L70 B4 WR Duplex DesignPlanning & Zoning Commission
Staff Report
Submitted for the May 2, 1995 meeting
Date
Approval Requested
Project Type
Location
Zoning
27 April, 1995
Final Design
Residential, new construction
Lot 70, Bl* Wildridge Subdivision
PUD
Allowed Use Category Duplex
Introduction
This project is a new 5051 s.f. duplex, 2525 s.f per side, not including garages. The proposed
siding materials include channel cedar, applied both horizontally and vertically, with stucco
accents on retaining walls. Roofing is architectural fiberglass shingles. Flues and flashing are
painted galvanized metal. The application, building and landscape materials lists and plan set are
attached for your review.
Staff Comments
The project conforms with all height, setback parking and access requirements; the building aligns
well with the topography; the materials are appropriate according to the design guidelines.
Design Review Considerations
According to the Commission's Procedures, Rules & Regulations, Section 6. 10, the Commission
shall consider the following items in reviewing the design of this project -
1 .
roject:1. Conformance with the Zoning Code and other applicable regulations of the Town.
2. The suitability of the improvement, including type and quality of materials of which it is to be
constructed and the site upon which it is to be located.
3. The compatibility of the design to minimize site impacts to adjacent properties.
4. The compatibility of the proposed improvements with site topography.
5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring
properties and public ways.
6. The objective that no improvement be so similar or dissimilar to others in the vicinity that
values, monetary or aesthetic will be impaired.
7. The general conformance of the proposed improvements with the adopted Goals, Policies and
Programs for the Town of Avon.
L70BL4WR.DOC
Lot 70, Block, -f, Wildridge, Final Design review, page 2
May 2, 1995 Planning & Zoning Commission meeting
Recommended Action
Approve as presented.
Recommended Procedure
1. Introduce Application
2. Applicant Presentation
I Commission Review
4. Commission Action
If you have any questions regarding this or any other project or community development issue,
please call me at 949-4280 (extension 129), or stop by the Community Development Department.
Respectfully submitted,
Michael Matzko
Director of Community Development
Planning & Zoning Commission Action
Approved as submitted ( ) Approved with recommended conditions
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
i
Date Sue Railton, Secretary
CONDITIONS:
1. Strong recommendation that an automatic sprinkler or drip system be installed;
2. Flues, flashings, and vents have a finished surface to match surroundings;
3. Meters beplaced on the building;
4. Retaining walls over 4 feet high must be designed by an engineer;
5. A construction fence be placed around area of disturbance;
6. Revegetation include native plant material.