Loading...
PZC Packet 100416 Town of Avon Planning & Zoning Commission Meeting Agenda Tuesday, October 4, 2016 One Lake Street If you require special accommodation please contact us in advance and we will assist you. You may call David McWilliams at 970-748-4023 or email cmcwilliams@avon.org with any special requests I. Call to Order – 5:00pm II. Roll Call III. Additions & Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda • Findings of Fact and Record of Decision for ECO Bus Shelter, MNR16030; Hearing conducted on September 20, 2016. VI. Work Session – Avon Hotel Summary: Representatives from Treadstone Development, LLC, will be attending to provide presentation and update on the evolution of the ‘Avon Hotel’ project. ~Reconvene at 7:00pm with remainder of agenda ~ VII. Major PUD Amendment – Short Term Lodging Use – PUBLIC HEARING File #: PUD16004 Application Type: Major PUD Amendment – Preliminary Applicant: Carryn and Bret Burton Property: Lot 3, Block 3, Benchmark at Beaver Creek Subdivision / 1060 W. BC Blvd. Owner: Westgate at Avon LLC Summary: Application to amend the Westgate PUD to permit short term lodging use as a use by right, and covert approximately 3,500 square feet from office into a hostel operation. VIII. Rezoning – New Town Hall – PUBLIC HEARING File #: REZ16002 Application Type: Rezoning Applicant: Town of Avon Property: Lot 4, A Resubdivision of Lot C, Sheraton Mountain Vista / 100 Mikaela Way Proposal: Application to rezone the property from Planned Unit Development (PUD) to the Town Center (TC) zone district. IX. Work Session - 2006 Comprehensive Plan Update Summary: Review of draft amendments to the Comprehensive Plan. 1 Agenda posted on Friday, September 30, 2016 at the following public places within the Town of Avon: -Avon Municipal Building, Avon Recreation Center, Avon Public Library, Town of Avon Website www.avon.org Please call 970-748-4030 for Questions X. Approval of Meeting Minutes • September 20, 2016 Meeting Minutes XI. Staff Approvals • US Bank Covered Entries • Balas East Townhomes Tree Removal • Coyote Ridge Driveway Extension XII. Adjourn 2 Agenda posted on Friday, September 30, 2016 at the following public places within the Town of Avon: -Avon Municipal Building, Avon Recreation Center, Avon Public Library, Town of Avon Website www.avon.org Please call 970-748-4030 for Questions PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF PUBLIC HEARING: September 20, 2016 DATE OF EXECUTED DECISION: October 4, 2016 TYPE OF APPLICATION: Minor Development Plan – Bus Shelter Design PROPERTY LOCATION: Highway 6 / Eaglebend Apartments FILE NUMBER: #MNR16030 APPLICANT: Town of Avon These findings of fact and record of decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.020(f): DECISION: Approval. The motion passed with a 5-0 vote. FINDINGS: 1. The proposed bus shelter design meets the applicable Development Plan review criteria outlined in §7.16.080(f), Development Plan, Avon Municipal Code. 2. No needed provision for bicycle racks was found at this location based upon proximity to the Eaglebend apartments and other bicycle storage facilities CONDITION: 1. The bus shelter will be built in mirror-image form, so that entrances to the shelter are on the south and east side of the structure. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ PZC Chairperson PZC Findings of Fact and Record of Decision: #MNR 16023 Page 1 of 1 October 4, 2016 PZC Work Session Lot B Avon Hotel PAGE 1 OF 1 To: Chairman Jim Clancy and Planning and Zoning Commission From: Matt Pielsticker, AICP, Planning Director Meeting Date: October 4, 2016 Agenda Topic: Work Session - Lot B Avon Hotel Project Introduction Representatives from Treadstone Development, LLC will be in attendance for a work session concerning the Lot B hotel project. This meeting follows an initial work session that took place earlier this spring. The purpose of Tuesday’s work session is to provide the Planning and Zoning Commission with a presentation on the progression of the project. Numerous design modifications have taken place based on the initial comments received in April by Planning and Zoning Commission, as well as initial review comments by staff. Staff encourages you to come prepared with questions and comments on the attached development plan drawings. The applicant is seeking direction on the revised plans, as well as providing the Planning and Zoning Commission with a unique opportunity to review the applications prior to a public hearing. We urge the Planning and Zoning Commission to consider what additional submittal items (if any) would be of assistance to fully review the application at the upcoming hearing. Project Timeline April 5 – Work Session with PZC to discuss initial design, site constraints, and solicit feedback. April 6 – Work Session with Town Council members who could not attend PZC. July 5 – Application received for a Major Design and Development Plan. July 12 – Staff provided initial comments and determined that the application was incomplete. Late July – Additional submittals were received including Drainage Report and studies. August 10 – Staff provided initial review comments and comments from OZ Architecture. September 21 – Revised plans and response to staff’s review comments were received. October 4 – PZC Work Session #2. October 18 – Public Hearing Process Forward A formal public hearing with Planning and Zoning is scheduled for October 18, 2016. Final action for this project will be by the Town Council, after reviewing the Planning and Zoning Commission’s recommendation, and conducting another public hearing. Attachments  Executive Summary of Development Proposal  Staff Comments to Applicant  Written Response to Town  Alternative Equivalent Compliance Narratives  Development Plan Drawings including Exhibit A DEVELOPMENT PROPOSAL LOT B – AVON CENTER AT BEAVER CREEK EXECUTIVE SUMMARY The attached materials present a plan to build a mid-scale hotel on the site identified as Lots 2, 3, 5, 7, and B in Avon Center at Beaver Creek in Avon, CO. The site is located in the urban core of the Town of Avon on West Beaver Creek Blvd next to the Sheraton Mountain Vista Villas, The Lodge at Avon Center, and the Seasons at Avon. The hotel will include 142 guest rooms on 5 floors with a breakfast room/lounge area, lobby, parking for 205 vehicles and typical supporting service areas. The development will include a separate recreation center which will feature a pool, fitness center, and restrooms. It will also include four residential condominiums. This recreation center will benefit both the proposed hotel and the residential owners of the Lodge at Avon. The site is 1.6 acres (68,925 sf) including frontage on both West Beaver Creek Blvd and the pedestrian mall. The site is zoned Town Center, which provides for a variety of uses such as hotels, commercial establishments, offices and some residential uses in a predominately pedestrian environment. The Town Center is distinguished from other areas in the Town and is meant to serve as the focal point for social, business and cultural activities. This district contains the highest intensity of uses and serves as a major transit destination as well as providing high levels of pedestrian accessibility. The proposed design supports the Town Center zoning in several significant aspects: 1) The development will integrate with the pedestrian mall and the re-model of West Beaver Creek Blvd to create a vibrant pedestrian area; 2) Significant excess parking is planned which will provide an opportunity for customers of the hotel, the businesses at the Lodge at Avon, and Alpine Bank to park and walk to their destinations; and 3) The hotel will bring over 50,000 customers per year to the heart of the Avon commercial district. These customers will frequent the restaurants and retail outlets located in the Town Center area spending an estimated $23MM/year In particular, this project includes a number of elements that are critical to the enhancement of the pedestrian mall and West Beaver Creek Rd areas including:  A main entry/exit for the hotel directly to the pedestrian mall, activating the mall and encouraging visitors to walk throughout the Town Center area.  Integration of the Main Street mall with the hotel in terms of elevations, landscaping, and walkways.  The creation of gathering spaces at strategic sites along the pedestrian mall.  The addition of micro-retail spaces, enhancing the commercial offerings in the Town Center.  Enhanced views through the site which are achieved by 1) Limiting the height of the hotel to below the maximum allowed height of 80’; 2) Stepping back the building adjacent to the pedestrian mall; and 3) Locating/positioning of the building on the site.  The connection of the pedestrian mall with West Beaver Creek Blvd via pedestrian access through the site  Use of balconies to integrate the hotel guests with the Main Street mall and West Beaver Creek Blvd  Elimination of the 2nd curb cut off Beaver Creek Blvd  Addition of landscaping/gathering areas to activate the West Beaver Creek Blvd remodel Site planning and building design were significantly impacted by the legacy agreements that run with the land. Among the agreements that encumber Lot B, the most major ones include:  Agreement with the Lodge at Avon regarding the provision of shared parking on the site.  Agreement with the Lodge at Avon regarding the development of a joint recreation center.  A joint access agreement with the owners of Lot C regarding the development of the entry drive across from Sun Rd  A reciprocal easement agreement with the Lodge at Avon and Alpine Bank regarding provisions for shared parking.  A drainage easement between Lots B and C The requirements of these agreements have driven much of the site design work for the project. Treadstone Development conducted a market and feasibility analysis which demonstrated that there is a clear need for mid-scale hotel units in the Town of Avon. Currently that segment is under-represented in the market resulting in a significant price gap between full service properties such as the Westin Hotel Riverfront Resort & Spa and economy properties such as the Comfort Inn Vail/Beaver Creek. This proposed development adheres closely to the design principals articulated in the West Town Center Investment Plan. In particular, pursuant to Section H of the plan, the proposed development contributes to the vitality of the pedestrian mall corridor. It is understood that this corridor is an important pedestrian connection. The proposed design includes clearly identified pedestrian routes along the corridor, enhances the accessibility of the corridor through design elements which reduce the perceived bulk on the pedestrian mall, and provides a clear northern terminus of Lettuce Shed Lane at the proposed Lettuce Shed Plaza. This plaza area will offer a variety of activities for all ages and capture sun throughout the day. The Central Restaurant Plaza is also envisioned to be an exciting plaza space with access to restaurants and the center of the Main Street corridor. The central location of this plaza will make this space an attractive environment for outdoor cafes and dining al fresco. The building form and land use should help strengthen this experience. The combination of effective design, increased economic opportunities, and cooperative development with neighboring land owners should offer an opportunity for the Town of Avon to realize the vision as contained in the Town Center Plan. In response to staff comments on the major development submission for the project, a number of significant changes were made to the plans for the project. These changes are detailed in the “response to staff comments” document. Highlights of those changes include:  Elimination of the 2nd curb cut to provide access to the site from the shared access drive across from Sun Rd. This was a significant change that addressed concerns that have historically existed on Lot B.  Submission of two AEC applications for the project.  Maintenance of an emergency access from West Beaver Creek Blvd and enhancement of the parking deck per fire department requirements.  Alteration of exterior building finishes, fenestration, balconies, roof design, and other elements. These design changes were undertaken to achieve several objectives: 1) To reduce the apparent mass and scale of the building; 2) To enhance the connectivity of the building to the surrounding neighborhood; and 3) To increase the use of materials and colors consistent with the development code.  Inclusion of a pedestrian walkway between Lots B and C to connect West Beaver Creek Blvd and the Main Street mall.  Increased landscaping to exceed minimum requirements  Plans to reduce the impact of the development on the environment and to increase the ways the project can support the goal of increased bike/pedestrian activity for the Town of Avon. Treadstone is very excited to present these updated plans for the development. We look forward to discussing your comments and to getting direction which will allow us to continue to move forward toward making this project a reality. 1 | P a g e August 10, 2016 Treadstone Development, LLC 505 8th Street Hermosa Beach, CA 90254 RE: Initial Review Comments for Lot B Hotel Submittal Greg, First off, the Town is excited to receive and review your hotel project, and look forward to finalizing plans for a successful project. This important infill project will undoubtedly bring vitality to the Town Core area and we are eager to move forward through the approval process . Staff will continue to make itself available to assist with the preparation and review of final plans. This letter summarizes Staff’s initial review comments for your Major Development Plan submittal. While the application remains incomplete pending utility verification approvals, the Town wanted to take this opportunity to offer comments and solicit additional information to refine your proposal and consider alternative design approaches. These comments and questions are important to address to ensure compliance with the Avon Development Code (“ADC”) as well as helping to aid in the review of this project by the general public and decision making bodies. In addition to this initial review conducted by Town Staff, input from OZ architecture was solicited to review the proposal and provide comments and questions on the design plan as it relates to the Development Code and surrounding projects. This firm is familiar with the Town of Avon development code, infill construction with the Wyndham project, and mo untain construction in general. Attached to this letter are comments from OZ with document titled “Review of a Major Development Plan”, dated August 8, 2016. We look forward to reviewing these comments with you at your earliest convenience. 1. Zoning:  The plans indicate 9,549 square feet of landscaped area on site (14.2% of lot area), and 6,631 square feet off-site, bringing the total landscaped area to 24.17% of lot area. The code requires a minimum of 20% on-site landscaped area; therefore, the Town Council must authorize using adjacent public land on Tract G to meet minimum standards. ADC Table 7-20-9  Please demonstrate the total square footage of the building coverage within the lot to meet lot coverage requirements.  The plans must demonstrate compliance with 80’ building height. Please show the roof plan with USGS existing contours underneath the building. 2. Alternative Equivalent Compliance (AEC):  An accompanying AEC application must be submitted to address the following design standards: o The code requires a 4:12 pitched roof. Since the design utilizes a flat roof for the primary form. ADC 7.28.090(j)(4)(ix) o Buildings greater than thirty (30) feet in height shall be designed to reduce apparent mass and visually anchor the building to the site by including a clearly identifiable base, body and top, with horizontal elements separating these components.” ADC 7.28.090(j)(4)(v)(B) o After 45’ of vertical rise, buildings are required to have a stepback of at least 8’. ADC 7.28.090(j)(4)(v)(D) 2 | P a g e 3. Access & Circulation:  According to Avon’s access management guidelines, curb cuts are generally limited to one point of access. Please demonstrate how the second entry “required for necessity, create[s] a better site design and that safety to the traveling public will not be compromised.” ADC 7.28.030(d)(6). The curb cuts are separated by 70 feet. Ideally these curb cuts will be consolidated. In an effort to minimize curb cuts and provide a safer and more pedestrian-oriented experience along Beaver Creek Boulevard.  Demonstrate how Lot C is served with this access easement and agreement. The access ramp indicates a retaining wall on the west side; please show the details for this retaining wall and how it is finished.  The proposed parking ramp has a grade of 9.4%. Site distance could be limited approaching West Beaver Creek Boulevard (“WBCB”), particularly to see pedestrians and bicycles. The sloping driveway is required to have no more than a 4% slope for the first 20 feet from the edge of the street pavement. ADC 7.82.030(d)(9)(iii)  What is the suggested turning movements for delivery and service vehicles?  The current circulation schemes require hotel guests to drive out to WBCB after checking in, to access the ramp that connects with the lower level parking garage. Connecting to the ramp from underneath the building appears could be studied. 4. Mobility and Connectivity:  While there is a direct pedestrian connection from the Main Street Pedestrian Mall to the hotel entrance, a connection lacks from the WBCB side to the hotel entrance. Planning suggests a delineated material or striping connecting WBCB to the entrance, and widening the entrance near the Mall to allow for a more seamless pedestrian experience . ADC 7.28.040(e)(4).  Bicycle facilities at a rate of 1 bicycle parking space per 10 vehicles (21 total spaces required) be placed within 150’ from the primary building entrance in a conveniently located area. Please demonstrate compliance with this code requirement. ADC 7.28.020(J)  The north to south pedestrian connection along the reciprocal access easement is an extension of Sun Road. This corridor not only has the potential to create a desirable four way stop along Beaver Creek Boulevard but it also provides access form WBCB to the Main Street Pedestrian Mall. This is a critical co nnection identified in the Avon West Town Center Investment Plan and the draft WBCB Reconstruction Plan. The current plans do not show any pedestrian connection in this location. A safe attractive pedestrian corridor through this easement or a more intuitive connection through the parking lot should be explored. 5. Screening:  How is the refuse screened from view? ADC 7.28.060  Please show how any rooftop mechanical equipment will be screened from nearby taller buildings. ADC 7.28.060(d) 6. Snow Storage:  The sloping drive is shown to have snowmelt. What are the total dimensions of pavement heating for the project? The Exterior Energy Offset requirements will be triggered for area in excess of 200 square feet. Avon Municipal Code (AMC) 15.27  Please include a snow storage plan for areas that will not be snowmelted. 7. Parking Study:  This study appears to meet the requirements of 7.28.020(g)(4)(ii), which allows for parking demand studies that are based upon relevant data and combination of land uses between Lot 55, Avon Center, and Lot B. 3 | P a g e  Retail space in the hotel, while minimal, does not appear to be accounted for.  The analysis accounts for six (6) spaces in the street. The final plans for WBCB are forthcoming and these spaces should not be accounted for until plans are final. 