Loading...
PZC Packet 082002Town of Avon Planning & Zoning Commission Site Tour August 20, 2002 12:00 PM Town of Avon Municipal Building 400 Benchmark Road Meet in the Community Development Conference Room. Lunch is available to those Commissioners who RSVP by 10:00 a.m. SITE TOUR Posted on August 16, 2002 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main lobbv Town of Avon Planning & Zoning Commission Work Session August 20, 2002 5:30 PM Council Chambers Town of Avon Municipal Building 400 Benchmark Road I. AGENDA A. Discussion of regular meeting agenda items. Estimated Times for each agenda item are shown for informational purposes only, and subject to change without notice. Posted on August 16, 2002 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main lobbv C'')), Town of Avon Planning & Zoning Commission Regular Meeting August 20, 2002 6:00 PM Council Chambers Town of Avon Municipal Building 400 Benchmark Road AGENDA I. Call to Order (6:00pm) II. Roll Call Ill. Additions and Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda Approval of the August 6, 2002 Planning & Zoning Commission Meeting Minutes [Tab 1] VI. Zoning — PUD Amendments (PUBLIC HEARING) (6:05pm to 6:35pm) A. Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan 120 West Beaver Creek Blvd. Applicant: Suites at Avon, LLC [Tab 2] Posted on August 16, 2002 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market. main lobbv ,i �, �, r� B. Lots 22, 22A, Tracts A, B1, B2, Block 2, Benchmark at Beaver Creek Subdivision / Chapel Square PUD 220 West Beaver Creek Place Applicant:: LB Chapel Square LLC [Tab 3] VII. Conditions of Final Design Approval (6:35pm-6:50pm) A. Chapel Square PUD Modifications to Final Design Proposed colors and Wal -mart facade Applicant: Timberline Management [ Tab 4] B. Lot C, Phase 1 B Office Building Architectural details Applicant: Oz Architecture {Tab 51 VIII. Other Business Adjourn (7:00pm) Hosted on August 16, 2002 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main lobbv Staff Report PUD August 20, 2002 Planning & Zoning Commission meeting Report date Project type Legal description Current zoning Address Introduction August 15, 2002 PUD- Final Development Plan Lot B, ACBC Subdivision PUD (Expired Plan) 0130 West Beaver Creek Boulevard The Lot B PUD was approved via a Development Agreement on September 19, 1998, and a Preliminary Development Plan was subsequently approved for this project on December 3, 1998 by Ordinance 98-23. Additionally, a final development plan was approved by Ordinance 99-3 (effective on February 23, 1999). This final development plan has since expired, and the project proponents are now seeking to re-establish this final development plan. The general development plan calls for 4 buildings (A, B, C and D). Buildings A and B are both proposed as 2 -story mixed use (commercial, accommodation, and employee housing units) that parallel the pedestrian mall. Building C is proposed as an 8 -floor building that contains limited commercial space, and 97 accommodation units. Building D is proposed as a 1 -story commercial property that is located entirely on Lot A that connects to Building C via a covered walk. Parking is proposed as a combination of surface and garage parking, featuring garage access along the joint access easement shared with Lot C. Though certain developments rights were vested based upon the original Preliminary Development Plan of December 3, 1998 until December 16, 2008, the proposed final development plan is seeking the following changes from these rights: • The inclusion of an additional 22 accommodation units, which may be rented, sold, or otherwise occupied separately from the primary units to which they are attached. The original vesting was for 82 units. The parking formula remains consistent with the original approval of 1 space per unit, regardless of bedroom program. • A reduction of proposed commercial space in Buildings A and B from 22,404 square feet K to 17,503 square feet. However, overall permitted commercial space remains 50,000 square feet of gross leasable area. • An increase in the rear property setback (at pedestrian mall level) from 5 to 10 feet to conform to the recommendations of the Town Center Plan, should the Town decide to implement the street improvements in the future. • A reduction of 270 parking spaces to 267 spaces. Otherwise, other parking formulas remain the same as original PUD approval. Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan August 20, 2002 Planning & Zoning Commission meeting Page 2 of 6 a A proposed compact parking space stall size reduction for 35% of the total spaces provided of both surface and garage spaces. PUD Design Criteria According to the Town of Avon Zoning Code, Section 17.20.110, the following shall be used as the principal criteria in evaluating a PUD. It shall be the burden of the applicant to demonstrate that submittal material and the proposed development plan comply with each of the following design criteria, or demonstrate that one or more of them is not applicable, or that a particular development solution is consistent with the public interest. 1. Conformance with the Town of Avon Comprehensive Plan's Goals and Objectives. The proposed project generally conforms to the Town of Avon Comprehensive Plan goals and objectives, more specifically to the following goals: Goal Al: Ensure a balanced system of land uses that maintains and enhances Avon's identity as a residential community, and as a regional commercial, tourism and entertainment center. The combination lodging, retail and service commercial uses generally conform to this goal. Policy A3.5: Since undeveloped land in the Town Center is scarce, it will be developed at higher density, include a vertically integrated mix of commercial and residential uses, and rely primarily on underground and/or structured parking. The proposed vertical mix of uses and residential and commercial densities generally conform to this policy. The majority of the parking is underground for this project. Goal B2: Establish the Town Center Area as an inviting, vibrant and safe pedestrian - oriented cultural, retail and entertainment hub. Adding accommodation units and commercial uses to this site will increase the pedestrian activity in the mall area. Design considerations required to create an "inviting, vibrant, and safe pedestrian -oriented hub" will be reviewed in detail through the design review process. Particular attention will be given to the access from the mall through the walkway connection between Building D and Building C, as well as the width of the walkway along the property line between this project and Lot C. Policy B2.2: Development and redevelopment in the Town Center should effectively separate vehicles from pedestrian access and circulation. The PUD development plan shows a proposed pedestrian network within the project, with connections with the Pedestrian Mall and adjacent properties and public ways. Further refinement of this plan will be required though the design -review process, including the provision of a minimum provision of 20% of the lot area for landscaping. Landscaping does not include walkways, as proposed by the plans. Policy B2.3: Encourage a range of uses in the Town Center, including retail, offices, hotels, recreation, tourism, and entertainment. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan August 20, 2002 Planning & Zoning Commission meeting Page 3 of 6 The plan provides a mix of accommodation units (timeshares) and commercial space. Staff anticipates uses similar to those in the existing Avon Center and other projects in the Town Center zone district. Policy E2.2: Structured parking will be incorporated in all new development and major redevelopment in the Town Center. Structured parking is incorporated in this proposal, with limited surface parking that will require some refinement to allow fire access and remove the proposed surface compact spaces. The project is combining parking for Lot A (Avon Center) and Lot B. As currently configured, there are a total of 244 spaces in use by the Avon Center - in excess of the Town zoning requirements by our calculations. Though this project proposes to eliminate a minimum of 85 existing surface spaces, they are compensated in the underground parking structure proposed. The Lodge at Avon Center (Lot A) is zoned Town Center, has approximately 40,801 GLFA of commercial and office space, 52 condominium units, and provides 244 parking spaces in total (104 underground and 140 surface, including the surface parking on Lot B). Records indicate that the total parking requirement for Avon Center when approved appears to have been 214 spaces. The total demand created by Lot B's current proposal calls for 152 spaces. The total number of aggregate parking spaces proposed in this plan for these two projects will be 371 spaces, as compared to the required 366 spaces. Access requirements may slightly reduce the number of proposed spaces, and will be further reviewed on a revised site plan before Council action and at final design. Additionally, compact spaces shown in the garage levels do not comply with requirements of the zoning code and must be revised to comply with the 30% maximum for compact underground spaces. Likewise, the nine compact spaces shown as surface parking do not conform. Policy H1.3: New development and redevelopment adjacent to the Pedestrian Mall should support its becoming a key focal point and unifying element for the Town Center. 2. Conformity and compliance with the overall design theme of the town, the sub -area design recommendations and design guidelines of the Town. The project generally complies with the overall design theme recommended in the Town Center Plan, however, guidelines in the plan call for a minimum pedestrian walkway between this project and Lot C of at least 6' in width. It is unclear from this plan whether or not that is being proposed. Additionally, the frontage to the pedestrian mall should allow sufficient space for the inclusion of an arcade or canopy feature, similar to the office/commercial building on Lot C. The project will be required to conform to the Design Guidelines of the Town, and will be reviewed in detail at that time. 3. Design compatibility with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and orientation. The project generally conforms to the immediate environment and neighborhood, creating an efficient relationship with the existing Lodge at Avon Center and potentially Lot C. Building height was previously approved through the PUD approval as being measured from the Avon Town of Avon Community. Development (970) 748-4030 Fax (970) 949-5749 Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan August 20, 2002 Planning & Zoning Commission meeting Page 4 of 6 Center, and the final design plans should clarify the actual height. The buildings proposed appear to be functional in their orientation, and compatible to the adjacent properties in bulk and scale. 4. Uses, activity, and density provide a compatible, efficient, and workable relationship with surrounding uses and activity. The proposed uses and density are compatible with the surrounding properties, however, several major clarifications must be made prior to the final development plan being approved, in particular the elevations and grades as they relate to the potential redevelopment of the pedestrian mall and connectivity to Lot C. 5. Identification and mitigation or avoidance of natural and/or geologic hazards that affect the property upon which the PUD is proposed. There appears to be no mitigation or avoidance of hazards required with the PUD plan proposed. Adequate shared drainage easements exist between both Lot B and Lot C and should be sufficient to accommodate post -development drainage. Additionally, snow will be removed to an off-site location such as the Eagle County landfill. 6. Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. The site plan is constrained by the density proposed, required parking and landscaping, and the general boundaries of the property. No open space is being proposed, and the amount of landscaping proposed with this plan appears to be inadequate. The aesthetics of the project will be reviewed in more detail through the design review process. 7. A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation that is compatible with the Town Transportation Plan. The proposed circulation pattern poses potential access issues for the Eagle River Fire Protection District, and in particular for Buildings A and B. The proposed emergency access is not supported and will be revised. The project generally conforms to the Town Transportation Plan recommendations; however, clarification of pedestrian walkways, corridor lighting, and proposed parking is required. 8. Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. Landscaping requirements appear to require revision, since this proposal includes walkways, which are specifically excluded from the 20% minimum landscape area per the Town of Avon Zoning Code. 9. Phasing plan or subdivision plan that will maintain a workable, functional, and efficient relationship throughout the development of the PUD. The phasing plan shall clearly demonstrate that each phase can be workable, functional and efficient without relying upon completion of future project phases. The proposed phasing plan appears acceptable, however, a specific construction staging plan, pedestrian protection plan, and temporary landscaping plan will be required for each phase of the project. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan August 20, 2002 Planning & Zoning Commission meeting Page 5 of 6 10. Adequacy of public services such as sewer, water, schools, transportation systems, roads, parks, and police and fire protection. Adequate public services appear to exist to service this development from the original PUD approval and Development Agreement. 11. That the existing streets and roads are suitable and adequate to carry anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD. The existing streets and roads are suitable to carry the anticipated traffic within the proposed PUD. The shared access easement with Lot C should provide adequate access to the project and to the proposed parking structure, however, garage slab elevations and finished floor elevations will require further clarification to correspond to Lot C. 12. Development Standards Development Standards including lot area, site dimensions, setbacks, height, density control, site coverage, landscaping and parking shall be determined by the Town Council as part of the approved development plan with consideration of the recommendation of the Planning Commission. Proposed development standards are attached to this staff report. Staff Discussion Building A and B have been modified on the plan to accommodate the preferred pedestrian mall alternative as outlined in the Town Center Plan. Additionally, parking has been clarified and the original formulas for parking remain consistent with this proposal. Access requirements for the surface parking lot along with compact space requirements may reduce the parking supply, and will require further review prior to Council action. The provision of 6 employee dwelling units is being offered by the developer as deed -restricted, which is supported by the Town Comprehensive Plan. The potential exists for future commercial area for this project, which is supported by the Town Center Plan; however, adequate parking must be demonstrated with any increases in commercial density. Staff Recommendation Approve Resolution 02-11, recommending to the Town Council approval of the Lot B PUD Development Plan for Lot B, Avon Center at Beaver Creek Subdivision, Block 2, Benchmark at Beaver Creek Subdivision, Town of Avon, Eagle County, Colorado with the following conditions: 1. Remove all surface compact spaces from the site plan. Only standard size (9'0"x18'0") parking spaces are permitted for surface parking. Total compact spaces cannot exceed 30% of the total parking spaces in the garage. 2. Delete the proposed emergency access, and reconfigure the surface parking area to accommodate a full one-way turning movement of the Ladder Truck (w/ 252" W.B.). This revision must be submitted by a Professional Engineer to verify the turning analysis. 3. The finished floor elevation of Buildings A and B must match the finished floor elevations of the Seasons building and be verified by a Colorado licensed surveyor. 4. All parking aisles will be a minimum of 24'0" in width. Minimum clear ceiling height on the parking structure entrance will be 7'6". Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot B, Avon Center at Beaver Creek Subdivision PUD Final Development Plan August 20, 2002 Planning & Zoning Commission meeting Page 6 of 6 5. Landscaping will be provided at a 20% minimum that meets the Town standards for landscaping area. 6. Both perimeter and internal sidewalks must have a minimum width of 8'0". 7. Garage spot elevations do not match the proposed grades, and require revision on the site plan. 8. A construction -staging plan is required to address each phase of the project, including temporary landscaping. 9. A note shall be added along with a dimensioned `envelope' to the site plan that indicates the future knockout area between Lot B and Lot C parking garages. 10. Architectural and design plans will be separately submitted and reviewed, and must comply with the existing Town of Avon Residential, Commercial, and Industrial Guidelines. 11. The PUD plan `Parking Requirements' table shall be amended to include the minimum parking provision of 214 parking spaces for Lot A. 12. In the event that the parking standards set forth herein are not satisfied at any phase of the project (including the minimum provision for Lot A), then accommodation units will be reduced to satisfy the parking requirement. 13. All underground parking must be completed in Phase 1 as proposed. 14. Revised development plan addressing all of the above conditions must be provided one week prior to first reading of PUD Ordinance by Town Council. 15. Except as otherwise modified by this permit approval, all material representations made by the applicant or applicant representative(s) in this application and in public hearing(s) shall be adhered to and considered binding conditions of approval. If you have any questions regarding this project or any planning matter, please call me at 748- 4030, or stop by the Community Development Department. Respectfully submitted, Tambi Katieb, AICP Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 16MA August 13, 2002 Ruth Borne Director of Community Development Town of Avon P.O. Box 975 400 Benchmark Road Avon, Colorado 81620 Reference: Lot C, Phase 1B Office ACBC Lot C, PUD Development Plan Conditions of Final Design Dear Ruth: A R C H I T E C T U R E® Pursuant to your letter dated 7 August 2002 we respectfully submit the requested CAD Drawings for SKA Details noted in Item 1: SKA 074 dated 7/14/2002 is resubmitted as SKA 095 dated 8/13/2002 and SKA 096 dated 8/13/2002 SKA 054 dated 5/17/2002 is resubmitted as SKA 094 dated 8/13/2002 SKA 076 dated 7/14/2002 is resubmitted as SKA 097 dated 8/13/2002 This package also includes new SKA Details: SKA 098 dated 8/13/02 — Entry Canopy Column Base SKA 099 dated 8/13/02 — Entry Canopy Fascia SKA 100 dated 8/13/02 — Detail at Entry Canopy SKA 101 dated 8/13/02 — 3rd Floor Wood Post SKA 102 dated 8/13/02 — Retail Canopy SKA 103 dated 8/13/02 — Bracket Details @ High Roof Glulam is deferred submittal as described in UBC -97. SKA 054, 98,99,100 will be provided to the glulam subcontractor for developing design -build documents. Subcontractor's shop drawings will be reviewed and approved by OZ and than forwarded to the Town of Avon for approval. Do not hesitate to contact us with any questions or comments. Sincerely, OZ Architecture Aleksandr Sheykhet, Architect CC: Wally Sheata Greg Barrows 1580 Lincoln Street, Suite 1200 AUC. COrIp7017it, ` �F John Lambert Chris Strumm Andy Sandoval phone 303.861.5704 fax 303.861.9230 PA51085.00 SMV Phase IMorrespondence\Letter\Some 8-13-02.doc D E N V E R B 0 U L D E R S U M M I T CORRUGATED — MTL SWG V CLOM — CHANNEL 3/47 JF- CAULK k SEAL rW HEAW TIMBER POST r7—r (SELECT DOUGLAS FR -LARCH) & SEAL CAM S(1 1� R - 5/r TYPE 'r W. SHFJITFIIIG 8, W/ a.. EIEIER FIl AT BO1H SES 1. 