PZC Packet 031505Town of Avon Planning & Zoning Commission
Meeting
AMarchjlO 15`", 2005
VON 0. A o o Meetings Held At: Avon Town Council Chambers
Meetings are open to the public
Avon Municipal Building / 400 Benchmark Road
5:00 pm Commission Work Session
(Discussion of Items on Agenda)
- REGULAR MEETING AGENDA -
(Please note that all times provided are estimates only)
I. Call to Order at 5:30 pm
II. Rall Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda: Approval of the March
Minutes
151, 2005 Planning & Zoning Commission Meeting
VI. Minor Project — Windows/Addition (5:35pm — 5:45pm)
Property Location: Lot 38, Block 3, Wildridge Subdivision/4560 Flat Point
ApplicantslOwners: Susan & James Dreisbach
Description: Susan and James Dreisbach have resubmitted a Minor Project application to change the
roof pitch on a portion of a roof at their duplex. This change in roof pitch facilitates the addition of
windows and may enhance their views facing south. The roof pitch would change from a 6:12 pitch to
a 3:12 pitch for an area measuring approximately 275 square feet. As proposed, the re -roof portion of
the project would utilize a stone -embedded steel product similar in appearance to asphalt shingles.
VII. Comprehensive Plan Update — (5:45pm — 7:00pm) (Public Hearing)
Description: The Planning and Zoning Commission to review the Introduction, Background, and
format of the draft plan.
VIII. Other Business
A. Minor Project Staff Approvals
Property Location: Lot 58, Block 4, Wildridge Subdivision/5170 Longsun Lane
Applicant: Robert Moehring
Description: Modification of a deck on the west unit of a duplex residence. The modification would
extend the deck from the western elevation to the southern elevation. The proposed wood material is
consistent with material submitted with the Final Design approval.
B. Zoning Code Amendments
Update on anticipated code amendments. (no action required)
IX. Adjourn (7:15pm)
Posted on March 11` , 2005 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main entrance bulletin board
• On the Internet at htto://www.avon.org//www.avon.org / Please call (970) 748.4030 for directions
'r
•
Town of Avon Planning & Zoning Commission Meeting
AVON
Minutes
oo0.� March 1St, 2005
5:00 pm - 5:30 pm Commission Work Session
I. Call to Order
The meeting was called to order at 5:30 pm
II. Roll Call
All Commissioners in attendance.
III. Additions and Amendments to the Agenda
Item XII was moved to consent agenda.
IV. Conflicts of Interest
Bob Trueblood declared a conflict with Item XII.
Tim Savage declared a conflict with Item IX and Item XI.
V. Consent Agenda:
A. Approval of the February 15"', 2005 Planning & Zoning Commission Meeting Minutes
B. Item XII — Lot 45C, Block 2, WR — Other Business — Minor Project Appeal
Approved with a vote of 5-0, with Commissioners Smith and Savage abstaining.
Vl. Discussion w4h Mayor Wolfe
The Mayor followed up from discussion at P&Z and Council joint work session, discussing the
meeting proceedings from the joint P&Z and council work session. Mayor Wolfe discussed the
condemnation proceedings and the agreement that the Council had was that once the owner
of the property was advised of the condemnation procedure, that the Town would inform Lot
61 and P&Z. The condemnation proceedings had nothing to do with the entitlements for Lot
61, based on the existing entitlements they could submit a design application to the
Commission.
The format of the joint work session was discussed with respect to the audio and room
configuration. Commissioner Trueblood voiced that the chambers should be brought into the
21" century with new technologies. The mayor explained the possibility of feeding live video
to Channel 5 so that when somebody recluses himself or herself they could still see what was
happening.
Commissioner Karow explained that more advanced notice of work sessions would result in
better cooperation and attendance. Meeting at the table should also provide a better
environment for creative thinking. Commissioner Karow discussed the new Council and the
need for continued dialogue to better understand the ideas and direction of Council. The
interpretation 'of codes and guidelines must be discussed for clarification on items such as
fencing and lighting for a better product in the end. Mayor Wolfe responded with the need for
a Public Benefit when reviewing special uses and variance applications.
Commissioner Didier would like to see more joint meetings in order to improve dialogue.
Mayor Wolfe explained that policies such as lock offs need to be brought up from P&Z.
Commissioner Struve brought up the issue of forgiveness versus permission and the need to
address it in a positive way. Mayor Wolfe responded that compliance deposits might be a tool
to explore to. ensure compliance, since most times there are repeat offenders. Chairmen
Evans discussed that the meeting minutes from P&Z reflected the Commissions frustrations
more than anything. Executive sessions should be held without any Town staff or
Commissioners. The role of P&Z has changed and will continue to change.
Mayor Wolfe highlighted 7 items that he had taken notes on including: the need for a better
joint meeting venue, executive session attendance and communication following these
sessions, more advanced notice for joint meetings, the need for continued dialogue between
Council and P&Z, more interplay on new ordinances, and compliance deposits and the need to
explore whether or not they are appropriate.
VII. Minor Project — Windows/Addition
Property Location: Lot 38, Block 32, Wildridge Subdivision/4560 Flat Point
Applicants/Owners: Susan & James Dreisbach
Susan and James Dreisbach submitted a Minor Project application to change the roof pitch on a
portion of a roof at their duplex. This change in roof pitch would facilitate the addition of additional
windows and may enhance their views facing south. The roof pitch would change from a 6:12 pitch to
a 2:12 pitch for an area measuring approximately 275 square feet. The Residential Design Guidelines
do not support 2:12 pitch roofs.
The Commission discussed the pitch, and discussed the use of other materials and at least a 3:12
pitch roof for this application. The applicant, Susan Dreisbach, discussed goals of the remodel with
the Commission and appreciated their input. The Commission was concerned with the pitch and the
materials, suggesting that a 3:12 metal roof application would be more appropriate and create a better
accent to the home. The applicant said that they would rework the proposal with the Commission's
input. The item was tabled (unanimously) to allow the applicant time to address the concerns and
submit a revised drawing.
VIII. Sketci Design
Property Location: Lot 12, Block 2, Benchmark at Beaver Creek Subdivision/540 Beaver Creek
Blvd.
Applicant/Owner.• Davis Partnership Architects/Daniel Ritsch
The applicant, Davis Partnership Architects, is proposing a multi -family project on this lot. Two
options have been submitted for review. Option 1 is proposing 19 units (13 dwelling units and 6
accommodation units). Option 2 is proposing 13 dwelling units. The applicant would like feedback on
the concept plan prior to initiating a zoning application for either option.
Ken Kovalchik presented the options submitted by the applicant in the staff report. He specifically
discussed the design and zoning issues, mentioning that one option would require a zoning variance
and staff would find no 'hardship' case for this proposal. Ken also reviewed the proposed stacked
underground parking spaces on Option 2. Ken then reviewed Option 1, reviewing the increased
density request and the addition of 'hot beds/accommodation units' on the property, which would
require a rezoning application. The rezoning application would require a PUD for this option, since no
zone district has the density requirements as requested. Also, staff believes the massing and density
of this option is not compatible with the adjacent properties. Chairman Evans requested to clarify the
requirement of the setback provisions, stating that at least 9 parking spaces (including underground
spaces) would be infringing on the front setback and require a variance application or rezoning.
Scott Nevin, the applicant, wanted to understand the desire and need for accommodation units in the
Town of Avon. The applicant was interested in providing 'hotbed' units, such as hotel units
(accommodation units) and that the units might be sold and then put into a pool to be rented. The
applicant mentioned that the accommodation option was not the first option to be pursued. They
looked at one building with thirteen units and looked at the previously approved 13 -unit design. He
mentioned that the issues in the 1998 proposal were related to massing and the visual impacts of the
parking structure. The applicant wanted to reduce the impact of one building on the site and preserve
the views from Alpenflora and Buck Creek. They will be able to meet the parking requirements of
Option 2 after removing the encroachments in the setbacks and double stack garage spaces. They
do believe that the 2 building scenario is the appropriate one for the site, reducing the massing
appearance from the south side of the site. Application tried to maintain views from Alpenflora and
buck creek condos.
Daniel Ritsch, owner, mentioned that they are hoping to raise the design standards for the area. He
also mentioned that breaking the project up into 2 buildings creates an upscale feel for the project,
and maintains view corridors for the neighboring properties, preserving views to Beaver Creek Resort.
Would like to be adaptive to needs of Avon with this project. Daniel discussed future development in
Avon and the enormous potential for the Town. Consideration to demographics and the size of units
was taken.
Chairman Evans discussed the setback encroachments and the parking issues with the applicant.
Chairmen Evans did not feel that parking could be accommodated on site. Chris Klein, owner on
West Beaver Creek Boulevard, asked that the massing be reduced and that compatible rooflines be
used with this site to Alpen Flora and Buck Creek Condominiums. He lives in a duplex in the area
and believes the density is too much for this lot, and that the majority of residents are primary
homeowners. He asked that the type of density be reduced.
