TC Council Packet 06-25-2013TOWN OF AVON, COLORADO
AVON TOWN COUNCIL MEETING FOR TUESDAY, JUNE 25, 2013
MEETING BEGINS AT 5:00 PM
AVON TOWN HALL, ONE LAKE STREET
PRESIDING OFFICIALS
MAYOR RICH CARROLL
MAYOR PRO TEM TODD GOULDING
COUNCILORS DAVE DANTAS, CHRIS EVANS, JENNIE FANCHER, ALBERT “BUZ” REYNOLDS, JR., JAKE WOLF
TOWN STAFF
TOWN ATTORNEY: ERIC HEIL TOWN MANAGER: VIRGINIA EGGER TOWN CLERK: PATTY MCKENNY
ALL REGULAR MEETINGS ARE OPEN TO THE PUBLIC EXCEPT EXECUTIVE SESSIONS.
GENERAL COMMENTS ARE WELCOME DURING PUBLIC COMMENT, AND COMMENTS ARE ALSO WELCOME ON ANY AGENDA TOPIC.
PLEASE VIEW AVON’S WEBSITE, HTTP://WWW.AVON.ORG, FOR MEETING AGENDAS AND MATERIALS.
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AND AVON LIBRARY.
THE AVON TOWN COUNCIL MEETS THE 2ND AND 4THTUESDAYS OF EACH MONTH.
______________________________________________________________________________________________________________
1. CALL TO ORDER & ROLL CALL
2. APPROVAL OF AGENDA
3. PUBLIC COMMENT
4. ACTION ITEMS
4.1. Notice of Award for Harry A. Nottingham Park Lake Liner Replacement Project Contract (Justin
Hildreth, Town Engineer)
4.2. Public Hearing on Resolution No. 13-20, Series of 2013, Resolution Approving the 2013 Supplemental
Capital Project Fund Budget Amendment (Justin Hildreth, Town Engineer)
4.3. Ordinance 13-08, An Ordinance Approving the Amended Final Plat, A Replat of Lot 61, Block 2,
Benchmark at Beaver Creek, Town of Avon, Eagle County, Colorado (Justin Hildreth, Town Engineer)
4.4. Action on Sherman & Howard Letter of Engagement for Buffalo Ridge I Affordable Housing Refinance
Transaction (Gerry Flynn, Buffalo Ride Vice-President)
4.5. Minutes from June 11, 2013 Meeting
5. WORK SESSION
5.1. Village at Avon Settlement Update (Eric Heil, Town Attorney)
5.2. Development Concepts for Capital Facilities on Town-Owned Properties: Locations, Funding Plans,
Timeframes, and Public Process, including Community Outreach (Virginia Egger, Town Manager)
5.3. Financial Matters – Report Only (Kelly Huitt, Budget Analyst)
6. COMMITTEE MEETING UPDATES: COUNCILORS AND MAYOR
6.1. CML – Councilor Jake Wolf
7. COUNCIL COMMENTS
8. MAYOR REPORT: FUTURE AGENDA ITEMS
9. EXECUTIVE SESSION
9.1. For the purpose of receiving legal advice pursuant to Colorado Revised Statute §24-6-402(4)(b) related to
settlement matters regarding Town of Avon v Traer Creek Metropolitan District, 2008 CV 0385 and Traer
Creek, LLC, et.al. v Town of Avon 2010 CV 316
10. ADJOURNMENT
PROPOSED AGENDA ITEMS FOR JULY 9, 2013 COUNCIL MEETING: IGA Lease with Eagle County for Use of the I-70 Regional Transportation Facility, Code
Amendments from PZC Recommendation, Kayak Refinance, Appointment of Avon Town Manager to serve on Housing Boards, Economic
Development Report, 2nd Quarter 2013-14 Strategic Plan Report, Comcast Franchise Agreement, Village at Avon Settlement Documents
TOWN COUNCIL REPORT
To: Honorable Mayor and Town Council
From: Justin Hildreth, P.E., Town Engineer
Date: June 19, 2013
Re: Notice of Award, H.A. Nottingham Park Lake Liner Replacement Project
SUMMARY:
The leaks in Benchmark Lake at H.A. Nottingham Park are well documented and have been an issue for
several years. The existing liner’s useful life is approximately 20 years and has been in service for
approximately 32 years. The lake was drained last fall because low flows in the Eagle River and Buck
Creek were not adequate to compensate for lost water from leakage. The lake was filled in May for the
Salute to USA event and XTERRA. The project has been designed and advertised for bid on May 16th,
23rd and 30th. The pre-bid meeting occurred on June 6th and the bid opening was on June 13th, 2013.
Sealed bids were received from 6 contractors and Ewing Construction and Trucking was the low bider in
the amount of $996,248. Staff is recommending that the project be awarded to Ewing Construction and
Trucking in the amount of $996,248.
DISCUSSION:
In response to the Town of Avon’s Advertisement for Bids, six sealed bids were submitted on June 13th,
2013. All six bids were responsive and contained the required 5% bid bond. Table 1 summarizes the
submitted bids:
Table 1: Bid Tabulation
Bidder Amount
Ewing Trucking and Construction $ 966,248
Gould Construction $ 1,500,465
Velocity Constructors $ 1,777,555
American Civil Constructors $ 1,274,780
American West Constructors, LLC $ 1,343,280
Oldcastle SW Group, dba United Co. of Mesa Co $ 1,200,838
The Town of Avon standard contract, approved by the Town Attorney, will be used for the project.
The State Engineer Office regulates dams in the State of Colorado. As part of the review of this project,
they are requiring additional rip-rap and shore protection rock along the lake edge. Traer Creek-RP, LLC
has agreed to allow the Town’s selected contractor to obtain this material from existing stockpiles and
buried sources on Lot 1 in the Village (at Avon). This is saving the Town approximately $40,000 of the
total project cost.
Staff is working with Walking Mountains Science Center on a wetland educational area on the northeast
corner of the lake consisting of a sub-irrigated area promoting wetland vegetation and placement of
Page 2
large boulders for student seating. The additional cost to the project is not expected to be significant,
likely less than $10,000.
SCHEDULE:
The lake will start draining on July 22, 2013. The contractor will mobilize soon after that with the
expectation that it will take a month to fully drain the lake. Most construction will occur in late August,
September and October. The Town is working with the Upper Eagle Regional Authority on options to
refill through the winter in the event there is a call placed on the Eagle River by downstream water right
holders.
FINANCIAL IMPLICATIONS
The existing 2013 budget for the lake liner replacement project includes $50,000 for design services and
$1,250,000 for construction for a total of $1,300,000. The following is a revised proposed budget based
on the bid and Consulting Engineer proposals. The State Engineer’s Office requires that the Design
Engineer supervise construction and certify that the project was constructed as approved. As a result
the construction services budget is higher than typically seen for other projects.
Table 2: Proposed 2013 Budget
Design Services $ 110,000
Construction $ 1,000,000
Construction Services $90,000
Contingency $100,000
Total $ 1,300,000
This project is funded by the Water Fund, of which revenues are generated by Town of Avon water tap
fees and a $3.25 monthly/SFE surcharge on resident’s water bills. The Water Fund has a fund balance
of $2,339,866 at the end of 2012 and therefore has adequate funds for the project.
RECOMMENDATION:
Direct Staff to Award construction contract for the H.A. Nottingham Park Lake Liner Replacement
Project to Ewing Construction in the amount of $966,248 and allow the Town Manager or designee to
approve amendments to the Contract, if within the budget shown in Table 2.
Town Council Report
To: Honorable Mayor Rich Carroll and Avon Town Council
From: Scott Wright, Finance Director
Justin Hildreth P.E., Town Engineer
Date: June 20, 2013
Re: Resolution 13-20, a Resolution to Amend the 2013 Town of Avon Capital Fund
Budget
SUMMARY: Resolution 13-20 amends the 2013 Capital Projects Fund expenditures by
adding new projects that were not contemplated when the budget was drafted last year,
modifying the budgets of projects based on more accurate information, the delaying of
several projects, and the cancellation of projects. Where appropriate revenue allocation are
also amended.
DISCUSSION: The following summarizes changes to the projects:
• IT Server Room HVAC upgrades added to the budget in the amount of $15,000
because of a recent failure of the existing HVAC system needed to properly cool the
room.
• Bus storage building mezzanine office furniture added in the amount of $75,000
because furniture is not an eligible grant expense.
• Forest Service Land Acquisition budget increased by $1,800 to cover some closing
costs.
• Nottingham Park Capital Improvements, 2013 program increased by $35,000 to
$85,000 to include emergency repairs to the tennis courts.
• Stonebridge Deck Repair and Overlay added to the budget in the amount of $50,000.
• 2013 Street Improvement budget increased from $250,000 to $471,533 to include
slurry sealing of residential roads. The current program includes overlaying Beaver
Creek Point and Drawspur Road. The roads that will be slurry sealed include
Saddleridge Loop, Drawspur, Nottingham Road and Metcalf Road.
• US Hwy 6 Trail and Eagle River Pedestrian/Bike Bridge delayed to 2014 because of
complications in acquiring easements. The revenue from the grants was also moved
to the 2014 budget.
• Beaver Creek Overlook Trail Parking Improvements added to the budget in the
amount of $10,000 and consists of 4 pull in parking spaces to serve the West Avon
Preserve Trailhead. These spaces will replace existing parallel parking spaces and will
be located across from Town of Avon property to mitigate the impacts to the
adjacent property owners.
