L4 NTST Multi fam designl -
Town of Avon
Final Design Staff Report
17 October, 1995 Planning & Zoning Commission meeting
Report date
Project type
Legal description
Zoning
Introduction
October 13, 1995
Multi -family resisdential
Lot 4, Nottingham Station Subdivision
PUD
The amended Nottingham Station PUD was approved by P&Z and Council earlier this year. This
application is for final design approval for buildings E,F,G, and H of Lot 4, Nottingham Station
subdivision. Buildings A -D have already received final design review approval.
This phase of the project (known as Canyon Run) consists of 28 units: Buildings E and G are six
plexes and Buildings F and H are eight plexes. In addition, there are 20 attached garage units on
the ground floor of the units and 4 detached garages with this phase..
Design Review Considerations
According to the Commission's Procedures, Rules & Regulations, Section 6.10, the Commission
shall consider the following items in reviewing the design of this project:
1. Conformance with the Zoning Code and other applicable regulations of the Town.
The PUD establishes the zoning requirements including height, setbacks and building
placement, landscaping and open space requirements for the property. The buildings are in
conformance with the approved PUD. The plan needs to indicate the phasing for the
landscape improvements and access so that is clear that the parking and landscaping
requirements are met for this phase.
2. The suitability of the improvement, including type and quality of materials of which it is to be
constructed and the site upon which it is to be located.
The buildings have been designed as part of the overall PUD. The buildings use the same
materials, stucco and wood siding, and asphalt shingles to complement the other buildings on-
site.
3. The compatibility of the design to minimize site impacts to adjacent properties.
The building design complements the other buildings on site and was originally planned as part
of the overall PUD including Lot 3 to the north. The site will be compatible with adjacent
properties.
4. The compatibility of the proposed improvements with site topography.
This element was reviewed as part of the original PUD approval.
Town of Avon Community Development
PO Box 975, Avon, CO 8162
(970) 949-4280 Fax 949-9139 Fax modem 949-4279
j:\p&z\101795pz\4ns. doc
Lot 4, Nottingham Station Sub( on, Final Design Review, page 2
October 17, 1995 Planning & Zoning Commission meeting
5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring
properties and public ways.
The landscaping plan was approved as part of the original PUD approval. The plan needs to
clearly indicate what landscaping will be installed with Phase 2 so that all landscaping adjacent
to the buildings is provided. The plan needs to indicate a ground cover for the areas that will
not be built on immediately.
6. The objective that no improvement be so similar or dissimilar to others in the vicinity that values,
monetary or aesthetic will be impaired.
The buildings use the same building materials with slightly different rooflines and siding
patterns to complement the buildings already approved within the PUD.
7. The general conformance of the proposed improvements with the adopted Goals, Policies and
Programs for the Town of Avon.
The multi -family development is in conformance of the designation for multi -family
development and with the PUD approved for the site and is in conformance with adopted
Goals, Policies, and Programs for the Town of Avon.
Staff Recommendation
Staff recommends approval with the condition that the applicant modify the plan, prior to
applying for building permit, as follows:.
1. Indicate landscaping to be installed with this building phase (including irrigation system) and
specify interim ground cover for those areas of the PUD not being developed at this time.
2. Indicate the paved driveway access to all units and garages, plus parking spaces, to be
installed in this phase.
Once complete, staff would review the modifications. Once the modifications comply with the
direction provided by the Commission, staff would then so notify the applicant that they could
submit the complete building permit application.
If you have any questions regarding this project or any planning matter, please call me at 949-
4280 (extension 131), or stop by the Community Development Department.
Respectfully submitted,
Karen Griffith, AICP
Town Planner
Town of Avon Community Development j:\p&z\101795pz\4ns.doc
PO Box 975, Avon, CO 8162
(970) 949-4280 Fax 949-9139 Fax modem 949-4279
Lot 4, Nottingham Station Subdivision , Final Design Review, page 3
October 17, 1995 Planning & Zoning Commission meeting
Planning & Zoning Commission Action
❑ Approved as submitted
❑ Denied
® Approved with conditions (noted below
❑ Tabled
Conditions of approval, reasons for tabling ❑ Withdrawn by applicant
to code or guidelines by number). o or withdrawal of application, or basis for denial (refer
L Tha+ c+,.ar .__
d -2be met.
Jack Hu , Ch ' Date D 7 tj5
Jack
Z.
Sue Railton, Secretary Date
Town of Avon Community Development
PO Box 975, Avon, CO 8162
(970) 949-4280 Fax 949-9139 Fax modem 949-4279
1:1P&Z1101795Pz1