Loading...
TC Council Packet 09-17-2014 Special Meeting TOWN OF AVON, COLORADO SPECIAL MEETING FOR WEDNESDAY, SEPTEMBER 17, 2014 MEETING BEGINS AT 6:30PM AVON TOWN HALL, ONE LAKE STREET Page 1 PRESIDING OFFICIALS MAYOR RICH CARROLL MAYOR PRO TEM JENNIE FANCHER COUNCILORS DAVE DANTAS, CHRIS EVANS, ALBERT “BUZ” REYNOLDS, JR., JAKE WOLF, MATT GENNETT TOWN STAFF TOWN ATTORNEY: ERIC HEIL TOWN MANAGER: VIRGINIA EGGER TOWN CLERK: DEBBIE HOPPE ALL REGULAR MEETINGS ARE OPEN TO THE PUBLIC EXCEPT EXECUTIVE SESSIONS. GENERAL COMMENTS ARE WELCOME DURING PUBLIC COMMENT, AND COMMENTS ARE ALSO WELCOME ON ANY AGENDA TOPIC. PLEASE VIEW AVON’S WEBSITE, HTTP://WWW.AVON.ORG, FOR MEETING AGENDAS AND MATERIALS. AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AND AVON LIBRARY. THE AVON TOWN COUNCIL MEETS THE 2ND AND 4THTUESDAYS OF EACH MONTH. ______________________________________________________________________________________________________________ 1. CALL TO ORDER & ROLL CALL – 6:30 PM 2. APPROVAL OF AGENDA 3. EXECUTIVE SESSION (THIS MEETING IS NOT OPEN TO THE PUBLIC) EXECUTIVE SESSION FOR A CONFERENCE WITH THE TOWN ATTORNEY FOR THE PURPOSE OF RECEIVING LEGAL ADVICE UNDER C.R.S. §24-6-402(2)(B) FOR THE PURPOSE OF DETERMINING POSITIONS RELATIVE TO MATTERS THAT MAY BE SUBJECT TO NEGOTIATIONS, DEVELOPING STRATEGY FOR NEGOTIATIONS, AND/OR INSTRUCTING NEGOTIATORS, UNDER C.R.S. §24-6-402(2)(E) WITH REGARD TO THE AVON PAVILION PROJECT CONTRACTS 4. WORK SESSION – 7:30 PM 4.1. REVIEW AND DIRECTION ON PAVILION CONSTRUCTION OPTIONS AND ASSOCIATED COSTS 4.2. DIRECTION ON FUNDING CHRISTY SPORTS PARKING LOT EXPANSION 5. COUNCIL COMMENTS 6. ADJOURNMENT TOWN COUNCIL REPORT PAGE 1 OF 1 To: Mayor and Town Council From: Virginia C. Egger, Town Manager Date: September 15, 2014 Agenda Topic: Nottingham Park Pavilion – Value Engineering & Recommended Program Changes The purpose of Town Council’s Special Meeting on Wednesday, September 17, 2014, is to provide direction to staff in regards to reducing estimated construction costs for the new Nottingham Park Pavilion. Contractor Chris Evans, Evans Chaffee Construction Group, met with me late on September 5th to notice me that his construction estimate, based upon the 90% completed design plans provide by VAg, architects for the Town, were at the $3,500,000 level. The most recent verbal estimate from architect Brian Judge, VAg, was $2,200,000 to $2,400,000. Over the weekend Chris reviewed all construction items and prepared a recommended set of value engineering and program cost cuts, bringing the construction estimate down to $2,700,000 for designed elements. Meetings were held with the architects and contractor on September 9th and 14th, Councilors Dantas, Reynolds and Wolf, attending one or both meetings, and with staff to assess options and prepare recommendations for value engineering and cost cuts. The described attachments provide information on the available options, summary of funding for the project and history of the Town’s efforts to construct a stage in Nottingham Park. On September 17th, I will be joined by Architects Brian Judge and Tom Bashford of VAg, and Evans Chaffee representatives Todd Goulding and Tommy Harmon. Town Engineer Justin Hildreth and Assistant Town Manager Scott Wright will also be present. Please find attached: Attachment 1 – Summary of Options for Design, Schedule and Construction Cost Estimated Attachment 2 - Town of Avon Nottingham Pavilion – Value Engineering & Program Cost Cutting Estimated – ECCG will bring an updated version on Wednesday as pricing is coming in daily.  