• Nottingham Lake Liner Replacement project revised up to $1,300,000 based on a
construction bid, design costs and a 10% contingency for the work which will
Resolution 13-20, Capital Project Fund 2nd Amendment
June 17, 2013 Page 2 of 2
commence in late summer. The transfer from the Water Fund was also increased
accordingly.
• Digital Ticketing delayed to 2014 because other partner’s must upgrade existing
software system to become compatible with the digital ticketing software.
• Town Facilities Planning was added to the budget in the amount of $30,000. These
funds will be used to help fund consultant expertise, including architectural services,
if needed, in developing a master facilities plan and/or specific schematic plan(s), if
directed by Town Council.
• Parking and Transportation Task Force Study added in anticipation of participation
with representatives from the Village at Avon, Beaver Creek Resort, ECO, and east
Avon parcels in formulating a parking plan from Traer Creek, through Avon to Beaver
Creek and integrated pedestrian, bicycle, transit and vehicular streets, sidewalks and
paths. The Task Force will commence meeting in late July 2013. A total of $50,000
has been recommended.
There is a net decrease in use of funds of $399,492 to the budget. The fund balance at the
end of the year will be $2,552,391, 70% above the minimum fund balance of $1,500,000 for
the Capital Projects Fund.
Modifications to the Capital Projects Fund are focused on 2013 expected expenditures. The
balance of the 5-year program is presented as adopted in late 2012. Consideration, of
changes to the 5-year program, is reflected in Council’s capital facilities planning work
sessions now underway and will ultimately culminate in as a recommendation in the 2014
budget sessions this fall.
Staff is prepared to address questions regarding the proposed projects and schedule and
looks forward to Council's input and direction with respect to this program.
RECOMMENDATION
Staff recommends that Council adopt Resolution 13-20, Series of 2013, a Resolution
Amending the Town of Avon 2013 Capital Projects Fund, as presented.
Attachments:
Exhibit A - Resolution 13-20, Series of 2013, a Resolution Amending the Town of Avon 2013
Capital Projects Fund
Exhibit B – Capital Projects Fund Amendment No. 2
Town of Avon
Resolution No. 13-20
Page 1 of 2
TOWN OF AVON, COLORADO
RESOLUTION NO. 13-20
SERIES OF 2013
A RESOLUTION TO AMEND THE 2013 TOWN OF AVON CAPITAL
PROJECTS FUND BUDGET
A RESOLUTION SUMMARIZING EXPENDITURES AND REVENUES BY
FUND AND AMENDING THE 2013 CAPITAL PROJECTS FUND BUDGET FOR
THE TOWN OF AVON, COLORADO, FOR THE CALENDAR YEAR
BEGINNING ON THE FIRST DAY OF JANUARY, 2013 AND ENDING ON THE
LAST DAY OF DECEMBER, 2013
WHEREAS, the Town Council of the Town of Avon has previously adopted the
2013 Capital Projects Fund budget; and
WHEREAS, the Town Council reviewed the revised estimated revenues and
expenditures for 2013; and
WHEREAS, the Town Council finds it necessary to amend the 2013 Capital
Projects Fund budget to more accurately reflect the revenues and expenditures for 2013;
and
WHEREAS, the Town Council has caused to be published a notice containing
the date and time of a public hearing at which the adoption of the proposed budget
amendment will be considered and a statement that the proposed budget amendment is
available for public inspection at the office of the Town Clerk located in the Avon Town
Hall during normal business hours, and that any interested elector of the Town of Avon
may file any objection to the proposed budget amendment at any time prior to the final
adoption of the proposed budget amendment; and
WHEREAS, whatever increases may have been made in the expenditures, like
increases were added to the revenues so that the budget remains in balance as required by
law.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF
THE TOWN OF AVON, COLORADO:
Section 1. That estimated revenues and expenditures for the Capital Projects
Fund are revised as follows for 2013:
EXHIBIT A
Town of Avon
Resolution No. 13-20
Page 2 of 2
Original or
Previously
Amended
2013 Budget
Current
Proposed
Amended
2013 Budget
Capital Projects Fund
Beginning Fund Balance
Revenues and Other Sources
Expenditures and Other Uses
$ 6,186,560
11,138,973
14,373,650
$ 6,186,560
10,336,973
13,971,142
Ending Fund Balance
$ 2,951,883
$ 2,552,391
Section 2. That the Capital Projects Fund budget, as submitted, amended, and
hereinabove summarized by fund, hereby is approved and adopted as the capital program
budget of the Town of Avon for the year stated above.
Section 3. That the Capital Projects Fund budget as hereby approved and adopted
shall be signed by the Mayor and made part of the public record of the Town.
ADOPTED this 25th day of June, 2013.
TOWN OF AVON, COLORADO
______________________________
Richard Carroll, Mayor
ATTEST:
_____________________________
Patty McKenny
Town Clerk
Page 1
Fund Summary
Original or Proposed
Prev. Amended Revised Difference
Actual Budget Budget Increase
2012 2013 2013 (Decrease)
REVENUES
Taxes 1,707,648$ 1,500,000$ 1,500,000$ -$
Intergovernmental 1,707,114 8,372,473 7,520,473 (852,000)
Investment Earnings 11,018 15,000 15,000 -
Other Revenue 693 1,500 1,500 -
Total Operating Revenues 3,426,473 9,888,973 9,036,973 (852,000)
Other Sources:
Transfer In from Other Funds 648,274 1,250,000 1,300,000 50,000
Total Other Sources 648,274 1,250,000 1,300,000 50,000
TOTAL REVENUES 4,074,747 11,138,973 10,336,973 (802,000)
EXPENDITURES
Capital Improvements:
Facilities 3,110,537 9,013,307 9,103,307 90,000
Land and Land Improvements 575 1,050,000 1,086,800 36,800
Roads and Streets 230,403 1,144,000 531,533 (612,467)
Utilities 43,521 55,000 55,000 -
Water Fund Projects 648,274 1,250,000 1,300,000 50,000
Communications and Technology - 139,106 92,265 (46,841)
Strategic Planning - 780,000 860,000 80,000
Total Capital Improvements 4,033,310 13,431,413 13,028,905 (402,508)
Other Uses
Operating Transfer-Out - General Fund 217,204 227,571 227,571 -
Operating Transfer-Out - Debt Service Fund 710,594 714,666 714,666 -
Total Other Uses 927,798 942,237 942,237 -
TOTAL EXPENDITURES 4,961,108 14,373,650 13,971,142 (402,508)
NET SOURCE (USE) OF FUNDS (886,361) (3,234,677) (3,634,169) (399,492)
FUND BALANCE, Beginning of Year 7,072,921 6,186,560 6,186,560 -
FUND BALANCE, End of Year 6,186,560$ 2,951,883$ 2,552,391$ (399,492)$
Capital Projects Fund #41
Amendment No. 2
EXHIBIT B
Page 2
Revenue Detail
Original or Proposed
Prev. Amended Revised Difference
Account Actual Budget Budget Increase
Number Description 2012 2013 2013 (Decrease)
Taxes:
51401 Real Estate Transfer Tax 1,707,648$ 1,500,000$ 1,500,000$ -$
Intergovernmental:
Federal / State:
53150 FTA 90 SGR Grant 1,118,012 6,360,876 6,360,876 -
53151 FTA 84 BBF Grant 155,342 - - -
53152 FTA / CDOT ARRA Grant - 523,000 523,000 -
53153 FHWA / CDOT Hwy 6 Trail Project - 355,000 - (355,000)
53205 CDOT FASTER Grant 414,403 586,597 586,597 -
53202 GOCO Grant - Eagle River Pedestrian/Bike Bridge - 497,000 - (497,000)
53299 State of Colorado Historical Grant (Water Wheel)19,357 - - -
Local Government / Other:
53402 Eagle County Trails Grant - 50,000 50,000 -
53000 Total Intergovernmental 1,707,114 8,372,473 7,520,473 (852,000)
Investment Earnings:
57101 Interest Earnings 11,018 15,000 15,000 -
Other Revenues:
58104 Fireplace Fees - 1,500 1,500 -
58999 Nonclassifed 693 - - -
58000 Total Other Revenues 693 1,500 1,500 -
Other Sources:
59201 Transfer In from Water Fund 648,274 1,250,000 1,300,000 50,000
59000 Total Other Sources 648,274 1,250,000 1,300,000 50,000
50000 TOTAL REVENUES 4,074,747$ 11,138,973$ 10,336,973$ (802,000)$
Capital Projects Fund #41
Amendment No. 2
EXHIBIT B
Page 3
(1)(2)(3)(4)(1+2+4)
Proposed Revised
2011 and Current Revised Estimated Difference
Account Prior Actual Budget Budget Project-to-Date Increase
Number Description Actuals 2012 2013 2013 Expenditures Current Proposed (Decrease)
CAPITAL IMPROVEMENT PROJECTS
Facilities:
General Government Facilities:
New IT Server Room HVAC Upgrades -$ -$ -$ 15,000$ 15,000$ -$ 15,000$ 15,000$ To Be Completed - 2013
I70 Transit / PW Facilities Improvement Project:
13004 Non-Grant Eligible Design 17,815 - - - 17,815 17,815 17,815 - Completed - 2011
13005 Public Works Facilities (On Site & Lot 5)5,262 400,347 238,865 238,865 644,474 644,474 644,474 - To Be Completed - 2013
13007 Final Design / Engineering Services (Grant #84)385,761 73,393 - - 459,154 459,153 459,153 - Completed - 2012