8. Design Standards:  The corrugated metal material for roofs will need to be presented. Are there examples of this material in use in a similar way on other projects? There are maintenance, finish appearance, and aesthetic concerns as the material stretches all the way to ground level in certain points.  Material #12 is not shown on the plans. Please demonstrate where it is located.  Lighting – AMC 15.30 o Please confirm the plan indicates 2 poles (AA 1-3) on WBCB. o The bollards on the Mall must match existing bollards in the Mall. o Please confirm that the FF lighting housing is “full cutoff” per code.  The WBCB side of the building does not appear to be a pedestrian friendly scale or 4- sided design as the Development Code encourages. ADC 7.28.090(j)(4)  Please refer to the attached ‘Review of a Major Development Plan Submittal’ performed by Oz Architecture, dated August 8, 2016, for additional design comments to be taken into consideration when finalizing the plans. 1. Miscellaneous:  The number of hotel units is listed as 140, 141, and 142 in different places. Please provide the accurate number across documents.  Fire o An Initial Code Summary for fire will be necessary. o What is the movement for fire trucks? o If there is not truck access on the property is there a Fire Command Center? If so, where is it located? o What is the fire rating of the construction? o What type of glass is suggested for the two perpendicular faces of the exit stairs on the WBCB side? They must be 2-hr fire rated (1027.6 of fire code)  Mechanical o Where will the exhaust from laundry facilities be located? Will there be a diesel generator? Will these areas be forced to vent onto the Mall? o What types of mechanical units will be on the roof? o Will each room have its own AC unit, or will it be roof mounted? o Where is the roof access point and will it require a stair access or hatch? In order to address comments, and ensure that the public hearings can be accommodated in a timely manner, Staff offers the above following draft schedule for discussion and finalization. Given the substantive nature of some of the comments, we anticipate the need to reevaluate this schedule moving forward. DRAFT SCHEDULE: Revised Plans Deadline for September PZC August 22, 2016 Public Notification sent to Vail Daily August 31, 2016 PZC Hearing & Recommendation to Council September 6, 2016 TC Hearing #1 *September 13, 2016 TC Hearing #2 September 27, 2016 *If PZC continues hearing, these dates subject to change 4 | P a g e Respectfully, Matt Pielsticker, AICP Planning Director Att: Review of a Major Development Plan by OZ Architecture Cc: Project File 1 Review of a Major Development Plan Submittal for the project described as: AVON HOTEL Performed for: The Town of Avon Performed by: OZ Architecture, Inc. August 8, 2016 Architectural Concerns and Notations: This first section lays out the initial reactions and/or questions that the architectural team at OZ produced prior to the review of the Town’s planning, entitlement and design guideline documents. Many of these initial notions will reappear in the sections which follow this one and will be further explored in the review of those documents as they relate to the Avon Hotel submittal. Site Plan and Overall Development: o Of the approximately 290 ft. of Main Street Mall frontage available to this project, only around 88 ft. is actually, “occupied” or “reinforced” by the design and location of these buildings; o Retail is minimal along the Main Street Mall; Suggestions:  Add retail to the south of hotel entrance under the overhang currently comprising a single parking space – combine that with Retail #3 and the office space shown to create better sized retail space;  Add a sundries shop in south-east corner of Hotel Lobby area;  Add significant-sized retail (perhaps F&B) at the west, currently blank end of fitness/condo addition to the Avon Center building thus replacing the 5 parking spaces shown there in the proposed site plan; o The parking along the mall seems unsightly; Suggestions, in lieu of completely reorienting the buildings proposed for the site:  See the retail suggestion for the end of the fitness and condo building;  Remove all of parking spaces adjacent to the mall edge and replace with pedestrian-oriented construction and uses; o The Hotel building seems to stand on a hollowed-out floor (of parking), and is perched on stilts similar in concept to LA-styled Mid-century apartment buildings. The building does not fully cover the parking level below it at grade so that the perimeter cars are exposed to sight, sun and snow. The planning department would be hesitant to positively associate this form as a solution for building a “base at the ground level”. Issues of weather, snow shedding and blowing, automobile noise for hotel guests, or ground plane pedestrian activity are all concerns; o Cars will, therefore, be the predominant feature of the ground level experience on nearly all sides of the buildings; o Screening of the parking garage, ramp and loading will be paramount to the building sitting appropriately on its site and to it being pedestrian friendly; o We have concerns as to how the parking lighting will affect the mall and the site at night; o There seems to be zero internal landscape proposed (other than the perimeter landscaping which is required to fulfil a certain portion of the landscape requirement) 2 resulting in the impression that both buildings reside in a sea of pavement and that the hotel in fact, sprouts from the parking surface; o The trash chute appears to terminate at the basement level – is this where the dumpsters sit? We are concerned with where the dumpsters may be stored on a daily basis and how odors will be handled near the mall; o We would caution against opening the doors out of the secondary elevator vestibule so close to the traffic movement and snow management issues inherent in the drive (which, at the same location, passes under the connecting bridge above these doors). Building Mass and Form o Neither of the two buildings seems to be, “fronting” the mall. Rather, the massing of the development is arranged perpendicular to Main Street.; o We have concerns as to the method of roof access and what that structure will look like in elevation; o The metal shards of sloping roof seem to shed onto the outdoor dining deck and the sidewalk on West Beaver Creek Boulevard (WBC); o Elevation B on Sheet A-3.1 does not adequately reflect the building design at the ground floor. Materials and Colors Proposed o Given the last point above, we have concerns with the distribution of materials at this key location and how they relate to the Main Street Mall and the Sheraton property. o The materials used at the base of the buildings may not uphold the requirement for durability listed elsewhere in this analysis; o The metal shards roofing turning into siding does not seem to uphold the notion of, “blending in with their surroundings” found elsewhere in this analysis; o This material will need to be non-reflective but even with that, the material selection does not seem to meet the Development Code Standards for earth-toned materials; o The glazing of the exit stair enclosures may not, depending on the construction type chosen, meet the code for separation of those stairs from the fuel source of a fire; o The material selection seems to warrant a full sized wall mock-up so as to determine its suitability of aesthetics and durability-in-performance and given the published design guidelines of the town. Technical Issues o We have concerns with the locations of the mechanical equipment and where the ground mounted transformers for the project might be and how they are screened from the Sheraton and others near and on the site; o We have concerns as to the method by which the kitchen exhaust and trash smells will be handled at the 2nd Floor food preparation and trash storage areas given their proximity to the Main Street Mall and the pedestrian connection to the Sheraton; o The condominium/fitness building does not appear to have any means of handling trash and recycling. Is this why the buildings are connected by a bridge? o Similarly, there is no indication of mechanical systems and the inherent exhaust associated with them for the condo structure; 3 o We have concerns as to the clear height under the connection bridge between the two structures. From some of the information given, it appears to be less than what is needed for truck and fire apparatus clearances. Avon Development Code (Title 7, with Appendix 7A) Observations: 7.28.060 (e)(3 “Service areas and access drives shall be located so they do not interfere with the normal activities of building occupants or visitors on driveways, walkways, in parking areas or at entries”. We have concerns with the application of the above section. In addition and from the same section, Paragraph 2 states that loading and service areas need to be screened from being visible off site. From WBCB, the loading will be clearly seen by pedestrians in its current configuration; Materials and Colors Proposed Section 7.28.090 – Design Standards The examples and issues discussed in these sections begin with generally-applicable design standards and gradually move into those more specific to mixed use buildings and finally to those that apply to this type of building within Avon’s Town Core. (c)(3)(i): “The use of high quality, durable building materials is required.” The materials proposed for use at grade appear to be a foreign-made integrally-colored cement composite panel in a cool grey color. The quality and appropriateness of the use of this material in Avon is of concern. (c)(3)(II) “Preferred materials reflect the Town’s sub-alpine character such as native stone, wood siding, masonry or timbers.” None of the preferred materials from this section are to be found in the proposed development. (c)(3)(v) “Indigenous natural or earth tones . . . in muted, flat colors with an LRV (Light Reflective Value) of 60 or less are required.” No reflectivity information for the metal shards described as, “Metal Roof Siding Silver Grey” was provided. However, (b)(4)(iii) further states that, “roofing materials shall be suitable for local environmental conditions. Colors shall be natural or earth tones.” Besides a huge flat and therefore unseen roof, the metal is the only presumed roof material suggested. (c)(5)(i)(A) Generally suggests that pedestrians should be protected from shedding snow coming off of roofs above. As stated earlier, the dining deck at the second level of the hotel building, which looks out over Main Street, appears to be unprotected against the snow coming off of the metal shard roof above. 4 Paragraph (C) repeats these requirements saying that roof designs which would allow accumulated snow, ice or rain to fall or slide onto sidewalks or other pedestrian building spaces should be avoided. Building Mass and Form (j)(3)(I)(A) “Buildings shall reinforce the street edges and create pedestrian-scaled open spaces.” Given that this development is listed as one of the town’s top priorities, we are concerned about the WBCB side of the project. (j)(3)(iv) “Mixed-use development shall incorporate on-site indoor and outdoor common spaces . . .” The section then goes on to describe the various types of patios, plazas, parks, squares, gardens, etc. which might satisfy the objective of the statement. Except for the, “multi-use lawn area (1636 s.f.)” near Lettuce Shed Plaza, there are no other common spaces on the site. This lawn area, may also detract from the Plaza by blurring its edges. The section concludes with this statement, “New development in Town Core shall maintain a high interaction between pedestrians and the activities inside the buildings at ground level.” Auto traffic is primarily accommodated on this site plan and very little interaction between inside and outside is to be found in the plan. (j)(4)(iii) Compatible Design (B) This section lists methods that might lead to an acceptable compatibility of design, presumably not only within the specific site development but also along the pedestrian mall and Town Center generally. While it declares that these features are not limited to the list of 12 architectural elements, the only one included in the design is the outdoor patio which appears at the second level, reserved for the hotel guest. (j)(4)(iv) Mixed-Use Buildings in Town Core “ . . . any portion of a new mixed-use building with street frontage floor area (lists the streets surrounding, for the most part, this development except for WBCB) must be occupied by retail, personal service and restaurant uses . . .” This project has slightly more than 530 s.f. of retail at its mall end, has a private pool, fitness and spa facility above grade in the addition to the Avon Center and, for the remainder of its ground level square footage, has an exposed parking space. NOTE: this section also requires, “ground-floor commercial space . . . be at least twelve (12) feet in height as measured from the finished floor elevation to the finished ceiling.” The section drawings indicate that the hotel and condo buildings all have a 12 foot floor-to-floor dimension that will yield something between 10’ to 10’-6” of floor to ceiling space. Therefore the design should be revised with the addition of 1’-6” to 2’ of floor to floor height at its ground floor so as to garner the required 12 foot clear height for commercial space. In addition to being a requirement, we would suggest that a clear height of 12 ft. is much more in keeping with industry standard for extra height at the ground floors of contemporary hotels. The extra height obviously provides a clearer “base” level, garners much needed light and visibility for the uses there, and generally speaks to the civic nature of the front of houses areas that hotels are often expected to provide. 5 (j)(4)(v)(B) Scale and Massing “Buildings greater than two stories or thirty (30) feet in height shall be designed to reduce apparent mass and visually anchor the building to the site by including a clearly identifiable base, body and top, with horizontal elements separating these components.” With a parking structure comprising the dominant amount of the “base” area of this building, and thus having only columns or pilotis and open air as its base, the building does not seem to present the stable ground plane this section suggests. Also, with the predominantly flat roof and no cornice or overhangs at the sky plane, the top of this building has no clear distinction from the, “body”. The building appears simplistic therefore, but for the metal shard roof turning into wall notion that appears in a few select areas. (j)(4)(viii)(C) Synthetic Materials “The use of synthetic materials is discouraged unless they can be shown to display the ability to age in a manner similar to or superior to the natural materials they replace.” While it is uncertain whether or not the materials selected for the project were meant to, “replace” natural versions, this development is made up of nearly 100% synthetic replicas of wood, stone panels and plaster. (j)(4)(x)(C) Windows “Upper floors shall be differentiated through the use of more solid areas than voids and with smaller vertically oriented windows in a regular pattern.” The fenestration strategy for this development appears to employ predominantly horizontally oriented windows (divided internally with some vertical muntins), modernist, slit-type or eyebrow windows at the exit stairs and curtain wall- like glazing behind the metal shard wall material at the Main Street and WBCB elevations. Development Code standards for parking-only structures warrant inclusion due to the separation of uses between the “base” and “body” of this building. (j)(5) Parking structures: (i) “To the maximum extent feasible, (the) ground floor of parking structures shall be wrapped with retail storefronts or residential uses to provide visual interest and to create pedestrian activity at the street level.” (v) “To the maximum extent feasible, parking structures shall be designed to significantly screen or buffer views of parked cars from surrounding properties through the use of architectural screens or other features.” October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 1 Staff Report – Major PUD Amendment October 4, 2016 Planning & Zoning Commission Meeting Project File Case #PUD1600 Legal description Lot 3, Block 3, Benchmark at Beaver Creek Zoning PUD Address 1060 West Beaver Creek Boulevard Owner Prepared By David McWilliams, Town Planner Introduction Carryn Burton (the Applicant) is requesting a Planned Unit Development (PUD) Amendment (the Application) to include a Flexible Lodging use for the Westgate Office and Retail Building at Lot 3, Block 2, Benchmark at Beaver Creek (the Property). The building is 15,250 SF on approximately 1 acre, and houses six businesses on two levels. The Applicant is requesting to amend the zoning thereby allowing the opening of the CoHabit LLC hostel at the Property. Process Major PUD Amendment Process According the Avon Development Code, the proposed PUD amendment is considered major because it will change the character of the development. This application is processed under §7.16.060(h), Amendments to a Final PUD, AMC. Subsection (1)(iv), sets forth criteria for a Major Amendment, while subsection (2)(iv) sets forth the review procedures for the same process. Public Notification In compliance with the Public Hearing and noticing requirements, a mailed notice was provided to all property owners within 300’ of the property. Additionally, a notice was published in the Vail Daily newspaper on Friday, September 23, 2016. Public Hearings The October 4, 2016 Public Hearing will determine a recommendation from PZC to Town Council for the proposal. Town Council will make the final decision on this Application after holding one more Public Hearing and issue an ordinance at that time. The Town Council hearing is tentatively scheduled for October 11, 2016. The Major PUD Amendment process requires a Preliminary PUD and Final PUD Public Hearing Process, with approval by Ordinance after Final PUD Hearings. Proposed PUD Amendment The Property is currently developed as a commercial site, zoned PUD. The current PUD allows the following uses: Retail Stores; Professional Offices; Personal Service Shops; Restaurants. The Applicant seeks to buy second floor units within the building and add the hostel use to the list of allowed uses within the Property. The fifth permitted use in the PUD is proposed to read as follows: “Flexible Lodging on the second floor, defined as a continuously staffed overnight lodging facility for transient guests that provides sleeping rooms and common areas for cooking.” This change would accommodate the potential opening of a hostel for units 203-208 on the second floor of the building. The total footprint of the proposed hostel use is 3,514 sf and would contain accommodations for 32 people, according to the proposed floor plan. October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 2 Staff Analysis The proposed development scenario is unquestionably impactful to neighboring businesses on the Property. The Applicant has contacted neighboring businesses and the HOA in an attempt to address any potential concerns. Of particular concern is parking. Current parking conforms to AMC 7.24.020 (C), with a variance for the restaurant space (currently occupied by Agave) for increased night allowances. No matter what direction this Application takes, the HOA will likely need to enact some type of parking management strategy due to Beaver Creek paid parking regulations taking effect in November. PUD Review Criteria Pursuant to §7.16.060(e)(4) , Review Criteria, AMC, the PZC shall consider the following criteria when forming the basis of a