Provides the estimated cost for construction at the 90% design level  Summarizes all design and contractor fees  Lists construction items which have been reviewed by the architect, contractor, Town staff and Councilors Dave Dantas, Buz Reynolds and Jake Wolf for elimination, change of finish materials and/or delay  Identifies items which are still in pricing  Provide a Pricing and Construction Contingency of 15% Attachment 3 – Funding of the Pavilion  Identifies Capital Projects Fund monies from Real Estate Transfer Taxes  Projects Capital Projects Fund Five Year Plan with Pavilion Cost Estimate Attachment 4 – Nottingham Park Pavilion History ATTACHMENT 1 Summary of Options for Design, Schedule and Construction Cost Estimated Estimated Cost of the Pavilion: July 22 $1,900,000 Estimated Cost of the Pavilion: August 20 $2,200,000 Estimated Construction Cost: September 5 90% Design Documents: w/o Value Engineering $3,500,000 Design and Contractor Fees: Fixed Amounts: $ 410,000 Total Funds Available: See Attachment 3 $3,500,000 OPTION 1: Complete Current Design with Value Engineering and Program Cost Cuts Estimated Cost: $3,500,000, includes all fees Attachment 2 Construct the current design with value engineering and program cost cutting for the green room. This option is still going through pricing and design analysis. The largest unknown savings component is the reduction of the new proposed height for the pump house and Green Room and/or reduction of the total height of the roof canopy by 10’ – 11’. This option preserves the original design, changes expensive finishes for still beautiful but less costly finishes and completes the project with the Green Room being constructed without a bathroom or sink. The needed plumbing for these elements could be added in the future. OPTION 2: Redesign and complete at a construction budget of $1,800,000 Estimated Cost: $2,200,000, construction of $1,800,000 with fees of $400,000 To date, the contractor has committed to purchasing goods and labor in the amount of $1,200,000. VAg has been asked to prepare a description and/or cost for use of these materials and completion of the stage with a balance of construction funds in the amount of $600,000. The option will be presented to Council at the September 17th meeting. Please Note: This option may not realistically result in a “useable structure”. $600k may only be enough to protect the existing structure (concrete & steel from the elements) along with a few additional finishes. OPTION 3: Stop construction and redesign for 2015 completion Sunk Cost Estimate for 2014: Design & Engineering: $410,000 Plus Construction: $700,000 +/- While $1,200,000 in materials and labor has been ordered, the project could complete the work in the lake bed, and close shop for a redesign and bid. Stopping current orders will require storage of materials, but are possible on some orders. This option would necessitate a review of the construction costs forecasts, and new fees for both design and construction management. Page 1 of 5 Possible Value Engineering ECCG Recommends Town Council Reps Recommend $3,497,750 $3,497,750 $3,497,750 ($878,334)($830,069)($833,659) $2,619,416 $2,667,681 $2,664,091 $245,000 $245,000 $245,000 $165,233 $165,233 $165,233 $410,233 $410,233 $410,233 $3,029,649 $3,077,914 $3,074,324 $392,912 $400,152 $399,614 $3,422,561 $3,478,066 $3,473,938 Total All Design & Construction Service Fixed Fees ATTACHMENT 2 TOWN OF AVON NOTTINGHAM PAVILION VALUE ENGINEERING & PROGRAM COST CUTTING ESTIMATES ESTIMATED TOTAL NOTTINGHAM PAVILION Pricing & Construction Contingency: 15% ESTIMATED TOTAL NOTTINGHAM PAVILION WITH CONTINGENCY SUMMARY OF VALUE ENGINEERING & PROGRAM COST CUTTING WORK TO DATE Current Construction Estimate: As designed at 90% Potential VE & Cost Cutting Savings* Estimated Construction Cost with Value Engineering & Cost Cutting Architecture, Engineering and Design Not to Exceed Fees General Conditions & Construction Service Fixed Fees * Does not include: Water Features - Eliminated per Owner Baffles at Canopy - No design yet AV System - Raceways included; no AV planned; producers must provide Performance Lighting System - Raceways included; additional savings from estimate below not yet itemized Any item not shown in drawings (skirts, signage, etc.) Does not include plate steel added between 75% & 90% CD's Page 2 of 5 Item #ITEM DESCRIPTION RATIONALE Possible Value Engineering ECCG Recommends Town Council Representatives Recommend 06 . 