13008 Final Design / Engineering Services (Grant #90)27,553 650,817 414,742 414,742 1,093,112 1,093,112 1,093,112 - To Be Completed - 2013
13009 Transit Facility Construction (Grant #90)- 1,325,508 6,956,380 6,956,380 8,281,888 8,281,888 8,281,888 - To Be Completed - 2013
13010 Transit Facility Construction (FASTER Grant)- 575,560 795,320 795,320 1,370,880 1,370,880 1,370,880 - To Be Completed - 2013
13011 Transit Facility Construction (ARRA Grant)- - 523,000 523,000 523,000 523,000 523,000 - To Be Completed - 2013
New Mezzanine Office Furniture - - - 75,000 75,000 - 75,000 75,000 To Be Completed - 2013
Transportation Facilities:
14005 Fuel Spill Cleanup - 84,912 5,000 5,000 89,912 89,912 89,912 - Completed - 2013
Cultural and Recreational Facilities:
15008 Rec. Center EPDM Replacement - - 80,000 80,000 80,000 80,000 80,000 - To Be Completed - 2013
Land and Land Improvements:
21009 Forest Service Land Acquisition 28,796 575 1,000,000 1,001,800 1,031,171 1,029,371 1,031,171 1,800 Completed - 2013
21015 Nottingham Park Capital Improvements - 2013 Program - - 50,000 85,000 85,000 50,000 85,000 35,000 To Be Completed - 2013
Roads and Streets:
Annual Street Improvements:
New Stonebridge Deck Repair and Overlay - - - 50,000 50,000 - 50,000 50,000 To Be Completed - 2013
Annual Street Improvements:
33012 2012 Paving/Road Improvements - 230,369 - - 230,369 230,369 230,369 - Completed - 2012
33013 2013 Paving/Road Improvements - - 250,000 471,533 471,533 250,000 471,533 221,533 To Be Completed - 2013
Project Expenditures
Total Project Budget
CIP Projects Inventory
Capital Projects Fund #41
Amendment No. 2
EXHIBIT B
Page 4
(1)(2)(3)(4)(1+2+4)
Proposed Revised
2011 and Current Revised Estimated Difference
Account Prior Actual Budget Budget Project-to-Date Increase
Number Description Actuals 2012 2013 2013 Expenditures Current Proposed (Decrease)
CAPITAL IMPROVEMENT PROJECTS
Project Expenditures
Total Project Budget
CIP Projects Inventory
Capital Projects Fund #41
Amendment No. 2
Multi-Modal/Alternative Mobility:
34015 US Hwy 6 Trail Project: Avon Rd. - Stonebridge - 34 - - 34 1,652,000 1,652,000 - To Be Completed - 2014
34016 US Hwy 6 Trail Project: Avon Rd. - Stonebridge - - - - - 100,000 100,000 - To Be Completed - 2015
34017 US Hwy 6 Eagle River Ped./Bike Bridge (GOCO)- - 894,000 - - 894,000 894,000 - To Be Completed - 2014
New Beaver Creek Overlook Trail Improvements - - - 10,000 10,000 - 10,000 10,000 To Be Completed - 2013
Utilities:
Waste Heat Recovery Project
41003 Heat Recovery Construction 3,784,442 13,521 - - 3,797,963 3,833,746 3,833,746 - Completed - 2012
41004 Heat Recovery Expansion Study - 30,000 - - 30,000 30,000 30,000 - Completed - 2012
41005 Heat Recovery Mall Expansion Design - - 55,000 55,000 55,000 55,000 55,000 - To Be Completed - 2013
41006 Heat Recovery Mall Expansion Construction - - - - - 350,000 350,000 - To Be Completed - 2014
Water Fund Projects:
61006 Metcalf Road Drainage 287,343 638,297 - - 925,640 925,640 925,640 - Completed - 2012
61010 Nottingham Lake Liner Replacement - 9,977 1,250,000 1,300,000 1,309,977 1,300,000 1,300,000 - To Be Completed - 2013
Communications and Technology:
81005 Paperless Packets - - 26,950 26,950 26,950 26,950 26,950 - To Be Completed - 2013
81006 UHF Radio System and Repeater - - 34,800 34,800 34,800 34,800 34,800 - To Be Completed - 2013
81007 Security Camera System Upgrade - - 45,515 30,515 30,515 45,515 30,515 (15,000) To Be Completed - 2013
81008 Digital Ticketing - - 31,841 - - 31,841 60,000 28,159 To Be Completed - 2014
Strategic Planning:
Planning and Consulting:
71050 Economic Development - - 750,000 750,000 750,000 750,000 750,000 - Ongoing
79108 Feasibility Study - Town Center West Lots B & C - - 30,000 30,000 30,000 30,000 30,000 - To Be Completed - 2013
New Town Facilities Planning Study - - - 30,000 30,000 - 30,000 30,000 To Be Completed - 2014
New Parking and Transportation Study - - - 50,000 50,000 - 50,000 50,000 To Be Completed - 2013
Total Capital Improvement Projects 4,536,972$ 4,033,310$ 13,431,413$ 13,028,905$ 21,599,187$ 24,179,466$ 24,680,958$ 501,492$
EXHIBIT B
Town Council Report
To: Honorable Mayor and Town Council
From: Justin Hildreth, P.E., Town Engineer
Date: June 20, 2013
Re: Ordinance No. 13-08, An Ordinance Approving the Amended Final Plat, A Replat
of Lot 61, Block 2, Benchmark at Beaver Creek, Town of Avon, Eagle County,
Colorado
Discussion: The Applicant, Wyndham Vacation Resorts, Inc. (“Applicant”) has submitted a Final
Plat for Lot 61, Block 2, Benchmark at Beaver Creek Subdivision. This Final Plat vacates two 7.5-
feet wide drainage and utility easements on the perimeter of the property to accommodate the
approved development. Also, the Final Plat will adjust the west property line by 16.38 Feet thus
narrowing lettuce Shed Lane from 50 FT to 33.62 FT wide. The adjusted property line is two Feet
east of the pedestrian sidewalk for Lettuce Shed Lane as agreed upon in Section 5.3 of the
Development Agreement adopted by Ordinance 13-03 on February 26, 2013.
Previous Town Council Action: Town Council approved Ordinance 13-03, Series 2013, An
Ordinance Approving a Rezoning Application from the Planned Unit Development (PUD) Zone
District to the Town Center (TC) Zone District, for Lot 1, A Resubdivision of Lot 61, Block 2,
Benchmark at Beaver Creek, Town of Avon, Eagle County; Approving a Major Development Plan
Application; and Approving a Alternative Equivalent Compliance Application, Approving a
Development Agreement for “Wyndham –Lot 61”, Located on Lot 1, a Resubidivision of Lot 61,
Block 2, Benchmark at Beaver Creek.
Recommendation: Based on provisions of 7.16.070 and other applicable sections of Title 7, Avon
Municipal Code, Staff recommends approval of Ordinance 13-08, Series 2013, An Ordinance
Approving the Amended Final Plat, A Replat of Lot 61, Block 2, Benchmark at Beaver Creek, Town
of Avon, Eagle County, Colorado subject to completion of technical corrections identified by
Staff.
Attachments
Exhibit A – Ordinance 13-08
Exhibit B – Amended Final Plat, A Replace of Lot 61, Block 2, Benchmark at Beaver Creek, Town of
Avon, Eagle County, Colorado
TOWN OF AVON, COLORADO
ORDINANCE 13-08
SERIES OF 2013
AN ORDINANCE APPROVING AN AMENDED FINAL PLAT, A REPLAT OF LOT 61,
BLOCK 2, BENCHMARK AT BEAVER CREEK
WHEREAS, pursuant to C.R.S. §42-4-303 and pursuant to the home rule powers of the
Town of Avon, the Town Council may by ordinance vacate any roadway or a part thereof;
WHEREAS, on February 10, 2004 the Town Council approved Resolution No. 04-05, Series
2004, A Resolution Approving the Final Plat, A Replat of Lot 61, Block 2 Benchmark at Beaver
Creek and Resolution No. 04-06, Series 2004, A Resolution Approving the Preliminary Plan and
Final Plat for A Resubdivison of Lot 61, Block 2, Benchmark at Beaver Creek;
WHEREAS, on October 14, 2008 the Town Council approved Resolution No. 08-35, Series
2008, A Resolution Vacating a Final Plat, a Resubdivision of a Replat of Lot 61, Block 2,
Benchmark at Beaver Creek;
WHEREAS, the Applicant submitted an application for a Final Plat Major Subdivision
(“Application”) to the Town’s Community Development Department on May 21, 2013 for a
replat of Lot 61;
WHEREAS, the Town Council of the Town of Avon held a public hearing on July 9 , 2013
after posting notice as required by law, considered all comments, testimony, evidence and staff
reports provided by the Town staff prior to taking any action on the Application;
WHEREAS, the Town Council finds approval of the Application is in compliance with the
mandatory review criteria for Final Plat Major Subdivision found in Avon Municipal Code
Section 7.16.070(f); and,
WHEREAS, approval of this Ordinance on first reading is intended only to confirm that the
Town Council desires to comply with state law, the Avon home rule charter and the Avon
Development Code by setting a public hearing in order to provide the public an opportunity to
present testimony and evidence regarding the application and that approval of this Ordinance on
first reading does not constitute a representation that the Town Council, or any member of the
Town Council, supports, approves, rejects, or denies the proposed zoning or other matters in this
Ordinances.
NOW THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE
TOWN OF AVON, COLORADO:
Section 1. Recitals Incorporated. The above and foregoing recitals are incorporated herein
by reference and adopted as findings and determinations of the Town Council.
