Loading...
PZC Packet 031416 Town of Avon Planning & Zoning Commission Meeting Minutes Tuesday, March 1, 2016 Avon Municipal Building – One Lake Street I. Call to Order The meeting was called to order at 5:00pm. II. Roll Call All Commissioners were present. Commissioner Bonidy arrived at the beginning of Item VI. III. Additions & Amendments to the Agenda None. IV. Conflicts of Interest No conflicts were disclosed. V. Consent Agenda • February 16, 2016 Meeting Minutes • Findings of Fact and Record of Decision for Brookside Lofts Stucco - Files MNR16001 / AEC16001 • Findings of Fact and Record of Decision for Riverside PUD Amendment – File PUD16001 Action: Commissioner Barnes made a motion to approve the Consent Agenda, with Commissioner Hardy seconding the motion. All Commissioners were in favor and motion passed with a 5-0 vote. VI. Salter Duplex Residences– PUBLIC HEARING Files: MJR16001 Application Type: Major Development Plan Alternative Equivalent Compliance Property: Lot 20, Block 2, Wildridge / 2957 June Creek Trail Applicant/Owner: Dolce Vita Development LLC c/o Nick Salter Summary: New duplex structure with 3,780 square feet and 3,276 square feet of liveable space per unit. Public Hearing: Garrett Fonda, neighboring property owner to the South, questioned the proximity of the development to his unit. It was determined to be between 20’ and 25’. Action: Commissioner Minervini motioned to approve The Major Design and Development Plan and Alternative Equivalent Compliance application with the following findings: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of high quality, durable building materials finished in a manner sympathetic to the scale and architectural style of the building. 1 March 1, 2016 Planning and Zoning Commission Meeting Minutes 3. The roof pitch complies with the review criteria. 4. The architectural design of the proposed structure and its materials and colors are compatible with the Town’s overall appearance, surrounding development, natural and existing landforms and the officially approved development plans for the area in which the structure is proposed to be located. The motion was seconded by Commissioner Bonidy and discussed. The motion passed with a 5-1 vote; Commissioner Barnes opposed. VII. 4411 Wildridge Residence – PUBLIC HEARING Files: MJR16002 Application Types: Major Development Plan Properties: Lot 26A, Block 3, Wildridge Subdivision / 4411 Wildridge Road Applicant: Jeff Manley Owner: 4290 WIldridge LLC Summary: New single-family home construction on Wildridge Road West. Public Hearing: No comments. Action: Commissioner Struve made a motion to approve the application with the following findings: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of high quality, durable building materials finished in a manner sympathetic to the scale and architectural style of the building. 3. The architectural design of the proposed structure and its materials and colors are compatible with the Town’s overall appearance, surrounding development, natural and existing landforms and the officially approved development plans for the area in which the structure is proposed to be located. 4. The application is in compliance with the Minor PUD Amendment approval footprint restrictions. Commissioner Hardy seconded the motion and it passed unanimously with a 6-0 vote. VIII. Sunnyside Addition – PUBLIC HEARING Files: MJR 16003 Application Types: Major Development Plan Property: Lot 49, Block 1, Benchmark at Beaver Creek Subdivision / 220 Nottingham Road, Unit #3 Applicant: NSA Investments, Inc. Owner: NSA Investements, Inc. Summary: Building addition measuring 704 square feet, with all materials/colors to match existing structure. Public Hearing: No comments. Action: Commissioner Barnes made a motion to approve the application with the following findings: 2 March 1, 2016 Planning and Zoning Commission Meeting Minutes 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of materials and colors that match the existing structure, in compliance with the Design Standards contained in the Development Code. 3. The architecture of the addition is compatible with surrounding development and the Town’s overall appearance. Commissioner Hardy seconded the motion and it passed unanimously with a 6-0 vote. IX. Buck Creek Medical Plaza Sign Program Files: SGN16002 Application Types: Master Sign Program Property: Lot 1A, Buck Creek / 50 Buck Creek Rd. Applicant/Owner: Avon MOB LLC c/o Aaron Brewster Summary: New building signage consisting of building identification, tenant, and 24 hour emergency signage. Action: Commissioner Barnes motioned to continue the application. The Commission provided direction to reduce the amount of signage, review lighting techniques for the signs, and include all directional signage for a complete package review. The motion was seconded by Commissioner Hardy and all were in favor. The motion passed with a 5-0 vote. X. Staff Approvals None XI. Future Agendas • Tract G Comprehensive Plan Amendment • Mtn Star Tank Site Zoning • B&B SRU Application Continuance XII. Adjourn The meeting was adjourned at 7:16pm. 3 March 1, 2016 Planning and Zoning Commission Meeting Minutes PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF DECISION: March 1, 2016 TYPE OF APPLICATION: Major Development Plan / Alternative Equivalent Compliance FILE NUMBERS: #MJR16001 / #AEC16002 PROPERTY LOCATION: Lot 20, Block 2, Wildridge Subdivision ADDRESS: 2957 June Creek Trail APPLICANT: Dolce Vita Development LLC c/o Nick Salter PROPERTY OWNER: Deer Trail LLP These findings of fact and record of decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.020(f): DECISION: Approved with 5-1 vote. FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of high quality, durable building materials finished in a manner sympathetic to the scale and architectural style of the building. 3. The roof pitch complies with the review criteria for AEC approval. 4. The architectural design of the proposed structure and its materials and colors are compatible with the Town’s overall appearance, surrounding development, natural and existing landforms and the officially approved development plans for the area in which the structure is proposed to be located. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ Jim Clancy, PZC Chairperson PZC Findings of Fact and Record of Decision: #MJR16001 | #AEC16002 Page 1 of 1 PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF DECISION: March 1, 2016 TYPE OF APPLICATION: Major Development FILE NUMBERS: #MJR16002 PROPERTY LOCATION: Lot 26A, Block 3, Wildridge Subdivision ADDRESS: 4411 Wildridge Road West APPLICANT: Jeff Manley PROPERTY OWNER: 4290 Wildridge LLC These findings of fact and record of decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.020(f): DECISION: Approved with 6-0 vote. FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of high quality, durable building materials finished in a manner sympathetic to the scale and architectural style of the building. 3. The architectural design of the proposed structure and its materials and colors are compatible with the Town’s overall appearance, surrounding development, natural and existing landforms and the officially approved development plans for the area in which the structure is proposed to be located. 4. The application is in compliance with the Minor PUD Amendment approval footprint restrictions. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ Jim Clancy, PZC Chairperson PZC Findings of Fact and Record of Decision: #MJR16002 Page 1 of 1 PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF DECISION: March 1, 2016 TYPE OF APPLICATION: Major Development Plan FILE NUMBERS: #MJR16003 PROPERTY LOCATION: Lot 49, Block 1, Benchmark at Beaver Subdivision ADDRESS: 220 Nottingham Road, Unit #3 APPLICANT: NSA Investments, Inc. PROPERTY OWNER: NSA Investments, Inc. These findings of fact and record of decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.020(f): DECISION: Approved with 6-0 vote. FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, and §7.16.090(f), Design Review, and was determined to be compliant with the applicable review criteria. 2. The application proposes the use of materials and colors that match the existing structure, in compliance with the Design Standards contained in the Development Code. 3. The architecture of the addition is compatible with surrounding development and the Town’s overall appearance. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY:______________________________________ DATE: ___________________ Jim Clancy, PZC Chairperson PZC Findings of Fact and Record of Decision: #MJR16003 Page 1 of 1 Staff Report Case #SGN16002 Master Sign Program March 14, 2016 Planning & Zoning Commission Meeting CONTINUED FROM MARCH 1, 2016 MEETING Project type: Master Sign Program (MSP) Zoning: Mixed-Use Commercial (MC) Address: 50 Buck Creek Location: Prepared By: Lot 1A, Buck Creek Matt Pielsticker, AICP Staff Report Overview This staff report contains one application for consideration by the PZC: 1. SGN16002: Master Sign Program for the Buck Creek Medical Plaza. This application seeks approval for two anchor tenants, as well as building identification and emergency directional signage. Summary of Request On behalf of Avon MOB LLC, the owner of the new three story Buck Creek Medical Plaza, Aaaron Brewster (Applicant) of NexCore Group is proposing a sign program for signage on two elevations of the new commercial building located on Nottingham Road. The Applicant has submitted a Master Sign Program (Exhibit A) which includes pan-channel letter signage for the Buck Creek Medical Plaza (the Property). The request includes the following: East Elevation (185 lineal feet of frontage): ‘Buck Creek medical plaza’ – Building ID. - White lettering with 5” deep bronze returns lit with white LEDs - 82.8 sq. ft. ‘+Centura Health’ – Business Sign - Blue logo and white letters with 5” deep bronze returns lit with white LEDs - 65.3 sq. ft. ’24 HOUR EMERGENCY & URGENT CARE’ – Directional Sign - Red acrylic lettering with 5” deep bronze returns lit with red LEDs - 89.5 sq. ft. - 237.6 sq. ft. TOTAL for East Elevation South Elevation (127 lineal feet of frontage): ’24 HOUR EMERGENCY & URGENT CARE’ – Directional Sign - Red lettering with 5” deep bronze returns lit with white LEDs - 111 sq. ft. ‘Colorado Mountain Medical’ – Business Sign - White lettering with 5” deep bronze returns lit with white LEDs - 68.6 sq. ft. - 179.6 sq. ft. TOTAL for South Elevation March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 1 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek All of the proposed signs are proposed are to be constructed 5” deep returns, flush mounted to the building, with internal LED lighting. A total of 417.2 square feet of building mounted signage is proposed on the two building elevations. The updated sign program includes three (3) new freestanding directional signs. All three signs stand 7’ – 8” tall and are constructed with aluminum framed cabinets with routed push through acrylic lettering and arrows. The signs are internally lit with LED light source, with dark bronze color to match elements of the building. Master Sign Programs Sign programs are encouraged for all projects, and are required as a part of the design review process for all proposed projects with multiple tenants. Sign program means a comprehensive, narrative description of allowed sign types, and scaled drawings of any building, lot, parcel, collection of parcels or other premises, showing the number, size, description, color, materials and location of all signs thereon. Sign programs shall be in accordance with the following general requirements: • Sign programs shall be compatible with the site and building, and should provide for a similarity of types, sizes, styles and materials for signs within a project. Several alternatives for signage should be included in the program so as not to be so restrictive as to eliminate individuality. • Sign programs may be proposed or changed only by the owners of the building or the owners’ association. Sign program changes or proposals may not be made by an individual business. • Proposed signs, not in accordance with an approved sign program, will only be considered by the Planning and Zoning Commission upon receipt of written evidence that the proposed sign is acceptable to the owners of the building or the owners’ association. • All sign programs shall be in written and plan form. Plans shall indicate size, location, type and number of signs for the site and buildings. • Programs may include limitations on wording, colors, design, lighting, materials and other restrictions, and deemed appropriate by the applicant. Planning Commission Review Criteria The Planning and Zoning Commission shall consider the following items in reviewing proposed designs: 1. The suitability of the improvement, including materials with which the sign is to be constructed and the site upon which it is to be located; Staff Response: The proposed materials are consistent with the Sign Code, which require “quality sign materials including anodized metal….interior lit, individual Plexiglas-faced letters; or three dimensional individual letters with or without indirect lighting.” The building is commercial in nature and the sign type appears to be consistent with the nature of the project. With that being said, compatibility with other neighboring projects should be reviewed carefully based on other surrounding improvements. 2. The nature of adjacent and neighboring improvements; March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 2 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek Staff Response: The Sign Code speaks to architectural harmony, specifically, that signs should be in harmony architecturally, and harmony in color with surrounding structures. The surrounding structures are limited to gas stations, Northside Café, Avon Truck and Auto, Walking Mountains Science School, and neighboring multi-family residential projects. Most of the surrounding residential projects have low scale project ID signs with minimal external lighting and natural materials (stone, wood, etc). The commercial signs are a mix of internally lit cabinet signs at the gas stations and externally lit signs, or unlit signs. See attached photographs for examples. 3. The quality of the materials to be utilized in any proposed improvement; Staff Response: As noted, the materials are of high quality and in compliance with the Sign Code. 4. The visual impact of any proposed improvement, as viewed from any adjacent or neighboring property; Staff Response: The signs are oriented so that they will not be seen from nearby residential projects. The signage is limited to internally lit pan channel signage with LED light sources. The Applicant has modified the proposal concerning LED lighting to reduce the power output by 50% so that the internally lit signs with white sign faces does not have a negative appearance as viewed from neighboring commercial properties or the public rights-of-way. 5. The objective that no improvement will be so similar or dissimilar to other signs in the vicinity that values, monetary or aesthetic, will be impaired; Staff Response: The Planning Commission must consider the aesthetics of the proposed Master Sign Program. Could aesthetics be improved with externally lit or back (halo) lit signs? 6. Whether the type, height, size and/or quantity of signs generally complies with the sign code, and are appropriate for the project; Staff Response: The quantity of signs is generally compliant based on the number of tenants in the building. The total square footage of signage proposed exceeds that allowable by the Sign Code, however, the code contains provisions to consider different quantities if presented in Master Sign Program format. Sign Code Building I.D. Requirements: Lineal Frontage of Building: 312 feet Allowance: *192 sq. ft. Proposed: **216.7 sq. ft. *Based on three (3) building frontages @ 64 sq. ft. per lot front; unless approved by a MSP. **Pursuant to PZC direction, the total proposed signage excludes 24 Hour emergency signage. March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 3 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek Sign Code Freestanding Sign Requirements: There are three signs proposed and PZC has the discretionary power to approve more than one (1) as noted. All of the signs meet the height and sign requirements of the Code. The D2 sign does not meet the ten (1) foot setback requirement and would require the processing of a Variance application in order to The sign types should be reviewed carefully based on other existing signs in the surrounding area. While the signs are appropriate for this type of commercial project, the site is located in a transitional zone between commercial and residential/educational zones. The proposed sign type (internally lit individual pan channel lettering) is not wholly consistent with other signs in the area. 7. Whether the sign is primarily oriented to vehicular or pedestrian traffic, and whether the sign is appropriate for the determined orientation. Staff Response: The signs are oriented to vehicular traffic which is appropriate given the site and auto-orientated nature of the area and adjacency to the highway interchange. Signage on the south elevation appear to be geared to Interstate 70 traffic and it should be determined if exposure to Interstate travel is appropriate. Staff Recommendation for Case #SGN16002 Staff recommends approving the proposed Master Sign Program Application for the Buck Creek Medical Plaza based on the analysis herein. Recommended Motion: “I move to Approve Case #SGN16002, an application for a Master Sign Program for the Buck Creek Medical Plaza based on the following findings and conditions: FINDINGS: 1. The MSP amendment was reviewed in accordance with AMC §15.28.080(16), Sign Programs, and found to be in general conformance with the recommendations and requirements of the Sign Code. 2. The design of the proposed MSP amendment complies with the review criteria set forth in §15.28.070, Design Review Criteria, of the Avon Municipal Code; 3. Three freestanding signs are warranted based on the three street frontages. 4. The proposed MSP amendment is compatible with the site and provides consistent quality and aesthetics to other improvements of the Buck Creek Medical Office project. CONDTIIONS: 1. The D2 sign must receive a Variance or be placed at least 10’ from the property lines. March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 4 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek 2. Except for 24 Hour Urgent Care signage, all LED lighting will be set to 50% power and set on timer to go off by 10pm. Attachments • Vicinity Map • Photographs of Property and surrounding Signs • Application Materials Vicinity Map March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 5 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek Photographs of Surrounding Properties and Buck Creek Medical Plaza March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 6 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 7 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 8 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek March 14, 2016 Planning and Zoning Commission Meeting – CONTINUED FROM MARCH 1st Page | 9 50 Buck Creek - Master Sign Program- Lot 1A, Buck Creek INTERNALLY LIT DIRECTIONALS (Qty 1 S/F - 2 D/F) JOB #: DATE: 1/25/16 DESIGNER:Jim Pogo SALES REP:Michael Bjorklund PROJ MGR:Eric Zeise D.1 2.0 DESIGN PHASE:CONCEPTUAL DATE DATE QC LANDLORD APPROVAL CLIENT APPROVAL 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 XX XX XX XX XX XX XXXX XXXX XXXX XXXX XXXX XXXX 2 3 4 5 6 7 8 9 10 SHEET NUMBER www.jonessign.com GREEN BAY PHILADELPHIA SAN DIEGO LAS VEGAS Buck Creek Medical Plaza 50 Buck Creek Lane Avon, CO 81620 SQUARE FOOTAGE OF SIGN AREA: 20 COLORS/FINISHES P-1 MP 41-313SP DARK METALLIC BRONZE A-1 2447 WHITE ACRYLIC FONTSGotham Medium SPECIFICATIONS 1. ALUMINUM FRAMED CABINET WITH ROUTED PUSHED THROUGH 5/8” WHITE TRANSLUCENT ACRYLIC 2. FACES AND RETURNS PAINTED P-1 3. WHITE LED LIGHTING 4. ARROW FACES TO BE 3/4” WHITE ACRYLIC WITH ROUTED OUT ARROWS 5. 1/2” EDGE CHANNEL TO HIDE WHITE LED PERIMETER LIGHTING PAINTED P-2 DRAWING FOR DESIGN INTENT ONLY. NOT FOR PRODUCTION. 02.00.16 JM ADD INTERIOR DIRECTIONAL CONCEPTUAL SIGNAGE1 P-2 MP WHITE Employee Parking Only Visitor Parking Buck Creek Rd. 3’-0”7’-8”5’-0”2’-8”7’-0”4’-0” 3’-0” FRONT ELEVATION 3/8” = 1’-0” NIGHT VIEW 3/8” = 1’-0” D.1.1 D.1.2 SIDE A D.1.2 SIDE B D.1.3 D.1.3 SIDE BSIDE A Employee Parking Only Visitor Parking Buck Creek Rd. 2/23/16 JP REVISION TO EXTERIOR/PARKING 3/10/16 JP NEW LOGO LAYOUT AND COLOR CHANGE- ADD DETAIL Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center 213782 R4 3/11/16 JP COPY CHANGE-LOCATION CHANGE 3 INTERNALLY LIT DIRECTIONAL DETAIL (Qty 1 S/F - 2 D/F) JOB #: DATE: 1/25/16 DESIGNER:Jim Pogo SALES REP:Michael Bjorklund PROJ MGR:Eric Zeise D.1 2.1 DESIGN PHASE:CONCEPTUAL DATE DATE QC LANDLORD APPROVAL CLIENT APPROVAL 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 XX XX XX XX XX XX XXXX XXXX XXXX XXXX XXXX XXXX 2 3 4 5 6 7 8 9 10 SHEET NUMBER www.jonessign.com GREEN BAY PHILADELPHIA SAN DIEGO LAS VEGAS Buck Creek Medical Plaza 50 Buck Creek Lane Avon, CO 81620 SQUARE FOOTAGE OF SIGN AREA: 20 DRAWING FOR DESIGN INTENT ONLY. NOT FOR PRODUCTION. 02.00.16 JM ADD INTERIOR DIRECTIONAL CONCEPTUAL SIGNAGE1 D.1.1 ENGINEERING STAMP REQUIRED CONSTRUCTION DRAWINGS TO FOLLOW 2/23/16 JP REVISION TO EXTERIOR/PARKING Employee Parking Only Visitor Parking Buck Creek Rd. 6” 3/4” 3’-0”7’-8”5’-0”2’-8”7’-0”4’-0” FRONT ELEVATION 1/2” = 1’-0” 3’-0”4’-0”3’-0”4’-0”COLORS/FINISHES P-1 MP DARK METALLIC BRONZE A-1 2447 WHITE ACRYLIC FONTSGotham Medium SPECIFICATIONS 1. ALUMINUM FRAMED CABINET WITH ROUTED PUSHED THROUGH 5/8” WHITE TRANSLUCENT ACRYLIC 2. FACES AND RETURNS PAINTED P-1 3. WHITE LED LIGHTING 4. ARROW FACES TO BE 3/4” WHITE ACRYLIC WITH ROUTED OUT ARROWS 5. 1/2” EDGE CHANNEL TO HIDE WHITE LED PERIMETER LIGHTING PAINTED P-2 6. DIRECT EMBED STEEL MATCH PLATE WELDED TO BOLT CAGE P-2 MP WHITE SIDE ELEVATION 1/2” = 1’-0” PERSPECTIVE VIEW NOT TO SCALE 1’-4”1’-4” 3/10/16 JP NEW LOGO LAYOUT AND COLOR CHANGE- ADD DETAIL 213782 R4 3/11/16 JP COPY CHANGE-LOCATION CHANGE S/F INTERNALLY LIT DIRECTIONAL - Rendering View JOB #: 213782 R3 DATE: 1/25/16 DESIGNER:Jim Pogo SALES REP:Michael Bjorklund PROJ MGR:Eric Zeise CL.1 3.0 DESIGN PHASE:CONCEPTUAL DATE DATE QC LANDLORD APPROVAL CLIENT APPROVAL 2/23/16 02.26.16 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 JP JM XX XX XX XX XX XX XX REVISION TO EXTERIOR/PARKING REVISE INTERIOR DIRECTIONAL SIGNAGE XXXX XXXX XXXX XXXX XXXX XXXX XXXX 2 3 4 5 6 7 8 9 10 SHEET NUMBER www.jonessign.com GREEN BAY PHILADELPHIA SAN DIEGO LAS VEGAS Buck Creek Medical Plaza 50 Buck Creek Lane Avon, CO 81620 02.00.16 JM ADD INTERIOR DIRECTIONAL CONCEPTUAL SIGNAGE1 JOB #: DATE: 1/25/16 DESIGNER:Jim Pogo SALES REP:Michael Bjorklund PROJ MGR:Eric Zeise 3.0 DESIGN PHASE:CONCEPTUAL DATE DATE QC LANDLORD APPROVAL CLIENT APPROVAL 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 00.00.00 XX XX XX XX XX XX XXXX XXXX XXXX XXXX XXXX XXXX 2 3 4 5 6 7 8 9 10 SHEET NUMBER www.jonessign.com GREEN BAY PHILADELPHIA SAN DIEGO LAS VEGAS Buck Creek Medical Plaza 50 Buck Creek Lane Avon, CO 81620 SQUARE FOOTAGE OF SIGN AREA: 20 DRAWING FOR DESIGN INTENT ONLY. NOT FOR PRODUCTION. 