0 1 Reduce Height of Pump House & Green Room by 5' - EPDM Flat Roof The plans call for extending the height of the existing Pump House by 10 feet. This doubles the height of the Pump House. The Green Room is designed to match the size and scale of the Pump House. This lowers the height by 5'. [See Footnote 1] This height addition is huge. This doubles the height of the existing structures and adds additional heated space within the buildings with no benefit to the space. This reduces the height and eliminates the sloping metal roof in lieu of a flat roof with fully adhered 60 mil EPDM roofing. PRICING PRICING PRICING 04 . 0 2 Change Basalt Panels to Black Stucco Eliminates the black basalt stone panels on the Pump House and the Green Room. Replaces it with a Portland Cement Plaster in a Charcoal/Black finish color with a v-groove reveal pattern to mimic the reveal pattern shown for the stone cladding system. Purely a cost driven decision. PC Plaster has been used extensively in this area for many years and is a proven system. The color and reveal pattern mimics what is designed. Stone panels can be added in the future. Comment VAg: Portland cement plaster (Stucco) will hold up to the weather, however it will not hold up to impact of equipment and public abuse such as vandalism and skateboarding. ($176,556)($176,556)($176,556) 04 . 0 1 Concrete Pavers in lieu of Flagstone (east pavers) Changes sandstone random pavers for a 60 mil concrete paver to match installation at the Pedestrian Mall. The concrete pavers are significantly less costly and will hold up better than the sandstone. Consider stamping. Vag Comment: Concrete Pavers are an acceptable alternate material as a cost reduction. Stamped concrete will crack and, if de-icing salts or chemicals are used, the finish will discolor, flake and the surface will spall. PRICING ($137,756)($137,756)($137,756) 16 . 0 1 Lighting VE * Meet with lighting designer next week to completely re- The lighting spec needs to be reviewed and adjusted. This need to be reduced and re=specified to reduce costs. There is no pre- determined plan for achieving this savings. The amount of lighting can be reduced and the lights respeced to lower costs. This scope of work is completely out of line cost wise and needs to be reduced. ($100,000)($100,000)($100,000) 04 . 0 3 Revised stone veneer to a more modern economical stone and reduce wall Changes out the modular buff sandstone with a more economical alternative. The OK brown stone is installed on the bottom of the stage. The type of stone isn't as important as the savings that can be generated. This is still a high quality finish. PRICING ($95,500)($95,500)($95,500) Page 3 of 5 Item #ITEM DESCRIPTION RATIONALE Possible Value Engineering ECCG Recommends Town Council Representatives Recommend 15 . 0 5 Eliminate Bathroom (all water & sewer), but include rough- ins * This eliminates all systems associated with the potable water system and the sanitary sewer system. This eliminates the bathroom and sink in the Green Room. Space for bathroom will be a drywalled storage room with a door. Exhaust fan is eliminated from bathroom. The cost associated with water supply and sewer lines to furnish one bathroom are significant. They only serve the plumbing system in the Green Room. The sewer line is not deep enough to tie into at the limit of the parking lot and will have to be chased across the parking lot increasing the potential cost exposure. VAg Comment: This is a program item that was added to the project by the Owner during the planning stages of the project. To eliminate the bathroom or not is the Owners decision. Water will need to be provided to the water hydrants/hose bibbs for cleaning/maintenance of the floor surfaces. PRICING ($64,851)($64,851)($64,851) 04 . 0 4 Change East On Grade Paver Plaza To Colored Concrete * Changes the concrete 60 mil pavers to colored concrete with a broom finish Cost savings VAg Comment: Stamped concrete will crack and, if de-icing salts or chemicals are used, the finish will discolor, flake and the surface will spall. PRICING ($55,757)($55,757)($55,757) 07 . 