EXHIBIT A
Section 2. Approval of Replat. The Amended Final Plat, A Replat of Lot 61, Block 2,
Benchmark at Beaver Creek, Town of Avon, Eagle County, Colorado, is hereby approved by the
Town of Avon subject to the condition that all utility providers accept the Amended Final Plat
provided before the Amended Final Plat is executed by the Town and recorded.
Section 3. Vacation of a Portion of Benchmark Court. The vacation of a portion of
Benchmark Court as indicated on the Amended Final Plat, A Replat of Lot 61, Block 2,
Benchmark at Beaver Creek, Town of Avon, Eagle County, Colorado is hereby approved by
Town Council.
Section 4. Correction of Errors. Town Staff is authorized to insert proper dates, references
to recording information and make similar changes, and to correct any typographical,
grammatical, cross-reference, or other errors which may be discovered in any documents
associated with this Ordinance and documents approved by this Ordinance provided that such
corrections do not change the substantive terms and provisions of such documents.
Section 5. Severability. If any provision of this Ordinance, or the application of such
provision to any person or circumstance, is for any reason held to be invalid, such invalidity shall
not affect other provisions or applications of this Ordinance which can be given effect without
the invalid provision or application, and to this end the provisions of this Ordinance are declared
to be severable. The Town Council hereby declares that it would have passed this Ordinance and
each provision thereof, even though any one of the provisions might be declared unconstitutional
or invalid. As used in this Section, the term “provision” means and includes any part, division,
subdivision, section, subsection, sentence, clause or phrase; the term “application” means and
includes an application of an ordinance or any part thereof, whether considered or construed
alone or together with another ordinance or ordinances, or part thereof, of the Town.
Section 6. Effective Date. This Ordinance shall take effect thirty days after final adoption in
accordance with Section 6.4 of the Avon Home Rule Charter.
Section 7. Safety Clause. The Town Council hereby finds, determines and declares that this
Ordinance is promulgated under the general police power of the Town of Avon, that it is
promulgated for the health, safety and welfare of the public, and that this Ordinance is necessary
for the preservation of health and safety and for the protection of public convenience and
welfare. The Town Council further determines that the Ordinance bears a rational relation to the
proper legislative object sought to be obtained.
Section 8. Publication by Posting. The Town Clerk is ordered to publish this Ordinance by
posting notice of adoption of this Ordinance on final reading by title at the Avon Town Hall,
Avon Recreation Center and Avon Public Library, which notice shall contain a statement that a
copy of the ordinance in full is available for public inspection in the office of the Town Clerk
during normal business hours. The Town Clerk is further ordered to publish a notice stating a
vested property right has been created in accordance with Section. 7.16.140(d)(2) of the Avon
Municipal Code.
EXHIBIT A
INTRODUCED, APPROVED, PASSED ON FIRST READING, ORDERED POSTED
AND REFERRED TO PUBLIC HEARING and setting such Public Hearing for 5:30 p.m. on
July 9, 2013 at the Council Chambers of the Avon Municipal Building, located at One Lake
Street, Avon, Colorado.
____________________________
Rich Carroll, Mayor
Published by posting in at least three (3) public places in Town and posting by title only at the
office of the Town Clerk at least six (6) days prior to final action by the Town Council.
ATTEST: APPROVED AS TO FORM:
____________________________ ____________________________
Patty McKenny, Town Clerk Eric Heil, Town Attorney
INTRODUCED, FINALLY APPROVED, AND PASSED ON SECOND READING, AND
ORDERED PUBLISHED BY POSTING on July 9, 2013.
____________________________
Rich Carroll, Mayor
Published by posting by title in at least three (3) public places in Town and posting by title only
at the office of the Town Clerk.
ATTEST:
__________________________
Patty McKenny, Town Clerk
EXHIBIT A
AM
E
N
D
E
D
F
I
N
A
L
P
L
A
T
A
R
E
P
L
A
T
O
F
L
O
T
6
1
,
B
L
O
C
K
2
TO
W
N
O
F
A
V
O
N
,
E
A
G
L
E
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MARCIN ENGINEERING LLC
BE
N
C
H
M
A
R
K
A
T
B
E
A
V
E
R
C
R
E
E
K
EX
H
I
B
I
T
B
MARCIN ENGINEERING LLC
AM
E
N
D
E
D
F
I
N
A
L
P
L
A
T
A
R
E
P
L
A
T
O
F
L
O
T
6
1
,
B
L
O
C
K
2
BE
N
C
H
M
A
R
K
A
T
B
E
A
V
E
R
C
R
E
E
K
TO
W
N
O
F
A
V
O
N
,
E
A
G
L
E
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
EX
H
I
B
I
T
B
TOWN OF AVON, COLORADO
AVON REGULAR MEETING MINUTES FOR TUESDAY, JUNE 11, 2013
AVON TOWN HALL, ONE LAKE STREET
Avon Council Meeting 13.06.11.Minutes
Page 1
1. CALL TO ORDER & ROLL CALL
Mayor Carroll called the meeting to order at 5:05 PM. A roll call was taken and Council members present
were Dave Dantas, Jennie Fancher, Todd Goulding, Buz Reynolds and Jake Wolf. Also present were Town
Manager Virginia Egger, Town Attorney Eric Heil, Deputy Town Clerk Debbie Hoppe, Finance Director Scott
Wright, Senior Planner Matt Pielsticker and Planner II Jared Barnes, Town Engineer Justin Hildreth, as well as
other staff members and the public. Councilor Chris Evans and Asst. Town Manager/Town Clerk Patty
McKenny arrived after roll call.
2. APPROVAL OF AGENDA
There were no changes to the agenda.
3. EXECUTIVE SESSION
At 5:05 pm Mayor Carroll moved to convene to an Executive Session to discuss the following:
a. For the purpose of receiving legal advice pursuant to Colorado Revised Statute §24-6-402(4)(b)
related to settlement matters regarding Town of Avon v Traer Creek Metropolitan District, 2008 CV 0385
and Traer Creek, LLC, et.al. v Town of Avon 2010 CV 316
The motion was seconded by Councilor Reynolds and the members met in Executive Session. Mayor Carroll
noted that the discussion would be confined only to the purposes of the executive session as stated above
and that if at any time during the executive session anyone believes that the discussion does not concern the
topic and purpose of the executive session, to please raise your objection immediately. The following
people were present during the executive session: Mayor Rich Carroll, Councilor Dave Dantas, Councilor
Chris Evans, Councilor Jennie Fancher, Mayor Pro Tem Todd Goulding, Councilor Buz Reynolds, Councilor
Jake Wolf, Town Manager Virginia Egger, Town Attorney Eric Heil, Finance Director Scott Wright. Town
Engineer Justin Hildreth, Town Clerk/Asst. Town Manager Patty McKenny. Town Attorney Eric Heil noted
that this executive session was for the purpose of providing legal advice on specific legal questions, and
requested that the Town Clerk cease recording the executive session at this time.
Mayor Carroll noted that the executive session adjourned at 6:10 PM and the meeting was now reconvened
in regular session. He asked if any Town Council member believed that any discussion in executive session
was inappropriate and not related to the topic and purpose of the executive session to please state the
objections at this time; there were no objections.
4. AVON URBAN RENEWAL AUTHORITY (SEE URA MINUTES)
5. AVON LIQUOR AUTHORITY MEETING (SEE LIQUOR AUTHORITY MINUTES)
6. AVON TOWN COUNCIL TO RECONVENE AT 6:00 P.M. OR AS SOON THEREAFTER AS POSSIBLE
7. PUBLIC COMMENT
Lee Rimel & Tess Christensen from Volunteers for Outdoor Colorado addressed the council with regard
to a request for volunteers to help with a new trail construction on the new West Avon Preserve open
space parcel. The community was invited to attend this weekend to construct the trail.
TOWN OF AVON, COLORADO
AVON REGULAR MEETING MINUTES FOR TUESDAY, JUNE 11, 2013
AVON TOWN HALL, ONE LAKE STREET
Avon Council Meeting 13.06.11.Minutes
Page 2
8. ACTION ITEMS
8.1. Letter of Agreement for a $7,500 Contribution to the Vail Leadership Institute in support of the
Entrepreneurs BaseCamp (Patty McKenny, Assistant Town Manager)
The Letter of Agreement with Vail Leadership Institute was presented as a manner in which the Town
of Avon could support the new educational initiative called the Entrepreneurs Basecamp with seed
funding. Currently the group is proposed to move to the Avon Season’s Building. It was noted there
were no budget ramifications since the funding was included in the 2013 budget but through an
investment type structure. After some discussion, Mayor Pro Tem Goulding moved to approve the
Letter of Agreement with the Vail Leadership Institute with funding support of $7,500; Councilor
Reynolds seconded the motion and it passed unanimously.
8.2. Public Hearing on Second Reading of Ordinance 13-06, Series of 2013, An Ordinance Approving a
Final PUD Amendment for Brookside Park Lot 1, Brookside Park PUD, Eaglewood Subdivision,
Town of Avon, Eagle County, Colorado (Jared Barnes, Planner II)
There was nothing additional to the Brookside Park PUD application; Rick Pyleman, representing the
applicant Riverview Park Associates, was present to answer questions. Mayor Carroll opened the
public hearing, no comments were made, the hearing was closed. Councilor Evans moved to approve
Ordinance 13-06, Series of 2013, An Ordinance Approving a Final PUD Amendment for Brookside Park
Lot 1, Brookside Park PUD, Eaglewood Subdivision, Town of Avon, Eagle County, Colorado. Councilor
Dantas seconded the motion and it passed unanimously.