02.00.16 JM ADD INTERIOR DIRECTIONAL CONCEPTUAL SIGNAGE1 D.1.1 SIDE AD.1.2SIDE B D.1.3 S I D E B S I D E A INTERNALLY LIT DIRECTIONALS (Qty 1 S/F - 2 D/F) D.1 SQUARE FOOTAGE OF SIGN AREA: 20 2/23/16 JP REVISION TO EXTERIOR/PARKING Employee Parking Only Visitor Parking Buck Creek Rd. Visitor Parking 3/10/16 JP NEW LOGO LAYOUT AND COLOR CHANGE- ADD DETAIL Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center Visitor Parking Main Entrance Walking Mountains Science Center 213782 R4 3/11/16 JP COPY CHANGE-LOCATION CHANGE 811C81SITE DIRECTIONAL SIGNAGEPLAN2301 Blake Street, Suite 100Denver, CO 80205303.861.8555DenverDPA Project:Sheet Number:Sheet Title:ConsultantIssue/RevisionsDateNo.Sheet InformationProject Information1ABCDE23456ABCDE123456COPYRIGHT - DAVIS PARTNERSHIP, P.C.14926.00.000MEDICAL OFFICE BUILDINGCONSTRUCTIONDOCUMENTS 09JUNE20150101 FAWCETT ROAD, SUITE 260, AVON, COLORADO 81620970.926.6007 MARTINMARTIN.COM0050 Buck Creek Lane Avon, CO 81620 ASI 002 06/29/15 1PR 002 07/22/15 2CCD 04 09/24/15 3PR 002 10/14/15 2ASI-011 02/02/16 4SIGNAGE 03/09/16 5 Staff Report – Special Review Use/Minor Dev/AEC March 14, 2016 Planning & Zoning Commission Meeting CONTINUED FROM FEBRUARY 16, 2016 Case # SRU15001, MNR15033, AEC15004 Project types Special Review Use Permit– Bed & Breakfast Minor Development Plan – Parking and Landscaping Alternative Equivalent Compliance - Legal descriptions Lot 37A & 37B, Block 2, Benchmark at Beaver Creek Subdivision Lot 36A & 36B, Block 2, Benchmark at Beaver Creek Subdivision Zoning Residential Duplex (Short Term Rental Overlay District) Addresses 228 A & B and 238 A & B West Beaver Creek Blvd. Prepared By Matt Pielsticker, AICP, Planning Director Summary Todd Roehr (the Applicant) is requesting a Special Review Use (SRU) permit to allow the use of a Bed & Breakfast (B&B) lodging establishment in both sides of two duplex structures. The properties are zoned Residential Duplex (RD) and located on Lots 36 and 37, Block 2, Benchmark at Beaver Creek Subdivision at 228 and 238 West Beaver Creek Boulevard (the Properties). Lot 37 includes ten (10) bedrooms, ten (10) bathrooms. Lot 36 is currently finished on the South/A Side with four (4) bedrooms and three (3) bathrooms. The South/B side has been left unfinished for several years following damage to the unit. Building plans have been submitted for renovations to both sides of the Lot 36 duplex and a complete remodel of the North/B Side with additional bedrooms and bathrooms to be finished; the total for the Properties and this SRU proposal is twenty (20) bedrooms. Site improvements including parking and landscaping are proposed with the accompanying Minor Development Plan and Alternative Equivalent Compliance (AEC) applications. Parking modifications include new pavement and drainage pan with added parking spaces behind the structures to bring the total parking space total for the Properties to twenty four (24) functional parking spots. Landscaping modifications include the removal of at least five trees for additional paved areas, and the planting of sixteen (16) trees and various native flowers on the street frontage. The AEC request is for off-site landscaping adjacent to the front of the project to meet the parking lot screening standards in the Avon Development Code (ADC). Updates Since the February 16, 2016 public hearing, the Applicant has completed and provided auto-turn analysis of all the parking spaces. Attached to this report are a sampling of the auto-turning studies; the full study will be available at the meeting for review. The landscape plan is now split between an existing conditions and proposed plan separately. Additionally, the floor plans have been updated with room numbers and a dedicated “Operator” unit, which is located in the lower level of Mi Casa (228 West Beaver Creek Boulevard). Please find the new attachments included and attached with this report. Location The properties are located on the south side of the street with direct access to the right-of-way via two perpendicular driveway access cuts. Adjacent to the north across the street is the Greenbrier Condos March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 1 multi-family residential; adjacent to the south is the Beaver Creek West Condos; adjacent to the east is the Wildfire Lodge duplex (lodging); and adjacent to the west is a residential duplex. Avon Development Code Definition of Bed and Breakfast Bed and breakfast means an establishment operated in a private residence or portion thereof, which provides temporary accommodations to overnight guests for a fee and which is occupied by the operator of such establishment. Zoning The Properties are zoned Residential Duplex (RD) and included in the Short Term Rental Zoning Overlay District (STRO). According to the Avon Development Code (ADC), “properties in the STRO zone district shall otherwise be subject to all requirements of the underlying zone district.” Land Use Table 7.24-1 specifically references a SRU for a Bed and Breakfast use in the RD zone district, if approved by the PZC. According to the ADC, the RD zone district “is established to accommodate single-family and duplex residential development either as single neighborhoods of similar units or in a development with a mix of unit types. This district implements both the residential low density and residential medium density classifications of the Avon Future Land Use Plan and should be located along a local road.” Special Review Uses Special Review Uses are regulated by Sec. 7.16.100 of the Avon Development Code (ADC) and provide a discretionary approval process for uses that have unique or widely varying operating characteristics or unusual site development features. The procedure encourages public review and evaluation of a proposed use's operating characteristics and site development features and is intended to ensure that the proposed use will not have a significant adverse impact on surrounding uses or on the community at large. The PZC may approve a SRU permit in perpetuity, but may assign a shorter time as deemed necessary. At least thirty (30) days prior to the expiration of a SRU permit, the holder of an SRU permit may apply for a review hearing before the PZC. The PZC could then review the use against the review criteria to March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 2 determine whether the SRU will be allowed to continue. If conditions of approval are not maintained, it would be considered a violation of the ADC and subject to revocation proceedings. Staff has determined that the proposed B&B at these locations is generally compatible with the zoning overlay district and with existing adjacent uses comprised largely of lodging-type uses or residential structures that permit short term rentals. Staff recommends conditional approval, with the Applicant being required to reapply for the SRU permit after two (2) years in operation should the PZC approve the SRU. This would provide the Town with greater assurance that the operation will not cause excessive disruption to adjacent uses and vehicle parking will be managed by the owner and manager of the B&B. Comprehensive Plan Analysis The Property is located within the Nottingham Park Residential District (District 21) of the Avon Comprehensive Plan, identified as a low priority district. Specific Land Use Policies identified in the Comprehensive Plan that support this application include: • Policy C.1: Provide a balance of land uses that offers a range of housing options, diverse commercial and employment opportunities, inviting guest accommodations, and high quality civic and recreational facilities, working in concert to strengthen Avon’s identity as both a year- round residential community and as a commercial, tourism and economic center. As proposed, the Application is generally compliant with the Comprehensive Plan and provides short term rental housing in an appropriate area of town. Building Safety and Code Requirements Willey Gray, Building Official for the Town of Avon in concert with the Eagle River Fire Protection District has reviewed the proposed use and building modifications for the proposed B&B in accordance with the Building and Fire Codes. According to the Applicant, the units are equipped (or will be equipped in the case of Lot 38 when construction permits are obtained) with hard-wired smoke detectors and carbon-monoxide detectors and fire suppression (sprinkler) system is being installed. Additionally, every room has (or will have) a functional fire extinguisher in the closet. Radon detectors are not required. These improvements bring the intended use into compliance with building code requirements. Staff is recommending final sign- offs from the Building Official and Fire District prior to Bed and Breakfast operations commencing. Parking The Properties are being reviewed concurrently since they would be sharing access and some parking spaces. The Town code requires one (1) space per accommodation unit, but falls silent to operator parking in the event of a Bed and Breakfast; therefore Staff has determined at least one space is necessary for caretaker/operator unit. The total parking requirement therefore is twenty-two (21) spaces for the Properties. There appear to be twenty four (24) functional spaces with the proposed parking layout, if that parking layout is approved with accompanying Minor Development Plan application. Please refer to the auto-turn studies which look at entering and exiting the spaces. The Town requires evidence of an easement and shared use agreement for construction of new driveways and parking lots in locations that cross property lines for the purpose of providing mutual ingress and egress and parking. The Applicant provided an executed Driveway and Shared Use Agreement for the arranged parking. March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 3 Landscaping & Alternative Equivalent Compliance As noted, some trees would require removal in order to reconstruct the parking areas in front and behind the structures. The Applicant has demonstrated compliance with the minimum landscaping quantities required by the ADC. In order to meet the screening standards for parking lot landscaping requirements as it relates to location, the Applicant is proposing trees and native vegetation to be placed in Town Right of Way consistent with other properties in the vicinity. These trees are not required to meet minimum quantity requirements; only for screening purposes. Site distance does not appear to be an issue with the placement of new trees in the proposed locations. The Landscaping modifications require review of Development Plan criteria and the AEC requires review and conformance with its own set of criteria set by Sec. 7.16.020(f) of the Development Code. According to code, the landscaping and parking modifications shall be reviewed as follows: (1) Evidence of substantial compliance with the purpose of the Development Code as specified in §7.04.030, Purposes; Staff Response: This application is in general conformance with the Purpose statements of the Development Code. Using the additional property for parking is an appropriate use of the land given the intended use of the Properties for bed and breakfast operations and the resultant parking requirements. (2) Evidence of substantial compliance with the §7.16.090, Design Review. Staff Response: The primary purpose of the Design Review section of the Development Code is to help blend development into the built environment with careful thought to the location of buildings and landscaping. With the proposing additional landscaping to buffer parking areas, the proposal appears to fall in line with the Design Review section of code. Other properties (i.e. Avon Lake Villas), have much more substantial areas of parking in the immediate vicinity with similar amounts of screening. (3) Consistency with the Avon Comprehensive Plan; Staff Response: The Property is located in District 21: Nottingham Park Residential. The planning principles for this district include: This Applicant is proposing to screen parking areas with additional landscaping materials and appears to be compliant with the planning principles. (4) Consistency with any previously approved and not revoked subdivision plat, planned development, or any other precedent plan or land use approval for the property as applicable; Staff Response: There are no previously approved development plans on file with Community Development for the Properties. (5) Compliance with all applicable development and design standards set forth in this Code, including but not limited to the provisions in Chapter 7.20, Zone Districts and Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development Standards; and March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 4 Staff Response: As mentioned, other than the parking lot perimeter requirements in AMC §7.28.050(f), Parking Lot Landscaping, this development plan is in compliance with the design and development standards in the Development Code. Approval of the Development Plan for parking and landscaping is contingent upon approval of the accompanying AEC request for perimeter landscaping. (6) That the development can be adequately served by city services including but not limited to roads, water, wastewater, fire protection, and emergency medical services. Staff Response: This development can be served by all services, including emergency medical and fire protection services. The AEC request for perimeter landscaping standards shall be reviewed in accordance with Sec. 7.16.120(d) of the Avon Development Code, as follows: (1) The proposed alternative achieves the intent of the subject design or development standard to the same or better degree than the subject standard; Staff Response: The Landscape Plan appears to achieve the intent of the Parking Lot Landscaping Standards, by softening the visual appearance of parked vehicles as viewed from West Beaver Creek Boulevard and Interstate 70. Added ground cover and native flower species also achieve the intent of these standards. Please refer to the attached landscape plan and unit breakdown summary provided by the Applicant. (2) The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard; Staff Response: As stated, the alternative achieves the goals and policies of the Avon Comprehensive Plan. It is difficult to know exactly what meeting the landscape buffer requirements for perimeter landscaping would look like with an alternative form of screening on the border of the property (i.e. fence), but the proposal achieves the goals and policies of the Avon Comprehensive Plan. The proposal conforms to the Planning Principles for this Residential District, which speak to buffering parking areas with landscaping. (3) The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard; and Staff Response: The proposed Landscape Plan results in an equivalent benefit to the community. (4) The proposed alternative imposes no greater impacts on adjacent properties Staff Response: As stated throughout, the proposed “alternative” landscape plan design does not impose any increased impacts to adjacent properties than strict adherence to the code. Special Review Use Review Criteria A SRU application must meet the criteria set forth in Sec. 7.16.100 of the ADC as follows: (1) The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations; Staff Response: The proposed use achieves Goal C.1 of the Avon Comprehensive Plan by increasing the number and diversifying the type of guest accommodations in Town. The Applicant is compliant with all applicable provisions of the Avon Development Code in order to permit the bed & breakfast use at this property through an approved Special Review Use permit. Approval of the site modifications required approval of the accompany Minor Development Plan and AEC application to meet perimeter landscaping standards. March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 5 (2) The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use-specific standards in the Development Code; Staff Response: The property is included in the Short Term Overlay District with RD zoning; the RD district is intended for single family and duplex residential development either as single neighborhoods of similar units or in a development with a mix of unit types. This particular neighborhood is a mixture of duplex structures surrounded by higher density residential and lodging uses. A bed & breakfast operation is permitted as a SRU if approved by the PZC. No additional use-specific standards are applicable but the development standards within this overlay district are regulated by the underlying (RD) zoning. The Applicant has demonstrated compliance with all applicable development standards such as parking in addition to bringing the duplex into compliance with applicable building codes for safety. (3) The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics; Staff Response: As described herein, the proposed bed & breakfast use within this specific neighborhood is compatible as the property is adjacent to similar lodging-type uses and all adjacent properties are included in the short term rental overlay district. For example, the neighboring property to the north (Lot 33) is a duplex structure that may rent the entire duplex as a short term rental. Avon Lake Villas to the South is considered a high density multi-family project with on-site short term rental management and uses. (4) Any significant adverse impacts (including, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts) anticipated to result from the use will be mitigated or offset to the maximum extent practicable; Staff Response: Potential nuisance issues such as noise, parking, and trash removal could be experienced with renting any property for short term rental use. However, a bed and breakfast operation differs from other adjacent properties who may rent their entire unit short term (i.e. a condo at Greenbrier across the street) as an on-site manager is required and customary for this type of use. In compliance with the definition of a Bed and Breakfast, the Applicant shall ensure the use is operator- occupied to mitigate any potential impacts as a result of the use including parking, lighting, noise, odor, dust and any other such external impacts. (5) Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development; and Staff Response: The Applicant is retrofitting the duplexes to all currently applicable building and fire codes within existing buildings that are currently serviced with all utilities, police and fire protection. If approved by the PZC, the Bed and Breakfasts should have a negligible impact on these utilities and services over that of a standard residence. (6) Adequate assurances of continuing maintenance have been provided. Staff Response: The applicant is proposing that the bed and breakfast will have an on-site operator to ensure effective management of the operation. March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 6 Staff Recommendations 1) Staff recommends that the PZC hold a public hearing and take action to approve Case #SRU15001, approving a Special Review Use permit for a Bed & Breakfast with findings and conditions as listed: Findings 1. The Application was reviewed in accordance with Sec. 7.16.100 Special Review Use and determined to be eligible for consideration with the applicable review criteria. 2. The proposed use has a negligible impact to adjacent uses and activities, including other short term rental properties immediately adjacent to or in the vicinity of the Properties. Conditions 1. The Special Review Use permit is valid for two (2) years from the date of approval and the owner shall be responsible for submitting for review and approval by the PZC a new application to renew the Special Review Use within six (6) months of expiration of the approved SRU permit. 2. The owner shall ensure the duplexes are occupied with an operator. 3. The owner and/or operator shall ensure all guests, visitors, employees, owners and operators of the Bed and Breakfast park on-site. 4. Prior to commencing operation of the units, the following must occur: a. All parking spaces and landscaping shall be complete. b. Final written sign-off from the Chief Building Official and Fire Department are on file with the Community Development Department confirming compliance with all fire and life safety requirements. c. Evidence of tap fee payment(s) to be provided to Staff. 2) Staff recommends that the Planning and Zoning Commission take action to approve Case #MNR15033 and Case #AEC15004, thereby approving a Minor Development Plan and AEC application for parking and landscaping improvements as follows: Finding 1. The Application is in conformance with the Minor Development Plan review criteria and AEC review criteria in AMC §7.16.020(f) and §7.16.120(d) respectively. Conditions 1. Exterior modifications shall be complete prior to the B&B operation commencing. Attachments Vicinity Map Application Narratives – Dated March 15 (Updated) & February 3 Landscape Unit Summary Floor Plans & Landscape Plans Auto-turn examples Short Term Rental Overlay District Map Public Comment March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 7 Vicinity Map March 14, 2016 PZC Meeting – Case #SRU15001/MNR15033/AEC15004 – Bed & Breakfast SRU 8 Town of Avon, Colorado (TOA) Planning and Zoning Commission (PZC) meeting 3.15.2016 Re: Tabled Agneda Item from PZC meeting 2.16.2016 regarding SRU Application for 228A&B and 238 A& B West Beaver Creek Blvd, Avon, Colorado Owner: Mein Haus, LLC& Mi Casa, LLC c/o Todd Roehr, Manager PO Box 202 Wolcott, Colorado 81655 Requests from PZC to be addressed: 1) Provide Numbering to Floor plans to assist in determining parking places needed 2) Provide numbering of parking places on Pan to make more legible 3) Provide Maneuverability Study on Parking pan 4) Provide Landscaping detail demonstrating required landscaping requirements for parking structure are supplied on Owner property and that additional landscaping the owners intend to place on Town of Avon Right of Way at owner expense are solely for added visual appeal. 1) Floor Plan Numbering (See documents: MiCasa022216 Rooms numbered.pdf ; MeinHaus022216 Rooms numbered.pdf; & HeilmemoreShortTermRentalOct29,2015.pdf) Per the above noted documents Mi Casa has 1 (one) operators’ suite and 10 (ten) bedrooms for guests, while Mein Haus has 10 (ten) bedrooms for guest occupancy. As such, using the floor plan that is currently under construction, Mi Casa and Mein Haus would require 11 and 10 parking places, respectively. The parking pan under consideration, follows all Code of the TOA requirements for parking and does not exceed the allowed paved area. (See: 4) Landscaping below). There are 12 parking spaces on Mi Casa property and 11 parking spaces on Mein Haus property, each having one overflow space. Therefore, the proposed parking plan shows a total of 23-25 parking places with 7 being covered. Mi Casa has 8 outdoor and 4 covered parking spots, while Mein Haus has 8 outdoor and 3 covered parking spots. (See: - Landscaping existing.jpeg, Landscaping Parking proposed.jpeg, Parking Manueverability.jpeg) As discussed at the 2/16/2016 PZC meeting, a Parking and Driveway Easement and Shared Use Agreement has been executed between Mi Casa and Mein Haus at the request of the town of Avon and recorded with Eagle county. Parking is reserved for guests and tenants. (See:Parking and Driveway Easement and Shared Use Agreement Mi Casa and Mein Haus 11.20.2015.pdf) 1)a) Operator requirements Regarding the use of one operator suite to be used for both properties, TOA attorney Eric Heil stated the following in his memo dated 10/29/2015: The definition of Bed and Breakfast does not expressly contemplate a group of separate residential structures to be used as a Bed and Breakfast nor does it expressly disallow one on- site operator for a group of residential structures. The proposed operations and function of the on-site operator for multiple residential structures is a matter that should be considered during the Special Review Use process. (sic) The current plan is to utilize a single on site operator until such time a larger staff is mandated by greater occupancy of Mein Haus/Mi Casa. The location of the caretaker suite on the geographic South ground floor of Mi Casa provides excellent visualization and access to both properties. Additionally, multiple on- site security cameras provide additional visualization of the properties from a single location around the clock. Depending on time of day and occupancy, during the regular daytime hours, it is anticipated that multiple employees and/or independent contractors will be on site as well. Currently, rules regarding overtime pay of salaried executive, administrative and professional employees is being studied and commented on by the executive branch of the United States government in its oversite of the Department of Labor. Estimates on the release of this rulemaking range from spring 2016 to late 2016 and may be subject to the challenge by the US Congress under the Congressional Review Act (CRA). This process is being monitored closely by Mein Haus/Mi Casa, the Colorado Hotel and Lodging Association (CHLA), and others as it likely has profound impacts across the hospitality industry and the Vail Valley economy. 1)b) Does the operator require a parking space? This question was brought up at the 2/16/2016 PZC meeting. It would be the opinion of Mein Haus/ Mi Casa that the operator (Innkeeper), which would live on site, is the key employee in running of the operations and providing a hospitable environment of the guests. Since we believe that contented employees lead to contented guests, it is of great importance that this employee be provided a hospitable living environment as well. 2) Provide numbering of parking places on Pan to make more legible 3) Provide Maneuverability Study on Parking pan (See: - Landscaping existing.jpeg, Landscaping Parking proposed.jpeg, Parking Manueverability.jpeg) Landscaping: The landscaping plan for each unit individually and collectively greatly exceeds the Town of Avon landscaping standards as determined in Town of Avon Code 7.28.050 Landscaping Town of Avon Code 7.28.050 section (C) does not list zoning district RD in the required landscaping area minimum Table 7.28-6 (See above). However, the largest value for minimum Landscape area listed on that table is for 25% of the lot area to be landscaped. Parking lot plans were scaled down to accommodate this requirement, with Mi Casa (238) and Mein Haus (228) having 26.3% and 32.1% landscaping area totaling 2857 ft2 and 3494 ft2, respectively. (See table below- Lot 36- Mi Casa 238 W Beaver Creek Blvd, Lot 37- Mein Haus 228 West Beaver Creek Blvd.) Required content of landscaping is determined by Table 7.28-7 in terms of landscaping units with a minimum of 1 unit being required for each 50 square feet of landscaped area and 25% of the required units being trees. (See Table 7.28-7) Thus, 58 and 70 units are required for Mi Casa and Mein Haus respectively- 128 units collectively. The requirements are met by the use of trees alone as per the attached table: (See: Landscaping Requirement Compliance Demonstration) Summarizing: Mi Casa requirement is 58 Landscaping Units with 110 and 158 available on the owner and combined (owner +TOA) properties, respectively. For Mein Haus, 70 Landscaping Units are required with 237 and 297 units on the owner and combined (owner + TOA) properties, respectively. The newly planted trees will be Colorado Blue Spruce of the maximum size reasonably obtained at the time of planting, but at least 8 feet in height. The choice of tree is determined to more closely match existing trees, however the appearance and disease resistance are the primary concern to the property owner. Once those trees are placed, additional ground cover will be planted using naturally occuring wildflowers of the Colorado alpine environment to be chosen according to colorfulness and hardiness. Dr. Sarada Krishnan, PhD Horticulturist, has agreed to consult and direct this project. Her background as Director of Horticulture and Center for Global Initiatives at Denver Botanic Gardens; lead author of the Denver Botanical Gardens’ in press book on Colorado wild flowers, and director of Horticulture and Conservation at the Denver Butterfly Pavilion would qualify her as the most prominent expert in the state of Colorado on this subject matter. Summary: It is the wish and desire of Mein Haus, LLC and Mi Casa, LLC and all of its associates to cooperate with the Town of Avon in all its functions to facilitate the approval of the use of this property as stated above. Sincerely, Todd Roehr, MD, Manager Mein Haus, LLC 228A West Beaver Creek Blvd Avon, CO 81620 Mi Casa, LLC 238 West Beaver Creek Blvd Avon, CO 81620 Mailing address: P.O. Box 202 Wolcott, CO 81655 970-949-4287 563-359-7987 563-343-3263 cell Enc: -MiCasa022216 Rooms numbered.pdf -MeinHaus022216 Rooms numbered.pdf -Parking and Driveway Easement and Shared Use Agreement Mi Casa and Mein Haus 11.20.2015.pdf -HeilmemoreShortTermRentalOct29,2015.pdf - Landscaping existing.jpeg - Landscaping Parking proposed.jpeg - Parking Manueverability.jpeg -Table 7.28-7 - Landscaping Requirement Compliance Demonstration SRU Application for 228A&B and 238 A& B West Beaver Creek Blvd, Avon, Colorado dated February 3, 2016 Owner: Mein Haus, LLC& Mi Casa, LLC c/o Todd Roehr, Manager PO Box 202 Wolcott, Colorado 81655 Proposal: Approval is requested to market and operate a Bed and Breakfast establishment on the premises of the above noted properties. Neighborhood There is a one block section that these properties sit on, which is currently zoned for residential use. The property is located within the town of Avon’s Short Term Rental Overlay district which allows rental of the property for less than 30 days. Surrounding this one block section of Avon are commercial operations, condominiums, hotels and businesses. The property immediately south at 220 West Beaver Creek Blvd is a 20 room establishment approved for use as a Bed and Breakfast under PUD 22 and owned through various legal structures by Robert Borg and his wife. Background: Historically, the building occupying 228 West Beaver Creek Blvd was constructed by Thomas and Hazel Nawoczyk to run and function as a European style chalet under the business name Wildfire and it functioned in that manner for a period of time. That property was purchased by Mein Haus, LLC in 2015 the past year with the intent to return the property to its original purpose. The property occupying 238 West Beaver Creek Blvd was purchased by Mi Casa, LLC from Mr. and Mrs. Kit Williams who also originally intended to operate a Bed and Breakfast at this location until they developed health concerns that delayed their plans. Both Mein Haus, LLC and Mi Casa, LLC are entities managed by Todd Roehr, who has complete legal authority to operate the properties. 