0 2 Delete Event Terrace Waterproofing* Deletes the horizontal waterproofing between the subslab and the topping finishes (pavers, etc.) The original design intent is for waterproofing over the concrete slab over unfinished metal deck. This is to prevent deterioration of the metal deck in areas where the sub slab cracks. However, we have included galvanized metal decking which has a rust preventive finish. Seems like the waterproofing could be eliminated as a result. VAg Comment: The Architect and Structural Engineer do not support this cost saving item. [See Footnote 2] ($45,972)($45,972)($45,972) 03 . 0 1 Eliminate Polished Slab Change the polished concrete slab at the stage to a grey broom finished slab. A grey slab will meet the requirements and hold up well. The broom finish will have better slip resistance than polished concrete. Polishing can be done later, if desired. [See Footnote 3] PRICING ($26,652)($26,652)($26,652) 04 . 0 8 Eliminate East On- Grade Concrete Plaza Tis eliminates the concrete plaza on grade on the east side in front of the stage. Not recommended. If the hardscape is removed, an asphalt roadway needs to be added eating up this potential savings. ($26,404)NR NR Page 4 of 5 Item #ITEM DESCRIPTION RATIONALE Possible Value Engineering ECCG Recommends Town Council Representatives Recommend 04 . 0 5 Change Event Terrace Concretye Pavers to Stamped Concrete * Changes the concrete 60 mil pavers to colored concrete with a broom finish Cost savings. Not recommended. VAg Comment: Stamped concrete will crack and, if de-icing salts or chemicals are used, the finish will discolor, flake and the surface will spall. PRICING ($21,861)NR ($21,861) 03 . 0 2 Eliminate basement slab on grade This will eliminate the slab on grade in the basement level and leave the gravel prep only. Storage can be done on top of gravel. This saves money and can be installed later. VAg Comment: Do not recommend. Concrete slab should be kept in electrical room at minimum. Equipment in space should be kept free of dirt and dust. ($18,271)($18,271)NR 07 . 0 1 Delete Rigid Insulation at Canopy There is 2-1/2" of rigid insulation in the roof assembly in the canopy above the stage. This is not a thermal requirement. Architect has If it's raining, sound is probably the least of the worries.($15,420)($15,420)($15,420) 09 . 0 2 Tile Changes Changes the specified tile from an expensive spec to a more moderately priced tile at $20 per SF installed. The speced tile ranges from $35 per SF to $96 per SF. ECCG's opinion is that this is significantly more expensive than expected for the Green Room floor and Restroom. VAg Comment: A more cost effective tile package can be selected ($14,496)($14,496)($14,496) 04 . 0 6 Change South Walkway to Colored Concrete * Changes the concrete 60 mil pavers to colored concrete with a broom finish Cost savings. This pathway ties to an asphalt pathway. Pavers seem excessive here. VAg Comment: Stamped concrete will crack and, if de-icing salts or chemicals are used, the finish will discolor, flake and the surface will spall. PRICING ($11,991)($11,991)($11,991) 09 . 0 1 Delete Drywall Deletes drywall from closets around steel columns on stage, the interior of the pump house and the basement walls. No reason for drywall to be installed in these areas.($11,424)($11,424)($11,424) 12 . 0 1 Eliminate Cabinetry in Green Room The plans call for 18 lineal feet of cabinets (base and upper) with 3' wide by 9' tall pantry closets at each end. Plans also show a solid surface counter top. This eliminates this cabinetry. Seem excessive for the use. What are these going to be used for? Why can't a table be placed in the space? VAg Comment: This is a program item that was added to the project by the Owner during the planning stages of the project. To eliminate the cabinetry or not is the Owners decision. Blocking should be provided in the walls in the event cabinets are added in the future. ($11,167)($11,167)($11,167) 08 . 