Loading...
PZC Packet 0706161 Agenda posted on Friday, July 1, 2016 at the following public places within the Town of Avon: -Avon Municipal Building, Avon Recreation Center, Avon Public Library, Town of Avon Website www.avon.org Please call 970-748-4030 for Questions Town of Avon Planning & Zoning Commission Meeting Agenda Wednesday, July 6, 2016 One Lake Street If you require special accommodation please contact us in advance and we will assist you. You may call David McWilliams at 970-748-4023 or email cmcwilliams@avon.org with any special requests I. Call to Order – 5:00pm II. Roll Call III. Additions & Amendments to the Agenda IV. Conflicts of Interest V. Consent Agenda  Findings of Fact and Record of Decision for Temporary Use File TMP16001 at Lot 26-28, Block 1, Benchmark at Beaver Creek Subdivision / 910 Nottingham Road – June 21, 2016 Action VI. Basecamp Condominiums –CONTINUED PUBLIC HEARING File: MJR16006 Application Type: Major Development Plan Legal Description: Lot 1, Eagle River at Avon / 38359 Highway 6 Applicant: Dominic Mauriello, MPG Owner: Red House Avon, LLC Summary: Proposal for fifteen (15) new condominium units in accordance with Red House PUD. File is continued from the June 21, 2016 meeting. VII. Live/Work Unit at Vail Avon Commercial Park- PUBLIC HEARING File: SRU16001 Application Type: Special Review Use Legal Description: Lot 14-15 Block 1, Benchmark at Beaver Creek, Unit #2NB Applicant: Mark Donaldson, VMDA Owner: Jeffery F. Schiros Summary: Proposal to allow the use of a live/work unit within the commercial space to include 3 bedrooms. VIII. Swift Gulch Master Sign Program Amendment -DESIGN REVIEW File: SGN16003 Application Type: Master Sign Program Amendment Legal Description: Lot 68, Block 1, Benchmark at Beaver Creek / 008 Nottingham Road Applicant: KTK General Contracting Owner: Avon Convenience LLC Summary: Proposal to amend the Master Sign Program to include a wave and blade design at pumps. 2 Agenda posted on Friday, July 1, 2016 at the following public places within the Town of Avon: -Avon Municipal Building, Avon Recreation Center, Avon Public Library, Town of Avon Website www.avon.org Please call 970-748-4030 for Questions IX. Approval of Meeting Minutes  June 21, 2016 Meeting Minutes X. Staff Approvals  Metal Fence | 4301 Eaglebend Drive  Swift Gulch Exxon Monument and Canopy Signs | 008 Nottingham Road  Stucco Repair and Repaint | 137 Benchmark Road XI. Other Business  Public Facilities (PF) and Town Center (TC) Code Amendments XII. Adjourn PZC Findings of Fact and Record of Decision: #MNR16006 Ulele Sculpture Page 1 of 1 PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE: July 6, 2016 TYPE OF APPLICATION: Temporary Use Application – Colorado Poolscapes, Inc. FILE NUMBER: #TMP16001 PROPERTY LOCATION: Lot 26-27 Block 1 Benchmark at Beaver Creek ADDRESS: 910 Nottingham Road APPLICANT: Colorado Poolscapes , Inc. OWNER: Avon Mountain Center, LLC c/o NAI Mountain Commercial These findings of fact and record of decision is made in accordance with the Avon Development Code (“ADC”) §7.16.020(f)(3), Findings. DECISION: Denied VOTE: 6 in favor; 2 opposed. FINDINGS: 1. The application was reviewed pursuant to §7.24.080, Temporary Use, and the use in question more properly aligns with the Sign Code. 2. The proposed use would set precedent in Town, and could lead to unattractive outcomes. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ Jim Clancy, Chairperson July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 1 Staff Report CONTINUED PUBLIC HEARING Case #MJR16006 Major Development Plan & Design Review July 6, 2016 Planning & Zoning Commission Meeting Project type Major Design & Development Plan - Townhomes Public Hearing  Required  Not Required Legal Description Zoning Lot 1, Eagle River at Avon Subdivision Planned Unit Development (PUD) Address 38359 Highway 6 Prepared By Matt Pielsticker, AICP Staff Report Overview This staff report contains one application for consideration by the PZC: 1. Major Development Plan with Design Review for a townhome project on the Red House property. Summary of Request Representing the property owner, Red House Avon LLC, Dominic Mauriello of MPG (“Applicant”) is proposing a design plan (“Application”) for fifteen (15) townhome units. The Applicant has submitted a Major Design and Development application, and review by Planning and Zoning is required with a public hearing. The project may be phased, and includes three buildings: Building A contains four (4) units, Building B contains five (5) units, and Building C contains six (6) units. The lot is accessed with a westbound turn lane off Highway 6 with right-in, right-out access. Additionally, right-in, right-out access is provided from Avon Road. Development Standards for the property are generally limited to those approved as part of the PUD zoning; however, some standards from the Avon Development Code apply for materials, colors, and townhome design. The file was continued from June 21, 2016. Updates to Development Plan The Application was reviewed at the June 21, 2016 PZC hearing. In response to comments at that meeting, the following changes were made to the plans:  3:12 roofs have been replaced by 6:12 main roofs and 4:12 shed dormers.  All buildings have at least 1 ridge step of at least 18".  Asymmetric dormer replaced with 6:12 dormer.  