recommendation: (i) The PUD addresses a unique situation, confers a substantial benefit to the Town, and/or incorporates creative site design such that it achieves the purposes of this Development Code and represents an improvement in quality over what could have been accomplished through strict application of the otherwise applicable district or development standards. Such improvements in quality may include, but are not limited to: improvements in open space provision and access; environmental protection; tree/vegetation preservation; efficient provision of streets, roads, and other utilities and services; or increased choice of living and housing environments. Staff Response: The stated purposes of §7.04, Development Code, AMC, and §7.16.060, PUD, AMC, includes statements regarding the implementation of the Comprehensive Plan; regulating intensity of use; avoiding increased demands on public services and facilities; and providing for compatibility with the surrounding area, among other statements. This Application addresses the long term vacancy within the Westgate Office and Retail Building, which confers a unique situation for the proposed hostel location. The units have been unoccupied for upwards of 5 years, and the owners have been unable to fill the space with viable tenants. This space’s location has presented a unique constraint to the owner due to its relative isolation from other commercial properties which limits the potential occupancy and necessitates innovative solutions to fill it. Regionally, office and commercial spaces “up valley” are pressured for conversion to accommodate visitors and residents in a variety of ways. The combination of the ongoing vacancy and these redevelopment pressures make this site ideal for the proposed PUD amendment. The proposed PUD amendment represents an improvement in the choice of accommodation environments in the Town. It promotes development within town that can be conveniently, effectively, and economically served by existing utilities and services. The resort-focused nature of the use fits well with the property’s location across the street from the Bear Lots. Existing roadways and services, including bus lines and access to resort amenities are efficiently employed in this development scenario. (ii) The PUD rezoning will promote the public health, safety, and general welfare; Staff Response: The Application’s proposed use generally promotes the public health, safety and welfare over that of the existing PUD by pivoting the Property to a mixed-use profile, thereby increasing pedestrian-scale development in the area. The “park once shop many” strategy promoted in many projects in the nearby Town Center can have a logical extension in the River Residential District (Avon Comprehensive Plan) due to the location near Beaver Creek. The site is served by two Town bus routes and by the ECO Bus route, further enhancing the connectivity options in the area. October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 3 However, staff also finds that the proposed density and parking constraints may not promote the general welfare. Section vi, below, expands on the parking analysis. Staff recommends that a viable and agreed-upon parking management plan be provided between the HOA and the Applicant as a condition of approval, to ensure acceptable solutions on the limited parking availability. (iii) The PUD rezoning is consistent with the Avon Comprehensive Plan, the purposes of this Development Code, and the eligibility criteria outlined in §7.16.060(b); Staff Response: The proposed PUD amendment is part of an established PUD, and is therefore not subject to the eligibility criteria or Public Benefit requirements outlined in §7.16.060(b). However, it is important to note that the original PUD was rezoned from Residential High Density Commercial, a now retired district, which was intended, “to provide for the development of multi-family residential uses and lodge units, along with accessory and complementary commercial uses. Townhomes, apartments, hotels and lodges, bed and breakfast lodges and retail (within lodge or hotel) uses are allowed within this district. RH-C should be located near the Town Center or along an arterial roadway.” Analysis of consistency with the Comprehensive Plan is provided below. Avon’s vision is “to provide a high quality of life, today and in the future, for a diversity of people and interests; and to promote their ability to live, work, visit, and recreate in the community.” The proposed facility furthers this vision by providing a new niche that satisfies different types of vacationers. Avon’s distinction as a tourist destination is enhanced by the new diversification. This vision is further reflected in the goals section, where Goal C.1 seeks to “Provide a balance of land uses that offers a range of housing options, diverse commercial and employment opportunities, inviting guest accommodations, and high quality civic and recreational facilities, working in concert to strengthen Avon’s identity as both a year-round residential community and as a commercial, tourism and economic center.” Goal E.1 seeks to “Ensure that there is a positive environment for small businesses.” While the PUD amendment would not guarantee local ownership or operation of the business that may result, the current applicants are Eagle Valley locals with different investment interests in the area. This property lies within District 20: River Residential District, within the Comprehensive Plan, however none of the planning principals apply to this rezoning. The future land use map (Pg. 27) indicates that this property shall be Neighborhood Commercial, where “these areas are intended to provide neighborhood- focused retail and service uses (such as markets, childcare, restaurants, and cafes) that are conveniently located near and connected with surrounding residential neighborhoods.” While the proposed use does not fall into that distinction, the property sits at an important crossroads between town, resort, and highway, leading to an appropriate space to stretch the Neighborhood Commercial ideal. (iv) Facilities and services (including roads and transportation, water, gas, electric, police and fire protection, and sewage and waste disposal, as applicable) will be available to serve the subject property while maintaining adequate levels of service to existing development; Staff Response: This PUD amendment does not change the current demand of public facilities and services, therefore the existing services can adequately serve the property. Also, the proposed use October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 4 may offset some demand in the short term rental market, thereby allowing for more traditional residential space to remain open to yearlong or seasonal rental. (v) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse impacts upon the natural environment, including air, water, noise, storm water management, wildlife, and vegetation, or such impacts will be substantially mitigated; Staff Response: No adverse environmental impacts are anticipated due to the PUD rezoning. Concerns of other businesses in the property over outdoor smoking spaces will need to be addressed due to proximity of the current smoking area to outdoor seating at Agave. Avon Municipal Code requires outdoor smoking to be at least 25 feet from doorways. Staff is also concerned over previously acceptable noise, smoke, and other potential nuisances produced during Agave’s concert nights. Sleeping arrangements very close to a concert venue may cause future hostel owners to file complaints and pursue other avenues to set more stringent quiet hours, or otherwise limit Agave’s current functionality. (vi) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse impacts upon other property in the vicinity of the subject tract; and Staff Response: Approval of this PUD amendment will inevitably result in more pressure on the property and necessitate mitigation. Staff’s analysis focuses on the impacts found within the Development Code, and the proposed mitigation. Possible impacts are listed below. Parking: No hostel minimum parking standards exist in the Town Code. To analyze a potentially feasible parking standard for this proposal, staff used the minimum parking standard for the potential space (3,514 SF of office space * 3 spaces per 1000 GFA = 9.597, rounded to 10). An alternative method for parking allocation takes the total square footage of the building tenants (15,250) and allocates each tenant their share of 53 spaces. The proposed hostel space represents 23% of the total square footage of the building, or a 12 space share of the lot. Staff allotted the private room space according to applicable standards within the AMC, and researched current best practices allocating parking for dorm-style accommodations. For private hotel rooms, AMC requires one (1) parking space per room. The proposed use contains six (6) private rooms, resulting in six (6) required spaces. For the dorm-style accommodation, staff found examples from other municipal guidelines and regulations of hostel uses: Portland, ME, one (1) space per eight (8) beds; Savannah, GA, one (1) space per eight (8) beds and one (1) space per two (2) employees; Boulder, CO, two (2) spaces per three (3) guests; Carbondale, CO, two (2) spaces per three (3) guests. By these standards, several potential parking regimes present themselves. Proposal Number Use Regulation Required Spaces (rounded up) 1 AMC + Dorm at 1:8 6 + 2 = 8 2 AMC + Dorm at 2:3 6 + 10 = 16 3 Complete Hostel at 1:8 4 (+ employee parking) 4 Complete Hostel at 2:3 22 October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 5 The proposed hostel also contains a dorm style room with 14 beds. Staff takes a moderate tact and proposes a minimum parking standard to be one (1) space per private room and two (2) spaces per every three (3) occupants within the dorm room, found in proposal number 3. The 16 required spaces can be reduced due to the potential mixed-use nature of the building by 15% per AMC 7.28.020(g)(2)(ii) for a total of 14 spaces. The total required spaces for this proposed use are more than the spaces allocated for these units. In order to satisfy the 10 space minimum standard under the, a maximum of 8 beds would be allowed in the dorm room. 10 spaces allocated is regulated at [(6 spaces for single occupancy with 15% reduction = 5.1 spaces) + (8 beds at 2/3 capacity and 15% reduction = 4.53 spaces)]. A parking variance was issued to the commercial restaurant space, currently occupied by Agave, which limited daytime seating to 900 SF, occupying 15 spaces, and allowed the restaurant to expand to 1,860 total SF and 31 allocated spaces at night. This allowed a higher use on the property due to complimenting hours of operation between the restaurant and the neighboring businesses. This arrangement has been largely effective over the past 20 years and has been flexibly applied according to changing uses of the restaurant to a night club venue. With the potential to designate 10 or more spaces to the hostel use, the variance could still be honored due to the size of the lot, and the reduction in use from other businesses after 5 pm. The Applicant proposes reestablishing a “parking pass” system, with assigned and posted spaces for each business. The declaration allocated 14 “parking passes” to the former Telcor space (the space now proposed as a hostel), allowing service trucks and employees full access to the site during business hours. The Applicant further proposes that guest cars will be periodically relocated during snow events, and guests will face booting or towing after their temporary permits have expired. This potential agreement would be subject to approval by the HOA and would satisfy the 14 space requirement outlined by Staff for full occupancy. Increased Nuisance: Currently owners have a problem with trespass/ inappropriate use of common areas of building. During concert nights, Agave has sometimes had difficulty fully monitoring the activities of guests, and the site has been subject to different criminal and otherwise inappropriate behavior. The new use may increase or decrease these nuisance problems, but the speculative increase does not amount to a “significant adverse impact”. Potential hostel owners or operators would have a duty to limit access to common areas at certain times, or limit inappropriate behavior by guests, just as the other uses currently have. Insurance: With a new use permitting overnight use of the building, there is a possibility of increased insurance premiums. The Westgate Covenant states that, “nothing shall be done or kept in any Unit or in or on the Common Elements, or any part thereof, which would result in the cancellation of the insurance on all or any part of the Project or in an increase in the rate of the insurance on all or any part of the Project over what the Association, but for such activity, would pay, without the prior written approval of the Association.” New use may increase insurance fees, and it would be the duty of the HOA to determine equitable compensation due to the changes. Necessary building upgrades: The change in use may require building additional fire barriers, etc. between existing units. The burden to neighboring business owners may be construction crews, building materials, etc. in their place of business for periods of time. The applicant states commitment to limiting construction impacts on neighbors, and does not anticipate the need to October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 6 access the lower floor or to change the concrete floor. With approval, the Applicant anticipates building modifications to take place with minimal impacts. Suggested Negotiations: In researching this case, staff encountered use conditions enacted by local governments that have successfully limited various impacts. In this case, due to the PUD nature, some of these regulations would be more successfully implemented by the HOA. Potential provisions include:  Cession of bookings when the allocated parking is filled for the hostel;  A fine by the HOA of $50 to the hostel owners if a hostel guest’s vehicle is towed/ booted;  A “guest responsibility” contract, signed during check-in, alerting guests of the unique constraints of the Property, and potential consequences to the guest and hostel owner for infractions. (vii) Future uses on the subject tract will be compatible in scale with uses or potential future uses on other properties in the vicinity of the subject tract. Staff Response: The scale of uses will be compatible with nearby properties. Surrounding high density residential development is allowed to have short term rentals by way of the Short Term Rental Overlay District, and this property will be compatible with surrounding uses. Limitation of the PUD amendment to the second floor of the building provides for adequate flexibility of this use in the future, but maintains the property’s functionality as a Neighborhood Commercial asset. Furthermore, while not planned at this point, the possibility of development at the Beaver Creek parking lots would likely compliment this proposed use as well. Staff Recommendation Staff is recommending conditional approval of the Application. The PZC shall conduct a Public Hearing, consider public comments, and approve Findings of Fact, Record of Decision, and Recommendation to Council pursuant to Section 7.16.020(f)(3), Findings. Recommended Motion: “I move to recommend approval of Case #PUD16004, an application for a Major PUD Amendment (Preliminary) for Lot 3, Block 3, Benchmark at Beaver Creek Subdivision together with the findings of fact noted in Staff’s report” The following Findings may be applied should PZC make a favorable recommendation to Council: 1. The Application meets the eligibility requirements for a Major PUD Amendment by increasing density. 2. The PUD Amendment does not severely change the character of the development. 3. The PUD Amendment generally promotes the public health, safety and welfare over that of the existing development rights by expanding lodging opportunities in close proximity to Beaver Creek Resort operations 4. The Application is in conformance with §7.16.060(e)(4), Review Criteria, AMC, and compared to the underlying zoning, the PUD Amendment is not likely to result in significant adverse impacts upon the natural environment or neighboring properties. The following Conditions may be applied to Preliminary PUD Amendment should PZC make a favorable recommendation to Council: October 4, 2016 PZC Meeting – 1060 Beaver Creek Boulevard PUD Amendment 7 1. Limit the dorm room to no more than 8 beds, or determine a long term off street parking plan with the Westgate HOA, or another offsite area, that conforms to the 2/3 spaces per occupant requirement. 2. Staff member shall be present on premise 24/7 when hostel is booked. 3. No unaccompanied minors allowed. 