228 West Beaver Creek Blvd, Side A was purchased in February 2015 by Mein Haus, LLC and currently has licenses in the Town of Avon, all of which are numbered 004364, as listed below: The Town of Avon, Colorado Sales Tax License Issued 1/1/2015 with no expiration date The Town of Avon, Colorado Business License-Short Term Accommodation Issued 7/31//2016 expiration 7/31/2016 The Town of Avon, Colorado Business License-Fixed Location Issued 2/1/2016 expiring 1/31/2017 Party Wall and Shared Use Issues: It is the intent to unite side A and B of both buildings. In the 228 property this will be accomplished by reinstalling a pass through that was in place prior its removal in February 2015. The pass through door was initially removed in February 2015, when only one side of the property was purchased at that time. (see photo below) The property at 238 will be remodeled and have Spanish adobe style arches placed between the two sides of the property in the common dining area. (See floor plan). Amended party wall documents allowing each property to share utilities have been executed, filed and accepted by Eagle County. Both properties will individually share common access across the party wall to mandated fire suppression sprinkler systems and offsite monitored fire alarms, limitless hot water production systems, Heating/Ventilation and Air conditioning (HVAC), laundry, common kitchen for staff preparation of meals for guests, separate kitchen for use by guests, backup generator power, and caretaker suites. Additionally, a document allowing shared use of parking and driveway has been executed between the two properties. (See Attached) (At the PZC meeting on December 1, 2015, Mr. Jared Barnes raised a question regarding the breach of the party wall in these properties. As discussed at that meeting and in actions since that time, the amendments to the Party Wall agreements that allow breach of the party walls for both 228 West Beaver Creek and 238 West Beaver Creek were filed and accepted by Eagle County 12/8/2015. Prior to filing these documents, the issue was discussed with Town of Avon Attorney Eric Heil, who expressed no concern regarding the drafting and filing such documents. From a legal standpoint, a party wall agreement in a duplex acts to assure that if a common wall or common property that lies along a line separating a duplex property is damaged or needs repaired, that both sides have an obligation to maintain the common elements. Furthermore, if one party does not assist in the upkeep and repair of the common element(s), then a lien can be placed on the non- complying owner. Since both sides of these properties are owned by the same entity, the possible conflict and argument becomes irrelevant and moot.) Remodel and upgrades to existing physical structures and operating plant Several upgrades to the properties have or are in the process of being completed at the present time and several upgrades to the properties are in the planning, permitting and construction process currently. Some of these upgrades are requested by the Town of Avon in order to operate these properties as a Bed and Breakfast. Some upgrades are needed for the safety, health and welfare of the current and future tenants. Some upgrades are useful for both of the previously mentioned purposes. Finally, some upgrades being planned are not necessary under any minimal code requirements, but will improve the safety, health and welfare of the current and future tenants regardless of the future approved special uses being considered by this panel. Parking Lot and Driveway (Alternative Equivalent Compliance) The current driveways for both 228 and 238 West Beaver Creek Blvd are blacktop and in poor state of repair from long term neglected maintenance by the previous owners and are scheduled to be replaced. While the current footprint of the parking lots and driveways may comply with the current zoning requirement for residential duplex, they are both inadequate for the current and projected occupancy of the structures. One parking plan submitted to the Town of Avon shows a new parking structure with a Town of Avon code compliant 6 foot landscaping buffer on the private properties between the projected parking lot and the Town of Avon Right of Way adjacent to West Beaver Creek Blvd in front of the structures. This plan does not require approval by the Planning and Zoning Commission (PZC) for construction. A second plan showing pavement up to the lot line adjacent to the Town of Avon Right of way would require approval by the PZC under the Alternative Equivalent Compliance rule. As noted, the Town of Avon Code requires a 6 foot landscape buffer between any parking lot for 3 or more vehicles and the adjacent street. There is currently an 18 foot wide right of way owned by the Town of Avon between the front lot lines and West Beaver Creek Blvd. Most of the 6 duplexes on the West Side of West Beaver Creek Blvd currently have landscaping that overlaps this right of way. The minimal parking requirement for a Bed and Breakfast as interpreted by previous Avon town planner Brian Garner is one parking place per available room for rent. We concur with Mr. Garner’s interpretation of the code and intend to exceed the minimal parking requirement for the combined properties. As such, in order to maximize available parking spaces as well as provide additional driving and turning room for vehicles, we respectfully request to place the mandatory 6 foot landscape buffer in the Town of Avon right of way as an Alternative Equivalent Compliance under the Code of the Town of Avon. As previously stated, there is 18 foot of grass between the lot line and West Beaver Creek Blvd. Currently, on these 2 and other properties on the same side of West Beaver Creek Blvd there are numerous flowering plants, trees, shrubs and scrub plants in the same right of way between the respective lot lines and the street. The request to the PZC for Alternative Equivalent Compliance was first suggested to us by Eric Heil, Town of Avon attorney, and it is our understanding this request represents a reasonable use according to his personally expressed opinion. In the proposed plans, there is a shared driveway between the front and back lots of the properties that overlaps the lot line between the 228 and 238 properties. A driveway easement and shared use agreement has been executed between Mein Haus, LLC and Mi Casa, LLC which are the respective owners of the 228 and 238 properties. A copy of this has been submitted along with the plans. Under the current plan, Mein Haus and Mi Casa will each have 10 guest rooms. The proposed parking plan shows a total of 26 parking places with 7 being covered. One parking spot bridges the two properties’ lot line. Mi Casa has 9 outdoor and 4 covered parking spots for a total of 13.5 parking spaces, while Mein Haus has 9 outdoor and 3 covered parking spots for a total of 12.5 parking spaces. As mentioned previously, there is a Parking and driveway shared use agreement between the two properties. Parking will be reserved for tenants and guests. Landscaping: The landscaping plan for each unit individually and collectively greatly exceeds the Town of Avon landscaping standards as determined in Town of Avon Code 7.28.050 Landscaping Town of Avon Code 7.28.050 section (C) does not list zoning district RD in the required landscaping area minimum Table 7.28-6. However, the largest value for minimum Landscape area listed on that table is for 25% of the lot area to be landscaped. Parking lot plans were scaled down to accommodate this requirement, with Mi Casa (238) and Mein Haus (228) having 26.3% and 32.1% landscaping area totaling 2857 ft2 and 3494 ft2, respectively. Required content of landscaping is determined by Table 7.28-7 in terms of landscaping units with a minimum of 1 unit being required for each 50 square feet of landscaped area and 25% of the required units being trees. Thus, 58 and 70 units are required for Mi Casa and Mein Haus respectively- 128 units collectively. The requirements are met by the use of trees alone as per the table below: Landscape Units Mi Casa (MC) (MC)Uni ts Mein Haus (MH) MH Units Ne w Retaine d Ne w Retaine d Ne w Retaine d Evergreen Tree >10 ft 8 14 4 56 10 140 >8-10 ft 8 11 12 96 4 6-8 ft 6 9 Deciduous tree > 8 inch caliper n/a 14 0+5 5 70 > 4-8 Inch caliper n/a 11 0+3 3 33 >2.5-4 Inch Caliper 7 9 0+4 4 36 Total Landscaping Units 152 139 The newly planted trees will be Colorado Blue Spruce of the maximum size reasonably obtained at the time of planting, but at least 8 feet in height. The choice of tree is determined to more closely match existing trees, however the appearance and disease resistance are the primary concern to the property owner. Once those trees are placed, additional ground cover will be planted using naturally occuring wildflowers of the Colorado alpine environment to be chosen according to colorfulness and hardiness. Dr. Sarada Krishnan, PhD Horticulturist, has agreed to consult and direct this project. Her background as Director of Horticulture and Center for Global Initiatives at Denver Botanic Gardens; lead author of the Denver Botanical Gardens’ in press book on Colorado wild flowers, and director of Horticulture and Conservation at the Denver Butterfly Pavilion would qualify her as the most prominent expert in the state of Colorado on this subject matter. A significant Blue Spruce that is currently too close to the fire hydrant located between the two buildings will either need to be sacrificed or moved as part of this project. Every effort will be taken to save the tree and relocate it, but our ability to do this is in question. No other significant trees, as defined in Town of Avon Code 7.28.050 (h)(1)(iv)(A), will be removed from either property. Sufficient replacement trees will be planted to satisfy the requirement for removing the single significant Blue Spruce, as is required by Town of Avon Code 7.28.050 (h)(1)(iv)(A)(2). Fire Alarm and Fire Suppression Systems The local fire marshall has requested that a sprinkler system and off-site 24 hour monitored fire alarm be installed in the properties. Those systems are in currently being constructed in both the Mein Haus, LLC and Mi Casa, LLC properties. These systems in Mein Haus may be operational by the time this matter is heard by the PZC. The fire suppression and alarm system will be shared by both sides of each respective property (228 and 238). Structural changes With respect to the requirements elicited in Town of Avon Code 7.16.100, no significant outward structural changes are anticipated for either the 228 or 238 West Beaver Creek property in order to function as a Bed and Breakfast. A remodel of the 228 property ground floor has been completed by placing a ¾ bath on the South side ground floor. The adjacent area will serve as an office and potential caretaker’s suite. The new bathroom and shower will be usable by the caretaker and can also be used by tenants to clean up after late check out following recreational activities in the Vail Valley. The ground floor rental unit on the North side of Mein Haus will be remodeled at a later date to make it handicap accessible compliant. Making one of the units fully ADA compliant will greatly enhance the marketability of the property. The 238 property has never been completed internally on the North side of the building. The structural design and engineering of the North side of that property has been evaluated for proper design and possible structural remodeling by Tim Hennum, a structural engineer with KRM Consultants in Avon, Colorado. The alterations suggested by him are minimal in scope. As discussed at the December 1, 2015 PZC meeting, a reputable local professional architect (Greg Macik of Tab Associates) has been contracted and has assisted in the design and floor plan modification for both properties. Those plans are submitted to the PZC and are currently out for bid and George Roberts has been retained to act as the general contractor for the future construction. The caretaker suite on the 238 property is located on the ground floor adjacent to the laundry and mechanical room with back office pass through and easy visualization of both properties. The office space on 228 is also designed to double as capacity for an additional on-site caretaker occupancy to use in high guest occupancy situations. Hot Water Systems and Garage Heating for Fire Suppression system compliance The hot water system of the 228 property has received a significant upgrade which will allow virtually unlimited hot water supply to all rooms. The boiler system for this unit is located in the crawl space under the North side of the building and in order for the South side of the building to have similar hot water supply, a single pipe will cross the party wall in the crawl space. There are plans in place to put other boiler units on the south side of the 228 property, but experience during full occupancy this winter with seasonal workers has shown that capacity to be unneeded at this time. The boiler also powers the Vail Valley’s first hydronic garage heaters which are now operational at Mein Haus. These were installed by the expert plumbers at PSI of Avon, CO. It is anticipated that a similar hot water boiler system will be built at Mi Casa. Heating, Ventilation and Air Conditioning upgrade (HVAC) Current heating systems are adequate for both buildings; however, the internal climate is overly warm in the summer months. Therefore, an upgraded heating and air conditioning system will be placed in both buildings this coming Spring. Back up power David D. Johnson, owner of Grand Electrical Services from Tabernash, Colorado has been consulted and will place Generac back-up generators on both the 228 and 238 properties. The generators will be placed near the electrical supply of each building and sit on their own independent concrete pads. These generators will be able to run off of the current natural gas supply, or can run on propane should the natural gas supply be interrupted by some extreme calamity in the valley. Summary: The proposed use is consistent with the original intent of these properties and the properties themselves are compatible in terms of design, scale, site design and operating characteristics. No adverse impacts are anticipated and the city facilities are already in place to service the proposed use of this property. As these structures and businesses have essentially been abandoned for the past couple of years, continued maintenance will undoubtedly improve in the future under the proposed use. It is the wish and desire of Mein Haus, LLC and Mi Casa, LLC and all of its associates to cooperate with the Town of Avon in all its functions to facilitate the approval of the use of this property as stated above. Sincerely, Todd Roehr, MD, Manager Mein Haus, LLC 228A West Beaver Creek Blvd Avon, CO 81620 Mi Casa, LLC 238 West Beaver Creek Blvd Avon, CO 81620 Mailing address: P.O. Box 202 Wolcott, CO 81655 970-949-4287 563-359-7987 563-343-3263 cell Landscaping Requirement Compliance DemonstrationMi Casa, 238 West Beaver Creek (Lot 36)Required Landscaping Units = 58New Retained New Retained New Retained New Retained New Retained New RetainedEvergreen tree >10 ft. tall 8 14 4 0 56 0 0 0 56Evergreen tree >8‐10 ft. tall 8 11 5 6 40 0 48 0 88 0Evergreen tree 6‐8 ft. tall 6 9000000Deciduous tree >8" caliper 0 14 1 0 14 0 0 0 14Deciduous tree >4‐8" caliper 0 11000000Deciduous tree >2.5‐4" caliper 7 9000000Total:556040 7048 0 8870Total Landscaping Units‐Owner: 110 Total Landscaping Units (Owner & Avon): 158Mein Haus, 228 West Beaver Creek (Lot 37)Required Landscaping Units = 70New Retained New Retained New Retained New Retained New Retained New RetainedEvergreen tree >10 ft. tall 8 14 7 2 0 98 0 28 0 126Evergreen tree >8‐10 ft. tall 8 11 4 0 0 32 0 32 0Evergreen tree 6‐8 ft. tall 6 9000000Deciduous tree >8" caliper 0 14 5 0 70 0 0 0 70Deciduous tree >4‐8" caliper 0 11 3 0 33 0 0 0 33Deciduous tree >2.5‐4" caliper 7 9 4 0 36 0 0 0 36Total: 0 19 4 2 023732 28 32 265Total Landscaping Units (Owner & Avon): 2973.6.2016Landscape MaterialAwarded Landscape UnitsPlantings Owner PropertyPlantings Avon PropertyTotal Landscape UnitsLandscape Units Owner PropertyLandscape Units Avon PropertyTotal Landscape UnitsLandscape MaterialAwarded Landscape UnitsPlantings Owner PropertyPlantings Avon PropertyLandscape Units Owner PropertyLandscape Units Avon Property U S HWY 6 SWI F T G U L C H R D NOTTINGHAMRD EBEAVERCREEKBLVD HURDLN W BEAVERCREEKBLVD BUCKCREEKRDAVONRDRIVERFRONTLN CHAPELPL MILLIESLN B EAVE R C REEKBLVD U S H W Y 6 BENC H M A R K R D BE NCHMARKR DSUNRD BEAVERCREEKPLSTONEBRIDGEDRAVONRDLAKESTPLAZAWAYThis map was produced by the Community Development Department.Use of this map should be for general purposes only.Town of Avon does not warrant the accuracy of the data contained herein. Author: JSF (EagleCounty), 9/10/14IShort Term Rental Zoning Overlay and PUD Short Term Rentals 0 1,000500Feet Short Term Rental Zoning Overlay Short Term Rental based on PUD Property Boundaries Subject PropertiesLakes and RiversTown of Avon Boundary Nottingham Lake Eagle River Eagle R i v e r Staff Report – Rezoning & Comprehensive Plan Amendment March 14, 2016 Planning & Zoning Commission Meeting Project type Case #REZ16001 / #CPA16002 Legal description Lot 16, Section 25, Township 4S, Range 82W Current Zoning N/A Proposed Zoning Public Facilities (PF) Address 1875 Paintbrush Prepared By Matt Pielsticker, AICP INTRODUCTION The Applicant, The Upper Eagle River Water Authority, has submitted a Rezoning application for a property set to be annexed by the Avon Town Council in April. The request would zone the property Public Facilities (PF) in order to accommodate the construction of a water tank this summer. Town Staff is processing a Comprehensive Plan Amendment application concurrently to acknowledge the location and use of the property on the existing and future land use maps in the Avon Comprehensive Plan. PROCESS The Planning and Zoning Commission (“PZC”) will review the Application and conduct a public hearing on March 14, 2016. After conducting a public hearing, PZC will forward a recommendation to Town Council. Subsequently, final action is taken on the applications by Town Council after conducting public hearings and either approval by Ordinance. PROPERTY BACKGROUND The site is currently located on uplatted land in Eagle County. A Federal Patent for the land was issued to the water authority as a result of the Eagle Valley Land Exchange. The 5 acre site will be annexed into the Town with a separate Ordinance. Access to the site is via an existing access road that extends from the Paintbrush right-of-way through Mountain Star Tract M, both of which are owned by the Mountain Star Homeowner’s Association. An existing access and utility easement exists on Tract M. PROPERTY DESCRIPTION The property is composed of two (2) parcels, totaling 5 acres, and contains forested property and an old access road connecting Paintbrush Road with a trail into the USFS lands beyond. Staff Review & Report PUBLIC HEARING: PZC PUBLIC HEARING: Council & 1st Reading of Ordinance PUBLIC HEARING: Council & 2nd Reading of Ordinance March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 1 The Property is bounded on the south by Lot 36 with a single family home approximately 1000’ from the away from the tank site. To the west, north, and east the site is bordered by USFS property and open space. REZONING CRITERIA: The review criteria for zoning amendments are governed by AMC §7.16.050, Rezonings. The PZC shall use the criteria below as the basis for a recommendation on the Rezoning application. Staff responses to each review criteria are provided. (1) Evidence of substantial compliance with the purpose of the Development Code; Staff Response: The Application is substantially compliant with the purpose statements of the Development Code by providing for the orderly, efficient use of the Property, while at the same time conserving the value of the investments of owners of property in Town. The Application promotes the health, safety, and welfare of the Avon community by designating the Property with a zone district that will accommodate a water storage facility. The water tank will ensure a safer community by ensuring adequate fire flows in the event of an incident. Additionally, the construction of the tank will “Minimize the risk of damage and injury to people, structures and public infrastructure” as stated in the Purpose provisions of the code. March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 2 The entire Purpose statement section from the Development Code (Section 7.04.030 - Purposes) is outlined for reference: (a) Divide the Town into zones, restricting and requiring therein the location, erection, construction, reconstruction, alteration and use of buildings, structures and land for trade, industry, residence and other specified uses; regulate the intensity of the use of lot areas; regulate and determine the area of open spaces surrounding such buildings; establish building lines and locations of buildings designed for specified industrial, commercial, residential and other uses within such areas; establish standards to which buildings or structures shall conform; establish standards for use of areas adjoining such buildings or structures; (b) Implement the goals and policies of the Avon Comprehensive Plan and other applicable planning documents of the Town; (c) Comply with the purposes stated in state and federal regulations which authorize the regulations in this Development Code; (d) Avoid undue traffic congestion and degradation of the level of service provided by streets and roadways, promote effective and economical mass transportation and enhance effective, attractive and economical pedestrian opportunities; (e) Promote adequate light, air, landscaping and open space and avoid undue concentration or sprawl of population; (f) Provide a planned and orderly use of land, protection of the environment and preservation of viability, all to conserve the value of the investments of the people of the Avon community and encourage a high quality of life and the most appropriate use of land throughout the municipality; (g) Prevent the inefficient use of land; avoid increased demands on public services and facilities which exceed capacity or degrade the level of service for existing residents; provide for phased development of government services and facilities which maximizes efficiency and optimizes costs to taxpayers and users; and promote sufficient, economical and high-quality provision of all public services and public facilities, including but not limited to water, sewage, schools, libraries, police, parks, recreation, open space and medical facilities; (h) Minimize the risk of damage and injury to people, structures and public infrastructure created by wild fire, avalanche, unstable slopes, rock fall, mudslides, flood danger and other natural hazards; (i) Achieve or exceed federal clean air standards; (j) Sustain water sources by maintaining the natural watershed, preventing accelerated erosion, reducing runoff and consequent sedimentation, eliminating pollutants introduced directly into streams and enhancing public access to recreational water sources; (k) Maintain the natural scenic beauty of the Eagle River Valley in order to preserve areas of historical and archaeological importance, provide for adequate open spaces, preserve scenic views, provide recreational opportunities, sustain the tourist-based economy and preserve property values; (l) Promote architectural design which is compatible, functional, practical and complimentary to Avon's sub-alpine environment; March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 3 (m) Achieve innovation and advancement in design of the built environment to improve efficiency, reduce energy consumption, reduce emission of pollutants, reduce consumption of non-renewable natural resources and attain sustainability; (n) Achieve a diverse range of attainable housing which meets the housing needs created by jobs in the Town, provides a range of housing types and price points to serve a complete range of life stages and promotes a balanced, diverse and stable full time residential community which is balanced with the visitor economy; (o) Promote quality real estate investments which conserve property values by disclosing risks, taxes and fees; by incorporating practical and comprehensible legal arrangements; and by promoting accuracy in investment expectations; and (p) Promote the health, safety and welfare of the Avon community. (2) Consistency with the Avon Comprehensive Plan; Staff Response: With the corresponding Avon Comprehensive Plan Amendment, the Application is consistent with the plan and recommendations related to the provision of public services including water. (3) Physical suitability of the land for the proposed development or subdivision; Staff Response: The Property is suitable for water storage and a small access roadway. The elevation of the property is at 9,200 feet which is adequate to serve the gravity flow tank. Vegetation on the property consists of aspen and various native grasses with some open meadows. (4) Compatibility with surrounding land uses; Staff Response: The area surrounding the parcel is mostly native forest, with single- family home construction to the south. Once the facility is operational, there will be minimal noise from maintenance vehicles monitoring the site on a routine basis. Long term Impacts to wildlife are minimal as documented in the Land Exchange environmental assessment documentation. (5) Whether the proposed rezoning is justified by changed or changing conditions in the character of the area proposed to be rezoned Staff Response: The rezoning is justified based on increased water demand in the Mountain Star subdivision to maintain adequate fire flows. (6) Whether there are adequate facilities available to serve development for the type and scope suggested by the proposed zone compared to the existing zoning, while maintaining adequate levels of service to existing development; Staff Response: The Property is served through an access easement from a privately owned and maintained roadway. March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 4 (7) Whether the rezoning is consistent with the stated purpose of the proposed zoning district(s); Staff Response: The PF zone district is well suited for construction of a water tank and leaving the property in relatively natural state. (8) That, compared to the existing zoning, the rezoning is not likely to result in adverse impacts upon the natural environment, including air, water, noise, stormwater management, wildlife, and vegetation, or such impacts will be substantially mitigated; Staff Response: The property currently has no zoning designation. All of the impacts associated with the construction and on-going maintenance of a water tank were evaluated with biological and wildlife studies. For example, to mitigate impacts to wildlife, construction will only be permitted between April 15 and December 15 for deer and elk range. No adverse impacts are expected, and any minor impacts will be mitigated. (9) That, compared to the existing zoning, the rezoning is not likely to result in significant adverse impacts upon other property in the vicinity of the subject tract; Staff Response: Temporary noise during construction will have some impacts to neighboring properties; however, BMPs