Loading...
PZC Packet 021505Town of Avon Planning & Zoning Commission '� 1111 Meetinkq AV O III February 15` , 2005 Meetings Held At: Avon Town Council Chambers C o L u a n u a Meetings are open to the public Avon Municipal Building / 400 Benchmark Road 5:00 pm Commission Work Session (Discussion of Items on Agenda) - REGULAR MEETING AGENDA - (Please note that all times provided are estimates only) I. Call to Order at 5:30 pm II. Roll Call III. Additions and Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda: Approval of the February 15', 2005 Planning & Zoning Commission Meeting Minutes VI Special Review Use — Drive through Bank (5:35pm — 6:05pm) — PUBLIC HEARING Property Location: Lot 22-B, Block 2, Benchmark at Beaver Creek Subdivision/245 Chapel Place (Chapel Square, Building C) — Resolution 05-02 Applicant/Owner's Representative: Greg Gastineau Description: Greg Gastineau is requesting a Special Review Use (SRU) Permit to allow for the use of a drive -up teller window for the future site of a Wells Fargo Bank. The drive -up teller would gain access just south of the Outback Steakhouse Monument sign at the access road behind City Market. Drive -up teller windows are not specifically allowed in the Chapel Square PUD, therefore a SRU permit is required. This agenda item is a Public Hearing. VII. Sketch Design — Commercial Building Addition (6:05pm — 6:25pm) Property Location: Lot 22-B, Block 2, Benchmark at Beaver Creek Subdivision/245 Chapel Place (Chapel Square, Building C) Applicant/Owner's Representative: Greg Gastineau Description: In conjunction with a Special Review Use (SRU) application, the applicant is proposing a sketch design plan to add a canopy and associated drive through lanes for a drive up banking facility. The proposed drive through would be located on the former "chapel' site, behind the City Market grocery store. All materials and colors of the canopy would match the existing building to the south (Lot 22-A), and the bank would occupy the entire first floor of the building. VIII. Minor Modification (6:25pm — 6:35pm) Property Location: Lot 45C, Block 2, Wildridge Subdivision/2520 Old Trail Road Applicant/Owner: Bob Mach Description: Bob Mach has submitted a Minor Project for a design change to his single-family project that is currently under construction in Wildridge. The application proposes to eliminate the wrap around portion of the deck and to reduce the size of the deck on the house by approximately 126 square feet. Posted on February 11`", 2005 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main entrance bulletin board • On the Internet at http://www.avon.org / Please call (970) 748.4030 for directions IX. Comprehensive Plan Update (6:35 — 7:15pm) Description: Distribution of the February gth Public Review Draft of the Comprehensive Plan. Staff will provide the Commission with a summary of proposed changes to the content, organization, and format of the Draft Comprehensive Plan. Staff will also update the Commission on the scheduled open house and upcoming public hearing dates. No action required. X. Adjourn (7:15pm) Posted on February 11` , 2005 at the following public places within the Town of Avon: • Avon Municipal Building, main lobby • Avon Recreation Center, main lobby • Alpine Bank, main lobby • City Market, main entrance bulletin board • On the Internet at http://www.avon.org / Please call (970) 748.4030 for directions Minutes of Planning and Zoning Commission February 1, 2005 Council Chambers Town of Avon Municipal Building 400 Benchmark Road Call to Order The meeting was called to order at 5:30 pm. II. Roll Call All Commissioners were present with the exception of Commissioner Savage. III. Additions and Amendments to the Agenda There were no additions or amendments to the agenda. IV. Conflicts of Interest There were no conflicts of interest to disclose. V. Consent Agenda Commissioner Struve motioned for the approval of the Minutes from the January 18th, 2005, ;Planning and Zoning Commission Meeting; Commissioner Smith seconded and the motion passed unanimously. VI. Sketch Design — Single -Family Residence Property Location: Lot 5, Western Sage PUD ApplicantlOwner.