Commissioner Savage believes that the massing might be appropriate with two building envelopes,
and said that the parking requirements must be complied with. The two curb cuts add value to the
property only. He is supporting Option 2 only, and the Commission concurred with this approach, as
Option 1 is not acceptable. Adequate parking will be a serious issue and would not support any less
than 32 parking spaces total for the project. Mr. Trueblood said the massing appeared to be too much
for the site, and is curious to see what a single building option would look like. Commissioner Struve
agreed on the perking issue, and did like the architectural details but riot the massing on northern
building. He saiC that the south (duplex) building could be angled diffe •ently to meet the neighbors
concerns. Commissioner Smith voiced the same concerns with perceived massing, parking issue,
and second building. Commissioner Karow reiterated the use of one structure to be stepped on the
site achieving the same goals and assimilating the project to neighboring properties. Space 9 through
17 currently in front setback and the tandem spaces are not supported. The minimum parking needs
to be supplied and more than the minimum will add value to the project. Commissioner Karow
mentioned that one curb cut would be allowed and the minimum parking requirements are not
enough. Chairman Evans agreed with his Commissioners thoughts, and mentioned that the Council
direction is to hold applications to the highest standard, in this case making sure that the property
relates to adjacent properties. He mentioned that the entitlements do not allow or encourage the
applicant to put the building massing lot line to lot line, and that the appearance of the building from
the south elevation will be massive and read like 70-75 feet in height. He did believe that the design
details and materials were creative, however ndgelines need to be broken up and stepped down.
Commissioner Didier also believed the massing was too much and that the building could be shorter
and less intrusive. Commissioner Karow believed the architectural character was very well done, and
wanted the applicant to realize that.
The applicant suggested a massing model showing surrounding properties may be helpful and the
Commission agreed. Ken Kovalchik clarified that the applicant should submit another sketch design
with the massing model, taking into consideration all comments of the staff and Commission.
Chairman Evans encouraged this approach to the applicant.
IX. Sketch Design — Duplex
Property Location: Lot 68, Block 3, Wildridge Subdivision/4223 Wildridge Road West
Appiicant/Owner. Stephen Turner
The applicant is proposing a duplex on this 5.24 -acre property. The lot is a steep downhill lot on
Wildridge Road West and faces the June Creek Drainage on the western border of the Wildridge
PUD. As proposed, the property would be accessed through an access easement on the developed
property to the south (Lot 69). Building materials include stone, timber, and stucco.
Matt Pielsticker presented the staff report. Bobby Ladd, the architect, discussed the staff issues. He
mentioned that they are working on correcting the plans according to the issues presented by staff,
and they will provide details as requested. Commissioner Didier clarified the lock -off being proposed,
and that the applicant plans show a 'stairs to apt'. Commissioner Karow encouraged the applicant to
park beyond the minimums required in the Town Code, particularly knowing that guest/rental bedroom
parking will be an issue. Commissioner Trueblood said the design complied with the criteria for sketch
plan, and Commissioner Karow agreed however noting the items that staff has identified.
Commissioners Struve and Smith agreed with the design discussion.
X. Sign Design — City Market
Property Location: Lot 67, Block 2, Benchmark at Beaver Creek Subdivision/72 B.C. Place
Applicant: Dave Betts, Store Manager
The applicant, Dave Betts — Store Manager, is proposing an advertisement sign near the main
entrance to the City Market grocery store. The sign measures 30 square feet (5' x 6') and consists of
wood, metal, and glass. This sign is strictly for advertisement and includes an area for current sales
at King Soopers/City Market stores.
Matt Pielsticker presented the staff report. The applicant was not in attendance. Commissioner
deliberation agreed with the criteria and staff recommendation presented. Commissioner Karow and
Chairman Evans agreed with the staff recommendation and said that the quality of the sign was not in
compliance with the sign code, and the sign should remain inside the store. Commissioner Smith
motioned to deny the Sign application based on the criteria of the Sign Code, particularly Criteria 1, 3
and 5, and Commiss.oner Karow seconded. The motion passed unanimous'y.
XI. Final Design — Single -Family
Property Location: Lot 76, Block 4, Wildridge Subdivision/5651 Wildridge Road East
Applicant/Owner: AJA Studio PC/Ray Verlinde
The applicant is proposing a single-family residence on this duplex -zoned .55 -acre lot. The sketch
design was reviewed by the Commission at their December 7,2004 meeting. The proposed residence
has a maximum building height of 32.5'. The proposed materials include stucco finish, wood siding,
asphalt shingles and corrugated metal roofing, and stone veneer.
Keri Kovalchik presented the staff report. The applicant, Andrew Abraham, said he would answer any
Commission concerns. Commissioner Struve thought that the details of the building proposed
complied with the guidelines. Commissioners Smith and Karow agreed, and Commissioner Karow
mentioned that the condition on a new lighting fixture should be deleted as the fixture submitted
complied with the Lighting Ordinance. Commissioner Karow and Chairman Evans suggested that the
landscaping plan was inadequate and the number of trees should be doubled and new materials
introduced. The applicant suggested he would resubmit the landscaping plan for review by the
Commission. Commissioner Karow motioned for approval, deleting condition #1 and adding
"Landscaping plan not approved, a new adequate landscaping plan must be approved by the
Commission prior to issuance of a T.C.O." in its place, also adding all conditions 2 through 7 as
recommended by staff. Commissioner Didier seconded the motion. Discussion by Commissioner
Trueblood on 'adequacy' of landscaping plan. Motion passed unanimously.
XII. Other Business
Property Location: Lot 45C, Block 2, Wildridge Subdivision/2520 Old Trail
ApplicanUOwner.- Bob Mach
Bob Mach submitted a Minor Project to eliminate the wrap around portion of a deck and to reduce the
size of the deck on the house (currently under construction) by approximately 126 square feet. This
application was denied at the Commission's February 15, 2005 meeting and was appealed to the
Town Council. The Council remanded the decision back to the Commission for further review in order
for the applicant to explore alternative design solutions. Mr. Mach has resubmitted with another
design option for the west elevation of the structure.
This item was moved to consent agenda.
XIII. Adjourn
Commissioner Savage motioned to adjourn; it was seconded by Commissioner Didier. The meeting
was adjourned at 7:35pm.
Respectfully submitted,
Matt Pielsticker
Planner
APPROVED:
Chris Evans
Chairman
Terry Smith
Secretary
Staff Report7vi
MINOR MODIFICATION
C O L O R A D O
March 15, 2005 Planning & Zoning Commission meeting
Report date March 10, 2005
Project type Modification to Final Design — Roof Change
Legal description Lot 38, Block 3, Wildridge Subdivision
Zoning PUD — 2 Units
Address 4560 Flat Point
Introduction
Jim and Susan Dreisbach have resubmitted a Minor Project application to change the
roof pitch on a.portion of a roof at their duplex. This change in roof pitch facilitates
additional windows on the south elevation of the unit. The roof pitch would change from
a 6:12 pitch to a 3:12 pitch for a roof portion measuring approximately 275 square feet.
The Residential Design Guidelines support a metal 3:12 roof. As proposed, a stone
coated steel product ("Guardian") would be used for the reroof portion of the project.
This application was tabled at the Commission's last meeting.
Design Review Considerations
According to the Town of
Guidelines, Section 7, the
the design of this project:
the following items in reviewing
1. The conformance with provisions of the Town of Avon Zoning Code.
This application conforms to all Zoning Code requirements. The maximum building
height remains unchanged.
2. The general conformance with Goals and Policies of the Town of Avon
Comprehensive Plan, and any sub -area plan which pertains.
The project appears to generally comply with the goals and policies of the Town.
3. Whether adequate development rights exist for the proposed improvements.
The project complies with existing development rights as approved in the PUD.
4. The design plan Is In compliance with all design plan submittal requirements.
• Residential Site Development:
No changes to the site design are proposed with this application.
Residential Building Design:
Town of Avon Community Development (970) 748.4030 Fax (970) 949.5749
Lot 38, Block 3, Wildridge Subdivision — Roof Design Modifications
March 15, 2005 Planning & Zoning Commission meeting Page 2 of 3
o Design Character. The Guidelines state that building design should take
advantage of solar gain and view corridors.
c Building Height Building height remains the same.
o Building Materials and Colors: According to the submitted building
elevations, all materials and colors are to match existing. This includes
the EIFS system, roof color, and rough sawn cedar fascia.
o Exterior Walls, Roofs, and Architectural Interest This application appears
to comply with this particular section of the Guidelines. The Residential
Guidelines state:
"All roofs, except the flat portion thereof, shall have a rise
of not less than 4 inches in 12 inches in distance. Primary
roofs shall have a 4:12 minimum, and a 12:12 maximum.
Secondary roofs shall have a 4:12 minimum, and metal
roofs shall have a 3:12 minimum."
This application proposes the use "Guardian" brand product, which utilizes
a process that bonds graded stone to steel panels. The end result is a
product similar in appearance to a traditional asphalt shingle roof with
advanced benefits. Please find product specifications attached to this
report.
5. The compatibility of proposed Improvements with site topography, to
minimize site disturbance, orient with slope, step building with slope, and
minimize benching or other significant alteration of existing topography.
The project would cause no disturbance to the existing topography surrounding the
structure.
6. The appearance of proposed Improvements as viewed from adjacent and
neighboring properties and public ways, with respect to architectural style,
massing, height, orientation to street, quality of materials, and colors.
This roof modification and new windows may be visible from adjacent properties and
public ways. However, this property is fairly isolated from others and this
improvement would be difficult to see from anywhere else in the PUD. The
proposed changes would not change the architectural style or overall massing of the
building.
7. The objective that no improvement be so similar or dissimilar to others in the
vicinity that monetary or aesthetic values will be Impaired.
Monetary and aesthetic values should not be impaired with this improvement.
8. The general conformance of the proposed improvements with the adopted
Goals, Policies and Programs for the Town of Avon.
The project is in general conformance with the goals and policies of the Town of
Avon.
