Loading...
PZC Packet 051507Town of Avon Planning &Zoning Commission Meeting Agenda for May 15, 2067 avo N Avon Town Council Chambers Meetings are open to the public C ° ` ° R A ° ° Avon Municipal Building / 400 Benchmark Road I. Call to Order (6:00pm) II. Roll Call III. Additions and Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda • Approval of the May 1, 2007 Meeting Minutes. VI. Minor Project - Reroof Property Location: Lot 1, Filing 4, Eaglebend Subdivision / 2000 Hurd Lane Applicant: Luis Landeros / Owner. Frank Doll Description: A Minor Project application to replace tar and gravel roof with a standing seam metal roof in the Eaglebend Subdivision. VII. East Avon Draft Plan - PUBLIC HEARING Description: Review of draft Town Center East District Plan. All stakeholders are invited to comment, and the next steps will be discussed. VIII. VAG, Inc. / Orion East Avon Concept Review -WORK SESSION Description: Preliminary review of a redevelopment concept that encompasses four properties in the East Town Center District: Christy Sports (Lot 21), Avon Annex (Lot 65-B), Town of Avon parcel (Lot 65-A), and the Benchmark Shopping Center (Tract Q). The Town Council has been invited to this Work Session. IX. Other Business X. Adjourn Posted on May 11, 2007 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main entrance bulletin board • On the Internet at httD://www.avon.ora / Please call (970) 748.4030 for directions r 0 Town of Avon Planning & Zoning Commission Meeting Minutes for May 1, 2007 AVONAvon Town Council Chambers CoL0 Meetings are open to the public Avon Municipal Building / 400 Benchmark Road - WORK SESSION - (5:00pm - 5:30pm) Discussion of regular meeting agenda items. - REGULAR MEETING - Call to Order The meeting was called to order at 5:30 pm. If. Roll Call All Commissioners were present. III. Additions and Amendments to the Agenda Item X, Sketch Design Review — Residential, A. Beowulf Single -Family, Property Location: Lot 6, Western Sage PUD / 5775 Wildridge Road East, be moved to the last item on the Agenda. IV. Conflicts of Interest There were no conflicts of interest to disclose. V. Consent Agenda Approval of the April 3, 2007 Meeting Minutes. Approval of the Amendment to the Agenda. Commissioner Green motioned to approve the Consent Agenda. The motion was seconded by Commissioner Lane. All Commissioners were in favor and motion passed unanimously with a 6-0 vote. Commissioner Foster abstained due to her absence at the meeting. VII. Transit Center Snowmelt — CONTINUED Property Location: Benchmark Court, Avon Transit Center Applicant: Design Workshop /Owner: Town of Avon Description: Follow up to condition of approval by Planning and Zoning Commission to provide snowmelt at the new Avon Transit Center location. Last review took place at the January 16, 2007 meeting. Jeff Schneider, Town of Avon Engineer, presented the proposed changes to the Transit Center to the Commission. Proposed changes/modifications were to tube only in pedestrian areas and approved by Town Council at their April 24, 2007, meeting. This area included bus turning areas to alleviate any safety concerns. The bid price per the approval was $3,500,000 and $2,500,000 was on the working budget with the contract. A $2.1 million dollar grant was given by CDOT that mandated the Transit Center can not change its appearance and the money must be spent this year. Mr. Schneider did mention schedule concerns. 11 Snowmelt is necessary and offers a high level of service. Construction costs prevent the boiler installation at this time. A centralized system would be addressed in the near future, one to two years maximum. Norm Wood, Town of Avon Engineer, mentioned three options: 1. Temporary boiler above ground; 2. Lot 61 tie into their parking structure; and 3. Tie into a central parking system. Justification for these options were that everything was open and easier to maintain, and a good proposal for the time being. Commissioner concerns included turning radius for the bus safety, definition of 'future', budget issues, plowing of areas with pavers installed, discussion of solar exposure in the vicinity, current winter driving in area was dangerous, concerns with long term safety and consistency with Planning and Zoning Commission conditions. Mr. Wood mentioned that the design of Main Street required snowmelt. Commissioner Green commented on paving with asphalt with tubing installed and do pavers at a later date, asphalt was a better solar melter and reduced the carbon imprint; or install tubing and await boiler installation in the future. Commissioner Lane mentioned that there are pavers everywhere currently. Commissioner Struve noted that pavers denoted pedestrian walkways and. asphalt was for vehicular areas. Commissioner Evans remarked that if this set the tone for the Mall project, would rather see a temporary boiler installed this summer. Commissioner Green voiced that it would eliminate where the plowed snow goes to. Mr. Wood expressed that alternatives would be examined and would prefer to come back to the Commission but needed approval to put out to bid and get contract that would be subject to temporary boiler and paver replacement. Commissioner Goulding commented that he was leery of future promises and preferred a temporary boiler and continued with issues of tubing not in use, not designed for it; supports operational snowmelt with a temporary boiler and the area to tube. Commissioner Evans mentioned the heated to unheated junctures are critical and sees no issue with the installation of the tubing. Commissioner Struve stated that the gondola will run in December and people will get to it one way or another thus commenting the need to snowmelt in critical areas. Commissioner Smith voiced that the pedestrian area needed to be snowmelt since people would be at risk otherwise. Commissioner Green motioned for conditional acceptance of Item VII, Transit Center Snowmelt, Property Location: Benchmark Court, Avon Transit Center, with the conditions that temporary snowmelt put in place for the 2007-2008 winter season to the greatest degree possible but the minimum includes the north south connector through bus pedestrian way and the pedestrian walkway to the bus shelter and that the Town come back to the Commission to describe their findings regarding temporary snowmelt and boiler and the final configurations based on their cost engineering that is going to be done. Snowmelt findings have to be: 1. public safety, pedestrian safety as a paramount issue; 2. establishing the precedent for the way the Commission wants the development to be viewed and the flavor, character and quality was very critical and that should be addressed from the outset as a very important part of this and that the differentiation of the pedestrian and vehicle way is of primary importance here. Commissioner Struve seconded the motion and the motion passed with all Commissioners in favor with a 7 — 0 vote. Vlll. Final Design - Commercial Timeshare - CONTINUED Property Location: Lot 3, Riverfront Subdivision / 218 Riverfront Lane Applicant: Aleksandr Sheykhet / Owner: East West Resort Development XIV LOP LLP Description: The applicant is proposing a Final Design application for the "Timeshare West" building in the Riverfront Subdivision. The building would contain 34 timeshare units (39 at buildout), which are two bedroom units each with the ability to have lock -off units. At the ground level there is approximately 6,000 square feet of shell space to be commercial/retail and timeshare sales. This application has been tabled several times. Matt Pielsticker presented the Staff Report. Commissioner Struve questioned the staff's recommendation #4, building encroachment, thought it was addressed and Mr. Pielsticker requested it to be revisited in the motion. Aleksandr Sheykhet, Obermeier Sheykhet Architecture on behalf of Starwood Vacation Ownership, began by presenting changes to the project. Commissioner Struve questioned if the presentation was accurate of the final design and was answered affirmatively by both Mr. Sheykhet, and Mr. Pielsticker confirmed. Commissioner review consisted of detail questions on the reveal, transitioning issues, materials, design variations between east and west elevations, and consistency of the 4 building elevations. Commissioner Struve preferred the hardy board to the white panels. Commissioner Foster questioned the lack of siding on the west elevation. Mike Williams, Starwood, commented that if materials need to maintain hardy plank all around, it will be visited. Commissioner Lane commented that the building should be designed from the inside and reflects the outside; Commissioner Struve did not prefer the lack of consistency but did respect the opinion of the architect; wanted a two story mock up; entry towers get lost in the rock, rock should be lighter and could not find detail on metal lights. Commissioner Goulding voiced concern with the elevations and their horizontal and vertical lines, base of columns called with colored gravel and didn't read strong structural connection, chimney caps did not reflect ventilation, and north entry lights needed consistency. Mr. Pielsticker mentioned that the applicant would be coming back with lighting details. Commissioner Green motioned for conditional approval of Item VIII, Final Design - Commercial Timeshare, Property Location: Lot 3, Riverfront Subdivision / 218 Riverfront Lane, dated 4/20/2007,to include staff findings, to included staff conditions and to add one condition that Planning and Zoning Commission strongly encourages the applicant to study the east elevation of this building and, at such time as the mock up is reviewed by this Commission, that the Applicant reveal their studies and if there are changes that they are proposing specifically to the east elevation, to tie this in, that those presentations and those drawings be delivered prior to the mock up for study by the Planning Commission in order for them to be reviewed as part of the mock up review. Mock up is to be two story. Commissioner Foster seconded the motion. All Commissioners were in favor and the motion passed 7 to 0. IX. Final Design - Single -Family Residential Property Location: Lot 2, Western Sage PUD / 5203 Longsun Lane Applicant: John G. Martin / Owner: Ted Leach, Western Sage Partners, LLC Description: Final Design for a Single -Family residence in the Western Sage PUD. Lot is accessed from private drive off cul-de-sac on Longsun Lane. The Design features a 2 - car garage, European style design with wood siding, stucco/stone siding, and large simple roof form. Jared Barnes presented the staff report. Jeff Manley, Architect, approached the podium to discuss this Final Design. Commissioner review questioned the mesh covering on the chimney, snow storage area, lower level walk out light, inconsistent window added flavor as a cottage look, gutters were suggested in the Western Sage PUD, and lose some sod, too much lawn. Commissioner Foster moved to approve Item IX, Final Design - Single -Family Residential, Property Location: Lot 2, Western Sage PUD / 5203 Longsun Lane, with the conditions set forth by Staff with the exception of condition #3. All Commissioners were in favor and the motion passed 7 to 0. X. Sketch Design Review - Residential A. Beowulf Single -Family Property Location: Lot 6, Western Sage PUD / 5775 Wildridge Road East Applicant: Bobby Ladd & Buz Reynolds /Owner: Beowulf Lot 6 LLC Description: Sketch Design review for a single-family residence on a Western Sage PUD property, accessed off Wildridge Road East at the top of Wildridge. Matt Pielsticker presented the Staff Report. Buz Reynolds, Owner, approached the podium and introduced Allison Vassar. Mr. Reynolds continued with the history and site issues of this lot. Commissioner review began with Commissioner Green's question of the square footage with the response that the home was to be 5300 square feet without the garage. Commissioner Evans requested more details on the retaining wall heights and was anxious to see a color palate and stucco texture for the project. Commissioner Goulding expressed that the stone needed to come down to grade and that the landscaping needed good sized materials. Commissioner Struve commented that the house takes advantage of the lot and the stonework was complimentary. Commissioner Foster remarked the need for 3- dimensional model; roofline looked odd; south elevation looked massive and that the home could use simpler lines. Commissioner Green voiced more detail was needed on the retaining wall; substantial landscaping and root balls could pose a problem; concern with the tie in to the home next door as connection was important and a 3-dimensional model would be beneficial. B. Lot 1 Single -Family Property Location: Lot 1, Western Sage PUD / 5201 Longsun Lane Applicant: John G. Martin /Owner: Ted Leach, Western Sage Partners, LLC Description: Sketch Design for a Single -Family residence of approximately 4,700 square feet in the Western Sage PUD. Lot is accessed from private drive off cul-de-sac on Longsun Lane. The Design features a 2 -car garage, European style design with wood siding, stucco/stone siding, and large simple roof form. Jared Barnes presented the Staff Report to the Commission. Jay Peterson, developer of Western Sage, approached the podium to give