- George & Amy Ruther Description: George and Amy Ruther are proposing a single-family residence in the Western Sage PUD. The total floor area of the residence is 3,523 square feet and a proposed maximum height of 32'. Proposed materials include wood siding, stone veneer, composite roofing and corrugated metal roofing. Ken Kovalchik presented the Staff Report to the Commission. Commissioner Didier questioned the sewer line easement. George Ruther, applicant, approached the podium to discuss the sewer issue and commented that the sewer easement is intended for lots 6 and 7 above his lot. Commissioner Smith commented on the landscaping plan. Discussion continued with the Design Guidelines and the Western Sage PUD criteria and those guidelines that are most stringent will prevail. Commissioner Struve asked about the roofing material on the southwest elevation. The response was that it would be cor-ten steel. Mr. Ruther FAPIanning & Zoning Commission\Minutes120051020105.DOC Page 1 of 4 commented that the portion of roof above the deck by the master bedroom might be removed. Commissioner Evans commented that the roofing materials to be used were appropriate. Commissioner Didier questioned the retaining wall. Mr. Ruther mentioned that the Final Plat should be recorded in mid March of this year. In lieu of the recorded Plat, Mr. Ruther mentioned that a deposit via either a Letter of Credit or Cash would be an option. VII. Sketch Design —Commercial Building Remodel Property Location: Lot 22, Block 2, Benchmark at Beaver Creek Subdivision/222 Chapel Place (Chapel Square, Building A) Applicant/Owner: Belle Fare of Vail Valley, LLC/ Timberline Management Description: Belle Fare of Vail Valley is proposing various exterior building modifications and a complete remodel of Building A (formerly Panda City) in the Chapel Square PUD. Exterior modifications include: new enclosed entrance, addition to Chapel Alley side of building, and new roof for outdoor seating area on south elevation. Ken Kovalchik presented the Staff Report John Forstman, applicant, approached the podium. He commented on the addition of the monument stairway, the need of the loading doe* for daily deliveries, additional outdoor seating and a fence for privacy. Mr. Forstman provided the Commission with an artistic rendering of the project and introductions of his management staff. Commissioner Didier questioned the truss issue. Mr. Forstman responded that construction drawings would reflect the answer. Commissioner Didier continued with the fence and storage unit. Commissioner Karow commented on the four issues of the Staff Report and that the project met the regulations. Commissioner Trueblood mentioned that parking might be an issue. Mr. Forstman responded that his staff reviewed parking and that his clientele would use the Office Depot area primarily. Commissioner Smith mentioned the project conforms to the Town's guidelines. Commissioner Evans commented that materials need to be according to Town standards and Final Design criteria will include the lighting ordinance, colors, reflective materials, and suggested a roof over the loading dock may be effective particularly during the winter to avoid constant shoveling. VIII. Zoning Map Update Resolution No. 05-01 F:\Planning & Zoning Commission\Minutes\2005\020105.DOC Page 2 of 4 Description: As required by the Avon Municipal Code, periodic updates to the Town Zoning Map shall be made and published when changes are made in district boundaries or other matters portrayed on the official zoning map. The last Zoning Map update was completed in November 2002. A number of technical corrections have been made in addition to land subdivisions. Eric Heidemann presented the staff report. Commissioner Karow moved to approve the Zoning Map Update, Resolution No. 05-01 and Commissioner Trueblood seconded the motion. All commissioners were in favor. Other Business: Eric Heidemann mentioned that Town Council would like to hold a joint work session on Tuesday, 2/8/05, from 3 pm to 5pm regarding Lot 61, its relationship to the Town, its sketch design concept and dialogue regarding massing, PUD, etc., and the response to its design. It will be a "sketch plan work session" with the applicant presenting the concept to both the Planning and Zoning Commission and Town Council for input and consideration. Reduced sets of the plans will be provided to the Commissioners prior to the meeting. Tambi Katieb mentioned to the Commission that the Gates' building permit will expire on Morntay 2/i /05 -and an inspection is not feasible. The inning with be arr empty