Shed dormers have been incorporated into the roof design to break up continuous eave and actively control snow.  Partial roofs have been incorporated above garage entries and main unit entries. This actively breaks down mass and also provides moisture protection for the user.  Building ends have been architecturally defined. July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 2  Cedar siding has been eliminated as an immediate building base material. It has been replaced by Swiss Pearl panel, metal panel or stucco.  Window patterns have been modified on Building C.  Vehicle gate at the south entry has been modified to increase queuing depth and mitigate pedestrian and cycling conflicts.  Materials and transitions have been further articulated.  Cross walks with proper signage have been incorporated project entries. Application Purposes 7.16.80 Development Plan The purpose of the Development Plan review process is to ensure compliance with the development and design standards and provisions of this Development Code. It is designed to encourage quality development reflective of the goals, policies and objectives of the Comprehensive Plan. 7.16.90 Design Review The purpose of the design review process is to ensure compliance with the development and design standards of the Development Code prior to the issuance of a building permit or concurrent with other required permits and to encourage quality development reflective of the goals and objectives of the Avon Comprehensive Plan. Public Notice Notice of the public hearing was published in the June 10, 2016 edition of the Vail Daily in accordance with Sec. 7.16.020(d) of the Avon Development Code. Mailed notice is not required for this application type. Property Description & Background The property is 1.131 acres or 49,266 square feet, and is located at the intersection of Avon Road and Highway 6. The property is bordered on the north by the Eagle River, on the east by Beaver Creek, on the south by Highway 6, and on the west by Avon Road. The Eagle Valley Regional bike path borders the west and south sides of the project, crossing the two driveway access points. July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 3 Aerial view of Lot 1 The land historically contained the Red House, a 1 ½ story residential building that was constructed in 1900. After being heavily modified with additions and different building materials in 1982, the structure no longer held historic value for registering. The building was eventually occupied as an office for Vail Resorts. The property was annexed in 2009 and obtained PUD zoning for fifteen (15) townhomes at the same time. The structure was ultimately demolished in 2012, and the property was graded flat in the building footprint area. Planning Analysis Allowed Use and Density: The Property is zoned Planned Unit Development (PUD) and is located in the Red House PUD. The Applicant is proposing fifteen (15) residential townhomes in accordance with the PUD Development Plan. Vacation/Short Term rentals are also a use-by-right. Lot Coverage, Setback and Easements: The applicant is proposing thirty-nine-point-four percent (39.4%) building site coverage, which complies with the maximum fifty percent (50%) allowed by the PUD. The proposed structure is in compliance with the setbacks and easements. The building footprints closely border the 30’ river setback, which is measured from the annual high water line. The PUD permits roof overhangs, above July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 4 ground balconies, and patios to extend into the river setback by notation on the PUD Development Plan. Please refer to Sheet PZC-4.0 for a closer look at the relationship of setbacks with the building footprints. Building Height: The maximum building height permitted for this property is forty-eight feet (48’). The applicant is proposing a maximum building height of forty-eight (48’) according to the development plans. The height must be verified during the building permit process with foundation and framing Improvement Location Certificates (ILC). Parking: The parking requirement is two (2) spaces per unit, and four (4) guest spaces, for a total of thirty-four (34) required parking spaces. The applicant has provided thirty- four (34) on-site spaces, thereby meeting the minimum parking standards. Outdoor Lighting: The Applicant is proposing to use dark-sky- compliant lighting fixtures. There are two pole mounted “barn” lights, one near each vehicle entrance. Additionally, each unit contains a brushed aluminum wall mounted fixture (see to the right) on the front and rear of the buildings. The fixtures comply with the Outdoor Lighting Ordinance. Snow Storage: The total driveway area is 7,627 square feet of surface area requiring 1,525 square feet of snow storage. The Applicant is proposing 1,543 square feet of snow storage. Snow storage is proposed at the bulb-out parking areas on either end of the project as well as between some of the driveway areas. The aspen trees that will be located between the driveways should accommodate ample snow storage area. The snow storage areas are practical and exceed the minimum requirement of twenty percent (20%) of the driveway area. Design Standards Analysis Landscaping: The proposed landscape plan meets the minimum landscape area requirements (20%) by providing 50.2% landscaped area. Plantings