,768 SF SECOND FLOOR 5,193 SF THIRD FLOOR 4,685 SF BUILDING B TOTAL (5 UNITS)14,619 SF AVERAGE UNIT FOOTPRINT FOR BUILDING B 953 SF AVERAGE B-UNIT TOTAL SQUARE FEET 2,924 SF BUILDING C GROUND LEVEL FOOTPRINT 4,030 SF SECOND FLOOR 4,323 SF THIRD FLOOR 4,072 SF BUILDING C TOTAL (5 UNITS)12,425 SF AVERAGE UNIT FOOTPRINT FOR BUILDING C 806 SF AVERAGE C-UNIT TOTAL SQUARE FEET 2,485 SF 2. PROPOSED NUMBER OF STORIES 3 3. PROPOSED CONSTRUCTION TYPE V-B 4. ALLOWABLE BUILDING HEIGHT 60', 3 STORIES TABLE 503 ALLOWABLE BUILDING HEIGHT: 40' ALLOWABLE STORIES:2 INCREASES ALLOWED:1 STORY AND 20' FOR S13R TOTAL ALLOWABLE HEIGHT/STORIES 60' AND 3 STORIES PROPOSED STORIES 3 PROPOSED BUILDING HEIGHT 42'-0" BUILDING CODE SUMMARY 5. ALLOWABLE FLOOR AREA (BASED ON OCCUPANCY AND CONSTRUCTION TYPE) A. UNLIMITED ALLOWED: NO B. ALLOWABLE AREA PER FLOOR: 7,000 SQ. FT. C. INCREASE IN FRONTAGE: YES D. MAXIMUM ALLOWABLE FOOTPRINT W/ SR13 SPRINKLERS: 7,000 SQ. FT. E. PROPOSED: 4,773 SQ. PER FOOTPRINT OF LARGEST BUILDING IV. FIRE-RESISTANCE REQUIREMENTS FOR TYPE VB - TABLE 601 1. BUILDING ELEMENTS: A. STRUCTURAL FRAME:0 HR B. BEARING WALLS - EXTERIOR:0 HR C. BEARING WALLS - INTERIOR:0 HR D. NON-BEARING WALLS - EXTERIOR: 0 HR E. NON-BEARING WALLS - INTERIOR: 0 HR F. FLOOR CONSTRUCTION:0 HR G. ROOF CONSTRUCTION:0 HR 2. TABLE R302.1(2) - FIRE SEPARATION REQUIREMENTS WALLS 3 FEET PROJECTIONS 3 FEET OPENINGS IN WALLS 3 FEET PENETRATIONS 3 FEET GENERAL NOTES ROOM NAME XXXXX X X 1 A0.X X X A3 A3 ROOM NAME/NUMBER EXISTING COLUMN CENTERLINE COLUMN CENTERLINE ACCESSORY DEMOLITION NUMBERED NOTES BUILDING WALL SECTION ELEVATION SECTION DETAIL PLAN, BLOW-UP DETAIL PARTITION TYPE WITH NO SOUND ATTENUATION PARTITION TYPE WITH SOUND ATTENUATION SYMBOLS BUILDING EXPANSION JOINT GYP BD CEILING SUPPLY AIR RETURN AIR ACCESS PANEL FLUORESCENT LIGHT WALL MOUNTED FLUORESCENT FIXTUREEXIT SIGNS - HATCH INDICATES EXIT TEXT AND ARROW INDICATES DIRECTION SMOKE DETECTOR WALL WASHER PENDANT TYPE LIGHT FIXTURE WALL MOUNTED LIGHT FIXTURE DOWNLIGHT STRIP LIGHT SPEAKER S D 01 +9'-0"CEILING HEIGHT S EXHAUST AIR A0.X X 01 SUSPENDED LIGHT SUSPENDED FLUORESCENT LIGHT CHANDELIER PROJECTOR A0.X X 01 A0.X X 1. DO NOT SCALE DRAWINGS. LARGE SCALE DETAILS SHALL GOVERN OVER SMALL SCALE DETAILS. SPECIFICATIONS GOVERN ALL. 2. CONTRACTOR TO ISSUE COMPLETE SET OF CONTRACT DOCUMENTS TO EACH SUBCONTRACTOR FOR COORDINATION OF WORK AND DESCRIPTION OF SCOPE 3. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT ALONE SHALL DETERMINE EQUALITY BASED ON INFORMATION SUBMITTED BY THE CONTRACTOR. 4. REFER TO STRUCTURAL DRAWINGS FOR ALL REINFORCING. 5. ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL SYSTEMS, COMPONENTS AND ELEMENTS PERMANENTLY ATTACHED TO STRUCTURES, INCLUDING SUPPORTING STRUCTURES AND ATTACHMENTS AND NON-BUILDING STRUCTURES THAT ARE SUPPORTED BY OTHER STRUCTURES, SHALL MEET THE REQUIREMENTS PER 2009 IBC CHAPTER 16 AND ASCE 7-02 SECTION 9.6 COORDINATE DESIGN WITH ARCHITECT AND ENGINEER OF RECORD. 6. STUCCO ASSEMBLY REQUIRES (2) AIR-INFILTRATION LAYERS AS A BOND BREAK BETWEEN THE WALL ASSEMBLY AND THE STUCCO APPLICATION. PROJECT TEAM LANDSCAPE MEP SKYLINE MECHANICAL 16 ALPINE RANCH ROAD GYPSUM, CO 81637 970.441.9195 CIVIL ALPINE ENGINEERING EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 ARCHITECTURE 359 DESIGN, LLC 3630 OSAGE ST DENVER, COLORADO 80211 CONTACT: WILL HENTSCHEL WHENTSCHEL@356DESIGN.CO INTERIORS OWNER RED HOUSE AVON, LLC P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 GEOTECHNICAL GENERAL CONTRACTOR STRUCTURAL KRM CONSULTANTS, INC. 101 EAGLE RD, AVON, CO 81620 970.949.9391 CONCRETE/ PRECAST CONCRETE SOIL SAND, EIFS FINISH COAT BRICK CMU STONE XPS RIGID INSULATION FIBERGLASS BATT INSULATION GYPSUM BOARD OR FIBERGLASS- REINFORCED GYPSUM BOARD PLYWOOD COVER BOARD MATERIALS CEILING SYMBOLS