0 3 Eliminate Fake Windows at Pump House & Green There are three fake windows installed at the Pump House and Green Room. This deletes these windows This has no affect on the functionality of the project and saves money.($7,373)($7,373)($7,373) 01 . 0 1 Use Cabin for Job Office Included money for job office, but Cabin is empty and not in use. ($6,478)($6,478)($6,478) Page 5 of 5 Item #ITEM DESCRIPTION RATIONALE Possible Value Engineering ECCG Recommends Town Council Representatives Recommend 08 . 0 2 Reduce Size of Sliding Doors The sliding pocket doors at the Green Room are drawn as 10' tall. This changes those doors to 7' tall. 10' tall doors are very costly. Vag Comment: We cannot support sliding doors to this space under 8’-0” tall PRICING ($6,170)($6,170)($6,170) 02 . 0 1 Eliminate Boulder Seating in front Eliminates the row of seating at the bottom of the 6' wall in front of the stage. People sitting on these boulders will not be able to see the stage. Boulders can be added later. ($5,861)($5,861)($5,861) 02 . 0 2 Landscape VE There is $50,000 worth of landscaping. Seems that this could easily be reduced by 10% 10% - Working on estimate to further reduce. Vag Comment: Landscape can be added at a later date. Recommend keeping landscape in planters in and around the structure. ($5,141)($5,141)($5,141) 04 . 0 7 Change North Paver Area inside Gate to Colored Concrete Changes the concrete 60 mil pavers to colored concrete with a broom finish Cost savings ($3,972)($3,972)($3,972) 10 . 0 1 Revise Bath Accessories Bath Accessory spec include a Dyson Air Blade hand dryer @ $2,100 and a lighted mirror at @ $1,200. This eliminates those items in lieu of a standard mirror. This is an extremely costly expense for a seldom used restroom. VAg Comment: More cost effective accessories can selected. Lighting and a large mirror will be needed for artists ($3,547)($3,547)($3,547) 15 . 0 3 Eliminate Cast Iron Waste & Vent Changes drain and vent lines from cast iron to PVC/ABS. The only reason to use cast iron in this application would be noise reduction. The drain lines through run the basement where noise reduction is not an issue. This has no affect on the stage. ($3,290)($3,290)($3,290) 09 . 0 3 Reduce Height of Restroom Tile Changes the tile wainscot in the restroom from floor to ceiling on all walls to a 4' height. There is no reason for the tile to go floor to ceiling given the cost constraints. VAg Comment: Tile height can be reduced. Town should anticipate maintenance of less durable finish more often than tile. ($3,084)($3,084)($3,084) 02 . 0 3 Gravel Boat Ramp in lieu of asphalt Changes the asphalt section of the proposed boat ramp to gravel. Cost. Asphalt would be a more user friendly option. KEEP AS ASPHALT MOVE TO LAKE LINER BUDGET ($2,928)($2,928)($2,928) 15 . 0 1 Add Air Conditioning to Green Room Direct sunlight from south west can be intense in the late afternoon. Cooling would be beneficial for multi- use functionality. Vag Comment: Recommend conditioning this space. $3,588 $3,588 $3,588 15 . 0 4 Reduce Heated Area in Storage Cannot Do NR NR 08 . 0 1 Eliminate Glass Above Stage Rejected NR NR 15 . 0 2 Humidification Vag Comment: Suggest roughing in power and plumbing Rejected NR NR ($878,334)($830,069)($833,659)ESTMATED SAVINGS ATTACHMENT 3 Pavilion Funding At the Town Council meeting of July 22, 2014, when evaluating all 2014 capital projects and faced with exceedingly higher bids than projected by Zehren Architects for the Pedestrian Mall, Post Boulevard Landscaping and Avon Road Landscaping, the Council reviewed a series of options. These included project scope reduction, project delays and the potential to finance the Nottingham Pavilion, which at that date was estimated to cost upwards of $1,900,000. The Council recommended the staff proceed with Certificates of Participation for the Pavilion construction. On August 26th, the Council deliberated whether the bonds should be taxable or non-taxable. The difference revolved around