Town of Avon Community Development (970) 748-4030 Fax (970) 949.5749
Lot 38, Block 3, Wildridge Subdivision — Roof Design Modifications
March 15, 2005 Planning & Zoning Commission meeting Page 3 of 3
Staff Recommendation
Staff recommends approval to the exterior design modifications proposed for Lot 38,
Block 3, Wildridge Subdivision based on the minor extent of exterior modifications, the
use of a high quality roof product, and the proximity to neighboring view sheds.
SAME AS
OgIGINAL
If you have any questions regarding this project or any planning matter, please call me
at 748-4030, or stop by the Community Development Department.
Respectfully submitted,
Matt Pielsticker
Planner
Aft: Exterior Elevation & Building Cross -Section
Letter from applicants, dated March 4th, 2005
Letter from duplex neighbor (east side of building), dated February 7th, 2005
Roof Specifications
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
ONE
tilt
ONE
O
Ila is
it
a °
A 7.
all g
��� ��� ��� s� �� tea$ �� �•
Z
0
U
W
CO
CN
W
U
March 4, 2005
Dear Planning and Zoning Commission:
Thank you for allowing us to resubmit modified plans for the minor project application
for 4560 Flat Point that was tabled at your March 2 meeting. As suggested by the
commission, we have revised the roof pitch to 3:12 and specified the use of galvanized
steel shingles with a stone -coated finish. This finish would approximate the appearance
of the asphalt shingles on the remainder of the roof. This design modification appears to
meet the Avon Residential Building Guidelines.
To give you a sense of how this will appear, we have attached pictures of the two metal
roofing products we are considering using. Apparently the Gerard metal shingles have
been successfully used in several projects in Avon. We are waiting for the actual samples
to see which product best matches the existing roof. We would be happy to supply
samples for the commission if that would be helpful.
The other change illustrated on the attached elevations is that the three new windows
would now be 3' rather than the previously proposed 3'10."
We appreciate your time and consideration of our proposal.
Thank you
Jim and Susan Dreisbach
February 7, 2005
Dear Community Development Board,
I am writing in regard to the remodel plans submitted by my duplex neighbors, Jim and
:,, �' Susan Dreisbach, at 4560 Flat Point Road, West Unit, in Wildridge. I have seen their
plans, dated February 4, 2005, which document that their proposed changes will not
negatively impact my property or views. I support their changing the line of their roof to
accommodate additional windows to the south in order to extend their view of the valley.
Sincerely,
wc.
Charles Sawyer
4560 Flat Point - EastUnit
RECEIVED
FEB 0 7 2005
Community Development
Metal Guardian stone coated 1 shingles rage 1 of s
a
Home About Us Metal Roofing Products Other Products Learn More WARRANT
P.O. Box 1711, La Porte, IN 46352
Metal Roofing
Woe) 83 -28 7 o East, La Porte, IN 46350
G IAR�j�'iY�a! (800j 837-2897 or (219) 324-2083
Yow Direct Corvieclion To Steel Rogjng! Cell: (574) 876-5804
GUARDIAN NSHINGLE-
SAME AS
ORIGINAL
Guarding
Against
The Forces Of
Nature!
WHAT'S SO GREAT ABOUT GUARDIAN SHINGLES??
We start out with a base
material if Zincalume AZ -
50 steel with several layers
of corrosion inhibitors.
Crushed and graded earth -
stone granules are bonded
to the steel panels with a
tough, ultra -violet resistant
1001/o acrylic resin
formula. A clear acrylic
overglaze is applied and
final oven curing completes
the process. The result is a
stone -coated steel shingle
that offers an impressive
30 -year non -prorated
transferable warranty!
READ MORE!
Puffe Aero oexgkm
sloe adp
11110% MF.Wft PMM Beeecod
ane MwepMte cmweralm C NIUM
me-lLLW W"M C010MV W -W
ne Steel
ane-ALumkeen, CodW tAZ-69)
ane PhoepMta Con9w0m CodYp
proteeum Vftw cod
Compare Stone -Coated Steel Shingles To Traditional Asphalt Shingles!
Protection/ Guardian Shingle -versus- Asphalt Shingles
Benefits
http://www.kbsmetalroofing.com/guardian.htm 3/3/2005
Metal Guardian stone coated s shingles
x ti
Page L of S
Lightweight
EXCELLENT!HEAVY!
(lust try lifting a bundle onto your
1.2 Ib./sq.ft. average weight
roofl)
EXCELLENT!
Fire Protection
Class "A" protection!
Supports combustion
(steel doesn't burn!)
EXCELLENT!
POOR!
Wind
Guardian has passed the Dade County required
Can lift and fly off easily in high
UL 580 and UL 1897 Wind Uplift tests.
winds
(warranted up to 120 mph winds)
EXCELLENT!
POOR!
Hail
(Class 4 Hail Rating by Texas Dept. Of
Hail can break shingles and, in
Insurance)
severe cases, penetrate roof decking.
Hailstone perforation warranty to 2.5" diameter!
EXCELLENT!
FAIR
Snow & Ice
(Our shingles interlock and stay flat, preventing
(however ice can dam up and back
ice damming)
up under shingles)
EXCELLENT!
POOR!
Earthquake
(Lightweight design, interlocking design adds
(Asphalt shingles put a lot of weight
strength)
over your head)
EXCELLENT!
FAIR
Weathering /
(30 year non -prorated transferable warranty,
(You can find warranties from l0 to
Warrantyplus
protection against hail and wind, as stated
25 years, or so)
above)
EnvironmentEXCELLENT!
POOR!
(Recyclable steel is easier on the environment)
EXCELLENT!
Resale
(Realtors consider steel roofing to be a premium
FAIR
roof)
Cost less than steel shingles, but
Cost more than asphalt shingles, but steel
you won't see any insurance
shingles could last as much as twice as long as
savings. You may have to replace
Cost
asphalt, saving money in the long run. Steel
your roof in 15 or 20 years. You
shingles will save you money on your
won't get the same protection
homeowner's insurance. You get what you pay
against fire, hail and wind like you
for!
do with steel shingles. You get
what you pay for.
Learn more about stone -
coated steel shingles.
Click HERE!
a Ex Click HERE to see Guardian's available colors
[ KBS Home Page] [Canyon Shake] [ Granite Ridge Shingles ] [ Guardian Shingles ]
[ KBS Shake Roofing ] [KBS Tile Roofing] [Snap -Lock Roof Panel] [Gutter Protector] [Tru -Lite
Tubular Skylights] [Synthetic Roof Underlayment] [ Fold -A -Vent ] (Accessory Pieces] [Financing
Options] [ Photo Album ] [ Facts About Metal Roofs ] [ Frequently. Asked Questions]
( How To Install ] [Photo Installation Manual] [ Find An Installer ] [ Free Estimates ]
[ Compare Wan -antics: Metal Roofing vs. Asphalt Roofing ] [Competitor's 'L ifecycle' Brochure]
http://www.kbsmetalroofing.com/guardian.htm 3/3/2005
Englert Metal Shingles
ENGLERT DECRA Shingle
ENGLERT DECRA Shingle
Plus
ENGLERT DECRA Shake
ENGLERT DECRA Shingle
rage i ui Z.
SAME AS
ORIGINAL
ENGLERT DECRA Shingle
ENGLERT DECRA shingles provide a high-performance, long-lasting, lightweight alternative to traditional
shingles. The installation process for this unique stone -coated steel shingle system is designed to closely
replicate that of traditional roofing materials. This product can be used in re -roof and new construction
applications.
Features 3 Benefits
Lightweight (1.25 pounds per square foot) and strong
Won't crack, curt, split or rot
Non-combustible (Class A material)
Impact resistant - Class 4 Impact resistance to UL2218 by Underwriters Laboratories (highest rating)
Walkable
Low maintenance
Long life
Non -porous - freeze / thaw resistant
Fast easy installation (Only 15 panels and 60 screws (or 90 nails) per square)
Transferable 50 -year limited warranty
Composition
ENGLERT DECRA shingles are pressure formed aluminum -zinc alloy coated steel with an acrylic bonded
stone chip finish.
Installation
Installs over solid deck or existing asphalt roofing. No battens or special tools required.
ENGLERT DECRA SHINGLE PROFILE
http://www.englertinc.com/resident/metal_shingle_s l .htm 3/3/2005
11 Englert Metal Shingles
Shingle
Installed Coverage: 49' x 19-314" (15 Panels per Square)
Shingle Installed Weight: 125 lbs per Sqaure
plain Expert
Website Image
rage / or
SAME AS
ORIGINAL
EMGLERT DECRA 6hingh
ENGLERT DECRA SHINGLE COLORS
Cobra shown approximate the actual color
http://www.englertinc.com/resident/metal—shingle—Sl.htm
1110, HOME
=,k
3/3/2005
*r
Shingle
Installed Coverage: 49' x 19-314" (15 Panels per Square)
Shingle Installed Weight: 125 lbs per Sqaure
plain Expert
Website Image
rage / or
SAME AS
ORIGINAL
EMGLERT DECRA 6hingh
ENGLERT DECRA SHINGLE COLORS
Cobra shown approximate the actual color
http://www.englertinc.com/resident/metal—shingle—Sl.htm
1110, HOME
=,k
3/3/2005
Memo
To: Planning and Zoning Commission
From: Eric Heidemann, Senior Planner
Through: Tambi Katieb, Community Development Direct
Date: March 9, 2005
Re: Comprehensive Plan Update — Introduction, Background and Orientation of
the Plan. (Public Hearing)
Summary:
On February e, 2005 the Comprehensive Plan Steering Committee released the Draft
Plan for public comment. Over the next few months, the Town will hold a series of public
hearings before the Planning and Zoning Commission and Town Council to conclude the
adoption process of the plan. Staff has prepared a tentative schedule of hearing dates
(see attached), the first of which begins March 15'h, 2005 before the Planning and
Zoning Commission.
