PZC Packet 0906051
Town of Avon Planning & Zoning Commission
Meeting
AVON September 6, 2005
C 0 L 0 R A D 0 Meetings Held At: Avon Town Council Chambers
Meetings are open to the public
Avon Municipal Building / 400 Benchmark Road
5:00 pm - 5:30pm Commission Work Session
(Discussion of Items on Agenda)
- REGULAR MEETING AGENDA -
I. Call to Order at 5:30 pm
Il. Roll Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda: Approval of the August 16, 2005 Planning & Zoning Commission Meeting
Minutes.
VI. Comprehensive Plan Update (6:00pm - 7:00pm) - PUBLIC HEARING
Description: Discussion on the proposed Goals and Policies. Discussion of regional land use
issues with Eagle County Senior Planner Cliff Simonton.
VII. Sketch Design - Mountain Center (7:00pm — 7:15pm)
Property Location: 910 Nottingham Road
Applicant/Owner. Mark Donaldson / Lund Capital Group
Description: The applicant is proposing to renovate the existing Mountain Center building by adding
architectural features to both the north and south elevations. The proposed modifications include:
decorative crown molding, metal roof forms above storefronts, window trim, columns, and arcade over
the existing staircase on south elevation.
VIII. Final Design — Walsh Residence (7:15pm — 7:30pm)
Property Location: Lot 10, Block 4, Wildridge Subdivision/5730 Wildridge Road East
Applicant: Jim Jose / Owner: Karen Walsh
Description: The applicant is proposing a final design plan to add a second dwelling unit onto an
existing single-family residence on Wildridge Road East. The application would utilize the existing
entrance to the property and all materials are proposed to match the existing structure with a stone
base and stucco. A sketch design plan for this project was reviewed at the Commission's June 7,
2005 meeting.
IX. Sign Design - Wells Fargo Bank (7:30pm — 7:45pm)
Property Location: Lot 22AB, Block 2, Benchmark at Beaver Creek Subdivision/250 Chapel PI
Applicant: Billy Huff - RMD Signs / Owner: Timberline Commercial Management
Description: The applicant is proposing two exterior signs for the new Wells Fargo Bank location in
Chapel Square. The two signs would be similar in design to the existing oval shaped business
identification signs in the Chapel Square PUD.
Posted on September 2, 2005 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main entrance bulletin board
• On the Internet at http://www.avon.org / Please call (970) 748.4030 for directions
X. Town Zoning Code Additions & Amendments (7:45pm - 8:15pm) PUBLIC HEARING
Applicant. Community Development
Description: The Commission to review a proposed Ordinance to amend Section 17.08 of the Avon
Municipal Code as it relates to the definition of "Use" Section 17.08.820, "Accommodation Unit"
Section 17.08.050, and "Kitchen" Section 17.08.400. The proposed Ordinance would add Section
17.08.285 to the Avon Municipal Code for the definition of an "Efficiency Kitchen".
XI. Other Business (8:15pm - 8:30pm)
A. Lot C PUD Amendment scheduled for September 20, 2005 Commission meeting.
XII. Adjourn (8:30pm)
Posted on September 2, 2005 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main entrance bulletin board
• On the Internet at htti)://www.avon.org / Please call (970) 748.4030 for directions
FIN Town of Avon Planning & Zoning Commission Meeting
VONMinutes
COLORADO August 16, 2005
5:00 pm — 5:30 pm Commission Work Session
I. Call to Order
The meeting was called to order at 5:37pm.
II. Roll Call
All Commissioners were in attendance with the exception of Commissioner Savage.
III. Additions and Amendments to the Agenda
There were no additions or amendments to the Agenda.
IV. Conflicts of Interest
There were no conflicts to report.
V. Consent Agenda:
■ Approval of the August 2, 2005 Planning & Zoning Commission Meeting Minutes.
Commissioner Smith motioned for approval of the Consent Agenda and Commissioner Struve
seconded the motion. Motion passed 5-0 with Commissioner Buckner abstaining due to his
absence at the last meeting.
VI. PUD Amendment / Sheraton Mtn. Vista - PUBLIC HEARING - Tabled from August
2, 2005 Meeting
Eric Heidemann made a presentation. Packet contents were presented, including a massing
mode[ with existing and proposed buildings. The history of the project, phasing, and the
surrounding land uses were outlined by staff. Elimination of restaurant, hotel space, and
commercial space was highlighted as it relates to staff's recommendation.
Commissioner Green questioned the water rights. Norman Wood explained how the original
development rights from the Avon Center at Beaver Creek Subdivision relate to the current
PUD plan. Commissioner Evans questioned if there is enough water for this development.
The response in short was that yes, there is Town water to negotiate for what is proposed.
Commissioner D'Agostino asked staff about the use by right for office and/or retail space.
The existing PUD permits retail space on the ground floor. The applicant would like to add
'office' as a use by right to the definition of retail. Commissioner D'Agostino questioned why
the applicant did not want to take part in a joint work session with Council.
The applicant, Ruth Borne, made a PowerPoint presentation to the Planning Commission
showing other timeshare properties operated by Starwood. Alexander Sheykhet (architect)
and Jim McKnight (Starwood Vacations) were introduced. Mr. Sheykhet made a detailed
presentation of the project.
N
Ruth Borne outlined the existing and proposed entitlements including number of units, uses,
and parking requirements. There was discussion of hotel versus timeshare use. , The
applicant stated that the current Sheraton averages almost 78% occupancy, with 20% being
hotel:
Commissioner Green questioned whether the "hotel" occupancy would be higher in the
proposed situation opposed to the mixed hotel/timeshare mix. Commissioner Evans spoke to
the parking in Section 5 of the proposal — Parking Standards. The definition of dwelling unit
versus timeshare unit and how parking is and has been applied to the project was discussed
at length. The Commission was in general agreement that the parking standards needed to
be clarified by the next meeting.
Commissioner Green asked about how the subdivision for the current project took place, and
if it was contemplated with the original approval whether the 2 bedroom units could be
subdivided into two separate units. The applicant explained the rational for the phasing.
Commissioner Evans asked about Phase 1 D and 1 E and how they relate to the Main Street
plan. Alexander pointed out the building architecture and how the buildings step down from 7
to 6 to 5 stories as it approaches Main Street. Additionally, the architectural features the
building would contain. Commissioner Green questioned how this project is pedestrian
friendly. Alexander explained how ground level features such as well-proportioned canopies,
retail space, and natural materials would benefit the pedestrian experience.
Commissioner Struve asked if the other Starwood properties have a standard for the ratio of
Commercial space for these projects. Mr. McKnight responded that the geographic area is
assessed and there are no set standards.
Commissioner Evans asked if Alexander could point out with the massing model what the
existing entitlements would look like opposed to the proposed massing. Alexander showed
the Commission how the project would look in both scenarios. Commissioner Buckner
questioned the proposed massing and if it was the economics that were driving the
appearance. He asked if there was consideration in keeping with the existing building
massing.
The relationship of the project's massing and Main Street was discussed. Alexander
described how pedestrian vitality could be strengthened with density, and not just the amount
of retail/commercial space provided. The Commission wanted to focus on the pedestrian
experience and how the proposed buildings may affect this experience.
Commissioner Green voiced the uninviting pedestrian environment as it relates to the 1996
Comprehensive Plan. Ruth Borne discussed the westerly elevation and how its architecture
was driven by the need to accommodate delivery vehicles and trash services during original
approval. Way finding from the Avon Recreation Center to the project and visa versa was
commented on, and the feeling of closing in the Courtyard with the buildings.
Commissioner Evans opened the Public Hearing to any interested members of the public
OPEN PUBLIC HEARING
There were no public comments..
CLOSE PUBLIC HEARING
r
Commissioner Evans summarized his issues with the application as it stands. Ruth Borne
explained their feelings on other projects in Town and the need for flexibility in the Lot C PUD
application. Commissioner Buckner was concerned with water. He felt that the mixed-use
aspect and project massing could benefit from discussions through a work session. The
underground access for Lot B was questioned. Ruth Borne responded that water would be
brought to the Town instead of buying from the Town. Commissioner Buckner was
uncomfortable with the massing of Phase 1 D specifically and the resulting phasing proposed
with this application. A work session possibility was discussed and whether a
Council/Commission session could happen. Tambi Katieb responded that this type of work
session could no longer happen with a live application.
Commissioner Struve wants to see water worked out, parking fixed, smaller retail spaces,
additional landscaping, and is concerned with the massing of the project as a whole.
He felt that the project would benefit with some sort of attraction in the courtyard to help draw
people in, instead of turning its back.
Commissioner D'Agostino was not in support of application as it stands. Specific points to
highlight included: the hotel to timeshare was o.k., disappointed with the loss of pedestrian
spaces at ground level, the parking definition and loss of spaces needs to be worked out, the
water issues must be resolved, massing of the project as it is a barrier and not a gateway
which is against the goal of creating a place. Two main issues; height and massing. The
building's new proposed phases do not appear to step down to Main Street. Scale could be
perceived better from all angles if the project were built with the current phases. More detail
fenestration, needs to be added.
Commissioner Smith has no problem with timeshare opposed to hotel land -use. She had a
problem with the perceived massing of Phase 1 D and it is not an inviting element to enter the
property. The Benchmark side is an issue and retail needs to be incorporated into the new
phases. Parking is a big issue even with existing phases. Underground parking is not
pleasant for guests who arrive by car and is not in support as presented. Commissioner
Green discussed issues relating to pedestrian orientated spaces. Massing does not step
down in a graceful matter. Commissioner Green referenced page 32 in the Comprehensive
Plan as it relates to public spaces. Parking was a concern to Commissioner Green and he
felt that the restaurant use may not be removed with the new phases.
Commissioner Evans stated that he is willing to accommodate a timed approach to
retail/office uses as part of a resolution with. He would like to retain the ability to have those
spaces there with carefully crafted language while still maintaining flexibility. Parking and
massing were also an issue to Mr. Evans.
Alexander stated that there seemed to be three general areas that the Planning Commission
had issues with that included: the retail space, massing, and parking. Ruth Borne followed
by requesting for a tabling to see if they can balance their needs and Commission's with
more time. Eric Heidemann asked for a two meeting tabling to allow staff for time to review
and evaluate any revised information that staff would receive.
Tambi Katieb requested a strikethrough draft Development Agreement to assist with the
review of this application. Ruth Borne stated that this is not the appropriate time since there
may be some major revisions between now and Council review. The Commission discussed
phasing and the desire was for one more phase instead of two. Mr. McKnight's response
was that only one more phase would not be economically feasible. Commissioner Evans
stated that if the remainder of the project did not happen all at once than what is the
compromise. The timing of the development agreement before going to council was
reiterated.
k.
Commissioner Green motioned to table the application until the regular meeting on
September 20th meeting. Commissioner Smith seconded the motion and all Commissioners
were in favor. The motion passed 6-0.
XII. Other Business
Commissioner Green questioned the parking and widening of Old Trail Road. It was
commented that there is no shoulder now. The next council meeting on the 23rd will include a
presentation by Design Workshop to follow up with the design charret and open house.
Discussion may include what the first phase of project will be.
Tambi Katieb gave update on the Gates project and stated that all approvals are now void and
expired. The Commission's decision on Lot 12 was upheld by Council.
XIII. Adjourn
Commissioner motioned to adjourn; Commissioner seconded the motion. All Commissioners
were in favor. The meeting was adjourned at approximately 8:30 pm.
Respectfully submitted,
Matt Pielsticker
Community Development
APPROVED:
Chris Evans
Chairman
Phil Struve
Secretary
Memo
To: Planning and Zoning Commissioners
From: Eric Heidemann, Senior Planner
Date August 29, 2005
Re: Proposed amendments to the Avon Municipal Code- Title 17 (Zoning)
Resolution 05- 11 PUBLIC HEARING
Background & Summary:
Attached to this memo is a resolution being forwarded for review, discussion, and
recommendation to Town Council regarding several staff initiated zoning code text
amendments. The proposed amendments presented are the result of several discussions at a
staff level regarding outdated, or unclear zoning definitions. Although the zoning code has
been recently updated in some areas, the definitions proposed for amendment have been in
existence for 20 years with little or no changes to them.
Several of the proposed amendments are directly related in their application or function and
have been identified by staff as outdated, particularly the definition of an "accommodation unit".
Through the evaluation and analysis of several significant land use applications currently under
review, it is apparent that conditions have changed in the market place, which requires more
flexibility with respect to how our code distinguishes or classifies land uses. The discussion
section below outlines the individual definitions proposed for amendment and a brief
description of the rationale for the amendment and it's applicability.
Discussion:
Resolution 05-11 proposes to amend the Avon Municipal Code - Title 17 (Zoning) with respect
to the following definitions. The underline text is language added, and the strike through text
would be eliminated:
• Section 1: Use. Use means the purpose for which land or a building is designated,
arranged, or intended, or for which it either is or may be occupied or maintained. Uses
not expressly allowed in this chapter as an "allowed use" are expressly prohibited,
unless otherwise approved."
In the past, staff has relied on the Zoning Administrator or the Planning and Zoning
Commission to make interpretations regarding among other things permitted or non -permitted
land uses. With regularity, those interpretations have concluded that uses not explicitly stated
as "allowed uses" were not permitted. This section of the amendment would add the last
sentence to the existing definition thereby making that determination clear. However, in the
event an applicant wanted a formal interpretation, that process would still be allowed.
-s -
Section 2: "Accommodation Unit. Accommodation unit means any room or group of
rooms , used primarily as-a-bedfeem for transient lodging, and
accessible from common corridors, walks or balconies without passing through another
accommodation unit and shall be no larger than 600 square feet. er-dwelling-unit An
accommodation unit may include an efficiency kitchen. Each accommodation unit shall
be counted as one-third (1/3) of a dwelling unit for purposes of calculation allowable
units per acre.
The "accommodation unit" has traditionally been used to describe a hotel room or a room that
functions similar to a hotel room. Many hotel developers have changed the way theses rooms
are marketed by the provisions or services the hotel rooms provide. For example, many hotel
rooms furnish what we later in this memo describe as an efficiency kitchen. This may include a
sink, refrigerator, or a hot plate. Because our current definition of an accommodation unit
prohibits these features, the way staff calculates density becomes skewed. Under our current
definition, if an accommodation unit contained a microwave, that unit would be consider one (1)
dwelling unit as opposed to an accommodation unit which is measured as one-third (1/3) of a
dwelling unit.
Because these units essentially function the same, with or without these specific features, we
believe that the proposed definition provides the flexibility needed in determining density. Its
important to note that this ratio (1/3 of a dwelling unit) only applies to the calculation of density.
All other matters (i.e. minimum parking standards, or water right allocation) are calculated
independent of this definition.
• Section 4:
#eRewing
"Kitchen. Kitchen means a room or portion of a room devoted to the preparation or
cooking of food for a person or a family living independently of any other family which
contains a sink and a stove or oven powered by natural gas, propane or 220-V electric
hook-up.
The definition of a kitchen is important primarily when used for the determination of a dwelling
unit. The presence of a kitchen has historically been used to distinguish a dwelling unit from
other incidental uses. If a structure contains a single kitchen, as defined above, then staff
calculates that structure as one dwelling unit. The current definition of a kitchen is broad, and
the literal interpretation would prevent features such as wet bars or what we describe below as
an efficiency kitchen, from being placed as an incidental use in a dwelling unit.
Staffs approach to the amendment is to refine the current definition of a kitchen and segregate
incidental features (see definition of efficiency kitchen below) from the currently broad definition
of kitchen. The distinguishing characteristic is the presence of a stove or oven.
• Section 3: "Efficiency Kitchen. Efficiency kitchen means a room, wet bar or similar
facility that may contain a sink, refrigerator, dishwasher, microwave oven, and/or hot
plate but expressly not a stove or oven, within an accommodation unit or dwelling unit
i
that is intended for the storage, preparation and serving of food or drink. Stub outs for
natural gas, propane or 220-V electric hook-ups are not considered customarily
incidental to a wet bar.
Recommendation:
We anticipate that the Commission will have questions on the proposed changes during your
meeting. We would like your feedback and any proposed changes to the resolution in order to
present this set of Zoning Code revisions to Town Council for first reading at their September
13, 2005 regular meeting.
We recommend that you hold the public hearing and deliberate on the proposed revisions, and
recommend approval to Town Council of Resolution 05-11. Should you choose to amend any
language of the proposal, staff is able to make those changes as part of your motion and codify
them in the signed resolution to Council.
Proposed Motion:
"I move to approve Resolution 05-11, recommending to Town Council the adoption of specific
revisions to Title 17 (Zoning) of the Avon Municipal Code"
Exhibit:
A- Resolution 05-11 Amending Title 17 of the Avon Municipal Code.
TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO. 05-11
SERIES OF 2005
A RESOLUTION RECOMMENDING APPROVAL TO THE TOWN COUNCIL OF
AMENDMENTS TO TITLE 17, MUNICIPAL CODE OF THE TOWN OF AVON, AS IT
RELATES TO THE DEFINITION OF USE, ACCOMMODATION UNIT, KITCHEN
AND ADDING A DEFINITION FOR EFFINCINCY KITCHEN
WHEREAS, Title 17 of The Avon Municipal Code requires review and revision on a
periodic basis in order to continue to serve the public interest; and
WHEREAS, the Planning and Zoning Commission have reviewed the attached revisions
("Exhibit A") to Resolution 05-11 Series of 2005, and held a public hearing as required
by the Avon Municipal Code to review the proposed amendments.
NOW, THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission
hereby recommends to the Town Council the approval of changes set forth in Resolution
05-11 Series of 2005 in order to amend the existing Avon Municipal Code as adopted.
ADOPTED THIS 6th DAY OF SEPTEMBER, 2005
Signed:
Date:
Chris Evans, Chair
Attest:
Date:
Phil Struve, Secretary
Exhibit "A" to Resolution 05-11
ORDINANCE NO. 05-11
AN ORDINANCE AMENDING TITLE 17, MUNICIPAL CODE
OF THE TOWN OF AVON, AS IT RELATES TO THE
DEFINITION OF USE, ACCOMMODATION UNIT, KITCHEN
AND ADDING A DEFINITION FOR EFFINCINCY KITCHEN.
BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF AVON, COLORADO:
Section 1. Amendment. Section 17.08.820, Chapter 20 of Title 17, Avon
Municipal Code, is as follows:
"Use. Use means the purpose for which land or a building is designated,
arranged, or intended, or for which it either is or may be occupied or maintained.
Uses not expressly allowed in this chapter as an "allowed use" are expressly
prohibited, unless otherwise approved."
Section 2. Amendment. Section 17.08.050, Chapter 20 of Title 17, Avon
Municipal Code, is as follows:
"Accommodation Unit. Accommodation unit means any room or group of rooms
xA,itheut a kitehen, used primarily as ^ bedr-efor transient lodging, and
accessible from common corridors, walks or balconies without passing through
another accommodation unit and shall be no larger than 600 square feet. er
dwelling unit. An accommodation unit may include an efficiency kitchen. Each
accommodation unit shall be counted as one-third (1/3) of a dwelling unit for
purposes of calculation allowable units per acre.
Section 3. Amendment. Section 17.20.110, Chapter 20 of Title 17, Avon
Municipal Code, is amended by addition of a new definition as follows:
"Efficiencv Kitchen. Efficiencv kitchen means a portion of a room. that ma
contain a sink, refrigerator, dishwasher, microwave oven, hot plate, wet bar or
similar facility but expressly not a stove or oven, within an accommodation unit
or dwelling unit that is intended for the storage, preparation and serving of food or
drink. Stub outs for natural gas, propane or 220-V electric hook-ups are not
considered customarily incidental to an efficiency kitchen.
Section 4. Amendment. Section 17.08.400, Chapter 20 of Title 17, Avon
Municipal Code, is amended as follows:
fig:
(1) Running water and sinki
i
and
(3) n e : .,t
Exhibit "A" to Resolution 05-11
"Kitchen Kitchen means a room or portion of a room devoted to the preparation
or cooking of food for a person or a family living independently of any other
family which contains a sink and a stove or oven powered by either natural gas,
propane or 220-V electric hook -W.
INTRODUCED, APPROVED, PASSED ON FIRST READING AND
ORDERED POSTED the 13th day of September, 2005, and a public hearing on this ordinance
shall be held at the regular meeting of the Town Council on the 13th day of September, 2005, at
5:30 P.M. in the Council Chambers, Avon Municipal Building, 400 Benchmark Road, Avon,
Colorado.
Ronald C. Wolfe, Mayor
ATTEST:
Patty McKenny, Town Clerk
INTRODUCED, FINALLY APPROVED, PASSED ON SECOND READING
AND ORDERED POSTED the - day of )2005.
Ronald C. Wolfe, Mayor
I
ATTEST:
Patty McKenny, Town Clerk
APPROVED AS TO FORM:
John W. Dunn, Town Attorney
Staff Report
Sketch Desi
AI U WN17�j`
VON
■■ C O L O R A D O
September 6, 2005 Planning & Zoning Commission meeting
Report date August 26th, 2005
Project type Commercial Building — Remodel
Legal description Lot 26/27, Block 1, Benchmark at Beaver Creek
Subdivision
Zoning Industrial Commercial (IC)
Address 910 Nottingham Road
Introduction
The applicant is proposing a sketch design plan to renovate the exterior of the Mountain
Center Building, which is located on the western end of Nottingham Road. The
proposed remodel includes: 1) a canopy addition over the stairway of the south
elevation; 2) applying crown molding and trim; 3) adding metal roof features above
storefront entry ways; 4) replacing overhead (roll -down) doors on the northern elevation;
and 5) relocating garbage dumpsters. Although most of the materials have been
described in the sketch design application, the proposed colors should be referenced at
final design.
The Mountain Center Building is partially occupied with commercial tenants on both the
second and third levels of the building. The first level contains what appear to be
unoccupied self -storage rooms. The applicant was recently issued a
demolition/maintenance permit to begin the renovation of the building.
Staff Comments
The exterior design modifications proposed appear to be in conformance with the Town
of Avon Residential, Commercial, and Industrial Design Review Guidelines and will be
an overall improvement to the buildings appearance. In general, the proposed
architectural features enhance the facade of the building, which has a prominent view
from 1-70. Although the building is linear with little articulation in mass and form, there is
some opportunity with the use of colors, materials, and details to enhance the building.
The applicant appears to be addressing this through the use of the standing seam metal
roof above level one entry way (south elevation), the use of columns, and applying
molding and trim around the windows.
The site plan indicates that the existing enclosed garbage dumpsters will be relocated.
The western most dumpster is currently located within Town right-of-way and will be
pushed further west outside of this right-of-way. The eastern most dumpster will be
relocated form the primary entrance further east to what appears to be a designated
parking space. Staff would ask that the applicant to clarify whether the future locations
will include enclosures and what material will be used for these enclosures. It appears
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 26/27, Block 1, BMBC, Mountain Center Sketch Design — Remodel
September 6, 2005 Planning & Zoning Commission meeting Page 2 of 3
that the current enclosures are 5-6' CMU walls that are painted to match the building.
Staff would also ask the applicant to clarify the height of any proposed enclosures and
whether the eastern most dumpster would be located in a designated parking space.
If the proposed dumpster is located within a designated parking space, the elimination of
one parking space does not appear to be an issue because the site plan indicates that
two spaces would be added along the southeast corner of the building by filling in the
first floor garden level area. Although the applicant has discussed with staff how the
future entrance and exists to the building would function, staff would ask that the
applicant be prepared to discussed access to the proposed building with the
Commission.
There are two other areas that may help improve the visual quality of the building: a
formal lighting plan, which would be required a final design, and a landscaping plan. In
addition, the applicant will be required to submit an application for a sign permit for any
proposed signs. The applicant acknowledges in the application that sign(s) to be
reviewed under separate application.
Design Review Considerations
The Commission and Staff shall evaluate the design of the sketch plan utilizing the
specific Design Standards, and by using the following general criteria:
A. The conformance with setbacks, massing, access, land use and other
provisions of the Zoning Code.
B. General conformance with Residential Development Sections A through D of
the Town of Avon Residential, Commercial and Industrial Design Review
Guidelines.
At the meeting the Commission will take no formal action on this sketch plan application.
Rather, direction on the design will be given to the applicant from Staff and the
Commission to incorporate into the final design application. Full size plan sets will be
available at the September 6`h meeting to provide written comments and guidance to the
applicant.
If you have any questions regarding this project or any planning matter, please call me at
748-4009, or stop by our office.
Respectfully submitted,
ric H emann
Senior Planner
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 26/27, Block I, BMBC Mountain Center Sketch Design — Remodel
September 6, 2005 Planning & Zoning Commission meeting Page 3 of 3
'J - -= i�
t o z n+Ch
Town of Avon Community Development (970) 748-4030
Fax(970)949-5749
i
Town of Avon Community Development (970) 748-4030
Fax(970)949-5749
Yi0 �•
(1 .a� "ice.__-..
0.40Ym Y i IN Y
'm..,.... ,.3,mY.m+..,.,....»m..
ttzw �N aor I co/zz/so mmssi 31vu
,
soo as mnxo oaa ae wvao
:.
26 T`Ddd Z£0 %003
wo nFw\aa oe2 riond mo P1nna
eim L+i a.a um.atsw.roti.r mm mm
m . n. , ae .t"m mnmitm..�
w C)
II JNILI33NIJN3
a�dra
-ASMAO WaAV'M@ I =01fl BZ 1C91
= O
ua nva oa voae wu
•Lt!'AUVW�fl
CjW Ij��� WBV.Lmrj " --j • W018000Sne=vi V
Ul , .
-
��.LB��/ ii VC W/V
® msvHa—T p,� a q� ' p MIC) a
n
. 3a UAOS 9 d u�o au T
y iyryy 1�C�p$ s de6WM1 2 WLL03S'
'
t�vw �>Hdve adol Cwv awohmi"So wou voo-F J24=-WMaA0UcWWs
3 ru
ysp
€°
§gi'
1 1 �� a 1� � j 8 8
'ry b d m� r. • n b m •� + u
ppa m
S s F m
c�
W z u
�R� p
i
'k
'L wuw...+mors„oxoro+n �.tivr� nuta "acLmm�row
p� � 0 0 o E `eJ IIIIIIIIIIIII III
J O O N O p O
ac,d m E rn
ocz� y
Z ^• m 6
O rn e a�
III��IIIIII��III
0
oms oavHoiOo'NOAV
avow WVH`JNU"
dnose ldlldd3 dNnl
HaD aO NIV1Nf1mam
80d NNOM NOLLVAON3NZl ydaM
W
z
w
v 1
no
n,
0Z%9OOVHOMO'NOAV
OVOM WVHDNI110N
dnOS9 VIM dNnl
N31N30 NIN1NtOW 3H1
NOA NHOM NOLLVAON3a aoR131X3
O O N
O 0 O
m
O> 9 Ol
ocmx
�Nm
W
y
e
� 6
y
e
0
0Z%9OOVHOMO'NOAV
OVOM WVHDNI110N
dnOS9 VIM dNnl
N31N30 NIN1NtOW 3H1
NOA NHOM NOLLVAON3a aoR131X3
�M1oO
o E'n
G O
I
N C'f fD
N
IIIIIIIIIIIIIIII
OZ9680OV210100'NOAV
I
e e
OVOa MONITION
I
,c c
C
ONO Idlldd3 dNnl
��•
m
nL
M1 W
Of C ly
m
yrs
V31N30 NIV NnOW 3Hi
NOA NUQM NOLLVAON3a a01URDS
o
I I I I I I I I I I I I I I
y J.
I I I
I
1
I
I
I
II I
I I I
I I I
I I 1
1 1 I
I II 1
I
I I yI
I I II
y J.
�ooN
oEo
�
"' °" `�
"' •' "'
OZ9L8OOt/i101OO 'NOAV
~
IIIIIIIIIIIIIIII
OVO2! WtlHJNLL1ON
X C
y m"
E
o �X
dnos9 ldlldVO ONnl
Z
ti A 6
E "
H! N30 NIVINnow 9Hl
¢
I
I
I
and AOM NOLLVAON3a NOINEI I
o
e
I I I I I I I I I I
I I
•
�'i
a
0
li
•
R
z
O
t= .
LU:
J
Lu
V/J
W`
a
M
NO
Q o
LU
�r
U1
_fes W
Q,,1Q
W b
E
O O
I
IIIIIIIIIIIIIII
omeoOVa0"IOO'NOAV
„
w t= o
c n
OVOM WVHJNLUON
x
d00S9 lVildVO ON01
Z
ti A C
o
MIN30 N%umoW 3Hl
m
HOA NNOV1 NOI.LVAON3a NOW3I
R
z
O
t= .
LU:
J
Lu
V/J
W`
a
M
NO
Q o
LU
�r
U1
_fes W
Q,,1Q
W b
IF
II I I I I I I I I I Oz9&e0GVHOIOO'NOAV
avow VfVI LUON
dnON9lVIIdVO dNnl
H N3O NIV.LNnOW 3H1
IIIIII II N&INUOMNOUVAON3a'SO MIY3
z n o
ri z
W
w
Staff Report 7vi
FINAL DESIGN PLAN
C O L O R A D O
September 6, 2005 Planning & Zoning Commission meeting
Report date August 30, 2005
Project type Duplex
Legal description Lot 10, Block 4, Wildridge Subdivision
Zoning PUD — 2 Dwelling Units
Address 5370 Wildridge Road
Introduction
Jim Jose of Holy Cross Building and Design is proposing to build an additional dwelling
unit onto a single-family home to create a duplex at the top of Wildridge on Wildridge
Road East.
As proposed, the additional unit would match the existing building with consistent
materials (i.e. stone veneer, stucco, cedar trim). While the existing residence utilizes a
stone veneer siding for the majority of the building with stucco and cedar accents, the
proposed addition would use limited amounts of stone on the south (street)facing side
of the building with stucco as the principal building material. The applicant has stated
that there may be changes to the existing structure that will occur during construction.
During sketch design review at the Commission's June 7, 2005 meeting, much of the
discussion included comments on the following items:
• Steep Driveway grades,
• Retaining wall design and construction,
• Vehicle movements,
• Window design,
• Massing, and
• Building sections.
The applicant has provided complete building elevations (existing with proposed) to
show the massing of the entire building, and a colored rendering as well as a color
board will be available for Commission review at the meeting.
History
The existing residence received final design approval in the summer of 1995. Concerns
from the Commission during design review included the proposed metal roofing as well
as drainage at the rear of the building. During construction of the building a design
Town of Avon Community Development (970)748-4030 Fax(970)949.5749
Lot 10, Block 4, Wildridge PUD, Walsh Final Design
September 6, 2005 Planning & Zoning Commission n
2of8
change application was approved for asphalt shingles in place of the approved sage
colored metal roofing. A final Certificate of Occupancy was issued in September of
1996. The current owners purchased the property earlier this year.
Design Review Considerations
According to the Town of Avon Residential. Commercial and Industrial Design Revi(
Guidelines, Section 7, the Commission shall consider the following items when
reviewing the design of this project:
1. The conformance with setbacks, massing, access, land use and other
provisions of the Town of Avon Zoninq Code.
• Allowed use: A single-family or duplex would be allowed on the property.
• Density. The lot is zoned for a duplex and the density is appropriate.
• Lot Coverage: Maximum site coverage allowed for this PUD is 50%. This project
is in compliance with the PUD, proposing 14% lot coverage (building coverage
plus driveway).
• Setbacks The setbacks for the property are typical for Wildridge with a 25' front
setback and 10' side and rear yard building setbacks. The roof overhangs on the
east side of the building addition would border the east setback. As originally
submitted the roof overhang on the east side of the building encroached upon
this platted setback. The Municipal Code requires no buildings, structures, or
uses above or below grade in building setbacks.
The plans have been revised to conform to the setback restrictions in place. An
ILC will be required to verify compliance with the required setbacks.
• Easements Easements of 10' in width border the entire property. The top half of
this property features a platted "Non -Developable" area which, according to the
Wildridge PUD, "shall be physically undisturbed and left in its present natural
state. No disturbance is proposed to this specially platted area.
• Building Height The maximum building height equals 35' on the main north -south
ridgeline located above the garage and living room spaces. This ridgeline is
approximately 5 feet lower than the main (highest) ridge of the existing single-
family residence. A framing ILC will be required to confirm the height
requirement in place.
• Grading. The proposed grading is in compliance with Town standards. Details
for the floor drain and drainpipe leaving the back patio would need to be provided
at building permit submittal. After discussion with the applicant, this drainpipe
may travel down between the two units to the front of the structure where it will
daylight.
• Parking. 6 parking spaces are required for this property, and although tight, 6
parking spaces could be provided with four interior spaces and two exterior. It is
questionable whether or not there is adequate space in front of the garage doors
suitable for outdoor parking at the new dwelling with the limited motor court area.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 10, Block 4, Wildridge PUD, Walsh Final Design
September 6, 2005 Planning & Zoning Commission n
3of8
The lack of maneuverability in the motor court area was discussed at sketch
review.
• Snow Storage: The Avon Municipal Code requires an area equal to twenty
percent (20%) of impermeable surface area be designated as a snow storage
area. However, that requirement "may be waived by the reviewing body of the
Town upon the demonstration that ... on-site snow melt is available." The entire
new driveway is proposed to be paved with an integrated snow melt system.
2. The general conformance with Goals and Policies of the Town of Avon
Comprehensive Plan, and any sub -area plan which pertains.
The project generally complies with the Goals and Policies of the Comprehensive
Plan.
3. Whether adequate development rights exist for the proposed improvements.
Adequate development rights exist for the proposed improvements.
4. The final design plan is in general conformance with Sub -Sections A through
D of the Residential, Commercial, and Industrial Design Guidelines.
• Site Development.
o Site Design: According to the provided survey, the original home was built
far enough to the west side of the lot to allow for a future unit to be added.
The proposed addition would border the eastern building setback and a
significant amount of excavation would be required to site the addition in
the proposed location.
Staff is concerned with the close proximity of the home, and more
specifically the proposed boulder walls to the eastern setback and
property line. It would be difficult not to disturb the neighboring property to
the east (Lot 11, Block 4, Wildridge) during excavation and wall
construction.
o Site Access: Site access is through the existing driveway and no
alterations to the existing driveway are proposed. The new driveway
would branch off through an existing rock wall approximately thirty-five
(35) feet from the edge of road. The main climb up the new driveway
would be at a 12% grade to reach the garage entrance.
The Design Guidelines state that driveway grades should not exceed 10%
for small residential projects; however, with a snowmelt system a 12%
driveway should be functional and safe with consideration to the generous
southern exposure that this property experiences.
o Parking and Loading: Driveway maneuvering is extremely tight in the
motor court area, partly due to the proposed (stepped) retaining wall
design east of the garage doors. A structural wall faced with stone
veneer, similar to what was used on either side of the existing home's
garage doors, would help to provide additional space for parking and
loading.
Town of Avon Community Development (970) 7484030
Fax (970) 949-5749
Lot 10, Block 4, Wildridge PUD, Walsh Final Design
September 6, 2005 Planning & Zoning Commission meeting Page 4 of 8
It was mentioned that the amount of parking is minimal and it must be
determined if an outdoor space is practical in front of the new dwelling unit
to provide the sixth required parking space.
• Building Design:
o Building Materials and Colors: Stucco is the predominate building material.
The proposed colors appear to be earth tone. A color board has been
provided to staff and will be available at the meeting.
It should be noted that the Guidelines encourage multiple building
materials on each elevation of the structure. In order to compliment the
existing single-family home it appears to be appropriate to use identical
colors and materials. The addition would use much less stone veneer
than present on the existing home.
o Exterior Walls, Roofs, and Architectural Interest The Design Guidelines
encourage "projections such as deep eaves, overhangs, canopies, and
other features that provide architectural interest." Architectural interest
has been incorporated into this design submittal and roof overhangs range
between 18" and 48".
