L9 B1 BMBC Material ModPlanning & Zoning Commission
Staff Report
Submitted for the May 2, 1995 meeting
Date 27 April, 1995
Approval Requested Final Design Review
Project Type Modification: new roofing material
Location Lot 9 Bl. 3 Benchmark at Beaver Creek Subdivision (Sunridge Phase I)
Zoning Residential High Density (RHD)
Allowed Use Category Apartments/condominiums
Introduction
This project involves the removal of the existing wood shake roof and replacement with an
architectural fiberglass shingle (Tamko Heritage II Shadowtone Series - Rustic Slate). A sample
will be provided at the meeting.
Staff Comments
The proposed modification appears to be consistent with the design guidelines, and probably
present a somewhat safer alternative than wood shake roofing.
Design Review Considerations
According to the Commission's Procedures, Rules & Regulations, Section 6. 10, the Commission
shall consider the following items in reviewing the design of this project:
1. Conformance with the Zoning Code and other applicable regulations of the Town.
2. The suitability of the improvement, including type and quality of materials of which it is to be
constructed and the site upon which it is to be located.
3. The compatibility of the design to minimize site impacts to adjacent properties.
4. The compatibility of the proposed improvements with site topography.
5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring
properties and public ways.
6. The objective that no improvement be so similar or dissimilar to others in the vicinity that
values, monetary or aesthetic will be impaired.
7. The general conformance of the proposed improvements with the adopted Goals, Policies and
Programs for the Town of Avon.
Recommended Action
Approve as presented.
L913L313M.DOC
Lot 9, Block 3, Benchmark, Final Design review, page 2
May 2, 1995 Planning & Zoning Commission meeting
Recommended Procedure
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
If you have any questions regarding this or any other project or community development issue,
please call me at 949-4280 (extension 129), or stop by the Community Development Department.
Respectfully submitted,
Michael Matzko
Director of Community Development
Planning & Zoning Commission Action
Approved as submitted ( ) Approved with recommended conditions (✓,-."
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date qo•w
��""����
14 S Sue Railton, Secretary
CONDITION:
1. All roofing be completed by the end of June 1996.
L9BL3BM.DOC