In order to establish structure and to maintain momentum throughout the adoption
process, staff has provided some general introduction and background material to
review. Attached to this memo are those relevant sections of the plan (pages 5-6, and
58-62) that we would like to cover during this initial review. Staff will also discuss the
format of the plan to help orient commissioners and structure the course of dialogue for
future public hearings.
Introduction:
The primary purpose of the Comprehensive Plan is to create a working document
containing specific goals and policies to guide the Town's Capital Improvement Program
and its review of development proposals. The Comprehensive Plan strikes a balance
between preservation of the long-range interest of citizens through the anticipation of
possible changes in such areas as transportation, housing, and economic base with the
protection of all valuable community resources including unique natural features, and
recreational areas.
A Comprehensive Plan is a non -regulatory document that provides information on the
existing conditions of the Town, assesses the issues facing the Town, establishes a
vision for future growth, and formulates goals and strategies to implement the Town's
vision.
This Comprehensive Plan Update is an opportunity to address emerging issues,
community needs and the significant new growth that is anticipated in the Town Center.
From the beginning, Staff endeavors to present a revised plan based on the input of our
Steering Committee, Planning Commission, Town Council and the citizens of Avon.
Comprehensive Plan Update Memo
March 9, 2005, Page 2
Background:
The Comprehensive Plan Update process began in early 2004 with the formation of a
Steering Committee comprised of 9 appointed stakeholders in the community who have
guided the Town through the process with the support of the planning staff and
consultant team. The Committee completed their work on February 9, 2005 by releasing
the draft plan for public comment.
The process has involved several key components which have been instrumental in
reaching out to individuals and entities that have an interest in the future of the
community. The following six principal project goals guided the development of the
Comprehensive Plan:
1. Create an Action Plan that brings to fruition Avon's vision through the
articulation of clear goals and policies that will direct and prioritize the
Town's future Capital Improvement Programs and its review and
facilitation of desirable future development.
2. Develop a Future Land Use Plan and supporting Community
Framework Plan based on Avon's existing conditions and their likely
evolution that identifies Avon's most desirable future land use mix and
configuration.
3. Develop an Economic Report based on a Buildout Analysis that
identifies Avon's existing constraints and opportunities to guide the
preparation and selection of the preferred land use plan and to develop
goals and policies that provide Avon's businesses a competitive
advantage.
4. Develop a Fiscal Impact Analysis Model to evaluate impacts from
development activity on Avon's public services costs and public revenues
in order to understand the inherent trade-offs of potential land use and
development scenarios.
5. Update other key plan elements.
6. Conduct a planning process that generates citizen and developer
Involvement and finds consensus.
Organization of the Plan:
One the most notable changes in the 2004 draft plan is the format or organization of the
plan compared to the 1996 Comprehensive Plan. The 2004 draft plan attempts to
addresses specific subarea planning principals and recommendations right up front. This
recommendation from the Steering Committee is an attempt to focus early on in the
document on area specific high priority policies. The subarea policy recommendations
are then followed by the over -arching or regional goals and policies. The Planning
Commission and Council may believe a different set of policies are of higher priority after
deliberating on the specific goals and policies presented in the Steering Committee draft.
The 2004 Draft Plan also contains a broader list of supporting documents (i.e. Market
Conditions Report and Fiscal Analysis) that were used in conjunction with the proposed
revisions. Although the two plans contain the. same primary elements (Land Use,
Housing, Transportation, Environment, Parks and Recreation), the 2004 draft contains
an expanded list of new or revised policies related to each of these elements.
Comprehensive Plan Update Memo
March 9, 2005, Page 2
Recommendation:
Staff recommends the Planning and Zoning Commission open this item up to a public
hearing, provide comments to staff on the items discussed, and establish general parameters
for subsequent public hearings.
Town Manger Comments:
Attachments:
A. Tentative Public Hearing Schedule.
B. Pages 5-6 and 58-62 Draft Comprehensive Plan.
C. Existing Land Use Map.
D. Pages 1-9 and Appendix A-3 of 'Market Conditions Report' providing
Demographic and Buildout background.
Public Hearing Schedule
Comprehensive Plan Update
Hearing Date
Joint Work Session
Discussion Items
May 3`d, 2005
Planning and Zoning
Part I: Introduction, Background, and
March 15`h, 2005
Commission
Orientation
Planning and Zoning
Part II: Land Use and Community
April 5`h, 2005
Commission
Framework
Part III: Subarea Planning Principle
Town Council
and Recommendations
June 28`h, 2005
Planning and Zoning
Part IV: Regional Goals and Policies
April 19`h, 2005
Commission
Part V: Supplemental Reports
Part VI: Open Discussion
Joint Work Session
Part I: Vision Statement
May 3`d, 2005
Planning and Zoning
P&Z Recommended Version/Review
Commission/Town
of Public Comment
Council
Part III: Subarea Planning Principle
Town Council
Part I: Vision Statement
May 24'h, 2005
Part Il: Land Use and Community
Framework
Town Council
Part III: Subarea Planning Principle
June 14`h, 2005
and Recommendations
Part IV: Regional Goals and Policies
Town Council
Part V: Supplemental Reports
June 28`h, 2005
Part VI: Open Discussion
Town of Avon Comprehensive Plan (DRAFT)
i
II. Introduction
A. Purpose of the Plan
The Town of Avon's role in helping to shape the Avon community's future is to put into place goals and
implementation policies that will encourage the types of growth envisioned as the most desirable and
beneficial to the community as well as those that will preserve and strengthen those existing elements that
currently make Avon such an incredible place to live and visit. The Comprehensive Plan provides the
foundation and framework for such policies and actions by articulating an effective vision in words and in
maps and diagrams of what the citizens, business community, land owners, and elected and appointed
officials want Avon to be in both the near and long term future.
The primary purpose of this plan is to create a working document containing specific goals and policies to
guide the Town's Capital Improvement Program and its review of and involvement with development
proposals. Combining consensus building with implementation prioritization, the Comprehensive Plan
strikes a balance between preservation of vital community attributes while addressing the community's
financial needs and desire for expanded public services.
Seven principal project goals guided the development of the Comprehensive Plan:
1. Create an Action Plan that brings to fruition Avon's vision through the articulation of clear goals
and policies that will direct and prioritize the Town's future Capital Improvement Programs and
its review and facilitation of desirable future development.
2. Develop a Future Land Use Plan and supporting Community Framework Plan based on
Avon's existing conditions and their likely evolution that identifies Avon's most desirable future
land use mix and configuration.
3. Develop an Economic Report in conjunction with a Buildout Analysis that identifies Avon's
existing constraints and opportunities to guide the preparation and selection of the preferred land
use plan and to develop goals and policies that provide Avon's businesses a competitive
advantage.
4. Develop a Fiscal Impact Analysis Model to evaluate impacts from development activity on
Avon's public services costs and public revenues in order to understand the inherent trade-offs of
potential land use and development scenarios.
5. Update other key plan elements.
6. Conduct a planning process that generates citizen and developer involvement and finds
consensus.
Recently, Avon has experience an increased level of vacancies within its Town Core commercial area and
a corresponding decline in its sales tax revenues. As a result, in addition to these seven project goals listed
above, a key focus of this planning effort was to identify the market and economic constraints and
opportunities facing Avon in order to better understand how land use and development decisions affect the
local economy and the provision of public services. From this understanding, the plan attempts to provide
a tangible set of economic goals and policies to guide decisions regarding the wide array of public services
provided by the Town, to create a nexus between the provision of these services and future land
development/redevelopment, and to identify additional opportunities for potential private/public
collaborations.
5
2/2/05
Town of Avon Comprehensive Plan (DRAFT)
B. Avon's History and Context
The Town of Avon is located in the Colorado Rocky Mountain along the scenic Eagle River. It sits at the
entrance to Beaver Creek Resort area and approximately 8 miles west of Vail. It is a fully incorporated
municipality within Eagle County, with the county seat located 20 miles to the west in the Town of Eagle.
Before the first settlers arrived in the Avon area around 1874, the Eagle River Valley was a summer
hunting and fishing haven for the Ute Indians. Elk, deer and buffalo were among the hunted animals in the
valley.
The early English immigrants in the area were said to have named the area Avon because it reminded them
of the Avon River Valley in England, birthplace of William Shakespeare.
Ranching and farming were the dominant activities in the area until the early 1970's producing cattle,
sheep, potatoes, peas, lettuce, and cream. From the late 1880's through the turn of the century, there were
10 passenger trains a day going through Avon.
The Nottingham family moved to the ranch in 1896. The Nottinghams ran cattle and grew potatoes,
lettuce, oats, wheat, peas and hay. In 1941, the ranch made the change from cattle to sheep and continued
to do so until 1972 when they sold their controlling interest in the land to Benchmark Companies for real
estate development in response to the burgeoning tourism industry in Eagle County. The tourism was
driven by the very successful Vail Ski Area and the continued development of the Beaver Creek and
Arrowhead Ski Areas adjacent to Avon on the south side of U.S. Highway 6. Third and fourth generation
Nottinghams still call this area home and have several public streets, parks, developments, etc. named atter
the family.
0 6 2/2/05
•
Town of Avon Comprehensive Plan (DRAFT)
VL Appendix
A. The Planning Process
The planning process undertaken for the Comprehensive Plan began in the winter of 2004 at
which time Town staff and the consultant team outlined a detailed planning process to:
+ Identify community issues and contextual information;
• Develop a community vision and an economic analysis;
• Develop a Future Land Use Plan and Community Framework Plan;
• Develop goals and implementation policies to support the Future Land Use Plan and to address
key community issues; and
• Develop a strategic implementation plan and community indicators analysis.