Roof pitches are varied with 6:12 and 11:12 pitches. According to the
Guidelines primary roofs shall have a 4:12 minimum and 12:12 maximum.
Additionally, the Guidelines require that pitched roofs are not oriented
such that excessive snow and ice does not accumulate over parking
areas. The submitted roof plan indicates that "snow clips" and gutters will
be used to help keep snow and ice from falling onto the driveway or
entrance to the home.
o Outdoor Lighting. A lighting cut sheet has been provided and is included
within the packet. The fixture is compliant with the Town's Outdoor
lighting ordinance and is'Dark Sky Qualified' with glare free illumination.
The fixture is full cutoff by definition and would have a weathered copper
finish.
o Duplex Development: The Guidelines require the use of compatible
building materials and an integrated design with enough architectural
variety to distinguish a single-family home from a duplex. It would be
evident that this is a duplex and not a large single-family residence.
Consistent building materials are utilized.
• Landscaping.
o Design Character. The Landscape Plan provides a mix of native shrubs
and four bristlecone pines. The proposed landscaping is consistent with
the Design Guidelines, acknowledging the drought conditions that subsist
in our region. All proposed plant species are drought tolerant and
adaptable to this area. The Landscape Plan is deficient of an irrigation
table, as required by the Guidelines.
o Retaining Walls: Terraced boulder retaining walls are proposed on the
east side of the site between the driveway and property line, and behind
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 10, Block 4, Wildridge PUD, Walsh Final Design
September 6, 2005 Planning & Zoning Commission meeting Page 5 of 8
the structure. A structural detail for the walls near the driveway has been
provided to staff for review against the site plan drawing.
Although the Design Guidelines prefer a series of lower retaining walls
with landscaped terraces to a high wall with an unbroken vertical face,
staff feels that in this situation a structural wall faced with stone (identical
to existing walls on the property) would be more appropriate not only to
provide more turnaround room for the tight vehicle motor court area but to
help limit the amount of disturbance required to site the improvements.
There would not be adequate space for landscaping in the terraces of the
proposed walls and the engineer of record has not articulated the
possibility to provide plantings between the walls.
5. The compatibility of proposed Improvements with site topography, to
minimize site disturbance, orient with slope, step building with slope, and
minimize benching or other significant alteration of existing topography.
The proposed addition would be effectively dug into the hillside with the majority of
the lower level buried on the east and north elevations. Site disturbance appears to
be limited to the property, yet this site layout and staging may be difficult to achieve
without disturbing the neighboring property due to excavation and the construction of
retaining walls. The building does not appear to step with the existing slope of the
property.
6. The appearance of proposed Improvements as viewed from adjacent and
neighboring properties and public ways, with respect to architectural style,
massing, height, orientation to street, quality of materials, and colors.
The project should not dominate the landscape of the property. The scale of the
proposed development is appropriate for the neighborhood and consistent with the
PUD.
7. The objective that no improvement be so similar or dissimilar to others in the
vicinity that monetary or aesthetic values will be Impaired.
During sketch review there was discussion on the design concept and how the
existing structure is viewed. Staff does not feel that the additional dwelling unit will
be so similar or dissimilar to others such that monetary or aesthetic values will be
impaired.
8. The general conformance of the proposed Improvements with the adopted
Goals, Policies and Programs for the Town of Avon.
The project is in general conformance with the adopted goals and policies of the
Town and is a use by right per the Wildridge PUD.
Staff Recommendation
Staff is recommending approval of this final design plan for Lot 10, Block 4, Wildridge
PUD with the following conditions:
1. A structural wall faced with stone veneer will be utilized on the east side of the
addition. This wall must be designed by a Colorado Registered Professional
Engineer.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 10. Block 4. Wildridge PUD. Walsh Final Design
September 6, 2005 Planning & Zoning Commission meeting Page 6 of 8
2. An irrigation table in compliance with the Residential Design Guidelines must be
submitted and approved by staff prior to installation of landscaping.
3. An Improvement Location Certificate will be required following the foundation and
framing inspections to verity height and building location.
4. Details for the underground drainpipe (including size and material) from the back
patio must be provided for review before installation.
5. Except as otherwise modified by this permit approval, all material representations
made by the applicant or applicant representative(s) in this application and in
public hearing(s) shall be adhered to and considered binding conditions of
approval.
If you have any questions regarding this project or any planning matter, please call me
at 748-4017, or stop by the Community Development Department.
R!e'§spe5YuIIy submitted,
Matt Pielsticker
Planner I
View of existing residence from across the street.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 10. Block 4. W ildridQe PUD, Walsh Final Design
From street looking towards area of proposed addition.
Entrance to the property.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 10, Block 4, W ildridge PUD, Walsh Final Design
September 6, 2005 Planning & Zoning Commission meeting Page 8 of 8
View to the south from proposed dwelling unit.
-pit
=mom MMM IL --
A, ^ r py
F-•—�—.0 w,,ysMyy..ypp.!�.
41
Aw,
'- 1 ^ ,J�1#�
� ��.lB' RSA
C .��+ � ,. ✓� Y V
V� � � V��
�
,�
i
�
Above existing dwelling unit looking south towards the ski resort.
I
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
44
Sea Gull Lighting Products Inc.
8463D-44 - Dark Sky. Outdoor Wall
Lantern
Neighbor friendly, Dark Sky Qualified outdoor wall lantern
finished in weathered copper finish over solid brass with
clear seeded glass. Specially designed socket placement
and reflector provide glare -free illumination and enhanced
light cut off.
Finish:
Weathered Copper
Glass:
Clear Seeded Glass
Category:
Outdoor Lighting
Size:
Width: 9" Height: 20 3/4" Extends: 9 3/4"
Height from center of outlet box: 8 3/4"
Light Bulb(s):
1 - Medium Base 100 W Max 120 Volts Lamp -
Bulb(s) Not Included
Installation:
No Installation or Specification sheet available
http://www.seagulilighting.com/Lighting-Fixture-8463D-44.htm17Print=l
rage i ui i
8/24/2005
N J Lf ) Z m tn w th c
AI
O O m m �oo�o
' 1 ' ,.(�_ We a �
O WW _/ CO N >' m M
^ , 0 \ p Q `i
z j O W o W o o co
tn�40 W a
Lu°
o�
�� o�0d aeQ U�N aM
U a
�rl
wWO Q
UA 0
L Z
- � O
LL
J3 K >
� t� o �
m
� LL O �
< z
:< O W LUX Lu
m�mIL
`L1J
V 1
aQzzz
O� pa,Zzut amU
z z Opp-�-zz z z z z
R'a �H �OXXN�zQZ000
X W V WZ JILW WXpF-F-F
WQI-Q1-V V V
LLJ °� w�z�J>> >a>awww
I1JQZ�'-zaW W W JW W> W>lil lllN
�1Z R' V Q U f a J W W W LU
W W W W W Z _Z Z_
V pOWaNW WZF=-FF-HF-HF-00�
Z Jp.zZ03-�R�J1�U1R� J1JJJ
� Op_QOOpaQQpwQQQpw-nS
J
V I-U1J V R11h231(1 WZ:K�IDW
W
aQaaaaaQ4Qa000a�Q
a
z
d
uj It
tu
V
0
3
:
E
F
it
0
R
E
kU
2
E"
AIP
•••••••••�•"L
'3DO1rQMN
$
"DAY jD MMQL
mum on own sola Am
dVMI IVOi k"Wd01
1SY3 OVOY Maw" WS
Kfl tate 4RMN* %On
not we a
N D 1 S-3 O o N 1 0 1 1 11 •
0 H
� � 1
�1N3�Sb'3�3Jb'l1%'t/�lO
l�f7
Pte' wy
«�
ii000 1SY}OflV M wy
UOt4 J»MS
WON i 9. -•O 411 ws Q IMIrft
OCWW oO'J NOAV
1.M awas 29cffmalIM O%s
t> X400 -f9 101 10-1
3'DNa 1532 HG-lVM
0
w O
O
z
M
.�
goers" swu SOCOAr o
rm ma swim" %on
=D& 3Me (M
N 0 1. 7 a + O N I a 1 I n.
,4t.Jo. `H
s:
mwm
Z L Zit 0
k
drw • do=me 4e. O M%W*
oaVU01" flood/
�
ao
pwmdiV.�a��VA�
N
rsr "'"'49
O
W w
=01
�
t► >I1:>Olg Lal
'm
3:)NaOlS3 ! HG -NM
<
„mow PO4S
mwm
Z L Zit 0
k
�
ao
Lo
I
co
I I I
111 � Q
I
( I I I I \ Q
� a
8665 -
I
van u la open" �•Fa
am we aAga avow 2parmam 0=
oava�lo� t�onv
POPM
N O I S 7 0 • O N I O i I n ror
«-m w Nl:)O'19 'OI 101 z t
y om imnww M wo Y �
HGI
UDROULOP4 "as 3�N3QIS ! 1 v 1�1
ilk i1
I I �
l` I
I
I I i
I I
I r
1 1
� r0
i�
I �
I r
I
I
I I
t �-00��-N
r �41 owI l r r r
z L ZA o
I
I
I
� I
I
1
0
Z960'9Z£'OLB =3 9£►L'9L£'OL5
vsn l£919 OPO -10J '01503
2901 a0B Od
Wotud0tNM0 ' U0PrUPU03 ' *j"NNI40M
1 0 • 0 NN I a I I n a
_,;... Hs10-so
X1+0 a 1 —1 Am wa O V^d,"D
OCPV-S0-T07 'NOhr
15V3 avos 3901wilm OELS
� ii701� 'OI lO�f
��N3Q 15�zi HG-IVM
�—
w
Z
O
W
W
pww,ee�
W�I0s4J
rar umaja
�wW�r+ aw'
u013owJOIUI laa4S
7 1 711 n
Z96o'9Z£'oL6 :XGi 9£YL'91£'OL6
vsn t£9t9 oPojolo'J 's16a3
b9ot 7a9 Od
J—dotMW UM{-11UOJ ' —P"4wV
N O I! 7 0 + O N I a 1 1 11 ■
1» —M,f
PW)1M47
35of T U.,Wa
»0-,1 = »B/I "is
910-W JwW"" ver
SOOL brew m em
uoilowiolul 3aa4S
us"a a W -mm aap Am on O tv4Ada
OCYW10'J 'NOAV
1Sd3 0YON 9901'smim O£LS
-b, >,D019 !OI 101
3'DN20IG3Z4 H51IdM
LLJ
{� W O
O
z x �
2GnOH ON1151X9
7 L z/L n
Z960'4Z£'OL6 =03 S£YL'9L£'OL6
YSO l£9tH op-cnao 'e1603
Z901 X" Od
lu—doqulp ' uoll—isueo '-n4-%4-Y
N O I! 3 0 • O N l a l l 11 •
ZVQH
pe -Addy
u6taa a &woe 0 Am soot Q wA+A"a
oLMloio7 ' 4oAv
1SY3 4Ho?J 394INMIM OILS
-tb >0O -JG �OI 10-1
D'DNDO15�Di H5-1`dM
PSIM4O
350f'T
up+a
.0-.l. .B/I
"D3S
910-10 ,ogwnN oor
SOOT; lsn9w bl
spa
uoilowjo;u1 laayg
u6taa a &woe 0 Am soot Q wA+A"a
oLMloio7 ' 4oAv
1SY3 4Ho?J 394INMIM OILS
-tb >0O -JG �OI 10-1
D'DNDO15�Di H5-1`dM
I .ws ,r .vta of -,a ry .rn v .v
O � 4
tu
lu
} p
a lu [D
saw
1 ` O tu a_ _
IL
NO Z a
x T
OL orTr
t o —
3:in
ISI
v,v rn r.v
n 3=
- �nwv slarvr��
/ t 9910H 9NLLSIX9
I O0
Nou.7-m �e 4
� , T�r vm lN �
— — — — — — — — — — — — -
- — — — — — — — — — — — — — — — — — — — — — — –�
�39WH 9NI-LGIX9 I I
II II
I II
II II
Z I Z/1 0
W O
W
V 1
4
.o -,s .>•-,s .4,G .Q -,G .o -a .1-.s .OI -.z .tL
� ! t
j A 11{
To F —
4
�o
I .ws ,r .vta of -,a ry .rn v .v
O � 4
tu
lu
} p
a lu [D
saw
1 ` O tu a_ _
IL
NO Z a
x T
OL orTr
t o —
3:in
ISI
v,v rn r.v
n 3=
- �nwv slarvr��
/ t 9910H 9NLLSIX9
I O0
Nou.7-m �e 4
� , T�r vm lN �
— — — — — — — — — — — — -
- — — — — — — — — — — — — — — — — — — — — — — –�
�39WH 9NI-LGIX9 I I
II II
I II
II II
Z I Z/1 0
W O
W
V 1
4
ZO5O'9Z£'OL5
:xei 9TVC9c£'Oc5
rsn tots
opamoa asp
Z901 xa'8 Od
wox
idol" '
nWl—lxuo7 ' un4-R4vr
N o 0 S-3 a + o a i a i i n•
�O
vo"Adr
uollowjo;ul hays
u6j-a • In. -3 AM soar O waWW.3
OCNIS 107 'NOAV
lSVR avcrd 990[NMIM OELS
b >001G SOI 10-1
�0N3Q 153z! H5-1'VM
H
0
W
0
CL
0
Z
X
w
Ali
1 7/1 n
S
W 0
O
P61304O
f 3r
aPZI0
SIN
wox
Slo-W
•wW�x+ as
SO Lsr!9iw bl
�O
uollowjo;ul hays
u6j-a • In. -3 AM soar O waWW.3
OCNIS 107 'NOAV
lSVR avcrd 990[NMIM OELS
b >001G SOI 10-1
�0N3Q 153z! H5-1'VM
H
0
W
0
CL
0
Z
X
w
Ali
1 7/1 n
S
W 0
O
ZSGO*VZ£'OL6 :XDJ S£YL'9L£'O1.6
vsn t£9l4 OD0MO:) '91603
2901 x0B Od
N O 1 E 3 O O N 1 0 i 1 n•
S -S
P«e,ddy
P64W4O
f'3' 0ADj0
SIN woos
510 -SO j*g1unN q91'
Go lG Grry bl 9100
uollowjolul loa4S
Aa • &IPOs -.3 Am on 0 FAA" -O
Oab'SOi07 'NOAV
15V3 avos 3941NOMM OE15
fb >IDO-IG 'OI 101
2'�)N20IS3z! HG-TVM
�h
z
X
W
W
CL
RA
-JE
L
O
F
F J
I
'CQ
(LU
nV
O
n�
L.�
X
UA
z
_O
�
LA
—A
A_L_I
I—
O
Z960'9Z£'OL6 mloj Si1L'9LCOL6
Y511 I£9l9 opwq*3 'M6o3
Z901 xo9 Od
N O 1 • 3 O 9 O N I O 1 1 n 0
SSO ,2"'nILOD-H
O
tz
v-Aiddv
ra�wa
f'3' uwao
sm
910-W jawn" aor
SO lsrK.ww bl em
UOIID Woo;u1 laat{S
7 1 711 n
�1
W
OL
0
OL
U
z
X
W
II
A s Iv ---3 MN 9M O ANA&D
OC N'410107 'NOhd
lsva CYCS 39CINc im OSLS
t7 >I DO -IG 'O 110-1
3�N3Q 153 HG-IVM
W
0
z
W
J
v
-1 Q
O
J
W
d)
p
O
J
W
O
J
LU
lu
00
n
O
b=
Q
J=
Ato
RZO
Ip
JO
Oil
Oin
N
tL 11
W
0
z
W
J
v
-1 Q
1 I
rW
J
p
O
�
O
J
U -
Z_
Q
W
0
z
W
J
v
ZOGO'9Z9'OLO =03 MC9c£'OL6
.4aa a bjpm —.3 Aq, mK O 3
VW 99919 0P -0I03 •01603
Z901 x09 Od
OCVNO Ol 'MOAV
Pw+ddr
1SN3 CNON 39a1NO11M OGLS
�—
O
lu�wdq�np ' uopanµtuo3 ' ^70N14vV
POINN3
U
N 0, 03 a O N, a l, n
� U�
I
LU
m
S�SOO H
slo.��
b >,D0��
,�
SO Lsrf9l V bl 010O
3DN361G:I� HG-IVM
u0pow"Ju1 iaQys
N
Q
J
Q
LU
J
>
�
w
z
w
w
w
LU
Q
O
u
>
w>
, JU
v�
-z
O
z
Ow
O
Ui
1
L
z L z/1 0
Z960.9Zf'OLG =03 SfWUVOL6
VSI 14919 OP-Ola'J '01503
Z901 xa8 Od
4—daa-0 - UON—i+UOD a -I -414-V
N O I a 7 a • O N 1 0 9 1 n
S�SO �A'IOH
Pe-imv
P64M4O
r2r uAn4
.0-,I ..WI wox
00-50 jwWro+ ca•
50 l5row bl *roa
uoilowjo;ul 3N45
.6j -a a anew -»n MN 9M O PI&A&o
OCYNO10") 'NOAV
1Sd3 OVON 2GONM1M OELS �—
W
LU
r
fb >00-l9 !01 10-1
3'DN20IS3'24 HG-lVM
1 ziL n
Z9611'QZ£'OL6 =Dj S£hL'9Lf'OL6
Q
O
wh"a • &Apwv M -+i MH soot ® 1osAdoo
Q
' Q
vsn tf9t9 op—too '-45-3
IN A
-C-
_�
Z90t xog Od
OCYNO,OI;) 'KOA'V
o
0
~
P—jddt
Lsva CVOd 39clwaIIM OSLS
A
>L
j
Q
_
K
Z
P94"13
LU
O
N 0 1 1 3 0 • O N 1 0 1 1 n
P'3'
aAUR+lt
LC
LU1
H
..10- mor
j, >{00-1G 'OI 101
lfl
510-50 •wa+�N
SO 15rew 1A
ciao
2'�)N:3015:3�4 HS1`dM
UO13OwJOIUI 3aa4s
7 1 7/1 n
Q
O
= j =
Q
' Q
-1 W -1
IN A
-C-
_�
ILt
d)
o
0
~
O
O
A
>L
j
Q
_
K
Z
w
w
Q
LC
�
Z9501OZ£'OLS moo! ML'9L£ OL6
Ysn L£9L9 OPOJOIo3 '81OD3
Z90L xo9 Od
t—dol-m ' you—t2uo9 ' 0-4-414-Y
N O 1• 3 O O N I O l l n
w-wddr
wMM4o
ra" U-
.0 -.l :.4/I pw5
slo-W jwWrni aor
50 Lsr�JIw bl em
uoi;owjo;ul hays
OLn
tzm
OCYNO'lOJ 'NOAV
1Sd3 Cyors aGai mim OGLS
-17 !OI 1.0-1
3�N3Q 153 HG-lVM
N
W
W60
W
a
/jo
J
z
/
z
Q
N
v
<
<
CLO
U -O
v
IL
O iv
O v
I
1 7./L 0
O
d)
w d)
z
j wtij 0
z W
IWL. a
Z
W
W60
Q
Q
a
/jo
LU
/
z
x
x /
LU
O
d)
w d)
z
j wtij 0
z W
IWL. a
Z
W
tW
1
til
1L
_
v
a
i
w
W
<
r
g
J
W
n
in
q
d
<
F
W
tW
1
til
Z9e0•9ZVOLS moi STI'V9ZVOLf
YSn l£9i9 opciom 'M5o3
Z901 :Og Od
I+ dol+iip0 ' uogonMuo3 ' am4z"4aiY
N O I U-3 0 • O N i O l i n
SS®� .�'"'I O H
i :11fo/
P -i1=17
asor-F upoiO
.O-,1 ■ .6/1 Mo�S
ilO-SO Ha+ii�N val'
SOON Lsrl9tIV bl sm
uollouuo;ul 3"45
-61+•0 7 our" —.3 4•N soot Q *AAA -3
Oav-N }07 'NOAV _
-Lyda a` os 3901T1allm OGCLS W O
W �-
2
��N3QIS�� HS-1'VM
OW \
m
f
7. L Z/L 0
a W1
w
- Q\
J
J
1
N
—_ W
5
-61+•0 7 our" —.3 4•N soot Q *AAA -3
Oav-N }07 'NOAV _
-Lyda a` os 3901T1allm OGCLS W O
W �-
2
��N3QIS�� HS-1'VM
OW \
m
f
7. L Z/L 0
a W1
w
- Q\
J
J
1
N
—_ W
�
\
Q
} O
n n
J
IL
J
Q JU
Z_
J
1- Q
W
L
I
F- lL.