FOIL-FACED POLYISO RIGID INSULATION ccSPF - CLOSED CELL SPRAY POLYISO FOAM INSULATION 359 DESIGN, LLC 3630 OSAGE ST DENVER, COLORADO 80211 CONTACT: WILL HENTSCHEL WHENTSCHEL@356DESIGN.CO GREGG & CO BUILDERS P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 SLIFER DESIGNS 216 MAIN ST C -100, EDWARDS, CO 81632 970.766.8061 CESARE, INC. 7108 S ALTON WAY, BUILDING B CENTENNIAL, CO 80112 303.220.0300 REQUIREMENTS PERMITTED USES SPECIAL REVIEW USES BUILDING HEIGHT SITE COVERAGE MAXIMUM DENSITY MINIMUM LANDSCAPE AREA MAXIMUM SIZE OF UNIT SETBACKS PARKING *SHORT TERM RENTALS ARE SUBJECT TO ALL APPLICABLE TOWN OF AVON LICENSING, FEES AND TAXES **FROM AVERAGE HIGH WATER MARK; PROVIDED THAT PATIOS, ROOF OVERHANGS, AND ABOVE GROUND BALCONIES/DECKS ARE PERMITTED WITHIN THE SETBACK - MULTI FAMILY DWELLING - SHORT TERM RENTAL* HOME OCCUPATION 48'-0" MAXIMUM 50% MAXIMUM 15 DWELLING UNITS 25% 2,400 SQ. FT. - FRONT: 25 FEET - PARCEL TK-14: 25 FEET - STREAM: 30 FEET** - STUDIO: 1 SPACE - ONE BEDROOM: 1.5 SPACES - TWO BEDROOM: 2 SPACES GUEST PARKING - 3-5 UNITS: 2 SPACES - 6-10 UNITS : 3 SPACES - 11-15 UNITS: 4 SPACES DEVELOPMENT STANDARDS PROVIDED - MULTI FAMILY DWELLING - SHORT TERM RENTAL* HOME OCCUPATION 48'-0" 37.1% 14 DWELLING UNITS 50.2% 2,369 SQ. FT. - FRONT: 25 FEET - PARCEL TK-14: 25 FEET - STREAM: 30 FEET** TWO BEDROOM: 2 SPACES GUEST PARKING 14 UNITS: 4 SPACES PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-1.1 COVER SHEET 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT BASECAMP AVON ROAD, US HWY 6 AVON, COLORADO PZC SUBMITTAL PROJECT SITE PROJECT LOCATION DRB SHEET INDEX SHEET NUMBER SHEET NAME PZC-1.1 COVER SHEET PZC-2.0 ARCHITECTURAL SITE PLAN PZC-5.0 ARCHITECTURAL ELEVATIONS - BUILDING C PZC-6.0 1ST LEVEL FLOOR PLAN PZC-6.1 2ND LEVEL FLOOR PLAN PZC-6.2 3RD LEVEL FLOOR PLAN PZC-6.3 ROOF PLAN PZC-6.4 UNIT PLAN AREA SCHEDULE PZC-7.0 LIGHTING PLAN PZC-8.0 MATERIALS BOARD PZC-8.1 MATERIALS BOARD PZC-8.2 EXISTING BASE CAMP BUILDINGS No. Description Date Attachment A 25' SITE SETBACK LINE FROM STREET RAISED PAVER CROSSWALK RASIED PAVER CROSSWALK SITE PROPERTY LINE SITE PROPERTY LINE 25' - 0"2 5 ' - 0 " 25' SITE SETBACK LINE FROM STREET GUEST PARKING SPOTS (2) GUEST PARKING SPOTS (2) ENTRY GATE ENTRY GATE EXISTING WATER LINE EASEMENT EXISTING ELECTRIC LINE EASEMENT CONCRETE DRIVEWAY LANDSCAPE AREA SNOW STORAGE MECH. BUILDING BUILDING A FOOTPRINT BUILDING B FOOTPRINT BUILDING B FOOTPRINT BUILDING C FOOTPRINT BUILDING C FOOTPRINT CONCRETE CURB/GUTTER WATER EASEMENT SEWER EASEMENT WATER EASEMENT EXISTING WATERLINE HAS NOT BEEN FIELD LOCATED IN THIS AREA. IT IS SHOWN PER EXISTING VALVES & ERWSD AS-BUILT PLANS. EXISTING WATERLINE WAS FIELD LOCATED NORTH OF THIS POINT TOTAL SITE AREA - 49,266 SQ. FT. TOTAL BUILDING AREA - 18,302 SQ. FT. PERCENTAGE OF SITE COVERAGE - 37.1% PROPERTY LINE C WATER EASEMENT SEWER EASEMENT WATER EASEMENT EXISTING WATERLINE HAS NOT BEEN FIELD LOCATED IN THIS AREA. IT IS SHOWN PER EXISTING VALVES & ERWSD AS-BUILT PLANS. EXISTING WATERLINE WAS FIELD LOCATED NORTH OF THIS POINT PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-2.0 ARCHITECTURAL SITE PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 1" = 20'-0" 1 ARCHITECTURAL SITE PLAN N 1" = 40'-0" 2 PZC SITE COVERAGE PLAN N 1" = 40'-0" 3 EASEMENT DIAGRAM SITE PLAN No. Description Date Attachment A PHASE 2 PHASE 3PHASE 4 PHASE 1 PHASE 1 PHASE 4 - BUILDING C PHASE 2 - BUILDING A: COMPLETED PHASE 3 - BUILDING B: COMPLETED PHASE 1 - ACCESS INFRASTRUCTURE: COMPLETED PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-3.0 PHASING PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 1" = 20'-0" 1 PZC PHASING PLAN N THE PHASING OF BASE CAMP WAS BE DEPENDENT ON PRE-SALES. PHASE 1 WAS FOUNDATIONS AND UTILITIES FOR ALL BUILDINGS AND TO THE SITE. PHASE 2 WAS BUILDING