4. Prior to Final PUD approval, a viable and agreed-upon parking management plan will be provided between the HOA and the Applicant as a condition of approval, to ensure acceptable solutions on the limited parking availability. Attachment A: Application Documents Adjacent Propertys Notified Expanded Parking proposal There are currently 54 parking spaces in the Westgate Lot, 2 of which are handicap assigned. Of the remaining 52 spaces, 30 spaces are designated in the Declaration as “assigned” or “passes”. This assignment is allocated to units according to square footage. Up until now, parking has not been assigned, but rather operated on a cooperative first -come first-serve basis. With the parking challenges facing Westgate this winter season, we propose assigning these 30 spaces to the respective owners: Parking passes are assigned as follows: Liquor store: 1 Fly fishing: 2 Ivy nails: 1 Real Estate: 4 Agave: 3 Bright Futures: 4 Unit 2A: 1 Cohabit: 14 Totaling: 30 These assigned spaces should each be marked by metal posts stating the restricted use by individual businesses and warning violators of potential booting. Additionally, these bays will require a parking tag to be hung from the vehicles mirror, or a permanent sticker if th e owner prefers. In the case of COhabit, we will issue a parking tag for customers to use the assigned bays. The tag will have the date of check-in and date and time of check-out. Any car in an assigned space without the tag or parked after check out time can be towed or booted. COhabit requests that all 14 bays be clearly marked and assigned to our business. Tags will be provided to guests at check in with an official stamped date and time. Each business owner can determine how best to utilize their assigned bays, whether issuing permanent tags/stickers to employees or using bays for customers. For example, Agave will receive 3 assigned bays, as well as 3 permanent stickers/tags for those bays. Richard can choose to use them for the restaurant shuttles, employees or customers. The remaining 22 bays will be contributed to a pool for communal use and be available to Westgate customers for short-term parking. In the unlikely event a customer of any business will be occupying a communal bay for more than 2 hours, the business can provide its customer with an extended period day pass tag. The use of tags in conjunction with assigned bays, allows Westgate to effectively manage and police their parking lot. A booting company needs to be contracted to enforce the parking rules. The tags and business bays will assist the booting company to patrol the lot effectively and immediately identify violators. With 30 bays accounted for, 22 spaces remain for late night customer parking to meet the requirements of Agave’s parking variance. Agave needs an additional 28 bays to operate at full capacity. (31 less the 3 permanent assigned bays). Bays assigned for office units can be designated as such, allowing free use after business hours, 5 or 6 pm. This will provide an additional 8-10 spaces for after-hour use by Agave customers. Thereby meeting the variance. Snow removal Snow removal will be challenge in a fully occupied lot. COhabit will have set hours when our assigned bays will be vacant. Customers will be required to vacate their parking bays at check out. This will allow snow ploughs to operate without restriction between check in and check out times. In the cases of multi-day stays by guests, COhabit will work with customers to move vehicles. COhabit will identify cars expected to be parked in bays for more than 1 day. Our 24 hour staff will assist guests in these situations. After heavy snow fall, guests will be asked to move their vehicles for snow removal. Alternatively, guests will be able to leave vehicle keys with the front desk and staff will move their cars to facilitate snow removal. With only 6 private rooms and 7 bunks, close interaction and customer service for our customers will not be challenge. Snow removal can be scheduled for the same time each day, our recommendation is 3 pm, an hour before check in. Overnight Parking Currently overnight parking is not permitted. However, the Declaration also makes reference to ‘working in good faith’. “No overnight parking is allowed. Any change in this policy will require the Association to work in good faith with the Owners and tenants in order to determine which parking management strategy accomplishes the best use of the parking area.” Considering overnight parking is being allowed in certain circumstances, the same courtesy should be extended to all owners for their assigned bays. Overnight parking is a necessary part of several business’ operations. COhabit asks that the board allow overnight parking in our 14 assigned spaces. Similarly, any business should be allowed to use their assigned parking spaces overnight if they so wish. Long term solutions Westgate HOA and unit owners have discussed the possibility of reconfiguring the current lot to create additional parking bays. Currently the lot space is not being maximized. By angling parking spaces and eliminating the island, more parking bays can be added. COhabit is committed to working with the HOA to facilitate these changes. The time and cost associated with these changes will be minimal. TOWN APPLICANT RESPONSE ZONING 1. The plans indicate 9,549 square feet of landscaped area on site (14.2% of lot area), and 6,631 square feet off-site, bringing the total landscaped area to 24.17% of lot area. The code requires a minimum of 20% on-site landscaped area; therefore, the Town Council must authorize using adjacent public land on Tract G to meet minimum standards. ADC Table 7-20-9 The percent of landscaping required per town zoning is 20% of the total site area. This would equate to 13,385 sf of the total site area of 66,925 sf. Currently, the plan includes on-site landscaped area of 11,102sf of the total lot area of 66,925sf, equal to 16.6% of the lot area. The applicant has submitted an AEC application which proposes to landscape an additional 4,372sf of adjacent property, including 3,230sf of Tract G (Pedestrian Mall), 739sf of Lot 4, and 403sf of frontage along West Beaver Creek Boulevard adjacent to Lot B. This additional landscaped area would increase the total landscaped area for the project to 21.7%. 2. Please demonstrate the total square footage of the building coverage within the lot to meet lot coverage requirements. See attached Landscape Area Calculations freferencve rreference. Site coverage per the plans is 36% 3. The plans must demonstrate compliance with 80’ building height. Please show the roof plan with USGS existing contours underneath the building. See attached Roof Plan for reference. The height of the building is less than the 80’ building height maximum. ALTERNATIVE EQUIVALENT COMPLIANCE (AEC) 1. The code requires a 4:12 pitched roof. Since the design utilizes a flat roof for the primary form. ADC 7.28.090(j)(4)(ix) Consistent with ADC7.28.090(j)(4)(ix), sloped secondary roof forms in the plan are at 4:12 in slope. The flat roof form remains predominant in the plan. We understand that it is discouraged; however, it is utilized in the plan as it is beneficial to other important considerations such as the inclusion of solar panels and reduced ice/snow shed. It is also consistent with neighboring properties. TOWN APPLICANT RESPONSE 2. Buildings greater than thirty (30) feet in height shall be designed to reduce apparent mass and visually anchor the building to the site by including a clearly identifiable base, body and top, with horizontal elements separating these components.” ADC 7.28.090(j)(4)(v)(B) Pursuant to ADC 7.28.090(j)(4)(v)(B), the design has been modified to include architectural elements that clearly define the base, body, and top of the building. These include elements such as distinct color/texture, varied materials, and the addition identifiable architectural treatments. 3. After 45’ of vertical rise, buildings are required to have a step back of at least 8’. ADC 7.28.090(j)(4)(v)(D) AEC Application is included as part of development application ACCESS AND CIRCULATION 1. According to Avon’s access management guidelines, curb cuts are generally limited to one point of access. Please demonstrate how the second entry “required for necessity, create[s] a better site design and that safety to the traveling public will not be compromised.” ADC 7.28.030(d)(6). The curb cuts are separated by 70 feet. Ideally these curb cuts will be consolidated. The project plan has been modified to include one curb cut. TOWN APPLICANT RESPONSE 2. Demonstrate how Lot C is served with this access easement and agreement. The access ramp indicates a retaining wall on the west side. Please show details for this retaining wall and how it is finished. Lot C will utilize the access drive to enter the lot from the south-east side. The plan includes a landing 20 feet from the street entrance. This will serve as the grade level entrance to Lot C. Lot C has indicated that future plans will not include an underground garage. Therefore it is not expected that Lot C will use the lower end of the access ramp. 3. The proposed parking ramp has a grade of 9.4%. Site distance could be limited approaching West beaver Creek Blvd, particularly to see pedestrians and bicycles. The sloping driveway is required to have no more than a 4% slope for the first 20 feet from the edge of the street pavement. ADC 7.28.030(d)(9)(iii) The plan has been modified to include one entrance at the shared access across from Sun Rd. The ramp slope has been modified and will be further defined as plans for the design of WBCB are finalized. 4. What is the suggested turning movements for delivery and service vehicles? Service vehicles can be accommodated per the included vehicle movement plan. Service vehicles will turn into the entry drive from WBCB and proceed to the first landing. At the landing, vehicles will turn left into the upper parking entrance. They will then back out into the access drive and back down to the service area. Vehicles will depart directly up the ramp to WBCB. TOWN APPLICANT RESPONSE 5. The current circulation schemes require hotel guests to drive out to WBCB after checking in, to access the ramp that connects with the lower level parking garage. Connecting to the ramp from underneath the building appears could be studied. Plan has been modified to eliminate this circulation scheme. MOBILITY AND CONNECTIVITY 1. While there is a direct pedestrian connection from the Main Street Pedestrian Mall to the hotel entrance, a connection lacks from the WBCB side to the hotel entrance. Planning suggests a delineated material or striping connecting WBCB to the entrance, and widening the entrance near the Mall to allow for a more seamless pedestrian experience. ADC 7.28.040(e)(4). A 6’-0” accessible pedestrian walkway is being provided along the shared access easement on the north-west side of the lot. Use of different paving material, lighting, and landscape will be provided to delineate walk way. 2. Bicycle facilities at a rate of 1 bicycl e parking space per 10 vehicles (21 total spaces required) be placed within 150’ from the primary building entrance in a conveniently located area. Please demonstrate compliance with this code requirement. ADC 7.28.020(J) 21 Bicycle parking spaces have been provided on both grade level and lower level parking. TOWN APPLICANT RESPONSE 3. The north to south pedestrian connection along the reciprocal access easement is an extension of Sun Road. This corridor not only has the potential to create a desirable four way stop along Beaver Creek Boulevard but it also provides access form WBCB to the Main Street Pedestrian Mall. This is a critical connection identified in the Avon West Town Center Investment Plan and the draft WBCB Reconstruction Plan. The current plans do not show any pedestrian connection in this location. A safe attractive pedestrian corridor through this easement or a more intuitive connection through the parking lot should be explored. A 6’-0” accessible pedestrian walkway is being provided along the shared access easement on the north-west side of the lot. Use of different paving material, lighting, and landscape will be provided to delineate walk way. SCREENING 1. How is the refuse screened from view? ADC 7.28.060 The refuse and recycling area is located below grade level on the north-west side of the lot. In this location, it is not visible from WBCB or adjacent property owners. 2. Please show how any rooftop mechanical equipment will be screened from nearby taller buildings. ADC 7.28.060(d) Rooftop mechanical equipment will be screened per the plan utilizing sloped roof elements that are integral to the design. These sloped roof elements are at least as high as the mechanical equipment being screened. SNOW STORAGE 1. The sloping drive is shown to have snowmelt. What are the total dimensions of pavement heating for the project? The Exterior Energy Offset requirements will be triggered for area in excess of 200 square feet. Avon Municipal Code (AMC) 15.27 The plan includes 31,813 sf snow melt area. Per the Exterior Energy Offset program, the project includes renewable energy systems that will be installed on- site prior to completion of the project which will generate the equivalent of at least 50% of the energy needed for the exterior energy use. Energy use includes snowmelt, outdoor pool, and hot tub facilities. TOWN APPLICANT RESPONSE 2. Please include a snow storage plan for areas that will not be snow melted. No snow storage is provided on the property as all exterior areas will utilize snowmelt. PARKING STUDY 1. This study appears to meet the requirements of 7.28.020(g)(4)(ii), which allows for parking demand studies that are based upon relevant data and combination of land uses between Lot 55, Avon Center, and Lot B. The study has been updated to include parking for included retail space. 2. Retail space in the hotel, while minimal, does not appear to be accounted for. 3. The analysis accounts for six (6) spaces in the street. The final plans for WBCB are forthcoming and these spaces should not be accounted for until plans are final. DESIGN STANDARDS 1. The corrugated metal material for roofs will need to be presented. Are there examples of this material in use in a similar way on other projects? There are maintenance, finish appearance, and aesthetic concerns as the material stretches all the way to ground level in certain points The standing seam roofs are used throughout the Colorado mountain area. The plan does not use corrugated metal. The use of this material is to provide durable, long lasting roofing as well as to provide flexibility to be able to provide screening of any roof equipment. 2. Material #12 is not shown on the plans. Please demonstrate where it is located. The concrete panel noted as material #12 will be used as an accent color within the swisspearl panels on the lower level TOWN APPLICANT RESPONSE 3. Lighting – AMC 15.30 - Please confirm the plan indicates 2 poles (AA 1-3) on WBCB. - The bollards on the Mall must match existing bollards in the Mall. - Please confirm that the FF lighting housing is “full cutoff” per code. 2 light pole have been added to WBCB Bollards will be provided on the mall to match existing. 4. The WBCB side of the building does not appear to be a pedestrian friendly scale or 4-sided design as the Development Code encourages. ADC 7.28.090(j)(4 The plan has been modified as follows: 1) Balconies have been added to WBCB side of building. These balconies will serve to connect guests in the hotel to WBCB; 2) the ground level frontage on WBCB includes landscaping elements that encourage public gathering and interaction with the project area; and 3) the entrance to the accessible pedestrian walkway that connects WBCB to the pedestrian mall is integrated with the WBCB end of the building. 5. Please refer to the attached ‘Review of a Major Development Plan Submittal’ performed by Oz Architecture, dated August 8, 2016, for additional design comments to be taken into consideration when finalizing the plans. MISC. 1. The number of hotel units is listed as 140, 141, and 142 in different places. Please provide the accurate number across documents. 142 2. Fire - An Initial Code Summary for fire will be necessary. - What is the movement for fire trucks? - If there is not truck access on the property is there a Fire Command Center? If so, where is it located? NEED TO INCLUDE. - What is the fire rating of the construction?  Fire access will be off WBCB with use of Fire Access Entry  A fire command control will also be provided at WBCB exit stair. See attached 11x17 exhibit.  The hotel will be Type I construction on 1st level + type V construction on the 4 floors built on concrete base TOWN APPLICANT RESPONSE - What type of glass is suggested for the two perpendicular faces of the exit stairs on the WBCB side? They must be 2-hr fire rated (1027.6 of fire code)  The exit stairs @ WBCB are exterior stairs with a glass facade  The 2 hour rating will be between the guest room and corridor into the exterior exit stairs. 3. Mechanical - Where will the exhaust from laundry facilities be located? Will there be a diesel generator? Will these areas be forced to vent onto the Mall? - What types of mechanical units will be on the roof? - Will each room have its own AC unit, or will it be roof mounted? - Where is the roof access point and will it require a stair access or hatch? Laundry exhaust will be from lower level parking and may be vented to roof, not to mall area. Each room will have its own fan coil A/C unit piped to mechanical equipment on roof. One of the 3 exit stairs will extend to the roof. Technical Issues (Oz Report) 1. Service Area Access - Location of service areas and access drives - Will loading and service areas be screened from being visible off site? Service and loading areas will be located below grade. As such, it will not be visible from either WBCB or the pedestrian mall. Service vehicles will access the area via the drive from WBCB. 2. Locations of mechanical equipment - Where are they located? - How are they screened? Most equipment will be located on the roof and will be screened by roof elements. Some mechanical equipment will be in the lower level parking area. 3. Kitchen exhaust and trash smells - How will they be vented? - How are they screened? The hotel will be a limited service establishment offering pre-prepared foods. Therefore, there will be minimal cooking equipment and resulting odors. Trash area is located below grade and a significant distance from the pedestrian mall. 4. Condominium/Fitness Building Trash - Where is trash located? Trash will be taken to the trash enclosure in the service area. TOWN APPLICANT RESPONSE 5. Locations of mechanical equipment in the condo building - Where are they located? - How are they screened? Mechanical equipment will primarily be in the units and venting will be to the roof. 6. Clearance height for bridge The bridge design has been modified to meet the requirements of the fire department. 7. Ground floor commercial spaces must be at least 12’ in height The design has been modified to meet this requirement. September 19, 2016 Matt Pielsticker Planning Manager Town of Avon Community Development Department PO Box 975 Avon, CO 81620 Re: Submittal for an AEC to utilize alternative architectural approaches to achieve the objectives of ADC 7.28.090(j)(4)(v)(D) Dear Matt: Treadstone Development LLC is submitting this application for an Alternative Equivalent Compliance (AEC) to allow for the use of alternative architectural elements to meet the requirement that states if the primary building walls exceed three (3) stories or forty-five (45) feet in height, as measured from finished grade to the underside of the eaves, then the building form shall step back at least eight (8) feet in depth (ADC 7.28.090(j)(4)(v)(D)). The objective for this requirement is to organize the form and mass of a building to provide human scale to adjacent streets, pedestrian walkways, plazas or other public spaces. The building mass is varied to create variety in the character of the adjacent streets and pedestrian places. The plan as presented includes step-backs on the pedestrian mall end of the building. The north- west, east, and south-east faces of the building do not include a step-backs; however, the plans meet the objective of reducing the apparent mass and scale of the building through three alternative approaches: 1) The plans incorporate the use of distinct changes in color, texture, and materials to break up the visual impact of the building height; 2) The building height is 69’ which is significantly less than the Sheraton building to the north-west or the Avon Center to the south-east. This lesser height creates a transition in the neighborhood, which lessens the impact of the mass of the building; and 3) The building includes multiple changes in form such as the inclusion of balconies and alcoves which break up the impact of the height of the building. It is also noted that the proposed design is consistent with neighboring buildings such as the Avon Center and Sheraton in the use of alternative architectural elements to break-up their apparent mass and scale. REVIEW CRITERIA Pursuant to ADC 7.16.12, the Town offers the following criteria as the basis for granting an AEC application: • The proposed alternative achieves the intent of the subject design or development standard to the same or better degree than the subject standard: As noted above, the objective of ADC 7.28.090(j)(4)(v)(D) is to reduce the apparent mass and scale of a building. The plans as presented include set-backs as a design element on the west end of the building. On the other sides of the building, the design that has been proposed is able to achieve a reduction in apparent mass and scale through the use of alternative architectural features, such as: § Pronounced recesses and projections § Distinct changes in texture and color of wall surfaces § Ground level arcades and galleries/balconies on higher floors § Protected and recessed entries § Vertical accents or focal points. • The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard: The West Town Center Investment Plan encourages diversity through its stated objective to provide enough consistency in the materials, forms, and building elements to create a district, while allowing enough flexibility to encourage unique architectural designs and character. In the context of the existing buildings, the proposed development will offer unique and interesting architectural elements. At the same time, it