PUD, as the development rights will be extinguished. Commissioner Struve questioned the Avon Car Wash site. Commissioner Trueblood questioned Tract Y and Mr. Katieb voiced that it is still in the court process. Jeff Schneider was introduced to the Planning and Zoning Commissioners as the latest addition to the Town of Avon's Engineering Department. IX. Adjourn Commissioner Didier made the motion to adjourn. Commissioner Trueblood seconded and the motion was unanimously approved. The meeting adjourned at 6:35 pm. Respectfully submitted, Ruth Weiss Recording Secretary FAPlanning & Zoning Commission\Minutes\20051020105.DOC Page 3 of 4 APPROVED: Chris Evans Chairman Terry Smith Secretary FAPlanning & Zoning Commissionwtinutes\20051020105.DOC Page 4 of 4 Staff Report7vi SPECIAL REVIEW USE C O L O R A D O February 15, 2005 Planning & Zoning Commission meeting Report date Project type Legal description Zoning Address Introduction February 9, 2005 Drive -Up Teller Chapel Square PUD PUD 245 Chapel Place The applicant, Greg Gastineau, is requesting a Special Review Use (SRU) Permit to allow the use of a drive -up teller window for the future site of the Wells Fargo Bank. The subject property, lots 22A and 22B of the Chapel Square subdivision, are currently zoned as PUD and allow for a mix of permitted uses. The applicant's request is to allow the use of a drive thru teller, which is a use not expressly permitted. The use would require the construction of a 16' wide drive thru lane, which would access the site from a 20' easement located between the City Market and the subject property, and construction of a canopy over the teller lanes. This application is being reviewed in conjunction with a Sketch Design application and subsequently a Final Design application. Criteria for Review According to section 17.48.040 of the Avon Municipal Code, the Planning & Zoning Commission shall consider the following criteria when evaluating an application for a Special Review Use permit: 1. Whether the proposed use otherwise complies with all requirements imposed by the Town Zoning Code. The site plan submitted appears to satisfy the minimum stacking requirements and circulation on site. The parking regulations require five (5) storage spaces for a teller window or drop station as set forth in Section, 17.24.020(2). Staff is recommending the applicant demonstrate this stacking requirement as part of the final design approval. The overall design of the drive-thru lane(s) works well and does not appear to create adverse traffic impacts off-site. However, staff's concern is that the design of the lane requires the removal of several existing parking spaces and landscaping (trees) along the western property line. In addition, there appears to be a utility easement and transformer located within the area of the future drive thru lane. Staff is confident these issues can be resolved through the design review process and recommends limiting the special review use to compliance with conditions outlined in the Sketch Design application and any conditions that may be attached to the Final Design approval. Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Chapel Square PUD, Special Review Use for Drive-oup Teller February 15, 2005 Planning & Zoning Commission meeting Page 2 of 2 2. Whether the proposed use is in conformance with the Town Comprehensive Plan. The goals in the Comprehensive Plan help guide the community's decisions about public and private investment and development. Currently, the Town of Avon does not have any full service drive-thru banking facilities. As a commercial development, a Wells Fargo drive-thru offers some balance to banking services provided for both the existing community as well as regionally. Policy A3.6 states that the Town should "encourage mixed use development... where compatible with existing neighborhoods". This property is bordered to the west by City Market, the south by Chapel Square, and the east by the Village at Avon. The immediate area is comprised of a range of residential and commercial land uses. Along with promoting mixed-use development, the Comprehensive Plan encourages certain elements of the Town's overall goals and policies. Policy A3.1 states that development should first be directed to areas within and adjacent to -established neighborhoods and developed areas. With the current buildout of Chapel Square and nearby residential and commercial land uses, the drive-thru bank will fit in well with this goal and the existing environment. Providing for vehicular access and parking is also an important element of planning for future development in Avon. Policy ELS states that planning of vehicular access and parking must take into consideration the safe and convenient movement of pedestrians from parking to building entrances. The site plan has also satisfactorily addressed this policy. 