5• 1�• JI r STEEL sm BATT INSULATION T.S.COLUMNJ `3' STORM STACK RE STRUCT. RE: RIYMBING DRAWNGS 1-5/B' STL STUDS 0 Ext. Pilaster Qa Plaza Ent. 1C-05419 SHERATON'S MOUNTAIN VISTA PHASE 18 AVON,COLORADO PROJ. NO. 51085.00 DATE 8/13/02 i�ri irn rnn AREH111VUH1 DWG. REFERENCED SKA-95.DWG SCALE 1" = 1'-0" SKA ARCHITHNI'll (OUTSIDE) 10, 7" L 7" L1 L GLULAM PILASTER (DEFERRED SUBMITTAL) 3/4' JT— CAULK do SEAL 'J' CLOSURE CHANNEL CORRUGATED MTL SIDING (INSIDE) 5/8' TYPE 'X' GYP. SHEATHING ON 6 ' STL STUDS W/ BATT INSUL GLULAM PILASTER @ ENTRANCE 1 1/2" = 1'-0" GLULAM CANOPY TO BE A DEFERRED SUBMITTAL L C- 05418 SHERATON'S MOUNTAIN VISTA PHASE IB AVON,COLORADO PROJ. NO. 51085.00 DATE 8/13/02 SwEn FOR — DWG. REFERENCED SKA-96.DWG SCALE As Noted SKA (D_PLAN DETAIL@1 CANOPY COLUMN LC -09995 ww BELOW rAL BRACKETS DD POST IR, Cur TDP F�I-v {� RTC.. L �t;�� ✓C�i�'�..,� SHERATON'S MOUNTAIN VISTA PHASE 1 B AVON,COLORADO PROJ. NO. 51085.00 SCALE 1" = 1p-0" DATE 8/13/02 I_______ 1 rnn ARCHIUCTUR DWG. REFERENCED SKA-94.DWG SKA �_ �- � �r � TS 8x8 T.O. 2nd FLR STANDING SEAM MTL. ROOF 113 —0 ON ICE AND WATER SHIELD a ABCHIUCTUHE PTD. STL U—SHAPED CONNECTOR (7 GA.) �— 6x4 WD. KICKER / / / l— 3" THICK T&G FASCIA DTL. TO BE —� SIM. TO PHASE 1A OVERSIZED BOLTS AND WASHERS T6x6 WD. COLUMN (NOTCH AT STEEL) 7'-0" A.F.G. EXTERIOR WALL (MIN.) SCONCE (RE: ELEC.) SECTION @ CANOPY BRACKET LC -09999 SHERATON'S MOUNTAIN VISTA PHASE 1 B AVOR COLORADO PROJ. NO. 51085.00 DATE 8/13/02 ISSUED FOR — DWG. REFERENCED SKA-97.DWG SCALE 3/4"=1'-0" SKA O9/ C, c 14'x14' TIMBER COLUMNS PLANTING BED - SANDSTONE BENCH 4' a' a a 6' TACK MOSS ROCK VENEER a'x9'x16' CMU — SLAB ON GRADE — CIP CONCRETE CIP FOUNDATION — 711 �,)Vfjl 11110e,111110 4 a as a 4 da a4 a a 0 SECTION @ ENTRY CANOPY COLUMN BASE 1C-09995 n as 4 a SHERATON'S MOUNTAIN VISTA PHASE 1B AVON,COLORADO PROJ. NO. 51085.00 SCALE 1" = V-0" DATE 8/13/02 ISSUED FOR 098 ABCN11EC10HE DWG, REFERENCED SKA-98.DWG SKA 1/Y PER FOOT 6. 0 0 ENTRY CANOPY FASCIA SECTION LC -09994 8' PTD. METAL FLASH/COLLAR PTD. ROD AND TURNBUCKLE 10' PTD. METAL FLASHING CONTINUOUS CAULK FULLY ADHERED 60 MIL EPDM ON 5/8' THICK GLASS FACED GYP. SHEATHING PTD. METAL FLASHING Y THICK T&G 18 GA. PTD. METAL FASCIA HEAVY TIMER (OR GLULAM) OOLUMN 14x14 SHERATON'S MOUNTAIN VISTA PHASE 1B AVON, COLORADO PROJ. NO. 51085.00 SCALE 1" = 1t-0" DATE 8/13/02 ibbutu r uK 099 ARCH111C1UBE DWG. REFERENCED SKA-99.DN SKA rA 1/Y PER Fr. l T.a MANDOW SILL 116 -a- METAL RASING (PTD. TO MATCH CORRUGATED METAL) Y THICK T&G GLULAM TRUSS O COLUMN UNE PTD. STEEL CONNECTION PLATE W/ OVERSIZED O BOLTS X GLULAM (OR UMBER) PLASTER BEYOND CORRUGATED METAL SIDING MOISTURE BARRIER EXTERIOR GYP. SHEATHING 6- METAL STUD W/ R-19 BATT 5/6' PTD. GYP. BD. SECTION DETAIL AT ENTRY CANOPY LC -09996 SHERATON'S MOUNTAIN VISTA PHASE 1 B AVON,COLORADO PROJ. NO. 51085.00 SCALE 1" = 1f-0" DATE 8/13/02 ISSUED FOR ANCHITHIO E DWG. REFERENCED SKA-100.DWIG SKA 100 C c SECTION @ 3rd FLOOR WOOD POST LC -09993 SHERATON'S MOUNTAIN VISTA PHASE 1 B AVON,COLORADO PROJ. NO. 51085.00 SCALE 1" = 1t-0" DATE 8/13/02 155ULU F UK ARCHIIHI0NE DWG. REFERENCED %A-101.DWG SKA 101 C>� C>� T.O. Znd FLR it — STANDING SEAM MTL ROOF ON ICE AND WATER SHIELD (CONTmus) T&G PTD. T.S. 1 51Y MTL. SAID 5/8' GYP. BD. MOISTURE BARRIER EIFS (PTO.) B' CONTINUOUS CAULK JOINT 4x10 WOOD PLANK (STS) CONTINUOUS CAULK JOINT EIFS (PTD.) T.O. WIND. HEAD 1w— PRE—FAB —PRE—FAB DRIP EDGE STOREFRONT 0 SECTION @ RETAIL CANOPY LC -09997 SHERATON'S MOUNTAIN VISTA PHASE 1 B AVON,COLORADO PROJ. NO. 51085.00 DATE 8/13/02 ARCHITECTURE DWG. REFERENCED SCALE 1" = 1p-0" SKA-102DWG SKA 102 nnLinnOlTr' C'UM01 r nki r -� BRACKET DETAILS @ HIGH ROOF ARCHITECTURE LC -09998 STAIR TOWER 'B' SHERATON'S MOUNTAIN VISTA PHASE IB AVON,COLORADO PROJ. N0. 51085.00 SCALE 1� = 1-0� DATE 8/13/02 ISSUED FOR - DWG. REFERENCED SKA-103.DWC SKA 103 1 �_ Staff Report FINAL DESIGN HFART of the VALLEY C O L O R A D O August 20, 2002 Planning & Zoning Commission meeting Report date August 16, 2002 . Project type Amendment to approved color scheme Reconfigured fagade for WalMart Building Legal description Lots 22, 22A, Tracts A, B1, & B2, Block 2, BMBC Subdivision (Chapel Square PUD) Zoning PUD Address 220 & 240 Chapel Square Place Introduction This is a companion application to the PUD amendment that will officially approve the design of the revised fagade for the WalMart building. The new owner of Chapel Square, LB Chapel Square LLC (hereinafter referred to as "Owner"), is seeking approval for a fagade improvement to the Walmart Building (Tract B-1). The new fagade is being proposed as a combination of a repaint of the existing CMU walls, an extension of the E.I.F.S cornice from Building A along the front wall of the building, and the addition of cast stone pilasters along the front fagade. The stone pilasters have a relief of approximately 10 inches. The end stone pilaster does turn the corner to the west elevation for approximately ten feet, and is proposed with a faux E.I.F.S arched window approximately four by seven feet in dimension. The Owner is also proposing a new comprehensive color scheme for the entire Chapel Square project including the WalMart building and is anticipating repainting this project (and covering all the existing "Hardi Board" with an E.I.F.S. stucco) by January of 2003. The colors proposed are Tony Taupe (dark tan), Rosemary (Green), and Accessible Beige (light tan). Photo simulations as well as a mockup (on the rear of the WalMart building) are available for your review. Design Review Considerations According to the Town of Avon Residential, Commercial, and Industrial Design Review Guidelines, Section 7, the Commission shall consider the following items in reviewing the design of this project: 1. The conformance with setbacks, massing, access, land use and other provisions of the Town of Avon Zoning Code. The project conforms to all setbacks, massing, access, land use, and other provisions of the Town of Avon Zoning Code. However, the current requirement for the fagade improvement has lapsed and the Owner is requesting a revised deadline for dealing with the improvements Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot 22, 22A, Tracts A, B-1, B2, Block 2, BMBC Subdivision, Chapel Square Final Design Modifications August 20, 2002, Planning & Zoning Commission meeting Page 2 of 3 that staff cannot support. Staff recommends the fagade and color improvements be completed no later than January 1, 2003 with no extension. 