his version of the history of the parcel and his desire to create an enclave look with marked similarities in each of the 5 homes. Jeff Manley remarked that view lines were created by push backs of each home in its site. Commissioner Smith remarked concern that the homes were too similar. Commissioner Foster voiced that the homes are the same form with shed to gable and that the basic r y style could be maintained with slight changes. Mr. Peterson commented that topography was the same on each lot. Commissioner Evans commented that the homes could be more similar than less similar; orientation was key, and 4 or 5 well designed and well detailed homes that don't detract from one another was preferred. Commissioner Goulding expressed that complimentary and not cookie cutter was encouraged, they should be well choreographed and detailed, suggested changes to roof form and driveway design to create some change, and that massing could create a changed look. Commissioner Green stated that the homes were all the same footprint and it didn't work for him, it did not allow for embellishments, and would prefer harmonious differences and suggested massaging the massing. IX. Other Business • Walkin the Dog: pursuing contacting property owner to advise of scars to the land and staff will report to the Commission on the outcome. Nothing has been done to the site since it was Red Tagged. • Vista Restaurant has moved out and there was a pre -application meeting to add stories to the building. X. Adjourn Commissioner Foster motioned to adjourn. All Commissioners were in favor. The meeting was adjourned at approximately 9:40 pm. Respectfully submitted, Ruth Weiss Recording Secretary APPROVED: Chris Evans Chairman Phil Struve Secretary ,4, Town of Avon TV Design Modifications N C O L O R A D O Residential Staff Report May 15, 2007 Planning & Zoning Commission meeting Report date May 10, 2007 Project type Roof Material Change - Minor Project Legal description Lot 1, Filing 4, Eaglebend Subdivision Zoning PUD — 1 Dwelling Unit Address 2000 Hurd Lane Introduction Luis Landeros, representing the owner of the property, is proposing a roof material change to the existing building. The property is a part of the Eaglebend Subdivision that was originally platted in 1987 and includes a mix of residential uses. The applicant has presented a sample of the roof material and color for review. The material is a standing seam metal roof. Design Approval Criteria According to Section 7 from the Residential. Commercial, and Industrial Design Guidelines, the Commission shall review all design plans utilizing specific Design Standards, and by using the following general criteria: 1. The conformance with setbacks, massing, access, land use and other provisions of the Town of Avon Zoning Code. This criteria is not applicable to the design review. 2. The general conformance with Goals and Policies of the Town of Avon Comprehensive Plan, and any sub -area plan which pertains. The property is located in District 27: Nottingham Station/Eaglebend District, and is labeled as a Low Priority District. The subject proposal does.not have any implications on the Comprehensive Plan. 3. Whether adequate development rights exist for the proposed improvements. There are no planned improvements that impact the development rights. 4. The Design plan is in general conformance with Sub -Sections A through D of the Residential. Commercial, and Industrial Design Guidelines. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 W A. Site Development: There are no planned changes to the site plan with this application. B. Building Design: The guidelines require that: All roofs, except the flat portion thereof, shall have a rise of not less than 4 -inches in 12 -inches of distance. Primary roofs shall have a 4:12 minimum, and a 12:12 maximum. The existing roof of the residence has a 2:12 pitch, which is below the minimum requirements of the Design Guidelines. The guidelines also state the following: Rooting material should be durable, weather resistant and suitable for environmental conditions encountered in this area. Colors should be natural or earth tones. Large expanses of bright, reflective material will not be acceptable, however, metal such as copper, cor-ten may be acceptable. The roofing material proposed does not appear to meet the requirements in the Design Guidelines since the metal proposed is neither copper nor cor-ten. The color proposed in the sample material should reduce the reflective characteristics of the proposed type of metal and are of a earthy hue. C. Landscaping: There is no landscaping being proposed with this application. D. Miscellaneous Items: There is nothing proposed that would be affected by these guidelines. 5. The compatibility of proposed improvements with site topography, to minimize site disturbance, orient with slope, step building with slope, and minimize benching or other significant alteration of existing topography. There is no site grading required. 6. The appearance of proposed improvements as viewed from adjacent and neighboring properties and public ways, with respect to architectural style, massing, height, orientation to street, quality of materials, and colors. Since the metal roofing material is appropriately painted, the appearance should be fine from the neighboring properties and public ways. 7. The objective that no improvement be so similar or dissimilar to others in the vicinity that monetary or aesthetic values will be impaired. No monetary values should be impaired or otherwise lowered with the planned improvements. 8. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. Town of Avon Community Development (970) 7484030 Fax (970) 949-5749 ro This project is in general conformance with the adopted Goals, Policies, and Programs for the Town. Recommendation Staff is recommending denial of the roofing material change on Lot 1, Filing 4, Eaglebend Subdivision, pursuant to the criteria listed in the previous section of this report. Recommended Motion "I move to deny the roofing material change on Lot 1, Filing 4, Eaglebend Subdivision, subject to the Design Approval Criteria. If you have any questions regarding this project or any planning matter, please call me at 748.4023 or stop by the Community Development Department. Respectfully submitted, Jare Barnes Planner I Attachments: A. Vicinity Map Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Design workshop, Inc. Memorandum Landscape Architecture Land Planning To: Avon Planning and Zoning Commission Urban Design Strategic Services Via: Eric Heidemann From: Rebecca Leonard Date: May 10, 2007 Project Name: Avon East Town Center Project #: 3928 Subject: Public Hearing We are pleased to present a draft of the East Town Center District Plan for your review. Since our last meeting, Design Workshop has taken the feedback on the preferred alternative from the February meeting, developed the Draft East Town Center District Plan, and reviewed several drafts with Town staff. The feedback from the Planning and Zoning Commission at the February meeting was to move forward with the alternative presented, build flexibility into the plan to accommodate obstacles to the implementation of road realignments, and to put together a sketch up model that includes the West Town Center plan, East Town Center plan, and the Riverfront Village. The staff has had several opportunities to review the document and provide feedback. All input has been considered in the draft of the District Plan. At the first public hearing on the plan, Design Workshop will be represented by Rebecca Leonard and Anna Gagne. We will provide a short presentation on the contents of the plan, facilitate a discussion with the Planning and Zoning Commission and interested public, and lay out a course of next steps. We look forward to helping you create the best possible plan for the East Town Center District! Agenda: I. Introduction and Review of District Plan II. Facilitated Discussion of District Plan III. Next Steps DESIGNWORKSHOP Asheville • Aspen • Denver • Park City • Phoenix • Santa Fe • Tahoe • Sao Paulo 120 East Main Street, Aspen, Colorado 81611 • (tell 970-925-8354 • (fax) 970-920-1387 www.designworkshop.com C Documents and Settmgsknptelsticker\Local Scttmgffemporary Internet Files\01,K58\070515 - PZCmemo.doc vnn District Plan Avon East Town Center Draft May 10, 2007 I DESIGW O �RKSHOP I L A v�`n District Plan Avon East Town Center Draft May 10, 2007 Town Council Ron Wolfe, Mayor Brian Sipes, Mayor Pro Tem Richard Carroll, Council Dave Dantas, Councilor Kristi Ferraro, Councilor Amy Phillips, Councilor Tamra Nottingham Underwood, Councilor Planning and Zoning Commision Chris Evans, Chairman Terry Smith, Vice Chairman Phil Struve, Secretary Christopher Green, Commissioner Julia Foster, Commissioner W. Todd Goulding, Commissioner Andrew Lane, Commissioner Community Development Department 970-748-4030 Town of Avon PO Box 975 Avon, CO, 81620 Chapter l: Introduction .................. I District Plan Intent Relationship to Town Wide Plans ........................ 2 District Description ......................_........... ...................3 History............................................................................ 4 District Opportunities and Contraints.................. 5 Plan Development......._............................................... 6 Charrette.........................................................................7 Alternatives................................................................... 8 Chapter 2: Physical Plan ................9 Proposed Plan Illustrative ......................................... 9 Summary of Planning Principles .............................10 4 LandUse.........................................................................11 Pedestrian Circulation__ ........ ............................... 25 Vehicular Circulation ............................................... 29 Parking........................................................................ 35 District Character...................................................... 39 Views-.. .............................. ........................................... 43 Chapter 3: Implementation ........ 47 List of Plan Graphics: District Location Map.................................................3 Age of Existing Buildings ........................................... 4 Plan Illustrative...........................................................9 District Land Use Areas............................................13 Existing Residential...................................................16 Proposed Residential.................................................17 Existing Commercial Use........................................20 Proposed Commercial Use.., ............. ..................... 22 Proposed Land Use by Floor Level........................24 Existing Pedestrian Circulation .............................26 Proposed Pedestrian Circulation......_ .................. 27 Walking Distance......................................................28 Existing Vehicular Circulation ............................. 30 Proposed Vehicular Circulation.._..........................31 Existing Parking........................................................ 36 Proposed Parking ...................................................... 37 Parking Entrances...................................................... 