3. Whether the proposed use is compatible with adjacent uses. Such compatibility may be expressed in appearance, architectural scale and features, site design and the control of any adverse impacts including noise, dust, odor, lighting, traffic, safety, etc. It appears that this use is both compatible and complimentary with the adjacent land uses with respect to the appearance, architectural scale and features, and site design. All of the proposed and existing zoning for The Village at Avon as well as the surrounding neighborhood provide a suitable environment for a bank and drive-thru. Staff has identified matters that need further clarification at the time of final design submittal. These items include: 1) Finished Grading to demonstrate positive drainage, particularly along the irrigation easement; 2) Vehicle stacking; 3) Vacation of the 10' Utility Easement and transformer relocation plans; 4) Landscaping removal and replacement; and 5) Proposed sign locations and design. Recommended Motion: Staff recommends approval of Resolution 05-02 to allow for the use of a drive -up teller window as described in the plans dated January 20, 2005 on the Chapel Square PUD with the following conditions: 1. Provide written confirmation of the release of the electrical easement and equipment from the respective utility company prior to issuance of building permit. 2. Replace landscaping (trees along the side walk) equal to the amount removed as part of improvements prior to issuance of building permits. 3. Except as otherwise modified by this permit approval, all material representations made by the applicant or applicant representative(s) in this application and in public hearing(s) shall be adhered to and considered binding conditions of approval. If you have any questions regarding this or any other project or community development issue, please call me at 748-4009, or stop by the Community Development Department. Respe ully sub it d, c Heid ann of Avon Community Development (970) 748-4030 Fax (970) 949-5749 J AVO K C O L O R A D O SPECIAL REVIEW USE Special Review Use Fees: Residential $!^� Non -Residential $ 300.00 Applicant: cl� 4MStWT.PCV (:01 QDS = f Mailing Address: Q, VMI, (z�f WLTS Leem City: ghiv, State: C4 Zip:DbSI Phone #: Oic +Ito-I+J4 Fax #:-(9-10)4-7t.. 111b(, Cell #: (q-? X10.442$ Owner of Property: C"Afv, SQVF441 L -Lt, Mailing. Address: (2 Vglt' pnyy''5LV l� (exp City: VMV- State: to Zip:8(bS-1 � Phone #: 0110)4 14.1444 Fax #: (9-1o)4-1(n.littp Cell #: (11 o) "0•(4414 Project Name: ct*rOW S%Jq� . WUA 0#4&0 L>Eoe' up Street Address: ? C"Afyl, ?L*m Lot: M, pb Block: y Subdivision: ' mri..kw h#4, AA. Vg'C*'Ozy Zoning Classification: PV1) Type of Special Review Use Requested (Please be specific): Review Criteria: Community Develop Ile A. Does the proposed use otherwise comply with all requirements imposed by the zoning code: 4 5McIAL EV(EW 16 R OpM 13 cAsl5c PR►vE-UP FOACAG neS AM NoT spEgF'CAuy e6P6ZPtED ►N TWE ex►snWr Pup Community Development, P.O. Box 975 Avon, CO 81620 (970)748-4030 Fax (970)949-5749 (rev. 12/27/01) Page I oft B. Does the proposed use conform to the Town of Avon Comprehensive Plan: 'M is, SITE tS IN SUSAZEA J* oF1ME cOMpIzEHEWR* FLAN ApSh5 WHICH tSTNE Co0VAC IAL, VtSlVttC[ 1146 BANK IS A C MEF5.7_0Jr U.G. C. Is the proposed use compatible with adjacent uses: TWE /IQIACEW USES Ag{ "t L, ANp oFr-tCE 114E 15An1K is coMYATiE5t.E Ta 714135E USZS- I (we) represent that all information provided to the Town of Avon in connection with this application as true and correct, that I (we) understand the Town of Avon regulations applicable to this project, and understand that incomplete submittals will delay application review. Owner designates Appli- cant as indicated to act as owner's representative in all application submittals related to this project Applicant: Owner: (Print Name): d?RS 0n41hJ (Print Name): V t!S hrsc►JT rol.CAtfW_WW?Wj