Loading...
PZC Packet 110700Town of Avon Planning & Zoning Commission Site Tour November 7, 2000 12:00 PM Council Chambers Town of Avon Municipal Building 400 Benchmark Road I. Site Tour Lot C, Sheraton Mountain Vista Mock -up of color and materials Meet in front of the Municipal Building. Lunch is available to Commissioners who RSVP by 10:30 a.m. Posted on November 3, 2000 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Avon / Beaver Creek Transportation Center • City Market, main lobby Town of Avon Planning & Zoning Commission Work Session November 7, 2000 5:30 PM Council Chambers Town of Avon Municipal Building 400 Benchmark Road I. Agenda A. Discussion of regular meeting agenda items. Dinner will be served. B. Site Visit Lot C, Avon at Beaver Creek Subdivision Sheraton's Mountain Vista Condition: Mock -up of Colors and Materials Posted on November 3, 2000 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Avon / Beaver Creek Transportation Center • City Market, main lobby m Town of Avon Planning & Zoning Commission Regular Meeting November 7, 2000 [1-y Council Chambers Town of Avon Municipal Building 400 Benchmark Road Agenda I. Call to Order II. Roll Call III. Additions and Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda A. Approval of the October 17, 2000 Planning & Zoning Commission Meeting Minutes [Tab 1 ] VI. Concept Review A. Lot 2, Block 4, Wildridge [Tab 2] Project Type: Duplex - Separate Driveways Applicant: Tab Associates Address: 5792 Wildridge Road East Posted on November 3, 2000 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Avon / Beaver Creek Transportation Center • City Market, main lobby VII. Condition of Final Design Approval A. Lot C, Avon at Beaver Creek Subdivision Sheraton's Mountain Vista Condition: Mock -up of Colors and Materials VIII. Other Business A. Staff Approvals: 1. Lot 87, Block 1, Wildridge Subdivision 2431 Old Trail Road Site Modification - Additional Driveway 2. Lot 47, Block 1, 410 Benchmark at Beaver Creek 410 Nottingham Road Landscape Revision - NightStar Project 3. Lot 8, Block 1, Benchmark at Beaver Creek 331 Nottingham Road Additional Parking 4. Lot 54, Block 3, Wildridge Subdivision 4420 West Wildridge Road Reroof with Asphalt Shingles 5. Tract N, Block 3, Benchmark at Beaver Creek 950 Beaver Creek Blvd. Landscape Revisions — ERWSD Wastewater Treatment Plant B. Sign Permits: 1. Lot 2, Benchmark at Beaver Creek 90 Benchmark Road, Avon Town Square "Wells Fargo" IX. Adjourn Posted on November 3, 2000 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Avon / Beaver Creek Transportation Center • City Market, main lobby Town of Avon Concept Review Report date Project type Legal description Current Zoning Address Introduction November 7, 2000 Planning & Zoning Commission meeting November 7, 2000 Concept Review of Driveway Scheme Lot 2, Block 4, Wildridge Duplex (PUD) 5792 Wildridge Road East This Concept Review Work Session is designed to provide preliminary review of the driveway scheme for Lot 2, Block 4, Wildridge Subdivision. The applicant has requested input from Community Development, the Engineering Department, and the Planning and Zoning Commissioners on the proposed access scheme to this lot prior to submitting an application for final design approval. The following is a summary of Staff concerns with this project: 1. There does not appear to be adequate evidence that the owner has difficulty with using one access point for both sides of the duplex residence. 2. Section 4.22 (A) of the Design Standards states that "Residential projects with 6 or fewer units shall be restricted to a single point of vehicle access from the public right -of -way. Additional points of access must be approved specifically by the Planning & Zoning Commission with the finding that additional access points are required for the project to otherwise conform to these Design Standards and other applicable Town regulations." 