Loading...
PZC Agenda 020795AVON PLANNING AND ZONING COMMISSION AGENDA FEBRUARY 07, 1995 CONTINUED IV. PUBLIC HEARING 1, Lot 37, Block 2, Wildridge Subdivision, Driveway Setback Variance, Public Hearing. 2. Lot 3, Nottingham Station, PUD Amendment, Public Hearing. V. FINAL DESIGN REVIEW 1. Lot 37, Block 2, Wildridge Subdivision, Sanner Duplex. 2. Lot 40, Block 1, Wildridge Subdivision, Sanner. 3. Lot 42, Block 1, Wildridge Subdivision, Loux Duplex. 4. Lot 28, Block 1, Wildridge Subdivision, Modifications, Orcutt. 5. Lot 14/15, Block 1, Benchmark at Beaver Creek Subdivision, Site Site Modifications. VI. OTHER BUSINESS VII. ADJOURNMENT POSTED AT THE FOLLOWING PUBLIC PLACES WITHIN THE TOWN OF AVON ON 02/03/95 AVON COASTAL MART ENTRANCE TO AVON POST OFFICE CITY MARKET MAIN AVON MUNICIPAL BUILDING PLANNING ANL ZONING COMMISSION STAFF RL_ ORT February 7, 1995 Lot 1, Riverside PUD 54 Unit Complex Design Modifications PROJECT TYPE: 54 Units ZONING: PUD COMPLIES WITH ZONING? Yes RECOMMENDED ACTION Approve the roof design modification for the west building of Eaglebend Phase III. INTRODUCTION At the last meeting, the Commission requested Eaglebend Phase III to resubmit for the roof design on the west building. Attached to this report are the revised elevations. STAFF COMMENTS Staff has no concerns with the proposed roof design. RECOMMENDED ACTION 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully Submitted, Mary Holden Town Planner PLANNING ANI, LONING COMMISSION STAFF RL_ ORT February 7, 1995 Lot 1, Riverside PUD 54 Unit Complex Design Modifications PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions (✓) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date7/I- X95 Sue Railton, Secretary The Commission approved with the following conditions: 1. Reduction in parking space size for 9 spaces on the east end and 12 on the west end to 16' deep by 9' wide. 2. Revised site plan with the realloeation of 2 units. 3. A 2 foot reduction of buildings "A" and "C" from the river. 4 Elevation change with Siding he Pxtended to roof line which is presently stucci 5. All design changes be brought to staff for review and staff having the option to bring changes back to Planning and Zoning Commission for any further discussion and review. 6. Recommendation that the developers bring back a plan to extend the roof