will be utilized to limit impacts with construction limited from 7am to 6pm Monday through Saturday. Once the tank is constructed there will be very few impacts to other properties in the vicinity. The location of the tank is approximately 175 higher than Paintbrush road and will not be visible. (10) For rezoning within an existing PUD, consistency with the relevant PUD Master Plan as reflected in the approval of the applicable PUD; and, Staff Response: The Property is not located in the Mountain Star PUD and this is not applicable. (11) Adequate mitigation is required for zoning amendment applications which result in greater intensity of land use or increased demands on public facilities and infrastructure. Staff Response: The zoning amendment will result in minimal impacts to public facilities and infrastructure. COMPREHENSIVE PLAN AMENDMENT CRITERIA: The review procedures for a Comprehensive Plan Amendment mimic those of a Rezoning application and therefore the two applications are being reviewed concurrently. The Avon Development Code allows concurrent review pursuant to AMC §7.16.020(b)(2), Concurrent Review. According to the AMC §7.16.030(e), PZC shall consider the following criteria in formulating a recommendation to Council: March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 5 (1) The surrounding area is compatible with the land use proposed in the plan amendment or the proposed land use provides an essential public benefit and other locations are not feasible or practical; Staff Response: The land use of the amendment is consistent with existing land uses in the vicinity. Construction of a water tank provides an essential public benefit. The location of this Property is strategic based on elevation and location proximate to the residential lots it will serve. (2) Transportation services and infrastructure have adequate current capacity, or planned capacity, to serve potential traffic demands of the land use proposed in the plan amendment; Staff Response: Several alternatives were considered for this water tank, from 235,000 to 5000,000 gallons. The capacity was set to 270,000 gallons, as recommended by an independent engineering study. (3) Public services and facilities have adequate current capacity, or planned capacity, to serve the land use proposed in the plan amendment; Staff Response: This facility will serve existing and future demands of the Mountain Star PUD. The plan amendment does not increase development potential in the area. (4) The proposed land use in the plan amendment will result in a better location or form of development for the Town, even if the current plan designation is still considered appropriate; Staff Response: The existing water tank on Tract M of Mountain Star will be removed and decommissioned with the construction of this upgraded tank. The location of the tank, approximately 1000’ above the existing residential construction, is appropriate. (5) Strict adherence to the current plan would result in a situation neither intended nor in keeping with other key elements and policies of the plan; Staff Response: The current Avon Comprehensive Plan does not contemplate the land exchange parcel where the tank will be located; therefore the maps are being updated to show the boundaries of the parcel and open space designation given how the property is intended to be developed. (6) The proposed plan amendment will promote the purposes stated in this Development Code; and, Staff Response: As stated above, the Purposes stated in the Development Code are achieved with the siting and development of the property for a water tank. (7) The proposed plan amendment will promote the health, safety or welfare of the Avon Community and will be consistent with the general goals and policies of the Avon Comprehensive Plan. Staff Response: The plan amendment will ensure that the Comprehensive Plan is consistent with the zoning application to accommodate the construction of the water March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 6 tank. The health, safety, and welfare of the Mountain Star community will be enhanced with a safe, appropriately sized water tank structure. RECOMMENDAITON Approval RECOMMENDED MOTION: “I move to Approve Resolution 16-02, recommending that the Avon Town Council approve Case #REZ16001 and Case #CPA16002, applications to rezone the Mountain Star Water Tank Site Property to the Public Facilities (PF) Zone District and amend the Avon Comprehensive Plan to integrate the Mountain Star Water Tank Site Property on land use maps.” ATTACHMENTS: Resolution 16-02 Rezoning Application Comprehensive Plan Exhibits March 14, 2016 PZC Meeting Mountain Star Tank Site Zoning and Comprehensive Plan Amendment 7 TOWN OF AVON, COLORADO PLANNING AND ZONING COMMISSION RESOLUTION 16-02 A RESOLUTION RECOMMENDING TO THE AVON TOWN COUNCIL APPROVAL OF CASE #REZ16001 and CASE #CPA16002, APPLICATIONS TO REZONE THE MOUNTAIN STAR TANK SITE PROPERTY PUBLIC FACILITIES (PF) AND AMEND THE COMPREHENSIVE PLAN WHEREAS, the Upper Eagle River Water Authority submitted an application to zone the Mountain Star Tank Site Property Public Facilities (PF) zone district, and Town Staff has processed an application to amend the Comprehensive Plan (collectively “the Applications”) to integrate the Mountain Star Water Tank Site Property on land use maps; and WHEREAS, the Avon Planning and Zoning Commission held a Public Hearing on March 14, 2016, where public comments were considered; and WHEREAS, the Planning and Zoning Commission makes the following findings with respect to the Applications: 1. The Applications are desirable to respond to changed conditions in the Mountain Star Subdivision. 2. The Applications were reviewed in accordance with AMC §7.16.030 Comprehensive Plan Amendment, and AMC §7.16.050, Rezonings, and found to be in substantial compliance with the review criteria as outlined in the staff report dated March 14, 2015 by Matt Pielsticker. 3. The Applications were reviewed concurrently, as permitted by AMC §7.16.020(b)(2), Concurrent Review. 4. The Applications promote the health, safety, and welfare of the Avon community by providing a site to meet current and future fire flow storage requirements for the 88 single-family residential lots in the Mountain Star subdivision. 5. The Application is substantially compliant with the purpose statements of the Development Code by minimizing “the risk of damage and injury to people, structures and public infrastructure” as stated in the Purpose provisions of the code. NOW THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission hereby recommends that the Town Council of the Town of Avon Approve the Applications as submitted. ACCEPTED, APPROVED, AND ADOPTED THIS ____ DAY OF _______________, 2016 AVON PLANNING AND ZONING COMMISSION SIGNED: ___________________________ Jim Clancy, Chairperson Resolution 16-02 – Recommendation Regarding Mountain Star Water Tank Applications January 25, 2016 Debbie Hoppe, Town Clerk Town of Avon 1 Lake Street Avon, CO 81620 Dear Debbie, I have enclosed separate Annexation Plats for Tract WT-1 and WT-2, together containing 5.00 acres, and, on behalf of the Upper Eagle Regional Water Authority (“Authority”), I hereby request serial annexation of both Tracts to the Town of Avon. I have also enclosed the executed Petition for Annexation from the Authority. The Authority acquired Lot 16, Section 25, Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado by U.S. Patent in 2013, Reception No. 201309275, from the United States of America in the Eagle County Land Exchange for the specific purpose of constructing a water storage tank above the Mountain Star Subdivision in the Town of Avon. In order to complete the permitting process for this new tank, it is appropriate that this property first be annexed to the Town. I request that this property be zoned PF – Public Facilities to be consistent with the proposed use of the property. I also request that the Town waive any fees for review of this Petition for Annexation as it is being submitted by another governmental entity in which the Town is a Contracting Party. The Authority plans to begin construction of this water storage tank in April 2016. I therefore request expedited consideration and approval of this Petition for Annexation so that this important project can proceed to completion as soon as possible. Sincerely, Jason Cowles, P.E. Planner, Upper Eagle Regional Water Authority Enclosures: Land Development Application Annexation Petition Annexation Plat List of Property Owners within 300’ of Annexation Parcel Mailing Envelopes for Adjacent Property Owners cc: Linn Brooks, General Manager James P. Collins, General Counsel Virginia Egger, Town Manager Matt Pielsticker, Town Planner Staff Report – Minor PUD Amendment March 14, 2016 Planning & Zoning Commission Meeting Project type Case #PUD16002 - Minor PUD Amendment Legal description Lot 1 and 2, Minervini Subdivision, A Resubdivision of Lots 15 and 16, Block 4, Wildridge Subdivision Zoning PUD Address 5678 and 5684 Wildridge Road East Prepared By Matt Pielsticker, AICP, Planning Director Introduction The Applicant, Jeff Manley, representing the owner of the properties, John Minervini, is applying for a Minor PUD Amendment to extend a condition of approval which required the construction of a new driveway by January 28, 2016. The delay in driveway construction was due to unforeseen medical reasons, and the applicant is now requesting a one (1) year extension to complete the driveway work by January 28, 2017. Background In 2014 the Minervini PUD Amendment was approved, whereby the building type for two lots, Lot 15 and Lot 16, Block 4, Wildirdge Subdivision were modified. Previous to the PUD Amendment the properties were zoned for three (3) dwelling units in the form of a single- family structure and a duplex structure. The PUD Amendment provided for a resubdivision and the ability to develop the properties with three (3) single-family structures. One of the structures is already constructed and is occupied by the Minervini family. Town Council approved the PUD Amendment on April 8, 2014 with the following conditions: (1) The Subdivision Plat shall include easements for utilities in the non-developable areas including the right to access and maintain such utilities; lot line easements are shall include Utility and Drainage easements, with the exception that the front lot line easement shall include a Slope Maintenance, Utility, Drainage, and Snow Storage Easement. COMPLETED AND RECORDED WITH EAGLE COUNTY (2) The maximum permitted roof ridge elevation for Lot 3 shall be 8,638’ above sea level. NOTED (3) The realigned driveway to access Lots 2 and 3 shall be constructed by January 28, 2016, based on the “Proposed Lots Conceptual Home Layout” plans, Page 2 of the Application submittal. NOT COMPLETED (4) The maximum building footprint shall be restricted to 3,000 square feet for proposed Lot 1, 4,000 sq. ft. for Lot 2, and restricted to 2,000 square feet for Lot 3. NOTED (5) The maximum livable square footage (not including garage space) shall be restricted to 4,000 square feet for proposed Lots 1 and 3. NOTED March 14, 2016 PZC Meeting – Minervini Minor PUD Amendment 1 (6) The maximum building height shall be restricted to twenty-eight feet (28’) for Lots 1 and 3. NOTED This Minor PUD Amendment is presented on the single issue of extending the timeframe of the condition cited above. The previous PUD Amendment approval is technically void as of January 28, 2016; this application extends the date to construct the driveway for one more year and would re-activate the full approval if Council takes action to approve and the condition is complied with in the proposed new timeframe. Process Minor PUD Amendment Process This application is processed under §7.16.060(h), Amendments to a Final PUD, AMC. Subsection (1)(ii), sets forth criteria for a Minor Amendment, while subsection (2)(ii) sets forth the review procedures for the same process. The application, as submitted, meets the criteria for a Minor Amendment. The March 14, 2016 meeting completes the public hearing requirements with the PZC. Another public hearing is required with the Town Council and action by Council is scheduled for April 12, 2016. Public Notification In compliance with the Public Hearing and noticing requirements, a mailed notice was provided to all property owners within 300’ of the property. Additionally, a notice was published in the Vail Daily newspaper on March 3, 2016. PUD Review Criteria Pursuant to §7.16.060(e)(4), Review Criteria, AMC, the PZC shall consider the following criteria when forming the basis of a recommendation: (i) The PUD addresses a unique situation, confers a substantial benefit to the Town, and/or incorporates creative site design such that it achieves the purposes of this Development Code and represents an improvement in quality over what could have been accomplished through strict application of the otherwise applicable district or development standards. Such improvements in quality may include, but are not limited to: improvements in open space provision and access; environmental protection; tree/vegetation preservation; efficient provision of streets, roads, and other utilities and services; or increased choice of living and housing environments. (ii) The PUD rezoning will promote the public health, safety, and general welfare. (iii) The PUD rezoning is consistent with the Avon Comprehensive Plan, the purposes of this Development Code, and the eligibility criteria outlined in §7.16.060(b); (iv) Facilities and services (including roads and transportation, water, gas, electric, police and fire protection, and sewage and waste disposal, as applicable) will be available to serve the subject property while maintaining adequate levels of service to existing development; March 14, 2016 PZC Meeting – Minervini Minor PUD Amendment 2 (v) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse impacts upon the natural environment, including air, water, noise, storm water management, wildlife, and vegetation, or such impacts will be substantially mitigated; (vi) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse impacts upon other property in the vicinity of the subject tract; and (vii) Future uses on the subject tract will be compatible in scale with uses or potential future uses on other properties in the vicinity of the subject tract. Staff Response: This PUD Amendment is limited to extending the condition of approval and should not affect other properties negatively. A delay in constructing shared access has no effect on the other conditions related to building height, building massing or building locations. Staff Recommendation Staff requests that the PZC conduct a public hearing, consider public comments, and direct Staff to prepare a formal Findings of Fact, Record of Decision, and Recommendation to Council pursuant to Section 7.16.020(f)(3), Findings. The Avon Town Council cited the following findings when approving the original PUD Amendment: (1) The Application will not result in adverse impacts upon the natural environment, including air, water, noise, storm water management, wildlife, and vegetation, or such impacts will be substantially mitigated with building footprint maximums; and, (2) Approval of the Application will reduce building massing compared to the existing underlying zoning, allowing for an improvement in quality over what could have been accomplished through the existing zoning designations; and, (3) Potential building impacts are reduced by certain restrictions stated in the conditions; and, (4) The Application is in conformance with policy recommendations in the Avon Comprehensive Plan, including “siting buildings of varying sizes along the street to maximize sun exposure, protect views, be compatible with surrounding development, and break up building bulk.” Attachments A: Letter Request and Driveway Plans B: Previous PUD Approval and Subdivision t March 14, 2016 PZC Meeting – Minervini Minor PUD Amendment 3 Date: 03-11-2016 Re: Minervini Residences Drive Dear Planning and Zoning Committee c/o Mr. Pielsticker, Town of Avon Planner Martin Manley Architects created the grading and driveway plan for the Minervinis for the bidding and to construct the drive. We complete this drawing in September, of 2015. This shows that we were in process of working to conform/comply with the conditions set forth by the PUD. Due to the owner illness, contractor workloads, and the winter closing date of the asphalt plant, we ran out of time to complete the project by the deadline. Mr. Minervini is in negotiation with DW Dantas Construction now to see if he can get the project started while the excavator is on a neighboring lot. I would like drive drawing as part of the presentation/packets. We are looking to extend the date that was recorded in the PUD, so that the Minervinis can finish the project and be in conformance with the intent of the PUD previously approved. The Goal was to provide the drive entrance that was not on the curve. Our current drawing addresses this safety concern. Thank you, Jeffrey P Manley AIA Martin Manley Architects 970-328-1299 (direct) 970-688-0326 (cell) www.martinmanleyarchitects.com DN DN F O U N D #5 R E B A R W / 1 1 /2 " A L U M IN U M C A P L S # 9 3 3 7 EDGE LAWN 8 ' 1 0 ' 1 0 ' 1 0 ' B R G =S 2 5 °1 9 '5 0 " W 8 6 0 7 '-0 "+ 8 6 0 5 '-0 "+ 8 6 0 8 '-0 "+ 8 6 0 6 '-0 "+ 8 6 0 8 '-0 "+ 8 6 0 7 '-0 "+ 8 6 0 4 '-0 "+ 8 6 0 5 '-0 "+ E L =8 6 0 9 .7 7 S E T B A C KBUILDING 861086108 6 0 0 8600S E W E R M H G -1 1 M E A S . R I M E L =8 6 0 7 .2 ' U T I L S T U BINVERT E L =8 5 9 9 .6 ' S L O P E M A I N T , D R A I N A G E , A N D S N O W S T O R A G E E A S E M E N T 1 .5 ' C M P E L =8 6 1 5 .7 1 .5 ' C M P I N V E L =8 6 1 2 .7 S E W E R M H G -1 2 B A S I S O F E L E V I N V E L =8 6 0 8 .1 2 .5 'X 2 .5 'S T O N E 8 6 1 2 .1 8 6 1 3 .6 8 6 1 5 .7 8 6 1 9 .2 8 6 2 1 .2 E D G E A S P H A L T R O A D T V P E D P H O N E P E D D I T C H C A T C H B A S I N F L A G S T O N E W A L K CONC APRON P L A N T E R B U I L D I N G O V E R H A N G F O U N D P I N & A L U M C A P L S #5 4 4 7 F O U N D P I N & A L U M C A P L S #9 3 3 7 F O U N D P I N & A L U M C A P L S #5 4 4 7 8 6 1 1 .3 8 6 0 8 .8 8 6 1 1 .4 8 6 1 1 .2 8 6 1 1 .2 I N V 8 6 0 9 .1 8 6 1 1 .1 L A N D I N G w /R O O F O V H G . S T E P S S P O T E L .(T Y P ) 8 6 1 0 .4 8 6 0 8 .9 8 6 0 7 .6 8 6 0 6 .5 R I M E L = 8 6 1 5 .6 U T I L I T Y & D R A I N A G E E A S E M E N T S P R O P E R T Y L IN E U T IL IT Y & D R A IN A G E E A S E M E N T S A B A N D O N E D B Y T H IS P L A T L O T 1 =3 9 °3 3 '2 4 " R =1 7 5 .0 0 'L =1 2 0 .8 2 'T =6 2 .9 3 'C L E N =1 1 8 .4 3 'B R G =S 1 3 °0 6 '4 8 " E N 5 1 °3 9 '2 1 "E 1 2 0 .7 6 'S 6 0 °4 5 ' 4 2 " E 1 2 7 . 2 2 ' =1 4 °0 5 '3 8 " R =1 7 5 .0 0 'L =4 3 .0 4 'T =2 1 .6 3 'B R G =N 2 5 °5 0 '4 9 "W C L E N =4 2 .9 4 '8 6 1 0 '-0 "+ 8 6 0 9 '-6 "+ 11°8609'-0"+).W.O.R'05(TSAEDAOREGDIRDLIWDN DN DN DN F O U N D #5 R E B A R W / 1 1 /2 " A L U M I N U M C A P L S # 5 4 4 7 F O U N D #5 R E B A R W / 1 1 /2 " A L U M IN U M C A P L S # 5 4 4 7 1 1 /2 " A L U M I N U M C A PLS# 9 3 3 7 N W 2 5 ° 0 .2 8 ' F R O M C O R N E R F O U N D #5 R E B A R W / 1 1 /2 " A L U M I N U M C A P L S # 9 3 3 7 F O U N D #5 R E B A R 0 .3 5 4 A C R E S 0 .3 5 1 A C R E S 0 .7 4 1 A C R E S 5 6 7 8 5 6 8 4 5 6 8 8 (R o b e r t A . & E l i z a b e t h L . T a y l o r ) (R .N . 2 0 0 9 1 5 5 9 0 ) (N e a l A . H a b e c k & J i n e a n e B . H a y b e c k T r u s t s ) (R .N . 2 0 1 3 0 2 9 9 0 ) (J a c k D . H u n n ) (R .N . 2 0 0 8 2 5 6 5 9 ) (C l i f f o r d K a y & A l t h e a T r e v o r C a l l a w a y ) (K a r e n , J o s e p h , J e r e m y & E l i z a b e t h M e r l i n g ) (R .N . 2 0 1 2 1 2 5 8 5 ) (T o w n o f A v o n ) (R .N . 2 0 1 3 1 4 5 8 7 ) X P E A K E L =8 6 0 7 .9 ' XPEAK E L =8 6 0 3 .8 ' X P E A K E L =8 6 1 1 .3 ' D E C K O U T L I N E B O U L D E R W A L L E D G E L A W N E D G E L A W N EDGE LAWN 1 0 ' 8 ' 1 0 ' 2 0 ' 1 0 ' 1 0 ' B R G =S 2 5 °1 9 '5 0 " W C L E N =1 1 2 .0 2 'T =5 9 .1 2 'R =1 7 5 .0 0 'L =1 1 4 .0 3 '=3 7 °2 0 '0 5 "S 46°00'08" E 121.00' N 34°27'27" E 94.17'S 22°14'05" W 99.87'8 6 0 7 '-0 "+ 8 6 0 5 '-0 "+ 8 6 0 8 '-0 "+ 8 6 0 6 '-0 "+ 8 6 0 8 '-0 "+ 8 6 0 7 '-0 "+ 8 6 0 4 '-0 "+ 8 6 0 5 '-0 "+ 0 .0 4 6 A C R E S 0 .2 1 9 A C R E S 0 .0 2 7 A C R E S N O N D E V E L O P M E N T E A S E M E N T C R E A T E D B Y T H I S P L A T N O N D E V E L O P M E N T E A S E M E N T C R E A T E D B Y T H I S P L A T N O N D E V E L O P M E N T E A S E M E N T C R E A T E D B Y T H I S P L A T 28.99'43.15' 3 1 .2 7 ' N 3 7 °4 1'3 8 "E B AS IS O F B E ARI N G S 0 .0 6 3 A C R E S G U A R D R A I L E L =8 5 9 7 .2 1 E L =8 6 0 9 .7 7 F N D . P L A I N #5 R E B A R S E T B A C KBUILDING S E T B A C KBUILDING 7 .5 '85708580860086108 6 2 0 8 6 10 8 6 2 0 861086108 6 1 0 8 6 1 0 860085908 6 0 0 86008 5 9 0 8590 8580 S E W E R M H G -1 1 M E A S . R I M E L =8 6 0 7 .2 ' U T I L S T U BINVERT E L =8 5 9 9 .6 ' 4 0 '6 0 'U T I L I T Y A N D D R A I N A G E E A S E M E N T S L O P E M A I N T , D R A I N A G E , A N D S N O W S T O R A G E E A S E M E N T 1 .5 ' C M P E L =8 6 1 5 .7 1 .5 ' C M P I N V E L =8 6 1 2 .7 S E W E R M H G -1 2 B A S I S O F E L E V I N V E L =8 6 0 8 .1 2 .5 'X 2 .5 ' S T O N E 8 6 1 2 .1 8 6 1 3 .6 8 6 1 5 .7 8 6 1 9 .2 8 6 2 1 .2 E D G E A S P H A L T R O A D T V P E D P H O N E P E D D I T C H C A T C H B A S I N F L A G S T O N E W A L K CONC APRON I N V O U T 4 " P V C E L =8 6 0 1 .1 S P R I N K L E R V A L V E (T Y P ) P L A N T E R D E C K H O T T U B 8 6 1 1 .2 C O N C P A D S E W E R M H G -1 3 F O U N D P I N A N D A L U M C A P L S #9 3 3 7 F O U N D P I N & A L U M C A P L S #5 4 4 7 F O U N D P I N & A L U M C A P L S #9 3 3 7 F O U N D P I N & A L U M C A P L S #5 4 4 7 8 6 1 1 .3 8 6 0 8 .8 8 6 1 1 .2 8 6 1 2 .0 8 6 1 1 .4 8 6 1 1 .2 8 6 0 9 .5 8 6 1 0 .8 F O U N D P I N & A L U M C A P L S #9 3 3 7 8 6 1 1 .2 8 6 1 1 .2 I N V S E W E R M H F -2 5 .1 8 6 0 9 .1 8 6 0 8 .4 8 6 2 7 .9 8 6 3 5 .5 P E A K E L . P E A K E L . 8 6 1 1 .1 8 6 1 1 .4 R O C K L I N E D D R A I N A G E S W A L E C O N C R E T E P A T I O R O O F O V H G . L A N D I N G w /R O O F O V H G . S T E P S S P O T E L .(T Y P ) 8 6 1 2 .0 8 6 1 0 .4 8 6 0 8 .9 8 6 0 7 .6 8 6 0 6 .5 8 6 0 4 .9 R I M E L = 8 6 1 5 .6 U T I L I T Y & D R A I N A G E E A S E M E N T S P R O P E R T Y L IN E U T I L IT Y & D R A IN A G E E A S E M E N T S A B A N D O N E D B Y T H IS P L A T U T I L I T Y & D R A I N A G E E A S E M E N T S U T I L I T Y & D R A I N A G E E A S E M E N T U T I L IT Y & D R A IN A G E E A S M E N T S A B A N D O N E D B Y T H IS P L A T 8623.10 8612.04 8635.52 8627.86 MON ELV-C RPEAK RPEAK 414 480 545 546 T R A C T K L O T 1 3 L O T 2 1 L O T 2 0 L O T 1 9 T R A C T K L O T 1 7 L O T 1 L O T 2 L O T 3 P A R C E L A S 4 4 °0 7 '3 5 " W 2 0 9 .5 3 'S 42°05'11" E 216.00' =3 9 °3 3 '2 4 " R =1 7 5 .0 0 'L =1 2 0 .8 2 'T =6 2 .9 3 'C L E N =1 1 8 .4 3 'B R G =S 1 3 °0 6 '4 8 " E N 4 4 °0 7 '3 5 " E 2 0 9 .5 3 'S 42°05'11" E 216.00' S 4 7 °5 4 '4 9 " W 1 8 0 .0 0 '1 1 5 .3 2 'N 5 1 °3 9 '2 1 "E 1 2 0 .7 6 'N 5 1 °3 9 '2 1 "E 8 1 .3 3 '79.46'111.54'49.18'50.69'S 6 0°4 5'4 2 " E 1 2 7.2 2' N81°39'18"E 14.05'S68°20'42"E 20.05'S38°20'42"E17.54'25.00' 6 4 .6 8 '=1 4 °0 5 '3 8 " R =1 7 5 .0 0 'L =4 3 .0 4 'T =2 1 .6 3 'B R G =N 2 5 °5 0 '4 9 "W C L E N =4 2 .9 4 'S17°52'52"E27.41'S 4 7 °5 4 '4 9 "W 1 0 4 .0 8 '8610'-0"+ 8 6 0 9 '-6 "+ 11°8609'-0"+ U T I L I T Y A N D D R A I N A G E E A S E M E N T U T I L I T Y A N D D R A I N A G E E A S E M E N T F O U N D P I N A N D A L U M C A P L S #9 3 3 7 F O U N D #5 R E B A R F O U N D P I N & A L U M C A P L S #9 3 3 7).W.O.R'05(TSAEDAOREGDIRDLIW14' - 0"14' - 0"14' - 0"Relocate address stone REMOVE (2) TREES NEW BERM TOP OF BERM AT 8616'-6" 8611.2'+ 8 6 1 1 .3 '+garage slab at 8611.5'+Work on the house is not in contract and not part of this submittal 8 6 1 1 .7 '++ 8 6 1 1.6' + 8 6 1 1.4'+ 8611.0'flow line+ 8610.5' 8610.0'+grade ay flowline = 2.5%'8 6 0 9 .2 '+ 8 6 0 9 .5 '+8609.1'+860886068 6 0 4 8602860486068608 grades at future lot drive shown for planning purposessnow storage easementline of existing drive line of existing drive existing tree 8816'-0"3' 8813'-0" t.o.w. b.o.w. + 8 6 1 1.0' + 8 6 1 1.4 8816'-0"4' 8812'-0" t.o.w. b.o.w. 8814'-0"2'-6"t.o.w. 8811'-6"b.o.w.861286148616 8 6 1 4 86108 6 1 2 line of existing drive TRUE NORTH PROJECT NORTH 20' - 1"12 '- 0". 8 6 1 1.0'+ 8 6 1 08612 8 6 1 3 .0 '+86128614861886168616 8610.0'+SNOW STORAGE 125 S.F.SNOW STORAGESNOW STORAGE LESS THAN 4% GRADE 20' - 0"15' - 0"2 9' - 0 " 1 0' - 0"8' - 0"970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631www.martinmanleyarchitects.comProject numberDateREVISIONS9/18/2015 9:05:17 AMA1.1SITE PLAN1503Minervini ResidencePROGRESS SET09.18.15Renovation of Single Family HomeLot 2, Minervini Subdivision5684 Wildridge Road East Avon, CO 81620No. Description Date 1" = 10'-0"1 01.0 SITE PLAN 1" = 30'-0"2 01.0 OVERALL SITE PLAN AREA OF DRIVE 1750' S.F. ON LOT 2 20% SNOWSTORAGE = 350 S.F. REQUIRED 430 S.F. OF SNOW STORAGE PROVIDED AREA OF DRIVE 470' S.F. ON LOT 1 20% SNOWSTORAGE = 94 S.F. REQUIRED 125S.F. OF SNOW STORAGE PROVIDED Attachment E TOWN OF AVON RESOLUTION NO. 14 -02 Series of 2014 A RESOLUTION APPROVING THE MINERVINI MINOR PUD AMENDMENT FOR LOTS 15 AND 16, BLOCK 4, WILDRIDGE, TOWN OF AVON, COLORADO WHEREAS, a Minor PUD Amendment Application ( "Application "), was submitted to the Community Development Department of the Town on October 7, 2013 by Dominic Mauriello Applicant "); and WHEREAS, the Application requests to amend the zoning of Lot 15 and Lot 16, Block 4, Wildridge, to allow three (3) single- family structures in place of the currently allowed single - family and duplex zoning; and WHEREAS, the Planning and Zoning Commission held public hearings on November 5, 2013, November 19, 2013, December 3, 2013, and January 7, 2014, after posting notice of such hearings in accordance with the requirements of Section 7.16.020(d), Step 4: Notice, Avon Municipal Code, and considered all comments provided; and WHEREAS, the Planning and Zoning Commission approved Findings of Fact, Record of Decision, and Recommendations on January 7, 2014, recommending that the Town Council conditionally approve the Application; and WHEREAS, the Avon Town Council held public hearings on January 28, 2014, February 25, 2014, March 25, 2014, and April 8, 2014, and after posting notice as required by law, considered all comments, testimony, evidence and staff reports provided by the Town staff prior to taking action on the Application; and WHEREAS, the Avon Town Council has examined the review criteria set forth in 7.16.060(e)(4); and WHEREAS, the Avon Town Council has made the following findings regarding the Application: 1) The Application was processed in accordance with §7.16.060(h), Amendment to a Final PUD, which allowed the application to be processed as a minor amendment pursuant to 7.16.060(h)(1)(11), Minor Amendment, and utilized the review criteria set forth in 7.16.060(e)(4), Preliminary PUD Review Criteria; and, 2) The Application is in substantial compliance with §7.16.060(e)(4), Preliminary PUD Review Criteria, AMC based upon review of the Application, the Town staff report and other evidence considered by the Avon Town Council at the public hearing; and, 3) The Application will not result in adverse impacts upon the natural environment, including air, water, noise, storm water management, wildlife, and vegetation, or such impacts will be substantially mitigated with building footprint maximums; and, Resolution 14 -02 Minervini Minor PUD Amendment April 8, 2014 Page 1 of 2 Attachment E 4) Approval of the Application will reduce building massing compared to the existing underlying zoning, allowing for an improvement in quality over what could have been accomplished through the existing zoning designations; and, 5) Potential building impacts are reduced by certain restrictions stated in the conditions; and, 6) The Application is in conformance with policy recommendations in the Avon Comprehensive Plan, including "siting buildings of varying sizes along the street to maximize sun exposure, protect views, be compatible with surrounding development, and break up building bulk." NOW, THEREFORE BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF AVON, that the Minor PUD Application for Lots 15 and 16, Block 4, Wildridge, Town of Avon, Colorado, is hereby approved subject to the following conditions, which shall be met as a condition to subdivision, design review and/or building permit approval: 1) The Subdivision Plat shall include easements for utilities in the non - developable areas including the right to access and maintain such utilities; lot line easements are shall include Utility and Drainage easements, with the exception that the fi•ont lot line easement shall include a Slope Maintenance, Utility, Drainage, and Snow Storage Easement. 