The first step of the planning process involved the collection of information to understand the
issues facing the Avon community, and to identify those unique opportunities and constraints that
would influence each issue. Various maps and overlays were generated during this initial phase
including an Opportunity and Constraints map identifying specific elements influencing Avon and
its future planning efforts. A series of community interviews were conducted during this phase to
PI;e;t frim renresentative members of the community their perspective regarding the issues and
58 2/2/05
PARKS, RECREATION, TRAILS AND OPEN-
PRIORITY*
COMPLETION
POLICIES
SPACE
Conduct a survey/feasibility of Nottingham Park to identify
and program enhancements to potential art, cultural, and
2
6 MONTHS
G.1.5
recreational facilities to better activate and enhance this area
as Avon's major recreational and cultural center.
Develop a river front park that connects the Eagle River to
2
1 YEAR
G.1.6
the Town Core and possibly to Nottingham Park.
POLICIES
'COMMUNITY IMAGE AND DESIGNPRIORITY*
COMPLETION
Instigate a specific area plan for the development and
redevelopment of the Town Center Commercial Shopping
District to inventory, analyze, and prioritize suitable sites for
1
1 YEAR
H.4.2
potential infill and redevelopment, to define a new modified
street grid, and to enhance the district's wayfinding elements
and overallpedestrian-orientation.
VL Appendix
A. The Planning Process
The planning process undertaken for the Comprehensive Plan began in the winter of 2004 at
which time Town staff and the consultant team outlined a detailed planning process to:
+ Identify community issues and contextual information;
• Develop a community vision and an economic analysis;
• Develop a Future Land Use Plan and Community Framework Plan;
• Develop goals and implementation policies to support the Future Land Use Plan and to address
key community issues; and
• Develop a strategic implementation plan and community indicators analysis.
The first step of the planning process involved the collection of information to understand the
issues facing the Avon community, and to identify those unique opportunities and constraints that
would influence each issue. Various maps and overlays were generated during this initial phase
including an Opportunity and Constraints map identifying specific elements influencing Avon and
its future planning efforts. A series of community interviews were conducted during this phase to
PI;e;t frim renresentative members of the community their perspective regarding the issues and
58 2/2/05
Town of Avon Comprehensive Plan (DRAFT)
concerns affecting Avon's future.
During the second phase, an economic and market analysis along with a study of Avon current
and potential future levels of development and redevelopment were conducted. Efforts to refine
Avon's vision statement were also initiated during this phase by developing thematic descriptive
characteristics of Avon's role as a full-service community and a destination resort.
The planning process' third phase entailed the development of two alternative future land use
plans and a draft Community Framework Plan. The process began by examining the Town's
existing subarea designations to assess the appropriateness their existing boundaries and to assign
to each subarea one of three relative priority designations - High Priority, Medium Priority, or
Static/Low Priority. Focusing on the High and Medium Priority subareas, a Full -Service
Community and a Visitor Based alternative land use plan were developed. Supporting each
alternative land plan were a set of planning principles for each subarea in support of each plan's
general vision and intent. After review and comment by Town staff and Comprehensive Plan's
Steering Committee, a preferred Future Land Use Plan was created that synthesized the alternative
land use plans' most desirable elements and their associated planning principles. A Community
Framework Plan was also developed to supplement the preferred Land Use Plan. Phase three of
the planning process concluded with Public Open Houses #1 at which members of the public were
given the opportunity to review the planning process's products to date and provide feedback and
comment.
During the forth phase of the planning process goals and implementation polices were drafted in
support of both the Future Land Use Plan and the Community Framework Plan and to address
Avon's. A series of document review sessions were conducted with members of the Steering
Committee, the public, the Planning Commission and Town Council, and Town staff, and were
followed by official public hearings before the Planning and Zoning Commission and Town
Council. The 2004 Town of Avon Comprehensive Plan was formally adopted by Ordinance No. -
on
B. Plan Organization
The Comprehensive Plan contains seven sections:
• Section I: Vision Statement
• Section If: Introduction
• Section III: Land Use and Community Framework
• Section IV: Town Sub -Area Planning Principles
• Section V: Goals and Policies
• Section VI: Implementation
• Section VII: Appendix For the purposes of this Comprehensive Plan, the following
terminology applies:
Goal: A goal is an end towards which effort is directed and provides the community with a direction. A
goal is a desired ideal and a value to be sought.
Policy: An implementation policy is a course of action that provides a broad framework for guiding
governmental action and decision-making. Implementation policies are established by the community; in
this case, residents, local business and property owners, the Comprehensive Plan's Steering Committee,
59 itetoa
Town of Avon Comprehensive Plan (DRAF7)
the Planning and Zoning Commission and Town Council. From these policies, the Town will develop
and/or update regulations necessary to implement the vision of the community as reflected by the goals
and implementation policies contained in this plan.
Indicator. Community Indicators are numerical tools used to measure a variety of economic, social, and
environmental trends. The Comprehensive Plan identifies a number of.potential indicators. When
evaluated collectively, the composite analysis will show the Town if it is achieving balance and improving
the general quality of life for the community.
Contained within the Goals and Policies sections are discussion paragraphs that summarize issues
and concerns raised throughout the planning process. Additionally, community indicators are
identified with their associated implementation policy(ies).
Regulatory Documents
While the Comprehensive Plan provides the framework for making land use and other community
related decisions, the Town's regulatory documents provide specific criteria and requirements
governing land use and development within Avon. These regulations, therefore, provide the most
direct means for implementing the vision, goals and policies expressed within the Comprehensive
Plan. The following provides a more detailed description of the Town's regulations controlling
land use and development.
Zoning Code of the Town of Avon — The Town's Zoning Code is perhaps the most important
implementation tool for the Comprehensive Plan. The regulations contained within this document
control the allowable uses of land within Avon as well as the physical standards controlling a
development's size, shape and form. The Zoning District Map should reflect the allowable land
uses and proposed locations as recommended in the Land Use Plan. In addition, zoning
requirements such as lot sizes, densities, setbacks, and height limitations should reflect the density
and design characteristics set forth in the Comprehensive Plan's Implementation Policies.
The Zoning Code should correspond to the goals and policies of the Comprehensive Plan to
ensure that incremental development decisions reflect the community's vision. Privately owned,
vacant land located within the Town of Avon will develop and redevelop over many years with
different owners, developers, investors, urban designers, and architects. The Comprehensive Plan
provides a framework for making responsible zoning decisions that reflect the desires of the
community and encourage continuity and compatibility between neighborhoods. All land use
applications should be reviewed for conformance not only with specific zoning requirements, but
also for consistency with the direction and guidance provided by the Comprehensive Plan. The
Zoning Code should be revised based upon the recommendations contained in this document.
Subdivision Regulations— The Town of Avon's Subdivision Regulations establish the process and
requirements for creating building lots, and construction of public improvements such as water
and sewer lines, roads, and landscaping. Through the subdivision process, roads and circulation
patterns are established, park and school sites are reserved, floodplains and other hazardous areas
are set aside, and public improvements are constructed.
Similar to zoning, the Subdivision Regulations implement the Comprehensive Plan by
establishing the requirements for improvements, land dedications, and engineering. Subdivision
proposals should be reviewed for consistency with Comprehensive Plan policies and zoning
requirements. Incremental subdivision decisions need to be consistent with the Comprehensive
60 zrztut)
Town of Avon Comprehensive Plan (DRAFT)
Plan so that, for example, major road rights-of-way or open spaces are reserved and connect one
subdivision to the next. The provision of trails connecting neighborhoods, proper street
alignments and grades, and proper drainage are examples of design issues addressed during the
subdivision process.
Functional Plans
The Comprehensive Plan is intended to serve as the principle planning document addressing the
Town's goals and policies related to land use and other key community issues. A number of other
"functional plans" and documents have been or may be adopted by the Town to address specific
topics or government functions. It is the Town's intention that the Comprehensive Plan provides
guidance in both updating current plans and formulating concurrent and future functional plans.
As these plans are adopted, they will provide a detailed framework for future land use and growth
management decisions. The following lists those functional plans currently used by the Town of
Avon.
• Avon Town Center Plan
• Avon Town Center Implementation Plan
• Recreation Master Plan
• Congestion Relief for Avon Road Study
• The Housing Strategy Plan
• Town of Avon Residential, Commercial, and Industrial Design Review Guidelines
• Transportation Master Plan
• Eagle Valley Regional Trials Plan
C. Amendment Procedure
The Town of Avon Comprehensive Plan is a policy document used to guide current and future
land use decisions. To function as an effective decision making document, the plan must be
dynamic and flexible enough to respond to changes in economic forces, legislative action,
infrastructure and development technologies, and public attitudes. Therefore, an amendment
procedure is necessary to keep the plan current.
The following types of comprehensive plan amendments are envisioned:
1. Comprehensive Plan Update. This amendment consists of an overall review and update
conducted periodically. This update should be a thorough analysis of the entire plan, including an
evaluation of goals and objectives, updates of forecasts and land -related elements, and the
reaffirmation of policies. The Town of Avon's Planning and Zoning Commission and Town staff
are primarily responsible for undertaking such an update, with input from other Town
departments, the Town Council, and the public.