38 MassingModel...........................................................42 Proposed Views..........................................................45 Key Redevelopment Areas.................................52-55 Appendix A: Market Analysis Appendix B: Financial Analysis Dramatic changes to Avon began in 2005 and 2006 as plans such as the redevelopment of the Avon West Town Center, the Transit Center and Riverfront Village were forming. It became clear that this was the time to also plan for the transformation of the East Town Center. Revitalization would contribute to the enhancement of the overall character, circulation, community services, and economic viability of Avon. The intent of the District Plan is to guide public and private projects in the Fast Town Center District. This document, in conjunction with the comprehensive plan, will be used as a decision-making tool by the elected and appointed officials, as a visioning tool for landowners and developers, and as a guide for future capital improve- ments in the District. The District Plan will likely be implemented over a 10 year period, however, it may take longer for certain properties. The rate of redevelopment will be primarily driven by private land owners. If the Town wishes to speed along portions of the implementation, there are several tools at their disposal. These include regulatory and economic incentives as well as partnership potential. This document describes the events that have led to the formation of this plan, analyzes the opportunities and constraints to redevelopment, identifies proposed changes, and proposes implementation and financing strategies. The District Plan is not intended to prescribe the physical form that individual property owners must create, but rather to provide guidance with general plan- ning principles. Therefore, the massing diagrams, figures showing building footprints, and calculations are only to help describe the vision for the overall District and show the comprehensive impact of these planning principles Alternative building shapes will be considered if they meet the planning principles. Construction underway throughout Avon including the gondola within West Town Center are indications that Planning the redevelopment of the central core is neces- sary to contribute to the continued vitality of the Town. The East Town Center can be viewed from 1-70. ••o a "The East Town This document works with the following documents to describe a vision, define goals Center is a key and policies, and set a course for implementation of the East Town Center District. revitalization prospect for the 1) Town of Avon Code community" -Avon 2) Town of Avon Residential, Commercial., and Industrial Design Review Guidelines Comprehensive Plan 3) Town of Avon Comprehensive Plan 4) West Town Center Investment Plan 5) Conditions Survey 6) Urban Renewal Plan Anyone interested in knowing more about the future of the East Town Center should become familiar with all of these documents. The Community Development Staff is available for questions regarding the Fast Town Center and can he reached at Town of Avon, PO Box 975, Avon, CO, 81620 (970)748-4030 info@avon.org Avon's traditional role has been as a gateway to Beaver Creek Resort, serving as a bedroom community for Beaver Creek and Vail employees and as a service provider for the two resorts East Town Center s retail character fits this role, with anemphasis on providing services and retail options that are not available in the resorts. Further east of Avon's existing East Town Center District is the Village at Avon PUD. The Village at Avon has entitlements to develop 2,400 dwelling units and 650,000 square feet of commercial development on 1,790 acres. Super Wal-Mart and Home Depot, located approximately one mile to the east, are the major anchor tenants of this regional shopping destination. West Town Center, on the west side of Avon Road, also pmv6des retail services, residential, lodging, civic buildings, and a public park. Nearby, Nottingham Station contains convenience retail and condominiums. Riverfront Village is soon to be developed and includes a resort, spa and vacation residences. East Town Center is bounded by 1-70 to the north, Avon Road to the west, and railroad tracks to the south. To the east, East Town Center is separated by undeveloped lots that form the western most portion of the Village at Avon. Of the 37 acres of land that compose the District, approximately 8.5 acres are public road right-of-way, 1.5 acres are open space that buffers Avon Road and the railroad tracks, and 12.2 acres are at -grade parking or vehicular access drives. Therefore, approximately 56 percent of the District is covered by paved surface designed for vehicular use. The District contains 390 condo units. The primary land -use in the District is retail and office with approximately 358,000 square feet of commercial space (8.22 acres). East Town Center is located in the commercial core. •ot • By 1972, bail had become one of the top destination ski resorts in the country and pres- The build- sure mounted "down valley" in Avon for ranch land to be developed. One branch of the ings within the Nottingham family sold its controlling interest in the land to Benchmark Companies District were and the Town of Avon was incorporated on February 24,1978. Later that same year the constructed be- Town adopted the official town plat, Benchmark at Beaver Creek, Replat No. 4. This plat tween 1975 and 1999, with the includes all of the properties in East Town Center and areas west. After ten years, in 1988, majority of the Avon had a permanent population of 1,500 people. buildings being constructed in There have been several changes since the original Benchmark Subdivision. For example, the 1980s. the Christie Lodge property was originally five platted properties, and was later consoli- dated into one. Beaver Creek Place was platted (on the Benchmark at Beaver Creek Subdivision) as a cul-de-sac road, but was later turned into a loop connecting with Beaver Creek Boulevard. Chapel Place was created some time later. PLANNING CONSIDERATIONS Below are the major current and existing conditions that have been considered during the planning process and have lead to the Planning Principles: • The Town Comprehensive Plan calls for an increase in residential uses in this District. Due LAND USE to current low density development pattern, there is room to accommodate this goal. • The District is currently not geared towards residential living. • The District includes, or is close to, existing anchor uses such as the grocery store, post office, library, recreation center, and local businesses. • The multiple retail areas within the town make it difficult for Avon to establish a singular image or presence in the eyes of the full-time residents as well as second hom- eowners and visitors. • The chain retailers and restaurants (both chains and locally -owned) tend to be po- sitioned at the middle tier in order to attract full-time residents but are not of a high enough quality to appeal to the other markets. • The numerous professional service providers located in East Town Center generate business to the retail areas during the day but do not generate activity in the evenings. • The retail mixes within East Town Center are missing key elements such as entrain- ment uses, clothing retailers as well as certain grades of office spaces. • Pedestrian circulation is improving throughout Avon with the addition of a transit sta- PEDESTRIAN tion, the gondola, and the many redevelopment projects surrounding the District. AND VEHICULAR • Pedestrian circulation in the East District is haphazard, disconnected and unclear. CIRCULATION • The rail corridor is planned to serve as transit/trails corridor in the future. • The transit center located in nearby West Town Center provides service to the entire valley. • Poor connections between the multiple retail areas within the town dissuade people from taking combined trips (`park once shop many-) • The street pattern in East Town Center is confusing, has diminished sight corridors, lacks a hierarchy, and does not entice people out of their car to experience the entire Town Center. • The separate highway interchange for the Village at Avon increases the separation between the Village at Avon retailers and East Town Center. • The Town ownership of the central parking area allows for redevelopment and ere- PARKING ation of a central plaza. • Large expanses of parking allow for redevelopment in a phased manner. • Redevelopment potential in the District provides the opportunity for developing a DISTRICT common architecture character. CHARACTER • Development currently underway in areas surrounding the East Town Center allow for a comprehensive approach to town planning. • Views of the surrounding mountains make the District a unique place. • The current construction quality does not suggest long-term sustainability of the buildings. • If given the proper incentives, most existing property owners support the redevelopment plan. IMPLEMENTA- • Development occurring in areas surrounding the District and new access to Beaver TION Creek via the gondola are raising property values in the District. These factors are also increasing the interest in living in the Town Center East District. • Current development standards (i.e. parking requirements, setbacks, lot coverage) discourage redevelopment. • The Town owns strategic parcels, key to redevelopment , Key stakeholders provided their thoughts regarding opportunities in the District. Property owners, Town Staff, and members of the general public provided input regarding the conceptual design diagrams at the charrette open house. f _ tint h �> X A perspective sketch was developed based on the outcome of the meetings that conveyed the conceptual massing and street character. A successful master plan could not be crafted without input, support and buy in from the community, property owners, businesses, Town of Avon, and service providers. Throughout the process, meetings were conducted involving a large array of stakeholders (i.e. businesses, property owners, general public etc.) Interested in the design process. Conceptual options were developed and evaluated. A five-day Community Partnership Charrette kicked off the District Plan process in July, 2006. Stakeholders, including representatives from nearly every property in the District, were interviewed. The charrette concluded with an open house attended by nearly fifty participants. Four concepts for the District were developed during the week. These concepts were unveiled for comment at the Open House. The concepts illustrated a variety of alternative circulation patterns, redevelopment opportunities, and central plaza designs and locations. In November 2006, the Planning and Zoning Commission gave direction on how to proceed with a refined alternative, modifying Alternative 3. The refined alternative was presented at a January 2007 open house meeting. The refined alternative illustrated the sum of input from the Planning and Zoning Commis- sion, direction from the market investigation, and additional design details. Most of the prop- erty owners in the District attended the meeting and supported the refined alternative. Several landowners are integral to the implementa- tion of the plan and efforts have been made to encourage cooperation and coordination on design visions and implementation Quick drawings were produced in the design charrette to examine such elements as • Continuation of "Main Street" • Land uses • Massing and form • Open space relationships • Architectural character • Streetscape improvements • Circulation and transportation • Parking Development Concept Diagram �yjWl v (J\ � Paw, ra.s y Vwwe T T�f JR' � ICCIIWN SSfIC' -. I11RR!'L T4 L�41AW � IK RAMI Architectural Character Circulation if A G1'MV.Ybl' BMgb4'aIw'. ]IAm lMY6 ��ftCO�U iNNo- * M AMNr srzP • ' I��!IL fLMCF. V 1v.'In.0 ivc I q VIP-flit,v, i Ahern,10ve 2 Four alternatives resulted from the charrette. Based on comments from the attendees of the charrette open house and the Planning and Zoning Commission, Alternative 3 was chosen for further refinement Alternative 3 was chosen over the other alternatives for the following reasons: • It provides two access points off Avon Road through the District. • It has a straight main .street ending in a plaza. • It moves Beaver Creek Boulevard north of the Christie Lodge, thereby incorporating a redevel- oped Lodge into the East Town Center concept. Building massing and footprints are for descriptivepurpoxs only Alternative building shapes will he censtdered if they meet the Planning Principles This chapter analyzes the existing conditions and describes the proposed District design. The vision For the District is conveyed through the following planning principles: • Land use • Pedestrian circulation • Vehicular circulation • Parking • District character • Views • Implementation r • .. The following planning principles are explained in detail in each section. They are to communicate the vision for the district, guide redevelopment, direct future capital improvements, and build expectations of the future changes to the District. LAND USE 1. Provide a mix of uses including commercial, residential and lodging. PEDESTRIAN 2. Ensure that pedestrians have safe and convenient access throughout the District. CIRCULATION VEHICULAR Maintain two access points off Avon Road. CIRCULATION 4 Maintain a dispersed circulation pattern through the District 5. Create quiet residential scale pedestrian streets. PARKING 6. Provide on -street parking. 7. Minimize the impact of off-street parking lots. S. Provide de -centralized parking garages. DISTRICT 9. Ensure the architectural character of the East Tovm Center compliments the character CHARACTER emerging in the N Vest Town Center. 10. Ensure that buildings with mid-size retail uses are designed in a manner That fits the character of the area and supports a pedestrian friendly experience. 11. Encourage a high level of site planning and design to maximize public and semi-public pedestrian spaces, 12. Maximize solar exposure. 13. Define the plaza and other key pedestrian areas by framing the space with buildings. 14. Utilize sustainable building practices. 