8.3.Public Hearing on Second Reading of Ordinance 13-07, Series of 2013, An Ordinance Approving a
Minor PUD Amendment for June Creek Corner on Lot 25, Block 2, Wildridge Subdivision, Town
of Avon, Eagle County, Colorado (Matt Pielsticker, Senior Planner)
There were a couple of conditions included in the Ordinance for the second reading for the June Creek
Corner Minor PUD Amendment submitted by George Plavec, as follows:
1) the building footprints limited to 3,600 gross sq. ft (including garage)
2) building separation will be at least fifteen feet (15’) between structures
Mayor Carroll opened the public hearing, no comments were made, the hearing was closed. Councilor
Dantas moved to approve Ordinance 13-07, Series of 2013, An Ordinance Approving a Minor PUD
Amendment for June Creek Corner on Lot 25, Block 2, Wildridge Subdivision, Town of Avon, Eagle
County, Colorado. Councilor Evans seconded the motion and it passed unanimously.
8.4. Public Hearing on Resolution No. 13-19, A Resolution to amend the 2013 Town of Avon Budget
(Kelly Huitt, Budget Analyst)
There was a review of the supplemental budget amendment with highlights presented on the General
Fund, the Transit Enterprise Fund, the Fleet Maintenance Enterprise Fund, and the Equipment
Replacement Fund. Mayor Carroll opened the public hearing, no comments were made, the hearing
was closed. Councilor Evans moved to approve Resolution No. 13-19, A Resolution to amend the 2013
Town of Avon Budget; Councilor Fancher seconded the motion and it passed unanimously.
TOWN OF AVON, COLORADO
AVON REGULAR MEETING MINUTES FOR TUESDAY, JUNE 11, 2013
AVON TOWN HALL, ONE LAKE STREET
Avon Council Meeting 13.06.11.Minutes
Page 3
8.5.Action on Fee Waiver for Garden Fencing in Wildridge (Jared Barnes, Planner II)
There was some discussion about how to move forward with this topic and consensus was to create a
short term and long term approach as well as solution. After some discussion, Councilor Evans moved
to keep the approval process in place per the Avon Municipal Code Chapter 7.28 with regard to Avon’s
Design Guidelines, but ask that the town waive the fee which is allowed for in Chapter 7.05.100 as a
way to work with the neighbors who just want to erect a fence for gardening purposes. Councilor
Fancher seconded the motion and it passed unanimously. Staff was directed to suggest alternate
approaches to processing this type of request with a future code amendment.
8.6. Approval of Minutes from May 28, 2013
Councilor Evans moved to approve the May 28, 2013 minutes; Mayor Pro Tem Goulding seconded the
motion and it passed unanimously.
9. WORK SESSION
9.1. Discussion about Eaglebend Dowd Affordable Housing Corporation (Kayak Crossing) Proposed
Multifamily Revenue Bond Refinancing (Gerry Flynn, Polar Star Properties)
Councilor Evans stepped down from the Council at this time due to a conflict of interest as his spouse
currently serves as a Board member. Gerry Flynn, Polar Star Property, presented a list of topics to
address with the Town Council as follows:
The current financial situation of the project
The nonprofit structure of EDAHC
The parameters of the refinancing proposal
The formal request to refinance the bonds
EBDAHC would pay for legal review of the refinancing documents ((to be completed by Sherman &
Howard)
There were some questions and discussion around the long term condition of the property, what kinds
of capital items would be completed in the future, the terms of the financing as well as some historical
performance operations information related to leasing, type of units, market needs, and finally
information about the subordinate debt ramifications. It was noted that final documents would be
presented either at the June 25th or July 9th meeting.
9.2. Discussion in regards to filling Town of Avon Board of Director vacancy for the Buffalo Ridge
Affordable Housing Corporation, EagleBend Affordable Housing Corporation and Eaglebend
Dowd Affordable Housing Corporation (Kayak Crossing ) (Patty McKenny, Assistant Town
Manager)
There was some discussion and at this time there was Council consensus to review this matter in
August.
9.3. Council Review and Direction on Recommended 2014 Budget Process and 5 Year Capital
Improvement Program, including Scheduling of Council Retreat(s) (Virginia Egger, Town
Manager)
There was discussion surrounding the proposed 2014 budget schedule and process per the council
packet information. Council provided some input to the schedule and process with general agreement
TOWN OF AVON, COLORADO
AVON REGULAR MEETING MINUTES FOR TUESDAY, JUNE 11, 2013
AVON TOWN HALL, ONE LAKE STREET
Avon Council Meeting 13.06.11.Minutes
Page 4
on the information that was presented. There was consensus to schedule a budget retreat on August
13th and not include a special meeting on September 18th. There was some discussion about getting
community input on town services from both residents & businesses.
10. VILLAGE AT AVON
10.1. Settlement Update (Eric Heil, Town Attorney)
The memo outlining the settlement update was reviewed and included updates on the status
conferences wth the court, the water tank bids, the snow storage agreement and other documents.
10.2. Resolution No. 13-18, Series of 2013, A Resolution approving several documents related to The
Village (at Avon) Litigation settlement, including: the Access Easement Agreement; the Wet
Well Easement Agreement; the Raw Water Special Warranty Deed; the Raw Water System
Operations and Maintenance Agreement; the Amended and Restated Nottingham Dam
Easement and Assignment Agreement; the Special Warranty Deed for Tract G, Filing 3; the Bill
of Sale for the Nottingham Gulch Storm Sewer; and the Bill of Sale for the Nottingham Gulch
Energy Dissipater
There was a review and discussion of the numerous documents included with Resolution No. 13-18.
Councilor Evans moved to approve Resolution No. 13-18, Series of 2013, A Resolution approving several
documents related to The Village (at Avon) Litigation settlement, including: the
a. Access Easement Agreement as Exhibit A; accepting all language except the utilities wording
which would be revised to include the right to install communication utilities within the
easement area
b. the Wet Well Easement Agreement as Exhibit B
c. the Raw Water Special Warranty Deed as Exhibit C
d. the Raw Water System Operations and Maintenance Agreement as Exhibit D
e. the Amended and Restated Nottingham Dam Easement and Assignment Agreement as Exhibit
E; this agreement was not to be included with this resolution
f. the Special Warranty Deed for Tract G, Filing 3 as Exhibit F
g. the Bill of Sale for the Nottingham Gulch Storm Sewer as Exhibit G
h. the Bill of Sale for the Nottingham Gulch Energy Dissipater as Exhibit H
There was an amendment to the motion that included providing the Mayor authorization to make any
minor changes with the Town Attorney regarding this resolution. Mayor Pro Tem Goulding seconded
the motion as well as the amendment and it passed unanimously.
11. COMMITTEE MEETING UPDATES: COUNCILORS AND MAYOR
Mayor Carroll spoke about the EGE Air Alliance continued effort to raise funding for their program.
12. COUNCIL COMMENTS
Councilor Wolfe spoke about summer kid’s music camps he is sponsoring that are held at State
Bridge.
TOWN OF AVON, COLORADO
AVON REGULAR MEETING MINUTES FOR TUESDAY, JUNE 11, 2013
AVON TOWN HALL, ONE LAKE STREET
Avon Council Meeting 13.06.11.Minutes
Page 5
There being no further business to come before the Council, the regular meeting adjourned at 9:20 PM.
RESPECTFULLY SUBMITTED:
_________________________________
Patty McKenny, Town Clerk
APPROVED:
Rich Carroll ________________________________
Dave Dantas ________________________________
Chris Evans ________________________________
Jennie Fancher ________________________________
Todd Goulding ________________________________
Albert “Buz” Reynolds ________________________________
Jake Wolf ________________________________
Heil Law & Planning, LLC Office: 303.975.6120
2696 South Colorado Blvd., Suite 550 Fax: 720.836.3337
Denver, CO 80222 E-Mail: eric@heillaw.com e-mail: ericheillaw@yahoo.com
H EIL L AW
TO: Honorable Mayor Carroll and Town Council Members
FROM: Eric J. Heil, Town Attorney
RE: Village (at Avon) Settlement Implementation Update
DATE: June 21, 2013
Summary: This memorandum provides an update on the settlement implementation for the Village (at
Avon) litigation.
Bond Issuance: Kutak Rock, the bond counsel for the 2013 Bond Reissue, was not able to complete its
review and provide an opinion in time for a June 27, 2013 Bond Closing; therefore, the closing has been
pushed back to July. The parties are continuing to work on revising documents so that The Village
Metropolitan District can issue the 2013 Bond Refinancing as tax-exempt bonds. Although the parties have
agreed in concept, the mechanics of revising documents to properly assign revenues to The Village
Metropolitan District presents complications in order to satisfy BNP, the bond counsel providing an opinion
that the issue qualifies for tax exempt bonds, and the goals of the Master Developer and both metropolitan
districts regarding the use of future revenues. The proposed revisions to document should not affect in any
manner the priority and use of Tax Credits and PIC Fee revenues as set forth in the Development
Agreement. Attached is a letter submitted to BNP Paribas stating the Town’s position and preference for a
tax-exempt bond issuance.
Status Conference with Court: Status Conferences were held on Thursday, June 13 and Thursday, June
20, 2013. The discussion has focused on the parties efforts to revise documents to authorize The Village
Metropolitan District to issue tax-exempt bonds in lieu of Traer Creek Metropolitan District.
Water Tank Bids: The Upper Eagle River Water Authority received three bids for the water tank
construction and is currently reviewing the bids. There are outstanding issues concerning the cost of
enhancements to a retaining wall and costs for removal of dirt which is not within the current budget.