2. Specific Amendment. This second type of comprehensive plan amendment contemplated
would not encompass the entire plan, but would rather be a more specific goal/policy, land use, or
map amendment. An example of this type of amendment might be an instance where the Town
desires to amend an area's proposed land use designation as a result of improved base data (such
as new subsidence information or floodplain information). It is possible that a land use proposal
could be introduced that conflicts with the Future Land Use Plan, but which, in fact, may be
complementary to the Comprehensive Plan's other pertinent goals and policies. To ensure
conformance with the plan, an amendment would be necessary. Specific amendments may be
61
2/2/05
Town of Avon Comprehensive Plan (DRAFT)
Auo�
proposed by either the Town or by the private sector (i.e. a registered voter of the Town of Avon,
property owner, or a property owner's authorized representative). Applications for a specific plan
amendment may be made at any time with the Community Development Department.
Any amendment proposed for the Town of Avon Comprehensive Plan shall follow the Town of
Avon's public notice and public hearing procedures as prescribed in the Town of Avon Municipal
Code.
Amendment Criteria: The following criteria shall be used by the Planning and Zoning Commission
and the Town Council when considering a Comprehensive Plan amendment proposal. The proposed
amendment shall:
1. Include a justification for the proposed change.
2. Be in conformance with the Plan's overall vision and its supporting goals and policies.
3. Be compatible with existing and planned surrounding land uses.
4. Not result in excessive detrimental impacts to Avon's existing or planned infrastructure
systems.
D. Market Conditions
(A description ofthe market trends associated with various land uses to provide context relative
to the Comprehensive Plan's current and future development provisions. This analysis will
include evaluation of economic and demographic framework, Avon 's f scal framework, and retail
development patterns.)
E. Fiscal Analysis of the Land Use Plan
(A summary ofthefiscal impact analysis model used to evaluate the relativefiscal implications of
the Comprehensive Plan's Land Use Plan. The model will also provide the Town ofAvon with a
tool to evaluate on an ongoing basis thefiscal impacts ofindividual development projects as well
as to tract the cumulative effects of expected growth and development.)
F. Buildout Analysis
(A summary ofthe buildout analysis quantilying the amount ofexisting and potential development
within Avon.)
G. Public Outreach Overview
(A summary of the public outreach efforts employed during the Comprehensive Plan's planning
process to involve members of the community.)
H. Relationship to Other Plans and Documents
The Comprehensive Plan is the official statement of the Town of Avon's vision. Though the goals
and implementation policies contained within the Comprehensive Plan cover a broad range of
62 2/2/05
2
«
�
CL
LU
»
7
2
LU
I
LU
�
k
O
U
2
O
»
«
LL-
O
2
�
O
e
m
� kb)
.� ....�.
FINAL REPORT
TOWN OF AVON
COMPREHENSIVE PLAN UPDATE
MARKET CONDITIONS
Prepared for:
Town of Avon
Prepared by:
Economic & Planning Systems, Inc.
June 2004
EPS #13876
0ENVEK
] 01VStreet Saito ii30 on 03- 23J)S/
D nvur.CO80 02.3511 fs xnl '3.9UA9
n""ep'y'.eOm
Economic &
Planning Systems
Real Esmte Economies
Re�ionai Eronamice
PNblie FSnanre
Land U. Polley
B EF KE LEY 3 A C P NM E NTO
pin,vc
5(0-41-11190 phenc 911, 6.49-11910
fo.
NW S41-9'0 Lir- 915-649-"_079
TABLE OF CONTENTS
I. ECONOMIC AND DEMOGRAPHIC FRAMEWORK.............................................................. 1
Population and Household Trends............................................................................... l
Housing and Residential Construction........................................................................ 4
EmploymentTrends........................................................................................................ 8
Visitationand Lodging................................................................................................. 13
II. FISCAL FRAMEWORK....................................................................................................... 16
RegionalContext...........................................................................................................16
Avon Expenditures and Revenues.............................................................................. 16
Capital Improvements Plan......................................................................................... 23
III. RETAIL DEVELOPMENT PATTERNS................................................................................. 25
Existing Commercial Conditions................................................................................ 25
CommercialPotentials.................................................................................................. 27
LIST OF TABLES
Table 1
Historical Population and Household Growth .......................................
1
Table 2
Average Household Size............................................................................
2
Table 3
Projected Population Growth....................................................................
2
Table 4
Population by Age, 2000.............................................................................
3
Table 5
Households by Income Range, 2000 Town of Avon Market Potentials4
Table 6
Residential Building Permit Trends, 1990-2002 .......................................
5
Table7
Housing Tenure...........................................................................................
7
Table 8
Type of Residence as a Percent of Total Dwelling Units ......................
8
Table 9
Estimated Employment by SIC Sector for Eagle County .......................
9
Table 10
Change in Employment, Eagle County, 1991-2000 ...............................10
Table 11
Estimated Employment by NAICS Sector for Eagle County ..............11
Table 12
Employment by Industry, ES202 Series, Fourth Quarter 2002............12
Table 13
Eagle County Employment Forecast, 2000-2025 ...................................13
Table 14
Skier Visit Data, Destination and Front Range Resorts, 1998-2003 ....
14
Table 15
Town of Avon Budget, 2004........................................:............................17
Table 16
Estimated 2004 Tax Revenue...................................................................
18
Table 17
Composition of Sales Tax Revenue, 2003 ...............................................
22
Table 18
Capital Improvements Plan.....................................................................
24
Table 19
Summary of Commercial Uses................................................................
25
Table 20
Summary of Approved Development Proposals ..................................
27
Table 21
Summary of Vail Valley Lodging Inventory .........................................
30
Appendix Table A-1
Sales Tax Collections, 1999-2003 ......................................
A-1
Appendix Table A-2
Accommodations Tax, 1999-2003 .....................................
A-1
Appendix Table A-3
Existing and Potential Development ...............................
A-2
LIST OF FIGURES
Figure 1 2001 Lodging Occupancy by Month.......................................................15
Figure 2 Sales by Community, 1997- 2003.............................................................16
Figure 3 Sales Tax Collections, 1995-2003..............................................................19
Figure 4 Sales Tax Collections by Month, 2003 ..................................................... 20
Figure 5 Percent Change in Sales Tax Collections, 2002-2003 ............................. 21
Figure 6 Monthly Occupancy Tax Collections, 2003 ............................................ 23
I. ECONOMIC AND DEMOGRAPHIC FRAMEWORK
This section provides a demographic and economic context for Avon. The analysis
addresses trends in population, households, housing, employment, lodging and
visitation. The purpose is to document existing and projected conditions, and provide a
basis for Town policies to be adopted as part of the Comprehensive Plan Update.
POPULATION AND HOUSEHOLD TRENDS
Avon was the fastest growing municipality in Eagle County from 1990 to 2002, as shown
in Table 1. Avon added over 4,200 residents at an annual rate of 10.7 percent during
this time period. As of 2002, Avon's population reached 6,081 with 2,089 households.
Overall, Eagle County added almost 24,000 new residents from 1990 to 2002, with an
annual growth rate of 6.3 percent. Household trends generally mirrored population
trends, as also shown in Table 1. Avon added 1,382 households at an annual rate of 9.4
percent. The number of households grew slightly slower than population, indicating an
increase in household size.
Table 1
Historical Population and Household Growth
Town of Avon Market Potentials
Households
Avon
1990
2000
1990-2000
Change Ann.%
Persons
Basalt
443
1,052
609
Avon
1,798
5,561
3,763
12.0%
Basalt
1,128
2,681
1,553
9.0%
Eagle
1,580
3,032
1,452
6.7%
Edwards'
--
8,257
--
--
Gypsum
1,750
3,654
1,904
7.6%
Minturn
1,066
1,068
2
0.0%
Red Cliff
297
289
-8
-0.3%
Vail
3,659
4,531
872
22%
Remainder of County
10,650
12,586
1,936
1.7%
Total
21,920
41,659
Households
Avon
707
1,890
1,183
10.3%
Basalt
443
1,052
609
9.0%
Eagle
592
1,064
472
6.0%
Edwards'
--
2,852
--
--
Gypsum
602
1,150
540
6.7%
Minturn
389
399
10
0.3%
Red Cliff
91
109
18
1.8%
Vail
1,680
2,165
485
2.6%
Remainder of County
3,850
4,467
617
1.5%
Total
8,354
15,148
6,794
6.1%
Source: Colorado State Demographer, Economic 8 Planning Systems
' Edwards Is recognized as a Census Designated Place (CDP) for the 2000 Census
:m of Avon Market Conditions
Final Report
June 2004
As shown in Table 2, household size increased from 1990 to 2002 in both Avon and in
Eagle County. Household size in Avon and Eagle County was slightly larger than the
State of Colorado. The average household size in Eagle County was estimated at 2.73
persons for 2002, and 2.79 for Avon, compared to 2.54 persons for the State of Colorado.
The larger household size in Eagle County reflects the higher than average number of
shared living arrangements and roommate -households.
Table 2
Average Household Size
Town of Avon Market Potentials
Change
Place 1990 2000 2002 (est.) 1990-2002
Avon
2.63
2.80
2.79
0.16
Eagle County
2.61
2.73
2.73
0.12
State of Colorado
2.51
2.53
2.54
0.03
Source: Colorado State Demographer, Economic 8 Planning Systems
H313876nwn wrep Ren\WJeb1t13676('an.rel oe,mprepHmASIHH SIZE
Table 3 shows a population projection prepared by the office of the Colorado State
Demographer. Eagle County and the Central Mountains Region are expected to grow
faster than the State as a whole. Population growth in Eagle County is expected to occur
at rates between 1.6 and 2.6 percent per year from 2000 to 2025. The fastest growth is
expected from 2005 to 2010 when the County will add 7,200 people at an average annual
rate of 2.6 percent per year.