15 Encourage a built form that will both maximize the visibility of the District from 1-70 while minimizing the noise from 1-70 VIEWS 16. Maintain key views to and from the District to provide visibility, orient people to their surroundings and define the character of the spaces. IMPLEMENTATION 17. Focus municipal involvement on those actions that produce the most public benefit. Provide a mix of uses includ- ing commercial, residential and lodging. • Expand residential uses within the District and create an environment that is comfort- able for residents to live within. Consider views, solar exposure, noise and proximity to amenities in the locating of residential uses. Upper floors should primarily be used for residential space. • Ensure affordable housing is integrated into the District. • Give preference to units with higher oc- cupancy rates to reinforce the year-round vitality of the Town Center. • Encourage flexible retail spaces. For exam- ple, by allowing first and second floor retail spaces (with internal circulation between the two levels), mid-size retail spaces can either gain additional square footage while maintaining minimal entrances or use the second level as increased floor to ceiling ratio. Second floors can also be flexible for residen- tial or office space. • Encourage land uses that create an exten- sion of transit -oriented development of the West Town Center. Much of the East Town Center is within a five minute walk of the new transit center and gondola. • Relate buildings to existing, approved, and planned adjacent uses pursuant to the Avon Comprehensive Flan. Building articulation can express the division of uses wirhin a structure. a Mid-sized retailers can bean ani�hor for smaller retailers. A mix at uses with density that is convenient for pedestrians can make for a vibrant and comfortable streetscape. • Encourage the continued presence of mid- size recaders by planning for a minimum of three commercial locations of 15,000 square feet. Mid-size retail spaces are underrep- resented in the Eagle Valley, while compc- tition for small retailers is significant. In addition, smaller retailers prefer to locate next to mid and big -box anchors because they generate traffic. • Avoid impairing the shopping path for retail- ers and create a continuous retail experience by minimizing gaps in the retail frontage. • Entice people to cross Avon Road by creating an attractive visual and physical connection drawing people from one side to the other. • Focus retail commercial use into the core of the District which includes the land sur- rounding the central plaza, "Main Street", and a few existing anchor retailers. The residential and commercial land use figures on the following pages divide East Town Center into four areas based upon the way in which they function: • Area t will be primarily residential with only a few buildings containing commercial uses on the lower floors. • Area 2 is to continue to be destination retail with the grocery store acting as the anchor. Residential will become a component of this mixed-use as will smaller retail uses. • Area 3 will continue to function as East Town Center's entertainment area, with bars, restaurants, and coffee shop tenants that pro�ride gathering spaces. Residential will be included on the upper floors. • Area 4 will be mixed-use with commercial uses on the "Main Street" including entertain- ment. Residential components are in all the buildings. IMS. -IW_ .. Building massing and footprints Understanding the District's current use of the land is an important first step to planning its future. Alternative building shapes will be considered i f diet/ meet the Planning Principles. A ,) Christie Lodge Buck Creek Pla-a Chapel Square City Market Residential land uses are limited in the East Town Center to lour parcels: the Christie Lodge, Buck Creek Plaza, Chapel Square, and City Market. The Christie Lodge is a pure timeshare product, with nearly 300 units. Each unit could have up to 52 owners (each week owned separately). Buck Creek Plaza includes .six residential condos on the second and third floors. Chapel Square includes 69 condos above the first floor commercial. City Market includes 14 units of employee housing apartments in the second door of the building. This is one of two City Market build- ings in their entire portfolio of facilities that include employee housing (Vail City Market is the other). Residential use in the District is encouraged to increase in the Avon Comprehensive Plan. The District Plan provides potential for residential use in nearly every structure with a doubling the amount of the total residential gross square footage. The District Plan includes a variety of residential types ranging from affordable housing to market rate (Refer to the Avon Housing Needs Assessment document for more informa- tion regarding affordable housing requirements). The affordable housing will be inline with Eagle County requirements. The market rate units could include condominiums, condo hotel, and accommodation units A preference should be given to units with higher occupancy rates to re-inforce the year-round vitality of the District. The second floor of mixed-use residential buildings includes flexible space. This flexible space could he commercial use or residential use at the owner's discretion. This space may also be remodeled from one use to the other. The estimated square footage for residential and commercial uses constitutes a range, to reflect the flexibility provided on the second floor. The second floor flexible space and other lower residential space would be appropriate for affordable housing. Residential uses are the key to keeping Town Center a vibrant place year- round. A a r k 'w` M EXISTING RESIDENTIAL SPACE SUMMARY( rosss . r.) RESIDENTIAL _ AREA 1 Area 1 298,000 - AREA 2 Area 2 9,000 I - AREA 3 Area 3 _ Area 4 72,000 I - AREA 4 Total Residential 374,000 Space (approximate) Sources Design Workshop 7 Y4 r , <,r 71 w• , Huddogmassingandjoorpr PROPOSED RESIDENTIAL A V 14 A PROPOSED RESID?NTIAL SPACE SUMMARY (gross sq. /}.) I IEEINNE Area I 662 000 - 678 000 -364 000 - 380 000 Area 2 Area 3 Area 4 Total Residential Space (approximate) Sources: Design Workshop 94,000 - 115,000 263.000 - 309,000 368,000 - 431,000 1,387,000- 1,530,000 85,000 - 106,000 263,000 - 309,000 296,000 - 359,000 1,008,000 -1,151,000 Thep opissed residmttal squa e footage 15 bawd on the massing model and is an estimate only - RESIDENTIAL _ AREA 1 - AREA 2 _ AREA 3 - AREA 4 A Retail Space: Estimated Tenant Mix' Groceries, liquor stores, dry cleaning, Convenience Goods 38% packing! shipping stores, salons, car washes Home furnishings, galleries, jewel - Shoppers Goods 38% ers, clothing, sporting goods, specialty stores Ealing & Drinking 24% Restaurants, pubs, coffee shops, fast food & quickcasualdining Building Material & Paint & carpet stores, lumber, plumbing Garden & electrical supply Automotive repair shops, dealers, parts Automotive stores, specialty detading & customin tion Approximate # of retail 53 Estimated Vacancy Rale = 12% tenants Office Space:. Approximately 87,000 square fep, Estimated Tenant Mire' Construction related 22% Home builders, development firms, engineers, architects Business Consulting & Accounting & law firms, advertising Support 14% agencies, consulting firms, staffing agencies Finance, Insurance & Real 36% Banks, insurance agencies, real estate Estate (FIRE) brokerages, mortgage lenders Medical & Dental 12% Doctor's I dentist's offices, clinics, coun- seling services, veterinarians Radin / news / TV & publications, Other 16% technology providers Sr developers, pet trainers, travel ege.,ws, Mot,, stud., :Approximate # of office 51 Estimated Vacancy Rate = 20% teoanls Sawn Tnwn nJAvon, F.agle Cnunry AssesmrnndDeigti IV'odslmp nsran 1, • Excluding o6srrved rv«xnf spas The boat building is one of the few in the District that is composed of retail on the first floor with a major component of office above. The Retail Space Table to the left contains data representing the current best -estimate of East Town Center's tenant mix. East Town Centers retail space has historically suffered from high vacancy rates, and many of the current retail spaces are in need of updating. Currently, retail vacancy is estimated at approximately 12 percent, and existing tenants are heavily weighted toward convenience retailers and miscellaneous middle -tier goods retailers which primarily target full and part time residents, Office tenants in East Town Center are more diversified than retail tenants, with tenants weighted toward the finance, insurance and real estate and construction related categories. This is not unusual, and is a trend throughout the Eagle Valley due to the dependency of the local economy on the real estate market. The 'other' category in Fast Town Center is well -diversi- fied in and of itself, with a range of non-profit institutions, travel agencies, and fitness studios. Office vacancies are currently estimated at approximately 20 percent, a factor which may he related to the relative age and condition of much of East Town Center's office space. t�at��lhr��a�i��wut4:tNYGt � 1rS.ti East Town Center will be redeveloped over time by individual property owners rather than by a master developer. Therefore, the proposed tenant mix recommendations in the table to the right were formed by first identifying the existing segment areas of East Town Center and then improving upon current tenancy patterns in these areas. The commercial mix is to stay roughly within a range of the existing commer- cial mix. The amount of space available for commercial uses is also roughly the same as the existing. If none of the flexible second floor space is used for commercial there would be a five percent loss in commercial gross square footage (23,000 gross square feet less than existing) in the District. If all of the second floor flex space is used for commercial then the existing commercial is increased by toughly one third (124,000 gross square feet more than existing). .,jP Retail Tenant Mix Convenience Goods 38% 30-40% Shoppers Goods 38% 30-40% taring & Drinking 24% 25-30% Building Material & Garden - 0-5% Automotive - - Office Tenant Mix Construction Related 22% 20-30% Business Consulting & Support 14% 15-20% Finance, Insurance & Real Estate (FIRE) 36% 30-40% Medical & Dental 12% 10-20% Other 16% 15-20% ' Source; Town of Avon, Eagle County Assessor and Design Workshop research (excludes observed vacant space) EXISTING COMMERCIAL SPACE SUMMARY (grow sq. 4.) Area 1 86,000 Area 2 43,000 Area 3 72,000 Area 4 139,000 Total Commercial 340,000 Space (approximate) Sources. Town of Avon, Eagle CountyAssessnc and Design Workshop l=ea 1 X�. - COMMERCIAL _ AREA 1 - AREA 2 - AREA 3 - AREA 4 V Current Tenants: Area 1 • Convenience oriented Video rental Liquor General merchandise Dry cleaning Banking Take-out pizza Nail salon • Limited specialty retail - Specialty foods - Sporting goods - Bakery • Limited dining options • Primarily finance, insurance & real estate -related office tenants Current Tenants: Area 3 • Entertainment - Bar/Pub/Casual dining - Coffee shop - Family dining • Secondary convenience -oriented - Nail salon/Dry cleaner • Construction -related office tenants • Business support office tenants • Limited medical office - Massage therapy - Dentistry Current Tenants: Area 2 • Limited retail - Grocery anchor - No associated in-line retail • Banking • Finance and business services office tenants Current Tenants: Area 4 • Concentration of restaurant tenants Quick -casual restaurants - Family Dining • Mainstream shopping goods -Sporting goods - Home decorating - Furniture • Office supplies (Office Depot) • Medical office tenants PROPOSED COMMERCIAL SPACE SUMMARY �wss sr. P.) - COMMERCIAL - AREA 1 - AREA 2 - AREA 3 AREA ' — ' PLA7A OVERLAY Total I)ifference from Existing.,! Area 1 25,000 - 42,000 decrease 61.000 - 44,000 Area 2 114,000 - 135,000 increase 71,000 - 42,000 Area 3 74,000. 120,000 increase 2.000.48,000 Area 4 104,000 - 167,000 dec. 35,000 - inc. 28,000 Total Commercial 317,000 - 464,000 dec. 23,000 - inc. 124,000 Space (approximate) Sources: Design Wvrkshvp The pi oposed commercial square footage is based on the massing modal and therefore is an estimate only. - COMMERCIAL - AREA 1 - AREA 2 - AREA 3 AREA ' — ' PLA7A OVERLAY Recommended Tenants: Plaza Overlay • Youth targeted retail • Quick -casual dining • Restaurants • Ice cream • Coffee shop • Specialty sporting goods • Clothing • Bath and body supply Recommended Tenants: Area 1 • Reduced retail presence in favor of residential lodging space, except along plaza frontage • Restaurant space at Christie Lodge • See plaza overlay zone for recommended tenants Recommended Tenants: Area 3 • Entertainment (Bar/Pub) • Bookstore • Coffee shop • Specialty food and gift • Finance, Insurance and Real Estate related office tenants (second floor) • Construction -related office tenants (second floor) • Sporting goods Recommended Tenants: Area 2 • Grocery/convenience sub -District - Grocery anchor - Dry cleaning Liquor Video rental Take-out food Hair/ nag salon Florist Pet supply • Banking finance &t insurance -related office uses Recommended Tenants: Area 4 • Family dining/sit-down restaurants • Home furnishings • Medical office tenants • Construction -related office tenants- Engi- neer, Architecture, etc (second floor) • Business support services - (second floor) Accounting/Law offices Copy services • Home/garden supply • Office supply Upper Floor Residential and Office Space Use upper floors for primarily residential and office uses. Consideration Of dews, solar exposure, noise and proximity i amenities should be given to th locations of residential uses. I ..8.0 r 19 •o• Second Floor Flex Space Allow second floor spaces to be used for a variety of retail, office and/or residential space provide access is internal to the buildin First Floor Retail Commercial Space Focus retail commercial uses into the core of the District which includes the land surrounding the central plaza, "Main Street", and a few existing anchor retailers. Building massing and footprints are for descriptisrparposes ordy. Alternative building shapes will be considered if they meet the Planning Principles 2. Ensure that pedestrians have safe and convenient access throughout the District. • Create an improved pedestrian connection across Avon Road and connect "Main Street" in the West and East Town Center Districts. • Realign East Beaver Creek Boulevard and allow the majority of Christie Lodge to develop on the south side of the street. This is the District's largest residential project and all uses in the District would benefit by creating better pedestrian connections with residents and visitors at the Christie Lodge. • Maintain strong pedestrian connections be- tween regional trails (e.g. potential rail/trail) and the retail core of the East Town Center. • Ensure that all building entries are promi- nent and visible to the pedestrian. • Provide pedestrian accessibility to adjacent uses with paseos, gates, pedestrian walk- ways, crossings, etc. • Separate bicycle and pedestrian paths from vehicular traffic with nature strips, amenity zones, and on street parking areas. • Locate bus stops in centralized locations that serve the retail and pedestrian uses. ,.a _`W WiiIIISs le Wide sidewalks allow for street furniture to be placed to create outdoor"living"spaces. Pedestrians are willing to walk greater distances in comfortable and attractive environments than when walking near uninviting places. 