include the use of deciduous and evergreen trees and shrubs. Aspens and larger (10’ to 16’) spruce trees are indicated on the plans. The area between Building C and Avon Road is heavily vegetated with an added berm extending what already exists in that area of the lot. Building Design, Building Materials and Colors: The primary exterior building materials and colors being proposed are included on final pages of the reduced plans. All of the building materials are of high quality and appropriate for the project. Details are provided for all of the material applications The Light Reflective Values (LRV) of the ‘Cape Code Gray’ measures forty (40), with is within the allowable LRV limit of 60. All other colors are well within the maximum allowed by code. All colors appear to be earth tone and acceptable by Code. Roof Material and Pitch: The roof material and pitch were reviewed for compliance with Sec. 7.28.090(d)(3) Roofs. Roof pitches have been modified since original submittal July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 5 to comply with pitch standards for primary roof forms. The applicant is proposing to use Dark Grey asphalt shingles for all roofing with a minimum four-to-twelve (4:12) pitch, which is compliant the Development Code. Design Standards for Townhomes The Avon Development Code (“ADC”) contains specific review criteria for townhome construction. ADC Section 7.28.090(d)(6) contains the following guidance when reviewing townhome designs: Duplex, Townhome, and Multi-Family Design. Duplex, Townhome, and Multi-Family developments shall be designed in a manner that creates a single unified structure and site plan. Unified design shall include, but not be limited to, the use of com patible building materials, architectural style, scale, massing, detail, roof forms, and landscaping. While ‘mirror image’ units are not supported, the design intent should be one that creates a unified structure with enough variety and architectural inter est to distinguish a duplex, townhome, or multi-family structure from a single family home. The design creates unified structures that can be differentiated from single units, with the use of detailing, massing, and the use of detailing to distinguish the individual units. Architectural interest is added with framed window bump outs, rich wood coloring and earth tone stucco. Major Development Plan & Design Review - Review Criteria §7.16.080(f), Development Plan (1) Evidence of substantial compliance with the purpose of the Development Code as specified in §7.04.030, Purposes; Staff Response: The Application is in compliance with the applicable purposes outlined in the Development Code. In particular, the proposed structures “promote architectural design which is compatible, functional, practical and complimentary to Avon’s sub-alpine environment” through the use of building materials and articulation. (2) Evidence of substantial compliance with §7.16.090, Design Review. Staff Response: Staff finds this Major Design and Development Plan Application compliant with the Design Review criteria of the Development Code. The Design Review section seeks quality development and structures that are visually harmonious with their site and surrounding vicinity. Conformance with this code section is discussed below in response to the Design Review criteria. (3) Consistency with the Avon Comprehensive Plan; Staff Response: The site is located in the Highway 6 Gateway Corridor (District 6) in the Comprehensive Plan. The Highway 6 Gateway Corridor includes principles that encourage a landscaped boulevard/parkway to provide a sense of arrival and departure for those traveling to and from Avon and to strengthen Avon’s overall community image and identity. Additionally, the Highway 6 Gateway Corridor encourages the enhancement of river access to the Whitewater Park. July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 6 This application provides increased landscaping to buffer the project and achieve the goals of the Comprehensive Plan. The river access is further enhanced by condition of the Red House PUD to include a new 3-4’ footpath under Bob the Bridge to access the south side of the whitewater park. (4) Consistency with any previously approved and not revoked subdivision plat, planned development, or any other precedent plan or land use approval for the property as applicable; Staff Response: The application is in conformance with the accompanying requirements of the Red House PUD. All provisions of the Annexation and Development Agreement remain in force and the development will comply with provisions of that approval. (5) Compliance with all applicable development and design standards set forth in this Code, including but not limited to the provisions in Chapter 7.20, Zone Districts and Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development Standards; and Staff Response: In addition to the above-referenced provisions of the Development Code the Red House PUD Development Plan states that the “Building architectural style and quality shall be commensurate with the conceptual rendering submitted with the PUD Zoning application and on file with the Town.” The following elevations were presented with the PUD Zoning file: The proposed Development Plan appears to have a commensurate design with that presented during PUD review in 2009. Pitched