Loading...
02-22-2017 Davis Partnership Additional Services Fee ProposalFebruary 22, 2017 Mr. Justin Hildreth Town of Avon, CO 100 Lake St. Avon, CO. 81620 Re: Avon Town Hall Additional Services #1: LEED Consultant Fee Proposal Justin, The following fees are for additional services for design services provided by Davis Partnership and consultant team based on the updated direction provided by the client. These fees are intended to be maximum fees and we will bill hourly against these totals. Scope of Work: A. LEED Consultant Scope: Attached. B. Architectural Scope: Services include coordination of MEP, Architectural, and LEED drawings and specifications, additional meetings with LEED consultants and MEP, and additional meetings with contractor and Owner pertaining to LEED. Architecture Fee: $2,425 Please also see attached LEED add service proposal for your reference. Fee Calculation: A. Group 14 Engineering B. Davis Partnership Admin Fee (5%) Total Fee: Reimbursable expenses to be billed at actual cost. $ 48,500.00 $ 2425.00 $ 50,925.00 Please review this proposal and let us know if you would like any additional information or to discuss this in further detail. woman ■ENOW ■11111101■ ■nmom moans DAVIS PARTNERSHIP ARCHITECTS DENVER OFFICE 2901 Blake Street, Suite 100 Denver, CO 80205-2303 T 303.861.8555 F 303.861.3027 www davispartnership.com ARCHITECTURE • LANDSCAPE ARCHITECTURE • PLANNING • INTERIOR DESIGN elegant solutions Proposal for Avon Town Hall Page 2 Sincerely, Joe Lear, AIA, LEED AP Principal Accepted by: Date: �' /3 ' 17 SUSTAINABILITY/LEED FEE PROPOSAL • Avon Town Hall January 13, 2017 Submitted by: Group14 Engineering, Inc. 1325 East 16th Avenue Denver, CO 80218 303-861-2070 Grou ENGINEERING Just in case you have forgotten your high school chemistry, Group 14 Engineering takes its name from the periodic table — Group 14 is the Carbon Group. Our name represents our firm's dedication to and focus on design guidance, field work, and engineering research to reduce carbon and greenhouse gas emissions. January 13, 2017 William Bussard Davis Partnership Re: Sustainability Services for Avon Town Hall Dear William: Thank you for the opportunity to submit our fee proposal for Avon Town Hall. It is our understanding that the project has been registered under LEED v2009 for New Construction. We recommend pursuing LEED v2009 for Commercial Interiors. Project can be changed to Cl through the project administrator and GBCI. Please find the following services included in this proposal. • LEED v3 for Commercial Interiors Consulting and Documentation • Energy Lighting consulting for LEEDE Cl • Fundamental Commissioning • Enhanced Commissioning (likely needed to get to Silver) If you have any questions, please don't hesitate to email (lcharlier@groupl4eng.com) or phone (720- 221-1074 — direct). Sincerely, Laura Charlier, LEED AP BD+C Sustainability Team Leader Page 12 GrouING p FIXED FEE PROPOSAL Avon Town Hall is a 15,000 sf tenant finish existing office building. Project has a goal of LEED Cl Gold certification. A draft checklist is included after the scope of work. Team members responsible for LEED online documentation are shown in the right-hand column. Project will likely need Enhanced Commissioning to get to Silver and will have to strategize to get to Gold. Project has been registered under LEED v2009 NC by Davis and will need to be updated through GBCI to LEED Cl. Initials ScopeConsulting Fees LEED Consulting and Documentation (LEED-CI v4) $33,500 Initials Energy/Lighting Consulting $4,200 In - Fundamental Commissioning $10,800 Initis_? Total: $48,500 ReimbursableInitials Initials LEED BD+C Registration Fee paid to GBCI Paid by Davis Initial,,, LEED BD+C Review Fee paid to GBCI $ 3,100 (based on building under 50,000 so Initials Total Reimbursables: $3,100 Initials Additional Initia!