2. The final design plan is in compliance with all final design plan submittal requirements. The final design proposed for the building is more acceptable color scheme than what currently exists. The fagade, if completed consistent with staff's recommendations and timelines, will comply with all design requirements including the revised time requirement of the PUD. 3. The compatibility of proposed improvements with site topography, to minimize site disturbance, orient with slope, step building with slope, and minimize benching or other significant alteration of existing topography. The improvements will not alter the topography of the site. 4. The appearance of proposed improvements as viewed from adjacent and neighboring properties and public ways, with respect to architectural style, massing, height, orientation to street, quality of materials, and colors. The appearance of the fagade modification or overall color scheme will be an improvement to the project and comply with the requirements of the PUD approval and our current design guidelines. 5. The objective that no improvement be so similar or dissimilar to others in the vicinity that monetary or aesthetic values will be impaired. The improvements as proposed should not impair monetary or aesthetic values in the area, and should improve the design of the project. 6. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. This application, with staff recommendations, will conform to the adopted goals, policies, and programs for the Town. Staff Recommendation Staff recommends approval of the overall color scheme as outlined in the application letter dated August 14, 2002 and as shown on the mockup for the Chapel Square PUD, Lot 22, 22A, Tracts A, B1 & B2, Block 2, Benchmark at Beaver Creek Subdivision, with the following conditions: 1. All "Hardi Board" on the entire project will be treated and painted as outlined in the application letter of August 16, 2002. Any deviation from the colors selected of the scheme will require resubmittal to the Planning and Zoning Commission. 2. Details of the following items be submitted and separately approved by the Planning and Zoning Commission: a) Cast stone pilasters termination on the front wall, b) E.I.F.S. cornice connection to Building A on the west elevation, and c) Clarification on the type of stone utilized as compared to the balance of the PUD. 3. Facade improvements to the Wa1Mart Building (Tract B-1) must be completed no later than January 1, 20Q�No extensions will be granted. Fines for non-compliance to the original fagade deadline (October 29, 2001) as required in the original PUD approval will be assessed and retroactive to that date per Town Code Section 17.40.010 (B). Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot 22, 22A, Tracts A, B-1, B2, Block 2, BMBC Subdivision, Chapel Square Final 1jesign Modifications August 20, 2002, Planning & Zoning Commission meeting Page 3 of 3 4. Except as otherwise modified by this permit approval, all material representations made by the applicant or applicant representative(s) in this application and in public hearing(s) shall be adhered to and considered binding conditions of approval. If you have any questions regarding this project or any planning matter, please call me at 748-4002, or stop by the Community Development Department. Respectfully submitted, Tambi Katieb, AICP Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 08114/2002 22:39 970-926-7576 BRAUN ASSOCIATES PAGE 01 PLANNING and COMMUNITY DEVELOPMENT August 14, 2002 Tambi Katieb, AICP Town of Avon PO Box 975 Avon, CO 51 G20 Re: Chapel Square PUD Dear Tambi: A mock-up of the painting scheme has been provided on the rear side of the Wal-Mart Building directly on the wall (near the gas meter5). The colors on the wall mockup from bottom to top are: Tony Taupe (dark tan), Rosemary (Green), and Accessible Beige (light tan). Wal-Mart Building: Base of building (lower half of front elevation) — Tony Taupe • Upper portion of front elevation — Accc55ible Beige • Cornice — Ro5emary • 50c and rear elevations — Tony Taupe Building A (attached to Wal-Mart): • 5a5e of building (lower half) — Tony Taupe • Upper portion of budding — Acce551ble beige • Recessed areas on upper 5torie5 — Tony Taupe • Cornice — Rosemary • Window trim and rails — Remain as existing - Rookwood 5hutter Green Building B (main Chapel 5cluare Building): • 5a5e of building (lower half front and Sides) — Tony Taupe Ph. - 970,926.7575 EdwaHsVillage Center, Suite C-209 Fax � 970,926.7576 nin; Fdwards Village Boulevard k��MN.faratlr1a59�riatnrrnm Post Office Box 7656 Edwards, Colorado 81632 08/14/2002 22:39 970-926-7576 BRAUN ASSOCIATES PAGE 02 • Base of Building (rear of building) — Rosemary • Upper portion of budding (all elevations) — Acce5vble beige • Recessed areas on upper stories — Tony Taupe • Cornice — Rosemary Window trim and rails — Remain as existing - Rookwood Shutter Green Budding C (smaller Chapel 5q.uare building)* • base of budding (lower half front and sides) —Tony Taupe • Base of Building (rear of budding) — Rosemary • Upper portion of building (all elevations) -, AccesS0le Beige • Recessed areas on upper Stories — Tony Taupe • Cornice —Rosemary • Window trim and rails — P.emain a5 existing -Rookwood shutter Green Existing Retail Building (Small building in front of Wal-Mart) • Base of building (lower half) — Tony Taupe • Upper porton of building — Accessible Beige • Cornice — Rosemary I hope this helps you with your review of the moc-up, kwhich weilleremain a5 ex st ng forhoto 5uLpmIttea The,Wal- "B" is a correct sample except for the der -k ra Is Mart photo 15 incorrect due to the new fa4ade treatment. Sin e y, Dominic- F DF. Mauriello, AICD C: Greg Gastineau 08/15/2002 23:57 970-925-7576 BRAUN ASSOCIATES PAGE 01 BNABRAUN ASSOCIATES, INC. PLANNING and COMMUNITY OM-LOPMENT Augu5t 16, 2002 Tamb► Katieb, AICP Town of Avon PO Dox 975 Avon, CO 81620 Re: Chapel 5auare Dear Tambl: This letter is intended to clarify our appl►cat►0115 to paint and complete facade Improvements at Chapel 5q,uare in Avon. The hardi board' that exists on the building was poorly in5talled/applied to the bullding. The application of this material has caused severe leaks within the bulldin15, Therefore, along with the painting of the building all of the hardy board will covered with Stucco (EIF5). The areas of "hard► board„ on the rear of the bu►Iding5 will be painted Rosemary (green) per the color Sample and mock-up provided. Other "hard) board" applications on the front of the building will be painted per the photo rendering (Beige). We are proposing that the painting/5tucco work begin early this fall and completed by Jan, of 2003. The proposed facade ►mprovement5 to the Wal-Mart Building will be completed by Jan, of 2004. We want to avoid disrupting the business of Wal-Mart and are proposing to complete the Improvements once Wal-Mart vacates the building in the fall of 2003. Thank you In advance for working with u5 to resolve this Issue. SI