A COMPETED IN 2017. PHASE 3 WAS BUILDING B IN 2019. THE LAST PHASE OF THE PROJECT IS BUILDING C. THIS PHASE COMPLETES THE CONSTRUCTION OF THE PROJECT, USING THE REMAINING UNUSED SITE AS STAGING. No. Description Date Attachment A TOTAL SITE AREA - 49,266 SQ. FT. TOTAL LANDSCAPE AREA - 24,737 SQ. FT. PERCENTAGE OF LANDSCAPE - 50.2% PROPERTY LINE PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-4.0 LANDSCAPE PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT N 1" = 40'-0" 1 PZC LANDSCAPE COVERAGE PLAN No. Description Date Attachment A WOOD 1 - 6" HORIZONTAL DARK GRAY WALL MATERIAL LEGEND WOOD 2 - 6" HORIZONTAL LIGHT CEDAR STUCCO 1 - WALLS WOOD 4- WINDOW BUMP OUTS DARK GRAY WOOD 3 DARK GRAY BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" LEVEL 1 100' - 0" LEVEL 2 110' - 0" LEVEL 3 121' - 4" LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" 7,487.12 7,489.47 A05 A01 A03 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" LEVEL 1 100' - 0" LEVEL 2 110' - 0" LEVEL 3 121' - 4" LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" 7,489.47 A06 A03 E09 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" LEVEL 1 100' - 0" LEVEL 2 110' - 0" LEVEL 3 121' - 4" LEVEL 4 131' - 4" 7,489.47 A01 A06 A09 A02 A05 A09 7,487.12 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" LEVEL 1 100' - 0" LEVEL 2 110' - 0" LEVEL 3 121' - 4" LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 8 1/4" 7,489.47 A05 A01 A03 A09 A07 A06 A01 A09 7,487.12 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-5.0 ARCHITECTURAL ELEVATIONS - BUILDING C 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT EXTERIOR MATERIAL LEGEND NOTE MATERIAL A01 ASPHALT SHINGLE ROOF, DARK GRAY A02 SHED DORMER ROOF; ASPHALT - LIGHT GRAY A03 2X12 ROOF FASCIA BOARD A05 WALL TYPE W1 - 8" HORIZONTAL WOOD SIDING; MUSHROOM; SEE A0-0 FOR STANDARD WALL TYPES A06 WALL TYPE W1 - 8" HORIZONTAL WOOD SIDING; DARK GRAY; SEE A0-0 FOR STANDARD WALL TYPES A07 WALL TYPE W1 - COMPOSITE WOOD PANEL SIDING; DARK GRAY; SEE A0-0 FOR STANDARD WALL TYPES A09 WALL TYPE W5 - STUCCO SIDING - OFF WHITE; SEE A0-0 FOR STANDARD WALL TYPES E09 1X4 WOOD HORIZONTAL RAILING NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' 3/32" = 1'-0" 1 BUILDING C - ELEVATION - SOUTH 3/32" = 1'-0" 2 BUILDING C - ELEVATION - NORTH 3/32" = 1'-0" 3 BUILDING C - ELEVATION - WEST 3/32" = 1'-0" 4 BUILDING C - ELEVATION - EAST No. Description Date Attachment A A4-31 04 A4-31 02 A4-31 03 -- 30' SITE SETBACK LINE FROM THE AVG. HIGH WATER MARK SITE SETBACK LINESITE SETBACK LINE EXISTING SEWER EASEMENT EXISTING WATER LINE EASEMENT ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG -- -- -- PZC-5.04 PZC-5.0 2 PZC-5.0 1 PZC-5.0 3 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.0 1ST LEVEL FLOOR PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 3/32" = 1'-0" 1 1ST LEVEL FLOOR PLAN N No. Description Date Attachment A A4-31 04 A4-31 02 A4-31 03 -- - ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG -- -- -- PZC-5.04 PZC-5.0 2 PZC-5.0 1 PZC-5.0 3 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.1 2ND LEVEL FLOOR PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 3/32" = 1'-0" 1 2ND LEVEL FLOOR PLAN N No. Description Date Attachment A A4-31 04 A4-31 02 A4-31 03 A4-21 04 -- - -- ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG ROOF OVERHANG -- -- -- PZC-5.04 PZC-5.0 2 PZC-5.0 1 PZC-5.0 3 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.2 3RD LEVEL FLOOR PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 3/32" = 1'-0" 1 3RD LEVEL FLOOR PLAN N No. Description Date Attachment A BUILDING A FOOTPRINT BUILDING B FOOTPRINT BUILDING A FOOTPRINT BUILDING B FOOTPRINT BUILDING C FOOTPRINT BUILDING C FOOTPRINT 30' SITE SETBACK LINE FROM AVG. HIGH WATER LINE EXISTING WATER LINE EASEMENT EXISTING