I
I
Z960'8Zf'OLG cx0j Sf1'L'9L8'0L6
Ysn tf9t9 0PO10103 '91603
Z901 x08 Od
lu—doiw0 • uoy—puo3 • unt20y40W
N O 1 3 3 0 • O N I O 1 1 n v
SSS0 � l0,H
.,¢
P—mv
PW112043
3rd 1^ uAwo
"an
910 -so J"WnN qW
500E IGn9w bl am
uo!lo wjoi u l laa 4s
AM a &Ary muo MN soot O w4a4ma
OHO -10'J 'NOAV
1sV3 avoN 3901salIM OELS
tb >00-I8 101 10-1
D�NDOIGDz4 HG-lVM
T
i_ L{
i 1
iF]
, Lm
w 1
W
W
T
I
w
J
v
W—z
W
do00
-
-1
O
\
O
11
<
LL
II
p
Q
Q
w
z
z_
Q
3
1
w
�-
a
�
Q
O
u_ I
Q
�
p
O
I
tz
I
I
w
J
v
Z980'9Z£'OL6 :xoj s vC9Lf'OLB
vsn l£9l9 opo-ioo '4m6u3
Z901 xo8 Od
sumd0f O ' uO3 ' —4 -N4 -V
N O 1 S 3 O O N, O l, n
SSS 0��� H
Pon*"*
u�eq
„0,1 -AM
�s
sl0-W J04*uuN (M
SOOC .Lsr?sfw bl •Wp
uol;owjojul 3"45
.,-a . &W, -•V 4-N 9009 o 3
'NOAd m
1Sl3 avo-S 394R1a'lIM Or.lS }— O
W
lu
f7 >I�O�f9 OI 10-1
3�N3QIS�� H5-1'VM
oLu
0
— N
I
II
zd)
Alu
�Dv
ED itf)
11
Staff Report
AVON
MASTER SIGN PROGRAM CO LORA D .
AMENDMENT
September 6, 2005 Planning & Zoning Commission meeting
Report date August 24, 2005
Sign type Master Sign Program - Addition
Legal description Lot 22AB, Block 2, Benchmark at Beaver Creek
Subdivision (Chapel Square, Building C)
Zoning Planned Unit Development (PUD)
Address 245 Chapel Place
Introduction
RMD Sign Company is proposing signage on Lot 22AB of the Chapel Square PUD, the
new home of Wells Fargo Bank. There are two proposed signs, each measuring 36
square feet. The signs would hang from the archways on the arcade level of the
building, with one facing City Market and the other facing Chapel Place.
The signs would have pan channel letters projecting 5 inches outward from a routed
aluminum cabinet (with .1/8" aluminum face) painted "Wells Fargo Red." These oval
sign cabinets would be two feet wider and one foot taller than those existing in the
current Chapel Square Master Sign Program (MSP). This sign design application would
also be a departure from the existing program by allowing a painted red cabinet, when
the existing program requires a metallic bronze finish to the sides and rear of the
cabinets.
Background
A revised MSP was approved for the Chapel Square PUD at the Commission's March
2, 2004 meeting. The revised program allowed for greater flexibility for individual
tenant's sign needs, approved the design for new monument signs, and the design for
banners to be installed on light poles. The MSP never contemplated Building C, except
for a small monument sign near the vehicle entrance to the south side of the project that
has since been installed.
On April 19th, 2005 the Planning and Zoning Commission denied a Master Sign
Program Amendment for the subject property. That program included two pan -channel
lettered building mounted signs and five directional signs on Lot 22A (Building C
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 22AB, Block 2, Benchmark at Beaver Creek Subdivision, Wells Fargo Signs
September 6, 2005 Planning & Zoning Commission meeting Page 2 of 3
property). The building mounted signs both measured 11' x 4'8" (approximately 51
square feet), and the directional signs stood seven feet tall. This application was
unanimously denied by the Planning Commission. The Commission had concerns with
the amount of signage proposed and compatibility with the existing program.
Master Sign Programs
Sign Programs are encouraged by the Sign Code for larger projects. Section
15.28.080.16 from the Avon Municipal Code states "sign programs shall be compatible
with the site and building and should provide for a similarity of types, sizes, styles and
materials for signs within a project."
Design Review Considerations
According to the Town of Avon Sign Code, Section 15.28.070, the Planning & Zoning
Commission shall consider the following items in reviewing this design application:
1. The suitability of the improvement, including materials with which the sign is
to be constructed and the site upon it is to be located.
The proposed materials for the additional signage (i.e. aluminum, acrylic faces)
included in this application are consistent with the existing sign program and the
Sign Code. The oval shaped signs located on Building B of Chapel Square are of
the same construction quality and general design. As stated in previous
applications, Building C is a continuation of Building B and staff feels that the
signage should represent the same human scale with oval sign(s) at the arcade level
instead of pan -channel signs mounted to the building.
2. The nature of adjacent and neighboring improvements.
The area is mixed-use with commercial, residential, service, and office land uses.
While sign construction varies on adjacent and neighboring improvements, the signs
in the area are generally internally lit pan channel letters or box type construction.
3. The quality of the materials to be utilized in any proposed improvement.
The Sign Code encourages "quality sign materials, including anodized metal; routed
or sandblasted wood, such as rough cedar or redwood; interior -lit, individual
plexiglass -faced letters; or three dimensional individual letters with or without indirect
lighting, are encouraged." The proposed materials are of high quality and should be
appropriate.
4. The visual impact of any proposed improvement, as viewed from any adjacent
or neighboring property.
The proposed signs should not have any negative impact as viewed from adjacent
properties. The signs would be visible from Chapel Place and the'eastern exit of
City Market's property.
5. The objective that no improvement will be so similar or dissimilar to other
signs in the vicinity that values, monetary or aesthetic, will be impaired.
It is Staff's opinion that there will be no monetary or aesthetic values impaired with
these signs.
town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 22AB, Block 2, Benchmark at Beaver Creek Subdivision, Wells Fargo Signs
September 6, 2005 Planning & Zoning Commission meeting Page 3 of 3
6. Whether the type, height, size, and/or quality of signs generally complies with
the Sign Code, and are appropriate for the project.
The proposed signs generally comply with the Sign Code in terms size and
construction quality. These oval signs would be larger than those in the current
program and on the retail building and Building B, however they would be the same
type and should be appropriate for the project.
7. Whether the sign is primarily oriented to vehicular or pedestrian traffic, and
whether the sign is appropriate for the determined orientation.
The primary orientation of the proposed signage is to automobile traffic which
appears to be appropriate.
Staff Review and Discussion
This application appears to follow the guidance that was given by both staff and the
Commission during previous applications and meetings. The goal or intention of a MSP
is to have consistent signage on a property in terms type, size, and construction.
Although larger that other'Building Identification' signs in Chapel Square, this submittal
appears to be consistent with the goal of the MSP and appropriate for the building
considering the tenant occupies the entire first level of the building.
Recommendation
Staff recommends conditional approval of the sign design application for Lot 22AB,
Block 2, Benchmark at Beaver Creek Subdivision.
Recommended Motion
"I move to approve the sign design plication for Lot 22AB, Block 2, Benchmark at
Beaver Creek Subdivision with t following conditions:
1. Bottom of oval cabinets+l1'6e at least 7'6" above finished walkway grade.
2. A sign permit must be issued prior to installation of signs.
3. Except as otherwise modified by this approval, all material representations made
by the applicant or applicant representative(s) in this application and in public
hearing(s) shall be adhered to and considered binding conditions of approval."
If you have any questions regarding this project or any planning matter, please call me
at 748.4030 or stop by the Community Development Department.
Respectfully submitted
Matt Pielsticker
Planner I
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
RECEIVED
CHAPEL SQUARE SIGN PROGRAM — SIGN DESIGN CRITERIA
"AAR 0 8 2004 .
::.I ..GENERAL INTENT Community Development
The se:crite na'have been established with the intent of assuring visual harmony for the mutual benefit of all
tenant leases. Conformance to these criteria will be enforced by the Lessor and any nonconforming or
unapproved signs will be brought into conformance at the expense of the Lessee. Existing signs which
conform to the previous sign guidelines will still be considered to be conforming signs.and will be accepted by
this amended sign program. The purpose of these amended criteria is to allow tenants to have individual
identity in their exterior signage, something which is critical to the success of their retail and/or restaurant
businesses.
2 GENERAL REQUIREMENTS
A The Lessee shall be responsible for the fulfillment of all signage requirements and specifications.
.. 8 All permits for signs and their installation. shall be obteiried.and paid for by the Lessee.
C The Lessee shall submit to the Lessor for approval two (2) copies of a detailed shop dravving, to scale, of
all proposed signage and/or graphics prior to fabrication and prior to making application to the Town of
Avon !or review. These drawings shall indicate size and style of lettering, installation details, colors and
logo design. The Lessor shall retain one (1) copy of the approved drawing and return the other to the
Lessee. '
^`A
D All signage shall be approved by the Lessor and all local gover
n
ing authorities priorto fabrication. Lessee
shall be responsible for any and all permits if necessary.
E Logo decals, hours of business, credit cards, emergepcy telephone numbers, etc shall be limited to a total
of 144 square inches (bne square foot) per single door entrance. Handwritten signs will not be permitted;
.''.these signs' frust be professionally Produced 'and installed..
.p YRT
F Advertising devices such as attraction boards,posters, banners and flags are not permitted.' '
G Flashing, animated, audible, revolving signs or signs which otherwise create the illusion of animation are
not permitted.
H Signs with exposed bulbs or light sources are not permitted.
I The Lessee shall be responsible for the installation and maintenance of all signs as well as the operations
of their sign contractor.
3 GENERAL SPECIFICATIONS
A SIGN TYPE A: Monument Signs (by Lessor, not Lessee/Tenant)
1 See site map for proposed monument sign locations (Sign Type A).
2 Monument signs are internally illuminated and are provided and maintained by the Lessor.
3 Tenants will be allowed, on a space available basis, to have a sign placard identifying the Tenant
included on a monument sign. Tenant to contact the Lessor to make such a request.
4 If space is available, Lessor will provide the Tenant with size parameters for the particular placard
location that is available. Tenant shall submit to the Lessor two (2) copies of detailed drawings, to
scale, of the proposed placard prior to fabrication.
5 All tenant identification placards on monument signs to have a white sign face and a bold contrasting
color for their logo/type. A bold sign face with white or contrasting logo/type will also be considered.
6 Refer to Sign Drawings Al, A2, A4, A5 and A6 for details related to specific monument signs.
I net i (nrfntarf n,4 na na
B SIGN TYPE B: Tenant Identity Signs (by Lessee/Tenant) •
1 Location of exterior signs must be centered within the archway of each location.
2 Identity signs will be made . of one cabinet (see enclosed drawings for shape).
3 A maximum of one t1) cabinet sign will be permitted per tenant entrance.
4 The size of the cabinet signs will be 2 feet high and 10 feet long (wide); see attached diagram.
5 Bottom of sign cabinat will be 8'-0" above the finished sidewalk. If any sign elements project beyond
the elliptical boundary of the sign cabinet, these elements will maintain a minimum clear distance of
7'-6" above the finished sidewalk. Refer to Diagram B attached.
6 Sign cabinets will be'made from 1/8" thick aluminum. The color of the sign cabinet will be metallic
bronze to"match existing sign cabinets.
7 The color of the sign face, individual letters, numbers or symbols within the sign face may vary to meet
the individual needs and identity of the Lessee. Tenants`are encouraged to develop a sign that clearly
and creatively identifies their business — using bold and easily readable fonts /typefaces, contrasting
colors,'and logos or other graphic elements which visually describe their business and. create an
appealing sign to attract customers.
8Idehtity Signs: Major Single Tenant=ldentit Signs: Any future.single-tenant occupying•the previous
MIM
art space shall.conform to Town size requirements (currently this refers to GartSports, Office
Depot and Pier 1 Imports).
SIGN TYPE C: Tenant IdentitySigns—Arcade / Blade Signs (byLessea/Te"na d
' t � .
1 Tenants with storefronts set back under arcades will'be allowed a maximum of one (1) hanging
arcade blade sign per tenant entrance. Blade signs should he 2 -sided (readable from both directions).
2 Maximum size of blade sign to be six (g)-square�feet. I)Uhenilons of sign to be eighteen (18) inches
high by forty-eight (48) inches wide/long; Bottom of sign shall hang above the walkway at a clear
distance of W-6". Refoto Diegram C ettacped. ;
3 Blade signs shall be perpendibularto the tenant storefront and centered within the arcade width
between the tenant storefront entrance arid,the arched colonnade'of the, arcade.::.; .
:4 ". The colorof the signyface individual letters, numbers ar symbols vuithmA. a sign face may vary to meet:::: .
the individual •needs and identity of the'tessee. Tenants are encouraged to de4elop a sign that clearly
and creatively identifies their business— using bold and easily readable fonts /typefaces, contrasting
colors and logos or other graphic elements which visually describe their business and create an
appealing sign to attract customers walking along the arcade.
5 The color / finish of the hangirig hardware to be metallic bronze.
D SIGN TYPE D. Directional Signs -Banners (by Lessor, not Lessee/Tenant)
1 Directional signs will be the responsibility of the Lessor and may be implemented as fabric banners
(Tyvek or similar) mounted an light posts. Refer to Diagrams for Sign Type D and Drawing SK -1 for
detailed information about the fabrication and mounting of these directional banners.
2 Directional signs are intended to offer general direction to retail shops, restaurants and parking; these
signs are not intended to be tenant ID signs and will not display any tenant names or logos.
3 Lessor shall retain the right to change out the banners for special events and/or holiday seasons, the
design and colors of which shall require approval by the Town of Avon — Community Development
Department, which shall not be unreasonably withheld or delayed; the banner designs submitted as a
part of this sign program package are otherwise intended for permanent year-round display. Seasonal
Christmas banners may only be displayed from November 15`through January 3151 each year.
I act t Incin tori nz nR nd
....... .............. ............... .............. ........ .... ........... ........... ........ ..
.......... .. ......
4 CONSTRUCTION REQUIREMENTS
I Sign Types A and B shall be internally illuminated. Sign Types C and 0 shall not be directly illuminated.
2 Electrical service to all illuminated signswillbe"piff the Lessee's electric meter.
3 No'exposed junction boxes, lamp . s, tubing . transformers, raceways, neon or gas-filled tubes'of any type are
permitted.
4 All signs must be U.L. listed and bear.the.U..L. label.
5 Installation must comply with all applic'6.ble.building, electrical and sign codes.
6 TM.Lepsee's sign contractor must seal off and touch up all mounting holes and leave the promises free of
debris after installation. The Lessor will be authorized to correct all such work at the expense of the
Lessee.
7 Lessee is'r6sporisible for the removal and.repair of the premises to its original condition at Lessee's
expense. If Lessee shall Nil to the return the premises to its original condition, Lessor shall have the right
to perform such work, and upon completion thereof, Lessee shall pay to Lessor as additional rent upon
demand the cost of overhead attributable to the making of such repairs.
N, Says
pA
I Pet I Infintod wi nA na
IDENIIF=ICAHONAL
B lenant IU Sims (Lilipse's)
Gin Outer StoGefront Soffits
IDENTIFICATIONAL
Tenant ID Signs (Blades)
3at tenant Storefront (Arcades)
DIRECTIONAL_
:1 Banners on Light Pules
Uire00011,31 Info
n
jig x .r
.;;'- ...:,* FY"5.� ,^" r Z "' 11•£.: 44>t9y} -131
'G jr c.. 5„'k a.'p.i:
t ;� Ei �• r k' a 'i '# ^a .a #zrs , a' ave a vLF t:
Y,; r A:41f,',,y" °i +f'•PYSL 1i. -Y'" -.t3. F r.1�iR! a'+�3 ,^,<SVYt4n� -n ,v;d
.r'' -. i y. d t 'sn x-,
.,.