2) The maximum permitted roof ridge elevation for Lot 3 shall be 8,638' above sea level. 3) The realigned driveway to access Lots 2 and 3 shall be constructed by January 28, 2016, based on the "Proposed Lots Conceptual Home Layout" plans, Page 2 of the Application submittal. 4) The maximum building footprint shall be restricted to 3,000 square feet for proposed Lot 1, 4,000 sq. ft. for Lot 2, and restricted to 2,000 square feet for Lot 3. 5) The maximum livable square footage (not including garage space) shall be restricted to 4,000 square feet for proposed Lots 1 and 3. 6) The maximum building height shall be restricted to twenty -eight feet (28') for Lots 1 and 3. ADOPTED APRIL 8, 2014. AVON TOWN COUNCIL By: Rich Carroll, Mayor Resolution 14 -02 Minervini Minor PUD Amendment April 8, 2014 Page 2 of 2 Attest: Debbie Hoppe, Town C erk VICINITY MAP SCALE: 1"=1000' 3 o' 0 A= 76'53'29'° R =175.00' L= 234.84' T= 138.92' BRG =N05 *33'00 "E C LEN =217.61' FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP LS# 5447 SLOPE MAINTENANCE, DRAINAGE & SNOW STORAGE EASMENT_ FOUND #5 REBAR LOT 17 Robert A. & Elizabeth L. Taylor) R.N. 200915590) FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP LS# 5447 IM 41199 HIGHWAY 6 & 24, EAGLE -VAIL P.O. BOX 1230 EDWARDS, CO. 81632 970)949 -1406 gh,. 1 1 FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP IS4 9337 FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP LS# 5447 FINAL PLAT MINERVINI SUBDIVISION] A RESUBDIVISION OF LOTS 15 AND 1 TOWN OF AVON, COUNTY OF EAGLE LOT 13 Karen, Joseph, Jeremy & Elizabeth Merling) R.N. 201212585) 209. 53, 35„ N Art;'() _ N3`1' A g PR` NC,S OF la s\cl LOT 19 Neal A, Habeck & Jineane B. Haybeck Trusts) R.N. 201302990) LAND USE SUMMARY LOT AREA 1 0.351 Acres 2 0.741 Acres 3 0.354 Acres PARCEL A 0.063 Acres See note ##5 regarding th USE Single Family Single Family Single Family Transfer Parcel e purpose of Parcel ADDRESS 5678 Wildridge Road East 5684 Wildridge Road East 5688 Wildridge Road East 5570 Coyote Ridge A LOT 20 Jack D. Hunn) R.N. 200825659 ) BLOCK 4, WILDRIDGE rATE OF COLORADO FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP LS# 9337 NW25' 0.28' FROM CORNER TRACT K Town of Avon) LOT 21 Clifford Kay & Althea Trevor Callaway) R.N. 201314587) f 40 .0 CERTIFICATION OF DEDICATION AND OWNERSHIP Know all men by these presents that Virginia R. Klyce and John Minervini Jr. (as to Parcel 1) and John Minervini Jr., Virginia R. Klyce and Regions Bank, d /b /a Regions Mortgage (as to Parcel 2), being sole owners in fee simple, mortgagee or lien holder of all that real property situated in the Town of Avon, Eagle County , Colorado described as follows: Parcel 1: Lot 16, Block 4, Wildridge according to the Final Subdivision Plat thereof recorded October 8, 1981 in Book 330 at Page 78, County of Eagle, State of Colorado Parcel 2: Lot 15, Block 4, Wildridge Subdivision according to the Amended Final Plot thereof recorded October 5, 2005 under Reception No. 931932, County of Eagle, State of Colorado and containing 1.509 acres, more or less, has by these presents laid out, platted and subdivided the same into Lots and Blocks as shown hereon and designate the some as Minery €ni Subdivision, Town of Avon, County of Eagle, State of Colorado and dedicate for public use the streets shown herein including avenues, drives, boulevards, lanes, courts and alleys to the Town of Avon; and the utility and drainage easements shown hereon for utility and drainage purposes only; and do further state that this subdivision shall be subject to the Protective Covenants, fled and recorded for this Subdivision in the Office of the Clerk and Recorder of Eagle County, Colorado, as Document Number Executed this —day of_, _, A.D., 20 Ow —r n _ M _ _ Virginia R. Klyce as to Parcels 1 and 2) STATE OF C-0-10millib SS COUNTY OF Jd. `,_) The foregoing Dedication was acknowledged before me th €s J—_ day of , 20-'AA-- by Virginia R. Klyce. My commission expires:_ .ak!VAM _- W€tness my hand and seal C` t 93MIMM An i "glill'LBQL CH 11MMON 00"0-100 .40 31VLS o ry Public winm P 3 3(00Vr John Minervini Jr. as to Parcels 1 and 2) STATE 040IQP 5S COUNTY OF51_) The foregoing Dedication was acknowledged before me this RA day of , 2D _q by John Minervin€ Jr. cl My commission expires:_ Witness my hand and seal JACM100*4'y QUEZ Nota ublic _ - - -- S1rA Wt ORAIJO NOi1kRY 1 y Ofi1>YT'{ M1' f l0lf20>It LIEN HOLDERS CERTIFICATE The undersigned beneficiary of a Deed of Trust upon the real property covered by this Final Plat, hereby consents to the submission of such real property to the provisions of the Final Plat. Mortgagee: Regions d /b /a Regio ortgage B Y - -.. ,,Z Print name r _IIfPIC STATE OF±" S COUNTY OFF-M& 4A The foregoing Dedication was acknow edged before m this r a j da of ____, 201 by 1@_ LfWr f a t- CA-21-WAI dof Regions Bank, D /B /A Regions Mortgage. My commission expires:l Witripss my hand and seal Notary Publi ID 97941 PIOTAO I IJf3LIC a Coverts. ft Iran Jan. 3, 201 a pQom• ®o NOTES: 1) Date of Survey: April, 2014 2) Land Title Guarantee Company title commitment Nos. V50038395 and V50038396 dated 04/02/2014 were used for all easement and title information. 3) Notice: According to Colorado low you must commence any legal action based upon any defect in this survey within three years after you first discover such defect. In no event, may any action based upon any defect in this survey be commenced more than ten years from the date of the certification show hereon. 4) The purpose of this Final Plat is to abandon the property line between Lots 15 and 16 and to reconfigure said Lots, creating Lots 1, 2, 3 & Parcel A and to create Non - Development Easements on new Lots 1, 2 & 3, all as shown and described hereon. 5) Parcel A, as shown and described hereon, is created for the sole purpose of tranfering land to Lot 20, Block 4, Wildridge (a.k.a. 5570 Coyote Ridge). Said transfer shall be executed by a seperate document. 6) Basis of bearings is a line connecting monuments found at at the southerly corner of Lot 1 and the easterly corner of Lot 2 having a bearing of N37 *41'38 "E as shown and described hereon. 7) Addresses are for informational purposes only and may be subject to change. Please verify addresses with the Town of Avon. 8) Restrictive Covenants are recorded in Book 345 at Page 844, 9) Lot 3Ais subject to Restrictive Covenants t i recorded at Reception Nos. "cd \ _ and —(_o1 e { 11 4_(S -- - - - -- 10) No structures may be developed on those parts of Lots 1, 2 and 3 designated hereon as "Non- Development Easement ". 11) Property is sub'ectt top dltionngl, zoning restrictions recorded at Reception No. U %*_A* TITLE INSURANCE COMPANY CERTIFICATE I DNXO does hereby certify that it has examined the title to all lands shown upon this plat and that title to such lands is vested in: John Minervin€ Jr. and Virginia R. Klyce, free and clear of all liens, encumbrances, +owe and assessments except as follows: V By:L As: TOWN CERTIFICATE This Final Plat is a pproved by the Town of Avon, County of Eagle, Colorado this _ I I day of _%_V_6Y_ —, 2011-, for filing with the Clerk and Recorder of the County of Eagle. Approval of this plat by the Town Is consent only and is not to be construed as an approval of the technical correctness of this plat or any documents relating thereto. WITNESS MY HAND AND SEAL OF THE TOWN OF AVON: TOWN COUNCIL OF THE TO AVON By: _ Director of Commu Development e,2 Attest: :SETownClerk coL PRADO SURVEYOR'S CERTIFICATE I, Masan L. Torry, do hereby certify that I am a Registered Land Surveyor licensed under the lows of the State of Colorado, that this Plat is a true, correct and complete Plat of Minervini Subdivision as laid out, platted, dedicated and shown hereon, that such Plat was made from an accurate survey of said property by me and under my supervision and correctly shows the location and dimensions of the lots, easements and streets of said subdivision as the some were staked upon the ground in compliance with applicable regulations governing the subdivision of Land. All monuments were set as required bytheSubd' ' Lions f the Town 'qf Avon. Ier,ev!I i7 v my hand and peal this g_ day of vt A. D,, 20_ -, Moso Colors m 38233 CERTIFICATE OF TAXES PAID I, the undersigned, do hereby certify that the entire 11amount of taxes and assessments due and payable as of Q_*u r.i_i!.__ upon all parcels of real estate described on this plat are paid in full. Dated this A y`h __day of 1AJ_ —_A.D. 20N. Treasurer 'of Eagle Coun os u CLERK AND RECORDER'S CERTIFICATE This Plat was filed for record in the Office of the Clerk and Recorder at 5 o'clock !f_ _= _ A.D., 2D .,. and i d re R tion' Number Dp _ ' VCleRecder B y: y A ..,. Protective Covenants are recorded as Reception 09 5C.IU -4 n a20N // -7/0No. -- ---- - - - - -- R$"IZG'K&LA o70 l '/ / /*/,% FOUND #5 REBAR W/ 1 1/2" ALUMINUM CAP LS# 5447 f 40 .0 CERTIFICATION OF DEDICATION AND OWNERSHIP Know all men by these presents that Virginia R. Klyce and John Minervini Jr. (as to Parcel 1) and John Minervini Jr., Virginia R. Klyce and Regions Bank, d /b /a Regions Mortgage (as to Parcel 2), being sole owners in fee simple, mortgagee or lien holder of all that real property situated in the Town of Avon, Eagle County , Colorado described as follows: Parcel 1: Lot 16, Block 4, Wildridge according to the Final Subdivision Plat thereof recorded October 8, 1981 in Book 330 at Page 78, County of Eagle, State of Colorado Parcel 2: Lot 15, Block 4, Wildridge Subdivision according to the Amended Final Plot thereof recorded October 5, 2005 under Reception No. 931932, County of Eagle, State of Colorado and containing 1.509 acres, more or less, has by these presents laid out, platted and subdivided the same into Lots and Blocks as shown hereon and designate the some as Minery €ni Subdivision, Town of Avon, County of Eagle, State of Colorado and dedicate for public use the streets shown herein including avenues, drives, boulevards, lanes, courts and alleys to the Town of Avon; and the utility and drainage easements shown hereon for utility and drainage purposes only; and do further state that this subdivision shall be subject to the Protective Covenants, fled and recorded for this Subdivision in the Office of the Clerk and Recorder of Eagle County, Colorado, as Document Number Executed this —day of_, _, A.D., 20 Ow —r n _ M _ _ Virginia R. Klyce as to Parcels 1 and 2) STATE OF C-0-10millib SS COUNTY OF Jd. `,_) The foregoing Dedication was acknowledged before me th €s J—_ day of , 20-'AA-- by Virginia R. Klyce. My commission expires:_ .ak!VAM _- W€tness my hand and seal C` t 93MIMM An i "glill'LBQL CH 11MMON 00"0-100 .40 31VLS o ry Public winm P 3 3(00Vr John Minervini Jr. as to Parcels 1 and 2) STATE 040IQP 5S COUNTY OF51_) The foregoing Dedication was acknowledged before me this RA day of , 2D _q by John Minervin€ Jr. cl My commission expires:_ Witness my hand and seal JACM100*4'y QUEZ Nota ublic _ - - -- S1rA Wt ORAIJO NOi1kRY 1 y Ofi1>YT'{ M1' f l0lf20>It LIEN HOLDERS CERTIFICATE The undersigned beneficiary of a Deed of Trust upon the real property covered by this Final Plat, hereby consents to the submission of such real property to the provisions of the Final Plat. Mortgagee: Regions d /b /a Regio ortgage B Y - -.. ,,Z Print name r _IIfPIC STATE OF±" S COUNTY OFF-M& 4A The foregoing Dedication was acknow edged before m this r a j da of ____, 201 by 1@_ LfWr f a t- CA-21-WAI dof Regions Bank, D /B /A Regions Mortgage. My commission expires:l Witripss my hand and seal Notary Publi ID 97941 PIOTAO I IJf3LIC a Coverts. ft Iran Jan. 3, 201 a pQom• ®o NOTES: 1) Date of Survey: April, 2014 2) Land Title Guarantee Company title commitment Nos. V50038395 and V50038396 dated 04/02/2014 were used for all easement and title information. 3) Notice: According to Colorado low you must commence any legal action based upon any defect in this survey within three years after you first discover such defect. In no event, may any action based upon any defect in this survey be commenced more than ten years from the date of the certification show hereon. 4) The purpose of this Final Plat is to abandon the property line between Lots 15 and 16 and to reconfigure said Lots, creating Lots 1, 2, 3 & Parcel A and to create Non - Development Easements on new Lots 1, 2 & 3, all as shown and described hereon. 5) Parcel A, as shown and described hereon, is created for the sole purpose of tranfering land to Lot 20, Block 4, Wildridge (a.k.a. 5570 Coyote Ridge). Said transfer shall be executed by a seperate document. 6) Basis of bearings is a line connecting monuments found at at the southerly corner of Lot 1 and the easterly corner of Lot 2 having a bearing of N37 *41'38 "E as shown and described hereon. 7) Addresses are for informational purposes only and may be subject to change. Please verify addresses with the Town of Avon. 8) Restrictive Covenants are recorded in Book 345 at Page 844, 9) Lot 3Ais subject to Restrictive Covenants t i recorded at Reception Nos. "cd \ _ and —(_o1 e { 11 4_(S -- - - - -- 10) No structures may be developed on those parts of Lots 1, 2 and 3 designated hereon as "Non- Development Easement ". 11) Property is sub'ectt top dltionngl, zoning restrictions recorded at Reception No. U %*_A* TITLE INSURANCE COMPANY CERTIFICATE I DNXO does hereby certify that it has examined the title to all lands shown upon this plat and that title to such lands is vested in: John Minervin€ Jr. and Virginia R. Klyce, free and clear of all liens, encumbrances, +owe and assessments except as follows: V By:L As: TOWN CERTIFICATE This Final Plat is a pproved by the Town of Avon, County of Eagle, Colorado this _ I I day of _%_V_6Y_ —, 2011-, for filing with the Clerk and Recorder of the County of Eagle. Approval of this plat by the Town Is consent only and is not to be construed as an approval of the technical correctness of this plat or any documents relating thereto. WITNESS MY HAND AND SEAL OF THE TOWN OF AVON: TOWN COUNCIL OF THE TO AVON By: _ Director of Commu Development e,2 Attest: :SETownClerk coL PRADO SURVEYOR'S CERTIFICATE I, Masan L. Torry, do hereby certify that I am a Registered Land Surveyor licensed under the lows of the State of Colorado, that this Plat is a true, correct and complete Plat of Minervini Subdivision as laid out, platted, dedicated and shown hereon, that such Plat was made from an accurate survey of said property by me and under my supervision and correctly shows the location and dimensions of the lots, easements and streets of said subdivision as the some were staked upon the ground in compliance with applicable regulations governing the subdivision of Land. All monuments were set as required bytheSubd' ' Lions f the Town 'qf Avon. Ier,ev!I i7 v my hand and peal this g_ day of vt A. D,, 20_ -, Moso Colors m 38233 CERTIFICATE OF TAXES PAID I, the undersigned, do hereby certify that the entire 11amount of taxes and assessments due and payable as of Q_*u r.i_i!.__ upon all parcels of real estate described on this plat are paid in full. Dated this A y`h __day of 1AJ_ —_A.D. 20N. Treasurer 'of Eagle Coun os u CLERK AND RECORDER'S CERTIFICATE This Plat was filed for record in the Office of the Clerk and Recorder at 5 o'clock !f_ _= _ A.D., 2D .,. and i dre R tion' Number Dp _ ' VCleRecder B y: y A ..,. Protective Covenants are recorded as Reception 09 5C.IU -4 n a20N // -7/0No. -- ---- - - - - -- R$"IZG'K&LA o70 l '/ / /*/,% Staff Report – Comprehensive Plan Amendment March 14, 2016 Planning & Zoning Commission Meeting Project File Case #CPA16001 Legal description Tract G, Benchmark at Beaver Creek Swift Gulch Addition Lot 5, Village at Avon Prepared By Matt Pielsticker, AICP INTRODUCTION The Town of Avon is processing a Comprehensive Plan Amendment to cross reference the planning studies completed in 2015 related to future potential uses on Tract G and other Town properties. The planning effort included public open houses and charrettes, culminating in a study titled “Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, Lot 5 Development Plan.” Staff finds that the formal recognition of this planning effort and final study is important to acknowledge the findings and recommendations found in the study. BACKGROUND Tract G encompasses approximately 47 acres and includes the Harry A. Nottingham Park, Nottingham Lake and playground, current Town Hall facility and the park’s storage sheds; the Library District’s Avon Library and Avon’s Recreation Center. The Tract is bisected by two roads; Lake Street and Mikaela Way, both of which have the ability to close partially for special events. The Tract also includes a pedestrian mall (“Main Street Mall”) containing numerous public art pieces and is in close proximity to vital retail and hotel sites. Recent Town investments include a major outdoor Performance Pavilion and the Main Street Mall in addition to enhancements to Avon Road, the primary north-south corridor in Town. Changes are supported by the Town Council and Planning and Zoning Commission to more fully develop the summer economy with cultural events, improve the objectives of walkability and to connect the park with the commercial core in east Avon, where the abundance of restaurants and retail has been developed. These changes are coupled with Town Council’s current interest in relocating the Police Department and neighboring fire department to a joint public safety facility located away from its current housing in a dated Town Hall facility. The need to update or relocate the remainder of general government services in the current Town Hall facility brought attention to the Tract G area and how best to plan for future needs and uses of this Tract, keeping in mind the other Town owned and managed properties. Two other parcels are owned by the Town outside of the core and required development planning as well. The Swift Gulch site is a combination of three different parcels of land: Lot 1A (10 acres), Lot 1B (4.2 acres), and Tract AA (9.7 acres). This location serves as the Town’s regional transportation facility and fleet services shop. Upper reaches of the site include material and large vehicle storage. Planned several years ago for a much larger transportation center and expansive administration building, these programs are not foreseen any longer. The site has a modular building destined for removal thereby creating more space to accommodate other Town uses. March 14, 2016 PZC Meeting Comprehensive Plan Amendment related to Tract G, Swift Gulch, and Lot 5 1 The final site, Lot 5, is utilized for Town snow storage (up to 50% in the winter) and as a general material laydown yard. The current long term view is to construct large equipment storage at the site and possible relocation of park’s equipment and smaller vehicles currently housing within Tract G, but no plan has been constructed to date. The Town contracted with Stan Clauson Associates after a competitive RFP process in fall, 2015. The planning firm developed a public participation program and developed multiple options for future facility locations. The project included the review of the 2006 Avon Comprehensive Plan, the 2007 West Town Center District Investment Plan, 2009 Nottingham Park Plan, 2015 Facilities Assessment and Space Needs Analysis, and 2015 Walkability Report. A public open house and charrette was held on October 13, 2015, with follow-up presentation at the October 27, 2015 Town Council meeting. All development scenarios were vetted with the public and the Avon Town Council, after which a final report was presented. The final report represents the preferred options informed by community feedback, Town Council, and Staff direction. The final plans, while conceptual in nature, are now being formally referenced in the Avon Comprehensive Plan for planning purposes. PROCESS The Planning and Zoning Commission (“PZC”) will review the Application and conduct a public hearing on March 14, 2016. After conducting a public hearing, PZC will forward a recommendation to Town Council. Subsequently, final action is taken on the applications by Town Council after conducting public hearings and either approval by Ordinance. COMPREHENSIVE PLAN AMENDMENT CRITERIA: The review procedures for this application are governed by the Development Code. According to the AMC §7.16.030(e), Review Criteria, the following criteria must be considered prior to formulating a recommendation to the Avon Town Council: (1) The surrounding area is compatible with the land use proposed in the plan amendment or the proposed land use provides an essential public benefit and other locations are not feasible or practical; Staff Response: The land uses presented in the planning study for Tract G were never envisioned with the Nottingham Park Master Plan or West Town Center Investment Plan; an “Inn” was integrated into previous studies as a potential compatible use and to fuel the Urban Renewal District. The Clauson Study provided numerous recommendations for uses that supported the other park uses including but not limited to: expanded turf area for larger play field, seating areas, conference center, parking facilities, improved restrooms, indoor ice arena, Community/Visitor Center, workforce housing, and important connections to the Eagle River and Main Street Mall. Staff Review & Report PUBLIC HEARING: PZC PUBLIC HEARING: Council & 1st Reading of Ordinance PUBLIC HEARING: Council & 2nd Reading of Ordinance March 14, 2016 PZC Meeting Comprehensive Plan Amendment related to Tract G, Swift Gulch, and Lot 5 2 Swift Gulch was found to be an excellent candidate site for housing on the upper bench, something that the Town had never envisioned as a real opportunity to help meet the future needs of employees and workers in Avon. Relocating Police to Swift Gulch was also considered as a backup option if other sites did not come to fruition. Moving some park facilities and functions from Tract G to Lot 5 was found to be a logical move. Additionally, design studies were developed for a co-location of Police and Public Works on the site in case the Police/Fire facility cannot be realized. These uses are in addition to the snow storage that exists today and is needed in future years. Compatibility of all of the land uses was considered and vetted with a “Community and Financial Costs” section of the report. While tradeoffs are associated with some of the land uses as presented, the final recommendations were found to provide harmonious land uses with those of the surrounding community. In all cases, further studies and planning work is required to finalize plans for physical development. (2) Transportation services and infrastructure have adequate current capacity, or planned capacity, to serve potential traffic demands of the land use proposed in the plan amendment; Staff Response: Transportation networks and infrastructure were considered with the land uses envisioned in the study. For example, the Swift Gulch site looked at easy connectivity to the rest of town through the existing paved path and adjacent bus stop. (3) Public services and facilities have adequate current capacity, or planned capacity, to serve the land use proposed in the plan amendment; Staff Response: The land uses in this amendment are conceptual and will require further studies to determine capacity. (4) The proposed land use in the plan amendment will result in a better location or form of development for the Town, even if the current plan designation is still considered appropriate; Staff Response: As mentioned, the study provides multiple options for future land uses of each of the three properties. The intent is not to adopt any one land use option formally, rather, to provide better informed decisions in the future for citing these important public facilities and community amenities. (5) Strict adherence to the current plan would result in a situation neither intended nor in keeping with other key elements and policies of the plan; Staff Response: Conditions have changed greatly since the 2006 Comprehensive Plan and other studies were completed. The performance pavilion, bus barn, and other developments related to the Town Hall and Police/Fire were not clearly defined in previous planning efforts. (6) The proposed plan amendment will promote the purposes stated in this Development Code; and, Staff Response: The Purposes stated in the Development Code are achieved with the siting and development of the properties for valuable public amenities and functions. (7) The proposed plan amendment will promote the health, safety or welfare of the Avon Community and will be consistent with the general goals and policies of the Avon Comprehensive Plan. Staff Response: The plan amendment will ensure that the Avon Comprehensive Plan provides the most up to date planning work related to these vital public properties. Tract G continues to evolve March 14, 2016 PZC Meeting Comprehensive Plan Amendment related to Tract G, Swift Gulch, and Lot 5 3 into the cultural center of the Town. Referencing the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan will help to promote the health, safety, and welfare of the Community. The Avon Comprehensive Plan supports the development of area specific district planning efforts to ensure that the planning guidance and implementation recommendations are current and appropriate. RECOMMENDATION Approve Resolution 16-03 as drafted, or with modifications to the findings. RECOMMENDED MOTION: “I move to Approve Resolution 16-03, recommending that the Avon Town Council approve Case #CPA16001, an application to amend the Avon Comprehensive Plan to reference the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, as prepared by Stan Clauson Associates.” ATTACHMENTS: • Resolution 16-03 • Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, dated November 12, 2015 March 14, 2016 PZC Meeting Comprehensive Plan Amendment related to Tract G, Swift Gulch, and Lot 5 4 TOWN OF AVON, COLORADO PLANNING AND ZONING COMMISSION RESOLUTION 16-03 A RESOLUTION RECOMMENDING TO THE AVON TOWN COUNCIL APPROVAL OF CASE #CPA16001, AN APPLICATION APPROVING AMENDMENTS TO THE AVON COMPREHENSIVE PLAN TO REFERENCE THE “PLANNING SERVIES REVIEW AND UPDATE OF NOTTINGHAM PARK MASTER PLAN, SWIFT GULCH MASTER PLAN, AND LOT 5 DEVELOPMENT PLAN” WHEREAS, the Town of Avon recognizes the importance of the Tract G area and how best to plan for future needs and uses of this Tract, keeping in mind the other Town owned and managed properties including Swift Gulch and Lot 5; and WHEREAS, the Town engaged Stan Clauson Associates to provide professional planning services, including charrettes and public open houses to gather community input and support for alternative land uses in Tract G, Swift Gulch, and Lot 5; and WHEREAS, the Avon Planning and Zoning Commission held a Public Hearing on March 14, 2016, where public comments were considered prior to formulating a recommendation to Council; and WHEREAS, the Planning and Zoning Commission makes the following findings with respect to the Application: 1. The amendment s desirable to respond to changed conditions that have resulted on Tract G. 2. The Application was reviewed in accordance with AMC §7.16.030 Comprehensive Plan Amendment, and found to be in compliance with the review criteria. 