will conform the design standards which require the building mass to be varied and to offer a human scale. The alternative design elements will perform the same function as the set-back would achieve. • The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard: The Avon Comprehensive plan envisions that the West Town Center District will offer multi-use development that is well-integrated with a pedestrian friendly environment. The proposed development will offer retail spaces and hotel access directly from the pedestrian mall. The effect of this design will be to activate the Main Street area to a significant degree. The design of the hotel will offer additional activation with decks and balconies to bring together the pedestrian environment of Main Street with the guests staying in the units. The architectural elements that have been proposed will lessen the impact of the scale of the building while staying consistent with the surrounding neighborhood. • The proposed alternative imposes no greater impacts on adjacent properties than would occur through compliance with the specific requirements of this Title: There will be no impacts on adjacent properties as a result of using alternative architectural elements to satisfy ADC 7.28.090(j)(4)(v)(D). …3 Thank you for your time and consideration. We look forward to your approval of our application. Please do not hesitate to contact me with any questions. Sincerely, Gregory Less President Treadstone Development, LLC September 19, 2016 Matt Pielsticker Planning Manager Town of Avon Community Development Department PO Box 975 Avon, CO 81620 Re: Submittal for an AEC for use of Tract G, Lot 4, and frontage on West Beaver Creek Blvd to meet requirement for a minimum of 20% on-site landscaped area (ADC Table 7-20-9) Dear Matt: Treadstone Development LLC is submitting this application for an Alternative Equivalent Compliance (AEC) to allow for the use of public land to meet the requirement for a minimum of 20% on-site landscaped area per ADC Table 7-20-9. Currently, the plan includes on-site landscaped area of 11,102sf of the total lot area of 66,925sf, equal to 16.6% of the lot area. This AEC application would propose to landscape an additional 4,372sf of adjacent property, including 3,230sf of Tract G (Pedestrian Mall), 739sf of Lot 4, and 403sf of frontage along West Beaver Creek Boulevard adjacent to Lot B. This additional landscaped area would increase the total landscaped area for the project to 21.7%. BACKGROUND Lot B has been the subject of numerous development applications dating back to the early 1980’s. This history included approved PUD’s in 1998, 1999, and 2002. As part of these PUD approvals the lot owner, neighboring lot owners, and the Town of Avon executed/recorded numerous agreements affecting items such as shared parking facilities, access easements, and drainage requirements. Despite the fact that the PUD approvals have since expired, these legacy agreements have survived and, as such, impose limitations on development on Lot B. For example, by agreement with the Town of Avon, a portion of the parking required for development of The Avon Center on Lot A was transferred to Lot B. As a result, any development on Lot B must include parking that is in excess the quantity required by code for the project. As a result of these encumbrances that have been recorded on Lot B, the lot area available for landscaping is limited. Rather than seek a variance for the landscaping area minimum, the applicant is seeking to utilize Town owned land to install additional landscaping and thereby meet the requirement of the code. The Avon Town Council reviewed the proposal to utilize public space to satisfy the landscaping requirement at its September 13, 2016 meeting. At that meeting the motion was made to allow Treadstone Development LLC to process a development application for a hotel project using portions of Town property to meet minimum landscaping requirements. The motion was approved unanimously. …2 REVIEW CRITERIA Pursuant to ADC 7.16.12, the Town offers the following criteria as the basis for granting an AEC application: • The proposed alternative achieves the intent of the subject design or development standard to the same or better degree than the subject standard: By utilizing the adjacent Town owned property, the project will be able to meet the requirement to provide a 20% minimum on-site landscaping coverage. In fact, the proposed landscaping coverage of 21.7% will actually exceed the minimum requirement. In addition, the project will also be able to provide strong integration between the building development and the landscaping of the adjacent pedestrian mall. This will enhance the vitality of the Main Street corridor as envisioned in the West Town Center Investment Plan. • The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard: In the Avon Comprehensive Plan, the pedestrian mall right-of-way is identified as the heart of the West Town Center District. The integration of high density, multi-use development with pedestrian friendly spaces is critical to the realization of Town Center as a vibrant, active, user-friendly area. Meeting/exceeding the 20% landscaping requirement is essential to maintaining the intent of this plan. By utilizing the public spaces as envisioned in the application, the project will be able to fulfill this aspect of the Comprehensive Plan. • The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard: The utilization of the public property will allow the development to fulfill the requirements for Lot B as presented in the legacy agreements which encumber the lot while also meeting the landscaping requirement as set forth in the code for Town Center development. In addition, it will proactively ensure that the development project and the Main Street mall will be well integrated and provide an exciting/inviting pedestrian space. • The proposed alternative imposes no greater impacts on adjacent properties than would occur through compliance with the specific requirements of this Title: There will be no impacts on adjacent properties as a result of using the proposed Town owned property to satisfy the minimum landscaping requirement. …3 Thank you for your time and consideration. We look forward to your approval of our application. Please do not hesitate to contact me with any questions. Sincerely, Gregory Less President Treadstone Development, LLC SHEET NUMBERCHECKED BY:SHEET TITLEDRAWN BY:PROJECT NO:DATE:CONSULTANTPCREVISIONSPROJECT TITLEAVON, COLORADOJAG07.12 .20162961 W. MacArthur Blvd.Suite 120Santa Ana, California, 92704t. (714) 556-2656f. (714) 556-269615-57505 8TH StreetHermosa Beach, CA 90254t.(310) 999-8791www.treadcon.comSTAMP AREAENTITLEMENT PACKAGE:AVON HOTEL05.11.2016HOA SET07.01.2016MAJOR DEVELOPMENT SUBMITTAL07.11.2016HOA SUBMITTAL07.12.2016SHARED ACCESSTREADSTONEC O R P O R A T I O NLANDSCAPE NOTESAND PLANTSCHEDULTEL -1.1GENERAL NOTES:1. ALL DISTURBED OR RE-GRADED AREAS TO BE RE-VEGETATEDWITH A LANDSCAPE TREATMENT SIMILAR TO THE AREASADJACENT TO THE DISTURBED AREA.2. SILT FENCE OR HAY BALES ARE TO BE PLACED AT THE LIMITOF CONSTRUCTION AS NEEDED TO PREVENT EROSION ANDSEDIMENTATION. A CONSTRUCTION FENCE WILL BE PLACEDAT THE LIMIT OF DISTURBANCE WHERE THE SILT FENCE ORHAY BALES ARE NOT USED.3. ALL WORK ON BOTH PROJECTS SHALL BE PERFORMED INACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES,AND LOCAL GOVERNMENT STANDARDS PER THE APPROVEDPLANS.4. CONTRACTORS SHALL BE RESPONSIBLE FOR CONTACTINGALL UTILITY COMPANIES FOR FIELD LOCATES OF ALLUNDERGROUND UTILITY LINES PRIOR TO ANY EXCAVATIONAND BECOMING AWARE OF ALL UNDERGROUND UTILITIESAND SUB-SURFACE INFRASTRUCTURE. CONTRACTORSSHALL TAKE SOLE RESPONSIBILITY FOR ANY COST INCURREDDUE TO DAMAGE TO UTILITIES.5. ALL STRUCTURAL ELEMENTS, BOULDERS AND TREES THATARE NOT IDENTIFIED FOR DEMOLITION OR REMOVAL ARE TOBE PRESERVED AND PROTECTED DURING ALL PERIODS OFWORK.6. ALL SITE AND LANDSCAPE ELEMENTS SHALL BE LOCATEDAND LAID OUT IN THE FIELD BY THE CONTRACTOR ANDAPPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO FINALINSTALLATION.7. FINAL LOCATION AND STAKING OF ALL PLANT ANDHARDSCAPE MATERIALS SHALL BE PERFORMED BY THELANDSCAPE CONTRACTOR AT THE DIRECTION OF THELANDSCAPE ARCHITECT. CONTRACTOR SHALL NOT PROCEEDWITH PLANTING AND FINAL INSTALLATION UNTIL LAYOUT ANDSTAKING HAS BEEN FULLY APPROVED BY THE LANDSCAPEARCHITECT.8. ALL BOULDER PLACEMENT IS TO BE APPROVED IN ADVANCEBY LANDSCAPE ARCHITECT PRIOR TO FINAL PLACEMENT.9. ALL ROADWAY AREAS WITHIN AND SURROUNDING WORKAREAS SHALL BE SWEPT AND CLEANED AT COMPLETION OFWORK EACH DAY AND NO MATERIALS SHALL BE STOREDWITHIN OR SURROUNDING THE WORK AREA OVERNIGHT.CONSTRUCTION SHALL NOT BE CONSIDERED COMPLETEUNTIL ALL PROJECT AREAS HAVE BEEN CLEANED OF ALLDIRT, DEBRIS, MATERIALS, AND ALL DAMAGED ITEMSREPAIRED WITH ACCEPTANCE BY THE TOWN ENGINEER ANDLANDSCAPE ARCHITECT.IRRIGATION NOTES & SPECIFICATIONS:1. AUTOMATIC DRIP IRRIGATION SHALL BE PROVIDED AT ALL NEW TREES, SHRUBS, ANDPERENNIAL BEDS. AUTOMATIC 6" POP-UP SPRAY HEADS OR ROTORS SHALL BEPROVIDED FOR LAWN AREAS. ALL OVERHEAD IRRIGATION HEADS SHALL BE SPACEDON CENTER PER THEIR COVERAGE RADIUS TO PROVIDE EVEN AND EFFICIENTWATERING.2. FLUSH DIRT AND DEBRIS FROM PIPING BEFORE INSTALLING SPRINKLERS AND OTHERDEVICES.3. A LOW VOLTAGE SYSTEM MANUFACTURED EXPRESSLY FOR CONTROL OF AUTOMATICCIRCUIT VALVES OF AN IRRIGATION SYSTEM SHALL BE INSTALLED. SYSTEM SHALLINCLUDE AN ADJUSTABLE 24 HOUR TIME CLOCK WHICH WILL ALLOW FOR AUTOMATIC,SEMI-AUTOMATIC, OR MANUAL OPERATION; CIRCUIT CONTROL WHICH ALLOWS FORMANUAL OR AUTOMATIC OPERATION; AND PROGRAMMABLE CAPABILITIES THATALLOW FOR INDEPENDENT WATERING SCHEDULES PER ZONE. THE SYSTEM SHALLINCLUDE A PRESSURE REGULATOR AND BACKFLOW PREVENTOR DEVICE WITH 20 GPMAT 60 PSI AT A 1" POINT OF CONNECTION. NOTIFY LANDSCAPE ARCHITECT IF THEREQUIRED FLOW CANNOT BE MET.4. IRRIGATION SYSTEM TO INCLUDE AN AUTOMATIC MOISTURE SENSOR THAT IS ABLE TOSHUT OFF THE SYSTEM WHEN RAIN IS DETECTED.5. PROVIDE 4'' PVC SLEEVING BELOW ALL HARDSCAPE TO ADJACENT PLANTING AREAS.6. MAINLINE IS TO BE BURIED 12''-18'' BELOW FINISHED GRADE. LATERAL PIPES SHALLBE BURIED 8''-12'' BELOW FINISHED GRADE IN LANDSCAPED AREAS AND A MINIMUM OF2'' BELOW FINISHED GRADE IN NATIVE/UNDISTURBED AREAS. ALL PIPE TRENCHESSHALL BE FREE OF ROCKS AND DEBRIS PRIOR TO PIPE INSTALLATION. BACKFILLTRENCHES WITH SOIL THAT IS FREE OF ROCKS AND DEBRIS.7. INSTALL ALL DRIP IRRIGATION LINES PER MANUFACTURER SPECIFICATIONS.8. VALVE BOX LOCATIONS ARE TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TOINSTALLATION.9. CONTRACTOR IS TO PROVIDE OWNER WITH AS-BUILT IRRIGATION PLANS THATINCLUDE APPROXIMATE MAINLINE ROUTING AND VALVE BOX LOCATIONS.10. THE FOLLOWING IRRIGATION TESTS AND INSPECTIONS SHALL BE COMPLETED BY THECONTRACTOR:10.1.LEAK TEST: AFTER INSTALLATION, CHARGE SYSTEM AND TEST FOR LEAKS.REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.10.2.OPERATIONAL TEST: AFTER ELECTRICAL CIRCUITRY HAS BEEN ENERGIZED,OPERATE CONTROLLERS AND AUTOMATIC CONTROL VALVES TO CONFIRMPROPER SYSTEM OPERATION10.3.TEST AND ADJUST CONTROLS AND SAFETIES: REPLACE DAMAGED ANDMALFUNCTIONING CONTROLS AND EQUIPMENT.11. CONTRACTOR IS TO PROVIDE START UP AND BLOW-OUT SERVICES FOR IRRIGATIONSYSTEM FOR THE FIRST SEASON IT IS INSTALLED.PLANT SCHEDULESymbolKeyBotanicalDescriptionQTYSizeSpacing NotesRMRosa 'MordenSunrise'MordenSunrise Rose10 5 gal.asshownSymbolKeyBotanicalCommon NameQTYSizeSpacing NotesCSCornus sericea'Isanti'IsantiDogwood8 5 gal.asshownSJSVSpirea japonica'Goldflame'GoldflameSpirea17asshown5 gal.Syringa vulgaris'Albert Holden'Albert HoldenLilac17asshown15 gal.CCCrataeguscrus-galli inermisThornlessCockspurHawthorne17Single Stem2.5"Cal.asshownDeciduous TreesAGAcergrandidentatumBigtoothMaple3Single Stem2.5"Cal.asshownPTPopulustremuloidesQuakingAspen9Single andMulti - Stem3"Cal.asshownConiferous TreesPPPicea pungens'Fat Albert'Fat AlbertBlue Spruce98' Ht.asshownPAPinus aristataBristleconePine76' Ht.asshownShrubsBTBerberisthunbergii'Atropurpurea'JapaneseBarberry11 5 gal.asshownPMPinus mugo'Big Tuna'Big TunaMugo Pine57 3' ht.asshown6' Ht.10' Ht.IRRIGATION AREA CALCULATIONSLandscape Area Provided11,102 SF16.6% of Lot / Sq. Ft.Total Irrigated Area9,224 SFSpray Area2,564 SFDrip Area6,760 SFSymbolKeyBotanicalCommon NameQTYSizeSpacing NotesGrassesCA105 5 gal.asshownCalamagrostisacutiflora 'KarlForester'Karl ForesterFeather ReedGrassHelictotrichonsempervirensHS102 5 gal.asshownBlue AvenaGrassKAKolkwitzia amabilisBeauty Bush24 5 gal.asshownPOPhysocarposopulifolius AmberJubileeAmber JubilleeNinebark19 5 gal.asshownJMJuniperus x media'Sea Green'Sea GreenJuniper10 5 gal.asshownACAbies concolorWhite Fir48' Ht.asshownKeyBotanicalCommon NameQTYSizeSpacing NotesPerennials - 1970 sfN/AAquilegiachrysanthaYellowColumbine6018"1 gal.N/ARudbeckia fulgidaBlack EyedSusan1 gal.18"55N/AHemerocallis'Hyperion'YellowDaylily6018"1 gal.N/AAquilegia coeruleaRockyMountainColumbine6518"1 gal.N/ASalvia nemorosaPurple Salvia1 gal. 18"55N/AMonarda'GardenviewScarlet'Red Bee-Balm1 gal. 18"60N/AOsteospermum'Avalanche'AvalancheWhite DwarfSun Daisy1 gal. 18"49N/AAquilegia 'WhiteStar'White StarColumbine5518"1 gal.N/AHemerocallis''Autumn Red'Red Daylily6918"1 gal.N/AHuecherasanguinea'Splendens'Red CoralBells5618"1 gal.N/AGeraniumviscosissimumStickyGeranium4318"1 gal.N/ACampanulapersicifoliaPeach-LeavedBellflower6418"1 gal.N/AGeraniumcaespitosumPurple WildCranesbill4518"1 gal.EuEriogonumumbellatumSulphurFlower3118"1 gal.N/AMachaerantherabigeloviiSanta FeAster1 gal.18"43N/AHemerocallis'Stella De Oro'Dwarf GoldDaylily5718"1 gal.Ground CoverSymbolKeyBotanicalCommon NameQTYSizeSpacingNotesGalium odoratumF158"-Poa pratensisN/A N/A-2564s.f.KentuckyBluegrass Sod1205s.f.SweetWoodruffProvide (5) trees ateach specified Ht.PLANTING NOTES AND SPECIFICATIONS:1. ALL PLANT MATERIALS SHALL BE NURSERY GROWN. PLANTS SHALL BEHEALTHY AND FREE OF DISEASE AND PESTS. ALL PLANT MATERIALS ARE TOBE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.2. LAYOUT AND LOCATION OF ALL PLANTS AND TREES TO BE APPROVED BYOWNER OR LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.3. LANDSCAPE CONTRACTOR SHALL SUPPLY PHOTOS AND LOCATION OF THESOURCE OF ALL TREES AND SHRUBS TO BE APPROVED BY LANDSCAPEARCHITECT PRIOR TO DELIVERY OF MATERIALS TO THE PROJECT SITE.4. ALL CONTAINER PLANTS SHALL HAVE BEEN GROWN IN THE CONTAINERS INWHICH THEY ARE DELIVERED FOR A MINIMUM OF TWO MONTHS, BUT NOTMORE THAN TWO YEARS FOR SHRUBS AND GRASSES AND ONE YEAR FORPERENNIALS AND GROUND COVERS.5. TOP SOIL / PLANTING BACKFILL IS TO BE CLEAN AND WELL SCREENED. ITSHALL CONSIST OF 66% NATIVE TOPSOIL AND 33% COMPOST, WITH A 25%HORSE MANURE CONTENT, TO A DEPTH OF 9" ACROSS THE ENTIRE EXTENTOF ALL PLANTED AREAS, EXCEPT AREA OF SOD.6.••••••••••••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••MULCH. THE SPECIFIED MULCH FOR ALL PLANTING BEDS IS TO BE A FINEBARK MULCH7.••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••COMPOST OR SOIL PEP (NO MULCH). CONTRACTOR SHALL PROVIDE ASAMPLE OF COMPOST AND ITS SOURCE TO LANDSCAPE ARCHITECT PRIORTO PLANT INSTALLATION.8. TREES SHALL HAVE ALL BINDING MATERIAL REMOVED AROUND THE BASE ONTHE TRUNK AND BURLAP MATERIALS REMOVED AT LEAST HALFWAY TO THEMIDDLE OF THE ROOT BALL PRIOR TO BACKFILLING AND PLANTING.9. EVERGREEN TREES GREATER THAN 6' ARE TO BE STAKED WITH (3) 5' STEELT-STAKES AND GUYED WITH GALVANIZED WIRE.10.LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ERADICATION,REMOVAL, DISPOSAL OF WEEDS WITHIN THE LIMITS OF WORK DURING THECONSTRUCTION PERIOD AND THROUGH THE PROJECT'S FINAL ACCEPTANCE.11.THE PLACEMENT OF RE-LOCATED TREES SHALL BE COORDINATED WITH ANDDETERMINED BY THE TOWN OF AVON.12.AT THE TIME OF PLANTING ALL NEWLY PLANTED TREES AND SHRUBS SHALLBE FERTILIZED WITH BIOSOIL MIX, ALL-PURPOSE FERTILIZER PERMANUFACTURER'S SPECIFICATIONS. THIS FERTILIZER TO BE MIXED IN WITHPLANTING BACKFILL. PLEASE CONTACT ROCKY MOUNTAIN BIO-PRODUCTS,10801 E. 54TH AVENUE, DENVER, CO. 80239, PHONE (303) 696-8964.13.ALL SOD, PERENNIAL BED, AND MULCH AREAS SHALL BE SEPARATED FROMONE ANOTHER WITH EDGING. THE PREFERRED PRODUCT IS RYERSON METAL• • • •• • •• • •• • • • • •••• • • •• • •• • • • • •• • •• •• • •• •• • •• • • • • •• • • • •• • • ••• •• • • • ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• • • •• • •••• • • • • • • •• • • •• • •• • •• •• •• •• • • •• • • ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••EDGES WITH 2 PINS. EDGING SHALL NOT EXTEND ABOVE SURROUNDING••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••7. THE PLANT LIST IS PROVIDED FOR REFERENCE ONLY, AND THE CONTRACTORIS RESPONSIBLE FOR VERIFYING ALL PLANT COUNTS AND IF A DISCREPANCYEXISTS, THE PLAN SHALL DICTATE.8. PRIOR TO PLANTING, THE IRRIGATION SYSTEM SHALL BE FULLY IN PLACEAND OPERATIONAL. ALL PLANTED AREAS ARE TO BE IRRIGATED.IRRIGATION TO BE DESIGN BUILD BY LANDSCAPE CONTRACTOR.9. PREPARATION OF ALL SOD AREAS WILL INCLUDE: LOOSENING THE SOIL TO A•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• •• •• • • •• • •• • • • • ••••• • • •• • • •• • • • • •• •• • •• • •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••CONSISTENTLY EVEN, FREE DRAINING SURFACE.10.LANDSCAPE CONTRACTOR SHALL SUBMIT A WRITTEN DOCUMENTREGARDING ITS POLICY OF PLANT WARRANTY FOR PLANTS PROVIDED BYCONTRACTOR. EACH WARRANTY SHALL CONFORM TO THE MINIMUMSTANDARD OF REPLACING ALL MATERIALS INCLUDING LABOR, DUE TO THESICKNESS OR DEATH OF A PLANT FOR A PERIOD OF TWO YEARS. FOLLOWINGTHE PLANTS INSTALLATION AND ACCEPTANCE OF THE PROJECT.11.ALL EXCESS NATIVE SOIL RESULTING FROM SOIL PREP SHALL BE DISPOSEDOF AND REMOVED FROM THE SITE.12.REFER TO CIVIL GRADING PLAN FOR PROPOSED GRADESSITE CALCULATIONS:SITE AREAS WITHIN PROPERTY BOUNDARYxTOTAL LOT AREA: 66,925 SFxTOTAL LANDSCAPE AREA: 11,102 SF = 16.6% OF TOTAL SITE AREAADDITIONAL LANDSCAPE AREAS SHOWN OUTSIDE OF PROPERTY BOUNDARY = 5,766 SFHARDSCAPE NOTES:1. LANDSCAPE BOULDERS ARE INTENDED TO MATCH THEEXISTING BOULDERS USED ALONG TH PEDESTRIAN MALLAND SHALL BE ANGULAR COLORADO BUFF SANDSTONEBOULDERS WITH VARIATION IN COLOR INCLUDING LIGHTBROWN, BEIGE, DARKS BROWNS, AND RUST ORANGE.2.••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••DIAMETER ROUNDED RIVER COBBLE OF SIMILAR COLORRANGES AS THOSE USED IN ALONG THE PEDESTRIAN MALL.3. PEDESTRIAN MALL PATH GRADING IS PROPOSED TO BERAISED BY ONE FOOT IN THE AREA SHOWN ON THELANDSCAPE PLAN. THIS WILL CREATE A BETTERRELATIONSHIP TO THE RETAIL FRONTAGE AND LOBBYENTRANCE OF THE NEW HOTEL ALONG THE PEDESTRIANMALL. LANDSCAPE AREAS ALONG THE SOUTH SIDE OF THEPATH WILL NEED TO BE ADJUSTED TO ACCOMMODATERAISING THE PATH GRADE.4. PAVERS SHOWN ON PEDESTRIAN MALL PATH ARE INTENDEDTO REPLACE THE EXISTING ASPHALT PATH IN ITS CURRENTALIGNMENT. COLOR AND PATTERN OF THE PAVERS IS TOMATCH THE EXISTING PAVER AREAS TO THE EAST.5. PAVERS SHOWN ALONG THE RETAIL SPACES OF THE NEWHOTEL ARE INTENDED TO BE A DIFFERENT PATTERN WITH ASIMILAR COLOR PALETTE TO COMPLEMENT BOTH THEPEDESTRIAN MALL PAVERS AND COLORS USED ON THEHOTEL.6. VEHICULAR DRIVEWAY PAVERS (80mm THICKNESS) AREINTENDED TO GUIDE GUESTS TOWARD THE HOTEL LOBBYAND DROP OFF AREA.83% of Landscaped area / Sq. Ft.28% of Irrigated area / Sq. Ft.72% of Irrigated area / Sq. Ft. SHEET NUMBERCHECKED BY:SHEET TITLEDRAWN BY:PROJECT NO:DATE:CONSULTANTPCREVISIONSPROJECT TITLEAVON, COLORADOJAG07.12 .20162961 W. MacArthur Blvd.Suite 120Santa Ana, California, 92704t. (714) 556-2656f. (714) 556-269615-57505 8TH StreetHermosa Beach, CA 90254t.