Date: 1 ltoOS Date: l 14bOS Community Development, P.O. Box 975 Avon, CO 81620 (970)748.4030 Fax (970)949-5749 (rev. 12/27/01) Page 2 of 2 TOWN OF AVON PLANNING & ZONING COMMISSION RESOLUTION NO. 05-02 A RESOLUTION APPROVING A SPECIAL REVIEW USE PERMIT TO OPERATE A DRIVE -UP TELLER ON THE CHAPEL SQUARE PUD, TOWN OF AVON, EAGLE COUNTY, COLORADO WHEREAS, Greg Gastineau, representing Chapel Square LLC, has applied for a special review use permit to operate a drive -up teller, as described in the application dated January 20, 2005, as stipulated in Title 17, of the Avon Municipal Code; and WHEREAS, a public hearing has been held by the Planning & Zoning Commission of the Town of Avon, pursuant to notices required by law, at which time the applicant and the public were given an opportunity to express their opinions and present certain information and reports regarding the proposed Special Review Use permit application; and WHEREAS, the Planning & Zoning Commission of the Town of Avon has considered the following: A. Whether the proposed use otherwise complies with all requirements imposed by the zoning code; and B. Whether the proposed use is in conformance with the town comprehensive plan; and C. Whether the proposed use is compatible with adjacent uses. NOW, THEREFORE, BE IT RESOLVED, that the Planning & Zoning Commission of the Town of Avon, Colorado, hereby approves a Special Review Use for the operation of a drive -up teller, as described in the application dated January 20, 2005, as stipulated in Title 17, of the Avon Municipal Code for The Confluence PUD, Town of Avon, Eagle County, Colorado, based upon the following findings: 1. That the proposed use otherwise complies with all requirements imposed by the zoning code. 2. That the proposed use is in conformance with the Town Comprehensive Plan. 3. The proposed use is compatible with adjacent uses. Subject to the following conditions: I. Except as otherwise modified by this permit approval, all material representations made by the applicant or applicant representative(s) in this application and in public hearing(s) shall be adhered to and considered binding conditions of approval. 2. Provide written confirmation of the release of the electrical easement and equipment from the respective utility company prior to issuance of building permit. 3. Replace landscaping (trees along the side walk) equal to the amount removed as part of improvements prior to issuance of building permits. ADOPTED THIS 15th DAY OFFebr•uao% 2005 Signed: Attest: Chairman Secretary Date: Date: Staff Report Sketch Desi i/�r 0, OOMMM AVON inC0 L0 R A D0 February 15, 2005 Planning & Zoning Commission meeting Report date February 8'h, 2005 Project type Commercial Building — Addition Legal description Lot 22-B, Block 2, Benchmark at Beaver Creek Subdivision Zoning Planned Unit Development - PUD Address 245 Chapel Place, Chapel Square Building C Introduction In conjunction with a Special Review Use (SRU) application, the applicant is proposing a sketch design plan to add a canopy and associated drive through lanes for a drive up banking facility. The proposed drive through would be located on the former "chapel" site, behind the City Market grocery store. All materials and colors of the canopy would match the existing building to the south (Lot 22-A), and the bank would occupy the entire first floor of the building. Staff Comments The exterior design modifications proposed appear to be in conformance with the Town of Avon Residential. Commercial. and Industrial Desion Review Guidelines. Access to the proposed drive up bank would be provided with a 16' wide drive and would open to three lanes of traffic near the building. Driveway grades appear to be a moderate grade, and must be less than 6%. All existing and proposed grades must be clearly indicated on the site plan to confirm driveway grades and functional drainage at final design. Additionally, the vehicle stacking must be indicated on the final design site plan to ensure at least "5 storage spaces/outside teller window or drop station." Drainage will be reviewed in detail at final design submittal and it must be demonstrated by the applicant that the 10' Utility, Drainage, and Irrigation Easement running the length of the eastern property line remains unobstructed. Within this Easement, an 18" PVC drain pipe daylights near the proposed entrance. There