roof forms, with stone and stucco siding were used in the conceptual PUD planning phase. (6) That the development can be adequately served by city services including but not limited to roads, water, wastewater, fire protection, and emergency medical services. July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 7 Staff Response: The Applicant has demonstrated that the proposed development can be served by all city and special district services in the area. §7.16.090(f), Design Review (1) The design relates the development to the character of the surrounding community; or, where redevelopment is anticipated, relates the development to the character of Avon as a whole; Staff Response: The proposed architecture, materials, color palette and landscape is similar in character to other structures in the area which feature wood and stucco siding, and earth tone colors. Additionally, the landscaping is proposed to consist of a mix of evergreen and deciduous species native to the area which is common throughout Town. (2) The design meets the development and design standards established in this Development Code; and Staff Response: The design is compliant with the development and design standards contained in the Development Code as determined by the above analysis. (3) The design reflects the long range goals and design criteria from the Avon Comprehensive Plan and other applicable, adopted plan documents. Staff Response: Applicable adopted plans include the Avon Comprehensive Plan and Townhome provisions of the Development Code. The design has been evaluated for conformance with these plans and staff has determined the proposed design meets the requirements as proposed. Staff Recommendation for MJR16006 Major Design & Development Plan: Staff recommends approving the Major Design and Development application for Basecamp on Lot 1, Eagle River at Avon. Recommended Motion: “I move to approve Case #MJR16006, an application for a Major Design and Development Plan for Lot 1, Eagle River at Avon, with the findings and conditions listed in Staff’s report.” Findings Should PZC Approve the Application: 1. The Application meets the requirements of the Red House PUD and is in conformance with the zoning requirements. 2. The building architectural style and quality is commensurate with the conceptual renderings submitted with the Red House PUD Zoning application. 3. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the review criteria. 4. The design meets the development and design standards established in the Avon Development Code. July 6, 2016 Planning and Zoning Commission Meeting Lot 1, Eagle River at Avon / Major Design & Development Page | 8 5. The design relates the development to the character of the surrounding community. 6. The design reflects the long range goals and design criteria from the Avon Comprehensive Plan. Conditions Should PZC Approve the Application: 1. If the project is broken into multiple phases, a phasing plan will be reviewed and approved by Community Development. Staff reserves the right to require Surety for site restoration in accordance with the Municipal Code. 2. Prior to building permit: a. A public improvement agreement will be executed. b. Crosswalk improvements will be reviewed approved by the Town Engineer. c. School Site payment-in-lieu will be satisfied. Attachment A. Revised Elevations and Roof Plan WOOD 1 CAPE COD GRAY WOOD 3 CEDAR WOOD 2 CHOCOLATE CEMENTITIOUS 1 GUN METAL WALL MATERIAL LEGEND STUCCO 1 DARK GRAY BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF BLDG A 142' - 1 7/8" E06 E09 E09 E03 E07 E06 E08 E01 7,485.94 7,485.94 7,484.44 BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF BLDG A 142' - 1 7/8" E09 E03 E07 E05 E04 7,484.44 7,485.94 7,485.94 BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF BLDG A 142' - 1 7/8" E03 E08 E05 E07 E01 7,485.94 7,485.94 7,484.44 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" LEVEL 1 100' - 0" LEVEL 2 110' - 0" BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF BLDG A 142' - 1 7/8" E05E09 E01 E06 E08 7,484.44 7,485.94 7,485.94 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 118 W SIXTH ST, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.384.9032 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.0 ARCHITECTURAL ELEVATIONS - BUILDING A 15029.00BASECAMP JUNE 16, 2016 PZC SUBMITTAL EXTERIOR MATERIAL LEGEND NOTE MATERIAL E01 ASPHALT SHINGLE ROOF E03 DECK FASCIA BOARD E04 6" HORIZONTAL WOOD SIDING - CAPE COD GRAY E05 4" HORIZONTAL WOOD SIDING - CHOCOLATE E06 6" HORIZONTAL WOOD SIDING - CEDAR E07 STUCCO SIDING - DARK GRAY E08 CEMENT COMPOSITE PANEL - GUNMETAL GRAY E09 METAL RAILING WITH HORIZONTAL BARS 3/32" = 1'-0"2 BUILDING A ELEVATION NORTH 3/32" = 1'-0"1 BUILDING A ELEVATION SOUTH 3/32" = 1'-0"4 BUILDING A ELEVATION EAST 3/32" = 1'-0"3 BUILDING A ELEVATION WEST No. Description Date NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' WOOD 1 CAPE COD GRAY WOOD 3 CEDAR WOOD 2 CHOCOLATE CEMENTITIOUS 1 GUN METAL WALL MATERIAL LEGEND STUCCO 1 DARK GRAY BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF - BLDG B 145' - 4 5/8" E09 E03 E07 E04 E08 E06 E01 7,489.17 7,486.31 7,486.31 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" TOP OF ROOF - BLDG B 145' - 4 5/8" E04 E07 E09 E03 7,489.17 7,486.31 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF - BLDG B 145' - 