SEWER EASEMENT TO BE RELOCATED, RE: CIVIL 25' SITE SETBACK LINE FROM STREET KAYAK PARK EASEMENT AVERAGE HIGH WATER MARK PER AEI TOPOGRAPHIC SURVEY, APRIL 2007 7,475.84 7,475.84 (43'-3/4") (46'-9 7/8")(46'- 9 7/8") (41'-5 1/4") 7,475.25 7,475.25 (33'-1 7/8") (33'-1 7/8") 7,485.19 7,474.94 (32'-8 1/4") (41'-11 1/4") (31'-1/4") (42'-5 1/4")7,485.15 7,477.58 (45'-3")(47'-11 1/4") 7,474.94 (42'-8 1/4") (42'-6 3/4") (40'-4 1/4")(44'-4 1/4") 7,485.19 7,477.58 7,478.35 (43'-11 1/4") (35'-3") (35'-3") (41'-8 7/16")(41'-8 7/16") (35'-9 3/4") (46'-7 11/16")(46'-7 11/16")(46'-7 11/16") (40'-9 1/2") (47'-7 11/16") (46'-1 11/16") (35'-10 11/16") (38'-6 5/8") (37'-2 5/8") (32'-4 11/16") (45'-1 11/16") (35'-4 13/16") (34'-4 11/16") (37'-2 5/8") (37'-6 5/8") (34'-10 11/16") 7,488.41 7,488.41 7,485.56 7,485.51 7,485.51 (46'-9 1/2") (45'-2")(34'-9 1/2") (35'-9 1/2") (35'-9 1/2") (47'-2") (34'-9 1/2") (36'-9 1/2") (37'-6 1/4") (37'-6 1/4") (35'-11 5/16") (46'-3 3/4") (38'-8 3/16")(35'-8 3/16") (46'-3 3/4")(45'-3 3/4") (36'-6 1/4") (37'-8 3/16") (36'-6 1/4")4" / 12"4" / 12"6" / 12"6" / 12"6" / 12" 6" / 12"6" / 12"6" / 12"6" / 12"4" / 12"4" / 12" 6" / 12"6" / 12" 6" / 12"6" / 12" PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.3 ROOF PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT 3/32" = 1'-0" 1 ROOF PLAN NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' N No. Description Date Attachment A PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.4 UNIT PLAN AREA SCHEDULE 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT AREA SCHEDULE (RENTABLE) BUILDING UNIT LEVEL AREA BUILDING C UNIT 10 LEVEL 1 449 SF BUILDING C UNIT 10 LEVEL 2 727 SF BUILDING C UNIT 10 LEVEL 3 740 SF UNIT 10 1,916 SF BUILDING C UNIT 10 GARAGE LEVEL 1 283 SF UNIT 10 GARAGE 283 SF BUILDING C UNIT 11 LEVEL 1 448 SF BUILDING C UNIT 11 LEVEL 2 728 SF BUILDING C UNIT 11 LEVEL 3 742 SF UNIT 11 1,918 SF BUILDING C UNIT 11 GARAGE LEVEL 1 282 SF UNIT 11 GARAGE 282 SF BUILDING C UNIT 12 LEVEL 1 449 SF BUILDING C UNIT 12 LEVEL 2 727 SF BUILDING C UNIT 12 LEVEL 3 740 SF UNIT 12 1,916 SF BUILDING C UNIT 12 GARAGE LEVEL 1 283 SF UNIT 12 GARAGE 283 SF BUILDING C UNIT 13 LEVEL 1 450 SF BUILDING C UNIT 13 LEVEL 2 726 SF BUILDING C UNIT 13 LEVEL 3 740 SF UNIT 13 1,915 SF BUILDING C UNIT 13 GARAGE LEVEL 1 279 SF UNIT 13 GARAGE 279 SF BUILDING C UNIT 14 LEVEL 1 449 SF BUILDING C UNIT 14 LEVEL 2 727 SF BUILDING C UNIT 14 LEVEL 3 741 SF UNIT 14 1,917 SF BUILDING C UNIT 14 GARAGE LEVEL 1 283 SF UNIT 14 GARAGE 283 SF BUILDING C 10,992 SF GRAND TOTAL 10,992 SF No. Description Date Attachment A PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-7.0 LIGHTING PLAN 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT No. Description Date Attachment A PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-8.0 MATERIALS BOARD 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT No. Description Date Attachment A PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-8.1 MATERIALS BOARD 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT No. Description Date Attachment A PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-8.2 EXISTING BASE CAMP BUILDINGS 15029.00BASE CAMPFEBRUARY 27, 2020 DRAFT No. Description Date Attachment A March 17, 2020 PZC Meeting – Avon Road Underpass Improvements 1 Map proposing a modified north-south pedestrian facility. TO: Planning and Zoning Commission FROM: David McWilliams, AICP, Town Planner RE: MNR20007 Minor Development Plan Public Hearing Avon Road ROW below I-70 Overpass DATE: March 12, 2020 STAFF REPORT OVERVIEW: For review is a Minor Design and Development Plan application for landscaping and lighting for areas of the Avon Road right-of-way. The Avon Road Underpass drawings ("Exhibit A") detail a complete remodel of the west side of the underpass between