0 a . t Existing pedestrian circulation is haphazard and discon- SIDEWALK QUALITY nected. Many commercial uses are set back from the main NO BUFFER FROM pedestrian circulation areas thereby distancing potential TRAFFIC shoppers from retail stores. Most pedestrian areas are directly - BUFFERED WITH next to streets and parking areas. This leaves pedestrians LANDSCAPING feeling unprotected from vehicles. INTERIOR CIRCULATION - CROSSWALK REGIONAL RAILJrRA1L CONNECTIONS BUSSTor Connections and consistent quality are the driving forces behind the pedestrian circulation planning principles. Connections are made to the proposed regional rail/trail from the plaza. Sidewalks run alongside retail spaces, allowing for window shopping. Bus stops are located adjacent to the primary residential areas in centralized locations. Sidewalks are set -back far enough from the roadway to allow for street trees to .shade pedestrians. SIDEWALK QUALITY _ NO BUFFER FROM TRAFFIC _ BUFFERED WITH LANDSCAPING - INTERIOR CI RCULATION - CROSSWALK - REGIONAL RAIL/TRAIL CONNECTIONS BUS STOP F . 1 TfCLI'2fnute J { w: distance to \ \F I i ♦ / Buil�ngmassolgandfoolprnnsare%rAesaiptivepulpnscsnnhAltrnmtivrbd-ii�shaprsSul!-mnsideralil:i�r�mreullPPfnnnmgPnmpfcs. �� ` ' ♦ 2 -va MINUTE WALKING RADIUS Nearly the entire District is within a ttvo and a half minute walk from (APPROXHASTELY 750 FLET) the planned central plaza space and within a five minute walk from the �♦ I/ Avon Station in the West Town Center. Several local bus stops also support the walkability of the District. 5 MINUTE WALKING RADIUS FROM AVON STATION (APPRO%IMAILLY ISM FEET) PROPOSED BUS STOP 3. Maintain two access points off Avon Road. • Redesign and replace Benchmark Road. • Allow "Main Street" through the East Toam Center to be two-way thereby maintaining a strong vehicular pattern and ease of access from Avon Road, 4. Maintain a dispersed circulation pattern through the District. • Create an altered grid to make a better envi- ronment for retail and residential uses. • Design "Main Street" and the roads that boarder the Plaza to be pedestrian -oriented and accessible for the retail uses. • Design East Beaver Creek Boulevard as an auto -oriented boulevard with minimal curb - cuts to service through traffic. • Avoid or minimize the impacts of traffic on residential streets to create a pleasant living environment • Minimize curb cuts on East Beaver Creek Boulevard and "Main Street" by encourag- ing landowners to access parcels off cross streets and alleys. • Large blocks should have alley access. 5. Create quiet residential scale pedestrian streets. • Create secondary streets that service the resi- dential development in the East Town Center. • Design residential .streets at a smaller scale to reflect a pedestrian priority. • Allow parallel parking on residential streets. The approach from Avon Road and Main Strectshouldconnectiuttally to the central plaza The scale aid small right of Way may encourage slower driving. n rI,7 Avon Road is an effective means of channeling Bcaver Creck-bound VEHICLE CIRCULATION skiers, residents and visitors between 1-70 and the resort. Unfortu- THROUGH TRIPS nately, its design discourages travelers from making stops in Avon. It BOULEVARD EXISTING VEHICULAR - MIXED USE/RETAIL STREET pedestrian travel between West Town Center and East Town Center, CIRCULATION difficult. The series of roundabouts along Avon Road provide the RESI DEH AL sTaeeT n rI,7 Avon Road is an effective means of channeling Bcaver Creck-bound VEHICLE CIRCULATION skiers, residents and visitors between 1-70 and the resort. Unfortu- THROUGH TRIPS nately, its design discourages travelers from making stops in Avon. It BOULEVARD also effectively bifurcates the town making cross-town travel, especially - MIXED USE/RETAIL STREET pedestrian travel between West Town Center and East Town Center, difficult. The series of roundabouts along Avon Road provide the RESI DEH AL sTaeeT primary vehicular access to the district. In addition to these round- SERVICE ROUTE abouts, the curvilinear street pattern is confusing, sight corridors are `k BUS STOP diminished and street hierarchy is unclear. Circulation is also hampered by the lack of capacity on East Beaver Creek Boulevard. Traffic volumes could potentially double through the East Tovvn Center district due to development of the Village at Avon. Therefore, it is not only important to solve the problems of the existing conditions, but also to accommodate future traffic. A new vehicular hierarchy will be reinforced by the design of East Beaver Creek Boulevard as a divided boulevard with a median and limited curb cuts. Through- traffic and service vehicles will use this boulevard. A central organizing element, such as the plaza, will also help slow traffic down in the pedestrian focused areas. Those vehicles having retail uses as destinations will use this area. RLsidennal streets will be designed with a narrow right-of-way and enhanced pedestrian ameni- ties to slow down traffic VEHICLE CIRCULATION - THROUGH TRIPS - SGULEVARD - hH%FD usE/RrTAIL STREET - RFSIDENTIALSTRFFT SERVICE ROUTE `A' Bus STOP A 1 • A • O"7_7 _1 � I tEt M* TYPICAL RESIDENTIAL STREET Wb R1G=n or WAY Budding massing is for descriptivepurposes only. Alternative building shapes wilt be considered tf they meet the Planning Principles. r Medium to high density residential can be designed as part of a healthy streetscape environment, while providing convenient access to nearby retail shopping. The residential streets design promotes clear vehicular and pedestrian circulation by providing clearly identifiable vehicular travel lanes and an 11- foot amenity zone and sidewalk for pedestrians. The 11 -foot Aide amenity zone and sidewalk should he implemented to allow for a minimum of six foot clear pedestrian travel zone. The remaining space should be located between the back of curb and the pedestrian travel zone Trash bins, benches, bike racks, street lights, sandwich boards, street trees and other amenities should be located in this amenity zone. Street trees are encouraged throughout the right- of-way on an average of 30 foot on -center. This will help reduce the visual impact of height as well as provide a separator between moving auto- mobile traffic and the pedestrian space. Parallel parking is encouraged to provide convenient parking separation of vehicular and pedestrian traffic. The dimension of the parallel parking is purposely tight to help slow traffic. Extensive understory plantings in the amenity area that will discourage or prohibit the movement of people from parallel parked automobiles to the sidewalk are not allowed. TYPICAL BOULEVARD Building massing is Jordes nluive purposes only. Altanwtive building shapes will be considered if they meet the PlamtingPiinnples The street design for the boulevard creates a "green" corridor that moves automobile traffic through the District at a convenient rate The planted median provides a green corridor that should only be disrupted for necessary left hand turning lanes and stacking. The median will help to calm traffic and avoid extensive curb cuts into other developments. The six foot amenity zone and six foot sidewalk should be implemented to allow for a safe walking emironment. The amenity zone could include trash bins, benches, bike racks, street lights, street trees, and extensive understory planting program of perennial and shrubs, not exceeding three feet in height The three foot shrub mass will provide separation from the constant automobile travel lane and the pedestrian area. The plantings should stop at pedestrian crossings and automobile intersections and should not compromise sight triangle design. Trees should be at least 30 feet on -center. An eight foot multi -use path should be imple- mented on the north side of boulevard. This is part of a larger multi -use path system. -i I', d.. G, i.lr. itdniek ir; hnedwithaplantedmedian- to TYPICAL MIXED USE/RETAIL STREET ' 9V O'WGXi OF WAY Budding massing is for desoiptivepurposes only. Alternative building shapes will be considered if they meet the Planning Principles. Mixed tise: developments avith angled parking allmv for more waver lent parking spaces while still maintaining a retail stmetseape experience. The typical mixed use/retail street design is aimed at providing a great pedestrian retail shopping experience while providing retailers with as much visibility, accessibility and convenient parking as possible This is achieved by providing two clearly identified automobile travel lanes with angled parking. The angled parking achieves the greatest number of parking spaces and helps to calm traffic. A 15 -foot sidewalk and amenity zone is envisioned as flexible space for the pedestrian. In this space outdoor cafes, trash bins, benches, bike racks, street lights, sandwich boards, street trees and other amenities are envisioned. A minimum six- foot clear pedestrian circulation route should be provided in the sidewalk and amenity zone. Trees should be at least 30 feet on -center. Understory plantings and/or planter pots are encouraged. Extensive understory plantings in the amenity area that will discourage or prohibit the movement of people from angled parked automobiles to the sidewalk are not allowed. 6. Provide on -street parking. • Provide on -street parking on all streets except East Beaver Creek Boulevard to help off -set retail parking requirements. • Mixed-use projects may receive discounted parking requirements beyond the Town's standard 15% reduction. • Allow angled parking on "Main Street" to maximize the on -street parking yield. 7. Minimize the impact of off- street parking lots. • Limit curb cuts to parking areas to provide clarity of vehicular travel areas and maximize parking. Curb cuts are discouraged on Main Street and East Beaver Creek Boulevard. • Place parking lots at rear or side of the site to allow a majority of uses to front directly on the street. • Build multiple small parking lots instead of one large lot. • Encourage improved access to retailers by creating a clear pedestrian path from all parking areas to the retail entrances. • Plant trees and shrubs to soften the visual impact, reduce heat island effect, provide shade and reduce noise of parking areas. • Place parking in proximity to dwelling units to allow for casual surveillance. 8. Provide de -centralized parking garages. • Encourage de -centralized parking garages in- tegrated with the redevelopment of buildings to ensure all retailers have access to parking. • Consider providing parking under the plaza space, as long as the view from "Main Street" is of the plaza and not the parking garage. The plaza shall remain at street level. • Avoid blank walls facing the street on build- ings v«th parking garages. if blank walls are unavoidable, decorate with artwork, display cases, vines, and high quality durable materials, Landscaping can minimize the appearance of surface parking Highly visible entrances to parking structures help mr orae motorist confusion when on -street parking is not available. ..1 TYPE OF PARKING SURFACE LOT ON—STREET STRUCTURED EXISTING ACRES SPACES 12.17 1,435 0.66 109 TOTAL 12.83 468 2,012 Thirty-three percent of the District land area is used for surface parking. Much of the time these parking spaces are under-utilized. PARKING - SURFACE - ON -STREET ® STRUCTURED EKI * OF SPACES PER LOT 30 13 20 20 2D I7 F� �S7 12 12 . 12 I1 740 t5 20 - .. n 12 n Building massing and(aorprints mz Jor dewripnveprrposes only Alternative building shapes will be cmuidv ed tf thn, mmt the planning Principles. EXISTING PROPOSED PARKING TYPE OF PARKING ACRES SPACES ACRES I SPACES _ SURFACE SURFACE LOT 12.17 1,435 3.28 345 - ON -STREET ON -STREET 0.66 109 1.67 356 STRUCTURED - -- - - STRUCTURED 468 1,473 F—o7o # OF SPACES PER LOT TOTAL 12.83 2,012 4.95 2,175 The proposed parking numbers shown are the maximum number of spaces that can fit within the proposed building footprints_ Property owners will likely desire to construct larger underground structures than shown and may include more than one floor below grade. W. Euenng prkmg atru ture cnnanm Canceprual access pima ea parkin,, Building massing and footprints are for descriptive purposes only. Alternative building shapes will be considered if they meet the Planning Principles Entrances to underground parking need to be strategically located to provide convenient access without causing traffic delays on major thoroughfares. Shared entrances are also desirable. 