4 5/8" E09 E07 E04 E08 7,486.31 7,489.17 7,489.17 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG A/B LEVEL 1 100' - 0" BLDG A/B LEVEL 2 110' - 0" BLDG A/B LEVEL 3 121' - 4" BLDG A/B LEVEL 4 131' - 4" TOP OF ROOF - BLDG B 145' - 4 5/8" E06 E08 E04 E09 E05 7,489.17 7,489.17 7,486.31 E01 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 118 W SIXTH ST, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.384.9032 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.1 ARCHITECTURAL ELEVATIONS - BUILDING B 15029.00BASECAMP JUNE 16, 2016 PZC SUBMITTAL EXTERIOR MATERIAL LEGEND NOTE MATERIAL E01 ASPHALT SHINGLE ROOF E03 DECK FASCIA BOARD E04 6" HORIZONTAL WOOD SIDING - CAPE COD GRAY E05 4" HORIZONTAL WOOD SIDING - CHOCOLATE E06 6" HORIZONTAL WOOD SIDING - CEDAR E07 STUCCO SIDING - DARK GRAY E08 CEMENT COMPOSITE PANEL - GUNMETAL GRAY E09 METAL RAILING WITH HORIZONTAL BARS 3/32" = 1'-0"1 BUILDING B ELEVATION SOUTH 3/32" = 1'-0"2 BUILDING B ELEVATION NORTH 3/32" = 1'-0"3 BUILDING B ELEVATION EAST 3/32" = 1'-0"4 BUILDING B ELEVATION WEST No. Description Date NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' WOOD 1 CAPE COD GRAY WOOD 3 CEDAR WOOD 2 CHOCOLATE CEMENTITIOUS 1 GUN METAL WALL MATERIAL LEGEND STUCCO 1 DARK GRAY BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 10 5/16" E08 7,489.64 7,489.647,488.14 E01 E02E05 E01 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 10 5/16" E09 E03 7,489.64 7,489.64 E05 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 10 5/16" E09 7,489.64 7,489.64 7,488.14 E05 E02 E01 E08 E04 E09 BLDG C LEVEL 1 100' - 0" BLDG C LEVEL 2 110' - 0" BLDG C LEVEL 3 121' - 4" BLDG C LEVEL 4 131' - 4" TOP OF ROOF - BUILDING C 145' - 10 5/16"E05 E06 E08 E04 7,489.647,489.64 7,488.14 E01 E02 E06 E07 PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 118 W SIXTH ST, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.384.9032 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-6.2 ARCHITECTURAL ELEVATIONS - BUILDING C 15029.00BASECAMP JUNE 16, 2016 PZC SUBMITTAL EXTERIOR MATERIAL LEGEND NOTE MATERIAL E01 ASPHALT SHINGLE ROOF E02 ROOF FASCIA BOARD E03 DECK FASCIA BOARD E04 6" HORIZONTAL WOOD SIDING - CAPE COD GRAY E05 4" HORIZONTAL WOOD SIDING - CHOCOLATE E06 6" HORIZONTAL WOOD SIDING - CEDAR E07 STUCCO SIDING - DARK GRAY E08 CEMENT COMPOSITE PANEL - GUNMETAL GRAY E09 METAL RAILING WITH HORIZONTAL BARS 3/32" = 1'-0"1 BUILDING C ELEVATION SOUTH 3/32" = 1'-0"2 BUILDING C ELEVATION NORTH 3/32" = 1'-0"3 BUILDING C ELEVATION WEST 3/32" = 1'-0"4 BUILDING C ELEVATION EAST No. Description Date NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' 4 6 +4 6 .5 4 7 4 7 4 6 4 5 4 8 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 3 4 3 + 4 2 .2 +4 4 .8 +4 3 .5 4 H P 4 5 4 3 4 3 4 3 4 4 4 3 4 4 4 3 4 1 4 1 7430 7440 7444 74407430383634323836341 8 38744074407430 7 4 2 0 7440 7 4 4 2 74 4 27444 W E E E E EEE E E E E EEE BUILDING A FOOTPRINT BUILDING B FOOTPRINT BUILDING A FOOTPRINT BUILDING B FOOTPRINT BUILDING C FOOTPRINT BUILDING C FOOTPRINT 30' SITE SETBACK LINE FROM AVG. HIGH WATER LINE 30' SITE SETBACK LINE FROM AVG. HIGH WATER LINE EXISTING WATER LINE EASEMENT EXISTING SEWER EASEMENT TO BE RELOCATED, RE: CIVIL 25' SITE SETBACK LINE FROM STREET KAYAK PARK EASEMENT AVERAGE HIGH WATER MARK PER AEI TOPOGRAPHIC SURVEY, APRIL 2007 7,474.06 7,476.82 7,476.82 7,474.56 7,484.44 (43'-3/4") (46'-9 7/8")(46'- 9 7/8") (41'-5 1/4") 7,474.06 7,484.44 7,476.15 7,476.15(33'-1 7/8") (33'-1 7/8") 7,485.94 7,475.69 (32'-8 1/4") (41'-11 1/4") (31'-1/4") (42'-5 1/4")7,485.94 7,478.25 (45'-3")(47'-11 1/4") 7,475.69 (42'-8 1/4") (42'-6 3/4") (40'-4 1/4")(44'-4 1/4") 7,485.94 7,478.25 7,478.25 (43'-11 1/4") (35'-3") (35'-3") 7,489.64 7,489.647,489.64 7,483.79 7,483.79 7,483.79 7,475.39 7,488.147,478.72 7,478.72 (41'-8 7/16")(41'-8 7/16") (35'-9 3/4") 7,477.89 7,489.64 7,477.89 7,488.14 (46'-7 11/16")(46'-7 11/16")(46'-7 11/16") (40'-9 1/2") (47'-7 11/16") (46'-1 11/16") (35'-10 11/16") (38'-6 5/8") (37'-2 5/8") 7,475.39 (32'-4 11/16") (45'-1 11/16") 7,477.40 (35'-4 13/16") (34'-4 11/16") 7,478.22 7,478.22 (37'-2 5/8") (37'-6 5/8") (34'-10 11/16") 7,489.17 7,479.79 7,477.79 7,477.79 7,479.79 7,489.17 7,479.79 7,477.79 7,474.94 7,486.31 7,486.31 7,478.68 7,486.31 7,478.68 7,478.68 7,477.52 7,477.52 7,474.94 (46'-9 1/2") (45'-2")(34'-9 1/2") (35'-9 1/2") (35'-9 1/2") (47'-2") (34'-9 1/2") (36'-9 1/2") 7,477.52 7,477.52 (37'-6 1/4") (37'-6 1/4") (35'-11 5/16") (46'-3 3/4") (38'-8 3/16")(35'-8 3/16") (46'-3 3/4")(45'-3 3/4") (36'-6 1/4") (37'-8 3/16") (36'-6 1/4") PROJECT NUMBER ISSUE DATE REVISION SHEET TITLE ISSUE SHEET NO.AVON ROADAVON, CO 816203630 OSAGE STREET DENVER, CO 80211 720.390.7401 EDWARDS BUSINESS CENTER 34510 US HIGHWAY 6, UNIT A9 P.O. BOX 97 EDWARDS, CO 81632 970.926.3373 118 W SIXTH ST, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.384.9032 P.O. BOX 526 WOLCOTT, CO 81655 303.916.2622 970.926.2378 CLIENT PZC-7.3 ROOF PLAN 15029.00BASECAMP JUNE 16, 2016 PZC SUBMITTAL 3/32" = 1'-0"1 ROOF PLAN No. Description Date NOTE: LEVEL 1 AS DRAWN (100'-0") IS AT AN ELEVATION OF 7,443.78' July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 1 Staff Report Case #SRU16001 Special Use Review July 6, 2016 Planning & Zoning Commission Meeting Project type Special Use Review Public Hearing Required Not Required Legal Description Zoning Lot 14-15, Block 1, Benchmark at