Remaining Documents for Town Approval: Documents which may come back to Council with additional
revisions for approval include: (1) Nottingham Dam Easement Agreement, (2) Revocable License
Agreement for Snow Storage, and (3) the Partial Assignment of Roadway Easements.
Requested Action: No Council action is requested at this time.
Thank you, Eric
M EMORANDUM
& PLANNING, LLC
HEIL LAW & PLANNING, LLC OFFICE: 303.975.6120
2696 SOUTH COLORADO BLVD., SUITE 550 FAX: 720.836.3337
DENVER, CO 80222 E-MAIL: ERIC@HEILLAW.COM E-MAIL: ERICHEILLAW@YAHOO.COM
HEIL LAW
June 17, 2013
Brandee Caswell
VIA E-Mail: Brandee.Caswell@faegrebd.com
RE: Village (at Avon) Settlement
Dear Brandee,
This letter follows-up with our discussion last Friday, June 14, 2013 with regard to implementation of
the Village (at Avon) litigation settlement. The Settlement Term Sheet approved by the Avon Town Council
in November of 2011 was based in part on Traer Creek Metropolitan District refinancing the current bonds
with a tax-exempt refinancing bond. Due to the recent ruling by the IRS of the Village Center development
in Florida, Traer Creek Metropolitan District is not able to gain a bond counsel opinion that it can issue tax-
exempt bonds. The Town endorses and supports the option of The Village Metropolitan District issuing the
refinancing bonds to implement the bond refinancing terms of the Settlement Term Sheet. The Town has
significant concerns over the viability of a taxable bond issuance by Traer Creek Metropolitan District. The
Town would consider the option of a taxable bond issuance by Traer Creek Metropolitan District as a
material change to the terms of the Settlement Term Sheet that would result in additional cost to the Town
over the course of the refinancing bond repayment and extended duration of the Town’s tax credit
obligation.
On behalf of the Town, I urge BNP to support the bond refinancing with a tax-exempt bond issuance by
The Village Metropolitan District. I further urge BNP to execute the Notice of Implementation today and
exercise all available efforts to move this process to closing on June 27, 2013 as previously scheduled. If
the Notice of Implementation is executed and delivered today, the Avon Town Council will proceed to
schedule a special meeting on or prior to June 24, 2013 to consider an emergency ordinance approving
revisions to the Development Agreement and any other documents requiring Town’s approval related to
properly authorizing The Village Metropolitan District to be the issuer of tax-exempt bonds for the bond
refinancing.
As always, please contact me if you have any questions or wish to discuss this matter.
Best regards,
Eric J. Heil, Esq., A.I.C.P.
Cc: Munsey Ayers
Kathy Kanda
Dee Wisor
Avon Town Council and Virginia Egger, Town Manager
ERIC J. HEIL, ESQ., A.I.C.P., OWNER
MEREDITH VAN HORN, ESQ., ASSOCIATE
& PLANNING LLC
DEVELOPMENT CONCEPTS
FOR CAPITAL FACILITIES ON TOWN‐
OWNED PROPERTIES
TOWN COUNCIL WORK SESSION
JUNE 25, 2012
Prepared by:
Justin Hildreth, Town Engineer
Matt Pielsticker, Senior Planner
Jared Barnes, Planner II
Scott Wright, Finance Director
Virginia Egger, Town Manager
SOURCES
Town of Avon Comprehensive Plan, February 2006
Master Plan for Harry A. Nottingham Park, November 2008
Avon West Town Center District Investment Plan, August 2007
East Town Center Avon District Plan, May 2008
Town of Avon Comprehensive Transportation Plan, October 2009
DEVELOPMENT CONCEPTS FOR CAPITAL FACILITIES
ON TOWN‐OWNED PROPERTIES
‐TABLE OF CONTENTS‐
Section 1: Overview & Purpose of Work Session (Virginia Egger, Town Manager)
Section 2: Master Plan Options: Town Facilities Site Options (Jared Barnes, Planner II)
2.1 Three Options for the Location of Town Facilities on Town Property
2.1.1 Option 1 – Town Hall – Relocate Fire Station Site
2.1.2 Option 2 – Town Hall – Co‐locate with Library on Nottingham Lake
2.1.3 Option 3 – Town Hall – Co‐locate with Recreation Center Phase 2
2.2 Fire Station & Library Leases Summary (Virginia Egger, Town Manager)
Section 3: Funding Scenario: Option 2 & 2015 World Championships Improvements (Virginia Egger, Town
Manager)
Section 4: Recreation Expansion – Phase 2
4.1 Bonding Program (Scott Wright, Finance Director)
4.1.1 Summary & Analysis of Bonding Revenues & Source, including timing and capitalized interest
4.1.2 Schedule for November 2013 Ballot
4.2 Summary of 1996 Proposed Programs & Town Surveys (Virginia Egger, Town Manager)
4.3 Estimated Cost of Construction ‐ Based on 1996 cost of Construction Estimate & Gypsum Facility (Jared
Barnes, Planner II &Justin Hildreth, Town Engineer)
4.4 Draft Schedule of Program Development, Design & Construction (Justin Hildreth, Town Engineer)
4.5 Ice Rink Options (Joe Histed, Parks Supervisor)
4.6 Artificial Turf Assessment (Joe Histed, Parks Supervisor)
Section 5: Town Hall Relocation
5.1 Bonding Options (Scott Wright, Finance Director)
5.1.1 Summary & Analysis of Bonding Revenues & Source
5.1.2 Schedule and process for approving Certificates of Participation
5.2 Estimated square footage needs & cost of construction (Justin Hildreth, Town Engineer)
Section 6: Mall Improvements
6.1 Bonding Options (Scott Wright, Finance Director)
6.1.1 Summary & Analysis of Bonding Revenues & Source
6.1.2 Schedule and process for approving an URA Refinancing and additional funds
6.2 Program Description and Estimated Cost for a Pedestrian Mall
(Matt Pielsticker, Senior Planner & Justin Hildreth, Town Engineer)
6.3 Heat Recovery Capacity Options (Justin Hildreth, Town Engineer)
Section 7: Parking Lot/Garage Space Estimates (Justin Hildreth, Town Engineer)
Section 8: Public Process & Procedures
8.1 Planning and Zoning Commission and Public Outreach (Matt Pielsticker, Senior Planner)
8.2 2013 Community Survey (Virginia Egger, Town Manager)
SECTION 1
Section 1: Overview & Purpose of Work Session
MAY 28TH TOWN COUNCIL WORK SESSION SUMMARY
On May 28th, Town Council met in a Work Session and did a site walk with the purpose of reviewing:
Planning concepts for the development of Town‐owned properties;
A preliminary update of Capital Projects Fund improvements expenditures to implement the Wyndham
Mall construction ; other projects tied to the 2015 Alpine World Championships; and, implementation of
special event venues as a key element in attracting, retaining and growing a diverse event calendar; and
The preliminary update of the Capital Projects Funds revenue projections, including the Town’s available
debt funding capacity utilizing existing revenue streams.
While no definite decisions were made or needed to be made at the meeting, Town Council provided direction on
three Town‐owned parcels:
Lot 5 and Swift Gulch should not be considered for location of Town Hall services, but be utilized for
transit, fleet, parks and road and bridge operations. It is important to keep “Town Hall” in the core
of Avon.
The Main Street project should be developed as a pedestrian way and not planned for vehicles, in the
near future.
In addition, Council did not give strong support to a co‐location of Town Hall with other general purpose
governments on sites outside of the core downtown area.
Town Council, during the Work Session, asked for additional information on a number of key planning elements,
including, but not limited to:
1. Parking capacity should be estimated for the current Fire Station/Library and Town sites;
2. Feasibility of locating Town Hall on top of the Recreation Center and as a co‐location with the Library on
Nottingham Lake; and validate leases;
3. Modify improvements of the Mall project, including Lettuce Shed Lane, as a pedestrian only use and
identify nodes and improvements.
4. Expand information on Phase 2 Expansion of the Recreation Center, including program, costs and
opportunities for management with WECMR or Eagle‐Vail Metro Districts;
5. Provide more detail on artificial turf and ice rink options;
6. Develop bonding schedules and timeframes to advance the master planning and implementation of a
facilities on Town‐owned property in the Core; and
7. Feasibility of widening the Railroad Bridge for a pedestrian and/or trolley lane should be assessed.
JUNE 25TH WORK SESSION MATERIALS
Town staff has prepared the following set of documents to begin addressing Council’s requested information.
Several new details have evolved from the work:
1. If the Phase 2 Recreation Center Expansion proceeds, the heat recovery generation capacity is not
sufficient to meet the needs of the Phase 2 Expansion and snowmelt of the Mall, including Avon Station
and Lettuce Shed Lane. The use of the surplus heat from the recovery system at the Recreation Center is
Page 1 of 30
SECTION 1
preferable: 1) low infrastructure costs for implementation, and 2) the system is most efficient when in
continual demand versus for a more sporadic use such as snowmelt. Snowmelt of Mall areas and Avon
Station, if desired, should be studied as taps onto existing natural gas service lines in the area.
2. Refinancing of the URA bonds and gaining additional net funds cannot be done until the County Assessor
issues the preliminary Assessed Valuation for the Town. This is provided on or about August 23rd. A
bond issue, with URA increment monies, can be extended to 2032 versus 2028, providing additional
revenue, however, a 1.25 times coverage would be required.