Table 3
Projected Population Growth
Town of Avon Market Potentials
Source: Colorado State Demographer, Economic 8 Planning Systems
H 113676Awn Gang PIpnV, O,o 3976Gane,al Na I'W.A.lPop P"
2000
2005
2010
2015
2020
2025
Projected Population
State
4,335,540
4,691,258
5,137,928
5,632,645
6,133,491
6,652,082
Central Mountains
147,334
158,343
180,718
209,380
240,840
274,885
Eagle County
41,659
49,601
56,816
64,436
72,157
79,673
Increase
2000-2005
2005-2010
2010-2015
2015-2020
2020-2025
State
--
355,718
446,670
494,717 -
500,846
518,591
Central Mountains
--
11,009
22,375
28,662
31,460
34,045
Eagle County
--
7,942
7,215
7,620
7,721
7,516
Annual Average Rate
2000-2005
2005.2010
2010-2015
2015-2020
2020-2025
State
--
1.6%
1.8%
1.9%
1.7%
1.6%
Central Mountains
--
2.0%
2.4%
2.4%
2.3%
2.1%
Eagle County
--
1.6%
2.6%
2.4%
2.1%
1.8%
Source: Colorado State Demographer, Economic 8 Planning Systems
H 113676Awn Gang PIpnV, O,o 3976Gane,al Na I'W.A.lPop P"
wn of Avon Market Conditions
Final Report
June 2004
AGE
In 2000, the two largest age groups in Avon were the 25 to 34 and 35 to 44 year age
groups. Twenty five to 34 year olds accounted for 30.5 percent of the Town's
population, while 35 to 44 year olds made up 16.6 percent of the population. When
compared to County averages and other jurisdictions, Avon's share of the 20 to 24 year
age group was higher than others. The concentration of this age cohort can also be seen
in the high percentage of renter households, discussed in the following section on
tenure. Gypsum had the highest proportion of school -aged children, ages 5 to 19, which
were 27 percent of the population.
Table 4
Population by Age, 2000
Town of Avon Market Potentials
Age
Avon
Basalt
Eagle
Edwards
Gypsum
Mintum
Red Cliff
Vail
County
Under 5 Years
520
204
253
619
312
57
21
152
2,960
5 to 19 years
775
468
733
1,669
998
194
49
355
7,740
20 to 24 years
826
141
140
628
222
102
30
614
3,830
25 to 34 years
1,698
557
576
1,754
627
264
60
1,484
9,610
35 to 44 years
921
576
661
1,585
786
197
46
688
7,929
45 to 60 years
667
596
494
1,565
552
176
44
840
7,411
60 to 74 years
141
115
112
391
118
57
26
345
1,803
75+ years
13
24
63
46
39
21
13
53
376
Under 5 Years
9.4%
7.6%
8.3%
7.5%
8.5%
5.3%
7.3%
3.4%
7.1%
5 to 19 years
13.9%
17.5%
24.2%
20.2%
27.3%
18.2%
17.0%
7.8%
18.6%
20 to 24 years
14.9%
5.3%
4.6%
7.6%
6.1%
9.6%
10.4%
13.6%
9.2%
25 to 34 years
30.5%
20.8%
19.0%
21.2%
17.2%
24.7%
20.8%
32.8%
23.1%
35 to 44 years
16.6%
21.5%
21.8%
19.2%
21.5%
18.4%
15.9%
15.2%
16.o%
45 to 60 years
12.0%
22.2%
16.3%
19.0%
15.1%
16.5%
15.2%
18.5%
17.8%
60 to 74 years
2.5%
4.3%
3.7%
4.7%
3.2%
5.3%
9.0%
7.6%
4.3%
75+ years
0.2%
0.9%
2.1%
0.6%
1.1%
2.0%
4.5%
1.2%
0.9%
Source: US Census. Economic 8 Planning Systems
M113aI6PmnC OYnpWkY.AN.
INCOME
Table 5 shows households by income range for the study area. In 2000, the median
household income in Avon was $56,921, which was approximately $6,000 lower than
Eagle County. Per capita income in Avon was $30,115, compared to $32,011 in the
County. The largest household income groups in Avon were households in the $30,000
to $49,999 (20.5 percent of households) and $50,000 to $75,000 ranges (23.8 percent of
households). Edwards had the highest median household income at $70,869. Vail had
the highest per capita income at $42,690.
vn of Avon Market Conditions
Final Report
June 2004
Table 5
Households by Income Range, 2000
Town of Avon Market Potentials
Income Range'
Avon
Basalt
Eagle
Edwards
Gypsum
Mlnturn
Red CIU/
Vail
Eagle
County
Less than $10,000 to $14,999
102
37
89
100
58
15
13
143
834
$15,000 to $29,999
289
94
112
293
108
104
18
298
1,708
$30,000 to $49,999
370
207
171
466
271
71
26
425
2,926
$50,000 to $74,999
430
281
281
714
361
92
27
541
3,711
$75,000 to $99,999
222
215
223
463
223
52
16
253
2,431
$100,000 to $149,999
225
120
94
470
118
52
4
283
2,074
$150.0001%$200,000+
17
927
M
4R
9
12
1
W
1.526
Total
1,808
1,046
1,006
2,983
1,187
405
105
2,174
15,210
Less than $10,000 to $14,999
5.6%
3.5%
8.8%
3.4%
4.9%
3.7%
12.4%
6.6%
5.5%
$15,000 to $29,999
16.0%
9.0%
11.1%
9.8%
9.1%
25.7%
17.1%
13.7%
11.2%
$30,000 to $49,999
20.5%
19.8%
17.0%
15.6%
22.8%
17.5%
24.8%
19.5%
19.2%
$50,000 to $74,999
23.8%
26.9%
27.9%
23.9%
30.4%
22.7%
25.7%
24.9%
24.4%
$75,000 to $99,999
12.3%
20.6%
22.2%
15.5%
18.8%
12.8%
15.2%
11.6%
16.0%
$100,000 to $149,999
12.4%
11.5%
9.3%
15.8%
9.9%
12.8%
3.8%
13.0%
13.6%
$150,000 to $200,000+
2.1
Lin
3...6%
.15,.91%
LIM
4.7%
in
19$6
10.0%
Total
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
Median income
$56,921
$67,200
$62,750
$70,869
$59,671
$51,736
$50,104
$56,680
$62,682
Per Capita Income
$30,115
$30,746
$22,657
$39,784
$21,790
$23,135
$19,864
$42,690
$32,011
1999 pollen
Saume: US Census, Economic a Planning Synems
N1,Y)Mw. Coq VMfA1'.EM.YIY16Gn.,Y Mcp.{nlo.<,�M11rt(m
HOUSING AND RESIDENTIAL CONSTRUCTION
In this section, information and trends on residential construction, occupancy, tenure,
and second home ownership are presented.
RESIDENTIAL CONSTRUCTION
In Avon, an average of 29 single family building permits was issued each year as shown
in Table 6. Basalt, Eagle, and Vail showed similar trends in single family housing
construction. There was more single family housing construction in Gypsum than in the
other incorporated towns, where a total of 751 single family building permits were
issued from 1990 to 2002. The largest amount of housing construction occurred in
unincorporated Eagle County, which includes the rapidly growing community of
Edwards. A total of 3,536 single family permits were issued in unincorporated Eagle
County during this time, or an average of 272 per year.
Appendix Table A-3
Existing and Potential Development
Avon Comprehensive Plan Update
Town Center East
Existing
Development
Future Dev. Potential
Ascom.
Total
CivicB
Ground
Other
Total
Exist.
Dwellin
Comm.
Project/Subdivision Name
Unit
Exist. AU
Sq Ft
Floor
Floor
Comm.
Retail
links 3
Sq. Ft.
---
and DU's
---
Comm.
Comm.
Sq. Ft.
Sq. Ft.
40,254
40,254
Town Center West
---
Chapel
-_
---
---
-
-
.-.
--
Lot B PUD
0
0
0
0
0
0
0
110.
50.000
Lot C PUD'
0
190
0
14,253
9,316
23,569
5,702
286
10,300
Lodge at Avon Center
-
52
---
29,647
27,821
57,468
25,200
0
0
Lot 61
--
--
--
-•
-
--
0
100
17,000
Comfort Inn
150
150
---
800
---
800
0 24 du or 72 au
---
Christie Lodge
140
280
--
14.500
---
14,500
2,900
---
---
Post Office
--
--
18.500
---
--
18,500
0
0
---
Dennys
--
--
--
5,268
--
5,268
5,268
0
---
1atBank
--
--
--
11,520
-
11,520
0
0
---
Alpine Bank Building
---
--
---
5,531
5,708
11,239
2,766
20
--
Weststar Bank Building
---
-
-
4,781
8,309
13.090
0
26
--
Avon Town Center Phase II
--•
--
-
7,075
7,000
14,075
1,769
53
5,572
Avon Town Center Phase 111
---
--
-
7,495
7,319
14,814
1,874
12,971
18,117
Avon Town Center Phase I
--
--
--
8.350
16,700
25,050
2,088
26
-
The Confluence Site
---
--
--
-
--
--
0
456
40,000
The Seasons
0
103
0
69,236
0
69.236
4,000
0
0
Subtotal
290
775
18,500
178,456
82,173
278,129
51,565
1,077
117,300
Town Center East
Chapel Square
---
---
...
--
-
---
--
...
...