Beaver Creek Light Industrial and Commercial (IC) Address 371 Metcalf Road Unit #2NB Prepared By David McWilliams, Town Planner Introduction Mark Donaldson (Applicant) is requesting a Special Review Use (SRU) Permit to allow the use of a live/work unit at the Vail Avon Commercial Center, unit 2NB (Property). The property is zoned Light Industrial and Commercial (IC). The proposed unit is a 2,015 square foot three (3) bed, two (2) bath dwelling with a kitchen, living room, dining room, family room, and storage closets. It is to be constructed within the existing working space occupied by Jeffery Schiros, owner of Jeff Schiros Painting, LLC. The remaining 625 square feet of the unit wi ll be maintained as office space, storage of painting related materials, a restroom, and vehicle storage. The live/work unit will have direct access to the exterior, as required by building occupancy code. Zoning The property is zoned (IC) and live/work units are permitted as a Special Review Use pursuant to §7.16.100, Special Review Use. Currently, there is another live/work unit within the complex, owned by Robert Wagner of Wagner Electric. §7.20.080(g) and Table 7.20-13 permits four (4) dwelling units per property (Lot), and requires Special Use Review of applications. If approved, there would be 2 (two) dwelling units on the lot. Special Use Reviews are regulated in §7.16.100 and, “provides a discretionary approval process for special review uses that have unique or widely varying operating characteristics or unusual site development features. The procedure encourages public review and evaluation of a use’s operating characteristics and site development features and is intended to ensure that proposed use will not have a significant adverse impact on surrounding uses or on the community at large.” Avon Municipal Code Review Standards:  §7.16.100 Special Review Use  §7.20.080 – IC Zone District  §7.24.060 – Special Review Uses  Table 7.20.13 – Dimensional Standards Staff has reviewed the proposed live/work unit according to the above standards and found no conflict with the intensity of use or scale of the proposal. The proposed conversion is a Special Review Use that, upon approval, shall be evaluated for compliance with all fire, health, and building codes. The presented design adheres to those guidelines, and the Applicant has been proactive in complying with the Town’s regulations. Comprehensive Plan Analysis: July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 2 Specific Land Use Policies identified in the Comprehensive Plan that support this application include: Policy C.2.1: Promote a wide range of residential uses including single family, duplex, multifamily, and vertically integrated residential units (housing on the upper floors of mixed use commercial buildings) throughout the town. Policy C.5.2: Permit accessory residential uses in association with light industrial commercial development when compatible. Policy D.1.1: Encourage creative, forward thinking development consistent with adopted plans. Policy E.1.2: Permit home occupations and live/work opportunities where there is minimal negative impact to the neighborhood to reduce traffic/commuting impacts in the community and provide affordable options for local entrepreneurs. Policy F.2.1: Encourage private development that provides a diversity of housing types, sizes, architectural styles, and process ranges appropriate for local working families. Metcalf Road District Planning Principle: Accommodate limited/accessory residential development that supports primary industrial/employment land uses. This three (3) bedroom live/work unit has the potential to positively affect t hese goals. The proposed live/work unit in the IC district is compatible with the zoning and current use, and will not adversely affect neighboring uses or the general wellbeing of the public. Parking and Traffic: Staff anticipates sufficient parking minimums to be maintained due to the nature of the development and adjacent uses. The use would have a negligible impact on the site, and could serve to limit trips generated by reducing average commutes of workers. Review Criteria A Special Review Use application must meet the criteria set forth in Sec. 7.16.100€ of the Avon Development Code as follows: (1) The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations; Staff Response: The proposed use furthers Goal C.5.2 of the Avon Comprehensive Plan by permitting a live/work unit in the IC zone district. The use is compatible with adjacent and surrounding uses. The applicant is compliant with all applicable provisions of the Avon Development Code to permit a live/work unit on this property. The applicant will be required to obtain State approval for electrical inspections. (2) The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use-specific standards in the Development Code; Staff Response: Live/work units are permitted as a Special Review Use in the IC zone district. Uses permitted in the IC zone district are intended to serve community and regional needs; the business and housing uses are consistent with the purpose and intent of the IC zone district. (3) The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics; July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 3 Staff Response: A live/work unit within this specific IC zone is compatible with, and will