Loading...
L64 B3 WR Design ChangePlanning & Zoning Commission Staff Report Submitted for the August 1, 1995 meeting Date 21 July, 1995 Review Type Final Design Project Type Change of roof and siding color Location Lot 64, Block 3 Wildridge Introduction The commission approved this project on May 2, 1995, with the condition that it be returned with a sample of the material and color of the metal roof The applicant now wants to use a brown (Burnt Chestnut) concrete tile roofing, as well as modifying the wood cedar siding to a semi- transparent blue -gray (Blue Balsam). Staff Comments The material and color of the roof and color of the siding are appropriate according to the design guidelines, specifically: 1. use of a lower -reflectivity roofing material 2. use of natural or earth -tone colors. Recommended Action Approve the roofing color and material, and the siding color, as presented. If you have any questions regarding this or any other project or community development issue, please call me at 949-4280 (extension 129), or stop by the Community Development Department. Respectfully submitted, George Harrison Assistant Planner 1.64R3WR nnr Lot 64, Block 3, Wildridge Subdivision, Final design review, page 2 August 1, 1995 Planning & Zoning Commission meeting Planning & Zoning Commission Action R Approved as submitted ❑ Approved with conditions ❑ Denied ❑ Continued ❑ Withdrawn by applicant Conditions (if applicable) The Commission approved as submitted. Date � S Sue Railton, Secretary c- T.64RIWR DOC