is also a 10' Utility Easement located where the canopy is proposed, and a transformer is located within this Utility Easement. The transformer would need to be relocated and this Utility Easement abandoned for this site design to function. In order to construct the improvements it appears that 7 parking spaces would be removed along with some trees. A complete landscaping plan will be reviewed at final design and must comply with the Commercial Landscaping Guidelines. The canopy itself would include three drive lanes and would match the existing building with a stucco cornice detail and cultured stone veneer base. Stucco color would match Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 Lot 22-B, Block 2, BMBC Wells Fargo Sketch Design — Drive -up Canopy Addition February 15, 2005 Planning & Zoning Commission meeting Page 2 of 3 the stucco on the main building. A flat roof is proposed for the canopy. Lighting cut sheets for any proposed lighting, including canopy lighting, must be submitted with the final design submittal and must be in compliance with the Town's Lighting Ordinance. Prior to, or along with the final design application, the applicant will be required to submit an application for a sign permit for any proposed signs. If the proposed signs do not comply with the master sign program for the Chapel Square PUD, the applicant would be required to amend the sign program. In brief discussion with the applicant an amendment to the sign program will be required for the future tenant's desired signage. This sketch design plan generally conforms to the Town's Commercial Design Guidelines. Staff has identified matters that need further clarification at the time of final design submittal. These items include: 1) Finished Grading to demonstrate positive drainage, particularly along the irrigation easement; 2) Vehicle stacking; 3) Vacation of the 10' Utility Easement and transformer relocation plans; 4) Landscaping removal and replacement; and 5) Proposed sign locations and design. Design Review Considerations The Commission and Staff shall evaluate the design of the sketch plan utilizing the specific Design Standards, and by using the following general criteria: A. The conformance with setbacks, massing, access, land use and other provisions of the Zoning Code. B. General conformance with Residential Development Sections A through D of the Town of Avon Residential Commercial and Industrial Design Review Guidelines. At the meeting the Commission will take no formal action on this sketch plan application. Rather, direction on the design will be given to the applicant from Staff and the Commission to incorporate into the final design application. Full size plan sets will be available at the February 15`h meeting to provide written comments and guidance to the applicant. If you have any questions regarding this project or any planning matter, please call me at 748-4413, or stop by our office. Respectfully submitted, Matt Pielstick r Planning Technician Town of Avon Community Development (970) 748-4030 Fax (970) 949-] 149 • • • ! ! SAME AS Lot 22-B, Block 2, BMBC Wells Fargo Sketch Design — Drive -up Canopy Addition ORIGINAL February 15, 2005 Planning & Zoning Commission meeting Page 3 of 3 Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749 icon Vl O a N c�i N I aoT O 0 oa s1aga5 o :, o o N d O \ Pi n EE€ aF.�mS m opea01031 6aond UOAV 0119A SIPAX I I I I I I I I I I I 1 I 1 I I I I I I I I I I I I I I I I 1 I I I I I I I I I i I I I Z I � I I Q I I `11 W o I I I Q m I W I T I O O Y N I O 0 oa .„ N �Q N d O \ c C.41 rc a R 0 •o i O N I O n. O \ c R 0 •o i d 4 W yN. u` C`7 I I 1 I I I I I I I I I I I I I I I I I I I Z I I I Q I W '------�-- w o II AB NOSMN 31V0 'ON IR[4PM1[IKI IIJ tiIIN(A'1'N(4-n'IJJ.I'I InI T.l.11lS'nM Jfllnln'IvtNlNuxrtlir2v [leCb1610[bl'IId RSIP N]'NOAV 4b%OY nit illi l[S9 SII IIPM 'CeSVeV,ne ,a _ ,ew • e^IwJ ,pa wYe eea 'IwwV a eW le wN ew 441N Men eV e, eP� BUFaaulau� ewA; :w.w41.•.,weweWwly:wvw,wWneetir •enw.w�ue OOV2i0100 'A1Nf100 310V3 o +� ucq VeaeawWro wlllw VIe1Ve ,PH lenw ReW eeoWnJ w�b,..4 e.,,e,w. w,eYwly eW w ,wYew .N, „n W ..n..e Rmw w 32iVf10S 13dVHO M wWe Aw ,eW ,[w eW VI 'M[aerple ,eu el paw < uwwJ wVle 0 O 9wT *� Rw M IMwV MN%wi W,eV4yN .V[ < Iwwroq W le Mn .W w.wV VZZ 101 d0 NOLL80d V t — �[n0 .ia AQi� ""°.