the edge of the road and the I-70 bridge. The Avon Town Council decided to split the project into two phases, prioritizing the west side of the underpass first, given budget constraints and the usage trends in the area. The final decision for this application rests with PZC. This plan is expected to be constructed in 2021. The primary goals for the redesign include: • increased safety, improved multi-modal infrastructure • enhanced image and character Streetscape improvements include: • benching of the underpass slope to provide for a larger pedestrian area • additional landscaping • snow shelter structures to protect pedestrians from above • raised sidewalk moved away from traffic for a more protected experience The Planning and Zoning Commission's scope of review includes vertical improvements such as snow shelters, the boulder wall, and landscaping. BACKGROUND: The project design is included in the Capital Improvements Plan for 2020. Town has planned for improving the underpass for some time. Recommendations from "Creating a Vision Toward a More Prosperous Future Through Healthier Built Environments” (July 2015 led by Blue Zones, LLC), mentioned “right- sizing” Avon Road. Further study of the corridor during the Town Owned Properties Plan confirmed that the road is not overbuilt at this section, but recommends enhanced north / south pedestrian facilities as follows: Starting from where the bike path north of the interstate crosses Avon Road, the new path will travel south beneath I‐70 to the west of the overpass pillars on the west side of Avon Road. This will require re‐engineering the sloped concrete walks to include a vertical retaining wall, and could result in the elevation of the path being a few feet above the elevation of the roadway. Through landscaped walls and additional path lighting, this would provide a psychological barrier between trail users and traffic, and greatly enhance the quality of travel beneath the Interstate. The Town is already studying this improvement. March 17, 2020 PZC Meeting – Avon Road Underpass Improvements 2 PUBLIC NOTICE: Notice of the public hearing was published in the March 6, 2020 edition of the Vail Daily in accordance with Sec. 7.16.020(d) of the Avon Municipal Code (AMC). Mailed notice is not required for this application type. PLANNING ANALYSIS: Landscaping: The planting pallet is made up of spruce, chokecherry, aspen, grasses, perennials, native grasses, Russian sage, ground cover, and mulch. Hardscape materials include snow protection shelters, concrete, a stone wall, and riprap stone under I-70. The most unique features are the protective shelters. They are designed to absorb plowed snow falling from the highway above and protect pedestrians and the area from its impacts. Landscaping choices are compliant with Avon Municipal Code and consistent with other improvements made to Avon Road in 2015. Protective Shelters: The shelters were designed taking visual cues from Avon’s bus shelters for materials, colors, and form, all of which are compliant with Avon Municipal Code. It does not connect to the sloped ground on the west side, thereby providing refuge from the elements while preserving prospect and open views of the area. Lighting: No additional lighting is proposed. Planning Staff is concerned that the existing LEDs may be inadequate under the shelters to provide for a safe and comfortable pedestrian experience. Planning Staff suggests a condition of approval to investigate running conduit during the construction process, should the need to provide additional lighting arise. Overlay illustrating the approximate locations of existing LED fixtures. REVIEW CRITERIA: § 7.16.080(f), Development Plan The PZC shall use the Development Plan and Design Review criteria as the basis for a decision on the design. Staff has provided a response to each mandatory review criteria. 