T
� • �< a � tC aYf � S'xi,_ * a: a �` 4ti y�.� ,y �,: 4 •�.i�'+�+a „.
'+rt r; c.. .x:. Y *.> y�:' i �• .r 'Y d+- K� a
FV
�',� ;�' rs },'"� s ti S}�a ii„Yi P T ;,�ca'�,� '�F r s,,,�.i'� •.�•. � �t �� �..,
s ii��'44•#- _ y � � G jd�Kr4f�z�g 9 G'. '' iai .3r F,c r4 �7�..`+j- "alr .r�;�1 ;"'7L
.Y K.� ed<�y,An .9Y3 7 Rt�tt�l',F .]� �.. � 3t'�•e - .^' �. ' ! .. ;%'^iii
I -
rk B Li Y F x a
f? �Y; hr`4, f.+f'iW ! . .>Qs•'' ter+ 1 ♦ h k2i � � +� � <_ C'
4302
�"j .� _ f�✓ li.`_45 4 F ; }'. ..4 7 •CF -S'. yn'•Gt' ':S'Yr Yp'S hi.4YC%%. LITi'+SS;Ge, i
;
H'1'?l. �L3 zryW ; r` �r .+ .. ,rog.,.ro d -tom{x� _�w>� •F'+•F7 T_: 7.y'3•.�'S•cu• 'l'.s
!N,
{-�. ' 7 3r.Y" ,b y a• : 3f3t' �iz.'�4.. 's'.
4,295
*tat. Inc
J'
s ,. ia. f{'y f�,�?
�� t3 {^! �`� � >�' U,��� •fin
ssLL ft S ry _S3+'4t i• ter.
2A 5
A:4 ry• 1n� >
u1' 4rr.x,}�� - ri 7+ [j l'�F' CCii c i..4 yt�� °' rt't'S ✓� ;?q`3 ,a
t OL
.434
454
r � i '.���,,��,?,?yy� Fi .[; �•i :� �' � � rc , .>�x< �' ,� ><� , +gip? 7�,�;.�.'
pKs � ,�s2 's.� D_ ta� < a• �t� i '„f aq, �r�' 3?D � � a''.�Z>S�',>«�*
�r x: fps a�:.F t y� iX��x4
t:ii.,shX-tnPY%:� � ? .�n," a.fr.�.ry „' �.v,. •.�.�._�...,Z ;�...',-�a
'r-- r..;...---�
ALUMINUM
LIGHT BOX;
BRONZE FIN15H
to 5TONE TO
MATCH E?(15TING
CHAPEL
5QUAKE
LOGO i
ELISTOMEKIC PAINT ON 5TUCCO TO
MATCH EXISTING YELLOW ON STOREFRONTS
UNDER BUILDING ARCADE
:..: SPOR''.,S
c` OfflCe DEPOT tA t�
TENAtJT fiEN�AMl b
REMOVABLE
BACKLIT SIGNAGE;
WHITE FACE WITH
COLOR TEXT
ALUMINUM
LIGHT BOX;
BRONZE FIN15H .
BUILOINGS
io '
TENA T
xTE ANT:.: .TENA T ..
r
i 4 ! C �)i r TENANT:.: :TENAf T
HO PIANO 9
TYPE HINGE
I I
I I
I
� I I
- -
- - -. - - - - - - - - - - - -I -- CONCRETE FOUNDATION
F1--- �J��y WALL AND FOOTER
- - - - - - - - - - - - - - - - - - - - - - - - - -'
10'-8 314 "
A Elevation Sign Type Al (one sided)
"get No. Project No. 03.101.CSQ Monument
c
Issue Date: 11.10.03 Monument Signs /
Al.97 Main St.
R°�"'°n°� Chapel Square unliw104
Edwards, CO 81632
Tine: s10N TYPE Al Avon, CO Phone: 970.926.2194
Scale: 114" = V.0" Fax: 970.920.2169
.................. . ........ ..............
o
Plan Sign Type A2
ALUMINUM CHAPEL
LIGHT BOX, SQUARE
BRONZE FINISH LOGO
VIUNM IV ELASTOMERIC FAINT ON STUCCO TO
MATCH FX15TING LIMESTONEJ q�7/ MATCH EXISTING YELLOW ON STOREFRONTS
BUILDINGS --\ �-- CAI' I UNDER BUILDING ARCADE
-A6
k
Pier. l l\r'p. .orfs
.0ut'bkk
Steakhbusq
Ilk
;r
TENANT JENA
TENANt TENAA4.T
-.-IA'
:TENANT JENAN T
T J
HD PIAN6
TYPE HINGE
----------
- - - - - - - - - - - - - - -
r - - - - - - - CONCRETE FOUNDATION
WALL AND FOOTER
------- - - - - - - - - - - - - - - - - - - - - - - - - - -
10'-8 3/4
D- Elevation Sign Type A2 (two sided)
Configuration Plan
REMOVABLE
BACKLIT BIGNAGE:
MITE FACE WITH
COLOR TEXT
. ALUMINUM
-'LIGHT bOX-,
''hRONZE FINISH
-.":' .!)at No.
Project No.
Issue Date:
A2
Revisions:
Title:
Scale:
03.101.CSO
11.10.03
816N TYPE A2
11411 n it -Oil
Monument Signs
Chapel Square
Avon, CO
97 Main St,
Unit W104
Edwards, CO 81832
Phone: 970.926.2194
Fax: 970.928,2160
I=
i
J
V-2 112
Plah Sign Type A3
LIMESTONE ALUMINUM CHAPEL
CAP'- LIGHT 13OX. 56WAKE
BRONZE FINISH LOGO
STONE ELA5TOMEKIC FAINT ON
MATCH EXISTING STUCCO TO MATCH EXISTING
BUILDINGS YELLOW ON STOREFRONTS
Configuration Plan
UNDER BUILDING ARCADE
.01/2"-
'N
3-2 5/8 6
t. V-2 JENA . NT
N
I
7's
TENANT .-- `\ m —
Ix.
y RE ABIT_
N
:TENANT
BACKOT SIGNAGE,
JE
WHITE FACE WITH -.w
TENANT
COLOR TEXT AND
DIRECTIONAL
JENANJ ARROWS
ALUMINUM
: T
LIGHT BOX; �:
C.BRONZE FINISH
r
HP PIANO
TYPE HINGE
CONCRETE FOUNDATION
WALL AND FOOTER.
r!----------------------- -- I t4bT pmol
1 0 mol
L ------------------------ -
Elevation Sign Type A3 I W /f— V$2 -T �
iet No. Project No. 03.101.CSO
a: 11.10.03
Revisions:
Title'. " SIGN TYPE A3
V01t) Scale: 112"= 11.011
Monument Sign TLAN
07 Main St,
Chapel Square Unit W104
Edwards, CO 81832
Avon, CO Phone: 970,920,2194
Fax: 970.926.2169
6'-4 V4'
V-2 1/231) CUT LETTERS
11 �� PEGGED OUT FROM
BACK EACH 510E
B Plan Sign Type A4
LIMESTONE ALUMINUM LIGHT BOX;
CAP BRONZE FINISH.
STONE t0 ARTWORK TO BE ELASTOMERIC PAINT ON
MATCH EXISTING PROVIDED BY DE51GNEK STUCCO TO MATCH EXISTING
BUILDINGS y' YELLOW ON STOREFRONTS
UNDER BUILDING ARCADE
-- - SNOWFLAKE LOGO
CARVED IN EIFS
1 1'-2 12 ".. DIMENSIONAL LETTERS PINNED
T FROM BACK;_ FONT t0 BE
OU
SPECIFIED BY PESIG'NM
r� r101 ,1 I BRONZE FINISH TO MATCH
7 L J t 1 `` I EX15TI�IG SIGNSx
N li CHAPEL.
i PLACE r 1. J 1
CHAPEL. Y r
PROF. SSINAL
Faa
' �UILdING
)[»d`':. NOTE:
LIGHTING FOR DIMENSIONAL
LETTERS TO BE PROVIDED IN
' .�•...-._,..�L._....�� _ LANDSCAPE AREA NEAR
BASE OF SIGN
V.'
1 1
_ -----•-t-- —moi— CONCRETE FOUNDATION
1 / WALL AND FOOTER
1------------------------�-1
r-
1.. 1
-------------------------
A Elevation Sign Type A4
;c`.9et No. Project No. 03.101 CSQ
Issue Date:
Monument Sign / LATE
• • 11.10.03 ,
A4 Revisions: 97 Main St,
Chapel Squat's undwla4
Edwards, CO 81832
Title: SIGN TYPE A4 Avon, Co
Rhone:. 970.928.2184
Scale: 1/2" = 1'-0" Fax: 970.926.2169
I I
I I
-----------------
ri
I I
L-------------_.-..-------_ -
Elevation of Freeway Sign Type A5
!+Rat No.
Project No.
03.101.CSCt
Issue Date:
11.10.03
A5Revisions:
Tltie:
SIGN TYPE AS
Scale:
114" =1'-0"
Monument Sign
Chapel Square
Avon, CO
EXISTING LIGHT13OX
W/ TWO TENANT SIGNS
NEW LIGHT BOX W1 TWO
y TENANT SIGNS; BRONZE
FRAME TO MATCH
EXISTING; WHITE FACE
WI COLOR TEXT
EIFS WRAPPED
• LINTEL AND SIGN.
BASE; MATCH EXISTING :.
EXISTING ROCK
FACED COLUMNS
EXISTING FOOTING
AND STEM WALL
97 Main St,
Unrcw104
Edwards, CO 81832
Phone: 970.926.2194
Fax: 970.926.2169
=U0W'V51
A Detail Q Column
.Rheet No.
Project No,
03.101.CSQ
Issue Date:
11.10.03
A6
Revisions:
Title:
SIGN DETAIL
Scale:
1" :1'-0"
STONE VENEER TO
►eAxru PYA' r,
FASTEN FRAME OF
CURYER STRUCTURE AND
I 1r.WT tiny Tn r.Mu wl
2" TUBE METAL
FRAME FOR CURVED
STRUCTURE PROVIDE
?L CR055 ERACING
EVERY 2'-0"
HD PIANO HINGE
TO ACCESS INTERIOR
OF LIGHTDOX
Monument Sign
11fFax:
ale St.Chapel Square wloaards, CO 81832Avon, Co ne: 970,928.2194 970.928.2169
Elliptical Tenant ID Signs - Sign Type B
■
0
CV
10'-0" .
si n cabinets: 2'-0' hi h b 10'=:0"wide/Iong.:Sign cebinetsao be fabricated
Elliptical sign aabinetsto tnatcfi existing . ,g 6 .. Y .... .
of i/B" alummuin withmetallic bronze finish.':Sign assembliesto:ba UL•rated and .bear:a ULlabe1. $ottom of sign
cabinet to .hang ate'-0".above the finished W6lkway:• My.elements that extend beyond the:elliptical boundary of the
cabinet shall extend a maximum of 6".below the bottom of the sign cabinet (a minimum of Z'-aaade the finished :•':
walkway. See Section 3-B of the Tenant Sign Design Criteria for general specifications
Diagram B: SIGN TYPE 6 - TENANT
V
rt
�
ITY G JEL)�j' S
i
I
`a% 6sgft
4'-0"
(48")
The total area of an arcade / blade sign to be six (6) square feet per face. Arcade / blade signs should be 2 -sided
(able to be read from either direction). Mounting hardware to be metallic bronze finish. Bottom of signs to hang
a clear distance of 8'-6' above the finished walkway of the arcade and shall hang perpendicular to the tenant entry
and centered in the arcade between the tenant storefront and the exterior arched colonnade. See Section 3-C of
the Tenant Sign Design Criteria for general specifications.
Diagram C: SIGN TYPE C - TENANT IDENTITY SIGN - ARCADE / BLADE
I
10'-0" .
si n cabinets: 2'-0' hi h b 10'=:0"wide/Iong.:Sign cebinetsao be fabricated
Elliptical sign aabinetsto tnatcfi existing . ,g 6 .. Y .... .
of i/B" alummuin withmetallic bronze finish.':Sign assembliesto:ba UL•rated and .bear:a ULlabe1. $ottom of sign
cabinet to .hang ate'-0".above the finished W6lkway:• My.elements that extend beyond the:elliptical boundary of the
cabinet shall extend a maximum of 6".below the bottom of the sign cabinet (a minimum of Z'-aaade the finished :•':
walkway. See Section 3-B of the Tenant Sign Design Criteria for general specifications
Diagram B: SIGN TYPE 6 - TENANT
V
rt
�
ITY G JEL)�j' S
i
I
`a% 6sgft
4'-0"
(48")
The total area of an arcade / blade sign to be six (6) square feet per face. Arcade / blade signs should be 2 -sided
(able to be read from either direction). Mounting hardware to be metallic bronze finish. Bottom of signs to hang
a clear distance of 8'-6' above the finished walkway of the arcade and shall hang perpendicular to the tenant entry
and centered in the arcade between the tenant storefront and the exterior arched colonnade. See Section 3-C of
the Tenant Sign Design Criteria for general specifications.
Diagram C: SIGN TYPE C - TENANT IDENTITY SIGN - ARCADE / BLADE
Retail
Shops
Restaurants
Underground
Parking
� c a (';'!FL
�
x,,.�d�"�r��4
ONION
SQUNRt
— L�
=_Y 4
exp';
-
Retail
Shops
=_Y 4
+ Restaurants
4-- Parking
ff rx3
SODURt ` N� :
�d
f:
in 11
Underground
Parking
1
Retail
Shops
Restaurants
Parking
Retail f,f�= Retal
Shops
Shops
�.
A _
Restaurants Restaurants
Parking ^� {�{s}�xy Ah, Parking
R Ff,
a,
JaV-7 +Arm ��� zf 3i s 3w yiil?,
{WWI �.
Retail
Shops I� F
r
�► },{ Restaurants ® r
fryer �.t. QL'�a�
Underground i l" Undergound
e F Parkin �r �" Parking
y °s
as rrr
IYURR
=1 IYI 1
nA u
Banner D1- Side 8
Banner D2 . Side B
• Banner size:
32" wide x 80" tall
• Letter sizes:
Upper case - 4" tall
Lower case - 2-1120 tall
• Font:
ITC Officina Sans Bold
Colors:
-White
Red - PMS 1795c
VO -At Green - PMS 376c
k Green - PMS 364c
• These'banners are snowy
for seasonal color and general
layout; they do not show all the
variations of text and arrows
on.A.. he"faces for:all 8 pairs
of tianners (D1- D8)
Sign Type D - Directional Banners - Christmas Holiday Season
(may be displayed November 1 st through January 31st each year)
• Banner size:
32" wide x W tall
• Letter sizes:
Upper case - 4" tall
Lower case - 2-112" tall
• Font:
Banner D1 -B
Banner 02-B
RFCEi%JED
tR 1, 2904
Community l)eveiopment
Sign Type 0 - Directional Banners - Christmas Holiday Season
Where existing, .
and where possible,
horizontal metal
bsr`to move'up'to
be level and aligned
w/lamp holder on
opposite side of pole;
so, eSkA for
mounting details
. :.Letter.heights:..•::•::.:::••
..:Upper esd = C high
Lower Case - 2-i/2" high
Banner size:
3Z -"wide x 80H high
• 7'-6".. aff minimum
this dimension: can be
increased due to how it
is mounted to the pole at
the top.banner.holder, we
Will increase this dimension
to the maximum able to be
achieved)
Sign Type 0 - Directional Banner on Typical Existing Light Pole
Where existing,
horizontal 'metal
bar to move up to
level required to
achie'Ve the noted
clearance below
the banner of 8'-3";
.in some me . cases; the.
mkil"..1irm" i" m", ay need
to move:to
the Opp . os : - ge
.
side*6,
w fie" "a' 't now exist
to locate the bninirs:l. .
as .�sh6Wn on the* she . in a p
and as shown here funder
drawings
e light fixture); see
SK -1a'
"
for mounting details
—8'-3'aff
Letter heights:
Upper Case - 4" high
Lower Case - 2-1/2' high
Banner size:
32' wide x 80" high
Sign Type D -
Directional Banner on
Taller Light Pole
(near Fiesta JARRMI
r
tsanner u i -A
Y�
v
Banner D1 -B
• Banner size:
32" wide x 80" tall
• Letter sizes:
Upper case - 4" tall
Lower case - 2-11T tall
mants
• Font:
• ITC Officina Sans Bold
` Colors:.:
... White
Yellow - PMS 1225c
?u ' Lt Purple - PMS 2726c
` a " Ok Purple - PMS 2735c
IM f _1
4l A A
PAIMNE4 .'
PAN70NE®
Iketail
2726 `C
Up
PAHME®
2735 C
Banner D2 -B
Sign Type 0 - Directional Banners
tsanner u i -A
Y�
v
Banner D1 -B
• Banner size:
32" wide x 80" tall
• Letter sizes:
Upper case - 4" tall
Lower case - 2-11T tall
mants
• Font:
• ITC Officina Sans Bold
` Colors:.:
... White
Yellow - PMS 1225c
?u ' Lt Purple - PMS 2726c
` a " Ok Purple - PMS 2735c
IM f _1
4l A A
PAIMNE4 .'
PAN70NE®
Iketail
2726 `C
Up
PAHME®
2735 C
Banner D2 -B
Sign Type 0 - Directional Banners
N C
Ch
W3
w
T
N
Z z <
JO< `
0.
N p
z O
Z0.
Lu
V-6W�
T
�u<�w
yam,•.•,•:
w
Y =�..�.. � ,
.'.D•• a
V6lZ'9Z9'OL6 :auoyd
ZU,
<�
am 0b 'sruomn
c
K0 M vHnS •::.