• 4"° NNVG O ve S113MMp. dVV4 OIHd` UE)Od01-IVLW /d I ` 49 r ` dao 6R Y 4 \\ \\ EA \ \ w2oo S Cosa "'x8RE U r :.. r 6 IN 1' 4f&66 2. ` dao 6R Y 4 \\ \\ EA \ \ w2oo S "'x8RE U r -I s YE�ih��hi§ 4 � UY5 �e--she � sIN �.d U opea0103 'uonV juewdolanea Allunwwoo UOAV 5002 8 0 033 021193 RPM . 03AI333H AbI o Y U N o � ' 2 W Of i O ON11 I u 51 I A j I -46; W --I. p ..C� .... W ul N I - - D I ��\ I W DQ O O d ,z- Z AbI o Y U N o � ' 2 W Of i O ON11 I u 51 I A j I -46; W --I. p ..C� .... W ul N .. - - D I ��\ I W DQ O O d II .I —f _ d'd N N 7 O .. I c / W O O� Q I N .. :...,-� m I-% i - -�- _ m w O m Uv W. z I / y AbI o Y U N o � M 7o N o 2 W Of U o U O ON11 II -a 51 F f--LL, -46; W CD N W I— / W ul N .. - - D I ��\ I W DQ O O d Q) _ —f _ d'd N N 7 O 0 W¢ c / W O O� Q W i N .. :...,-� m I-% i - -�- _ m w O m Uv W. z AbI O I n o Y U N o � M 7o N o 2 0 o' U U o U O ON11 II -a 51 F i -46; W CD N N o W ul N > N E ��\ I W DQ O _ d Q) _ _ W _ O N N 7 O I W¢ (DU 0 W O O� Q 0 Z N O I n o Y U N o � M 7o N o 2 0 o' U U o U O ON11 II -a 51 F i -46; W CD N N o 4 ul N C N N E O _ d Q) � C O I n N o � M 7o N o M II 0 o' U U o U •� U F i -46; W CD N Q) o 4 ul N C N C 0 O Q) b Q) � C � O N N 7 O I 0 0 .� N Q 0 Z N O I n N o � M 7o N o M II C a i F i -46; W �— a` ul 4 ul N W � o C14 O O I O n O i - O Z Memo To: Planning and Zoning Commission From: Matt Pielsticker, Planning TechnicianJ4 Date: February 7, 2005 Re: Minor Project Application — Deck Alteration Summary: Staff received a Minor Project application for a design change to the 2520 Old Trail property where a single-family residence is currently under construction. The application proposes to reduce the size of the deck. As approved, the deck wraps around from the south to the west elevation of the residence. The deck has already been constructed on the south elevation (per approved plans) and this application proposes to eliminate the western portion. Background: A previous Minor Project application for design changes was heard at the Commission's October 19'h, 2004 meeting. At that meeting, action was taken on a number of exterior and site design changes, including changes to the deck (see number 6 below). Attached to this memo are reduced photocopies showing the proposed reduction in deck area. The deck change being proposed with this application was denied at your October 19, 2004 meeting because the Commission felt that removing the deck would be inconsistent with the Design Review Guidelines. The Residential Guidelines do not specifically address decks and their placement. Subsequently, the applicant missed the appeal period and has resubmitted a new application for further review. Following is a recap of the previous Minor Design application and the changes that were proposed, and with a brief progress update on each change: 1. Install two berms on easterly property lines, each with two 12' spruce trees. Action: Conditionally approved. The neighboring property owner (Lot 44, Block 2, Wildridge) must submit a letter of approval for these berms prior to issuance of a Temporary Certificate of Occupancy. Progress: No letter has been received by Community Development. The applicant has started dialogue with the neighboring owner's representative. 2. Install 40' length of 3' high split rail fence on property line between Lot 45B and Lot 45C. Action: Approved. Progress: Posts in ground. 3. Install 20' length of 6' high cedar fence at north east comer of structure for hot tub screening. Action: Denied. 4. New window location for main level window on north elevation. Action: Approved. Progress: Complete. 5. Omit bellyband detail from all elevations except for gable bumpout on north elevation and utilize continuous wood trim above windows in place of bellyband. Action: Denied. The bellyband must wrap around the entire north elevation of the home and will terminate into the inside comers of the building. Progress: Trim board has been applied to approved locations. 6. Omit deck on west elevation. Action: Denied. 7. Two new firebox bumpouts with one on west elevation and one on east elevation. These boxes utilize shingle roofs and accent wood siding. Action: Approved. Progress: 900/6 Complete 8. Cedar sided double garage doors in place of one single arched door. Action: Approved. Progress: Complete except for trim. 9. New swale between duplex on Lot 45B and Lot 45C. Action: approved. Progress: Not constructed. F.•IP/annhrg6ZonMgCwwWsslonIMemam12"L45CBZWRBob Mach ~ProJ tabc A OtW et@.