Loading...
L70 B4 WR Duplex DesignPlanning & Zoning Commission Staff Report Submitted for the May 2, 1995 meeting Date Approval Requested Project Type Location Zoning 27 April, 1995 Final Design Residential, new construction Lot 70, Bl* Wildridge Subdivision PUD Allowed Use Category Duplex Introduction This project is a new 5051 s.f. duplex, 2525 s.f per side, not including garages. The proposed siding materials include channel cedar, applied both horizontally and vertically, with stucco accents on retaining walls. Roofing is architectural fiberglass shingles. Flues and flashing are painted galvanized metal. The application, building and landscape materials lists and plan set are attached for your review. Staff Comments The project conforms with all height, setback parking and access requirements; the building aligns well with the topography; the materials are appropriate according to the design guidelines. Design Review Considerations According to the Commission's Procedures, Rules & Regulations, Section 6. 10, the Commission shall consider the following items in reviewing the design of this project - 1 . roject:1. Conformance with the Zoning Code and other applicable regulations of the Town. 2. The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon which it is to be located. 3. The compatibility of the design to minimize site impacts to adjacent properties. 4. The compatibility of the proposed improvements with site topography. 5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. 6. The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. 7. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. L70BL4WR.DOC Lot 70, Block, -f, Wildridge, Final Design review, page 2 May 2, 1995 Planning & Zoning Commission meeting Recommended Action Approve as presented. Recommended Procedure 1. Introduce Application 2. Applicant Presentation I Commission Review 4. Commission Action If you have any questions regarding this or any other project or community development issue, please call me at 949-4280 (extension 129), or stop by the Community Development Department. Respectfully submitted, Michael Matzko Director of Community Development Planning & Zoning Commission Action Approved as submitted ( ) Approved with recommended conditions Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) i Date Sue Railton, Secretary CONDITIONS: 1. Strong recommendation that an automatic sprinkler or drip system be installed; 2. Flues, flashings, and vents have a finished surface to match surroundings; 3. Meters beplaced on the building; 4. Retaining walls over 4 feet high must be designed by an engineer; 5. A construction fence be placed around area of disturbance; 6. Revegetation include native plant material. L70BL4WR.DOC