not negatively impact, adjacent uses which are non-intensive and commercial in nature. (4) Any significant adverse impacts (including, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts) anticipated to result from the use will be mitigated or offset to the maximum extent practicable; Staff Response: A live/work unit is less intensive than legally existing uses on the property and will have a negligible impact on traffic generation, lighting, noise, odor, dust and other external impacts. (5) Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development; Staff Response: The live/work unit will be constructed to all currently applicable building and fire codes within an existing building that is currently serviced with all utilities, police and fire protection. It should have a negligible impact on these utilities and services. Recommended Motion: “I move to approve Case #SRU16001, an application for a live/work unit wi thin the commercial property on Lot 14-15, Block 1, Benchmark at Beaver Creek Subdivision together with staff’s recommended findings and conditions.” Findings: 1. The Application was reviewed in conformance with the provisions and procedures outlined in §7.16.100, Avon Development Code. 2. Live/Work Units are supported by the Comprehensive Plan goals and policies, as outlined in Staff’s Report. Condition: 1. The unit will be leased to employee(s) of Jeff Schiros Painting, LLC, employee(s) of another business situated at 371 Metcalf Road, or a Building Property Manager/ Caretaker for the subject property. ATTACHMENTS:  Vicinity Map of Property  Subdivision Map of Property  Application Materials including floor plan July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 4 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 5 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 6 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 7 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 8 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 1 Staff Report Case #SGN16003 Master Sign Program Amendment July 6, 2016 Planning & Zoning Commission Meeting Project type Master Sign Program Amendment Public Hearing Required  Not Required Legal Description Zoning Lot 68 Block 1, Benchmark at Beaver Creek, Eagle River at Beaver Creek Neighborhood Commercial (NC) Address 8 Nottingham Road Prepared By David McWilliams, Town Planner Background KTK General Contracting (applicant) seeks approval to amend the Comprehensive Sign Program of the Swift Gulch Business Center, 2003 (attached). These changes would allow the current tenants to update corporate logos in the gas pump area with the addition of blade signs for increased branding and advertisement space. Staff recently approved corporate logo changes to the top of the canopy and the monument sign based on conformance with the existing Master Sign Program. Summary of Request Applicant seeks the addition of six (6) interior lit blades over pumps and three (3) waves attached to the east canopy column, per Exxon corporate standards. (attached) The addition of the blades requires review and action by the Planning and Zoning Commission. Staff administratively approved changes to the monument, canopy signs, storefront logos, and pumps. Planning Analysis Sign Program Design Review - Review Criteria §15.28.070, Design Review Criteria 1) The suitability of the improvement, including materials with which the sign is to be constructed and the site upon which it is to be located; Staff Response: The proposed signage improvements are suitable to the gas station site. The materials proposed are aligned with other commercial signage improvements in the commercial corridor. 2) The nature of adjacent and neighboring improvements; Staff Response: Adjacent and neighboring improvements use similar quality materials and design to those being proposed in this application. The neighboring gas station does not utilize ‘blade’ signs, however, the pump area is branded appropriately. 3) The quality of the materials to be utilized in any proposed improvement; July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 2 Staff Response: The application proposes the use of polyurethane blades encasing a steel support structure, which is similar to other materials found throughout the commercial corridor. 4) The visual impact of any proposed improvement, as viewed from any adjacent or neighboring property; Staff Response: The signage is intended to be visible to auto traffic from the commercial corridor, and is consistent with the appearance of nearby properties. 5) The objective that no improvement will be so similar or dissimilar to other signs in the vicinity that values, monetary or aesthetic, will be impaired; Staff Response: Aesthetic values should not be impaired as the improvement is exclusive to Exxon gas station and maintains the character of the use and vicinity. 6) Whether the type, height, size and/or quantity of signs generally complies with the sign code, and are appropriate for the project; Staff Response: The type, height, size, and quantity of signs are generally compliant with the sign code. The quantities are consistent with sign code limitations and appropriate for the project as proposed. 