3. The development of the Mall from the Recreation Center to Benchmark Road, as a pedestrian way, with
replacement of the asphalt and more simplified augments, including landscaping and placement of Avon
Road bronzes and benches is estimated to cost $1,982,000.
WORK SESSION OUTCOMES
The June 25th Work Session is a follow‐up discussion on Town‐owned properties and development opportunities.
What is time sensitive is whether Town Council wants to consider a ballot issue in November for either:
1. Extension of the 3.027 mills for use in a Phase 2 Recreation Center expansion and other park
improvements, including design, with the actual bond date to be determined as a function of capitalized
interest costs, and possible small additional mill levy for on‐going utilities and maintenance funding;
2. While not required, a vote on issuing Certificates of Participation (COP) supported by existing revenues
for use for a Town Hall design and construction. COPs may be issued at any time under the granted
authorities to Colorado municipalities, but if Council wants voter approval, a question may only be posed
in November of each year.
If there is interest in pursuing a question in November, then work on preparing scope, costs, community
outreach and term needs to commence now.
A final determination on how to proceed with mall improvements must be made by October 1st.
Information is provided in this document to help Council consider its next steps in reaching these decisions and
other directives in continuing work on this development program.
Page 2 of 30
Section 2.1: Summary of Town Facilities Options
This section discusses the various options for development concepts of Town Facilities. The following
table (Table 1 – Town Facilities Site Options) overviews three options within the Town Core and
highlights the different uses for each option. Furthermore, each option is detailed with pros and cons
and includes a map for reference.
TABLE 1
TOWN FACILITIES SITE OPTIONS
Current Uses OPTION 1 OPTION 2 OPTION 3
Town Hall Parking Lot/Garage/Police Library/Town Hall Parking Lot/Garage
Cabin Parking Lot/Garage/Police Library/Town Hall Cabin
Parks Shop
Parking Lot/Garage/Police
* Relocate Parks Dept. to
Rec Center/Parking
Garage/Swift Gulch/Lot 5
Library/Town Hall
* Relocate Parks Dept.
to Rec Center/Parking
Garage/Swift Gulch/Lot 5
Parks Shop and Parking
Lot/Garage
Pumphouse Pumphouse and Stage Area Pumphouse and Stage
Area
Stage
(relocate or renovate
pumphouse)
Playground Playground Stage Area (alternative
location)
Playground or Stage
(alternative location)
Restrooms Restrooms Restrooms/Playground
relocated near here
Restrooms/Playground
relocated near here
Recreation Center Phase 2 expansion Phase 2 expansion Recreation - Phase 2 &
Town Hall
Ice Rink
(Ice slab on athletic field
also being evaluated)
In front of Rec
Center/Summer is
playing/activity field
In front of Rec
Center/Summer is
playing/activity field
In front of Rec
Center/Summer is
playing/activity field
Recreation Field Recreation Field: sports &
concerts
Recreation Field: sports
& concerts
Recreation Field: sports
& concerts
Fire Station Town Hall Parking Lot/Garage Surface parking lot
Library Library Parking Lot/Garage Library
Lake Street Open except for special
events
Open except for special
events
Open except for special
events
Page 3 of 30
2.1.1: Option 1 – Town Hall Relocate – Town-owned Fire Station Site
Option 1 is predicated on the relocation of the existing Fire Station to its new site along Nottingham
Road.
• The Fire Station relocation allows for Town Hall to be constructed on the site, next to the Library.
• The Library will remain in its location, but may be expanded upon.
• A multi-level parking structure on the existing Town Hall site with temporary surface parking.
• A conference area; multi-use performance space could be constructed on top of the parking garage.
• Relocation of the existing Parks maintenance building and cabin for additional parking.
• The playground will remain in its current location and can be replaced and improved.
• The restrooms on the north side of the upper field will also remain, but can be modernized.
• The Recreation Center Phase II expansion can proceed to the north of the existing Recreation Center.
• An ice rink can be constructed in front of the Recreation Center. During summer months this area can
transition to a hard surface for events and outdoor programming.
Pros:
• A new Town Hall being constructed next to the existing library centralizes civic facility locations and
may provide opportunities for the sharing of reception, restroom, and conference facilities in the
design of Town Hall and potential renovation of the Library.
• Maximizes staff efficiency with proximity to the Recreation Center and Mall.
• The potential for 2-3 indoor special event spaces: Recreation Center gymnasium as multi-use space;
Town Hall multi-use meeting/special event space and top of parking garage special event space.
• Shared maintenance operations.
• The location of a parking structure on the existing Town Hall site will serve as a parking and loading
facility for daily park uses, special events, and concerts at the stage.
• Ability to construct more parking than Option 2, at less cost per space.
• Location immediately adjacent to special events venue.
• Proximity to the gondola.
• Parking can begin as surface, with a parking garage being constructed later.
Cons:
• The location of a parking structure on the existing Town Hall site will be located farther away from
what is acknowledged as a generally acceptable walking distance from the Westin Gondola for skier
parking.
• The option will require coordination from both the Eagle River Fire Protection District (ERFPD) and
Eagle Valley Library District (EVLD) on coordinating building designs, financing, and relocations.
• Site may be too limited to meet the full square footage needs of Town Hall.
• Visual impact of parking structure from park users.
Page 4 of 30
Page 5 of 30
2.1.2: Option 2 – Town Hall – Co-locate with Library on Nottingham Lake
Option 2 is also predicated on the relocation of the Fire Station, but instead of locating a new building on
this site, this option:
• Places a multi-level parking structure on where the current Fire Station and Library structures sit.
• New Library and Town Hall separate or joint facility on the current Town Hall/Parking/Parks
Maintenance/Cabin site.
• Stage Area located next to Pump House with an alternative location on the existing playground
site.
• The playground will remain in its current location if the stage is located next to the Pump House
or it can be replaced and relocated to the existing restrooms site.
• The restrooms on the north side of the upper field will also remain or be relocated depending on
the location of the stage, but can be modernized in either location.
• The Recreation Center Phase II expansion can proceed to the north of the existing Recreation
Center.
• An ice rink can be constructed in front of the Recreation Center. During summer months this
area can transition to a hard surface for events and outdoor programming.
Pros:
• The separate Town Hall and Library building has the potential to increase the number of
conference rooms or multi-functional spaces for greater event planning.
• A joint Town Hall and Library building has the potential to share reception, restroom and
conference facilities thus requiring less space for each building.
• The relocation of the Library building will not require additional collaboration with the ERFPD and
is not contingent on the relocation of the Fire Station.
• The existing library building site can become a surface parking lot and is scalable once the ERFPD
relocates their station, then scalable into a parking structure as funds permit.
• The location of the parking structure on this site is located within a generally acceptable walking
distance from the Westin Gondola for skier parking.
• Aesthetic appeal of library patrons overlooking Nottingham Lake.
• The alternative stage location may reduce noise impact on adjacent properties
• Could provide less visual impact on the lake as viewed from the upper field and Lake Street.
• Better experience for concert viewers on lawn.
Cons:
• The separate Town Hall and Library building will not allow for the sharing of reception, restroom,
and conference facilities thus requiring more space for each building.
• The timing of construction of a parking structure and maximization of temporary surface parking
is contingent on ERFPD’s relocation of the fire station.
Page 6 of 30
Page 7 of 30
2.1.3: Option 3 – Town Hall – Co-locate with Recreation Center Phase II
Option 3 does not require as much coordination with the ERFPD as no Town facility will be located on
their existing site, but this option includes:
• Town Hall will be relocated to the existing parking lot to the east of the Recreation Center or the
second level of the Recreation Center expansion.
• A multi-level parking structure on the existing Town Hall site with temporary surface parking.
• Stage Area located next to Pump House with an alternative location on the existing playground site.
• The playground will remain in its current location if the stage is located next to the Pump House or it
can be replaced and relocated to the existing restrooms site.
• The restrooms on the north side of the upper field will also remain or be relocated depending on the
location of the stage, but can be modernized in either location.
• The Recreation Center Phase II expansion can proceed to the north of the existing Recreation Center.
• An ice rink can be constructed in front of the Recreation Center. During summer months this area can
transition to a hard surface for events and outdoor programming.
• The existing Parks maintenance building and cabin remain.
• Once the Fire Station relocates, its site can become surface parking and part of a Library expansion.
Pros:
• The Town Hall located adjacent to or on top of the Rec Center, will allow the Town Hall and Recreation
Center to share offices and multi-use spaces for programming and special events.
• Maximizes staff efficiency with proximity to the Recreation Center and Mall.
• The Library building will be allowed to expand and will have the potential for a greater footprint by
utilizing the Fire Station Site.
• The location of a parking structure on the existing Town Hall site will serve as a parking and loading
facility for daily park uses, special events, and concerts at the stage.
• The alternative stage location may reduce noise impact on adjacent properties as well as provide less
visual impact on the lake as viewed from the upper field and Lake Street.
• Ability to construct more parking than option 2, at less cost per space.
• Location immediately adjacent to special events venue.
Cons:
• The separate Town Hall and Library building will not allow for the sharing of reception, restroom, and
conference facilities thus requiring more space for each building.
• The location of Town Hall on top of the Recreation Center expansion can be problem-some for ADA
and court due to the increase reliance on elevators.
• The location of a parking structure on the existing Town Hall site will be located further than a
generally acceptable walking distance from the Westin Gondola for skier parking.
• The Town Hall location will remove existing parking for the Recreation Center and will require use of
the Park Structure for all parking services.
• Visual impact of parking structure from park users.