= •WM • apvgoo taw . g1 coq od c, W 0 Z I I I ' I I I I I I � a� 0 W 0 Z OMOFI00 `WAS 0 JM Z X"AnH ' 9tJAFI sa ` ' 23KHMM 3 JArI V 1 Ro tp T a� 0 U � O U 1` Q N OMOFI00 `WAS 0 JM Z X"AnH ' 9tJAFI sa ` ' 23KHMM 3 JArI V 1 Ro tp N% I0 - 0 a� Ln C=) O N W `z o � � E E z Z z o N O W m m V)O ~ F m O Q N QCL O Z W -j00 W J= Q O O O Oa0 p N N(n0 U N O } W QaN / WfW a J D<Z WW YW W 0 NpW <c 3 Q N �0O �0V 5S Up Z O W J low W O Y MH Y N% I0 - 0 MaMW IM•�i� W!^N • '�M'[1�JlS$Q •—A aAWD 3I w I 111 OardO►IOO`WAY Z }ram O 9t an NOISL1 agm ZD=am l 3 AZI&aNNW tq tl8 p. LU o Nuj 3I w I 111 Memo To: Planning and Zoning Commissioners /I� From: Eric Heidemann, Community Development f Date February 9, 2005 Re: Distribution of Draft Comprehensive Plan Introduction Attached to this memo is the Draft Town of Avon Comprehensive Plan. Based on the timeline provided below, the Public Open House scheduled for March 3rd is followed by the first public hearing before the Planning and Zoning Commission scheduled on March 15`h The purpose of this distribution is to allow the Commission one month to review, ask questions, and provide comments prior to the first public hearing. Part of the public distribution of the Draft Plan included approximately 4,000 postcards sent to all box holders with the Town, an email to residents/business owners/ and members of the development community, and a press release scheduled in the near future. Background The role of the Comprehensive Plan is to provide a framework for moving Avon into the future as a healthy community. It defines a vision statement for the Town and provides goals, policies, and other measures for community development that support the vision. The Draft Comprehensive Plan is the result of remarkable effort and work performed by the Comprehensive Plan Steering Committee. The purpose of this broad-based citizen's advisory board is to ensure that the consultant team (RNL) and staff respond to public comments received through the public open houses, stakeholder interviews, and general comments received from the public concerning the Comprehensive Plan. Over the last 12 months, the Comprehensive Plan Steering Committee has met 11 times to discuss the draft plan and provide guidance. February 9 Public Distribution February 15 Planning and Zoning Commission Review March 3 Public Open House March and April Council and Planning and Zoning Commission Public Hearings Feb 15 2005 12:23PM MI IELLO PLANNING GROUP, 9 748-0377 P.1 1�1 I 1 IMnurlollo Plnnnlns Woup February 14, 2003 Eric Haidemann Senior Planner Town of Avon PO Box 975 Avon, CO 81620 Re: Draft Avon Comprehensive Plan Dear Eric: Thank you for the opportunity to participate in the drafting of the Avon Comprehensive Plan, As you may be aware I have been retained by Vail Resorts to monitor the planning effort and the process for the Avon Comprehensive Plan. Vail Resorts has asked me to send you this letter with their continued concern, raised back in September, of language referring to the preservation of the "Red House." Under the Medium Priority Subareas and within subarea 6 (U.S. Highway 6 Gateway Corridor) the plan makes the recommendation to "preserve the 'Red House' as culturatUritage amenity." Vail Resorts owns the "Red House" and requests that this statement and any other reference to this structure be removed from the plan. First of all, the subject property is not located within the corporate limits of the Town and secondly the strxWe has no cultural or heritage significance to the Town of Avon. It seems as little premature to identify any structure or property in the Town as worthy of preservation until a proper and comprehensive analysis has been conducted Town wide. It is our understanding that the reference to the "Red House" was offered as a public comment in one of the open houses early in the development of the comprehensive plan and does not reflect the proper data and analysis to conclude that the structure is in fact a cultural amenity. Given the lack of comprehensive research and evaluation into the cultural/heritage value of this structure, we believe the reference should be deleted from the plan. Feb 15 2005 12:29PM MR ELLO PLANNING GROUP, 97 748-0377 p.2 If you have any questions, please feel free to call me at 74&0920. Sincerely, Dominic F. Mauriello, AICP Principal C: Town of Avon Planning Commission Jack Haan, Vail Resorts 2