(310) 999-8791www.treadcon.comSTAMP AREAENTITLEMENT PACKAGE:AVON HOTEL05.11.2016HOA SET07.01.2016MAJOR DEVELOPMENT SUBMITTAL07.11.2016HOA SUBMITTAL07.12.2016SHARED ACCESSTREADSTONEC O R P O R A T I O NLANDSCAPE PLANL -1.0N1CONCEPTUAL LANDSCAPE PLAN1" = 20'-0"PLANNOTES:1. SEE SHEET L1.1 FOR DETAIL PLANT SCHEDULE AND SITE CALCULATIONS2. LANDSCAPE IMPROVEMENTS SHOWN IN EASEMENTS, RIGHT OF WAYS, AND TOWN OF AVONPROPERTY ARE CONCEPTUAL AND SHALL BE COORDINATED WITH THE PROPER ENTITIES PRIOR TOCONSTRUCTION.3. SITE IMPROVEMENTS AND MODIFICATIONS TO PEDESTRIAN MALL LANDSCAPE AREAS SHALL BECOORDINATED WITH THE TOWN OF AVON. 52ND + 4TH +56.19'FLUSHACTIVATORON WIDE SIDEFLUSHACTIVATORON WIDE SIDE+54'+57'HOTELIN DESIGN30" x 48" CLEARSPACE 0.20.20.20.20.20.20.20.20.20.20.50.50.50.50.50.50.50.5111111122222222222735 S. Xenon Ct. #201Lakewood, Colorado 80228Ph: 303.716.1270Fax: 303.716.1272www.givenandassociates.comProject #G16090ENTITLEMENT PACKAGE:AVON, COLORADOAVON HOTEL05.11.2016HOA SET07.01.2016MAJOR DEVELOPMENT SUBMITTALSITE LIGHTINGPHOTOMETRIC PLANE-1.0 735 S. Xenon Ct. #201Lakewood, Colorado 80228Ph: 303.716.1270Fax: 303.716.1272www.givenandassociates.comProject #G16090ENTITLEMENT PACKAGE:AVON, COLORADOAVON HOTEL05.11.2016HOA SET07.01.2016MAJOR DEVELOPMENT SUBMITTALSITE LIGHTINGCUTSHEETSE-2.0 735 S. Xenon Ct. #201Lakewood, Colorado 80228Ph: 303.716.1270Fax: 303.716.1272www.givenandassociates.comProject #G16090ENTITLEMENT PACKAGE:AVON, COLORADOAVON HOTEL05.11.2016HOA SET07.01.2016MAJOR DEVELOPMENT SUBMITTALSITE LIGHTINGCUTSHEETSE-3.0 WALL SCONCETRESPAGREYED CEDARTRESPARUSTED BROWNMETAL ROOF SIDINGSILVER GRAYFLEETWOOD WINDOWCOLOR : F-4STUCCODE5326 ROOT BEER FLOATSTUCCODE6367 COVERED IN PLATINUMSTUCCODE6369 LEGENDARY GRAYSTUCCODET634 DOWNING TO EARTHSWISSPEARLLIGHT GREY 8710 SANDBLASTED FACADESWISSPEARLGREY 8760 SANDBLASTED FACADESWISSPEARLGREY 8720 SANDBLASTED FACADE1234567891011121234531011372961 W. MacArthur Blvd.Suite 120Santa Ana, California, 92704t. (714) 556-2656f. (714) 556-2696ARCHITECTS505 8TH StreetHermosa Beach, CA 90254t.(310) 999-8791www.treadcon.comRECREATION CENTERMATERIAL BOARD AVON HOTEL MATERIAL BOARDWALL SCONCETRESPAGREYED CEDARTRESPARUSTED BROWNMETAL ROOF SIDINGSILVER GRAYFLEETWOOD WINDOWCOLOR : F-4STUCCODE5326 ROOT BEER FLOATSTUCCODE6367 COVERED IN PLATINUMSTUCCODE6369 LEGENDARY GRAYSTUCCODET634 DOWNING TO EARTHSWISSPEARLLIGHT GREY 8710 SANDBLASTED FACADESWISSPEARLGREY 8760 SANDBLASTED FACADESWISSPEARLGREY 8720 SANDBLASTED FACADE1234567891011121234537361134512321141010651135713334 MAJOR DEVELOPMENT PLAN SUBMITTALAVON HOTEL 11X17 EXHIBIT A REVISION #1 09.19.2016 VICINITY MAPMAIN S T LETTUCE SHED LNSEASONS AVON RDRAIL W A Y WYNDHAM AVON CTR SHERATON RAIL W A YW B E A V E R C R E E K B L V D SUN RDAVON RDI-70 LOT A LOT B (PHASE II) LOT 5 (SUBSURFACE) LOT 6 ( SURFACE + AIR) LOT 2A (LOT A) LOT 3A (LOT B) LOT 7 (PHASE II) LOT 1 (SUBSURFACE PHS I) LOT 2 (DECK SURFACE PHS II) LOT 3 (AIRSPACE PHS II) first floor plan scale:1/32”=1’-0”BOUNDARIESA V O N C E N T E RS E A S O N S H O T E L F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T . LOT A LOT B (PHASE II) LOT 5 (SUBSURFACE) LOT 6 ( SURFACE + AIR) LOT 2A (LOT A) LOT 3A (LOT B) LOT 7 (PHASE II) LOT 1 (SUBSURFACE PHS I) LOT 2 (DECK SURFACE PHS II) LOT 3 (AIRSPACE PHS II) basement scale:1/32”=1’-0”BOUNDARIESA V O N C E N T E R H O T E L B E A V E R C R E E K B L V D.M A I N S T . SUBDIVISION EXHIBIT A V O N C E N T E RS E A S O N S H O T E L F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .first floor plan scale:1/32”=1’-0”SITE PLAN A V O N C E N T E R H O T E L B E A V E R C R E E K B L V D.M A I N S T .SITE PLAN scale:1/32”=1’-0” basement ACCESS EASEMENT PROPERTY LINE first floor plan scale:1/32”=1’-0”SITE EASEMENT FIRE TRUCK FIRE CMD CTR FH FH FIRE HYDRANT FH STAND PIPESP SP first floor plan scale:1/32”=1’-0”FIRE ACCESS A V O N C E N T E RS E A S O N S H O T E L F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .GROUND 77 PARKING 7 ADA PARKING 11 AVON CTR PARKING BASEMENT 121 PARKING TOTAL 205 PARKING first floor plan scale:1/32”=1’-0”PARKING A V O N C E N T E R H O T E L M A I N S T . B E A V E R C R E E K B L V D.GROUND 77 PARKING 7 ADA PARKING 11 AVON CTR PARKING BASEMENT 121 PARKING TOTAL 205 PARKING basement scale:1/32”=1’-0”PARKING A V O N C E N T E RS E A S O N S H O T E L F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .PATH OF TRAVEL HOTEL ENTRANCE RETAIL ENTRANCE first floor plan scale:1/32”=1’-0”PEDESTRIAN ACCESS SERV TRUCK SMALL SERV. TRUCK B E A V E R C R E E K B L V D.M A I N S T .first floor plan scale:1/32”=1’-0”SERVICE/DELIVER ACCESS SERV TRUCK M A I N S T .basement scale:1/32”=1’-0”SERVICE/DELIVER ACCESS scale:1/32”=1’-0” ground floor VEHICULAR ACCESSIN OUT ONE WAY IN OUT ONE WAY basement scale:1/32”=1’-0”VEHICULAR ACCESS A V O N C E N T E RS E A S O N S F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .first floor plan scale:n.t.s LANDSCAPEZ E H R E NAND ASSOCIATES P.O. BOX 1976 Avon, Colorado 81620 ARCHITECTURE • PLANNING • INTERIORS LANDSCAPE ARCHITECTURE 970.949.0257 FAX 970.949.1080 www.zehren.com A V O N C E N T E RS E A S O N S F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .scale:n.t.s first floor plan LANDSCAPE CALCZ E H R E NAND ASSOCIATES P.O. BOX 1976 Avon, Colorado 81620 ARCHITECTURE • PLANNING • INTERIORS LANDSCAPE ARCHITECTURE 970.949.0257 FAX 970.949.1080 www.zehren.com first floor plan scale:1/32”=1’-0” A V O N C E N T E RS E A S O N S F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .COVERAGE TOTAL LOT B LOT COVERAGE 24,149 SF 66,925 SF LOT COVERAGE SNOW MELT COVERAGESNOWMELT COVERAGE 31, 813 SF A V O N C E N T E RS E A S O N S F U T U R E T O W N H A L L B E A V E R C R E E K B L V D.M A I N S T .scale:1/32”=1’-0” ground floor CODE STUDYThe following codes apply: 2015 International Building Code 2015 International Energy Conservation Code 2015 International Plumbing Code 2015 International Mechanical Code Building Information: Building Type: IA Concrete podium + VA above - fully sprinklered Allowable Height: 5 floors + Basement - Height is under 80’-0” Use and Occupancy Classification Primary Occupancy : R-1 Parking : S-2 Type of Construction Table 601 Building Elements: S-2 (1-A) R-1 (V-A) A. Structural Frame 3 hr 1 hr B. Bearing Walls - Exterior 3 hr 1 hr C. Bearing Walls - Interior 3 hr 1 hr D. Non-bearing Walls - Ext. 0 hr 0 hr E. Non-bearing Walls - Int. 0 hr 0 hr F. Floor construction 2 hr 1 hr G. Roof construction 1-1/2 hr 1 hr Avon Hotel Sheets A-1.0 + A-1.1 Parking Tabulation Ground floor Basement Total 77 regular stalls 7 ADA stalls 121 regular stalls 205 stalls 11 regular stall for Lot B Sheets A-2.0 + A-2.1 Gross Building Area Hotel Ground floor Basement 2nd floor 3rd floor 4th floor 5th floor Retail Ground floor Total 8, 552 sq ft. 3, 605 sq. ft 23, 810 sq. ft 21, 634 sq. ft 21, 634 sq. ft 21, 634 sq. ft 536 sq. ft 101, 405 sq. ft Rooms - total 142 units Accessible Double Queen Balcony Accessible King Balcony Accessible King Sofa Double Queen, 1 Double Queen, 2 Double Queen, 3 Double Queen Balcony Double Queen Balcony, 2 King Balcony King Sofa King Sofa Balcony 2nd 1 1 2 2 4 8 2 0 6 5 0 3rd 1 1 2 2 4 8 2 4 6 5 2 4th 1 1 2 2 4 8 2 4 6 5 2 5th 1 1 2 2 4 8 2 4 6 5 2 Sq.ft 534 534 480 294 306 330 402 545 434 384 497 units per floor Recreation Center Sheets A-2.3+ A-2.4 Gross Building Area Recreation Center Ground floor Outdoor deck Fitness area Condo 2nd floor 3rd floor 4th floor 5th floor Total 2, 900 sq. ft 1, 678 sq. ft 3, 545 sq. ft 3, 545 sq. ft 3, 545 sq. ft 2, 545 sq. ft 17, 213 sq. ft Pool 18’x36’ 42” deep Phase II Specification 1. Pool not less than 18’ x36’, 42” deep 2. Spa not less than 10’ dia., 36” deep 3. Outdoor deck including pool + spa not less than 2,800 sq. ft 4. Fitness area not less than 250 sq ft to include changing rooms/restroom Spa 10’ Dia. 36” deep Open Deck 2, 900 sq. ft Lot 3 (Airspace) Lot 2 (Deck Surface) Covered Walkway BUILDING SUMMARY WALL SCONCETRESPA GREYED CEDAR TRESPA RUSTED BROWN METAL ROOF SIDING SILVER GRAY FLEETWOOD WINDOW COLOR : F-4 STUCCO DE5326 ROOT BEER FLOAT STUCCO DE6367 COVERED IN PLATINUM STUCCO DE6369 LEGENDARY GRAY STUCCO DET634 DOWNING TO EARTH SWISSPEARL LIGHT GREY 8710 SANDBLASTED FACADE SWISSPEARL GREY 8760 SANDBLASTED FACADE SWISSPEARL GREY 8720 SANDBLASTED FACADE 1 2 3 4 5 6 7 8 9 10 11 12 MATERIALS WALL SCONCE TRESPA GREYED CEDAR TRESPA RUSTED BROWN METAL ROOF SIDING SILVER GRAY FLEETWOOD WINDOW COLOR : F-4 STUCCO DE5326 ROOT BEER FLOAT STUCCO DE6367 COVERED IN PLATINUM STUCCO DE6369 LEGENDARY GRAY STUCCO DET634 DOWNING TO EARTH SWISSPEARL LIGHT GREY 8710 SANDBLASTED FACADE SWISSPEARL GREY 8760 SANDBLASTED FACADE SWISSPEARL GREY 8720 SANDBLASTED FACADE 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 53 3 11 3 4 5 1 2 10 6 5 11 3 5 7 1 3 4 hotel MATERIAL BOARD 1 2 3 4 5 3 10 11 3 7 10 10 2 6 WALL SCONCE TRESPA GREYED CEDAR TRESPA RUSTED BROWN METAL ROOF SIDING SILVER GRAY FLEETWOOD WINDOW COLOR : F-4 STUCCO DE5326 ROOT BEER FLOAT STUCCO DE6367 COVERED IN PLATINUM STUCCO DE6369 LEGENDARY GRAY STUCCO DET634 DOWNING TO EARTH SWISSPEARL LIGHT GREY 8710 SANDBLASTED FACADE SWISSPEARL GREY 8760 SANDBLASTED FACADE SWISSPEARL GREY 8720 SANDBLASTED FACADE 1 2 3 4 5 6 7 8 9 10 11 12 4 3 3 4 5 rec + condo MATERIAL BOARD ROOFscale:1/32”=1’-0” ELEVATIONSscale:1/32”=1’-0” south north ELEVATIONSscale:1/32”=1’-0” west east October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 1 Staff Report – Rezoning October 4, 2016 Planning & Zoning Commission Meeting Project file Case #REZ16002 Legal description Lot 4, Mountain Vista Resort Subdivision Current Zoning Planned Unit Development (PUD) Proposed Zoning Town Center (TC) Address 100 Mikaela Way Prepared By Matt Pielsticker, Planning Director Introduction The Avon Town Council authorized processing a Rezoning application (the “Application”) for the new Town Hall property. The Application would rezone the property from the current Planned Unit Development (“PUD”) designation to the Town Center (“TC”) zone district. The proposed use as a Town Hall, with supporting community uses, is consistent with the newly adopted changes to the Town Center list of allowed uses. The Planning and Zoning Commission (“PZC”) will review the Application and conduct a public hearing on October 4, 2016. After reviewing Staff’s analysis and considering public input, PZC will forward a recommendation to the Town Council. Background Shortly after the Town purchased the Mountain Vista Office Building and Lot 4, Mountain Vista Resort Subdivision, Staff presented the option to rezone the property to PF; this would have been concurrent with the Points of Colorado application to rezone the remainder of the Mountain Vista Resort Subdivision as TC. While the accessory uses of the Mountain Vista building are still pending, the potential to use ground floor space to accommodate retail, a coffee shop, a visitor’s center, or other similar use is being considered. Analysis of the structural capability to hold additional floors, potentially accommodating housing on the top of the building, is also forthcoming. Council provided direction to further evaluate the zoning options so as to not restrict possibilities with new construction. Staff then presented draft code text amendments to the PZC in August. The code text amendments pertained to the PF and TC zone districts and were presented in an effort to allow more flexibility with additional housing uses in PF and governmental uses in the TC zone district. A change in building height for the PF zone district was also included so as to not require comprehensive plan amendments in the future if public buildings exceeded the 40’ height limitation. PZC Recommendation At the August 2, 2016 meeting PZC recommended the following code text amendments: 1. Table 7.24-1. Multi-family Dwellings will be added as a Special Review Use in the PF zone district. October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 2 2. Table 7.20-11. Building Height Maximum will increase from 40’ to 60’ in the PF zone district. 3. Table 7.20-11. Maximum Density (Units/Acre) assignment of 15 Units/Acre will be added in the PF zone district. PZC recommended that housing be added as a Special Review Use in the PF zone district in order to review compatibility of future potential housing projects that may be located adjacent or attached to other governmental projects and uses. For example, adding housing to a project on the Town’s Swift Gulch was viewed as a case where additional public review by PZC is necessary to maintain separation of semi-industrial uses and residential uses. When discussing residential land uses on PF properties, there was a desire to add a maximum density per acre in order to add congruency with other zone districts. The number of 15 DU/Acre was chosen as it is comparable to the Residential Medium Density (RMD) zone district. As mentioned above, multiple projects in the PF district have already been approved and/or construction that exceed 40’ in height. After considering implications of an increased building height on other PF properties, PZC found the change appropriate and recommended that the height be increased to avoid the need to process comprehensive plan amendments. PZC discussed adding Governmental Uses as either a Use-by-right or Special Review in the TC zone district. After discussing the possible negative ramifications of having such governmental land uses (County administrative uses on ground floor of Seasons, or Fire Department office next to Avon Station were both cited as examples), the Planning Commission recommended no changes to the TC district; therefore not permitting these types of uses in the future. When Council reviewed the code text changes additional changes were made to the ordinance. Council discussed building height for PF district properties and felt that those instances should in fact receive a higher level of review, which includes a comprehensive plan amendment, to ensure they are compatible with adjacent properties. Council also determined that governmental offices should not be viewed separately from other types of commercial offices in the TC district, which are allowed by right. The ordinance was approved as follows: 1. Table 7.24-1, Allowed Uses, of the ADC is amended to add “S” (special review use) to the “PF” (Public Facilities zone district) column for the following Residential Uses: Dwelling, Single-Family Detached; Dwelling, Two-Family/Duplex; Dwelling, Townhouse; Dwelling, Multi-Family; Dwelling, live/work; and, Accessory DU; and 2. Table 7.24-1, Allowed Uses, of the ADC is amended to add “P” (permitted) to the “TC” (Town Center zone district) column for the following Public and Institutional Uses: Library; Government services, offices and facilities; and, Post office branches.” No changes to building height in PF were approved, and no limitation on density for housing projects in the PF district was added to the table of allowed uses. As an example, the recommended density limit of 15 DU/Acre would have yielded only 4 potential units on Lot 4 given the small size of that parcel. October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 3 Process The review process first requires a noticed public hearing with PZC. Final action is taken on the Application by Town Council after conducting public hearings and either approval by Ordinance or denial by motion. Property Background The Property is currently part of the Sheraton Mountain Vista PUD and originally slated for retail/restaurant on the first level, and office on second and third floors. It was platted and constructed as part of the initial PUD development phases. Since construction the building has remained vacant and only two of the three Sheraton Mountain Vista PUD phases was constructed. Property Description Lot 4 is approximately a 1/4 acre in size and is currently surrounded by parking lots and undeveloped portions of the Mountain Vista development project. The lot itself is covered mostly with the vacant office building footprint and concrete surrounding. The Property is bounded on the west by Tract G and surface parking; south by the Main Street Pedestrian Mall; on the north by the partially Staff Review & Report PUBLIC HEARING: PZC Council & 1st Reading of Ordinance PUBLIC HEARING: Council & 2nd Reading of Ordinance October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 4 developed Sheraton Mountain Vista Subdivision, and on the east by Lot B and potential future site of a hotel. Rezoning Review Criteria Analysis As outlined in Sec. 7.20.080(c), the TC district “is intended to provide sites for a variety of uses such as hotels, commercial establishments, offices and some residential uses in a predominately pedestrian environment. The Town Center should be distinguished from other areas in the Town and serve as the focal point for social, business, and cultural activities. This district contains the highest intensity of uses and should serve as the major transit destination as well as provide high levels of pedestrian accessibility..” The review process and review criteria for zoning amendments are governed by AMC §7.16.050, Rezonings. PZC shall use the criteria below as the basis for a recommendation on the Application. Staff responses to each review criteria are provided. (1) Evidence of substantial compliance with the purpose of the Development Code; The entire Purpose statement section from the Development Code (Section 7.04.030 - Development Code Purposes) is outlined for reference: (a) Divide the Town into zones, restricting and requiring therein the location, erection, construction, reconstruction, alteration and use of buildings, structures and land for trade, industry, residence and other specified uses; regulate the intensity of the use of lot areas; regulate and determine the area of open spaces surrounding such buildings; establish building lines and locations of buildings designed for specified industrial, commercial, residential and other uses within such areas; establish standards to which buildings or structures shall conform; establish standards for use of areas adjoining such buildings or structures; (b) Implement the goals and policies of the Avon Comprehensive Plan and other applicable planning documents of the Town; (c) Comply with the purposes stated in state and federal regulations which authorize the regulations in this Development Code; (d) Avoid undue traffic congestion and degradation of the level of service provided by streets and roadways, promote effective and economical mass transportation and enhance effective, attractive and economical pedestrian opportunities; (e) Promote adequate light, air, landscaping and open space and avoid undue concentration or sprawl of population; (f) Provide a planned and orderly use of land, protection of the environment and preservation of viability, all to conserve the value of the investments of the people of the Avon community and encourage a high quality of life and the most appropriate use of land throughout the municipality; (g) Prevent the inefficient use of land; avoid increased demands on public services and facilities which exceed capacity or degrade the level of service for existing residents; provide for phased development of government services and facilities which maximizes efficiency and optimizes October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 5 costs to taxpayers and users; and promote sufficient, economical and high-quality provision of all public services and public facilities, including but not limited to water, sewage, schools, libraries, police, parks, recreation, open space and medical facilities; (h) Minimize the risk of damage and injury to people, structures and public infrastructure created by wild fire, avalanche, unstable slopes, rock fall, mudslides, flood danger and other natural hazards; (i) Achieve or exceed federal clean air standards; (j) Sustain water sources by maintaining the natural watershed, preventing accelerated erosion, reducing runoff and consequent sedimentation, eliminating pollutants introduced directly into streams and enhancing public access to recreational water sources; (k) Maintain the natural scenic beauty of the Eagle River Valley in order to preserve areas of historical