A'!'jra"'1'0, omAICP Edwards Village Center, Suite C-209 Ph. - 970,926,7575 0105 Edwards Village Bewlevard Fax - 970.926.7576 Post Office Box 2658 www,braunassociates,com Edwards, Colorado 8 1632 OB/15/2002 23:57 970-926-7'-,76 BRAUN ASSOCIATES PAGE 01 BNABRAUN ASSOCIATES, INC. PLANNING and COMMUNITY E)M.LOPMENT August 16, 2002 Tambl Katleb, AICP Town of Avon PO Dox 975 Avon, CO S 1 G20 Re: Chapel Square Dear Tambl: This letter 15 Intended to clarify our application5 to paint and complete facade Improvements at Chapel Square In Avon. The hard) board that ex15t5 on the building was poorly In5talled/applled to the bulld►ncg. The application of thl5 material has caused severe leaks within the bulldlncg5. Therefore, along with the painting of the building all of the hardy board will covered with Stucco (EIF5). The areas of "hard) board" on the rear of the buildings will be painted Rosemary (green) per the color sample and mock-up provided. Other "hard) board" applications on the front of the building will be painted per the photo rendering (Belge). We are propoeing that the palnting/5tucco work begin early thl5 fall and completed by Jan. of 2003. The proposed facade Improvements to the Wal-Mart Building will be completed by Jan, of 2004. We want to avoid disrupting the bu51ne55 of Wal-Mart and are proposing to complete the Improvements once Wal-Mart vacates the bulld►ng In the fall of 2003. Thank you In advance for working with u5 to resolve th15 I55ue. VSI Alf '0'aurlello, AICP Edwards Village Center, Suite C-209 Ph. - 970,926,7575 0 105 Edwards Village Bewlevard fax - 970.926,7576 Post Office Box 2658 www,braunassoaates,com Edwards, Colorado 8 1632 Mar,16. 1996 12:24AM j IVU UJJI C/G rACT CTnta: Tn WATru s' --0"11 CAMM011y 0"CAMtnunity Development PILASTER ELEVATION SCALE:1/2" = 1'-0" ARCHFIC1URI PILASTER PLAN SCALE:1/2° = V-0" EXTERIOR SHEATHINGON METAL STUD PILASTER FURRING ABCNIiECiURE Staff Report PUD VON C O L O R A D O August 20, 2002 Planning & Zoning Commission meeting Report date August 16, 2002 Project type PUD Amendment Legal description Lots 22, 22A, Tracts A, B1, & B2, Block 2, BMBC Subdivision (Chapel Square PUD) Current zoning PUD Address 220 & 240 Chapel Square Place Introduction The new owner of Chapel Square, LB Chapel Square LLC (hereinafter referred to as "Owner"), is seeking several amendments to the existing PUD. The most significant amendment requested is to remove a condition placed on the original approval that required the fagade of WalMart to be completed in the same style as the rest of the project within two years after the first Temporary Certificate of Occupancy being issued for the property. The deadline for completing the facade improvements was October 29, 2001. Additionally, the Owner is seeking an amendment to the Chapel parcel to reconfigure the site to accommodate four additional parking spaces and a loading area to benefit Building C. PUD Design Criteria According to the Town of Avon Zoning Code, Section 17.20.110, the following shall be used as the principal criteria in evaluating a PUD. It shall be the burden of the applicant to demonstrate that submittal material and the proposed development plan comply with each of the following design criteria, or demonstrate that one or more of them is not applicable, or that a particular development solution is consistent with the public interest. 1. Conformance with the Town of Avon Comprehensive Plan's Goals and Objectives. The planned amendments generally conform to the Comprehensive Plan goals and objectives, in particular: Goal Al(c : Identify parcels of land upon which the existing land use is inappropriate, and promote their redevelopment. Staff is requiring the Owner proceed with fagade improvements, new color scheme, and stucco work as proposed in the accompanying final design application by January 1, 2003. Goal 1: Ensure that a high quality visual image of the Town is established through both public and private sector activities. The requirement of a facade on the Wa1Mart building is an appropriate measure to protect the visual quality of the Chapel Square PUD. Town of Avon Community Development (9/U) [4d-403UFax Lot 22, 22A, Tract A, B1, & 32, Block 2, BMBC Subdivision, Chapel Square PUD Amendments August 20, 2002 Planning & Zoning Commission meeting Page 2 of 4 2. Conformity and compliance with the overall design theme of the town, the sub -area design recommendations and design guidelines of the Town. The proposed changes comply with the overall design theme of the Town only if a fagade or other arcade arrangement is constructed as recommended by staff. To remove the requirement of a fagade without requiring the Owner to construct this building in a manner consistent with the remainder of the Chapel Square PUD is not acceptable and conflicts with the design theme of this project. 3. Design compatibility with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and orientation. The proposed PUD amendments should continue to be compatible with the immediate environment and design. The loading dock configuration must be reviewed under separate application for final design modification when engineering drawings are available. 4. Uses, activity, and density provide a compatible, efficient, and workable relationship with surrounding uses and activity. The proposed uses and density continue to provide a compatible, efficient, and workable relationship with the surrounding uses and activities. The deletion of the proposed chapel from the project as a `use by right' is acceptable, since the Town did not require this chapel to be constructed through the original PUD approval. 5. Identification and mitigation or avoidance of natural and/or geologic hazards that affect the property upon which the PUD is proposed. The proposed amendments should not affect any natural or geologic hazards that may exist on the PUD. 6. Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. The proposed revisions to the site plan can be partially supported as a loading dock only, and should produce a more functional access plan for Building C. 7. A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation that is compatible with the Town Transportation Plan. The circulation system as proposed, with several minor modifications, appears compatible with the Town Transportation Plan. Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. Landscaping and open space are not issues of this PUD amendment. 9. Phasing plan or subdivision plan that will maintain a workable, functional, and efficient relationship throughout the development of the PUD. The phasing plan shall clearly demonstrate that each phase can be workable, functional and efficient without relying upon completion of future project phases. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot 22, 22A, Tract A, B1, & B2, Blo.K 2, BMBC Subdivision, Chapel Square PUD r-._ _-ndments August 20, 2002 Planning & Zoning Commission meeting Page 3 of 4 The phasing plan and subdivision plan will remain functional and efficient, and the proposed PUD amendments do not appear to affect these items. 10. Adequacy of public services such as sewer, water, schools, transportation systems, roads, parks, and police and fire protection. Adequate public services are already in place for the entire Chapel Square PUD project. The proposed PUD amendments do not affect public services. 11. That the existing streets and roads are suitable and adequate to carry anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD. The proposed PUD amendments do not appear to affect the existing road network servicing the project. 12. Development Standards The only development standard potentially affected by the proposal is the minimum landscaping area, which will need to be specifically identified when the new loading dock area is submitted as a design (minor modification) and building permit. Additionally, the deletion of the church and subsequent clarification on the "Uses By Right" chart must be recorded on a revised PUD mylar, as will the modification of the current fagade improvement requirement. Staff Comments Staff supports the fagade improvements and the revised condition as recommended herein and in companion with the final design application. The proposed parking and loading dock to Building C will require civil drawings to determine whether or not it is functional; however at this time, we would support the use of this area as a loading dock. We recommend the PUD mylars identify only a loading dock and continue review of this proposal through a formal design review process. Recommended Motion Approve Resolution 02-10, recommending to the Town Council approval of the Chapel Square PUD Amendment, Lots 22, 22A, Tract B-1, and Tract B-2, Block 2, Benchmark at Beaver Creek Subdivision, Town of Avon, Eagle County, Colorado with the following conditions: 1. Fagade improvements to the WalMart Building (Tract B-1) must be completed no later than January 1, 2003, and `Note 16' accordingly revised on the PUD mylars. No extensions will be granted. Fines for non-compliance to the original facade deadline (October 29, 2001) as required in the original PUD approval will be assessed and retroactive to at dagi�te er Town Code Section 17.40.010 (B). 2. The final location, dimension, and details of the proposed loading dock to service Building C will be reviewed and approved through the design review process. This will require hard-line drawings to scale, and a recalculation of the available landscaping area for the entire project. 3. The PUD mylars will be revised to delete the proposed `Chapel' from Lot 22A, as well as revise the `Uses by Right' chart to indicate whether or not `Churches' is a use by right. Town of Avon community Development (970) 748-4030 Fax (970) 949-5749 Lot 22, 22A, Tract A, B 1, & B2, Block 2, BMBC Subdivision, Chapel Square PUD Amendments August 20, 2002 Planning & Zoning Commission meeting Page 4 of 4 4. Except as otherwise modified by this permit approval, all material representations made by the applicant or applicant representative(s) in this application and in public hearing(s) shall be adhered to and considered binding conditions of approval. If you have any questions regarding this project or any planning matter, please call me at 748- 4030, or stop by the Community Development Department. Respectfully submitted, Tambi Katieb, AICP q IX O�lc'� E� VAS pr exisr� eLD NVT' C,KAPE'L LS A LOSS Tb CQtMTnurJ Lr( W LO RS -- L.A'Su. ?C PA►�I�r K biT R iSS�IVT Lrji� W7 S RZ9 S coaso-mlrf("t OP - C'40 LO K rC'4LOK SC"KeMz; FA C -,QED b (?ZS�.nn8%'& OQ^�?U—C61" tMAC.cS Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 G:\Lba\FDP\LBA-FDP-Ol.dwg, 01 (2), 06/15/2002 04:12:51 PM, Jack ----------- -- N N N N N N N N N N N N N N N N N xxxxxxxxxxxxxxxxx mmmmmmmmmmmmmmmmm V 01N A41N+Of0 OC V TNAfOi1N� O NNmmmccc8m-i N accccccc m�xm��5.� m `M! m6666666g�IN82�2m M mzzzzzzz p m 0TTTV*UMT m���r�m zvvavvvv vmvm my G�7I �'mmsaon0 5r5r -0S Z µ{ �` mvmvmmm z 0 ���..���..J{� s �j z z 5 z lid vi DNI-D>D Z N T �] y p g z egg x1 ��++o o O tij n n F--� Oo OO O O o CD z N � r'Dm-imr m3D-Q-iim�77O rm mz�r 2<m 1^^� � mT. oo °cAiT UJ d o0Z-I-1M D 0zjm��r m `�.000ms 0 i2-Qm=z >a -M.0.�D Cw ,� ->ooz<mm C < n O N< O T mzmnmz V mm.c,Q d�Z�zmr O M. 'o C QDm Z m;xmD r 'gowoo mcnD3" p>imD MKOOz mmm0 xz iam 0oam 0 C') M M o 0 D m x y mjMP o z 0 M -OF C O z 0 3 - Q 3 s - 3 3 3 3 = F = D D� _3� mD D � r'Dm-imr m3D-Q-iim�77O rm mz�r 2<m 1^^� � mT. oo °cAiT UJ d o0Z-I-1M D 0zjm��r m `�.000ms 0 i2-Qm=z >a -M.0.�D Cw ,� ->ooz<mm C < n O N< O T mzmnmz V mm.c,Q d�Z�zmr O M. 'o C QDm Z m;xmD r 'gowoo mcnD3" p>imD MKOOz mmm0 xz iam 0oam 0 C') M M o 0 D m x y mjMP o z 0 M -OF C O z G:\Lba\FDP\LBA-FDP-02.dwg, 02 (2), 08/15/2002 01:40:03 PM, Jack ----------------- mC zz C) o r D Ln oz o0 o (n D u m I 5 r O a�0 SEW G) Nkm.omo 3ommmm M D m oO�C)m M oO Z -I mD z�p�r O C)� v D oom> m ;o oKo Zm v�Dp mDOZxm mI �px in CD C o zoo{mo D v T - m zoo--�'n mm a m O Z m 0 �m�x-i o m a°AxmD m>zz �vv m ti y K n A N -1Z D mKr))z°z m m m n. T z�am m m D z Omm0 O {='a1 m m4 v Z G) r C./-) (7� r Vic _ r ^ r tt tTjyoh r o � "op o O nay 9 N Clj bC` ^ 1D ono N °) 0o , t, h O _ z C) J CD 5 r O a�0 SEW G) Nkm.omo 3ommmm M D m oO�C)m M oO Z -I mD z�p�r O C)� v D oom> m ;o oKo Zm v�Dp mDOZxm mI �px in CD C o zoo{mo D v T - m zoo--�'n mm a m O Z m 0 �m�x-i o m a°AxmD m>zz �vv m ti y K n A N -1Z D mKr))z°z m m m n. T z�am m m D z Omm0 O {='a1 m m4 v Z G) C./-) (7� r o � z m m � O m 0 r-1 d z z r 1 Iii FMM� r G:\Lba\FDP\LBA-FDP-03.dwg, 03 (2), 08/15/2002 04:17:53 PM, Jack El i ri / p 1\ �' A O O \\ \\ \ /p % Q l \\\°9 0 �\ �\\ \\ \\ ° . r \\ \\ \\\\ o \ o M \\ » ° \\\\ O Com' o / `� �� v ° o \\\ O O ii i 'Il e �i ^ ip / �O� m;DOmO r -M m,,, C)�_ ♦�J1 �, Boz-mZ D 0()11mo r r 41 \\ \♦♦ p'i+ \ i��i�//�' i'�/ 10m� ou k"=o m tTj CtTl �� ♦ O i i i MK0z `) ll, \L/ moi' ii% m D O Z x V, -uI vm CDC LTJ z T. {m— M Z opo O \��\\ .'