3. The dual driveway causes an increase in site disturbance. This is of particular concern since this lot is situated on a relatively large drainage basin. By constructing the proposed two driveways, there would be an increase in fill material in the drainage areas. 4. There are many other designs for the site that would allow for better access and less visual impact on the site. The single access proposal that was submitted does not fit the single access criteria of not exceeding 24 feet in width. Also, the access separation and hammerhead should be pulled back out of the 10 -foot snow storage and drainage easement. 5. Staff does not find that an additional access point would be required for the project to conform to the Design Standards. By the applicant's own admission, a single access point would serve this project without any undue hardship as a result of the Design Standard requirements. Summary: Staff recommends that the applicant submit a final design for this project that uses only a single access point for both sides of the duplex. We cannot find any compelling rationale for two access points to this lot. The applicant is not restricted in any way by topography or safety constraints to such a degree as to warrant another access point to this project. Town of Avon Community Development \ \finance \cd - public \p &z \staff reports\ 2000\ 110700\ newbonidyritoduplexlot2bl4wr _.doc (970) 748 -4030 Fax (970) 949 -5749 �... _�: s ,:: j :t �... _�: s �.> ..�� . •t�44 ;�� ���. F ':1 r - +.r * � � .yNF. «�E t y�'._.E 1. i '., €:r � t t4 caq�. .� ` ._ ss .. �"' z ' .. � . , ' ,. C?. .i�w �. l t ,,, •. _r r ,�. � � � ::�: . ...;a ".ter. ,.�.4 � � r � .. . '�' �"'-t.�± ,. ., ,_, ,.. _ lw 0 � ƒ \ §� ƒ� ®� «» ^ \ < \ \ \ \ TAB Associates, Inc. The Architectural Balance P.O. Box 7431 Avon, CO 81620 -7431 (970) 748 -1470 (970) 748 -1471 fax www.tabassociates.com tab @vail.net Memo Project: Bonidy /Rito Duplex, Lot 2, Blk. 4, Wildridge Date: September 26, 2000 RE: Separate Driveways FROM: TO: Tab Bonidy, NCARB Ruth Borne, TOA PD Remarks: VIA: 949 -5749 K in Project No: 2017 I have attached 2 driveway schemes. Scheme A, with separate driveways, is preferred by both couples. Although the Town has a general rule disallowing separate driveways, we believe it is the best solution for the Town for the following reasons: Scheme A has one garage facing the street and one turned; thereby reducing Garage door impact on the neighborhood. 2. Due to the steep site, the east half Garage elevation is 8580' requiring 4 feet of elevation change. The west half Garage elevation is 8576' requiring between 1 and 3 feet of elevation change depending where the driveway entry is located. Because the driveways require different slopes, they must have separate drive start slopes; thereby requiring a 24' wide entrance in Scheme B. This equals the same amount of driveway frontage; therefore, Scheme A has less overall asphalt impact at the street in one location. 3. Scheme A presents more opportunity to landscape and hide driveway impact on the street. 4. Due to the site location at the very top of the hill, very few cars pass the lot; therefore the driveway entrances have very little "traffic" implications. 5. The driveways are located on the inside corner so there is no visibility problem. 6. When cars are parked in front of the garages, Scheme A will not appear like the parking lot which Scheme B will appear to be. Scheme A's cars will be easier to screen with landscaping than Scheme B. 7. The steep cross slope between the driveways in Scheme B will probably require some boulder walls making it appear more "forced ". 8. The two couples prefer separate driveways; thereby reducing potential confusion and conflict. 9. Although the building is in the same location in both schemes, the building in Scheme B appears closer to the road. 10. Scheme B looks like a duplex, where Scheme A does not. Attachments: Scheme A— Partial Site Plan, Scheme B —Partial Site Plan S: \Bonidy- Rito\Memo\Me mo0926. doc Y A4 ID I ^oi 9 1 1 1 Lo 1 I 4f F / / / I � � II II I \ / SO 77J w F", =u TTi / � o , I � I 1p NJ / I I I ( I o I I g � � �b