9. Ensure the architectural character of the East Town Center compliments the character emerging in the West Town Center. • Encourage the use of authentic, contempo- rary architecture with a focus on form and appropriate use of materials. • Make the buildings visually and architectur- ally pleasing (vary the color, height, setback, materials, texture, landscaping, trim and roof shape). Eliminate box -like forms with large, unvaried roofs by using a variety of building forms and roof shapes. • Enhance views and make spaces feel larger by maximizing the number of windows. • Ensure that rhythm, size and proportion of openings (windows, doors) are similar to other high quality buildings in the District • Use porches, verandahs, mezzanines, stairs, railings, cornice details, and window details to enhance buildings' character. • Select building materials and colors that are complementary to the surrounding area. • Encourage the reuse and recycling of build- ing materials as redevelopment occurs. • Incorporate civic art into public infrastruc- ture projects .such as bridges, transit systems, highways, roadways, or water features. This building exemplifies the authentic, contemporary, mountain architecture style; use of subtle earthtone colors; and mix of regional building materials encouraged in the West Town Center. 0 1 A 0 A 0. Splitting. buildings into modules with different treatments creates a pattern, articulates the facade, and clearly identifies where entrances are located. Active first floor spaces, appropriately scaled buildings, and well designed public spaces will enhance the character of the district. 10. Ensure that buildings with mid-size retail uses are de- signed in a manner that fits the character of the area and supports a pedestrian - friendly experience. • Locate mid-size retail uses in anchor loca- tions that accent architectural elements and provide high visibility. • Encourage traditional streetscape designs that put an emphasis on the building and not the parking. • Ensure facades are pedestrian scale by using articulation and a retail module system of 16-25 feet. • Provide views of active streets instead of views of dead parking lots. 11. Encourage a high level of site planning and design to maxi- mize public and semi-public pedestrian spaces. • Design landscaping to enhance the archi- tecture and create/define useful public and private spaces. • Use hardy, native plant species - trees, shrubs, and ground cover - that are easy to maintain and minimize water use. • Provide a variety of seating choices in landscaped areas, • Include paths to accommodate children, adults, bicycles, skateboards, shopping carts, walkers, pets, furniture moving, etc. • Provide appropriate lighting to insure that paths are safe at night. • Plant deciduous shade trees along streets and parking lots to minimize heat island effect. 12. Maximize solar exposure. • Maximize solar exposure by limiting build- ing heights on the south side of streets and plaza spaces to a level that allows sun to reach the northern sidewalk during the winter solstice. 13. Define the plaza and other key pedestrian areas by framing these spaces with buildings. • Provide more visibility to the plaza by encour- aging architectural accents around the plaza. • Relate buildings to the street and locate them on the site so that they reinforce street frontages. • Utilize "build -to" lines instead of "setbacks" to bring pedestrians and the retail environ- ments closer together. 14. Utilize sustainable building practices • Promote LEED Neighborhood Development standards throughout the District. • Require all new buildings to be LEED certified • Encourage the use of renewable materials. • Reuse materials whenever possible. • Improve energy efficiency in all new buildings. • Encourage.stormwatermanagement tech- niques such as binswales and green roofs. 15. Encourage a built form that will both maximize the visi- bility of the District from I-70 while minimizing the noise from I-70. • Preserve views into the plaza to attract potential shoppers from 1-70. • Allow the bulk and mass of structures clos- est to 1-70 to act as a buffer for noise. a • A•a Building mass can positively contribute to the public spaces if designed with articulation, varied materials, and ample windows. Good views and close proximity to plaza space are amenities for surrounding residential buildings. They also bring activity to the retail areas. A+a ■ Existing Massing Extremely low, density development, aging building stock and large expanses of surface parking illustrate the potential for redevelopment and infill. The Town Center zoning encourages higher densities but also requires large set backs, substantial parking areas, and 501'a lot coverage. These requirements have contributed to the lack of redevelopment activity in the area. Proposed Massing The District Plan calls for increased density in the East Town Center District to help fulfill the vision of the Town Center as the focal point of the community. See the Avon Comprehensive Plan (page 33) Urban Built Form Diagram for more information. Building massing and footpnnts are far descriptive purposes only Alternative building shapes and mass will be considered if tha meet the MammngPrinciples- 16. Maintain key views to and from the District to provide visibility, orient people to their surroundings and define the character of the spaces. • Reinforce key dews of the plaza space from I-70 by encouraging open transportation corridors. • Maintain several opportunities to view Bachelor Gulch, Beaver Creek and the rocky bluff from "Main Street" and the plaza. • Maintain views to Game Creek Bowl, Swift Gulch and Beaver Creek/Bachelor Gulch from the plaza space. • Special consideration should be given to elements that could disrupt the views like building bulk, trees, signage, overhead utilities, and lighting to ensure that they are handled in such a manner that protects the view to the extent possible. Views of the mountains and ski resort are a distinct part of Avon. EXISTING VIEWS ;rte PROPOSED The identified views from public areas are considered essential in maintaining a visual connection to the surrounding environment, orienting people to their surroundings, and ensuring these views can be enjoyed by the general public. The Town will be making a large investment in the public spaces of the East Town Center. To maximize the value of their investment, these views should be protected. will heconvde,ediJ Chi irm ihr l""I"ples Primary views represent those that should be preserved at all costs. Elements VIEWS that could disrupt the views like building bulk, trees, signage, overhead utili- - PRIMARY ties, and lighting should not be allowed. - SECONDARY Secondary views represent valuable views but those that may he in jeopardy due to desired redevelopment of existing underutilized lands. El Avon East Town Center District Plan +I Intentionally Blank Avon East Town Ccntu District Plan 17. Focus municipal involvement on those actions that pro- duce the most public benefit. • Work with surrounding landowners to develop a central plaza that will energize the space, provide an orienting element, and create an alternative reason for going to the East Town Center beyond what exists there today. The Town should take the lead in designing, developing, programming, and maintaining the plaza space and make it part of the Avon parks and Recreation system. Coordination with landowners and retail tenants is essential to ensure the aiability of surrounding retail, consistent access and circulation, alternative parking arrangements, and workable phasing plans. • Work with surrounding landowners to straighten "Main Street". The Town may also consider a curved "blain Street" reflect- ing the Planning Principles set forth in this plan. However, this will not accommodate the same level of on -street parking. This may force private development to accommo- date all parking requirements on-site. • Allow for the realignment of East Beaver Creek Boulevard if the affected landowners can cooperate on a redevelopment plan for the area. • Work with surrounding landowners to im- plement a rich streetscape pattern that will compliment that of the West Town Center. • Create an Urban Renewal Plan and explore TIE financing to help pay for public improve- ments in the District. Great public spaces can draw people of all ages and interests to the urban center. It may be desired to separate gathering/resting spots from high activity pedestrian paths. 1 0 PARTNERSHIP The current inefficient physical pattern, the undesirable development pattern allowed by right in the Town Center Zone District, and the over supply of development in surrounding areas have stifled redevelopment in the area. Today's rising values resulting from the new gondola and River Front Village, in conjunction with a willingness of Town Council to work in partnership with landowners, creates new redevelopment opportunities. The key to implementation is to work with the landowners and developers by understanding their needs and the impact this policy has on their property's redevelopment potential. Continued dialog must occur between the Town and the East Town Center stakeholders. The phasing strategies shown in this document are to illustrate a navigable route through redevelopment. Flexibility is needed to determine the best overall method of achieving the vision explained in the Planning Principles. This flexibility is to accommodate the complexity of redevelopment projects, allowing each individual property rede- veloping on the property owner's schedule. Additional flexibility includes the footprint and massing of the buildings and the manner in which parking requirements are met. For example, the areas identified as private amenities may be utilized as parking areas or plaza space. was Bu I&V massing and footprints are for descriptivepurposes only Alternative building shapeswill beconsida ed if they meet the PlanningPnnciples Based on preliminary cost estimates, the public expenditures associated with the plaza Both public and private invest - with 240 underground parking spaces, road improvements, and streetscape work equals ments are nearly 32 milhon dollars. needed to Beaver Creek Place finance the It is anticipated that the needed revenues to pay for these improvements will be shared redevelopment. between the Town and the developers. The Town has already committed to substantial funding in the West Town Center. Therefore, funding mechanisms such as Tax Incre- ment Financing (TIF) must be explored. In addition, each redevelopment project may also need to bear the cost of some of the capital improvements made necessary by the increase in their density. The level of private investment in capital improvements will be determined during the development review process. Infrastructure Expenditure Summary Publicly Funded Projects Expenditure Beaver Creek Boulevard $2,346,754 Benchmark Road $1,222,094 Beaver Creek Place $926,977 Main Street Plaza $1,941,416 Chapel Place $808,838 Residential Street Type $1,868,917 1 Service street (SF) $906,6761 Plaza 521,667,993 TOTAL $31,689,665 .Sourca Design Workshop The roads shown with dark brown shading will need to be constructed while those without shading make use of existing roads. A - 0. The public revenues estimated by the District Plan indicate that the Town will see between 45 million and 50 million dollars in revenues through build out and ongoing revenues of between 4.5 million and 5.5 million dollars. Public revenues were calculated using two scenarios: the first assumes that all flex space is commercial space, the second assumes that all flex space is residential space. Scenario 1: Because this scenario places a higher parking burden on the District, parking payment -in -lieu fees are the primary reason for the higher public revenues that occur in this scenario. On an ongoing basis, however, this scenario also shows a greater return than if all flex space was built out as residential space due to anticipated sales tax revenues. Scenario 2: The lower parking burden in this scenario would increase developer returns, especially when one considers the relative demand for housing product in the mountains as compared to commercial space However, this scenario results in a lower ongoing return to the public sector. Public Revenue Summary Scenario I Scenario 2 Revenue Source From Buildout I Ongoing From Buildout I Ongoing RETA $15,072,400 $1,593,994 $17,008,255 $1,748,073 Retail Sales Tax N/A $2,397,158. N/A $1,305,510 Property Tax N/A $769,906 N!A $737,582 Recreation Amenities Fee NI -A $775,145 N'A $775,145 Parking Payment in Lieu Fee$34,360,000 N/A 1 528,453,445 N/A TOTAL $49,432,400 $5,536,203 $45,461,700 $4,566,310 Source Design Workshop To test the District Plan and determine the probability of redevelopment, it is helpful to conduct conceptual Pro Formas for each parcel and test the plan. These are based on Most parcels are showing IRR