:. 1S.u!BW L6 : •:
(03ION SV 03H3Y-UY
"
:3�►+�
)119W3SSV?J3NNV9 H11M
.
:Sncw1= c4
N C
Ch
W3
w
T
N
Z z <
JO< `
0.
N p
z O
Z0.
Lu
V-6W�
T
�u<�w
yam,•.•,•:
w
Y =�..�.. � ,
.'.D•• a
•:•
ZU,
<�
Z
c
z,z
N C
Ch
W3
w
T
N
Z z <
JO< `
0.
N p
z O
Z0.
Lu
V-6W�
T
�u<�w
yam,•.•,•:
w
Y =�..�.. � ,
S
:z.
ZU,
<�
_
2
z,z
(03ION SV 03H3Y-UY
"
N C
Ch
W3
w
T
N
Z z <
JO< `
0.
N p
z O
Z0.
Lu
V-6W�
T
�u<�w
LLJ J
S
m
z
_
2
(03ION SV 03H3Y-UY
"
:3�►+�
)119W3SSV?J3NNV9 H11M
31GYNIY190 Wl1WIXVW
99 Oi NOISN311IQ SIH1)
IYM ONLLSIX3
11 O -L NV310'NIW „9-.L
J I
LLJ J
S
m
z
z
N��d
A«s
CL
cm
cc,
cc
-o
c CmCc
m L
to
'O d m
70E
�yV
� a
z $ ad
c"�pN
++ m X
N
R
93cC
mer9 :
=Mxo'8:6
Q x R U
JS
m
ZNmd'a l�d
m
01
c m a
v � H
Cud
m E
ld y,I
m�3vi�3��
2E
oft
C U
V go i U
m a
— a
a.Ic%,j C- ° 1
-i;;-
co C
A
��mw
E
"0 l�
a
Cm C
t
43
=LLo
E=a
N
a ''
=T.yV-m
�
CC
k O
Ln
d
cli
c�
V
s_
G
W
CO
E
cc
Memorandum
Design Workshop, Inc.
Landscape Architecture
To:
Town of Avon Planning and Zoning
Land Planning
Commission 1I
Urban Design
Via:
TambiKatie
Strategic Services
From:
Rebecca Leonard
Date:
August 30, 2005
Project Name:
Avon Comprehensive Plan Support
Project #:
3555
Subject:
Agenda for September 6 Meeting
Copy To:
The proposed agenda for the meeting on September 6 is as follows:
1. Regional Issues: Dialog with Cliff Simonton, Eagle County Senior Planner
2. Present the Goals and Policies of Comprehensive Plan
3. Discussion on the Goals and Policies of Comprehensive Plan
4. Next steps: Special Meetings?
DESIGNWORKSHOP
Asheville • Aspen • Denver • Park City • Phoenix • Santa Fe • Tahoe • Santiago • Sao Paulo
120 East Main Street, Aspen, Colorado 81611 • (tel) 970-925-8354 • (fax) 970-920-1387
www.designworkshop.com
Town District Planning Principles!
1. Goals and Policies
While each District -has specific Planning Principles, a number of overarching goals and
policies provide direction in the following topic areas community -wide:
• Regional Awareness
• Urban Form
• Land Uses
• Economic Development
• Housing
• Transportation
• Environment
• Parks, Recreation, Trails and Open Space
• Public Services, Facilities, Utilities and Government
• Community Character
Each topic area contains one or more goals and several specific policy objectives. Certain
goals and policies are more specific and timely than others; however, all goals and policies
contribute to the vision of the plan and its implementation.
Finally, certain policies interrelate to several topic areas (such as policies that are relevant to
both Land Use and Economic Development). Where this redundancy occurs, the policy will
cross-reference other goals or policies accordingly.
Town of Avon Comprehensive Plan
Page 1
Town District Planning Principles
A. Regional Coordination
Goal A.1: Collaborate with Eagle County, adjacent municipalities, and other
agencies to implement this plan and to ensure Avon's needs and
goals are being considered.
Policy A.1.1: Work with Eagle County, adjacent municipalities,
and other agencies on cooperative planning efforts,
including joint planning agreements to govcm
review and action on development applications
within the Town's 3 -mile planning area
Policy A.1.2: Refer development submittals to Eagle County,
adjacent municipalities, and other agencies to ensure
that regional issues are identified and considered as
part of the public process.
Policy A.1.3: Review development submittals from Eagle County,
adjacent municipalities, and other agencies to ensure
that the town's issues are identified and considered
as part of the public process.
Policy A.1.4: Participate in agreements with Eagle County,
adjacent municipalities, and other agencies regarding
funding of facilities and revenue sharing.
Policy A.1.5: Work with Eagle County, adjacent municipalities,
and other agencies to coordinate efforts to address
regional issues related to such topics as the railroad
corridor, 1-70, trails, and the Eagle River.
B. Urban Form
Goal B.1: Maintain a compact community form.
Policy B.1.1: Enhance Avon's compact community form by
targeting future medium and high-intensity
development to infill locations within the Town
Center that are readily accessible to and otherwise
integrated with existing retail areas and transit
service routes.
Policy B.1.2: Require that development in the Town Center be at a
higher density and include vertically mixed uses.
Policy B.1.3: Locate uses that generate traffic near transit facilities
or shared parking facilities to minimize automobile
travel and re -parking multiple times within the same
area.
Town of Avon Comprehensive Plan
AV I) N Page 2
Town District Planning Principles;
Policy B.1.4: Encourage redevelopment and revitalization of
currently underdeveloped, outdated, rundown, or
otherwise dysfunctional areas.
Goal B.2: Provide a distinct physical and visual separation between Avon
and its surrounding communities that preserves the natural beauty
of the surrounding mountains and the Eagle River valley.
Policy B.2.1:
Inventory, analyze and prioritize lands adjacent to
the developed portions of the Town, particularly
developable open space, steep slopes, drainage
corridors, ridgelines, river frontage and other
environmentally sensitive areas, for possible
acquisition and/or preservation as formal open space
or for other public purposes in order to maintain
Avon's visual identity.
Policy B.2.2:
Maintain the Eagle River as a valued resource and
require development and redevelopment to be
compatible with the riparian environment.
Policy B.2.3:
Encourage cluster style development in areas of less
density to promote creative and efficient site design,
avoid impacts on environmental resources, and
augment designated open space.
Policy B.2.4:
Work with landowners to identify opportunities for
conservation easements or other permanent
protection tool.
Goal B.3: Ensure that annexations provide an overall benefit to the
community and are in conformance with this plan's goals and
policies.
Policy B.3.1: Require all annexed lands to be master planned in
conformance with the Future Land Use Plan and all
existing design standards, and to clearly show
physical, visual, and functional connections to
existing development and Town facilities.
Policy B.3.2: Participate in planning efforts related to lands
outside the Town's corporate limits that may affect
the Town by maintaining open communications with
Eagle County, adjacent municipalities, and other
quasi- governmental agencies.
Policy B.3.3: Coordinate land use policies and regulations with
Eagle County, adjacent municipalities, and other
quasi- governmental agencies to make development
more consistent across political boundaries.
Townof Avon Comprehensive Plan `
Page 3 A V o �yu0
Town District Planning Principles
Policy B.3.4: Ensure that the conditions stipulated in all
annexation agreements, subdivision improvement
agreements and other subsequent commitments
between the Town and an annexor(s) clearly identify
the intent and/or purpose of the future disposition or
development of the annexed lands, provides a
sufficient level of specificity to assure that the
identified intent or purpose will be achieved, and
provides sufficient assurance that the proposed
annexation will support the Town's goals and
policies and benefiting both existing and future
Town residents.
C. Land Use
Goal CA: Provide a balance of land uses that offer a range of housing
options, diverse commercial and employment opportunities,
inviting guest accommodations, and high quality civic and
recreational facilities that work in concert to strengthen Avon's
identity as both a year-round residential community and as a
commercial, tourism and economic center.
Policy C.1.1: Ensure that proposed development and
redevelopment projects conform to the Future Land
Use Plan's designations and are of a scale and
intensity as appropriate for the planning district in
which they are located.
Policy C.1.2: Ensure each development contributes to a healthy
jobs/housing balance in the Town and surrounding
area.
Policy C.1.3: Focus lodging and guest accommodation in the
Town Center to take advantage of the proximity to
retail, commercial and other community services.
Policy C.1.4: Encourage the development of detailed District
Master Plans for each District. Once written,
immediate action should be taken to provide clear
and simple zoning that would allow the type of
development approved in the District Master Plan.
Policy C.1.5: Where no District Master Plan has been prepared,
flexible zoning such as Planned Unit Development
should be considered as an alternative to straight
zoning if it would allow a more efficient
development pattern. However, such flexible zoning
will only be allowed where it provides a benefit to
the community, is consistent with this
comprehensive plan, and is compatible with
n 4 N Town of Avon Comprehensive Plan
fl Page 4
Town District Planning Princlples
surrounding development. Variations from standard
zoning will be permitted only as needed to achieve
effective development and a clearly demonstrated
community benefit.
Policy C.1.6: Include sufficient land for public uses such as
schools, recreation, community facilities (such as
childcare), and government services near the people
who use them.
Policy C.1.7: Permit home occupations and live/work
opportunities where appropriate to reduce
traffic/commuting impacts in the community.
Policy C.1.8: Encourage development applicants to meet with
adjacent residents, businesses, and property owners
prior to and during design, planning, and application
phases. This will allow applicants to identify
concerns and propose strategies for addressing them.
Policy C.1.9: Require proposed development near the railroad
corridor, particularly in the Town Center, to
anticipate future transit and incorporate this potential
into building and site design. (Refer to Policy F.3.4)
Goal C.2: Ensure that Avon continues to develop as a community of safe,
interactive, and cohesive neighborhoods that contribute to the
Town's overall character and image.
Policy C.2.1: Promote a wide range of residential uses including
large -lot single family and duplex, small -lot single
family and duplex, multifamily, and vertically
integrated residential (housing on the upper floors of
mixed-use commercial buildings).
Policy C.2.2: Require new residential development to provide a
variety of housing densities, styles, and price ranges
based upon the findings of a housing needs
assessment study. (Refer to Policy E.1.2.)
Policy C.2.3: Require pedestrian, bike, and automobile
connections, where appropriate, between proposed
and existing residential neighborhoods. The use of
multiple access connections, traffic calming devices,
and/or street design standards will be employed to
minimize cut through traffic.
Town of Avon Comprehensive Plan ._ZfW'p
'age 5 Am
U II
Town District Planning Principles
Goal C.3: Use mixed-use development to create a more balanced,
sustainable system of land uses.
Policy C.3.1: Require vertical and/or horizontal mixed-use
development to occur in those areas identified in the
Future Land Use Plan for mixed-use to enhance the
Town's ability to respond to changing market
conditions.
Policy C.3.2: Require retail for a prescribed minimum depth of 25
feet along the "Main Street" in the Town Center to
ensure an active street frontage and appropriate mix
of uses.
Policy C.3.3: Provide opportunities for temporary office and
service uses in ground floor retail space when
market demand is low, but retain permanent
designation as retail.
Goal C.4: Encourage sustainable commercial development that enhances
Avon's overall economic health, contributes to the community's
image and character, and provides residents and visitors with
increased choices and services.
Policy C.4.1: Develop District Master Plans for the East Town
Center District identifying parcel configurations and
new automobile and pedestrian circulation
alignments to increase the district's viability.
Policy C.4.2: Require future commercial businesses, where
appropriate, to cluster buildings and to provide
publicly accessible amenities.
Policy C.4.3: Encourage neighborhood retail and service activities
in locations that are convenient to residential
neighborhoods. Require such development to
provide pedestrian connections to adjacent
development and to existing and proposed trail
systems.
Policy C.4.4: Encourage commercial developments to utilize
green planning and construction techniques (i.e.
LEED certification).
Goal C.5: Create incentives for redevelopment of existing light industrial and
manufacturing uses that conform to existing plans and design
standards.
Policy C.5.1: Service commercial and light industrial uses,
including warehousing and light manufacturing,
Town of Avon Comprehensive Plan
A N
Page 6
Town District Planning Principles'
should be designed to support effective vehicular
access and circulation and allow effective screening
from adjacent uses and public ways.
Policy C.5.2: Permit accessory residential uses in association with
light industrial commercial development when
compatible.
Policy C.5.3: Require adequate infrastructure improvements
including safe access, utilities and controlled access
from collectors.
D. Community Image and Design
Goal D.1: Ensure that development and redevelopment is integrated and
compatible with existing and planned adjacent development and
contributes to Avon's community image and character.
Policy D.1.1: Ensure that both the scale and appearance of
development and redevelopment responds
appropriately to adjacent development.
Policy D.1.2: Restrict large surface parking areas that directly abut
local streets. If a large surface parking area is
located abutting a local street, use beans, plant
materials of varying height, or other screening
materials to buffer and screen these parking areas.
Policy D.1.3: Create a unified and cohesive physical framework
and community image by ensuring compatible
building orientation, scale, massing, siting, street
alignments, streetscape furnishings, signage,
lighting, etc.
Policy D.1.4: Continue to update and enhance the Avon land use
regulations so that development is subject to a
thorough, rigorous set of development criteria
Goal D.2: Create community gateways and streetscapes that reflect and
strengthen Avon's unique community character and image.
Policy D.2.1: Beautify town with street trees, sidewalks,
landscaping and public art.
Policy D.2.2: Design and maintain the Town's streets and
walkways as safe, attractive public spaces.
Policy D.2.3: Ensure that development and redevelopment
adjacent to Interstate 70 maintains significant views
from the highway and features quality landscaping
Town of Avon Comprehensive Plan
Page 7 Am
Il 11
Town District Planning Principles
and architectural design.
Policy D.2.4: Improve the streetscape along U.S. Highway 6 to
strengthen Avon's overall community image and to
stimulate future development and redevelopment by
providing a more attractive and cohesive street edge.
Policy D.2.5: Enhance "Bob" the bridge so that it becomes more
of an architectural feature and gateway to the
community.
Policy D.2.6: Coordinate with the Colorado Department of
Transportation to lessen visual and noise impacts
from I-70 on adjacent development within the Avon
community while preserving important views of
Avon from 1-70.
Goal D.3: Enhance the Town's Image as a unique and distinct community
exemplifying quality development and conveying the town
character.
Policy D.3.1: Develop community gateways along the Avon's
major roadway corridors (as identified on the
Community Framework Map) that respond to and
strengthen Avon's community identity. Gateways
will delineate the Town's boundaries using
landscape, signage, and/or right-of-way treatments
that are applied consistently to create a unified
community image at the town's border.
Policy D.3.2: Strengthen Avon's community edge to distinguish it
from neighboring communities through the
continued preservation of open space.
Goal D.4: Enhance the Town Center's character and continue to emphasize
the Town Center as Avon's commercial, cultural, and civic center.
Policy D.4.1: Require the use of the West Town Center Plan for
development and redevelopment in the district in
order to facilitate and implement the plan's key
components to include the "Main Street" concept.
Policy D.4.2: Use the development of an East Town Center
District plan to identify suitable sites for potential
infill and redevelopment, to define a new modified
street grid, to enhance the district's wayfinding
elements, and to develop an overall pedestrian -
circulation system connecting to the West Town
Center District.
A N Town of Avon Comprehensive Plan
Page 8
Town District Planning Princlples'
Policy D.4.3: Require development and redevelopment of existing
structures in the Town Center to include
architectural elements, site planning, signage, and
hardscape elements that encourage pedestrian
activity. Promote a pedestrian -friendly and inviting
Town Center environment that encourages residents
and visitors to frequent and remain in Avon's Town
Center for extended periods.
Policy D.4.4: Coordinate efforts between Avon's business
organizations to strengthen the Town Center as the
commercial and civic core of Avon. Focus
appropriate new civic and cultural facilities in the
Town Center.
Policy D.4.5: Ensure that pedestrian is prioritized over the
automobile in the Town Center.
Goal D.5: Ensure protection, conservation, rehabilitation, and adaptive reuse
of historically significant resources in Avon.
Policy D.5.1: Evaluate development proposals to avoid or mitigate
adverse impacts on historical resources, including
adjacent neighborhoods, and to preserve, reclaim,
and compensate for the value of the impacted
historic resource.
Policy D.5.2: Support independent citizens groups who wish to
preserve or enhance historical resources and sites
throughout the Town of Avon.
Policy D.5.3: Develop the role of the Historic Preservation
Advisory Committee.
Goal D.6: Develop new and continue to enhance existing cultural facilities,
events, and programs that strengthen Avon's community
character and image.
Policy D.6.1
Policy D.6.2:
Policy D.6.3:
Town of Avon Comprehensive Plan
Page 9
Support cultural activities oriented to families and
year-round residents, such as theater, concerts in the
park, school activities, etc.
Encourage, through partial funding or other means,
local festivals and special events.
Encourage development of civic and recreational
amenities that benefit existing neighborhoods.
Town District Planning Principles
E. Economic Development
Goal EA: Strengthen Avon's Town Center in order to maximize its economic
potential.
Policy E.1.2:
Conduct a retail analysis to identify specific
opportunities to increase retail expenditures within
Avon to reduce sales tax migration to other nearby
communities and to support a year-round retail mix.
Policy E.1.3.
Facilitate the redevelopment of underutilized parcels
and promote a concentration of uses in the Town
Center. Balance the needs for additional floor area
and density with the needs to preserve view
corridors and maintain reasonable levels of mass and
bulk. Encourage shared access, circulation, and
structured/shared parking to unify redeveloped sites.
Policy E.1.4:
implement the Town Center West and Main Street
Public Improvements Project to include its "Main
Street" component. Require all development and
redevelopment in the Town Center to document
ways to meet or enhance the plan's overall
framework and intent.
Policy E.1.5:
Enhance the Town Center area's pedestrian -
orientation by linking together the two Town Center
districts, the Confluence site, and the Nottingham
Station residential and commercial areas. Enable
pedestrians to easily circulate throughout the
commercial areas, including connections across
Avon Road and the railroad right-of-way.