3. The Application promotes the health, safety, and welfare of the Avon community by citing the most up to date planning efforts for public properties. 4. The Application is in conformance with the Avon Comprehensive Plan goals and policies; specifically, Policy C.1.4. Develop detailed District Master Plans for each District. NOW THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission hereby recommends that the Town Council of the Town of Avon Approve the Application to amend the Avon Comprehensive Plan is hereby approved as set forth in Exhibit A – Comprehensive Plan Amendment referencing Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, prepared by Stan Clauson Associates and dated November 12, 2015. ACCEPTED, APPROVED, AND ADOPTED THIS ____ DAY OF _______________, 2016 AVON PLANNING AND ZONING COMMISSION SIGNED: ___________________________ Jim Clancy, Chairperson Resolution 16-03 – Recommendation Regarding Comprehensive Plan Amendments for Stan Clauson Report Town District Planning Principles High Priority Districts Town of Avon Comprehensive Plan Page 71 B. High Priority Districts The following districts are high priority for the Town: District 1: West Town Center District The role of the West Town Center District is to serve as the heart of the community. Social, cultural, intellectual, political, and recreational gatherings occur in this district. In addition, the district acts as the common ground between the full-time residents, part-time residents, and destination guests through diverse retail and entertainment opportunities. The West Town Center District will be an intensely developed mixed use, pedestrian-oriented area that serves as the primary focus for residential and lodging development within the overall Town Center. Currently, this district provides a diversity of land uses in vertically mixed-use buildings. Uses include retail, office, residential, government services, civic facilities, and parks loosely grouped around a 50-foot pedestrian mall right-of-way. The heart of the community. Town District Planning Principles High Priority Districts Town of Avon Comprehensive Plan Page 72 Planning Principles:  Create a new “Main Street” in the existing pedestrian mall right-of- way.  Realign West Benchmark Road to improve circulation in the area and enhance the development feasibility of vacant parcels.  Link pedestrian, bicycle, and automobile circulation to and through Avon’s Town Center, Nottingham Park, the Confluence site, and the Eagle River.  Develop a multi-modal transit center.  Develop a parking structure associated with the expansion of Avon’s Recreation Center.  Develop a mix of uses that provides a strong residential and lodging bed base supported by community and guest commercial uses.  Create inviting storefronts with retail, restaurant, and entertainment uses on ground levels and offices, lodging, and residential uses above.  Establish public plazas and other gathering spaces for community interaction and social events.  Provide entertainment opportunities for residents and guests to enliven the area and promoted and extended retail hours.  Use signage, streetscape design, landscaping, points of interest, and other wayfinding elements to help orient visitors to important destinations within the district and the larger Town Center.  Use architectural detailing on ground level/first floor to enhance the pedestrian environment that includes a human scale, display windows, appropriate lighting, and other pedestrian amenities.  Site buildings of various sizes along the street edge to maximize sun exposure, protect views, and break up building bulk.  Develop a new transit center and private/public structured parking facilities that provide easy access to and through the district.  Consider planning recommendations from the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, as prepared by Stan Clauson Associates. Town District Planning Principles Medium Priority Districts Town of Avon Comprehensive Plan Page 79 C. Medium Priority Districts The following Districts are deemed to present a medium priority for the Town. District 5: Nottingham Park District The Nottingham Park District is Avon’s cultural, civic, and recreational hub. Included in this district are Harry A. Nottingham Park, the municipal office complex, fire department, library, elementary school, and the Town’s recreation center. The district functions as the center for community activities, such as the Town’s Fourth of July celebration and various athletic tournaments. Good pedestrian circulation between the municipal center, the park, the Town Center, and adjacent residential uses exist, but will need to be enhanced to respond to key future developments in the West Town Center District and the Confluence District. Views and access into and from the Nottingham Park are key components to Avon’s image and identity. Cultural, civic, and recreational hub. Town District Planning Principles Medium Priority Districts Town of Avon Comprehensive Plan Page 80 Planning Principles:  Strengthen this area as a cultural and recreational center by including amenities such as a performing arts pavilion, maintaining flexible space for temporary concession facilities, and providing a western anchor to the future “Main Street”.  Create private, comfortable spaces along Buck Creek for passive activities as an alternative to the play fields and other active spaces available within the rest of Nottingham Park.  Use signage, streetscape design, landscaping, points of interest, artwork, and other wayfinding elements to help orient visitors to the district’s various functions, the cultural and civic activity center, and toward important destinations within the Town Center area.  Realign Benchmark Road perpendicular with the future “Main Street” per the Avon Town Center Plan and enhance the pedestrian connections between the municipal center and the park.  Preserve view corridors to Beaver Creek and the new “Main Street” in the West Town Center District.  Consider planning recommendations from the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, as prepared by Stan Clauson Associates. Town District Planning Principles Medium Priority Districts Town of Avon Comprehensive Plan Page 86 District 8: Village at Avon East District The Village at Avon East District is the region’s commercial center. It is intended to provide the Village at Avon West District with supporting commercial development and regional commercial uses associated with the I-70 and Post Boulevard interchange. The site is characterized by gently sloping topography along the valley floor with steeper slopes rising up to I-70. Planning Principles:  Create a unified and cohesive physical framework and community image (compatible building orientation, scale, massing, street alignments, streetscape furnishings, signage, lighting, etc.) between the Village at Avon West District and the rest of the Town.  Site buildings of various sizes (but smaller than those found in the West Town Center District) to maximize sun exposure, protect views, and break up building bulk.  Create a strong overall pedestrian-orientation with tree lined streets and walking paths.  Screen large regional commercial uses from I-70 with trees and berms.  Consider planning recommendations from the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, as prepared by Stan Clauson Associates. The re comm cente Town District Planning Principles Low Priority Districts Town of Avon Comprehensive Plan Page 101  Acquire and maintain as public open space the U.S. Forest Service-owned parcel adjacent to Wildridge that includes Beaver Creek Point.  Add an alternative or second access route to Wildridge (perhaps forest service road during the spring and summer).  Identify and delineate all open space parcels and public trails.  Site buildings of varying sizes along the street to maximize sun exposure, protect views, be compatible with existing surrounding development, and break up building bulk. District 25: Mountain Star Residential District This area is a planned unit development established in 1992, of large-lot, single-family homes, located east of Wildridge on the south-facing slopes north of the main valley floor. This covenant-controlled, gated community has its own design review committee. Planning Principles:  Prohibit significant alteration of natural environment and minimize stress on wildlife and loss of habitat.  Consider the development of a trailhead to access the surrounding public lands. District 26: Swift Gulch District The Town of Avon’s Public Works and Transportation Departments are located in the Swift Gulch District. In response to the area’s high visibility from I-70, efforts have been made to screen the existing buildings and facilities and ensure that they blend into the surrounding environment. Town District Planning Principles Low Priority Districts Town of Avon Comprehensive Plan Page 102 Planning Principles:  Encourage building at a scale that minimizes visibility from I-70.  Screen accessory uses with landforms and landscaping.  Encourage sidewalks and pedestrian connections.  Consider planning recommendations from the Planning Review and Update of Nottingham Park Master Plan, Swift Gulch Master Plan, and Lot 5 Development Plan, as prepared by Stan Clauson Associates. District 27: Nottingham Station/Eaglebend District The Nottingham Station/Eaglebend District contains single-family and multi-family residential development. The area is mostly developed, with a few remaining individual residential lots still undeveloped. Design issues for development in this area are to address visibility from U.S. Highway 6, the protection and enhancement of the riparian environment along the Eagle River, and appropriate public access along the river. Planning Principles:  Examine the potential to develop pedestrian and bicycle connections between Stonebridge Drive and the Village at Avon Residential and Commercial Districts.  Encourage development to take into consideration the objectives of the Eagle River Watershed Management Plan including river setbacks and best practices for development in proximity to the river.  Provide a public access easement, where appropriate, within building setback areas in development adjacent to the Eagle River for public enjoyment of the river and construction of a public recreational trail.  Building should be oriented to capitalize upon the Eagle River as an amenity. Parking Fire and Police Public Wo rks Town Hall Relocation Enhancements to kPark WorkforceWorkforce HousingHousing Planning Review & Update Nottingham Park Master Plan Swift Gulch Master Plan Lot 5 Development Plan for the Town of Avon 16 November 2015 STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 4 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 INTRODUCTION The Town of Avon engaged Stan Clauson Associates, Inc. (SCA) to review and update the master plans for three separate town owned parcels. These parcels included Tract G (otherwise known as Nottingham Park), Swift Gulch, and Lot 5. U S HWY 6 SWIF T GULC H R D NOTTINGHAMRD EBEAVERCREEKBLVD HURDLN EA GLEBENDDR WBEAVERCREEKBLVD POSTBLVD YODERAVEBUCKCREEKRDAVONRDRIVERFRONTLN NOTTINGHAMRANCHRD CHAPELPL FAWCETTRDMILLIESLN BEAVER CREEKBLVD U S H W Y 6 BENCHMARKRD B ENCHMARKRDSUNRD B E A VE R C R E E K PLSTONEBRIDGEDRAVONRDLAKESTPLAZA W AYPOSTBLVDTextWalkingMountainsLnWalkingMountainsLnWalkingMountainsLnWalkingMountainsLnWalkingMountainsLnWalkingMountainsLnW a lk ingMountain sLnNottingham Lake Tract G Swift Gulch Property Lot 5 Village at Avon This map was produced by the Community Development Department. Use of this map should be for general purposes only. Town of Avon does not warrant the accuracy of the data contained herein. Author: ASzczesny, Date: 08/06/15 I 06001,200300 FeetRFQ - Vicinity Maps RailWay Town Parks Buildings TOA Owned Properties Subdivision Boundaries Property Boundaries Lakes and Rivers Avon Town Boundary Project Properties The scope of work was divided into four phases to be completed over a two-month period. The fi nal report has been organized based on the four phases, described as follows: Phase One – Evaluate the Physical, Built, and Regulatory Environment: Following the review of previous and ongoing planning efforts and technical materials, a kick–off meeting and initial site visit was held with staff. The SCA Team prepared an outline of the site opportunities and constraints that would potentially be incorporated into the preliminary fi ndings report. Phase Two – Public Outreach and Town Council Review: SCA developed the opportunities and constraints, and prepared a presentation which was provided to the public and Town Council. The public outreach process included a public open house with a tour of the Tract G, along with areas surrounding Town Hall and the current Fire Station site. This was followed by a Q&A session and a design charrette, allowing participants a hands-on opportunity to address design issues. SCA then incorporated this community feedback into the preliminary fi ndings report and presentation delivered that evening at the Town Council work-session. Phase Three – Updated Review Report, Preferred Option(s): Based on a more in-depth understanding of the community desires, SCA refi ned the preliminary site plan alternatives and selected a preferred alternative for each site. In addition, SCA outlined the fi nancial and community costs/benefi ts for each site. The Updated Review Report and accompanying drawings were then presented at the Town Council meeting of 27 October 2015. Phase Four – Preparation of the Parcel by Parcel Plans: The Final Report reviews the planning process undertaken providing a record of the meetings, work-sessions, and feedback from staff that lead to the parcel by parcel plans. The Final Report includes all fi ndings, analyses, and recommendations with accompanying graphics. Finally, a prioritized implementation plan has been provided. Phase One Kick-off Meeting / 23 September 2015 The kick-off meeting was held at Avon Town Hall on 23 September 2015 and consisted of three parts: 1. Meeting at Town Hall with Town Staff tointroduce the project with a review of thestudy area mapping; STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design5 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 2. Tours of the sites and associated areas of interest lead by Town Staff. Key objectives for eachsite were provided; and 3. Luncheon meeting where a review of previous planning studies, project schedule, and keyobjectives was discussed. Contractual matters and agenda for next on-site meeting werefi nalized. Review of Project Scope / Discussion of Key Issues Staff met with the consultants to discuss the scope of work and schedule. In attendance from the Town of Avon were Virginia Egger, Matt Pielsticker, Justin Hildreth, and Gary Padilla. In attendance from SCA were Stan Clauson, Patrick Rawley, and Larisa LaLonde. The Staff/Consultant meeting began by discussing the two major recent developments in downtown Avon. The first development was completion of the Main Street Mall. This pedestrian mall connects Nottingham Park, the library and the recreation center, and the commercial/lodging district. In addition to connecting the vital areas of town, the mall contains many public amenities including numerous sculptures, a large mural, public seating, and a climbing wall. The second recent development is the construction of the Avon Performance Pavilion at Nottingham Park. The Pavilion includes a large stage, an outdoor gathering space overlooking the lake, and modest support facilities. Staff shared that the stage has become a great community asset and this popularity has necessitated the Town to consider hiring an event planner to market and manage the bookings. The review next looked at the existing Town Hall building, stating that Town Hall contains all Town staff offi ces as well as the police department. As such, the existing Town Hall is cramped and requires signifi cant code upgrades. It was stressed that it is important for Town Hall to remain centrally located. New locations that have been explored for Town Hall include the Sheraton Mountain Vista Office Building (also known as the Skier Building), a vacant building located on the pedestrian mall, or the soon to be vacated Fire Station site, located across Lake Street from the existing Town Hall. If Town Hall is to move to either of these locations, the Police Department would either move to a co-located site with the Fire Department or some other location to be determined. Tours of the Site Following the kick-off meeting, Staff took the consultant team on a walking tour of Nottingham Park and surrounding areas, including the pedestrian mall, library, fi re station, “Possibilities Plaza,” the approach to the Gondola, and Town Hall. Points of discussion were as follows:1.Town Hall can: a.Stay where it is and be remodeled,; b. Stay where it is and be remodeled with anaddition for the police department; c.Move to the Sheraton Mountain Vista Offfice Building and the current building be demolished; d. Move to the Fire Station site following the FireDepartment relocating to their new location; e. If Town Hall is relocated, its present locationcould possibly be used for park expansion and/or other community amenities. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 6 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 2. The new Avon Performance Pavilion needs additionalsupport facilities. Staff clarifi ed that vehicular access needs to be maintained to the stage and the Parks Department needs a small storage facility in Nottingham Park for mowers and everyday maintenance equipment. 3. The playground is being relocated closer to the existingrestrooms and picnic area along the irrigation ditch. The site of the existing playground has not been reprogrammed at this time. 4. The current fi re station will soon be vacated. Possible usesfor the site discussed included demolishing the building and constructing a new Town Hall or utilizing the site as an auxiliary outdoor space for the library. 5. The new Main Street pedestrian mall needs better connectivity to the park. The fi rst fl oorcommercial along the mall is largely underutilized and greater foot traffi c would supportcommercial activities. Following the walking tour Town staff and Consultants drove to the Swift Gulch site and Lot 5. Points of discussion: 1. It was noted that Swift Gulch is located above the bus barn in a protected box canyonsurrounded by open space with generous separation from the I-70 corridor. The centrallocation of the site could make it a good candidate for a public works facility or possiblypolice headquarters. Grading for snow storage facilities, which is a function of public works,may be diffi cult at this sloping site. Utilizing the site for affordable housing was also discussed.The views of Town and the mountains and proximity to transit may support using the site foraffordable housing. Affordable housing at this location appeared to be well received byStaff. 2. Lot 5 is a triangular lot adjacent to big box stores, surface parking lots, the Eagle River, andInterstate I-70. Residential development is located across the river. In the past the Town hasused the site for snow storage and also leased a portion to the Eagle River Sanitation District.The main discussion on site revolved around relocating public works offi ces, equipment,and material storage, as well as continuing snow storage operations. The potential to usea portion of the site to accommodate a modest amount of work force housing was alsomentioned. Gary Padilla stated that the site was of adequately sized to enable Public Worksoperations to be consolidated at one location. Staff referred to a recorded deed restrictionlimiting the use of the property to Public Works operations, but indicated that the deedrestriction could possibly be modifi ed, if necessary. A modifi cation or lifting of the deedrestriction would need to be pursued if affordable housing or other non-Public Works usesare pursued on the site. Luncheon meeting with Town staff An informal review of the tour and key issues took place followed by the review of several of the Town’s previous planning efforts, including: •Comprehensive Plan - 2008 •Facilities Assessment and Space Needs Analysis – 2015 •Avon Walkability Study – 2015 •West Town Center District Investment Plan – 2007 Gary Padilla reviewed parking demand around Nottingham Park. Parking on the north side of the park is limited and demand will increase with the use of the swim beach and the relocation of boat rentals. Matt Pielsticker provided that parking for the park was primarily accommodated by on-street parking, which appears to be marginally suf fi cient. ƌĞĂƟŶŐĂsŝƐŝŽŶ dŽǁĂƌĚĂDŽƌĞ WƌŽƐƉĞƌŽƵƐ&ƵƚƵƌĞ dŚƌŽƵŐŚ,ĞĂůƚŚŝĞƌ ƵŝůƚŶǀŝƌŽŶŵĞŶƚƐ ǀŽŶ͕ŽůŽƌĂĚŽ STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design7 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 The meeting concluded with a discussion of next steps and refi ning the agenda for the public outreach meetings and presentation to the Town Council to take place on 13 October 2015, with a Preliminary Findings Report to be provided in advance of that meting. Phase Two Preliminary Findings Report / 8 October 2015 The Preliminary Findings Report provided: •A review of existing conditions of each of the subject sites with a brief assessment of theviability of previous plans; and •Preliminary recommendations for potential uses that could be pursued on the NottinghamPark, Swift Gulch, and Lot 5 parcels. The preliminary recommendations were intended toinitiate the community discussion. Overview •Nottingham Park is and will be the center of community in Avon. This demands that thefunctions of the Park be supported and enhanced whenever possible. Support facilities,such as rehearsal space and dressing rooms for the popular new event stage, are criticalfor the long-term viability of the venue. Enhanced park amenities, ranging from a splashpark to fl exible community pavilions, can attract an ever-increasing number of diversepark visitors. By refi ning this strong touchstone of the community, an enhanced Park willattract people, via the Main Street Mall, to the true heart of Avon. •Motivated pedestrian activity along the Mall will boostcommercial activity, encourage social interactionsbetween residents and visitors, and provide a vitalbackbone for the west end of Town. Strengthening theconnection of the Mall to the Park will be key to creatingthis backbone. In this manner, the Park, the Mall, andthe various civic uses (library, recreation center, andpossibly a new Town Hall) adjacent to the Mall will forma transect that creates an undeniable sense of placeand confl uence of community uses to complement thePark. •The existing Town Hall is cramped and in need of updates. Somewhat strikingly, the building’s condition does not mirror the great energy created by the new development that has occurred in recent years. SCA recommends that a new Town Hall be developed at a new location so that town government has a fully functioning, comfort-, able, and inviting space to do business. In making this determination, we have carefully considered the fiscal realities associated with the various options for Town Hall and find that, while a significant investment, moving the new Town Hall to the Sheraton Mountain Vista Office Building is the best option for the long-term needs and fi nancial health of the Town. This move would create new opportunities for defi ning vibrant areas for community activity which will support the Park. •The Police represent an element of the community that deserves a dedicated, morecentrally located home. With the planned Fire Station relocation, interesting opportunitiesfor a collaborative base of operations are created. We believe this opportunity to co-locate Fire and Police together can be a benefi t to the community. If co-location is not STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 8 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 ultimately possible, the centrally located Swift Gulch site may be the most appropriate for Police operations. Public safety uses should take precedent over other potential uses of Swift Gulch. • Accessibility and past uses of the Swift Gulch and Lot 5 properties have led us to determine that Swift Gulch presents opportunities for workforce housing, if Police co-locate with Fire. Lot 5, in keeping with the deed restriction in place, is best utilized for Public Works operations. Future site planning activities for Public Works and snow storage at this location will require in-depth attention to site design and mitigation of visual impacts. Town Hall Preliminary investigations of the existing Town Hall have found that the building no longer meets the needs of staff and citizens of the Town of Avon. This aging structure does not refl ect the vibrant growth and active community that has come to characterize Avon. A complete and costly renovation would be required simply to meet current staffi ng needs. Remodeling the existing structure, with expansion for current space requirements for Police and other departments will only delay an eventual need to fi nd a new home for government in the future that is more inviting and representative of the community. Moreover, Town Hall should be more centrally located, closer to other civic and community uses. Our fi ndings concerning the existing Town Hall are based on the following: • Remodeling the existing building represents one of the higher cost options as indicated in the “Facility Assessment and Space Needs Analysis” prepared for the Town; • Keeping Town Hall excludes other viable and potentially less costly alternatives that exist to move Town Hall to another location; and • Moving Town Hall provides an opportunity to provide other community-based uses that can be pursued in the southeastern corner of Nottingham Park. Could We Remodel Town Hall? According to the “Facility Assessment and Space Needs Analysis,” the renovation of the existing Town Hall would primarily focus on: • Addressing ADA accessibility issues; • Code compliance defi ciencies; • Substandard energy effi ciency; • Outdated fl oor layout; • Ineffi cient use of space; and • Addressing general qualities of space. To address these issues, it is estimated that remodeling cost will be in the neighborhood of $4.5 million. Expanding the building to accommodate future staffi ng needs and Police operations increases the cost to $7.5 million. The community may initially accept this cost in the context of a strong attachment to the existing building or the belief that the existing structure is worthy to keep as a piece of Avon’s history. However, without this feedback from the community, we continue to return to the concept of creating a new Town Hall. Relocation of Town Hall The existing Town Hall occupies a corner of Nottingham Park that may be better utilized for other community-based uses that can support the Park and provide new amenities. Several options present themselves for moving Town Hall. These options all assume the relocation of Police to the New Fire Station Site, which will be discussed later. Some options for relocation consist of: STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design9 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Option # 1: Utilize Sheraton Mountain Vista Office Building for the new Town Hall (preferred) – •The vacant Office Building is a centrally located, visible structure that is ringed by other community facilities. Following the acquisition by the Town, the building would only require tenant fi nishing in a manner acceptable to the Town for their personnel needs. With the generous size of the building, future growth in staffi ng needs can be accommodated and other ground level opportunities, such as community spaces, exhibits, public restrooms, and other civically related uses, could be provided. Using an already constructed modern building provides certain environmental sustainability benefi ts. Costs for purchase and remodeling are approximately $6 million, with some possible cost off-sets related to parking area exchanges. Option # 2: Utilize the existing Fire Station site following relocation of Fire – •A Town Hall located at the existing Fire Station site would use a site already owned by the Town and still enable the use of the vacated existing Town Hall site for community and park oriented uses. However, construction of the new Town Hall at this location may be diffi cult given the constrained nature of the site. Using this site also requires the demolition of two buildings, the existing Town Hall and the existing Fire Station, and the construction of a new building. Estimates for new construction with Police operations were estimated to be $9.8 million. If Police are located with Fire, the fi nal price may be less but it may still be more than utilizing the Office Building. While the site lacks the great visibility of the Office Building, the Town would be able to build its own structure which could be tailored to the Town’s specifi c needs. Option # 3: Split Town Hall located behind Recreation Center and Library (Design Workshop Avon Center West Investment Plan) – •This option, which was fi rst explored in a report by Design Workshop, is an interesting optionas it forms a gateway to the pedestrian mall from the Park. Furthermore, this optionprovides visibility for Town Hall and vitality to the mall by replacing a surface parking lot.It is worth pointing out that, based on feedback from discussions with staff, the plan thatprompted this concept is generally considered to be obsolete due to other improvementsbeing made to the vicinity and changing municipal desires. Police Operations We do not recommend keeping the Police operations with the Town Hall. Police operations located anywhere adjacent to Nottingham Park lack direct connectivity to the rest of Town which hinders response time. Additionally, a Police Station represents a signifi cant use of space that might otherwise be used for other community uses. A more centrally located Police station adjacent to primary east west thoroughfares offers greater accessibility in diffi cult traffi c conditions. Moreover, providing a dedicated home for this important community resource is appropriate. With the Fire station relocating to a site between Buck Creek Road and Swift Gulch Road, an opportunity exists to co-located Police with Fire. This collaborative endeavor of fi rst responders creates a public safety “Community of Collaboration.” Studies have found that a Community of Collaboration increases effi ciency of STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 10 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 response and decrease response time, critical metrics of effectiveness in the emergency response community. Sharing the same physical site has also been shown to encourage social contact between fi rst responders which in turn increases communication and collaboration in emergency situations. Nottingham Park (Tract G) The September 2015 Community Survey confi rmed that the Park and Nottingham Lake is still widely regarded as the centerpiece of the Town by local residents. The Park benefi ts from its proximity to a signifi cant segment of the community thanks to adjacencies to the Avon Elementary School, the Avon Recreation Center, and residential and condominium development. This proximity makes the Park’s amenities and green spaces an important and well used community asset. The recent addition of the performance stage and the resulting events that take place at the stage further enhance the Park’s position as the heart of the Town of Avon. Respondents to the Community Survey indicated a greater need for additional amenities such as more restrooms and additional parking. We add to this list of required new elements the following: 1. Key Program Elements • Storage for Parks Department equipment; • Support facilities for stage to include spaces such as additional dressing rooms and rehearsal space; • Strong connection to the Main Street Mall. 2. Other Desired Elements • Connections to the Eagle River and the regional trail system; • Expanded turf areas for ballfi elds and additional seating for venue; • Indoor ice arena; • Outdoor ice rink/summer splash park; • Nordic Center with groomed trails; • Community/Visitor Center; • Multi-use fl ex-pavilion; • Skate park; • Community amphitheater; and • Engagement of river. Supporting and enhancing existing Park activities should be a high priority for the Town. If the existing Town Hall is to be relocated, the community should engage in a design exercise that would utilize the program elements described above. Using a “kit-of-parts” approach, the community can consider how certain elements complement each other and fi ll a need that the community desires. A design exercise could therefore look like this: • As additional bathrooms, additional parking, storage for Parks Department equipment, support facilities for stage operations, and a strong connection to the Main Street Mall are fundamental improvements to make, one can build upon these fundamentals in creating new opportunities from the desired elements. • Historic use patterns, such as ice skating on the lake, which is unfortunately no longer considered safe, may inspire the addition of an outdoor ice rink that could be converted to a splash garden, thus creating year-round activation of the southwestern corner of the Park. • Building on this burgeoning sense of “town center,” a community/visitor center may be incorporated with the support facilities for the stage. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design11 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 • The community/visitor center could contain a café for Park visitors, a fl exible meeting space for indoor community gatherings, an indoor venue for rehearsals and small performances which would supplement the stage in adverse weather, or an area for fi lm screenings. Primarily, however, the indoor venue would function as standalone amenity. Fire Station Site The relocation of the Fire department to the new Fire Station location presents an opportunity to utilize this Town-owned site for a number of uses. While Town Hall could be located to this site, the site lacks the central location that we feel is important for the Town Hall. Similarly, Police could utilize this location, but issues with isolation and ease of response still exist. The Fire Station site’s proximity to the library suggests using the space for library related functions, such as an outdoor plaza or intimate amphitheater for book readings, story hours, or library gatherings. This amphitheater, far from being the sole domain of the library, could compliment new community uses that inhabit the space vacated by the relocated Town Hall. Options that explore engagement with the river could use the amphitheater for nature talks. A community fi re pit could be added to use when outdoor ice skating is ongoing. The site could also be utilized for parking and the required storage for the Parks Department. Providing suffi cient parking is at times an issue at the Park, and parking demand will only increase as enhancements to the Park are made. Swift Gulch Site Swift Gulch is located above the bus barn in a protected box canyon surrounded by open space, with generous separation from the I-70 corridor. Previous plans looked at consolidating Public Works operations with equipment and material storage, and offi ces in one location. The Public Works offi ces have since been relocated to the southern side of the bus barn. Currently, the space is used as storage yard for Public Works and is generally underutilized. The central location of the site could make the site a good candidate for a Public Works facility or possibly Police operations. The main impediment to utilizing Swift Gulch for Public Works is the fact that the site is located atop a steep hill. The grade would make access in the winter by snow plows and other equipment diffi cult. Additionally, extensive grading and water quality measures would need to be utilized for snow storage facilities. The central location of the site makes it an ideal location for Police, provided co-location of Police and Fire is not pursued. With our preference to co-locate Police with Fire, utilizing the site for workforce housing may be the best option. Taking advantage of the box canyon, the proximity to open space and trails, and the generous setback from I-70, Swift Gulch could provide a very desirable setting for workforce housing and the families who would call it home. The views of Town and the mountains to the south and the proximity to transit only bolster the use of this site for housing. Initial discussions with staff indicated that workforce housing may be a good opportunity. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 12 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Lot 5 Lot 5 is a triangular lot adjacent to big box stores, surface parking lots, the Eagle River, and Interstate I-70. Residential development is located across the river. In the past the city has used the site for snow storage and also leases a portion to the Eagle River Sanitation District. Previous plans considered using this site for Public Works, in conformance with a deed restriction limiting the use of the property for Public Works. We generally agree that using this site for Public Works is likely the best option. The site does not present the grade challenges found at the Swift Gulch site, making snow storage operations, which currently occur on the site, a good fi t. The ability to consolidate Public Works offi ces, equipment and material storage, and related operations further support the continued use of the site for Public Works. While the deed restriction limits the use of the site for Public Works, there may also be potential to provide a modest amount of workforce housing. A modifi cation or lifting of the deed restriction would need to be pursued if workforce housing or other non-Public Works uses are deemed appropriate. The location of Lot 5 at the far eastern end of Town would seem to preclude its use for Police operations. The presence of the large box stores to the west give the site a cul-de-sac feel, one that may compliment the consolidation of Public Works operations. While some storage will be provided at Nottingham Park for mowers and other equipment, the site is still within reasonable distance for Public Works to travel to job sites. Attention will need to be paid to the visual characteristics of any future development. Careful site planning and judicious use of landscape screening should manage any visual impacts. Public Outreach and Town Council Work-session / 13 October 2015 The Public Open House was held in Council Chambers. Twenty-one members of the public, Town of Avon staff, and Avon elected offi cials signed the sign-in sheets with a small number of additional attendees likely. Virginia Egger, Town Manager, and Matt Pielsticker, Planning Manager, were in attendance at the meeting for the Town of Avon planning staff. Both Virginia and Matt assisted in facilitation of the public outreach. Larisa LaLonde and Patrick Rawley were in attendance for SCA. Larisa and Patrick also facilitated the public outreach. To initiate the Public Open House, the Preliminary Findings Report for the three subject sites was presented. The Preliminary Findings Report recommended that: • Nottingham Park is the center of community in Avon and the functions of the Park must be supported. Support facilities for the new stage are needed and enhanced park amenities can attract more diverse park visitors. The adjacencies created by community  FormoreinformationortoRSVPpleasecontact MattPielsticker,PlanningManager,at 970.748.4413ormpielsticker@avon.org *detailedagendatofollow  Come PLANwithus! Pleasejoinourcommunityinexploringlanduse optionsfor“TractG”–thecurrentsiteofTown Hall,FireStation,libraryandparkinglots.The sessionbeginswithapresentationbylanduse plannersfromStanClausonAssociates.Atour ofthesitewillfollow.Thesessionwill culminatewithfun,handsonvisioning exercises! OCTOBER13TH11:30AM–2:00PM AVONCOUNCILCHAMBERSͲONELAKESTREET LUNCHPROVIDED STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design13 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 based facilities can be utilized to build community. All future improvements must provide improved restroom facilities. •Study how strengthening the connection of the Main Street Mall to the Park will drawpeople to the park and create a sense of place and increased pedestrian traf fi c in thewest end of Avon. •As the existing Town Hall needs to be updated, by scrutinizing the alternatives of rebuilding or relocating, the Sheraton Mountain Vista Office Building seems likely the best option for the long-term space needs of the Town as well as the fi nancial health of the community. A move to the Office Building may create new opportunities for defi ning vibrant areas for community activity which will support the Park. •The Police need to be more centrally located and visible. A collaborative base ofoperations with the Fire Department at Buck Creek can be a benefi t to the community. •Swift Gulch presents opportunities for workforce housing with Police operations as a viablebackup use if Police do not co-locate with fi re. Confi rming previous studies, Lot 5 is bestutilized for Public Works operations. Questions and comments were taken throughout the presentation in connection with each of the above recommendations. Following is a summary of the comments received by topic along with a response, if appropriate: Public Comments Regarding Preliminary Recommendations Town Hall Relocation- •Could you connect existing Town Hall and Fire Station site by closing off Lake Street?Yes, connecting the two sites is possible. However, the recent expense of constructing theenhancements made to Lake Street may not justify the move. •Why is the Sheraton Mountain Vista Office Building not occupied? It is our understanding the owner has been approached from time-to-time for partial leases and/or sale. However, the owner of the property has only wanted to lease the entire building and not individual suites. The building has never been listed for sale, as it is not part of the core business of the owner. No purchase offer has come to fruition. •Can the uses of the Sheraton Mountain Vista Office Building be expanded, possibly for housing above?Yes, the Office Building could be expanded for housing. The Office Building currently has the space to meet the needs of the Town in the future and two additional stories can be added. •Was Town Hall considered at Swift Gulch?Due to the more remote nature of the Swift Gulch site, Town Hall was not consideredat Swift Gulch. In addition, the Town Council in the spring of 2013 concluded Town Hallshould be in the core to promote vitality and customer service. •Additional public parking near the Park is needed. Parking reviews are underway that have shown approximately 500 spaces within a fi ve-minute walk of the park. The provision of increased parking is a priority in all preliminary site plans of the Park. Police Relocation- •Police should be more visible. •The Fire Station site would be too congested. •Police at Buck Creek provides greater accessibility to I-70. •The opportunity to share space with fi re is attractive. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 14 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 • Police located at Swift Gulch would increase response times compared with their current location. • Does the Buck Creek site provide for expansion for the future?The current design accommodates full build out of the Town and staffi ng projections needed for build-out. The initial designed size and cost of facility is a concern. Swift Gulch Workforce Housing- • Is there suffi cient room for both public works and affordable housing?While there is suffi cient size to accommodate public works and workforce housing, the reduction of workforce housing may not be an acceptable trade-off. • Swift Gulch seems too isolated for workforce housing. • What impact would workforce housing have on the bus barn?Workforce housing access would be designed to avoid any confl icts with the bus barn. Accessibility to transit is a key benefi t. • The thought of mixing industrial uses and housing is not ideal. • How many units of workforce housing can the site support?Approximately twenty (20) units of varying size appear to be possible. While additional study is required, the site appears to be viable for development. • Like the access to open space! • How much would providing utilities cost?Further development of the site specifi c designs will be required before utility cost and other site improvement costs can be accurately estimated; soils in the area may require special foundation costs. • Housing is more appropriate than police because police should be more visible. • Using Town-owned land for housing is more appropriate than using it for police. • Town-owned land makes workforce housing feasible. • How many acres are feasible to build upon?A little over four (4) acres. • Need to address alternatives for transportation. • Need to maintain public access to trails, maybe with a small parking area too. Lot 5 Public Works- • Might be too loud to locate workforce housing with public works. • Would add more visual blight on Post Boulevard (east I-70 exit) expanding the building lights from Walmart and Home Depot. • Opportunity to continue to support other events which occur in Avon, such as the Audi winter driving seminar. • Snow storage requires 1.5 acres. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design15 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 The public took a brief tour of Nottingham Park lead by SCA. Using a map with areas of interest and potential programmatic elements listed, attendees were asked to consider where certain interventions could be made to the Park to enhance user experience and address facility shortcomings. The Public Open House was reconvened in Council Chambers following the tour. Attendees were asked to split into four groups to engage in a charrette drawing exercise. Four tables were set up with drawing materials, maps, and templates of potential programmatic elements, such as a scaled championship soccer fi eld or indoor ice arena. The templates were intended to make it easier for attendees to understand the spatial requirements of certain uses and to understand how programmatic elements might be paired to create vitality. Seven iterations of potential site plans were created by the tables. Some themes common among the proposed site plans included: •Town Hall was located at the Sheraton Mountain Vista Office Building in five of the seven iterations. Two options provided that the current Fire Station site may be appropriate for Town Hall. •In place of the existing Town Hall, the majority of groups looked at providing some type ofsignifi cant structure. Identi fi ed uses of this structure included a convention center and hotel,multi-use buildings with residential uses, and fl exible space that could accommodateuses such as ice hockey and farmers’ market space. Parking was included in many ofthe iterations that proposed signifi cant structures, responding to a key perceived needadjacent to the park. •In addition to being a backup location for Town Hall, the existing Fire Station site wasidentifi ed as location for live/work housing, possibly with a civic twist, such as housingvisiting guest artists. •A strong connection between the Main Street Mall and the Park was provided in most ofthe proposed site plans. •The existing fi eld space/venue area was preserved in all iterations and expanded toaccommodate larger play-fi eld space and increased venue capacity. •Interactions between the fi eld and other park amenities were explored. •Support facilities for the stage were provided, with a pavilion building located immediately adjacent to stage and the lake a preferred option. •Internal park circulation was considered, generally building on the connection with theMall. Some groups explored connections to the River as well as residential areas to thewest of the Park. •The paddle boat concession and dock, which is also the location for stand up paddleboarding, or S.U.P., was located near the newly established swim beach. •Building on previous design efforts for the Park, the area to the north of the stage wasidentifi ed for additional landscaping and possible creation of a lagoon for interactiveplay. •Parking was discussed in conjunction with the Recreation Center expansion as well asalong the railroad right-of-way. Additional studies have shown that suffi cient parkingmay be located within a short distance to the Park. Enhanced mobility improvementswill need to be pursued to encourage Park users to park remotely and/or walk or bike theshort distance from parking to Park. AREAS OF OPPORTUNITY MAIN PEDESTRIAN CORRIDOR PEDESTRAIN CONNECTORS TOWN HALL/POLICE PARKS/PADDLEBOATS STAGE/BALLFIELDS PLAYGROUND SURFACE PARKING LOT SKIERS BUILDING FIRE STATION EAGLE RIVER ACCESS Town of Avon Existing Conditions 12 October 2015 VIEWS MAI N S T R E E T M A L L 4 1 3 2 7 EA G L E R I V E R NOTTINGHAM LAKE RAIL R O A D 6 5 8 1 2 3 4 5 6 7 8 STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 16 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 The individual plans that resulted from the charrette exercise have been distilled to a preferred alternative bubble site plan. All charrette plans have been provided in the appendix for additional review. A brief tour of the storage area below the stage was provided by Mayor Pro Tem Jake Wolf. Additional focus group meetings had been contemplated with members of the nearby homeowner’s association and lodging interests, but did not take place as participants did not respond to invitations. SCA staff also met with various members of the Town of Avon staff who were not involved in the public open house. These Town employees expressed support for the preliminary recommendations being discussed. Avon Town Council Work Session The Preliminary Findings Report was again presented to members of the Avon Town Council at a Council Work Session. This more conversational review of the preliminary fi ndings largely focused on the fi nancial costs to construct or fi nish new facilities and the space needs of the various departments. Consensus among the Council was voiced for the recommendations contained in the Preliminary Findings Report, including: •Town Hall should be replaced; the Sheraton Mountain Vista Office Building is a very good option; •Police can co-locate with Fire at the Buck Creek site if the price is acceptable; •Lot 5 should be utilized for Public Works and possibly also for Police; and •Swift Gulch is a viable option to provide workforce housing. Council also discussed rising construction costs and appropriate fi nancing options for the desired projects. Phase Three Updated Review Report / 22 October 2015 The Updated Review Report provided: •A review of the public open house and work session with Town Council, both held on 13October 2015; •Potential community costs and benefi ts of the various preferred options, using thecommunity values voiced at the Public Open House and Town Council comments as abaseline; and •Financial costs to the Town of Avon and the potential opportunities for investment in thecommunity that each of the preliminary recommendations represent. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design17 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 As SCA further developed the preliminary site plans for the Swift Gulch and Lot 5 parcels, recommendations were tested against a closer look at the respective sites and the costs involved. Site constraints were more carefully considered, along with constructibility and space needs of the various proposed uses. For Nottingham Park, through the charrette process, desired community amenities have been identifi ed from a list of wide-ranging options. Some of the options have gained traction while new ideas have been brought to the table for consideration. It appears that all options can provide additional support the Park but at various costs. Redefi ning how municipal services are provided can create greater community vitality. However, affordability must be a part of the conversation to ensure community acceptance. Community and Financial Opportunities and Costs Equipped with feedback from the public, a greater understanding of the issues impacting the subject sites, and the political and economic realities of Town, we moved forward to test our recommendations by initiating preliminary site design for the three parcels. Constructibility has been brought into the focus, along with possible effi ciencies and issues. New uses have been considered, some with great potential to make a strong impact on the Town. The costs and opportunities of each option are reviewed below. Understanding the costs and opportunities is important for the ultimate goal of creating a site by site development plan. Lot 5- Following the work session, Council suggested utilizing Lot 5 for Police in addition to Public Works. Upon further investigation, Police will be able to co-locate with Public Works if Public Works somewhat reduces the area for snow storage or invests in a snow melt system. The proposed reduction of snow storage as presented in the following preliminary site plans is approximately 20 percent. Two scenarios are presented: 1. Lot 5 Preliminary Site Plan A provides for co-located Police and Public Works; and 2. Lot 5 Preliminary Site Plan B provides Public Works as a standalone facility. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 18 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Figure 1: Lot 5 Preliminary Site Plan A - Co-Located Police and Public Works Figure 2: Lot 5 Preliminary Site Plan B- Public Works only STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design19 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Community and Financial Costs – Lot 5 Preliminary Site Plans A & B Lot 5 Preliminary Site Plan A Lot 5 Preliminary Site Plan B Community Costs x Co-location of Police and Public Works utilizes the entire site. To accommodate both uses, and depending on the total area needed for snow storage, some of Public Works operations may be required to remain remote or operations at the site curtailed. x Staff inefficiencies may result as will the feeling of being cramped, and the community perception that various required improvements to allow co- location, such as snow melting equipment, are unnecessary and/or not environmentally sensitive. x Public Works facilities located remotely from Lot 5 may take space that might be better utilized to enhance community vitality. x The potential for providing stand-alone workforce housing is not possible. Some housing could be incorporated into the facilities, but the quality of this housing would be compromised. x Space for community events such as the Audi winter driving seminar, is reduced. Financial Costs x Reducing the area of operations available for Public Works may require additional construction of support facilities, or investment in snow melt system. x Snow melt systems can be costly to install and operate and require monitoring to ensure operational parameters are correctly maintained. x Construction costs are climbing. x Construction costs are climbing. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 20 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Community and Financial Opportunities – Lot 5 Preliminary Site Plans A & B Lot 5 Preliminary Site Plan A Lot 5 Preliminary Site Plan B Community Opportunities x Good accessibility and visibility for both Police and Public Works; the site was obtained specifically for public works through an inclusive public process. x Police would be located near an area where many calls take place. x Co-locating Police and Public Works frees other locations, such as the existing Fire Station site, for other community uses. x As the site is located adjacent to substantial development, the perceived visual impacts will be less. x As the site is located adjacent to substantial development, the perceived visual impacts will be less. x Lot 5 is a confirmed location for Public Works, meeting most criteria for operations, and the Preliminary Site Plan validates previous planning exercises. The potential for public opposition is reduced. The site was obtained specifically for public works through an inclusive public process. Financial Opportunities x Lot 5 is an existing Town owned property. Construction cost to build the facilities is the only expense to the Town. x Co-location of Police and Public Works could provide opportunities to share facilities such as garage space and mechanical systems. x Further study will uncover efficiencies in site planning that may stretch the size of the site. x Lot 5 is an existing Town owned property. Construction cost to build the facility is the only expense to the Town. x Further study will uncover efficiencies in site planning that may stretch the size of the site. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design21 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Swift Gulch- Swift Gulch can accommodate approximately twenty units of workforce housing. These units can be provided in varying sizes, along with adequate parking and storage as well as visitor parking. Additional areas have been provided for site amenities, such as playgrounds, and parking provided for non-residents to access the open space. Concerns of accessibility and the visual impacts of being adjacent to the transportation operations have been considered. While a bus stop is not currently provided adjacent to the transportation operations, it could easily be provided. A dedicated walk with a comfortable slope could connect the housing to the future bus stop. Landscaping would screen the transportation operations from housing. When considering the potential for locating Police at Swift Gulch, Town Council has identifi ed issues with site constraints, visibility, and access. Moreover, locating Police on Swift Gulch drastically reduces the potential for providing workforce housing. For these reasons only workforce housing is being proposed on the Swift Gulch site. One scenario is presented: 1. Swift Gulch Preliminary Site Plan provides for workforce housing. Figure 3: Swift Gulch Workforce Housing Study STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 22 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Community and Financial Costs and Opportunities – Swift Gulch Preliminary Site Plan Swift Gulch Preliminary Site Plan Community Costs x Providing workforce housing at Swift Gulch does not create vitality within the core of Town, however, the benefits of new housing in Avon versus down valley will be an economic advantage. x Swift Gulch is on the opposite side of I-70 from the main areas of Town and is perceived to be remote. Educational efforts need to be made to inform the community that the walk time from Swift Gulch to the core is approximately ten minutes. x Along with other efforts to encourage transit ridership throughout Town, residents will need to be encouraged to utilize transit. Financial Costs x Site constraints have been identified, particularly issues with soil stability. Additional soil testing, civil engineering, and specialized construction techniques may be required on top of escalating construction costs. Community Opportunities x Swift Gulch provides an excellent opportunity to provide significant workforce housing within Town limits. An improved pedestrian corridor already exists along Swift Gulch Road which provides easy access to the core in approximately ten minutes. x Workforce housing likely represents the highest and best use as other municipal uses are not viable options. x The Swift Gulch site is adjacent to open space, a key consideration when locating workforce housing. Access to open space provides readily accessible recreational opportunities and allows the workforce housing to enjoy a secluded location. x Swift Gulch is removed from I-70. Meaningful grade change allows for separation to be created between the transportation operations and potential workforce housing. Moreover, the site offers excellent views to the south which would make the workforce housing provided more desirable and unique; solar energy applications should be available. x The site is immediately adjacent to potential transit and Town of Avon facilities, countering the more remote location and providing an opportunity for town employees to live immediately adjacent to work. Financial Costs x Swift Gulch is a Town owned property and construction cost of the workforce housing the only expense to Town. With involvement from other partners, such as the Town of Vail who are looking for shovel ready projects to provide workforce housing, the financial impacts to the Town of Avon are potential reduced. Nottingham Park- Strong support was given at the Public Open House as well as in the Council work session for pursuing enhancements to the Park. This support was provided based on the understanding of the greater opportunity costs of keeping Town Hall at its current location rather than providing community gathering spaces. Purchasing the Sheraton Mountain Vista Office Building for Town Hall also received conditional support. The fi nancial impacts of the purchase of the Sheraton Mountain Vista Office Building are not fully known. It is important that the Town be able to negotiate a purchase price that does not over-value the property. The uncertainty of the success of negotiating the right purchase price demands the creation of an alternative which utilizes the existing Fire Station site for Town Hall and/or Police. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design23 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Two scenarios were presented: 1.Nottingham Park Preliminary Site Plan A provides for Town Hall located in the Sheraton Mountain Vista Office Building, structures that may include convention center, hotel, or other mixed use structures adjacent to the Park, and live/work opportunities at the Fire Station site; and 2.Nottingham Park Preliminary Site Plan B provides Police and Town Hall located at Fire Stationsite with parking located across Lake Street in lieu of community uses. Additional communityfacilities are also provided, but to a lesser degree. Figure 4: Nottingham Park Preliminary Site Plan A - Town Hall at Sheraton Mountain Vista Office Building Figure 5: Nottingham Park Preliminary Site Plan B - Town Hall & Police Station at Fire Station Site STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 24 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Community and Financial Costs – Nottingham Park Preliminary Site Plans A & B Nottingham Park Preliminary Site Plan A Nottingham Park Preliminary Site Plan B Community Costs x With significant development of the Park edge for a convention center, hotel, or large mixed use structure comes concerns of providing adequate parking. x Placing substantial uses immediately adjacent to the Park risks overwhelming the Park and altering the character of a beloved park space. x Significant projects take away space that might otherwise be used for more intimate community uses. x View to the south would be blocked. x Adequate use area requirements for playing fields to be verified. x Locating both Town Hall and Police on a constrained site risks transferring some of the issues currently being experienced in the existing Town Hall to a new site with little opportunity to accommodate growth. x Town Hall and Police at the Fire Station do not provide ideal accessibility for both community resources. x All desired secured parking spaces for police cannot be accommodated. x Adequate use area requirements for playing fields to be verified. Financial Costs x Move Town Hall to the SMV Office Building: Building does not utilize Town owned property and requires an appropriate purchase price which may not be attainable. x Substantial structures with attendant parking requirements are very expensive projects to pursue which will require complex financing and public votes. x Building new structures and amenities closely on the heels of the initial investment of the stage may be politically unpopular. x Construction costs are climbing. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design25 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Community and Financial Opportunities – Nottingham Park Preliminary Site Plans A & B Nottingham Park Preliminary Site Plan A Nottingham Park Preliminary Site Plan B Community Opportunities x Enhanced Park amenities will strengthen the core and provide needed support for the stage and venue. x Unique opportunities are created for additional residential uses located within the core which will add vitality and a sense of community. x Utilizing the SMVO Building for Town Hall has broad support and provides a central location for municipal services. Moreover, the SMVO Building is the poster child of an under-used building. x Enhanced Park amenities will strengthen the core and provide needed support for the stage and venue. x The Town owned Fire Station site is able to accommodate either Town Hall or Police, if necessary. x Utilizing the Fire Station site for Town Hall and Police provides good visibility for these key community resources. Financial Opportunities x Enhanced park amenities will attract a more diverse park visitor and potentially create opportunities for youth sports tournaments. x Interest in convention space and lodging would support economic vitality x Enhanced park amenities and ball fields will attract a more diverse park visitor and potentially create opportunities for youth sports tournaments. Conclusion The Preliminary Site Plans contained in the Updated Review Report represented preferred options that were informed by initial community feedback and staff direction. Additional investigations and collaborative efforts with the Town followed. We reviewed these preferred alternatives with Town Council on 27 October 2015 to obtain additional feedback and arrive at a clear set of action items for the fi nal design effort. The fi nal design effort presented in the detail parcel by parcel plans offer a synthesis of the community concepts that have been offered and developed through the process. Town Council Presentation / 27 October 2015 The Updated Review Report was presented to members of the Avon Town Council at a Council Meeting held on 27 October 2015. SCA began the discussion with a review of the public open house and design charrette held on 13 October, including the seven charrette maps of Nottingham Park, Town Hall, and the current Fire Station site. Each alternative was reviewed with the “Big Ideas” highlighted. These were brought together in an overlay of all the highlighted areas showing the preferred development patterns offered by the attendees. Following the public outreach review SCA presented the Preliminary Site Plan alternatives from the Updated review report. Various ideas were discussed including parking, land use adjacencies, accessibility, etc. Some of these ideas were speculative and did not represent a consensus, so they were not carried forward. The comments that gained traction and were incorporated into the Final Parcel by Parcel plans are as follows: •Nottingham Park Preliminary Site Plan A should be revised to show a new mixed usebuilding or an adaptive reuse of the existing Town Hall building. •Nottingham Park Preliminary Site Plan B should be revised to eliminate the PoliceDepartment at the Fire Station site and reduce the building footprint to represent a standalone Town Hall on the site. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 26 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 • Lot 5 Preliminary Site Plan A was discussed at length and found unacceptable due to the remote location for the Police Department. It was decided to continue to show police on Lot 5 as a last resort alternative, but to also consider the space for stand alone workforce housing. • Lot 5 Preliminary Site Plan B should also be revised to include workforce housing. • There were no changes to the Swift Gulch preferred plan for affordable housing. Due to time constraints, the consultants omitted their planned collaborative exercise examining the strengths, weaknesses, opportunities, and threats of each site plan alternative. The Council moved quickly from the site designs to focus largely on the fi nancial costs to construct and maintain existing and proposed facilities. A consensus was reached regarding a budget cost to co-locate police with fi re at the Buck Creek site. The architects for the facility were in attendance. They were directed to value engineer the project, and develop a plan that operates within the budgetary parameters. Phase Four Final Report & Parcel by Parcel Plans / 16 November 2015 The Final Report provides: • Final version of materials including graphic boards, maps, and meeting notes for Town records. • Summary report of planning strategies suggested. • Final Parcel by Parcel Plans with all supporting documentation. • Prioritized Implementation Plan. The preliminary site plan alternatives have been revised per the feedback received from the Town Council on 27 October. With Town Staff, Town Council and participants of the public outreach driving the iterative planning and design process, SCA proposes the following parcel by parcel plans for each subject site. Lot 5- Two scenarios are presented: 1. Lot 5 Preliminary Site Plan A provides for Public Works and Police or standalone workforce housing; and 2. Lot 5 Preliminary Site Plan B provides for Public Works and minimal workforce housing incorporated into facility buildings. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design27 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Figure 1: Lot 5 Preliminary Site Plan A - Co-Located Public Works and Police or standalone workforce housing. Figure 2: Lot 5 Preliminary Site Plan B- Public Works and workforce housing. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 28 MASTER PLAN UPDATE TOWN OF AVON November 12, 2015 Swift Gulch- No changes from Preliminary Site Plan: 1. The preferred alternative for Swift Gulch remains focused on providing affordable housing. Nottingham Park- Two scenarios are presented: 1.Nottingham Park Preliminary Site Plan A provides for a Town Hall located in the Sheraton Mountain Vista Office Building, a mixed use building or an adaptive reuse of the existing Town Hall building adjacent to the Park, and live/work opportunities at the Fire Station site; and 2.Nottingham Park Preliminary Site Plan B provides a Town Hall located at Fire Station site withparking located across Lake Street in lieu of community uses. Additional community facilitiesare also provided to a lesser degree. Figure 4: Nottingham Park Preliminary Site Plan A - Town Hall at Sheraton Mountain Vista Office Building STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design29 MASTER PLAN UPDATETOWN OF AVON November 12, 2015 Figure 5: Nottingham Park Preliminary Site Plan B - Town Hall at Fire Station Site Conclusion The Parcel by Parcel Plans contained in this Final Report represent preferred options informed by community feedback, and Town Council and Staff direction. The fi nal update to the plan is based on the Town Council discussion of the preliminary plans on 27 October. These fi nal plans are conceptual in nature and are for planning purposes in developing a long range plan for the town owned parcels studied. Further investigation and planning efforts will be necessary to develop plans to execute the desired improvements. Recommendations for phasing of implementation 1. Confi rm Buck Creek for police station relocation. 2.Further explore the relocation of Town Hall through acquisition of the Sheraton Mountain Vista Office Building or a study of a standalone Town Hall at the Fire Station site. 3. Develop a detailed site plan for the consolidation of Public Works facilities and workforcehousing on Lot 5, and allocate funding to the execution of the project. 4. Investigate opportunities for affordable housing developments at Swift Gulch and otherappropriate sites within Avon. 5. Initiate improvements to Nottingham Park utilizing the existing Town Hall site and currentparks storage buildings to be vacated. The most desirable elements are a championshipsoccer fi elds, which would also serve to increase the performance venue capacity, and acommunity fl ex space that would include support facilities for the stage and public restrooms. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 30 MASTER PLAN UPDATE TOWN OF AVON November 16, 2015 List of Appendices A. Tract G Planning – Stakeholders List B. Preliminary Findings Report conceptual sketches presented to charrette participants and Town Council C. Preliminary Findings Report list of possible program elements provided for discussion at public open house D. Public open house sign in sheets E. Public Open House Charrette Maps Tables A - D F. Updated Review Report Preliminary Site Plans G. Updated list of key and desired program elements H. Final Parcel by Parcel Site Plans STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design31 MASTER PLAN UPDATETOWN OF AVON November 16, 2015 Appendix A Tract G Planning – Stakeholders List Town Sta ff Gary Padilla, Public Works gpadilla@avon.org John Curutchet, RecreaƟ on jcurutchet@avon.org ScoƩ Wright, Finance swright@avon.org Virginia Egger vegger@avon.org Danita Dempsey, Special Events ddempsey@avon.org JusƟ n Hildreth, Engineering jhildreth@avon.org Bob Ticer, Police rƟ cer@avon.org Tract G Neighbors Mike BenneƩ , Beaver Creek West & Falcon Pointe Condos mbenneƩ @beavercreekwest.com Roy Getchell, Avon Elementary leroy.getchell@eagleschools.net Lynn Brooks, Eagle River Water and SanitaƟ on lbrooks@erwsd.org Michael Smith, Seasons ResidenƟ al HOA Mikar2@msn.com MaƩ Trasen, Gart Proper Ɵ es mtrasen@garproperƟ es.com Terry Smith, Avon Library terry-dan@comcast.net Steve Macdonald, Avon Center smacvail@gmail.com Lisa Mutz-Nelson, Falcon Point Lnelson@eastwestresorts.com Steve Kalapos, Beaver Bench kalapos@comcast.net Ronda, Ticino Restaurant niederhauserdr@comcast.net Carl Bauer, Eagle Riverfront kbauer@eagleriver fi re.org Hospitality/Resort Kristen Pryor, WesƟ n KPryor@wesƟ nriverfrontbeavercreek.com Todd Goulding, Wyndham tgoulding@gda-co.com David Weiss, Sheraton david.weiss@starwoodvo.com Jen Brown, BC Resort JBrown@vailresorts.com Brian Nolan, BC Board of Director and Group970 brian@group970.com Bill Simons, BC Resort BSimmons@vailresorts.com Developers Hoff mann Commercial greghoff mann@ospreycapitalllc.com djimenez@hoff manncre.com Village at Avon DanLeary@traercreek.com marcuslindholm@traercreek.com michaellindholm@traercreek.com Performing Arts/Event Management ScoƩ y Stoughton, Bonfi re Entertainment scoƩ y@bonfi rentertainment.com Michael Imhoff , Vail Valley FoundaƟ on mimhof@vvf.org Chris Romer, Vail Valley Partnership cromer@visitvailvalley.com Elected & Appoint Offi cials PZC Council STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 32 MASTER PLAN UPDATE TOWN OF AVON November 16, 2015 Appendix B STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design33 MASTER PLAN UPDATETOWN OF AVON November 16, 2015 Appendix B STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 34 MASTER PLAN UPDATE TOWN OF AVON November 16, 2015 Appendix C Town of Avon Planning Services Review and Update of Nottingham Park. M.P., Swift Gulch M.P., Lot 5 Development Plan Public Open House 13 October 2015 Key Program Elements • Storage for Parks Department equipment; • Support facilities for stage; • Restrooms; • Strong connection to the Main Street Mall; and • Maintain adequate parking. Other Desired Elements • Connections to the Eagle River and the regional trail system; • Expanded turf areas for ballfi elds and additional seating for venue; • Indoor ice arena; • Outdoor ice rink/summer splash park; • Covered outdoor ice rink / summer fl ex space; • Nordic center with groomed trails; • Community/Visitor Center; • Multi-use fl ex pavilion; • Skate park; • Community amphitheater; • Bike share facilities; • Pedestrian amenities; • Picnic pavilion; • Hotel / lodge; and • Dog park. STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design35 MASTER PLAN UPDATETOWN OF AVON November 16, 2015 Appendix D STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design 36 MASTER PLAN UPDATE TOWN OF AVON November 16, 2015 Appendix D STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design37 MASTER PLAN UPDATETOWN OF AVON November 16, 2015 Appendix D Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design39MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design40MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design41MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design42MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design43MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design44MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design45MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design46MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix ESTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design47MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix FSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design48MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix FSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design49MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix FSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design50MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix FSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design51MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix FSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design52MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 STAN CLAUSON ASSOCIATES INC landscape architecture • planning • resort design53 MASTER PLAN UPDATETOWN OF AVON November 16, 2015 Appendix G Required and desired elements updated 30 October 2015 Potential improvements to Nottingham Park; Key Program Elements • Flex Community Space with support facilities for stage; • Restrooms; • Expanded turf areas for ballfi elds and additional seating for venue; • Strong connection to the Main Street Mall; and • Maintain or enhance adequate parking. Other Desired Elements • Connections to the Eagle River and the regional trail system; • Indoor ice arena; • Outdoor ice rink/summer splash park; • Covered outdoor ice rink/ summer fl ex space; • Nordic center with groomed trails; • Concessions/skate and ski rentals; • Better connectivity to neighborhoods to the West; • Space for food trucks; • Skate park; • Bike share facilities; • Pedestrian amenities; • Children’s music park; • Wading lagoon; • Picnic pavilion; • Dog park; • Community fi re pit; • Relocated playground; • Relocated paddle boats; • Mixed Use building including conference/event space, lodging, and/or affordable housing; and • Incorporate parking structure. Potential Improvements to Fire Station site; • Town Hall alternative; • Live/work; • Workforce housing; • Art studio with artists in residence; and • Skatepark. Public Works required improvements at Lot 5; • Center of operations with offi ces, locker rooms, restrooms, and breakroom (approx. 2,600 SF); • Garage for 5 plow trucks and 2 street sweepers (approx. 3,500 SF); • Covered storage for cinder and ice slicer storage, and two loaders (approx. 9,000 SF); • Annex for traffi c control devices, hand held equipment, etc. (approx. 3,000 SF); and • Parks storage (approx. 2,200 SF). Appendix HSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design55MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix HSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design56MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix HSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design57MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015 Appendix HSTAN CLAUSON ASSOCIATES INClandscape architecture • planning • resort design58MASTER PLAN UPDATE TOWN OF AVONNovember 16, 2015