L40 B1 WR Duplex DesignPLANNING ANi, LONING COMMISSION STAFF R PORT
February 7, 1995
Lot 40, Block 1 Wildridge
Duplex
Final Design Review
PROJECT TYPE: Duplex
ZONING: PUD -2 Units COMPLIES WITH ZONING? YES
RECOMMENDED ACTION
Approve final design review for Lot 40, Block 1, Wildridge, with the following conditions:
1. The flues, flashings and vents be painted to match the color scheme of the building.
2. The building lighting be approved by staff prior to issuance of a building permit.
3. Revegetation include native bushes.
4. Meters be placed on the building.
5. The landscape material be located out of snow storage easement.
6. The grading plan be revised to eliminate slopes exceeding 2:1.
7. Engineering concerns be addressed prior to the issuance of a building permit.
INTRODUCTION:
Mr. Michael Sanner has submitted plans for Final Design Review approval of a duplex on
lot 40, which is .40 acres. The site slopes to the north at approximately 4%. The duplex
will contain two levels and varies in height, with the tallest point at 27' high.
The duplex will consist of the following materials:
Materials
Color
Roof
300 # asphalt
oxford gray
Siding
clear cedar plywood
with 1x4 cedar battens
Oly. 916
Other
Stucco
mountain ash
Fascia
1x4 over 2x10 cedar
2x10 Oly. 916
1x4 ,moore green
Soffits
r.s. plywood
Oly 916
Window
clad
white
Window Trim
stucco at stucco
Oly 916
2x6 r.s. cedar at wood
Door
wood
Oly 916
Door Trim
wood
Oly 916
Garden Wall
stucco '
mountain ash
Flues/Flashings
Chimney
stucco
mountain ash
PLANNING ANNj- LONING COMMISSION STAFF R-�.PORT
February 7, 1995
Lot 40, Block 1 Wildridge
Duplex
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions (,I' Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date ,, �� 9� Sue Railton, Secretary
The Commission approved with the following conditions:
1. The flues, flashings and vents be painted to match the color scheme
of the building.
2. e building lighting be approved by staff prior
building permit.
&eyegetation incl -do native bushes-.
4. Meters be placed on the building.
5. The landscape material be located out of snow storage easement.
6. The grading plan be revised to eliminate slopes exceeding 2:1.
7. Engineering concerns be addressed prior to the issuance of a
8. Landscape plan brought back to Planning and Zoning for approval.