Policy E.1.6:
Develop the East Town Center District subarea plan
in a comprehensive manner to include the physical
form, circulation, and connectivity to surrounding
districts.
Policy 5.1.7:
Encourage future Village at Avon accommodations,
dining, and retail to be located adjacent to the Town
Center in order to strengthen Avon's status as the
regional retail trade center.
Policy E.1.8:
Support sales -tax generating businesses, such as
restaurants and specialty retail stores, to locate in
key strategic locations within the Town Center.
Policy E.1.9:
Identify and promote Avon's viable niche
opportunities to create a diverse and attractive Town
Center tenant profile.
Town of Avon Comprehensive Plan
AV II N
Page 10
Town District Planning Principles
Policy E.1.10: Allocate Town resources, including but not limited
to Town staff support, to Town Center
redevelopment efforts and business retention and
development efforts.
Policy E.1.11: Provide excellent, high-quality public facilities in
the Town Center area including but not limited to
parks, Town Hall, sidewalks, streets, recreational
facilities, and library.
Policy E.1.12: Implement methods for better meeting Avon's
parking needs within the Town Center such as a
Town Center parking district and/or parking garage.
Policy E.1.13: Explore parking programs (paid, metered, and time -
controlled) to maximize the efficiency of the system
and to ensure that it meets the needs of visitors and
patrons as well as residents and employees.
Goal E.2: Ensure the ability to fund and implement the necessary
development and redevelopment by encouraging strategic use of
town funds to leverage high quality private sector investment.
Policy E.2.1: Pursue economic development benefiting the Town
of Avon by using local, county, state, or federal
resources that are available including the
investigation into various incentive programs and
selection criteria. Community funds could be
applied to different projects based upon level of
projected public investment versus revenue returns
to the Town.
Policy E.2.2: Use the Capital Improvement Plan to fund key
public facilities that will catalyze private sector
projects.
Policy E.2.3: Encourage private investment in Avon through such
tools and strategies as Tax Increment Financing for
specific development proposals; General
Improvement District Bonds; expedited review
processes; public/private financing mechanisms;
applying for development and redevelopment grants;
and participation (cost and revenue) in delivering
infrastructure and services as appropriate and
advantageous to the Town and its economic
development efforts. .
Policy E.2.4: Attract existing businesses within the region to
relocate to Avon by promoting its available
commercial land and buildings as well as its existing
infrastructure and its accessible location.
ITown of Avon Comprehensive Plan
Page I I
Town District Planning Principles
Policy E.2.5: Address public economic and demographic
information requests, as well as coordinate business
attraction, retention, and reinvestment efforts
between Town departments. Utilize local data and
resources such as the Vail Valley Economic Council
and Eagle County Profile wherever possible.
Policy E.2.6: Continually review business taxation practices in an
effort to maintain Avon's competitive position in the
region, while maintaining a healthy fiscal structure.
Policy E.2.7: Investigate the potential costs and benefits of
establishing a vacancy assessment fee to discourage
long-term commercial/retail vacancies.
Goal E.3: Increase the number of visitors to Avon by enhancing our
attractiveness as a destination resort community.
Policy E.3.1: Promote effective transit and access with Beaver
Creek Village that may include a direct lift
conveyance, mass transit, trails, and pedestrian
connections.
Policy E.3.2: Strengthen the tourism potential within Avon by
working collaboratively with organizations
throughout the community to capitalize upon Avon's
unique recreational and cultural assets (i.e.
coordinated marketing efforts).
Policy E.3.3: Institute minimum density requirements for
development proposals in the Town Center and
enforce minimum density requirements for existing
land use approvals to achieve the needed critical
mass of accommodation units.
Policy E.3.4: Actively support marketing partnerships to promote
Avon as a tourist destination.
Policy E.3.5: Strengthen existing and develop additional cultural
and recreational attractions oriented toward both
local residents and visitors.
Policy E.3.6: Develop a joint visitor center with Beaver Creek on
the east day parking lot or other suitable location to
increase the effectiveness of providing information
about the Avon community, its businesses, and the
various special activities and events occurring within
the community.
Policy E.3.7: Encourage increased use of the Town's website to
promote local tourist attractions. Monitor and
Town of Avon Comprehensive Plan
AV 11 N Page 12
Town District Planning Principles,
maintain the website to provide both current and
general information about the Avon community, its
businesses, and the various special activities and
events occurring within the community.
Policy E.3.8: Ensure that the tourism and recreational attractions,
shopping and dining areas, parks, transit stops, trails,
and bicycle routes are coordinated within an
integrated wayfinding signage program oriented to
both pedestrian and vehicular traffic.
Policy E.3.9: Identify and honor cultural and historic sites with
such elements as museums, interpretive parks,
markers, memorials, fountains, sculptures, statues,
signage, banners, informational kiosks, public art,
and flags.
Policy E.3.10: Encourage and facilitate the creation of new tourist
attractions relating to interesting, niche retail and/or
manufacturing operations. Examples include the
Leaning Tree Museum, Celestial Seasonings Tea in
Boulder, or the REI flagship store in Denver. Pursue
businesses that have a corporate philosophy in line
with Avon's (i.e. North Face, Snapple, and Trek
Bicycles)
Policy E.3.11: Seek opportunities to highlight and support local
artists, experts, and resources such as private
collections or specific hobbies as part of Avon's
overall cultural/heritage efforts.
Policy E.3.12: Coordinate advertising of local festivals and events
with window displays and special promotions by
area businesses.
Policy E.3.13: Seek marketing opportunities for local businesses
such as restaurants and lodging to capitalize on an
overall cultural/heritage community image rather
.than a single venue or event.
Policy E.3.14: Encourage collaborative approaches between the
various community stakeholders, such as but not
limited to the Vail Valley Chamber and Tourism
Bureau, Avon Chamber of Commerce, Beaver Creek
Resort Company, Vail Resorts, Eagle County School
District, Town of Avon Parks and Recreation
Department, and Eagle County Library District to
enhance Avon's overall guest potential.
Policy E.3.15: Achieve greater use of existing facilities in the
community with an expanded schedule of events to
Town of Avon Comprehensive Plan EWPn'
Page 13 Am II y
Town District Planning Principles
strengthen the Town's year-round guest potential
and to provide an amenity for local residents.
F. Housing
Goal F.1: Provide a diverse, quality housing inventory to serve diverse
economic segments and age groups of the population.
Policy F.1.1: Require that infill residential development is
compatible in design, scale, and use with existing
neighborhoods.
Policy F.1.2: Initiate a housing needs assessment to understand
the housing needs of the community and establish
policies and programs that would address these
needs. Ideally, a housing strategy would result that
takes into consideration the unique opportunities and
constraints found in the community. Encourage
innovative designs that contribute to the quality and
diversity of the housing stock.
Policy F.1.3: Encourage private development to include a
diversity of housing types and prices within
developments.
Goal F.2: Provide an attainable housing program that incorporates both
rental and ownership opportunities for permanent and seasonal
residents that are attractive, safe and integrated with the
community.
Policy F.2.1: Require that development, annexations, and major
redevelopment includes or otherwise provides for
affordable housing within the community.
Policy F.2.2: Require that affordable housing is integrated with,
rather than separated from, the rest of the
community.
Policy F.2.3: Encourage affordable housing be close to existing
development, serviced by transit, and close to
schools/child care.
Policy F.2.4: Require that affordable housing be maintained as
affordable in perpetuity including price control
mechanisms that ensure units are affordable to
desired income levels.
Policy F.2.5: Establish a minimum dwelling unit size requirement
for designated affordable housing units that
effectively meets the residents' livability needs.
Y u Town of Avon Comprehensive Plan
Page 14
Town District Planning Principles
G. Transportation
Goal G.1: Create an integrated transit system that minimizes dependence on
automobile travel with the Town by making it easier to use transit,
walk, ride bicycles, and utilize other non -motorized vehicles.
Policy G.1.1: Ensure that streets effectively accommodate transit,
pedestrian, bicycle and other modes of
transportation. Prioritize pedestrians, bicycles, and
transit over private vehicles when designing streets.
Policy G.1.15: Connect pedestrian, bicycle, and vehicular
circulation systems with regional transit.
Policy G.1.2: Require that commercial, public and other uses that
generate significant employment and customer
traffic are served by transit and linked by pedestrian
and bicycle paths to minimize their dependence on
automobile travel.
Policy G.1.3: Ensure that commercial areas, in particular the Town
Center, are designed to minimize in -town
automobile travel by making it easier for people
arriving by car to park and conveniently walk to
multiple stores and businesses.
Policy G.1.4: Identify and participate in cost-effective transit
partnerships with local resorts and other
governmental entities to include aerial conveyances,
buses, and other transit services and facilities.
Policy G.1.5: Ensure that adopted roadway and intersection
standards have adequate provisions within the public
right of way to fully incorporate both auto and non -
auto modes.
Policy G.1.6: Track annual traffic counts, in particular the
prevailing ease of north -south travel to and through
Avon, to note year-to-year trends that could lead to
reallocating street vehicular and pedestrian capacity
needs.
Policy G.1.7: Investigate the feasibility and cost/benefit of a
Metcalf Road to West Beaver Creek Boulevard
pedestrian connection across I-70, with possible
inclusion of public transit/emergency vehicle access
or possibly general traffic use.
Policy G.1.8: Devise a public transit service plan that would
replace the current one-way loop system with a two-
way system utilizing new road links. Compare
Town of Avon Comprehensive Plan t"
Page 15 Am 0 N
Town District Planning Principles
annual service hours and productivity (passengers
per vehicle -hour) estimates of the two alternative
service plans.
Policy G.1.9: Require development and redevelopment proposals
within the Town of Avon's transit service area to
provide all appropriate transit amenities such as
passenger shelters, waiting areas, pedestrian access,
and lighting.
Policy G.1.10: Develop a toolkit of traffic calming measures that
would be appropriate and acceptable to achieve the
desired balance between vehicular, pedestrian and
bike travel capabilities.
Policy G.1.11: Investigate the feasibility of implementing an
alternative fuel program for the Town's transit and
fleet vehicles to enhance air quality.
Policy G.1.12: Preserve a corridor for a funicular or other fixed
guideway transit mode to link the Village at Avon to
the Town Center.
Policy G.1.13: Develop a comprehensive town pedestrian
circulation plan and require all development
proposals to include it graphically on their plans,
specifically addressing ways each proposal
contributes to the concept and its implementation.
Policy G.1.14: Investigate alternative funding sources for
operations and capital improvements: federal/state
grants, public/private cost sharing opportunities, etc.
Policy G.1.17: Support a transit system that maximizes ridership by
providing frequent service even if higher subsidy
levels are required.
Goal G.2: Ensure that the railroad right of way corridor becomes an integral
part to the Town's mobility system.
Policy G.2.1: Ensure the preservation of the railroad right-of-way,
in its entirety, through and adjacent to Avon, if it is
abandoned.
Policy G.2.2: Provide safe and cost-effective, at -grade
pedestrian bicycle crossings through the railroad
right-of-way, particularly between residential
neighborhoods and employment centers, shopping
centers, and schools.
Policy G.2.3: Provide safe and cost-effective, at -grade crossings
Town of Avon Comprehensive Plan
Page 16
Town District Planning Principles!
through the railroad right-of-way, particularly
between the Town Center and the Confluence site.
Policy G.2.4: Start a task force to investigate and advocate for a
regional reuse plan for the railroad right of way
corridor that fully investigates the potential benefits
and costs of developing a regional light rail transit
system.
Goal G.3: Facilitate the development of a conveyance linking the Town of
Avon with Beaver Creek Village.
Policy G.3.1: Investigate transport technology options that could
accommodate transit passenger as well as skier and
boarder use to directly link the Town Center with
Beaver Creek Village.
Policy G.3.2: Work cooperatively with the Beaver Creek Resort
Company and other appropriate entities to reach an
equitable arrangement for funding and operating the
conveyance.
Policy G.3.2: Develop a strong pedestrian connection between the
conveyance, parking, and the transit center.
Goal G.4: Provide a safe and efficient vehicular transportation system.
Policy G.4.1: Develop alternative roads to more effectively
disperse and relieve traffic congestion in community
centers and on major roads.
Policy G.4.2: Require new roads in developing areas to tie into the
existing road network.
Policy G.4.3: Require multiple access points for all development
to disperse traffic and allow for safe evacuation if
necessary.
Goal G.5: Encourage a "park once/shop many" environment
Policy G.5.1: Initiate a parking needs assessment and management
study for the Town Center, revising Town Code and
parking standards as necessary and effective to
create incentive for redevelopment.
Policy G.5.2:
Policy G.5.3:
;Town of Avon Comprehensive Plan
Page 17
Ensure parking facilities are easily accessible by
pedestrian connections and have minimal visual
impacts.
Investigate the feasibility of joint development of
Ro
Town District Planning Principles
structured parking facilities in the Town Center area
to support private and public uses.
Policy G.5.4: Require that all development or redevelopment in
the Town Center incorporate structured parking or
contribute to a pay -in lieu program established to
develop joint private/public parking structures.
Individual underground parking structures should
share access and otherwise connect to adjacent
underground parking structures.
H. Environment
Goal H.1: Protect Avon's unique natural setting and its open spaces.
Policy H.1.1: Protect and capitalize on the Eagle River corridor as
an important recreational amenity and riparian
habitat by implementing the Eagle River Watershed
Plan.
Policy H.1.2: Acquire or otherwise permanently protect
important/significant open space.
Policy H.1.3: Require development and redevelopment to
accommodate wildlife habitat, including deer and
elk migration routes, or otherwise mitigate loss of
habitat.
Policy H.1.4: Prevent visual degradation or degraded solar access
from development.
Goal H.2: Protect the health, safety, and welfare of the citizens through
avoiding or adequately mitigating environmental hazards
Policy H.2.1: Avoid development in environmental hazard areas
such as floodplain, steep slopes, areas with
extensive geologic hazards, wildfire hazard areas,
and areas with erosive soils.
Policy H.2.2: Require development and redevelopment to
minimize degradation of sensitive natural areas,
restricting development on steep hillsides.
Goal H.3: Protect the health, safety, and welfare of the citizens by
eliminating, reducing, or preventing air, water, light, and noise
pollution.
Policy H.3.1: Reducing the number of air pollution sources to the
extent possible, such as limiting the number of
e^I1msu' Town of Avon Comprehensive Plan
Page 18
Town District Planning Principles
fireplace installations, reducing demand for
automobile trips, and reducing pollution from
existing sources through the use of alternative fuels,
scrubbers, and other technologies.
Policy H.3.2: Require appropriate control of fugitive dust from
disturbed sites in adherence to Avon's Building
Code as determined by the Building Department
Policy H.3.3: Protect water quality by following the Eagle River
Watershed Plan's recommendations.
Policy H.3.4: Ensuring that outdoor lighting does not create
undesirable light pollution and complies with the
"Dark Sky Ordinance" passed in 2004. Revisit the
ordinance 5 years atter adoption to ensure it is
achieving the desired goals.
Policy H.3.5: Develop an educational campaign on noise pollution
to inform residents, employees, second homeowners,
and visitors of Avon's goals regarding noise.
Goal H.4: Conserve environmental resources to ensure the most efficient
use of such resources.
Policy H.4.1: Support regional and local efforts for recycling and
maintain support of regional recycling facilities.
Policy H.4.2: Require use of green building and energy efficient
appliances and building techniques and water
conservation approaches for new and existing
development.
Policy H.4.3: Conserve water through public education, supply
management, and demand management techniques,
requiring residential, commercial, and municipal
landscaping to be compliant with the water
conservation design guidelines adopted in 2003.
Goal H.S: Protect and conserve unique, distinctive, or historic natural and
man-made features in recognition of their irreplaceable character
and importance to the quality of life in the Town of Avon.
Policy H.5.1: Protect from destruction or harmful alteration
historically significant structures, archaeological
sensitive areas, and other landmarks as determined
by the Town. Preservation of these sites will be
protected through the planning of compatible
surrounding land uses. Proposals with potential
adverse impact will be dealt with on a case-by-case
Town of Avon Comprehensive Plan
age 19
Town District Planning Principles
basis. Evaluation of impacts may be required as part
of the development review process.
Policy H.5.2: Require that proposed development applications
include an evaluation of potential impacts on
possible wildlife habitat and corridors, and wetland
areas. Construction of buffer zones may be required
to protect these areas. The size and dimensions of
such buffer zones and their vegetation will be
determined by the Town on the basis of reports
which may be required from the developer for the
particular habitat.
Parks, Recreation, Trails and Open Space
Goal 1.1: Provide an exceptional system of parks, trails, and recreational
programs to serve the year-round leisure -time needs of area
residents and visitors.
Policy 1.1.1:
Require new residential and resort developments to
incorporate recreational amenities that are accessible
to the public.
Policy 1.1.2:
Continue to evaluate and acquire parcels or
easements for open space, trails, and recreation.
Policy 1.1.3:
Integrate the Town's recreational trail system with
the regional trail systems (ECO Trails, USFS, and
BLM) wherever possible.
Policy 1.1A:
Require new annexations and developments to
include or otherwise contribute to land for trails,
open space, and recreation purposes.
Policy 1.1.5:
Coordinate with Eagle County and other government
and non-profit agencies in planning, protecting, and
managing public open space, and in providing access
and linkage opportunities.
Policy 1.1.6:
Conduct a master plan study of Nottingham Park to
identify program enhancements to potential art,
cultural, and recreational facilities to better activate
and enhance this area as Avon's major recreational
and cultural center.
Policy 1.1.7
Develop a river front park that connects the Eagle
River to the Town Center and Nottingham Park.
Town of Avon Comprehensive Plan
MINII N . Page 20
Town District Planning Principles
Goal 1.2: Coordinate and collaborate with surrounding jurisdictions and
agencies to develop seamless recreational opportunities.
Policy 1.2.1: Participate in travel management planning by the
USFS to ensure that trail connections and tmilheads
are meeting the town's needs.
Policy 1.2.2: Collaborate with other rccreation providers such as
Western Eagle County Metropolitan Recreation
District and private homeowners association to
discuss joint use of facilities and coordinated event
planning.