1. Evidence of substantial compliance with the purpose of the Development Code as specified in §7.04.030, Purposes; Staff Response: The Development Code is intended to "promote design which is compatible, functional, practical and complimentary to Avon's sub-alpine environment." One of the overriding goals for this project is to improve the Town's main visitor entrance with improvements that reflect and respect the local environment. The plant species were selected based upon our sub-alpine environment and locations of plantings were sensitive to light limitations. The palette was selected for compatibility with other recently installed planting pallets. March 17, 2020 PZC Meeting – Avon Road Underpass Improvements 3 2. Evidence of substantial compliance with §7.16.090, Design Review; Staff Response: The Application is in compliance with the review criteria for Design Review; discussed below. The streetscape elements are high quality, aesthetically pleasing, and help to define the Town and the resort experience for visitors. The design takes queues from other streetscape projects; but also makes a statement for its unique constraints. 3. Consistency with the Avon Comprehensive Plan; Staff Response: The Avon Comprehensive Plan includes several Goals and Policies that appear to be addressed with this Application, including the following: Goal C.2: Create community gateways and streetscapes that reflect and strengthen Avon's unique community character and image. Policy C.2.1: Beautify the Town with landscaping and public art. Policy C.2.2: Design and maintain streets and walkways as safe, inviting, and pedestrian/bicycle friendly public spaces. Policy C.2.3: Reinforce community gateways along major roadway corridors that strengthen Avon's community identity. The project is located in the I-70 Gateway District, which describes the area as follows: The interchange on I-70 at Avon Road is the main gateway to the Town. The area should reflect the character and quality of the community and create a sense of arrival. The gateway should be improved through enhancing the pedestrian experience, lighting, road and right of way materials, enhanced view corridors, and signage. The emphasis should be on the creation of a positive entry experience that extends the character of Town Center to Avon’s front door. Planning Principles: • Enhance the intersections at the on/off ramps on Avon Road to include streetscape improvements and special landscape features. • Maintain the elements that contribute to the gateway experience. • Improve the I-70 interchange for pedestrians and bikers. • Improve the aesthetics of the Avon Road underpass. • Screen adjacent buildings and parking from I-70. The Town Owned Properties, quoted above, is also a document included in the Comprehensive Plan. Staff is satisfied that this application achieves the ideals in the plan. 4. Consistency with any previously approved and not revoked subdivision plat, planned development, or any other precedent plan or land use approval for the property as applicable; Staff Response: There are no pertinent plans for the Avon Road Right of Way. 5. Compliance with all applicable development and design standards set forth in this Code, including but not limited to the provisions in Chapter 7.20, Zone Districts and Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development Standards; and Staff Response: The Design Plan is in compliance with all applicable development and design standards set forth in the Development Code. 6. That the development can be adequately served by city services including but not March 17, 2020 PZC Meeting – Avon Road Underpass Improvements 4 limited to roads, water, wastewater, fire protection, and emergency medical services. Staff Response: Engineering Staff will consult with CDOT to gain approval of the project once approved by PZC. §7.16.090(f), Design Review: 1. The design relates the development to the character of the surrounding community; or, where redevelopment is anticipated, relates the development to the character of Avon as a whole; Staff Response: The application proposes a design that relates to the character of the surrounding community. 