and archaeological importance, provide for adequate open spaces, preserve scenic views, provide recreational opportunities, sustain the tourist-based economy and preserve property values; (l) Promote architectural design which is compatible, functional, practical and complimentary to Avon's sub-alpine environment; (m) Achieve innovation and advancement in design of the built environment to improve efficiency, reduce energy consumption, reduce emission of pollutants, reduce consumption of non-renewable natural resources and attain sustainability; (n) Achieve a diverse range of attainable housing which meets the housing needs created by jobs in the Town, provides a range of housing types and price points to serve a complete range of life stages and promotes a balanced, diverse and stable full time residential community which is balanced with the visitor economy; (o) Promote quality real estate investments which conserve property values by disclosing risks, taxes and fees; by incorporating practical and comprehensible legal arrangements; and by promoting accuracy in investment expectations; and (p) Promote the health, safety and welfare of the Avon community. Staff Response: The Application is substantially compliant with the purpose statements of the Development Code by providing for the orderly, efficient use of the Property, while at the same time considering adjacent land uses and compatibility of land uses in the vicinity. The Application complies with the goals and policies of the Avon Comprehensive Plan and other applicable planning documents. Two planning study documents were completed in 2015 that support the rezoning and final use of the building as a Town Hall. The Avon Town Hall Facility Assessment and Space Needs Analysis was completed by SHE, consultant to the Town. In addition to looking at space requirements and condition of the existing Town Hall, the study identified Lot 4 as the preferred option for a new Town Hall. Further support for this rezoning was documented with the Planning Services Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, completed in November, 2015 by Stan Clauson Associates, consultants t o the Town. October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 6 That planning study looked at three alternatives for Town Hall, with the preferred option being relocation to the Sheraton Mountain Vista Office Building (Lot 4). (2) Consistency with the Avon Comprehensive Plan; Staff Response: The rezoning application will provide consistency with the Comprehensive Plan, and supporting planning documents listed above. Specific goals and policies that support the rezoning include: Policy C.1.6: Include sufficient land for public uses such as schools, recreation, community facilities (such as childcare), and government services near the people who use them Goal J.2: Ensure cost effective provision and development of public facilities and services. Policy J.2.2: Locate schools, parks, and other civic facilities, along trails, sidewalks, and transit facilities. Goal J.3.1: Encourage the broad participation of citizens in planning efforts October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 7 and decision-making. The West Town Center Investment Plan also supports moving public offices from their current location to accommodate other potential uses in its current footprint. The area between the Recreation Center and New Town Hall property is still envisioned to accommodate an expansion to the Recreation Center as well as a possible parking structure with employee housing and limited retail space on the Pedestrian Mall. (3) Physical suitability of the land for the proposed development or subdivision; Staff Response: The Property is physically suitable for the proposed development as a Town Hall. A design and development process is already underway for the envisioned land use. Options for adding above, or adding above and out over the existing parking lot are being explored further by the Town’s design consultants. (4) Compatibility with surrounding land uses; Staff Response: Governmental offices, with supportive community and related uses fit well between the park, Recreation Center, and library, with transition to the Pedestrian Mall and lodging activities that surround. Public uses are concentrated in this area of Town at the edge of Nottingham Park and appear to be compatible with surrounding residential, commercial, and lodging land uses. The interface of Lot 4 with the surrounding uses (both existing and proposed) will be studied in more detail with the completion of the Main Street Pedestrian Mall. (5) Whether the proposed rezoning is justified by changed or changing conditions in the character of the area proposed to be rezoned Staff Response: As identified with updated planning studies conditions have changed in the area of Tract G with the construction of the construction of the Pavilion. Additionally, ballot issues passed for the police and fire departments for the relocation to the north side of Interstate 70. Overall conditions on the Main Street Pedestrian Mall and Tract G have changed since adoption of earlier planning studies in the mid-2000s. (6) Whether there are adequate facilities available to serve development for the type and scope suggested by the proposed zone compared to the existing zoning, while maintaining adequate levels of service to existing development; Staff Response: Adequate facilities are available to serve the development type and scope. If the building is added onto in significant form or intensity of use, available utilities are available and could be up-sized. October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 8 (7) Whether the rezoning is consistent with the stated purpose of the proposed zoning district(s); Staff Response: The TC zone district is appropriate for the Lot’s intended uses. The TC district implements the mixed-use classification in the comprehensive plan and permits Governmental offices, residential, and other potentially viable ground floor uses for the building. The desire to make the ground floor of the building inviting and usable by the entire community is in concert with the intent of the TC zone district which is the most intensely developed district in a predominantly pedestrian environment. (8) That, compared to the existing zoning, the rezoning is not likely to result in adverse impacts upon the natural environment, including air, water, noise, stormwater management, wildlife, and vegetation, or such impacts will be substantially mitigated; Staff Response: Staff does not anticipate any adverse impacts upon the natural environment, compared to the existing zoning. (9) That, compared to the existing zoning, the rezoning is not likely to result in significant adverse impacts upon other property in the vicinity of the subject tract; Staff Response: No significant impacts to other properties in the vicinity are envisioned with a TC land use designation. If building height is increased it will be subject to development review by PZC and Council and will be reviewed in context with adjacent existing or potential construction. All of the neighboring properties are aware of the proposed rezoning and intended use of the property; some neighboring property owners intend to perform additional improvements to create additional vibrancy in the area. (10) For rezoning within an existing PUD, consistency with the relevant PUD Master Plan as reflected in the approval of the applicable PUD; and, Staff Response: The rezoning would supersede and void the existing PUD Development Plan documents. This is seen as a major benefit to rezoning, especially because the remaining portions of Lot C have already been rezoned to TC and this remaining parcel is orphaned. (11) Adequate mitigation is required for zoning amendment applications which result in greater intensity of land use or increased demands on public facilities and infrastructure. October 4, 2016 PZC Meeting Lot 4 Town Hall Rezoning 9 Staff Response: The intensity of use is comparable to existing zoning and possible uses of the property and other surrounding. Staff Recommendation Staff recommends approval. PZC shall direct Staff to prepare a formal Findings of Fact, Record of Decision, and Recommendation to Council pursuant to Section 7.16.020(f)(3), Findings, to be presented to the Council for final action. Recommended Motions and Findings: “I move to recommend Town Council approval of Case #REZ16002, an application for rezoning of Lot 4, Mountain Vista Resort Subdivision together with the findings of fact.” The Following Findings May be Applied Should the PZC recommend approval of the Application to the Avon Town Council: 1. The Application was reviewed in accordance §7.16.050, Rezonings, Avon Development Code, and is found to be in substantial compliance with the review criteria as outlined in the staff report produced by Matt Pielsticker for the October 4, 2016 meeting. 2. The Application provides assurances with respect to building form, development standards, and allowed uses consistent and in scale with adjacent neighboring existing and planned land uses. 3. The Application is substantially compliant with the purpose statements of the Development Code by providing for the orderly, efficient use of the Property, while at the same time conserving the value of the investments of owners of property in Town. To: Chairman Jim Clancy and Planning and Zoning Commission From: Matt Pielsticker, AICP, Planning Director Meeting Date: October 4, 2016 Meeting Agenda Topic: Comprehensive Plan Update Work Session No. 3 Introduction At your last meeting we discussed the legal boundaries of the Comprehensive Plan with the Town Attorney, as well as a more detailed review of the Appendices. We now turn back to the front of the plan to start a review of the body of the document, beginning with Section I, II, and III. Please be prepared to discuss the redline strikethrough (“Attachment A”) at the October 4, 2016 Work Session. Other Updates  Additional Demographic information has been updated since your last meeting. (“Attachment B”)  Staff has received the Comprehensive Plan graphics from Design Workshop for minor edits. These will be introduced at a future meeting once updated. Schedule of Meetings The attached (“Attachment C”) schedule includes the upcoming schedule for the update process. The ADC requires a public hearing before a formal recommendation at the completion of the process. Attachments A – Strikethrough of Section I, II, & III B – Updated Supplemental Demographics C – Schedule of Meetings Avon’s Vision Town of Avon Comprehensive Plan Page 5 I. Avon’s Vision A. What We Want To Be Avon is unique due to its dual role as a year-round community serving the needs and interests of those that live and work within the community full-time and as a resort community that hosts both short and long-term visitors. The juxtaposition between these two functions has often made planning and decision-making for the Avon community and its leaders challenging. During this planning process it became apparent, however, that much of what the community expressed in terms of values, beliefs, and desires for Avon’s future could in fact provide a synchronized direction for many of the unique issues and concerns associated with each of Avon’s two identities. Put in terms of a vision for what we want our Town to be: “…To provide a high quality of life, today and in the future, for a diversity of people and interests; and to promote their ability to live, work, visit, and recreate in the community.” B. What We Value From the understanding that Avon’s dual role as a community for year-round residents and as a destination resort community could and should be mutually supportive, a set of Core Values were identified that provide an overarching direction for the Comprehensive Plan and its implementation. Reflective of the natural environment. Avon will continue to enhance its strong connections to its spectacular scenery, magnificent natural surroundings, and ample outdoor recreational opportunities. Distinctive Built Form. Avon will develop with a hierarchy of built forms that reflects the importance of the Town Center as the center of the community. High Quality design and finishes are found throughout the community. Sense of place and character. Avon will be a fully developed community made up of smaller residential neighborhoods and a thriving Town Center that collectively provide a unique sense of place and charm that is not only enjoyed by those that live and work here year-around, but that is enviously enjoyed by those that come to visit. Thriving center of activity and entertainment: Avon will provide the Eagle Valley with unique shopping, dining, entertainment and recreational opportunities. Attachment A Avon’s Vision Town of Avon Comprehensive Plan Page 6 A vibrant economy: Avon will maintain a strong and sustainable year-round economy through our own efforts and through private/public partnerships. Diversity. Avon recognizes that our community is the sum of its parts and that a healthy and vibrant community must welcome and encompass people with a wide range of backgrounds, interests, vocations, family status, and economic means. Avon will provide a total environment that is supportive of and attainable by a diverse community. Connectedness to culture and heritage. Avon will provide exceptional art, architecture and cultural events and facilities, and promote its ranching, agricultural, and railroading heritage. An exceptional transportation and transit network. Avon will support a multi-modal transportation network that provides convenient, efficient, clean links throughout the town, to ski area base facilities, and the entire Eagle Valley region. Cooperative partnership with organizations throughout the Eagle Valley: Avon will be good neighbors to Beaver Creek, Eagle County, surrounding communities, and public lands in order to achieve mutual enhancements and the success of all. C. How We Will Achieve Our Vision From our Vision and its underlying values, the Comprehensive Plan develops several tools to achieve them: Goals and Policies: Having defined the Vision for Avon and the supporting Subarea Strategic Roles, tools are needed to shape the character of the subareas to their intended outcome. These same tools are also needed to guide decision making with respect to individual development projects and governance issues. We have these tools in our Goals and Policies:  Goals: These are statements of intent by the Town Government that when implemented will support the achievement of the Vision. They are in fact our strategies to achieve our Vision.  Policies: Under each Goal, we have established a series of Policies. These tactical actions are necessary to implement and achieve the strategic objectives of our Goals and consequentially our Vision. Town District Strategic Roles: In order for the Vision to be achieved each geographic region or subarea of the Town must have a defined contribution or role within the total town. These subareas have been specified and a specific Attachment A Avon’s Vision Town of Avon Comprehensive Plan Page 7 strategic role, character, and identity has been assigned to each so that the area may appropriately support our becoming the town that we envision. Attachment A Introduction Town of Avon Comprehensive Plan Page 9 II. Introduction A. Purpose of the Plan The Town’s challenge is to shape the community’s future by putting into place goals and implementation policies that will encourage the types of growth envisioned in this plan. This Comprehensive Plan provides the foundation and framework for such policies and actions by articulating an effective vision in words, maps and diagrams. Six The following principal project goals guided the development of this Comprehensive Plan:  Conduct a planning process that generates citizen and developer involvement and finds consensus.  Create an Action Plan that articulates clear goals and policies and that will direct and prioritize the Town’s future Capital Improvement Programs and future development.  Develop a Future Land Use Plan and Community Framework Plan based on Avon’s existing conditions and that identifies Avon’s most desirable future land use mix and configuration.  Develop an economic report in conjunction with a buildout analysis to identify economic constraints and opportunities facing Avon in order to better understand how land use and development decisions affect the local economy and the provision of public services.  Develop a Fiscal Impact Analysis Model to evaluate impacts from development activity on Avon’s public services costs and public revenues in order to understand the inherent trade-offs of potential land use and development scenarios.  Update other key plan elements. B. Avon’s History and Context The Town of Avon is located in the stunning Rocky Mountains of Colorado along the scenic Eagle River. The town serves as a gateway to the world-class Beaver Creek Resort and is eight miles west of world-famous Vail. It is a home rule municipality in Eagle County, with the county seat located 20miles to the west in the Town of Eagle. The early Eagle River Valley, including the area that was to become Avon, was first inhabited by the Utes. These great Native American horsemen spent winters in the mild climate to the west and returned to, in their language, “the shining Attachment A Introduction Town of Avon Comprehensive Plan Page 10 mountains”, each summer to hunt mule deer, elk and the great buffalo. The earliest Anglo-Americans visiting the area were probably hearty Mountain Men trapping beaver to supply fur for city folks' fashionable top hats. In 1845 a dashing adventurer, John Charles Fremont, led his California-bound expedition down the Eagle River through present day Avon and caught what they called a “buffalo fish,” probably a mountain white fish or a very old cutthroat trout, at a riverside camp called “William's Fishery”. The famous Hayden Survey party came to the Eagle Valley in 1873 noting impressive geology near present day Minturn and Squaw Creek, near present day Cordillera. Settlers arrived in the early 1880's, including George A. Townsend who "took up a homestead" of 160 acres, the legal limit, and built a house at the confluence of the Eagle River and Beaver Creek. Mr. Townsend is said to have fancied the name Avondale for the area. At some point, Avon became its official name. Early pioneers, including Townsend, grew hay and raised cattle to feed hungry miners in nearby Red Cliff. Metcalf and Oscar Traer rode together to Central City to witness each other's paperwork “proving up” their respective claims under the federal Homestead Act. Homesteaders also worked together to dig essential irrigation ditches, sometimes using dynamite and a horse-drawn scoop called a fresno, some of which still supply irrigating water to Avon today. As early as July 4, 1891, the Eagle County Times reported “Eagle County is a good place to visit, a better place to settle in, and the best place in the state for capital- seeking investment.” In the 1920’s head lettuce was the crop of choice in Avon and neighboring Beaver Creek and Bachelor Gulch. Box cars stood at the Avon Depot, loaded with ice from the Minturn ice house (the ice had been cut the preceding winter at Pando up near Tennessee Pass) and readied for freshly cut lettuce heads delivered in crates by farmers and their ranch hands including wives. These refrigerated railcars shipped Avon crops as far as the east coast providing fresh lettuce weeks after the nation's standard lettuce harvest was gone. Through the years Avon land produced cattle, hay, potatoes, peas, oats and, starting in the 1940's, sheep. By this time most of Avon's homesteading families were long gone but descendents