L1 EW Building DesignTown of Avon Final Design Review March -4,1997 Planning & Zoning Commission meeting Report date February 28, 1997 Legal description Lot 1, Eaglewood Subdivision, Brookside Buildings B and C, Final Design Review Current zoning PUD Address 37333 Highway 6 Introduction This final design review is for Buildings B and C, Brookside PUD. On February 18, 1997, the Planning and Zoning Commission recommended approval of the amended PUD for Brookside PUD. The ordinance was approved on first reading and is scheduled for public hearing and second reading on March 11 th. The final design review plan proposes 54 units, with 40 condominium units and 14 Townhomes. The plan is consistent with the PUD. The location of the "C" Buildings has been modified to provide a 20 foot back up area from all parking spaces. The applicants have also added evergreen trees to replace the cottonwoods that will be removed along the irrigation ditch. The architecture has not been changed from the PUD. The architecture is an alpine style featuring cedar and stucco siding, timber and stone trim and "weathered" asphalt shingle and metal roofs. Design Review Considerations According to the Commission's Procedures, Rules & Regulations, Section 6.10, the Commission shall consider the following items in reviewing the design of this project: 1. Conformance with the Zoning Code and other applicable regulations of the Town. • Allowed use: Conforms with the allowed residential use. • Density: Conforms with the approved PUD. • Lot Coverage: Conforms with the approved PUD. • Setbacks: No proposed encroachments. • Easements: There are irrigation and drainage easements that encroach slightly into Building B. A revised subdivision plat will be submitted that will eliminate the encroachments. The revised plat will need to be recorded before a building permit is issued. Town of Avon Community Development j:\p&z\1997\030497\brookbc.doc (970) 949-4280Fax modem (970) 949-5749 Brookside PUD, Final Design Review Buildings B and C, page 2 March 4, 1997 Planning & Zoning Commission meeting • Building Height: The tallest height of 62.5 feet on the eastern ridgeline of Building B from existing elevation conforms to the PUD. All other building ridges appear to be under 60 feet in height. The actual ridgeline elevations need to be shown on the site plan to document no building exceeds the 60 foot and 63 foot height limitation. • Grading: All proposed slopes conform with the maximum of 2:1 slope guideline. Although the driveway ramp grade is 1,1 percent, the ramp will be heated. • Parking: Four of the compact spaces do not meet the minimum requirements of an 8 feet width. • Snow Storage: The snow storage includes areas where trees will be planted. It is staff s opinion that this approach can be successful for deciduous trees where branches do not extend to the ground. Staff does not believe the areas where the Spruce trees are proposed can function dually for snow storage, especially when consideration is made for the slope in this area. Staff recommends that the final design be approved subject to the owners committing to hauling snow from the property as needed since the area for snow storage is limited. • Landscaping: Submitted landscape plan appears suitable. The landscape plan includes replacement trees for the trees removed adjacent to the irrigation ditch and proposed Building B. 2. The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon which it is to be located. The rough sawn cedar, stucco, and timber and stone trim are high quality materials suitable to the site. 3. The compatibility of the design to minimize site impacts to adjacent properties. There are no residential uses adjacent to the residential portion of the property. The residential buildings are compatible with the Brookside Commercial Building A. The architecture has been upgraded from the original PUD proposal. The final design conforms to the approved PUD, which was found by the Planning and Zoning Commission to be compatible with the neighborhood. 4. The compatibility of the proposed improvements with site topography. The improvements are generally compatible with the site's topography. Staff suggests some fine tuning of the recreational trail to move it away from the steep river bank, adjacent to Building A. The owner of this building has agreed to the fine tuning prior to construction. Staff recommends the final trail alignment and design be approved by staff prior to issuance of building permit. 