2. The design meets the development and design standards established in this Development Code; and Staff Response: The design enhances the gateway experience of the Town and meets the established design standards. 3. The design reflects the long- range goals and design criteria from the Avon Comprehensive Plan and other applicable, adopted plan documents. Staff Response: The design elements in this Application bring forward several of the long range goals and design criteria form the Avon Comprehensive Plan. These improvements are intended to tie seamlessly with neighboring improvements to better define and connect the Town. The improvements continue to define Avon as a destination resort with quality design elements and the design directly implements goals, policies, and principles highlighted above from the Avon Comprehensive Plan. STAFF RECOMMENDATION FOR MNR20007: Staff recommends approval of the Minor Development Plan for the Avon Road Underpass, with the following findings and condition: Findings: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, §7.16.090(f), Design Review. The design meets the development and design standards established in the Avon Development Code; 2. The application is complete; 3. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. The demand for public services or infrastructure exceeding current capacity is mitigated by the application; and 6. The design relates the development to the character of the surrounding community. Condition: 1. Engineering Staff shall investigate running electrical conduit to the snow shelters, should the need for additional lighting arise. RECOMMENDED MOTION: “I move to approve Case #MNR20007, an application for Minor Design and Development Plan for the Avon Road Underpass, Block 2 Benchmark at Beaver Creek Subdivision together with the findings of fact and condition outlined by Staff.” ATTACHMENTS: A. Application Materials March 17, 2020 PZC Meeting – Avon Road Underpass Improvements 5 Thank you, David McWilliams 970-749-4023 / cmcwilliams@avon.org Z E H R E N A N D A S S O C I A T E S ARCHITECTURE PLANNING INTERIORS LANDSCAPE ARCHITECTURE Avon Road I-70 Underpass Improvements Avon, CO Minor Development Plan Submittal YARNELL CONSULTING& CIVIL DESIGN, LLC PROJECT AREA Avon RoadI-70WestboundI-70EastboundEastbound On-Ramp Roundabout #2Roundabout #1 February 27, 2020 Eastbound Off-RampWestbound On-Ramp Westbound Off-Ramp Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLCExisting Summer Conditions Existing: • Uninteresting landscape • Bridge columns restrict pedestrian and bicycle circulation • Concrete slope drains water onto sidewalk in winter. Southern Property Line Looking West PROJECT AREA Avon Road I-70WestboundI-70EastboundRoundabout #2 Roundabout #1 Eastbound Off-Ramp Westbound On-Ramp 1 5 2 6 3 7 4 8 Existing: • Broken concrete slopes • Narrow strip of grass is as difficult to maintenance • Narrow sidewalk attached to roadway Existing: • Pedestrian sidewalk leading into Avon • Unattractive concrete slope • No way finding • New Avon road landscape ends at this location Existing: • Unattractive and broken pavement • Bridge columns located within pedestrian circulation of sidewalk • Loud traffic noise from concrete slopes Existing: • Crosswalk • Uninteresting grass slope • New landscape island • Light poles Existing: • Narrow