the Council’s desire to seek a donor for the naming of the stage. After a review of options, Council directed staff that the proceeds from Certificates of Participation be used for road and street improvements already planned for in the adopted Five Year Capital Improvements Fund. The use of streets would always be public and not create a future challenge with private monies funding the stage or being hosted on the stage. A debt issue of $3,500,000 will afford afford the Council the opportunity to advance its road and street improvement program over a shorter time frame and also bring in the Metcalf Road climbing lane in 2014, at a cost of $285,000, for the most dangerous section prior to a full rebuild of the road. The new debt issue, therefore, is constructed for Road and Street improvements as follows: Capital Projects Fund 2015-2017 Road and Street Improvements Source of Funds is from Real Estate Transfer Taxes Total Amount for Certificates of Participation: $3,500,000 • Estimated interest rate on 15-year issue: Still being priced in the market • Estimated annual average debt service: TBD once interest rate set • Two Readings of an Ordinance: September 23 and October 14 • Closing in 2014 • Funds can be used over three years Estimated Annual Unencumbered Fund Balance with new debt service: $1,400,000 The new monies for road and street projects, in the amount of $3,500,000, allows the Pavilion to then be paid for in the Capital Projects Fund from current and expected real estate transfer taxes – the source of funding in the Capital Projects Fund. ATTACHMENT 4 NOTTINGHAM PARK PAVILION (STAGE) HISTORY 2008 - H.A. NOTTINGHAM PARK MASTER PLAN The Master Plan for Harry A. Nottingham Park (2008) supports the inclusion of a performing arts pavilion either in the vicinity of the current Municipal Building or integrated with a remodeled pumphouse. The survey of park users resulted in approximately 45% of the respondents supporting a performing arts pavilion. The Master Plan identifies the areas of the park for a pavilion as Zone A and Zone E. Zone A, is recognized as the common green, or events area of the park and Zone E is the area around Town Hall and the log cabin. The Master Plan includes several planning recommendations for Zone A, including “new pumphouse façade, possibly integrated with the future addition of a multi-purpose lakeside pavilion and larger rental concession spaces.” This zone is the small area at the southeast corner of the lake, just south of the pumphouse. Alternatively, the Master Plan recommends the “multi-purpose community pavilion/band shell” be located in Zone E. The Master Plan also contains other concepts for the pavilion such as the area immediately adjacent to the Municipal Building. That location was further explored with design and construction drawings in 2010. Excerpts from the Master Plan follow this Attachment 4. 2010 – STAGE DESIGNED AND BID In 2010, a 60% complete and preliminary stage design was completed VAg and bid by the Town of Avon. The stage was located on north of Town Hall, 25 FT deep by 46 FT wide and 35 FT tall. The low bid came in at $573,000. The stage was not constructed. DECEMBER 2013 – STAGE REVIEW WITH PROMOTERS At the December 14, 2013, Town Council meeting, the Council directed staff to meet with local event promoters to evaluate the stage design and present alternative locations for the stage in Nottingham Park2 JANUARY 28, 2014 – STAGE LOCATION Council reviewed five (5) potential locations for the stage. Staff recommended keeping that stage at the currently proposed location by Town Hall because the plans are 60% complete and any changes will be minimal and easily incorporated for a summer 2014 construction. The stage is estimated to cost $650,000. Council provided direction for further review. FEBRUARY 25, 2014 – DESIGN FUNDING APPROVED Council appropriates $20,000 from the Capital Projects Fund’s Contingency line item to complete the construction plans and bid out the project. VAg is identified as the preferred