5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. The visual appearance of the buildings will be attractive, with the buildings utilizing high quality material and trim to enhance appearance. The buildings' appearance has been reduced in scale from the original PUD approval by utilizing dormers and a steeper pitched roof on Building B, allowing a three story building with loft instead of four story building. Building C has been redesigned as four buildings which further reduces visual impact by allowing smaller scale buildings. Town of Avon Community Development j:\p&z\1997\030497\brookbc.doc (970) 949-4280Fax modem (970) 949-5749 Brookside PUD, Final Design Review Buildings B and C, page 3 March 4, 1997 Planning & Zoning Commission meeting Staff does have two comments on the Building C designs. The side elevations may appear more balanced if the cedar siding is extended to the third floor of the building with the belly band in the middle, rather the siding being on the top floor only of the buildings. Additionally, on the south elevation of Building 1, both a hipped and a gabled roof are used. Staff suggests that two gables may provide a more balanced looking and congruent building. 6. The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. The buildings have their own unique character yet blend in with the commercial building and will enhance the appearance of the surrounding neighborhood. 7. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. As discussed in the PUD application, the project is in conformance with Goals, Policies and Programs of the Town. Recommendation Staff recommends approval of the Final Design review, Buildings B and C, subject to the following conditions: 1. A commitment be made to provide snow removal in addition to the snow storage provided on site on an as needed basis. 2. The compact parking spaces shall be revised to meet minimum dimensions of eight feet in width. 3. The hipped roof on Building Cl be changed to a gabled roof. 4. The trail be changed to meet Town Standards and conform to the subdivision plans. Final alignment of the trail shall be approved by staff in conjunction with the subdivision review and building permit applications. 5. Final Grading and Engineering Design including the piping of the irrigation ditch and commitments for phasing of improvements be approved by staff. 6. The Final Design Review is conditioned upon a revised final plat being submitted and approved by the Town prior to issuance of building permit. 7. Ridgeline elevations be provided on plan set A1.2 to document that no building exceeds the maximum height allowed by the PUD. l - 4 it 111 -o-I,• • I I move to approve the Final Design review, Brookside PUD, Buildings B and C subject to the staff conditions outlined in the report to Planning and Zoning Commission. Town of Avon Community Development j:\p&z\1997\030497\brookbc.doc (970) 949-4280Fax modem (970) 949-5749 Brookside PUD, Final Design Review Buildings B and C, page 4 March 4, 1997 Planning & Zoning Commission meeting If you have any questions regarding this project or any planning matter, please call me at 949-4280 (extension 131), or stop by the Community Development Department. Respectfully submi d, _ Karen Griffith, Al P Town Planner Town of Avon Community Development j:\p&z\1997\030497\brookbc.doc (970) 949-4280Fax modem (970) 949-5749 Brookside PUD, Final Design Review Buildings B and C, page 5 March 4, 1997 Planning & Zoning Commission meeting Planning & Zoning Commission Action ❑ Approved as submitted ❑ Denied YApproved with conditions (noted below) ❑ Tabled ❑ Withdrawn by applicant Conditions of approval, reasons for tabling or withdrawal of application, or basis for denial (refer to code or guidelines by number): Dat Jack Hunn, Char fittest: _ Date Sue Railton, Secretary 1. Snow storage is allowed only in areas so de_:_n aced or. the PUD Development Plan anc =ina: Design Review Plan sheets A l 1 Al ? and Al 3. Excess sraw shall be had:ed erY Sitc :n accordance with Section 17.50 : C6 of:he A cn..lun!ctpal Code 2 The compact Larking spaces a:ai: ':x reaised :c mee::r r�mun: _'imcn>iors cr eigh: fee: is width. 3. Roof details be full cabled for Budding C 1, fuii hipped gabled for Buiidine C 2 and Duren hipped vabiec for Building C3 ?. The trail be c :angcd : .. S:asGar_'s ::........e subdi a:c: pians Fina: alignment ofhe traii shall be accroced by staff :r. cce; :. ion w::n the rrat subdivis.or review and building permit application. 5. Final grading and Engineering Design inclt:airg the piping of me irrigation each and commitments for phasing of improvements be approved by staff 6. The Final Design Resiew is condit!onedq_ a revised Fina'. plat "being sucn.Faed and approved by, he Town prior :u :ssuance of b:.iidir._ permit R dgeline ele -ions be ^ .r: a - :o maximum he_ht allowed by Pi.D 8 All buildin<e r%punted light f:_._res she:. have a frc,ted or seede4 Mass 9. Windows on ocildings C 1, C=. C 3: and C4 be maroon. z=r 10. Ridgeline ILC be obtained at time of construcGOr.. 11. Eliminate the pole lights west of the trash onclosureS Town of Avon Community Development j:\p&z\1997\030497\brookbc.doc (970) 949-4280Fax modem (970) 949-5749