sidewalk next to traffic lanes. • Bridge columns impede pedestrian walkway. • No landscaping • No identity for entrance to Avon Town Center Existing: • Inconsistently colored concrete slope. • Fast moving traffic at cross- walk. • I-70 Bridge lacks character • Wide sidewalk Existing: • Unattractive guardrail and chain link fencing on I-70 bridge. • No landscape interest • Lacks identity as a gateway between North and South Avon. 1 234 5 6 7 8 Eastbound On-RampWestbound Off-Ramp Key Plan Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLCHazardous Winter Conditions Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLC TOPOGRAPHIC MAP INTERSTATE 70 RIGHT-OF-WAY/AVON ROAD County of Eagle, State of Colorado MARCIN ENGINEERING LLC P.O. BOX 1062 AVON, CO 81620 (970) 748-0274 (970) 748-9021 FAX GRAPHIC SCALE (IN FEET) 1 inch = 30 ft. TOPOGRAPHIC MAP INTERSTATE 70 RIGHT-OF-WAY/AVON ROAD Section 12, Township 5 South, Range 82 West of the 6th Principal Meridian County of Eagle, State of Colorado Survey Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLC Scale: 1” = 16’ 0 16’8’32’Proposed Conditions Illustrative Site Plan Avon RoadI-70WestboundI-70EastboundEastbound On-Ramp Roundabout #2 Roundabout #1 Eastbound Off-RampWestbound On-Ramp Westbound Off-Ramp Boulder Wall Existing Sidewalk Perennials Native Seed Snow Protection Shelter (Typical of (4) Boulders Groundcover (Sweet Woodruff) Tree and Shrub Plantings on Slope I-70 Bridge (Above) Proposed Sidewalk 2:1 Rip Rap Slope (Below Bridges) Drainage Swale Perennials Existing Plant Bed to Remain Drainage Swale Tree and Shrub Plantings on Slope Native Seed Existing Concrete Slope Plant Bed (Mulch) Plant Bed (Mulch)Section LineAttachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLCProposed Landscape Materials and Planting SCALE: 1"=16' 2/24/20 0 8' 16' 32' AVON ROAD UNDERPASS - CONCEPTUAL LAYOUT AND GRADING PLAN AVON, CO Scale: 1” = 16’ 0 16’8’32’ I-70 Westbound Avon Road Weeping White Spruce Bark Mulch Perennials Russian SageConcrete Sidewalk Snow Protection Shelter Sweet Woodruff Ground Cover Columnar Aspen Tree Rip Rap Slope (Angular Stone) A Boulder WallCanada Red Chokecherry Ornamental Grasses Native Grass Swale I-70 Eastbound Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLC Scale: 1/4” = 1’-0” 0 4’2’8’Site Section Snow Protection Shelter Character Images Boulder Wall Character Images Existing Town Bus Stops Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLCProposed Snow Shelter Materials and 3D Model Views Snow Shelter Materials 3D Model Views Corrugated Galvanized Steel Roofing Steel Columns and Beams Powder Coated Black 6x6 Columns / 6x12 Beams Existing I-70 Concrete Bridge Trex Tongue and Groove Ceiling Board Formed Concrete Foundation Sweet Woodruff Ground Cover Sandstone Boulders Concrete Sidewalk Native Grass Rip Rap Mulch Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLC SHEET NO. SHEET TITLENO.NAMEISSUE / REVISIONDATE:DATETHE DESIGNS SHOWN HEREIN INCLUDINGALL TECHNICAL DRAWINGS, GRAPHICREPRESENTATION & MODELS THEREOF, AREPROPRIETARY & CAN NOT BE COPIED,DUPLICATED, OR COMMERCIALLY EXPLOITEDIN WHOLE OR IN PART WITHOUT THE SOLEAND EXPRESS WRITTEN PERMISSION FROMZEHREN AND ASSOCIATES, INC.DESIGN BY:DRAWN BY:REVIEWED BY:PROJECT NO.:L2.0 1 LANDSCAPE PLAN 1" = 20'-0" (22" X 34" SHEET) 10' 20' 40'0 LANDSCAPE PLAN L2.0Landscape Plan Scale: 1” = 20’ 0 20’10’40’ Attachment A po box 975 . avon . colorado 81620 . 970 748 4000 . www.avon.org Town of Avon Zehren and Associates, Inc. Avon Road I-70 Underpass Improvements February 27, 2020 YARNELL CONSULTING & CIVIL DESIGN, LLC SHEET NO. SHEET TITLEAVON ROAD IMPROVEMENTSAVON ROAD BETWEENROUNDABOUTS 1 AND 2AVON (EAGLE COUNTY), COLORADOJ. YARNELLJ. YARNELLJ. YARNELL17.0252/23/2020OVERALL GRADING PLAN C2 811Site and Grading Plan Attachment A