-' Enhanced Cx (Optional, 5 points) $ 5,500 Ire Measurement & Verification (Optional, 5 points) Upon Request Total: $5,500 We the undersigned accept the terms outlined in this proposal. Name (Printed) Signature Date Company Name Billing Contact Name: Address: Email: Phone: * Please initial, sign, scan and email this page back to Group14 % Laura Charlier, Icharlier0grounMeng.com * Page 13 ■ Energy Modeling ■ Energy Efficiency Consulting ■ Lighting/DaVlighting ■ Window/Wall Thermal Performance ■ Building Research ■ Green Building Certification ■ Occupant Engagement ■ Sustainability Planning ■ HERS/ENERGY STAR Ratings DETAILED SCOPE OF WORK ■ Fundamental Commissioning ■ Enhanced Commissioning • Warranty Inspection • Owner Training • Monitoring -Based Cx G rEo,u p ■ Energy Audits ■ Retro Commissioning ■ Measurement & Verification ■ Energy. Efficiency Financing ■ Operational Consulting 1.1 Schematic Design Collaborative Design In the early collaborative design session, the entire team will address site, water, energy, materials and resources and indoor environmental quality. It is intended to map out a strategy for achieving the projects energy, sustainability, and operating goals - along with agreement and buy -in from all parties about the project's sustainability goals and within the restrictions of the budget. This meedn will take lace in Avon. 2 Register Project with GBCI Register Project under LEED for Commercial Interiors v2009 Researchd. Group14 will research project issues to provide LEED guidance to the team in order to meet LEED goals. A - Water Efficiency Group14 will work with the architect, landscape and MEP designers to minimize water use through the use of high efficiency fixtures. A goal of 40% water savings is proposed. B - Material Selection Group 14 will work with the architect and interior designer to select materials that will help us meet LEED criteria for materials -related credits. Group14 will provide a Construction Waste Management (CWM) Plan to achieve the Construction Waste credit(s). C - Indoor Environmental Quality Group 14 will work with the architect, interior designer, and mechanical engineer to arrive at a design that provides superior indoor environmental quality through the distribution of fresh air, minimizing indoor pollutants, and bringing in natural light throughout the facility. Group14 will provide an Indoor Air Quality IAQ Plan. 4 Energy/Lighting Consulting Group14 will work with the design team to identify energy efficiency goals for the project. Group14 will assess the design from an energy perspective and make efficiency recommendations to the team with respect to the lighting, mechanical systems and controls and will assist electrical and mechanical engineers in completing LEED online relevant credits. This includes LEED online documentation of credits EAp2, EAc1.1, 1.2, 1.3, and 1.4 if achievable. Page 14 GrouING p 1.2 Design Development Group14 will participate in the Design Development kick off meeting in Avon and 50% DD meeting via phone to ensure project is on track to meet LEED goals. Group14 will review design development documents for adherence to LEED criteria. Action Items will be updated. Group14 will review all specifications for inclusion of LEED requirements. Group14 will provide LEED specification lan2uaize as needed. 