7) Whether the sign is primarily oriented to vehicular or pedestrian traffic, and whether the sign is appropriate for the determined orientation. Staff Response: The signs are primarily oriented to vehicular traffic, commensurate with the property’s primary use as fuel and snack stop. Staff Recommendation for SGN16003 Sign Program Amendment: Staff recommends approving the Sign Program Amendment application for Lot 68, Block 1 Benchmark at Beaver Creek, Swift Gulch Business Center. Recommended Motion: “I move to approve Case #SGN16003, an application for a Sign Program Amendment for lot 68, Block 1 Benchmark at Beaver Creek with the following additional language to the Master Sign Program as illustrated in Attachments D and E to Staff’s Report: Sign Specification. 2e) Blade Signs. Three (3) red waves on the east canopy columns and six (6) red interior lit “Synergy” signs over all pumps. Together with Staff’s recommended findings.” Recommended Finding: 1) The Sign Program Amendment is compatible with the site and building, and should provide for a similarity of types, sizes, styles and materials for signs within the project. 2) Per the Sign Code, several alternatives for signage should be included in the program. July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 3 Attachments A. Current Pump area B. Built example of new pump area C. Mockup at Swift Gulch D. Proposed Blade E. Proposed Wave F. Original 2003 Sign Plan July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 4 A) Current Pump Area B) Built example of the new pump area July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 5 C) Mockup of Blades and Waves at Swift Gulch Location D) Proposed Synergy Blade July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 6 E) Proposed Synergy Wave July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 7 F) Original Sign Program Text July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 8 July 6, 2016 Planning and Zoning Commission Meeting Lot 68, Block 1, Benchmark at Beaver Creek Sign Program Amendment Page | 9 1 June 21, 2016 Planning and Zoning Commission Meeting Minutes Town of Avon Planning & Zoning Commission Meeting Minutes Tuesday, June 21, 2016 I. Call to Order The meeting was called to order at 5:10pm II. Roll Call Commissioner Howell was absent; all other Commissioners were present. III. Additions & Amendments to the Agenda There were no changes to the agenda. IV. Conflicts of Interest No conflicts of interest were disclosed. V. Consent Agenda  Findings of Fact and Record of Decision for Sign Variance File #VAR16001, Lot 1A, Buck Creek Subdivision / 50 Buck Creek Road Action: Commissioner Hardy moved to approve the Consent Agenda. The motion was seconded by Commissioner Golembiewski and the motion passed with 5-0 vote, with Commissioner Barnes abstaining. VI. Pool and Spa Temporary Display – CONTINUED PUBLIC HEARING File: TMP16001 Application Type: Temporary Use Legal Description: Lot 26-28, Block 1, Benchmark at Beaver Creek Subdivision / 910 Nottingham Road Applicant: Colorado Poolscapes, Inc. Owner: Avon Mountain Center, LLC c/o NAI Mountain Commercial Summary: Application to install inflatable duck for sales display on roof of Mountain Center property. Request is for 2nd and 4th weeks of each month. This file is continued from June 7, 2016 meeting. Public Comments: None. Action: Commissioner Minervini moved to deny Case TMP 16001 with the following finding: Finding: This application is deemed a sign and as such should fall under the sign design review and not a temporary use review. Commissioner Barnes seconded the motion and the motion passed with a 4-2 vote, with commissioner Bonidy and Hardy opposing. VII. Basecamp Condominiums –PUBLIC HEARING File: MJR16006 2 June 21, 2016 Planning and Zoning Commission Meeting Minutes Application Type: Major Development Plan Legal Description: Lot 1, Eagle River at Avon / 38359 Highway 6 Applicant: Will Hentschel, 359 Design Owner: Red House Avon, LLC Summary: Proposal for fifteen (15) new condominium units in accordance with Red House PUD. Public Comments: None. Action: Commissioner Bonidy made a motion to continue the item to the next meeting. Commissioner Barnes seconded the motion, and the motion passed unanimously with a 6-0 vote. VIII. Town of Avon Wayfinding Signage Application Type: Sign Design Legal Description: N/A – Town Core Area Applicant/Owner: Town of Avon Summary: Final sign design review for new wayfinding signs for installation on Town light poles in the Town Core area. Mockups of a similar design were presented at the meeting for review. Public Comments: None. Action: Commissioner Barnes moved to approve the sign design for wayfinding signage with the Findings listed in Staff’s report. Commissioner Golembiewski seconded the motion and the motion passed unanimously with a 6-0 vote. IX. Approval of Meeting Minutes  June 7, 2016 Meeting Minutes Action: Commissioner Bonidy moved to approve the meeting minutes. Commission Hardy seconded the motion, and the motion passed unanimously 6-0. X. Staff Approvals  Simply Massage Sign / 25 Hurd Lane  Roof Mounted PV System / 2140 Saddleridge Loop  Stone Cooking Oven / Wildridge Road XI. Other Business  July 6, 2016 next Regular Meeting o Accessory Dwelling Unit at Vail Avon Commercial Park  Commissioner Barnes commented on the difficulty bicyclists encounter along Beaver Creek Blvd. XII. Adjourn The meeting was adjourned at 7:50 pm. Approved this 6th Day of July, 2016 _______________________ Jim Clancy, Chairperson