Building A
--
---
---
9,350
8,259
17,609
9,350
---
Building B
---
69
---
40,254
40,254
40,254
--
---
Chapel
-_
---
---
-
-
.-.
--
._
2,000
Building
---
---
---
8,731
12,125
20,856
0
--
---
Chapel Sq. 1 -story shops
--
••.
---
7,165
7,165
7,165
--
---
Gags - Office Depot - Pier 1
--
--
---
---
--
---
-
---
--
Parking Lot
Shopping Center
-
--
---
65,226
---
65,226
65,226
---
City Markel
--
14
--
56,468
---
56,468
56,468
--
-
51 Beaver Creek Place
--
--
--
7,000
--
7,000
7,000
--
-
Avon Medical Center
--
--
---
4,923
--
4,923
0
--
--
North Court
---
--
-
7,692
-
7,692
7,692
---
Buck Creek Plaza
---
6
--
3,306
10,345
13,651
3,306
--
AvonPlaze
---
-
10,174
3,699
13,873
10,174
--
---
Avon Plaza
---
--
-
4,323
1,249
5,572
4,323
--
Benchmark Plaza
---
--
-
5,146
12,971
18,117
3,602
--
---
Christy Sports
...
--
--
17,300
17,300
17,300
30
--
Benchmark Shopping Center
--
--
--
13,340
13,330
26,670
13,340
72
...
The Annex -TOA
---
--
-
---
-
-
--
--
The Annex
--•
---
---
16,400
16,400
16.400
18
.--
Subtotal
0
89
0
276,798
61,978
338,776
261,600
120
2,000
Total
290
864
18,500
455,254
144,151
817,905
313,165
1,197
119,300
Lot C indudes 266 timee6me unee, 20 employee housing units, and 125 hotel bedreoma.
' 1250meahere or 160 ecmmmotletbn udta ar 100 wnda aanenklp coMoe
' The 8 units at Chapel Square, 14 at City Merkel, and 6 on Lot a PUD are deed resmded employee units
Source: Toan MAvon, RNL Design, Ec,mmlc & Planning Systems, Inter eea
A-2
MAR -15-2005 TUE 01:22 PM J"" LLP FAX NO. 3n"4420191 P. 01
Johnson & Repucci LLP
Attorneys and Counselors at Law
FACSIMILE COVER SHEET
FACSIMILE NUMBER: (303) 442-0191
DATE: March 15, 2005 FROM:
TIME:
CLIENT NO.:
2521 Broadway
Suite A
Boulder, Colorado 90304
(303)442.1900
Pax: (303)442.0191
Michael J, Repucci
BOULDER
WINTERPARK
To: Name
Company/Firm
Facsimile No.
Tatnbi Katieb
970) 949-5749
George Pakozdi
905 522-0100
Steve MacDonald
970 479-9624
Keith Elliott
314 962-9255
MESSAGE: Please see the attached letter dated March 15, 2005 regarding the Avon
Center at Beaver Creek -I homeowners Association's Draft Comprehensive Plan.
If you have any questions please do not hesitate to contact me.
Mike
NUMBER OF PAGES FOLLOWING THIS COVER SHEET:, 3
IF YOU NEED A CONFIRMATION OR ANY OF THE PAGES RE -SENT,
PLEASE CALL OUR OFFICE AT THE FOLLOWING NUMBEW (303) 442-1900
IF YOU DO NOT CALL WITHIN 15 MINUTES, WE WILL ASSUME YOU HAVE RECEIVED THE
PAGES SATISFACTORILY, SENT BY: Barbara
OUR FACSIMILE NUMBER: (303) 442-0191
CONFIDENTIALITY NOTE: The information contained in this facsimile transmittal sheet and
document(s) that follow are for the exclusive use of the addressee and may contain confidential, privileged
and nondiselosable Information. If the recipient of this facsimile is not the addresses, or a person
responsible for delivering this facsimile to the addressee, such recipient is strictly prohibited from reading,
photocopying, distributing or otherwise using this facsimile transmission, or its contents, in any way. If the
recipient has received this facsimile transmission in error, please call as immediately and return the
facsimile transmission to us via the United States Postal Service. Thank you.
MAR -15-2005 TUE 01:22 PM J"" LLP
FAX N0. Or04420191
JOHNSON IS REPUCCI LLP
ATTORNEYS AND COUNSELORS AT LAW
2521 BROADWAY, S111TE A
BOULDER, COLORADO &3304
TELErmoNm 303 442.1000
rf.I.F.FAK 8111-142-OR11
Michael J. Repucci w +rLawimrn
mirenucci A0-rlaw.com
March 15, 2005
By Facsimile and U.S Mail
Town of Avon
Attn: Mr. Tambi Katieb
Community Development Department
P.O. Box 975
Avon, Colorado 81620
Re: Draft Comprehensive Plan
Dear Mr. Katieb:
' LA
BOULDER
WINTER PARK
This firm represents the Avon Center at Beaver Creek — I Homeowners
Association, Inc. (the "Association'), whose individual members are all of the owners of
the condominium units located in the Avon Center (the "Condominiums"). The
Association requested our firm to provide the Town a listing of the Association's
comments concerning the new Draft Comprehensive Plan ("Draft Plan"). We request
that these comments be included in the materials provided to Planning and Zoning for the
meeting this evening,
The Association reviewed the Draft Plan and representatives of the Association
also attended the recent public open house. The Association has certain concerns
regarding the Draft Plan that it would like addressed as part of the public hearing process.
We understand from the presentation at the open house that the goal of the Draft Plan is
to create a "critical mass, sense of place and sense of community networking" for Avon.
Economic considerations are clearly driving the Draft Plan. The Town anticipates
redevelopment to assist with the economic realities but represented at the open house that
this redevelopment and associated density would not be at the expense of Avon's sense of
place. The Association is concerned about maintaining the sense of place that is
currently enjoyed by the Association's owners and guests. There are certain aspects of the
Draft Plan that the Association believes require further clarification and/or revision in
order to address this concern.
Initially, the Association is very concerned about the potential environmental
impacts associated with a transit center. The Avon Center currently is located along a
quiet pedestrian mall, Before this mall is opened to street traffic, it is critical to assess the
traffic impacts on the ahutting properties. The Avon Center is not air conditioned and its
owners leave their windows open during the summer. Increased traffic, and in particular,
22259
MAR -15-2005 TUE 01:23 PM J- '.LP FAX N0. '-"420191 P. 03
Town of Avon
Attn: Mr. Tambi Katieb
Community Development Department
March 15, 2004
Page 2
bus traffic is a serious concern. Although the Association believes that relocating the
transit center away from Lot 61 is helpful, the circulation of bus traffic may still be
problematic. At this time the Association has not seen a detailed traffic circulation plan
to fully assess the impacts of the transit center plan proposed in the Draft Plan. It is
important to address this issue as early in the process as possible.
The Draft Plan discusses the importance of satisfying parking needs in the Town
Core. It proposes that new development in the Town Core provide structured parking or
contribute to a pay -in lieu program to jointly develop private/public parking structures.
As you are aware, there is already a significant lack of parking in the Town Core. The
Association believes that it is imperative that any now development provide for its own
parking at the time of development. Permitting a delay in the construction of additional
parking will only exacerbate an already serious problem.
The Association is also concerned about the interplay between the Draft Plan and
other functional plans already in existence. The Town adopted the Avon Town Center
Implementation Plan less than four years ago. The Implementation Plan specifically
recognizes the need to protect view corridors and actually delineates where development
should occur on Lot 61 so as to protect the view corridors of the adjacent properties,
including the Avon Center. Similarly, the Design Review Guidelines at Section 5A state
that "...scenic values, views, and climatic orientation should be the dominant factors in
the design and sighting of buildings." To satisfy this objective, Section 5A requires that
"[s]ite layout and proposed improvements shall consider the use of passive and active
solar use, and the retention of neighboring properties `view corridors'." In addition,
Section 5B of the Design Review Guidelines states that solar access is of primary
importance within the Town Core. These two documents, the Implementation Plan and
Design Review Guidelines, emphasize the importance of maintaining views, solar access
and scenic values all in keeping with protecting the sense of place that is the Town of
Avon.
During the open house, the Association inquired about the relationship between
the Draft Plan and the other functional plans. There is language in the Draft Plan at page
63 that provides that in the event of any conflict between the Draft Plan and any other
functional plan or documents, the Draft Plan will prevail. It was represented by the Town
that the Draft Plan is not intended to conflict with the other functional plans, including
the Implementation Plan, and that these different plans should all be in accord with one
another. The importance of the Implementation Plan was specifically acknowledged and
the Town agreed that language concerning the maintenance of view corridors in the
Town Core area identified in the Implementation Plan should be specifically included in
the Draft Plan. The Draft Plan should clarify that new density in the Town Core should
22259
MAR -15-2005 TUE 01:23 PM Jr" 'LP FAX N0. 3n"4420191 P. 04
Town of Avon
Attn: Mr. Tambi Katieb
Community Development Department
March 15, 2004
Page 3
not be at the expense of view corridors, solar assess and the general character that
currently exists.
The Association appreciates the opportunity to provide input on the new Draft
Plan. The Association concurs that it is important to protect Avon's some of place and
that this objective should not be overridden by purely economic concerns. Thank you for
�• your consideration.
Very truly yours,
EX-
PRIN4 /. �./.�...
Michael J. Repucci
cc: George Pako2di (by facsimile)
Keith Elliott (by facsimile)
Tom Crosbie (by email)
Tedra Barring (by mail)
Bob Roman (by email)
Stuart Borne (by email)
Steve MacDonald (by facsimile)
22259