J. Public Services, Facilities, Utilities and Government
Goal III: Utilize this comprehensive plan in all town dealings including
capital planning, the operation/maintenance of facilities, and
programming of events.
Policy J.1.1: Consistently adhere to established policies and
regulations. .
Policy J.1.2: Analyze town spending to assure that the priorities
of this comprehensive plan are being considered for
implementation.
Goal J.2: Ensure cost effective provision and development of public facilities
and services.
Policy J.2.1: Coordinate with special purpose districts regarding
service expansions and other development that could
affect the achievement of the districts goals and
objectives.
Policy J.2.2: Locate schools, parks, and other civic facilities,
along trails, pedestrian and bicycle connections, and
transit facilities.
Policy J.2.3: Ensure that annexations and new subdivisions
include or otherwise provide for community services
and facilities (i.e. schools, transit, fire, affordable
housing, etc.) based on the increased demand created
by those developments.
Policy J.2.4:
Policy J.2.5:
Town of Avon Comprehensive Plan
page 21
Analyze the net costs of various types of growth and
development including long-term service provisions
and secondary impacts.
Encourage development of neighborhood and
community-based childcare facilities and include
Town District Planning Principles
youth in the programming of any community or
public facilities.
Goal J.3.1: Encourage the broad participation of citizens in planning
efforts and decision-making.
Policy J.3.1
Policy J.3.2:
Policy J.3.3:
Policy J.3.4:
Strive for increased transparency in government.
Build awareness of upcoming events, planning
processes, and decisions.
Use multiple means of communicating with the
public including radio, newspapers, mailings,
internet, email, churches, community centers, etc.
Strive for bilingual communications to inform
Hispanic residents, employees, and visitors of town
business and information.
Town of Avon Comprehensive Plan
AY 0 N Page 22
Eagle County Comp Plan, FINAL TEXT EDIT
3.2.2 Quality of Life
Nearly all development issues are associated with the pursuit and protection of a
positive quality of life. "Quality of life" is a term typically used to describe physical and
economic satisfaction, and is often associated with adequate wealth, health, and
comfort. Quality of life can also include emotional fulfillment and personal satisfaction
(or dissatisfaction) with the cultural or intellectual conditions under which you live. As
such, quality of life may have as much to do with one's mind and its perceptions as it
does with day to day physical experiences; as much to do with the culture of an area as
it does with the physical environment.
Nevertheless, it is likely the physical realities of a beautiful and pristine• mountain
environment, world-class recreational amenities, a great climate and a robust economy
that initially draw people to Eagle County. For many, enjoyment -of the life style provided
by these characteristics is the primary reason they decide to become fulltime residents.
But there are many other reasons to live here. The small town atmosphere, quiet living,
neighborliness, opportunities for a "connection" to nature, clean air and water, abundant
wildlife, and a broad spectrum of cultural and educational ° events and activities all.add
significantly to the quality of life choices available in the County. These attributes,. in
addition to easy. access to the cities of Glenwood Springs, Grand,Junction and Denver,
create a truly rich and wonderful place to call home. This may be why.residents who do
not ski, do not bike, and do not hike or raft or fish seem to appreciate Eagle County as,
much as those who do.
Every person has their own definition of what is important in their lives. To the degree
that physical conditions, amenities and experiences contribute to a -person's definition,
the quality of life in Eagle County. has changed considerably over the -past 30 years.
Many of the living experiences enjoyed by residents 40 years ago in Eagle County are
not available to residents living here today. On the flip side, there are many quality
experiences now available that the original homesteaders could not have even dreamed
of. In the -face of booming growth, the decisions that face local officials now is which of
the many quality of life characteristics currently available to visitors and: residents should
continue to be available in the future.
Some would say policy makers should do nothing, for as Eagle County grows, and the
dynamic of -its population changes, so too will expectations change for the quality of life
people seek. Others feel that certain characteristics fundamental to the quality of
mountain living.are at risk, and that greater management and --more directed planning by
government is necessary.
This Comprehensive Plan assumes that the quality of life that can be found in Eagle
County today is worth preserving. As such, it attempts to,identify those elements that
are significant to the County's current "quality of life" and to provide a shopping cart of
tools and policiesthat may be used to help preserve them for -.the future.
3.2.3 Growth
Like quality of fife, growth means different things to different people. Long-time locals
have mixed feelings about growth, noting on one side the negative impacts of crowds,
noise, traffic, and pollution, while (sometimes only secretly) acknowledging the benefits
of improved public services, better schools, more shopping options and the potential for
better jobs. Many new -comers to the valley are of urban origin, and they enjoy having
access to the cultural events, facilities and amenities common to a more urban
environment. Many who live here promote reducing or even stopping growth, but most if
not all would agree that the growth that has occurred in Eagle County to this point in time
has enriched their lives in one way or another.
Eagle County is a very popular destination. Regardless of their origin, people come to
here to seek a better quality of life, and many specifically desire an escape from the
commotion of urban living. As people arrive, however, the commotion increases.
Between 1990 and 2000 Eagle County was the 10"' fastest growing county in the United
States. During that time its population doubled. By the year 2006, it is estimated that
Eagle County's population will reach 50,000. There are presently more jobs in the
County than workers, and thousands of workers currently commute to Eagle County
each day from surrounding areas. By the year 2030, conservative projections by the
State place the county's population at 88,000. Those same projections indicate many
more jobs, a potential shortage -of workforce housing, and a daily commute of people
from other areas of approximately 33,000. Rush hour traffic could become city -like, and
many envision an eventual urbanized high-density corridor along both Interstate 70 and
Highway 82.
Population growth in Eagle County will continue. A Dwelling Unit Analysis conducted by
Eagle County's Department of Community Development in 2005 indicated the existence
of almost 12,000 dwelling units that can be built on currently vacant but already
approved lots or parcels within the Towns and in unincorporated areas of the County.
Using this number, and applying the regional average of 2.7 persons per household,
Eagle County, could physically accommodate 32,000 additional people today, with no
further land use approvals. Development pressure will likely continue and more lands
will likely be up -zoned by the County or annexed by the Towns in the future to allow
higher residential densities. A population in the year 2030 of 88;000 may well be on the
conservative side.
There is an incontrovertible axiom that infinite growth is not possible in a finite system.
Most would agree that Eagle County's resources: its land, its water, and its visual and
cultural amenities - are not without limit. Indeed; low snowfall amounts over the past
several years has created considerable concern for the County's water supply,
especially given the need to preserve adequate flows in stream and river environments.
Growth has played an enormous role in shaping the economic success and vitality of the
modem day Eagle County. Unfortunately, growth has also produced negative impacts
such as traffic, pollution, crowded venues and noise that detract from Eagle County's
quality of life and, potentially, the vitality of the county's communities and environment.
At present, the County's economy is strong, but it is conceivable that poorly managed
growth could begin to diminish the quality of life experience to the point where
businesses would be negatively impacted. This is why future planning is so critical.
Given the limited amount of private land, the possibility of a time when development
patterns along the County's major travel routes, become essentially fixed in place exists.
A "fixed in place" development pattern does not mean that the economy would stop
growing, as there is always re -development (the county is already seeing this), and there
are always gains to be made through economic diversification. In a place that "sells"
recreational experiences, natural beauty and healthy lifestyles, there is a balancing act
that must occur between growth and the need to preserve the physical and social
characteristics that support a desired quality of life.
Sustainability, maintenance, preservation, continuation, conservation, safeguarding,
keeping, or upholding are all catch phrases used to explain the concept of balance for
long-term benefit. Just like treading water or keeping the weight off after a diet, balance
is not an effortless state. It is a process that allows growth and expansion in some areas
while acknowledging the need for contraction and decline in others.
The key to sustainability or maintenance is monitoring. Understanding the effects of
growth and development on the economy, community, and environment is essential, to
determining the best ways to mitigate their impacts. Decision makers in Eagle County
must think about the connections between the economy and the environment, society
and jobs, housing, quality of life, and the myriad of other indicators of a community's
wealth. Each new development proposal must be viewed against the larger -picture of
Eagle County's future.
How can growth be managed to achieve the best future for the County? What tools
should• be utilized to better direct growth and reduce the related impacts? Fortunately,
the situation in Eagle County is not unique. Many other communities in Colorado and
elsewhere in the United States are actively investigating or are currently employing
strategies to find a balance and insure the future well being of their citizenry. As well
equipped and progressive as Eagle County has always been, it must continue to
communicate with and study the experiences of others as it formulates its own set of
growth management strategies.
This comprehensive plan is intended to provide the most current ideas, policies, actions
and guidelines that can be used to find an appropriate balance between population
growth, economic success, quality of life and environmental preservation in Eagle
County.
Policies:
- 3.1 Monitor the pace of population growth, economic growth, and the changing
environmental conditions due to growth.
- 3.2 Manage growth to strike a balance between protection of Eagle County's
economy, quality of life, and environment.
3.2.4 Development
Early development in Eagle County mirrored transportation routes, which generally
followed streams, rivers and valley floors. Shallow slopes in these areas held good soil
and were easy to access, irrigate and farm. Steeper slopes were of little use or interest
to early settlers and, with the exception of mining, were generally left undisturbed. A
linear development pattern along valley floors resulted.
In the 1960's, local governments began to see the need to regulate land use, and in
1964 Eagle County adopted its first set of subdivision regulations. In 1974, zoning was
applied to all unincorporated county lands. These new land use regulations were
designed to control the placement and quality of growth in the county, which generally
continued to follow transportation corridors and valley floors, as these areas were still
the most suitable locations for development.
It was not long, however, before development pressure and the strong market for real
estate began pushing housing and resort construction toward private lands once
considered far too remote to develop. Side valley benches, hillsides and ridge tops were
accessed by long, privately maintained roads, and became locations for subdivisions,
golf courses and gated communities. While these isolated communities require
expensive infrastructure and the creation of separate service districts, they generally pay
for themselves in Eagle County through property owner assessments. However, they
also create many service jobs, provide little to no workforce housing, disrupt wildlife
habitats and contribute to a sprawling development pattern.
Development pressure remains high in the county today, and land values are
consequently inflated. Eagle County has become a place where virtually any large
agricultural tract of land with water rights represents a potential gold mine to the owner,
as it could one day be successfully developed into a golf resort or high-end second
home community.
There are fifteen community centers in the County. Vail, Mintum, Red Cliff, Avon, Eagle,
Gypsum, and Basalt are incorporated towns, and all, with the exception of Vail and
Redcliff, have been actively annexing adjacent land in the past ten years to
accommodate residential and commercial growth. Eagle -Vail and Beaver Creek are
essentially unincorporated suburbs of the Town of Avon. The largest population center
is unincorporated Edwards, and the smallest centers, also unincorporated, are Bums,
McCoy and Bond, which serve ranches in the northern part of the county, and Wolcott,
which is likely to see significant growth pressure soon given its location on the 1-70
corridor. On the Roaring Fork River, unincorporated EI Jebel lies between Glenwood
Springs in Garfield County and Aspen in Pitkin County. Finally, Dotsero is an emerging
center located west of Gypsum on the Colorado River where over 400 dwelling units and
20,000 square feet of commercial space have recently been approved.
Continued growth on the valley floor has begun to blend several once separate
communities. It is difficult today to see where Avon ends and Edwards begins, Eagle is
only slightly separated from the incorporated boundary of Gypsum and Basalt and EI
Jebel are rapidly growing together. Many point to these as examples of ex -urban sprawl
in the County, and would note the negative impacts of fragmented wildlife habitat,
degraded views and diminished opportunities to develop or retain unique community
character.
Existing towns and unincorporated communities will continue to be important homes for
Eagle County residents and second -home owners. But space is limited, and in the
future existing community centers will find it more and more difficult to expand onto
previously undeveloped land. Internal re -development with increases in vertical height is
one option, but many residents will oppose the increased density and the obstructed
views that taller buildings would create. Tools should be put into place that allow
creative and appropriate mechanisms for the renovation of existing towns. There may
also be a need in the future to locate new communities in the County where density and
infrastructure can be focused. To prevent a sprawling development pattern, a rigorous
set of criteria for the site -selection of any future new community should be established.
An important legacy of the 1981 and the 1996 Eagle County Master Plans was that the
open, rural character of Eagle County should be protected. The 1981 Plan stated, "A
finite amount of development would be acceptable, provided the resulting land uses
would be in harmony with the natural and social environment and adjacent land uses".
New development would be allowed to occur only if there were changed conditions in an
area or if a demonstrated community need was being satisfied. To this end, the '81 and
'96 Plans promoted a number of policies, including:
- Locating development to avoid critical wildlife resources and to maintain hay
meadows and pasture lands.
- Maintaining buffer areas between communities in their natural state.
- Encouraging use of the Planned Unit Developments technique to promote
creative and efficient site design, and clustering to reduce service costs,
maximize open space and promote efficient transportation.
- Requiring new development to pay for a fair share of its demanded capital needs.
- Designing development in an energy efficient manner.
- Locating residential developments away from transportation rights-of-way and
incorporating noise control techniques in residential design.
- Requiring new communities or large-scale developments to: provide the full
range of public services, have a site-specific economic determinant, minimize
their negative environmental and social effects, and include a phasing plan.
The 1996 Eagle County Master Plan stated more specifically,
The objective of Eagle County, as expressed by this the Master Plan, is to
support and encourage the diversity of Eagle County's economic development
and to accommodate a reasonable level of growth, but only if that growth can be
provided with necessary facilities and services in a fiscally responsible manner,
and only if that growth is consistent with the character of Eagle County, causes
minimum impact on environmental and wildlife resources, and is compatible with
adjacent land uses.
These policies and statements are consistent with the sentiment of the community today
and they have been factored into the core values of this plan.
Policies:
- 4.1 Promote and focus urban and suburban growth within existing towns and
community centers.
- 4.3 Encourage redevelopment and revitalization of currently underdeveloped
outdated, rundown, or otherwise dysfunctional areas.
environment.
- 5.1 Ensure development equitably mitigates its own impacts upon both the
natural and the built environment.
burdened.
3.2.5 Density
In the context of a rural setting, density is often associated with a diminished quality of
life. Residents in a place like Eagle County are rarely in favor of any plan that suggests
more people per acre. Unfortunately, a few bad examples of higher densities have
ruined public perceptions regarding the important role that more compact living
arrangements can play. From a practical standpoint, higher density could be a solution
to many of the issues currently faced. There is a need to accommodate growth, but
there is an equally important desire to preserve the County's open space, environment
and rural character. If used judiciously, increased density in specific areas could be a
highly effective tool for achieving these goals.
High housing demand with low housing supply creates shortages and forces home
prices up. Focusing development into areas of higher density within existing towns and
unincorporated communities can help bring down the costs of development by spreading
the cost of land over more residential units. Higher densities can also help meet the
demand for workforce housing whilst averting sprawl. Balancing demand with supply
helps keep housing affordable.
Increasing density in existing towns and communities makes sense as it places people
near existing infrastructure and services. More density in existing communities can
create fiscal savings, as new infrastructure is often unnecessary. Studies have shown
that the cost of providing services to outlying areas grows exponentially as development
gets farther and farther from existing facilities.
Density can reduce traffic and increase options for public and other forms of
transportation. It is often easier in a more compact mixed-use community to ride a bike
or walk than it is to try to get around with a car. Visitors often rely on walking or public
transportation, and focusing residential and commercial development to denser, mixed-
use areas provides an environment where the greatest variety of transportation options
exists. Sprawling development is difficult to serve efficiently with public transportation.
Transit stops become much more viable when they are located close to areas of higher
density.
Finally, Eagle County and its incorporated towns need to project the image of a vibrant,
active place where all tourist attractions and amenities are easy to find and access.
Areas of open space and public parks should be strategically sized, positioned and
otherwise incorporated into all areas of higher density.
Policies:
3.2.6 Community & Character
"Know thyself." The same holds true for a geographic region like Eagle County. Review
the local papers and marketing brochures, and it is relatively easy to define many
elements of Eagle County's present-day community and character.
A sense of place is difficult to describe. Simply put, it is the feeling that you have arrived
someplace special. The beauty, topography, open space, climate, and recreation found
in Eagle County make it a very special place, indeed, but sense of place involves more
than just an area's physical attributes. It involves community and people - real
communities that provide positive lifestyles and quality living, and residents who are
genuinely happy, content and proud of where they live.
Eagle County residents bring their differing perspectives to this beautiful place and
spend their time here working together to make something of which to be proud: a
thriving community in harmony with the natural environment. They share a common
love for the quality of life it provides. Second homeowners and visitors reap the benefits
of these efforts, with positive results. They "sense" the place created by nature and by
local residents, love what they find, and bring with them the money which drives a
significant portion of the local economy.
Communities that develop their own character, their own unique set of "local"
experiences and venues and amenities, are the communities that can boast a special
sense of place. Vail successfully created a European village where there once was
nothing. Mintum has long been known for some unique restaurant experiences, and
now offers a popular summer Farmer's Market. Avon is working to create a new "main
street" in its downtown area and a water park on the river, and Basalt works continuously
to maintain the attractiveness of its historic main street shopping area. Eagle has the
annual Rodeo and Fair, and Gypsum has its annual Gypsum Daze event. All these are
examples of attempts to create or retain some uniqueness, to develop a "sense of place"
that will draw more visitors, support local business and create happier, more content
residents.
Establishing community character in towns like Eagle, Gypsum and EI Jebel that serve
as bedroom communities for resort complexes like Vail and Aspen can be a challenge,
as most of the residents work somewhere else during the day. Community building
within resort towns can also be difficult because of absentee second homeowners and
the transient nature of the service workforce. Eagle County and Town governments
must work both separately and together to lessen these impacts, to provide affordable
units close to the workplace, and to create more year-round jobs and more reasons for
people to stay and become involved. Each community should be allowed to draw on its
own history to develop attractions, amenities and events that are unique to it and
hopefully different from other towns, thus providing all who live and visit here with a full
pallet of entertainment, recreation and shopping options.
Policies:
7.2 Support attempts by local communities to establish unique venues and attractions
associated with enhancing community and sense of place.
�
F.
�f
f