broad assumptions and should be considered an estimate for analysis purposes only. The between estimate is based on a build out taking place within ten years. Most parcels are showing 4% and 29% a preliminary internal rate of return (IRR) of anywhere from four percent to 29 percent. A healthy rate of return is between 15 percent and 20 percent. In lackluster market conditions returns of 12 percent can attract redevelopments. The following summary of IRR illustrates the effectiveness of the District Plan and begins to show the possible phasing of the private development (those with higher IRR will likely begin sooner). Internal Rate of Return (IRR) Parcel Estimated Developer Return Parcel I- Christie Lodge 29% Parcel 2- Buck Creek 190/0 Parcel 3- North Court 23% Parcel 4- Avon Plaza 21% Parcel 5- American Nat'l Bank 7% Parcel 6- 51 Beaver Creek Place 23% Parcel 7- City Market 4% Parcel S- Chapel Square Bldg B 21% Parcel 9- Chapel Square Bldg A 15% Parcel 10- Pier 1/ Office Depot 10'x, Parcel 11- Avon Annex North & South 41Yo Parcel 12- Benchmark Shp Center N &r S 12% Parcel 13- Boat Building 10% Smirce Drsipi Workshop ,v.. r ham; 9 'u',i �• is i5orall Streetscape P txq�irofwnenta ♦ 4 Y Building massing and footprints are for descriptive purposes only, Alternative building shapes will be considered if they meet the Plarming Principles, I Redevelopment of the Avon Annex and the Chapel Square office building will provide tv4 o of three necessary relocation sites for the mid-size retailers 3 z Once the mid- size retailers are relocated, the plaza can be constructed and the existing mid- size retail building can be redeveloped. There will be more interest in redevelopment once the plaza and mid-size retailers are redeveloped as anchors to the District Building massing and f vtprints are for descriptivepurposes mtly. AItenmtive building shapes will he considered if they melt the Plmming Prmoples. Individual landowners may be able to move forward with construction on a portion of their property. B11 4 AA t 1'1 Joint development agreement is necessary hetween the Town and property owners to this area to realign "Main Street". q jl 1 t Construction on the south.sidc of the street would be Feasihle once "Main Street" is reconstructed. Building inassing and f vtprints arejordescriptirepurposes only. Alternative building shapes will be considered if they meet the Planning Principles. -.,-.0 `! I �P{ Y c IS 2�� ,� A Joint development agreement is necessary between the Town and Christie Lodge owners to move East Beaver Creek Boulevard and extend Beaver Creek Place, 3 2 Joint development agreement is necessary between the Town and the Beaver Liquor Building owners to realign and build a new connector street between East Beaver Creek Boulevard and Beaver Creek Place extension. Property line should be adjusted between East Beaver Creek Boulevard and the Avon Plaza to allow additional built form to anchor new intersection Budding massingandf ootprmts are for dese"iptivepurposes only. Alternative building shapeswdl be considered if they meet the Planning Principles. The District Plan is In summary, the district plan development included a public process in which existing an opportunity to conditions were evaluated, planning considerations were identified, alternative plans share a vision for were explored, market investigations and financial analysis was conducted to test redevelopment. alternative futures, feedback was used to recycle alternatives, and a final alternative was described in both graphic terms (plans and diagrams) and verbal terms (planning principles). The vision of the East Town Center, as identified in the Comprehensive Plan, is to make the most of the redevelopment opportunities by considering the needs and desires of the community, establishing a cohesive mix of uses including retail, office, and residential, planning for public gathering spaces, and creating strong pedestrian and street connec- tions. This vision is more clearly articulated with the plans, diagrams, and planning principles found in this District Plan. The vision has a physical, environmental, social, and economic facet that together will make this district a jewel of the community, a compliment to the West Town Center, and a source of pride for the residents and busi- ness owners in the district. The future of this district lies directly in the hands of the property owners. This plan includes hefty financial investment for the Town of over 30 million dollars, for which the Town will likely use a funding mechanism such as TIF that depends on private invest- ment in the district. The landowners should recognize this plan as an opportunity ro come together on a shared vision for the district and a distinct opportunity to leverage the improvements identified for the public spaces. Together, the Town and the property owners can create a cohesive physical framework and community image in the East Town Center. Memo May 15, 2007 Planning & Zoning Commission Meeting TO: Planning and Zoning Commission FROM: Community Development Department REGARDING: Orion Development PUD Conceptual Proposal Introduction The applicant, Orion Development, has requested a conceptual review by the Commission and staff of a new PUD to be developed on a development site comprised of a combination of four separately subdivided parcels (Lots 21, 65A, 65B, and Tract O). The underlying zoning currently in place for the proposed development site is Town Center (TC). The total area of the proposed development site is approximately 5.39 acres (234,700 sq ft) and is comprised of the four lots listed above. The proposed project is detailed, on a conceptual level, in the applicant's submittal memorandum, dated May 4, 2007; and the associated sketch plans provided with the proposal package (Attachments A and B, respectively). Staff Comments As this is a preliminary conceptual review, staff will not be making a formal recommendation at this time. However, considering the importance of this proposed project in terms of both size and the prominence of the proposed development's location, there are several topics of discussion that merit the Commission's focused attention at this time. Town Center (TC) zoning allows for a maximum building height of eighty feet and the applicant is proposing, via the PUD process, a maximum building height of approximately one hundred and twenty feet (120'). For the sake of discussion, the current draft of the East Town Center District Plan calls for approximately five to six floor plates above grade, and the applicant's proposal contemplates ten floor plates above grade and three below. Also, the draft District Plan calls for a maximum residential density of approximately 310,000 sq ft, and the applicant's proposal envisions approximately 397,000 sq ft of residential space. The underlying zoning allows for thirty (30) dwelling units per acre. In this regard, it is important to note that the applicant will present at the hearing the total unit counts and how the proposal compares with existing entitlements and the draft District Plan using the same quantitative units for the sake of a comparable analysis. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Orion Development Preliminary Sketch Design May 15, 2007 Planning & Zoning Commission Meeting Page 2 of 2 Discussion Items The following topics merit special consideration by the Commission at this time: 1. Land Use — are the land uses proposed by the applicant are appropriate for the site given the existing zoning and pertinent comprehensive planning documents? 2. Bulk & Mass — the bulk and mass of the proposed structure must be carefully scrutinized in terms of the Town's goals for the area and the scale of neighboring structures, present and future. 3. Architectural Character — does the conceptual -level character of the building depicted in the applicant's renderings fit into the desired character of structures anticipated in the Town's vision for the East Town Center District Plan? The Commission will take no formal action at this time. Rather, direction on the design will be given to the applicant from Staff and the Commission to incorporate into a formal zoning application. If you have any questions regarding this project or any other planning matter, please feel free to contact me directly at 748-4002. Respectfully Submitted, i��awGv� ��%.✓Glr Matthew R. Gennett, AICP Senior Planner Attachments: Exhibit A: Applicant's Memorandum dated May 4, 2007 Exhibit B: Reduced Conceptual Sketch Plan Sets Town of Avon Community Development (970) 748-4030 Fax (970) 9495749 LO/4LY0 :3. vUlaSS[ alh5 ^»^N :3'IYJS t � x !l ;aagg aaA03 O £ `s a nu3 �Nwvaa O ' 2 8 € i opelo[oJ `uond w O 21111 lz lorl E 9m ioK 1314ro ma :3"K Ja3f03d `op• \ ...• v .4r LJ A VAg, Inc. Architects & Planners Memorandum: Project Name: Orion Development in the East Avon Town Center District Project No: 2536.00 Date: May 4, 2007 RE: DRAFT for Worksession #1 May 15, 2007 (to be submitted as final prior May 15, 2007). FROM: Pedro Campos, ASLA TO: Eric Heidemann CC: Larry Brooks Brian Judge Brad Kuskin Anne Weil Bill Ankele Jonathan Heroux Dear Eric: VAG, Inc Architects & Planners Town of Avon Town of Avon Orion Development Orion Development Orion Development White Bear Ankele Piper Jaffray On behalf of Orion Development thank you for the opportunity to conduct a set of work sessions with the Town of Avon to discuss redevelopment concepts in the East Avon Town District. Our understanding is the work sessions arc the preferred format to obtain the Town's informal feedback prior to initiating a formal development application process, and that past projects have benefited from such an approach. As you are aware Orion Development has been an active participant in the Town's master planning for the East Avon Redevelopment District. This has been a valuable process that has helped us understand the Town's redevelopment goals and objectives. With the East Avon Town Center District Plan coming to a culmination over the next few months, Orion believes the timing is right to come forward with initial redevelopment ideas to help all parties understand what is being contemplated, and how it will need to be coordinated moving forward. As one of the major stake holders in this district we have developed some initial re -development concepts that attempt to directly address many of the redevelopment priorities identified by the Town and its consultant(s). These concepts are very preliminary in nature and not intended to be perceived as final in any way. Orion would like to stress the plans were specifically developed to test the potential of a comprehensive master planned approach to redevelopment of an entire sub -area of the District. And also the inclusion of the Benchmark parcel in the redevelopment area, which is currently under contract and under going a phase of due diligence. Whatever the ultimate size and configuration Orion Development believes its project will serve as major catalyst and set the tone for redevelopment in Avon's Town Center. In addition to the graphic materials being submitted under separate cover, this memorandum is part of our official submittal toward the work sessions and to begin to address the most significant development issues that will need to be addressed in great detail through out the application and review process. Physical Address: (970) 949-7034 Mailing Address: 90 Benchmark Rd., Suite 202 fax (970) 949-8134 P.O. Box 1734 Avon, CO 81620 email generalLvagarchitects.com Vail, CO 81658-1734 We are listing below in no particular order some of the major questions that we have heard from the Town in the course of meeting and communication with some of the key municipal staff. We have provided responses that are as detailed as possible at this initial stage of the project. Where no detail is yet available we have indicated how we anticipate to address the issue(s) and to confirm if our approach(es) are acceptable. Our goal is to get as much discussion and feedback as possible and appropriate for these early work sessions and in advance of making a formal submittal in the ensuing weeks. The questions and Orion's initial responses are as follows: 1. What type of project is being proposed and how does it fit in with the larger vision for the Avon Town Center? Orion Development is contemplating a high density mixed use 'life-style' project that seeks to establish and reaffirm the Avon Town Center as the major central commercial core in the upper Eagle / Vail Valley. The vision is for the project to establish a new iconic landmark that is readily identifiable with the Town of Avon as a vibrant space for commerce, business, entertainment, and community gatherings and events. The goal is for the project to foster and create a high quality down town environment that is well conceived and designed as a precedent project to set the tone for other redevelopment in the Town of Avon. 2. What is the proposed Mix of Land Uses with total proposed aggregate square footage by type? The proposed mix of land uses is a combination of commercial (retail, food and beverage), office, conference, accommodation (hotel and timeshare), and residential (condominium and employee `core' housing). The total gross floor area reflected in the current plans is 1,289,602 sf, with 524,709 (40.7%) of this below grade as parking uses, and 764,893 sf (59.3%) above grade with a mix of land uses listed above. Following are some of the major areas of use by type, and as reflected in the preliminary development summary spreadsheet attached with the graphic portion of the submittal (figures have been rounded off): • Ground Floor Retail: 75,500 sf • Office or Commercial (second floor): 84,000 sf • Conference Facility: 25,000 sf • Service / Mechanical / Storage: 103,000 sf • Residential / Hotel: 397,000 sf (split to be determined) • Guest Services: 28, 000 sf 3. What is the size/scale of the project, the height and bulk? The project arca contemplated for redevelopment is approximately 5.39 acres (234,700 sf) and includes Lot 21, Lot 65B, Benchmark, as well as the Town's Lot 65A. The project is structured into two areas, a north and south area, separated by a main street and public multi -use events plaza. The total building footprint at the ground floor / street level is 2.69 acres (1 17,500 sf) or 50% coverage of the total site area. The other 50% of the total site is covered in a mix of exterior amenities, open space, new 'main street' and public multi -events plaza being proposed. The height of the project varies on both the north and south areas, between (3), (6), and (10) stories that step back deliberately to respond to views and solar conditions. The maximum height of the project is (10) stories at 120' and the average height of the project is (6) stories at 80'. A significant portion of the project abutting street level is (3) stories at 40'. 