1.3 Construction Documents 1.4 Construction Administration Page 15 GrEoup PRELIMINARY LEED CHECKLIST Avon Town Hall LEED 2009 for Commercial Interiors Project Checklist 1/12/2017 Preliminary Checklist - Subject to Change Yes ? No 10 2 9 Credit_ 1 Site Selection 1 to 5 G14 Path 1: Brownfield Redevelopment 1 Path 6: Light Pollution Reduction 1 Path 7: Water Efficient Landscaping -Reduce by50% 2 Path 8: Water Efficient Landscaping - No Potable Water Use or Irrigati 2 Path 12: Other Quantifiable Environmental Performance 1 6 Credit Development Density and Comm unity Connectivity 6 6 Credit 3.1 Alternative Transportation - Public Transportation Access 6 G14 2 Credit 3.2 Alternative Transportation - Bicycle Storage and Changing Rooms 2 G14 2 Credit 3.3 Alternative Transportation - Parking Availability 2 G14 Yes No 6 0 5 WATER EFFICIENCY 11 Prereq 1 'Water Use Reduction Req'd G14 g 5 Credit 1 Water Use Reduction 6 to 11 G14 Yes No 18 1410 1 ENERGY & ATMOSPHERE jPrereq 1 'Fundamental Commissioning of Building Energy Systems Req'd G14 As Prereg2 Minimum Energy Performance Req'd G14 Prereq 3 Fundamental Refrigerant Management Req'd HVAC 5 Credit 1.1 Optimize Energy Performance - Lighting Power 1 to 5 G14/8ec S Credit 1.2 Optimize Energy Performance - Lighting Controls 1 to 3 G14/Dec 5 Credit 1.3 Optimize Energy Performance - HVAC 5 to 10 G14/HVAC 4 Credit 1.4 Optimize Energy Performance - Equipment and Appliances 1 to 4 G14/Owner $ Credit Enhanced Commissioning 5 G14 5 Credit 3 Measurement and Verification 2 to 5 G14 5 Credito Green Power 5 G14 Yes ? No 4 4 1 6 MATERIALS & RESOURCES Prereq 1 Storage and Collection of Recyclables Req'd G14 1 Credit 1.1 Tenant Space - Long -Term Commitment 1 G14 2 Credit 1.2 Building Reuse - Maintain Interior Nonstructural Components 1 to 2 1 Credit Construction Waste Management 1 to 2 G14/Contractor 2 Credit 3.1 Materials Reuse 1 to 2 1 Credit 3.2 Materials Reuse - Furniture and Furnishings 1 G14 1 Credit Recycled Content 1 to 2 G14/Contractor 1 Credit 5 Regional Materials 1 to 2 G14/Contractor 111 Credit 6 Rapidly Renewable Materials 1 Credit Certified Wood 1 G14/Contractor Page 16 Yes ? No Yes I No Go r,u p Prereq 1 'Minimum Indoor Air Quality Performance Regld j HVAC Prereq 2 Environmental Tobacco Smoke (ETS) Control Req'd G14 Credit 1 Outdoor Air Delivery Monitoring 1 j Credit Increased Ventilation 1 Credit 3.1 Construction IAQ Management Plan - During Construction 1 G14/Contractor Credit 3.2 Construction IAQ Management Plan - Before Occupancy 1 HVAC/Cont. Credit 4.1 Low -Emitting Materials- Adhesives and Sealants 1 G14/Contractor Credit 4.2 Low -Emitting Materials- Paints and Coatings 1 G14/Contractor Credit 4.3 Low -Emitting Materials - Flooring Systems 1 G14/Contractor Credit 4.4 Low -Emitting Materials- Composite Wood and Agrifiber Products 1 G14/Contractor Credit 4.5 Low -Emitting Materials -Systems Furniture and Seating 1 G14/Contractor Credit 5 Indoor Chemical and Pollutant Source Control 1 G14/HVAC Credit 6.1 Controllability of Systems - Lighting 1 Bec Credit 5.2 Controllability of Systems - Thermal Comfort 1 Credit 7.1 Thermal Comfort - Design 1 HVAC Credit 7.2 Thermal Comfort -Verification 1 G14 Credit 8.1 Daylight and Views - Daylight 1 to 2 G14 Credit 8.2 Daylight and Views - Views for Seated Spaces 1 :INNOVATION Credit 1.1 "Innovation in Design: Exemplary Performance Lighting Power 1 G14 Credit 1.2 Innovation in Design: Green Cleaning ? 1 G14 Credit 1.3 Innovation in Design: Integrated Pest Management ? 1 G14 Credit 1.4 Innovation in Design: TBD 1 G14 Credit 1.5 Innovation in Design: TBD 1 G14 Credit LEED®Accredited Professional 1 G14 Yes ? No 1 2 11 REGIONAL•' • on • code 81620 11 Credit 1.1 Regional Priority: EAc1.1, 5 points 1 Credit 1.2 Regional Priority: Water Use Reduction 11 pts; 1 Credit 1.3 Regional Priority: MRc2 2 points/75% 1 1 Credit 1.4 Regional Priority: SSc2 Development Density & Community 1 Yes No Connectivity; MRc3.1 Materials Reuse 2 pts; SSc1, 5 points Project Totals (pre -ce rtifi cation estimates) 110 Possible Certified 40-49 points Silver 50-59 points Gold 60-79 points Platinum 80-110 points Page 17