architect by staff when considering VAg’s work on the original stage. APRIL 22, 2014 – SITE SELECTED & ADDITONAL DESIGN FUNDING IS APPROPRIATED Council approves locating the stage at the pumphouse site and provides additional design funding of $50,000. Shift to design assist program determined to be needed to meet project completion date target. MAY 27, 2014 – BUDGET AMENDMENT APPROVED FOR $1,000,000 STAGE JULY 15, 2014 - DIRECTION PROVIDED TO FUND STAGE WITH CERTIFICATES OF PARTICIPATION With high bids being received for three major projects – The Mall and Post Boulevard and Avon Road Landscaping, the Council directs staff to pursue a debt issue using COPs for the stage. This allows currently approved budget funding to support the projects as negotiated down and modified. Bond proceeds are shown at $2,050,000 in support of a facility cost of $1,930,000. JULY 22, 2014 – EVANS CHAFFEE CONSTRUCTION GROUP SELECTED AS CONTRACTOR AUGUST 20, 2014 – DIRECTION PROVIDED TO USE CERTIFICATES OF PARTICIPATION FOR STREETS With the goal of raising funding support for the stage, including naming rights, the Town Council concludes debt for the approved street and road projects in the Capital Projects Fund is a better fit for the COPs. Excerpts from the Town of Avon Master Plan for Harry A. Nottingham Park Avon, Colorado November 2008 To view the document in its entirety, please visit: http://www.avon.org/DocumentCenter/Home/View/834 TOWN COUNCIL REPORT To: Honorable Mayor and Town Council From: Virginia Egger, Town Manager Date: September 15, 2014 Agenda Topic: Direction on Christy Sports Parking Lot Expansion I have reported to Jon White, President, Hoffmann Commercial Real Estate (HCRE), Council’s direction to change the proposed License Agreement to a 20-year amortization schedule with a 99-year term. Mr. White has replied to me that HCRE would not enter into the License under those terms. He feels the development costs and on-going operations and maintenance costs, including probable asphalt overlay replacement at 15 years, should be considered. To “take back” the parking lot with no compensation for the improvements at 21 years, he concluded is not a good business enterprise for HCRE. He proposes one of the following options, based upon an updated cost estimate for the improvements of $150,000: 1. HCRE will construct the parking lot with the Town of Avon contributing 50% of the improvement costs. The Town will assume all maintenance and operations of the lot once finished this fall. 2. The option presented at 2nd Reading be approved: 99-year term, with the License ending at any time the Town pays HCRE up to $150,000 for the improvements. I will be able to report on compliance status at Wednesday’s meeting. TOWN COUNCIL REPORT To: Honorable Mayor and Town Council From: Virginia Egger, Town Manager Date: September 15, 2014 Agenda Topic: Direction on Christy Sports Parking Lot Expansion I have reported to Jon White, President, Hoffmann Commercial Real Estate (HCRE), Council’s direction to change the proposed License Agreement to a 20-year amortization schedule with a 99-year term. Mr. White has replied to me that HCRE would not enter into the License under those terms. He feels the development costs and on-going operations and maintenance costs, including probable asphalt overlay replacement at 15 years, should be considered. To “take back” the parking lot with no compensation for the improvements at 21 years, he concluded is not a good business enterprise for HCRE. He proposes one of the following options, based upon an updated cost estimate for the improvements of $150,000: 1. HCRE will construct the parking lot with the Town of Avon contributing 50% of the improvement costs. The Town will assume all maintenance and operations of the lot once finished this fall. 2. The option presented at 2nd Reading be approved: 99-year term, with the License ending at any time the Town pays HCRE up to $150,000 for the improvements. I will be able to report on compliance status at Wednesday’s meeting.