of William Nottingham had stayed on and owned and operated nearly all of the land called Avon. By 1972 Vail had become one of the top destination ski resorts in the country and pressure mounted “down valley” in Avon for ranch land to be developed. One branch of the Nottingham family sold its controlling interest in the land to Attachment A Introduction Town of Avon Comprehensive Plan Page 11 Benchmark Companies and the Town of Avon was incorporated on February 24, 1978. The new town was comprised of the land in present day central and western Avon including the area that soon became Nottingham Park. After ten years, in 1988, Avon had a permanent population of 1,500 people. Another branch of the Nottinghams sold its land to companies owned by developer Magnus LindholmTraer Creek, the area encompassing present day eastern Avon and the northern hillside. Residents continued to move to Avon and, in 1998, Avon was home to over 3,000 residents. As of 200320145, Avon's population had more than doubled to 6,384727 people living in 2,321317 households. Bibliography Simonton, June B., Beaver Creek. the First One Hundred Years. June B. Simonton, Vail, Colorado. Copyright 1984. Simonton, Don and June. Living on the Mountain. A History and Field Guide of Bachelor Gulch. Vail Associates Real Estate Group, Inc., Avon, Colorado. Copyright 1996. Top left: Early Avon residents. Above: Lettuce storage sheds. Left: Avon in the 1950s. Attachment A Land Use and Community Framework Existing Land Use Patterns Town of Avon Comprehensive Plan Page 13 III. Land Use and Community Framework A. Existing Land Use Patterns Avon’s existing pattern of land uses has remained essentially unchanged since the adoption of its first comprehensive plan in 1996 with the notable exception of the annexation and initial development of the Village at Avon PUD on 1,790 acres of land east and north of the Town’s previous boundaries. The pattern of existing development in Avon has been shaped by land use regulations, natural physical characteristics of the valley, and man-made facilities and features that have been constructed over time. Significant natural features that have influenced land use patterns include the steep valley walls, relatively flat terrain upon the valley floor, the Eagle River, and smaller tributaries and drainages such as Metcalf Creek, Buck Creek, and Swift Gulch. Man-made features that have had an impact upon development and land use patterns within the Town are the railroad, US Highway 6, Interstate 70 (I-70), the local street pattern, and Nottingham Lake. Ownership of lands by the US Forest Service and the remaining land ownership patterns has also had an influence upon the arrangement of the various land uses within the Town. Land development patterns and land use designations were initially formalized in 1974, when Benchmark Corporation received approval from Eagle County for the creation of the Benchmark at Beaver Creek Planned Unit Development (P.U.D.) comprising much of the area that is now the Town of Avon. Through the platting of the 513-acre Benchmark at Beaver Creek Subdivision, Blocks 1-3, each lot or development parcel was assigned a land use designation specifying the permitted uses upon each lot, and also assigned a designated number of development rights. Each development right assigned represented the ability to construct one dwelling unit. At the time that Avon was incorporated, the development rights system remained intact and a zoning ordinance was adopted. This system has since been amended over the years; however, some of the original development rights were adopted as part of the last major Zoning Code revision in 1990. The primary focus of urban development within Avon has been in the Town Center District adjacent to Avon Road. This important roadway is the major north-south connection between I-70 and US Highway 6, and serves as the main Attachment A Land Use and Community Framework Existing Land Use Patterns Town of Avon Comprehensive Plan Page 14 access to Beaver Creek Resort. East of Avon Road, the land has been developed mainly as a one to two-story shopping center area, and is primarily oriented toward serving consumer need for both local residents and visitors traveling by automobile. A limited amount of office use also exists within this area, as well as a moderate number of residential units within vertically mixed-use buildings. The recent development of the Chapel Square mixed-use project and the associated redevelopment of the former Wal-Mart shopping center have provided a starting point for redevelopment of this area. A number of older developments provide opportunity for redevelopment due to their age and their underutilization of the land on which they are located. The area just west of Avon Road has developed into the most intensely developed area of the Town Center District. The initial developers of Avon intended the Town Center District to become the centerpiece of the town. Avon Center, The Seasons, and Mountain Vista reflect this intent by their higher density character, including a vertical mix of uses with retail and commercial uses on the ground level and a combination of residential, office, and lodging uses on upper floors. The buildings in this area currently orient themselves along the Town’s pedestrian mall, but the Town has initiated efforts to convert this pedestrian mall into a new ‘Main Street’ that can accommodate primarily pedestrians and secondarily automobiles. Located east of Avon’s existing East Town Center District is the Village at Avon Planned Unit Development. Annexed into the Town of Avon in 1998, the Village at Avon covers an area of approximately 1,790 acres extending from the existing Town Center District on the west, the railroad right- of-way on the south, the I-70 bridge over the Eagle River near the Eagle-Vail commercial area to the east, and the valley’s northern hillside north of I-70. The PUD established entitlements to develop 2,400 dwelling units (500 of which are to be constructed as affordable housing) and 650,000 square feet of commercial development. The approved PUD development plan and associated PUD Guide provide the Village at Avon developers a broad amount of latitude in terms of the design, placement, and types of uses that can be developed. In general terms, however, the PUD development plan identifies mixed use urban village development with a system of open spaces/parks and civic/cultural/entertainment uses along the valley floor, a regional commercial area immediately south of the new I-70 interchange, and residential on the lower and upper saddles of the valley’s northern hillside. West of the Town Center District is Nottingham Lake and its associated parkland and surrounding residential Attachment A Land Use and Community Framework Existing Land Use Patterns Town of Avon Comprehensive Plan Page 15 development. This area, along with the western portion of Avon between U.S. Highway 6 and the railroad, has been the focus of relatively intense multi-family development. Avon’s elementary school and the district water and wastewater treatment plants are also located in this area. A node of commercial activity within Avon is located on the north side of the I-70/Avon Road interchange. The land uses in this area include convenience stores, auto repair shops and a restaurant. These uses service the local population as well as highway travelers. Residential uses are also situated along the north side of I-70, and take advantage of the buildable areas adjacent to Nottingham Road. The Town’s only light industrial land uses occur along the western end of Nottingham Road and along Metcalf Road north of I-70. Uses in this area consist of a mixture of wholesale commercial, warehousing, office, and commercial service facilities. The area is already developed, with only a few remaining vacant parcels. Located on the north side of Avon are the Wildwood, Wildridge, and Mountain Star residential subdivisions. These areas have been designed to take advantage of southern views and solar exposure. Wildwood is a mixture of duplex and multi-family residential units, including affordable and deed restricted projects. Wildridge has developed into a mixture of single-family, duplex, and multi- family residential units. Mountain Star consists of high-end single-family residents on large lots. Eaglebend and Nottingham Station are residential areas located along the Eagle River, on the east side of Avon Road between the railroad and the river. These areas include a mixture of multi-family, duplex, and single-family housing units. Attachment A Land Use and Community Framework Opportunities and Constraints Town of Avon Comprehensive Plan Page 19 B. Opportunities and Constraints An inventory of existing and potential geographic and physical elements influencing Avon and its future planning efforts was conducted. The results of this investigation were compiled in a map of the Opportunities and Constraints. The following are some of the key elements depicted on the Opportunity and Constraints map: Opportunities:  Redevelopment of older buildings and the re-organization of parcel boundaries and the associated street pattern to create more organized and effective urban framework in the Town Center District;  Development of a transit connection directly connecting Avon’s Town Center District with Beaver Creek Village;  Development of a lift connection directly connecting Avon’s Town Center District with Beaver Creek Landing;  Opportunity to connect Avon’s Town Center District to the Eagle River;  Opportunities to increase recreational and mobility options to and from Avon with the regional trail through Avon along the Eagle River;  Utilization of Nottingham Park as a strong anchor/destination to the future “Main Street”Main Street Pedestrian Mall;  Enhancement of existing civic and recreational amenities near Nottingham Park to strengthen this area as Avon’s civic and cultural center;  Opportunity for trail connection from Buffalo Ridge to the Village at Avon; and  Potential to use the railroad right-of-way for transit service or trails. Constraints:  Avon Road is perceived as a barrier for pedestrians attempting to walk between the East and West Town Center Districts.  Avon’s East Town Center District is fragmented and lacks strong auto and pedestrian connections.  The railroad right-of-way creates a linear barrier separating Avon’s Town Center District from other certain residential and commercial area and the Eagle River. Attachment A Land Use and Community Framework Future Land Use Plan Town of Avon Comprehensive Plan Page 23 C. Future Land Use Plan The Future Land Use Plan establishes preferred development patterns by designating land use categories for specific geographical locations. It should be understood that the land use designations depicted on the land use map do not supersede the Town’s zoning districts and regulations. While the Town’s zoning districts and their associated regulations establish each parcel’s property rights in terms of allowable uses and conditions of development, the Future Land Use Plan and its land use designations are illustrative only and associated to general geographic areas and are therefore not suitable for parcel specific decision making. The Future Land Use Plan was developed by:  Integrating the ideas and concerns of local residents and property owners expressed at Stakeholder Interviews, Steering Committee meetings, Public Open Houses, Town Council hearings, and Planning and Zoning Commission hearings;  Analyzing existing land use conditions, opportunities, and constraints related to physical, social, economic, and political issues and concerns;  Understanding market conditions related to the future residential, commercial, office and industrial uses;  Creating a balanced, more sustainable inventory of land uses that provides landowners and developers greater flexibility to meet changing market demands;  Increasing the supply of residential/accommodation and commercial uses within Avon’s Town Center District to provide a critical mass and diversity of uses, services and amenities that create both day and night activities within an inviting and energized urban environment;  Defining an overall community form that peaks in terms of density and building height in the Town Center District surrounded by lower density and scale development; and  Creating a unified and cohesive physical framework and community image between the Village at Avon and remaining portions of town. The following definitions are intended to describe the intent of each land use designation depicted on the Future Land Use Plan. They should be considered in coordination with this Comprehensive Plan’s overall vision and its individual Goals and Policies.  Civic/Public – Public areas are intended to contain uses related to community services, such as fire stations, Attachment A Land Use and Community Framework Future Land Use Plan Town of Avon Comprehensive Plan Page 24 schools, community centers, hospitals, municipal centers, recreation centers, police stations, and municipal maintenance yards. Each proposed public use should be evaluated separately in terms of its land area and topographical constraints, as well as its compatibility with adjacent uses.  Open Space – Areas identified as open space are to be protected from development, so that the natural character and environment of the landscape is preserved. Open space may also be used as a buffer between conflicting land uses and activities, as an edge to the community, to preserve views, as a mechanism to preserve a valued natural resource, or to protect the public from a hazardous situation. Floodplains, with their associated riparian habitat and wildlife, steep slopes, ridges, and other lands with unique physical properties are also good candidates for open space designation.  Parkland – Parks are intended to provide for the passive and active recreation needs of the community or region. Where possible, they should be located and designed to take advantage of natural features and amenities.  Residential Low Density – Areas designated for residential low density are intended to provide sites for single-family, duplex, and multi-family dwellings at a density no greater than 7.5 dwelling units per acre.  Residential Medium Density – Areas designated for residential medium density are intended to provide sites for multi-family dwellings at a density no less than 7.5 and no greater than 15 dwelling units per acre.  Residential High Density – Areas designated for residential density are intended to provide sites for multi- family dwellings no less than 15 and no greater than 20 dwelling units per acre.  Mixed Use– The intent of the mixed-use designation is to create an area providing commercial retail and service uses with a supporting mix of office, residential, lodging, and entertainment uses in an urbanized, pedestrian- oriented environment. A high proportion of lodging and other residential uses should be achieved in order to create the needed critical mass of population and activity to energize the Town Center District. Building should be vertically mixed, with retail, restaurants, and other commercial services located on the lower levels in order to encourage a high level of interest and pedestrian Attachment A Attachment B Avon’s housing occupancy is made up of approximately 32% renter occupied units, 23% owner occupied units, and 45% vacant units, defined as no one living at the property at the time of the survey, unless the occupants are only temporarily absent. 32% 23% 45% Avon Housing Occupancy, 2014 Renter Occupied Units Owner Occupied Units Vacant Units (on day of suvey) 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Avon (3,882)Basalt (1,766) Eagle (2,474)Edwards (5,377) Gypsum (2,123) Minturn (501)Red Cliff (116) Vail (7,209)Eagle County (31,392) Housing Occupancy, 2014* Occupied Vacant The educational attainment in Avon roughly mirrors that of the County, with slightly more not achieving a high school diploma and slightly less achieving a bachelor’s degree or higher. Avon’s income distribution has more people at the lowest end of earnings, more people in the middle income brackets, and fewer at the higher categories than Eagle County. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% No high school degree High school graduate Associates degree Bachelor's degree or higher Bachelor's degree Graduate or professionalPercent of Residents Educational Attainment Avon Eagle County 0% 5% 10% 15% 20% 25% 30% 35% Less than $10,000 $10,000 to $14,999 $15,000 to $24,999 $25,000 to $34,999 $35,000 to $49,999 $50,000 to $74,999 $75,000 to $99,999 $100,000 to $149,999 $150,000 to $199,999 $200,000 or morePercent of Residents Income Distribution Avon Eagle County Attachment C – Schedule of Meetings Meeting #1 September 6 Project Goals Scope & Schedule Meeting #2 September 20 Appendices including Updated Demographics Relationship to Development Code & Legal Authority Review of Other Comprehensive Plans Meeting #3 Section I: Avon’s Vision Section II: Introduction Section III: Land Use and Community Framework Meeting #4 Section IV: Goals and Policies Meeting #5 Section IV: Goals and Policies (Cont’d) Meeting #6 Section V: District Planning Principles Meeting #7 Section V: District Planning Principles (Cont’d) Meeting #8 Updated Graphics and Complete Draft Meeting #9 Public Hearing and Recommendation to Council Town of Avon Planning & Zoning Commission Meeting Minutes Tuesday, September 20, 2016 I. Call to Order The meeting was called to order at 5:12 pm. II. Roll Call Commissioner Barnes was absent; all other Commissioners were present. III. Conflicts of Interest Commissioner Golembiewski stated that he is working as a consultant for the Eaglebend apartments and expressed support for the shelter; PZC decided to recuse him from the decision making process. IV. Consent Agenda The consent agenda was not voted on due to the absence of wording about changes to a decision. V. Minor Development Plan – ECO Bus Stop Shelter File: MNR16030 Application Type: Minor Development Plan Location: Public Right of Way on Highway 6 in front of Eaglebend Apartments Applicant/Owner: Town of Avon Summary: The Town of Avon proposes to install a new ECO bus shelter at the stop in front of the Eaglebend Apartments on Highway 6. The shelter design matches the ECO Transit standard. Public Comments: None. Action: Commissioner Hardy moved to approve MNR16030 with the following Findings and Conditions: Finding: 1. The proposed bus shelter design meets the applicable Development Plan review criteria outlined in §7.16.080(f), Development Plan, Avon Municipal Code. 2. No needed provision for bicycle racks was found at this location based upon proximity to the Eaglebend apartments and other bicycle storage facilities. Condition: 1. The proposed bus shelter will be built in mirror-image form, so that entrances to the shelter are on the south and east side of the structure. Commissioner Howell seconded the motion and the motion passed with a 5-0 vote. VI. Work Session - 2006 Comprehensive Plan Update Summary: The Planning and Zoning Commission was given updated demographic data to use as a basis for assessing the coming proposed updates. Town Staff got direction to exclude the majority of data in appendices unless they were directly tied to items within the body of the document. VII. Staff Approvals • Storage Shed at 2080 Wildridge Road 1 September 20, 2016 Planning and Zoning Commission Meeting Minutes VIII. Staff Updates • Lot B Hotel • BC Blvd Public Meetings IX. Adjourn The meeting was adjourned at roughly 7:45 pm. Approved this 4th Day of October, 2016 SIGNED: _______________________ Jim Clancy, Chairperson 2 September 20, 2016 Planning and Zoning Commission Meeting Minutes