Loading...
L19 B3 WR Conditions of ApprovalPLANNING AND CONING COMMISSION STAFF REPORT March 7, 1995 Lot 19, Block 3, Wildridge Subdivision Blender Residence Condition of Approval -- Boulder Wall, Entry Lantern and Colors PROJECT TYPE: Single Family Residence ZONING: PUD COMPLIES WITH ZONING? YES STAFF RECOMMENDATION: Approve the proposed boulder wall, the entry lantern with meters and the color and materials for Lot 19, Block 3, Wildridge as submitted. INTRODUCTION: Brian Vedder has submitted revised plans for the boulder wall and the entry lantern. Color and material samples will be provided at the meeting. STAFF COMMENTS The boulder wall has been broken up into three sections with plant material throughout the wall. The entry lantern contains the meters on the elevation facing the retaining wall. RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Mary Holden Town Planner PLANNING AND �LON1NG COMMISSION STAFF REPORT March 7, 1995 Lot 19, Block 3, Wildridge Subdivision Blender Residence Condition of Approval -- Boulder Wall, Entry Lantern and Colors PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions (✓) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date] / Sue Railton, Secretary The Commission approved with the proposed boulder wall, the entry lantern, and -Yu -1 -1 -ding colors with the split face block color to be returned along with the corrisponding building colors and town minimum standards will