�� ��� m m �1 [moi o o _ ~Am x� n 3 i m m� m D i Tm1'nzo i' mk0ny30 AD-IZD m K G) z Z mmm0 zz�am o o o C) m O.Mom f -f D m mo i o z G) G:\Lba\FDP\LBA-FDP-04.dwg, 04_ 08/15/2002 03:09:57 PM, Jack c 0 z t. ;> Io�o t7lm D0zxm noo .P l 1 cp0�'�� ` 1 0 �— b (D mzm'oAz ,no LA O r 0 � mOmOO ° N z< ��7 Zmo O i �>Iu ^ o U1 mmm�zz a�o0.o-0 Z m�'D A�IZD O d n A D D z Oz 7, z ' FT mmmP ':a Om b 00000 O{ = O A 1 ;p D O mz i G:\Lba\FDP\LBA-FDP-05.dwg, 05_ 08/15/2002 03:08:14 PM, Jack 0 M ll� W O10 o O r-+ W nhCD ,noti p0" iv IrD A. b mm 3ommmm ;M. D M O Or� O T %UOCy 0 ;0mZ Zz ��r D Z rOD Z 1-000 m0O 'mO> 0 Z.'CI o�X�C>: moC zD;tm - C: 0 < o mn ;m m�ZmIZ mmA�OO mm ;u ;am �p 0Dm m A - �m D moo rony.n 0 N Z D m ; , Z z mmmC)n Z a m 000nm O { O 0 2X m mo 0 Z G) G:\Lba\FDP\LBA-FDP-06.dwg, 06_ 08/15/2002 03:06:52 PM, Jack on -imr mm��w g,om o mm,m n ;mcg;M' /��rn/-- U! _Ti r -F w�ma O D E., m. � -7� m3OOm-j M C �DAZ�C VJ Z 00 °° r 3z- Go 0n0 m O rnm�-Z OOC'� N O C") 'U Z_ m m chiz a pN Z y Y"t Lj zmr MO %, M- O r+� ON —.a mA�mn m'noo m N D 3 n m D I Z D m➢>ZZ O in mmm.n g z mm >Z .ted 000nm o T O n � m 1 oO z 0 G:\Lba DP\LBA-FDP-07.dwg, 07_ 08/15/2002 03:12:34 PM, Jack 03�o�fns r Cm)m G)�D� m c o m m M m '^' 1 ;00-9AD UJ � C)T Y/ �°m�y D �� r 3 0 z-1 m m>0�z DXM aluX AN c c 0 -mg zD�<m� cop - vNi<� TI 3zmu z V 8-{lzmE; O to � m m A Og R�gOD. Z mOMx3D M m.00 �uci>KC) :O > i D m 3 GD)ZZ mmm. 0 xz�am ;UOmm 000nm 003 -n 0; o j = ; D m mom 0 Z G) r 0 M t a o n CNj onornou, p O O NCD > O 91 P- b c� 03�o�fns r Cm)m G)�D� m c o m m M m '^' 1 ;00-9AD UJ � C)T Y/ �°m�y D �� r 3 0 z-1 m m>0�z DXM aluX AN c c 0 -mg zD�<m� cop - vNi<� TI 3zmu z V 8-{lzmE; O to � m m A Og R�gOD. Z mOMx3D M m.00 �uci>KC) :O > i D m 3 GD)ZZ mmm. 0 xz�am ;UOmm 000nm 003 -n 0; o j = ; D m mom 0 Z G) G:\Lba\FDP\LBA-FDP-08.dwg, 08_ 08/15/2002 03:14:57 PM, Jack 6._o. W-10' I F-D ri m vO mvzm m r mmO DT ^JO� vv°rn ;mu c�w - C ipCM.,0 r-zm �ms 30pZs =s10zoz cn r� m m>vZ;C/3 iM c c Zy�<m� TT 0c 00 t-+ l 1 � z '0< Wiz, mp T c1�x �' o o b ti (D mnmmmz ;u o V _I g o ~ O z ;u O o CP�mmmm00 'yn0>m ��o�Dm Z mm r,mD mmoov n Uy -i ZD m 3 > z z EI mrnmoc� �o�'m R mm�D.zi 0vovm ommom m{�D v i v z I G:\Lba\FDP\LBA-FDP-09.dwg, 09_ 08/15/2002 03:16:15 PM, lack .1 a OD m3mm 01 m r DO Om< 3pmmmm �7 D omo�c�; cosmn Zo� p � r moo- m• v `fS � O O m S 1 ;6 CO Z 'mD0Z Xm 0 o°�;mo Z <mc 3zm p8mZ0 mm;u 00 p -z+M -n ,' M� m m � oco, m 0 T M D m '- o o ON xD�ZD m M K G) Z z f°mm. xz�am 0000M O.Mr)x <=;D m mom o z 0 O r r cn Vs �o 00 �o C ao�0 r�O MN J F�'t �1 .1 a OD m3mm 01 m r DO Om< 3pmmmm �7 D omo�c�; cosmn Zo� p � r moo- m• v `fS � O O m S 1 ;6 CO Z 'mD0Z Xm 0 o°�;mo Z <mc 3zm p8mZ0 mm;u 00 p -z+M -n ,' M� m m � oco, m 0 T M D m '- o o ON xD�ZD m M K G) Z z f°mm. xz�am 0000M O.Mr)x <=;D m mom o z 0 O r G:\Lba\FDP\LBA-FDP-10 THRU 12.dwg, 10_ 08/15/2002 03:23:50 PM, Jack b ff 19 y O � O �H x �d >� H tt p �+ ao o Q 00 Oo< O P2 O 2i O O CD N �1 I b ff 19 (7� r Oy td c� m C m � D r r n R" -8 -mo- O � m m A n 0 jmMZmo O F D n m D O u 1 O O m �rm�yrII :07CmD m0 -.-1 ZO m mD30 �D-imy in -Z,0 O d M --d m>>z0 mmm00 0 0 0 A m � v cmio�m m < 4 �-i 0 2: m m 0 Z ✓�yl 0 m (7� r Oy td c� m C m � D r r n R" -8 -mo- O � m m A n 0 jmMZmo O F D n m D O u 1 O O m �rm�yrII :07CmD m0 -.-1 ZO m mD30 �D-imy in -Z,0 O d M --d m>>z0 mmm00 0 0 0 A m � v cmio�m m < 4 �-i 0 2: m m 0 Z ✓�yl 0 G:\Lba\FDP\LBA-FDP-10 THRU 12.dwg, ll_ G8/15/2002 04:21:09 PM,]adc `0 DD In D 0C> N pN 41E3 G3 9 52z Ira L ea, L g+• L 94, L W4' L s-' L g-' L Fa' 4 >� r� y tTl � �+ >~ O F n ~ C O0 IJ o z C)Iii 0 10+0 lall Ira L ea, L g+• L 94, L W4' L s-' L g-' L Fa' oD -4mr- nmc�0�° �Mmm-D m p pr- n n An Z: mu w�-i o Z Z o- m- � �3oom� nD Z A,�oo m>-z�N zDv<m< z<ANDt_n 3Z'-, f<IIO wnm�pZ MA�o -Z .+ A -M, s0 D-omW x� ��nD m A T D fn m Z p C 0-0 w0 mAaD,Di 3 Dc ZM.mZz mm0mA Z J A A 00 Onm ;a-< m m 0 0 z i i i i i lall r oD -4mr- nmc�0�° �Mmm-D m p pr- n n An Z: mu w�-i o Z Z o- m- � �3oom� nD Z A,�oo m>-z�N zDv<m< z<ANDt_n 3Z'-, f<IIO wnm�pZ MA�o -Z .+ A -M, s0 D-omW x� ��nD m A T D fn m Z p C 0-0 w0 mAaD,Di 3 Dc ZM.mZz mm0mA Z J A A 00 Onm ;a-< m m 0 0 z G:\Lba\FDP\LBA-FDP-10 THRU 12.dwg, 12_ 08/15/2002 03:20:05 PM, lack D G) G) m r m m r- D m m m r &T w ir 00 m_ a m pm �� 3 2z mm �()O �mwZ" MM AmS �m-T-M 82 g�2 S�2 g�2 2 �2 m2 �oWoo y O � m m y 3 P> O m , c, mmm0acM �z.im MOR- z cm7oOn m x Om m jMODl oz G) H tTj p n° o 00N > F �yyCD Ono O > O o t"r O oN J 7 CD" &T w ir 00 m_ a m pm �� 3 2z mm �()O �mwZ" MM AmS �m-T-M 82 g�2 S�2 g�2 2 �2 m2 �oWoo m m y 3 P> m , c, mmm0acM �z.im MOR- z cm7oOn m x Om m jMODl oz G) G:\Lba\FDP\LBA-FDP-13.dwg, 13- 08/15/2002 03:28:43 PM, lack b rf r CD C mD .. 5 ( =j Z c ooF�-ao zD�<�� COO- N K Zmfn ,Zmjz mm�moo �z`zmr omm A m �c >o0>n momma m�zz 0 00 MEn K0 xly �ZD pDDZO m i G) Z mmm� wok?m z 00 0m 003 m O A 0{�O m Di m mo 0 Gzi N O z G:\Lba\FDP\LBA-FDP-14.dwg, 14_ 08/15/2002 03:27:23 PM, Jack m3�"o°m°o I— C1mG),n� 3 m o m m m m " 1 mmO > moo °0T M, o�r �30oms ->1Z r0 p0 n> Z m���>;u C/)^ vv�Z�O IJ s - Z< T N 3z'0-mz ,mmmcAio Z �I zm O �Ammx� P.->io°>m Z m X x � > m� 0 Zo m 0> - w> -i Z> mMC)0z m m m O O 7cz�Am Z 0 0 0 n m TO O> ao � mjmo� o z G> b5d t� d G� r� °o r O LhO HCD ono O 0- jv � OyCD e"t O m3�"o°m°o I— C1mG),n� 3 m o m m m m " 1 mmO > moo °0T M, o�r �30oms ->1Z r0 p0 n> Z m���>;u C/)^ vv�Z�O IJ s - Z< T N 3z'0-mz ,mmmcAio Z �I zm O �Ammx� P.->io°>m Z m X x � > m� 0 Zo m 0> - w> -i Z> mMC)0z m m m O O 7cz�Am Z 0 0 0 n m TO O> ao � mjmo� o z G> G:\Lba\FDP\LSA-FDP-15.dwg, 15_ 08/15/2002 03:25:33 PM, Jack r� H 90 ,no 0, 0 0 ci d r 0 b0 0 O 171b r i G oil lei `;_ 2, 0>S' -i �r1to O m 0 D 1 mzmmmm �D moo°cpm Ac ,S;a oz - w0z-iAm �z� �30o- m- v m 0O n� 1 ZO OD X K 0m� o°���o ZGo^ D(n 6z z mmT 0 -4 --j 8Mmmx �o0s mATmoo D m�mK0D O N I Z D X K I mmmC)co A0m Z C 7000m ;u -4 0 D m mom 0 Z ci G:\Lba\FDP\LBA-FDP-16.dwg, 16_ 08/15/2002 03:35:32 PM, Jack d td M H t=i r r� C H O z E =ice 1m 0 z gg Io H M r M a H O z M r C 1-1mm r O0 D ... ommmw m,,n D mo oO I- o ZTZ �-D 0 Z�.1 mD �r o- m- `> 3 0 0 m mac° MM 0 3Z m D O Z M, o��5mo C. zD�<�� 1 . 0, m 0 m mT. MO zzo Tz- ;1 T m�SCC Z m r mm ;ml 01 ooDI mmzxma mmoo Ny 3(0 ;uD�Za N , ;,>>O m3oz m m m . 0 XZmo A m 00z00M 0 , T 0p m < A D m M!2 0 z D ci d O V1 MIJ u tz tTj or -I 0 00 0 CD C) 1n e-+ O o C) �-1 CCD E =ice 1m 0 z gg Io H M r M a H O z M r C 1-1mm r O0 D ... ommmw m,,n D mo oO I- o ZTZ �-D 0 Z�.1 mD �r o- m- `> 3 0 0 m mac° MM 0 3Z m D O Z M, o��5mo C. zD�<�� 1 . 0, m 0 m mT. MO zzo Tz- ;1 T m�SCC Z m r mm ;ml 01 ooDI mmzxma mmoo Ny 3(0 ;uD�Za N , ;,>>O m3oz m m m . 0 XZmo A m 00z00M 0 , T 0p m < A D m M!2 0 z D G:\Lba\FDP\LBA-FDP-17.dwg, 17 (2), 08/15/2002 03:55:04 PM, Jack FA lmm '0 `I q BEAVER CREEK BLVD. r SIDEWALK ❑s[� 9P-3' td 1� F==r=f cn — cn�D II °I Q pOp 1 nr� oto Lh O O � u z J V] CD i `I q BEAVER CREEK BLVD. r SIDEWALK ❑s[� 9P-3' PROPERTY LINE `I q 9P-3' F==r=f — II °I Q j II jj I U I � I Ij ii j I II II I � I II a III P z � 0 II � Po III 1 II II 9 � I II I 1 II I I II I 1 II I I II I I II I I II I I I) I I I) I N h I II I I II I IF,N 1 nAo I � w rrul - -------- 1 o� I gP ~ I 1 I —� ------ Z I I 8 8 8 8 o 0 0 o a o I 1 I P� 1 U I F �I im I 20 I I I �I 1 I I I I $ I � I 1 1 I - 1 p0 cA ZiZ N r 0 z a p PROPERTY LINE_ 9 m��-01 m n< 0ommmm mmcT �a "nc�m� ozl�M'm 0 o- M. -o p o O m �mm" 1 �?00':z m� os§,- m > 0 Z> x M, z> -;Dm Z G N D N C O OD N m O 2 m m z �m.mnm m { Z m' u m m x N 101 00 DO ;00 Om 0 A c. 0 :DD IZy m MG10z mmm�c� X m ;u 0Z 00 0 In, m .'f0 , 00 y m m o 0 Z 0