4. How are views, solar issues, and general orientation issues being addressed? Physical Address: (970) 949-7034 Mailing Address: 90 Benchmark Rd., Suitc 202 fax: (970) 949-8134 P.O. Box 1734 Avon, CO 81620 email: gencral@vagarchrtcets.com Vail, CO 81658-1734 The project is oriented to take advantage of views in all directions, and to be viewed from all directions, given the location of the redevelopment site within the Town Center and greater context within the Town of Avon at the base of Beaver Creek. As such there is no 'back of house' philosophy on this project, all facades will be treated with great care given the presentation and visibility to the community. Emphasis has been placed in the orientation of elements to create a cohesive street fabric at the ground level and to frame primary and secondary views to, from and through the project. Special care has been given to create sun -tilled south and south west outdoor spaces and maximize the most desirable solar aspects. Likewise the building mass has been developed to avoid shadow casting into key areas of the plan during the most critical times of the year, especially along the new main street and public plaza. 5. What is the intended phasing? While there is no fine plan for phasing, a phased approach to development is definitely being contemplated. The preliminary direction is first to redevelop the south side of the project along with the bulk of the new 'main street'. The second phase of the project would then involve the redevelopment of the north side of the project as well as the proposed public multi -use events plaza. 6. What type of tenants are contemplated and how is Orion dealing and addressing displacement (and / or replacement) of existing businesses? Orion anticipates a variety of businesses and tenants for this project and given the emphasis of the project on multiple land uses. A few mid-size anchor retailers are desired and anticipated to help 'ground' the project at the street level as well as healthy mix of unique life-style retail shops, restaurants, and dining establishments. An entertainment and cultural venue for indoor performances has been contemplated. The overarching goal is to create a vibrant retail and shopping environment that will foster a 'sense of place' within Avon's downtown. Professional businesses such as legal, design, engineering, and medical are contemplated for the office spaces on the 2nd and 3 floors. Boutique hotel operators of international reputation are being considered for hotel and lodging land uses. Orion is also in the process of identifying which existing businesses may be interested in staying in the project and negotiating details that would allow their permanence. The phasing approach is also being done to address displacement of existing businesses and there will likely be opportunity for some businesses to be displaced into one area of the project while the other is being worked on. Ultimately there are market and economic factors that will affect the desire and ability of each existing tenant to remain in the project. 7. How is employee housing / core housing being addressed at this stage? Orion Development is fully aware that housing is the major issue facing the greater resort region and is prepared to help the Town of Avon set the best precedent possible in this arena. As such Orion Development is addressing employee housing with a 'core' housing philosophy. This philosophy places emphasis on providing employee housing within the commercial core of the project, and integrated into the project 'on-site' first and foremost and to the extent that is possible. Only after all on-site opportunities have been maximized, and if necessary, Orion will consider off-site housing strategies, and lastly payment in lieu strategies. Orionis willing to negotiate core housing with the Town of Avon in context of town -wide issues. It may be desirable to pursue a combination of on-site, off-site, and payment in lieu strategics in order to fully address the range of needs of employees and the Town. Orion Development is currently analyzing Eagle County's Housing Guidelines and amendments being considered to the housing guidelines and their applicability to this project. 8. What does Orion want to `get' from the Town, and what is Orion proposing to `give' to the Town? What is the public benefit? Physical Address ( 970) 949-7034 Mailing Address. 90 Benchmark Rd., Suite 202 fax: (970) 949-8134 P.O Box 1734 Avon, CO 81620 cmml gencmlCavagarchitects corn Vail, CO 81658-1734 This is a question / issue that will be over-riding the entire application and review process. Ultimately it is Orion Development's intent to negotiate closely with the Town to reach a balance between what is being provided to the Town as public benefits, and what is being conceded by the Town toward making the project possible for Orion. At this stage, Orion Development believes that the consolidation of (3) of the key parcels in the East Avon District and the proposal to redevelop these as a whole is of tremendous value to the Town. It greatly facilitates the implementation of a new main street as identified in the Comprehensive Plan and also allows a significant arca of the Town Center to redevelop, with a critical mass sufficient to catalyze redevelopment and fit within the Urban Renewal Plan that the Town is seeking to establish. In more detail, Orion Development is proposing to include the Town's Lot 65A within its redevelopment area and due to the location of the parcel as an `island' within Orion's land assets. Orion would reciprocate this inclusion of Lot 65A by establishing the framework for, designing and building the new main street. The right-of-way of the new street would possibly be deeded to the Town and to equate the same land mass occupied by Lot 65A. Other benefits such a major public multi -events plaza are also contemplated in the current plans, but at this time Orion believes it is premature to begin discussing any such commitments with the Town and until the plan is developed in greater detail. Eric, I hope you understand our approach at this time in the process and it is acceptable to you, Larry and others at the Town of Avon. Please feel free to contact me at any time should you need any further information and clarification toward the work session. We would greatly appreciate any preliminary feedback you may be willing to provide in advance of the work session and are open to any suggestion you feel may make the work session(s) more successful and effective. We look forward to continuing to participate in the planning process initiated in July of 2006 and are very excited to be directly involved with the redevelopment contemplated for Avon in the near future. Orion Development is likely to be one of the Town's greatest allies in moving the redevelopment vision forward, and we look forward to the May 15 work session. Thanks again for your inclusive approach and consideration. Respectfully, Pedro Campos, ASLA Senior Land Planner & Landscape Architect VAg, Inc Architects & Planners --- END OF MEMORANDUM --- Physical Address. (970) 949-7034 Mailing Address: 90 Benchmark Rd., Suite 202 fax (970) 949-8134 P O. Box 1734 A% on, CO 81620 email: geneml@vagarchitects.com Vail,CO 81658-1734 bD �g p��ii 4AD1811" ;aiva anssi 9M:OK toarona ,&M -„i :RIVDS (,£Z+ Ian31) £p;uaulasug - uuid .10019 :a Iiu 9AIMV71u oparoIoD'uond t Z ;OZ :3w N'loaroxa w a QV1 y a o a a r O r M N .ti 0 h� Q m U ju < S a z ¢ w HU -Ww v r ti w c7 V a w z a W Q a o C1, E❑❑❑❑EN / i a caa[iro :atva anss[ „o-, Id 010 ([££+ [ana'I) ZO auamaseg - ue�d ioo�,� ...� Wall swmvaa O a e a€ # opeJoIo7 °uon'V y w N iZlo'I 9CSZ:UN A.3HMlid :II N13WOaa 4 N y f� 0 m F , W d U 44 i�u<<uiiu��u�iu<<u►�u<<u� i i i 0 318119• :11vc 3055[ 9Csz :oN iairOHa „P,09=„[ :a7VJs (1£b+ Ian37) 10 jUauia5eg - ueld .1001A w v, G' h z U J Q Q w z a - Ww F w w w Q? .w�o¢ Q o w W° IS n/ u U a. [L U R4 F in. OF �• 0 low _ op wo•�• • :a Illi oNIMYau opelo[oD'uoetl TZ 1o'I :3wroN L13mNa LO/BIl40 :3.Lv0 :iflsS, .&M -A :3wjs (,£S+ [aAarl) 10 algid ug[d.100[3 �• , r.� � $ g � j� S ^ :33111. ONIMVNtI opeaoIoJ >� `uoniZ101 9M :ON 1J3romd :31W N .C13fONd a5 Q v m W T rl N y� ao c o M ^ W U 7. UJ Q R y N a ism 5 's a � m ism d coreuto :3lva anss� ,.o-,�=„� :311v�s c a x a a (,89+ IaA31) ZO alEld Leld .10013 <� 1 r• a g p 3 c :311111.9MMtl Q O opeaoIo:) °Qonm N IZIo1'I 9f5Z :ON 3J3fOUd :3 W V N 133ZONd y. y N N N O MNO 00 h CA F`1-. •7y ti aQ! a0 F C1� M❑❑❑❑-� / I roBv>o :aivu aassl 9M :O\ 133foua 1'"-„i :a'rvos i e c � 1 caeuxa :atva "881 �K � � � x �yy x (,06+ [ana'I) t�0 algid ugly doold �O ~ 0 i g j a x 3 `3'ilil. ONIMVNa Q � a € opea010J `aonV N iZlo'I x 9LSZ :aA JJ3fOHd :3WtlN.L73fONd wcr N C � N en R 9 w - _ U z zQn W w ¢ F U C p. ■❑❑❑❑■■ 41 s carsveo �ayva anssI „o-,av=„l :anvos C; x � (,[OT+ laAa'I) SO 3301d UVId.10O13 [� _ ope rojoj'ul1onN jZ i0 rl1 E C E 9f5Z :ON .IJnfONd ;HWYN iJnfONd m � m r 5 ® o Q � cr tz� z 0.• W W C7 • • O �o�Q��-0 UJ ate. ■❑❑❑❑ -10 I I I I I I 1 1 1 C L01P1ro0 KLLtlo 3[1551 U 09=,.1 :3'IVJS VIZI l+[anal) 90 meld eid a001,3 00 u o,'I.MViIo o o^ R e € opeao1o3uon1 N TZ 9"Z :ON 1J3roma :3 W V S 1p8rotta Iei� N a S b 9 8 W F F d m z > U w x F W U d OO z F, U] W Ai O W z � `. I..1w m LOrBlfro :31tl(13RSSI '10-109=„1 :31M)s / e fifi n ;� 11CZT+ lana'I) Lo alUld aeld x001A O� �• 1 ~ � �� � as ?' 3'i11194LMtlMo 0 b0 e € ope.10103'uoeV N T Z 1o'I wsz :OK JJ3fowd :3w” 133roaa y 0 � � M M r `V Inti � �i U U d W ^a d U w z a Q H zo N OF d C a LONIM :31va 3assl ..0-109-111 >33vas (Ih£i+ lana'I) 80 Nuld U91d -10013 O bDy E a 22e 2201,opelol oJ'non1 N lz a 6 wsz:oNjjsrobd :HW N1 3roud w C C N ac r 3 � ® o v. U u ¢ ¢ F w x z U W w ^. z Q� w CD 0 Q �j xo H o ¢ o u U �./ LWBI/oo :,Uvuansm &.09=..1 ;ajvV d C�2_. x Ax d3 (,Stl+ lanai) 60 3191d ueld J00IJ opeaoloa IUOAV y N d h iZlo'i e` x 9fSZ :Ok JJefOrid :3W VN .LJafONd V Q c c N V' N 47 f7 N 7 M N Q S L ® o x Q 94 W ¢< w d x z w �J Z � >z � w � 0 OV rWy U w a U O C7 cK vwi LOlBlnO :31v(t af19s1 1&109-1.1 :'d'IVJs (19SI+ I3n37) 01 aluld ueld J001A N `. , r j # P c :3'1111 `.1MMtlaa Q a v €a a opeaoloa � `uona N < TZ l0'11 1 9esz :on�.l�3roaa :3wvN a�3roaa w N N N R Q O 00 e7 N Q g ® `o Lu Y F F ¢ 0 m z �! ad _J F w FWD F w� w w a V CW7 C7 g w z a q H zo A• g�g R Y a ix 1 \ I I \ I \ I \ \ I � I �p � \ I I • I • c� \ ' I � I 1 &.09-A :33vJs LOISIM :3.Lva3ass1 ugld PON M :39.1.11 Wmwa ope.1010:) `UOAV N i Z 101 3 W V N .173fOMA 9Cs7:O\ IJ3fOHd L �(77� ee � F Q E v Q C4 a a w U LLIu < CA U ¢ $ w w pw CA v7 z a x W¢ ® Y 7 wi rHn CA F r� (A/CS/60 :3.LVO 8ass1 %"S W ION :39Y3S a 3 fi , x�55 3ya ;)AI JaVad \• � � d � R ; 9 d c �3331.L'JNIMtlNO r� 6 e� 3 opeao1o3 'uond w N TZ 101 a h 9fSZ �ON,LJ3LOHd :3WtlN 1J3fOUd 72 L ID E3 0 L 0 0 r,1 V LOIM" !8 VO WIRS1 vcsz :oN .raarova -PN M ION :glvJ an►;aasJad 3IIIl BNIMV ff OpeaoIO:) 'aonV [Z 3o7 :awvN ioaroaa LOT 21 - AVON, CO PRELIMINARY DEVELOPMENT SUMMARY -/►, �A VAg, Inc. architects & planners April 20, 2007 PLATE # PARKING RETAIL/ COMMERCIAL CONFERENCE ISERVICE/MECH.1 RESIDENTIAL HOTEL/GUESTJ BELOW GRADE ABOVE GRADE SPACES SQ.FT. RESTAURANT FACILITIES STORAGE SERVICES GFA GFA ' BASEMENT 03 374 20,902 174,903 IBASEMENT02 232 i 25,080 26,175 174,903 BASEMENT 01 218 25,109 174,903 PLATE 01 38 75,411 3,535 6,781 111,216 PLATE 02 40,821 2,513 28,324 9,921 98,794 PLATE 03 * 43,370 2,710 28,324 6,429 101,898 PLATE 04 3,727 58,726 4,814 81,935 PLATE 05 3,727 63,540 81,935 (PLATE 06 3,727 63,540 81,935 PLATE 07 3,356 45,840 61,767 PLATE 08 3,356 45,840 61,767 PLATE 09 2,105 31,422 41,823 PLATE 10 2,105 31,422 41,823 ;TOTAL 862 0 75,411 84,191 25,080 103,047 396,978 27,945 1 524,709 764,893 * Not measured P:12536 -Lot 21 Redevelopment1111. Project Information102. Program and Unit CountslPreliminary Program Areas_070418.xis T O T A L G F A 11,289,602 I