Page 8 of 30
Page 9 of 30
Section 2.2: Fire Station & Library Lease Summary
Eagle County Library – Avon
The Agreement between Town of Avon and Eagle Valley Library District was finalized
December 14, 1993.
The Agreement provides for a ground lease term of 99 years. The Agreement provides for
modifications in writing by both parties.
A Lease Between The Town of Avon, State of Colorado and the Eagle Valley Library District was
signed on July 13, 2004 and, in addition stating the lease term of January 1, 1994 through
January 1, 2093. The Lease provides for modifications in writing by both parties.
Eagle River Fire Protection District – Avon Station
The Avon Fire Station Intergovernmental Lease Agreement was signed on August 24, 2004.
The Lease is for up to 99 years; either party may terminate the Lease upon written notice,
“which termination shall thereupon become effective at the end of 60 days following the
date of proper notice”.
If the District no longer utilizes the Fire Station property for fire protection purpose, the
lease terminates and all right revert to the Town.
Page 10 of 30
SECTION 3
Section 3: Funding Scenario: Option 2 & 2015 World Championships Improvements
FUNDING SCENARIO for OPTION 2 FACILITY LOCATIONS
5‐YEAR CAPITAL IMPROVEMENT PROGRAM
WITH LONG TERM FINANCING
1. Maintain a Capital Project Fund Balance of $1,500,000 or more.
2. Implement 5‐year Street Pavement Prevention Program for residential and rural roads to extend the life
of the pavements beginning in 2013. Accelerate core asphalt repair schedule for deteriorated street
sections.
3. Discontinue Nottingham Lake as a winter ice skating venue; develop a slab/boards surface on the athletic
field or in front of the Recreation Center.
4. 2015 Alpine World Championships: Plan in the 2014 Budget for the following Capital Project Fund
Improvements:
o Pedestrian Mall URA & Capital Projects Fund $ 325,000
o Heat Recovery ‐ Mall Capital Projects Fund $ 350,000
o Recreation Center Shower Remodel Capital Projects Fund $ 100,000
o Recreation Water Slide Replacement Facilities Reserve Fund $ 100,000
o Improve RR Bridge Façade Capital Projects Fund $ 75,000
o Welcome to Avon Monument Capital Projects Fund $ 100,000
o Avon Road Streetscape Improvements Capital Projects Fund $ 200,000
o Transit Stop Improvements Capital Projects Fund $ 75,000
o Rubber Tired Trolley/East West Capital Projects Fund $ 180,000
Connection on Benchmark Road
o Parking Structure Funded through Public‐Private Partnership
Page 11 of 30
SECTION 3
5. Projects – Long‐Term Financing:
NOTE: Cost Estimates are only best ranges for this preliminary session.
BOND RECEIPTS AND USES
1999 Revenue Bonds
RETT for COPs GO BONDs URA Refunding
AVAILABLE FUNDS $6.3 ‐ 7.7 M $8.4 ‐ 10.8 $1.1 @ 1.25x
PROCEEDS SPENT IN SCENARIO 7,740,000 10,600,000 1,100,000
USES
Capital Projects
Fund
Town Hall 20,000@200 & 800,000 Site Costs 4,800,000 207,000
‐ Multi‐Purpose "Theatre" Costs 700,000 675,000
‐ 34 x 24 tension membrane tent 400,000
Recreation Center
Expansion/Refurbishment/Multi‐use "Theatre"
costs 8,925,000
Playground Equipment 770,000
Restrooms Remodel 275,000
Upper Athletic Field Remodel 350,000
Pump House Remodel 50,000
Ice Rink 230,000
Seasons Pedestrian Mall/Lettuce Shed
Lane/Park Connection: TOTAL FROM TWO
FUNDING SOURCES 1,982,000
TOTAL 5,900,000 10,600,000 1,982,000
Page 12 of 30
SECTION 4
Section 4.1.1: Summary & Analysis of Bonding Revenues
The Town’s only General Obligation (GO) bond will be paid off in 2016. Currently, for 2013, the mill
rate is 3.027 mills and generates $546,132 in property taxes based on a net assessed value of
$180,420,250. The concept for funding Phase 2 of the Avon Recreation Center relies on the concept
of presenting a ballot question to the voters that would allow the Town to continue to levy this tax.
The bonding capacity of the bond issue would total $10.850 million and would provide a total of
$10.671 million in project funds available, based on current interest rates and a thirty‐year maturity.
Bond authorization could be granted by the voters as early as November, 2013. In order to avoid
having to provide for capitalized interest, the bonds would be dated December 1, 2016. Earlier
issuance is possible, but capitalized interest will reduce the funds available for construction by
approximately $260,000 per year.
SOURCES AND USES OF FUNDS
Town of Avon, Colorado
General Obligation Bonds, Series 2016 (30 Yrs)
Preliminary
AA‐ MMD as of May 7, 2013
Dated Date 12/01/2016
Delivery Date 12/01/2016
Sources:
Bond Proceeds:
Par Amount $ 10,850,000
Net Original Issue Discount ‐784
10,849,216
Uses:
Project Fund Deposits:
Project Fund $ 10,670,716
Delivery Date Expenses:
Cost of Issuance 70,000
Underwriter's Discount 108,500
178,500
$ 10,849,216
Page 13 of 30
SECTION 4
Section 4.1.2: Schedule for November 2103 Ballot
$10,850,000*
Town of Avon, Colorado
General Obligation Bonds, Series 2013
Draft Election Timetable, as of June 2013
AUGUST 2013 SEPTEMBER 2013
S M T W T F S S M T W T F S
1 2 3 1 2 3 4 5 6 7
4 5 6 7 8 9 10 8 9 10 11 12 13 14
11 12 13 14 15 16 17 15 16 17 18 19 20 21
18 19 20 21 22 23 24 22 23 24 25 26 27 28
25 26 27 28 29 30 31 29 30
OCTOBER 2013 NOVEMBER 2013
S M T W T F S S M T W T F S
1 2 3 4 5 1 2
6 7 8 9 10 11 12 3 4 5 6 7 8 9
13 14 15 16 17 18 19 10 11 12 13 14 15 16
20 21 22 23 24 25 26 17 18 19 20 21 22 23
27 28 29 30 31 24 25 26 27 28 29 30
31
Date Event Responsibility
Prior to
8/27/13
Council adopts resolution calling the election and setting forth the
questions
A/BC
8/27/13 IGA with County approved A/BC
9/6/13 Clerk certifies ballot content to County Clerk A
9/20/13 Last day for pro and con comments to be filed for TABOR notice All
9/24/13 Town Clerk provides TABOR notice to County Clerk A/BC
10/4/13 TABOR notice is mailed A
10/16/13 Notice with financial information is posted on Town’s Web site A
11/5/13 Election day A
A ‐ Town of Avon, Staff and Consultants
BC ‐ Bond Counsel and Disclosure Counsel (Sherman & Howard)
UW ‐ Underwriter (Piper Jaffray & Co)
Page 14 of 30
SECTION 4
Section 4.2: Summary of 1996 Proposed Programs & Town Surveys
PHASE 2 ‐ 1996 PROPOSED
PROGRAM
SQ FT
GYMNASIUM 17,874
CLIMBING WALL 2,900
RAQUETBALL/SQUASH 5,574
MEETING ROOMS (3) 4,763
MEETING ROOM 905
BASE BUILDING 8,751
TOTAL PHASE 2
BUILDING 40,767
AVON RECREATION DISTRICT COMMUNITY SURVEY, JUNE 2012
The survey, conducted by Intercept Insight, focused on current program satisfaction offered at the
Recreation Center, in addition to the types of special events the responders would like to see
happening in Avon. Of note, in terms of Phase 2 Rec Center expansion, the responders, who were all
users of the Rec Center, provided these insights:
Those who use the Vail Recreation District do so mostly for the ice arena, Nordic center and
mountain bike series.
Those who use WECRMD do so mostly for the Field House, the pool and the youth sports
programs.
Overall satisfaction with the Avon Recreation Center is 4.1, with 5.0 being the highest level of
satisfaction.
2008 TOWN OF AVON COMMUNITY SURVEY
The purpose of this survey was to gain input from the community on key issues facing the Town.
Homeowners, local and second, plus local residents identified through the voter registration list
received the survey.
There was one question regarding where a respondent would first spend $100: Enhancement of the
parks and trails, local affordable housing opportunities and stimulate the local economy were the
top three uses of the money, followed by Rec Center expansion. Acquire open space and police
protections were the last in priority, respectively.
When asked directly, 50% of local homeowners, 40% of second homeowners and 46.8% from the
voter list favored Rec Center expansion.
Page 15 of 30
SECTION 4
Section 4.3: Recreation Center Phase 2 Expansion –Estimated Cost of Construction
1996 PROGRAM & CONSTRUCTION ESTIMATE
Architectural Resource Consultants from Boulder prepared a Construction Cost Estimate for the
Avon Recreation Center Phase II in July, 1996
The program, totaling 40,767 square feet, included:
Gymnasium
Climbing wall
Racquetball/squash courts
Four meeting rooms
Costs were calculated as follows:
PHASE 2 – 1996 CONSTRUCTION COST ESTIMATE
SQ. FT. PER SF TOTAL
GYMNASIUM 17,874 $122.59 $2,191,162.00
CLIMBING WALL 2,900 $133.57 $387,319.00
RAQUETBALL/SQUASH 5,574 $91.54 $510,219.00
MEETING ROOMS (3) 4,763 $102.32 $487,199.00
MEETING ROOM 905 $195.90 $177,272.00
BASE BUILDING 8,751 $187.28 $1,638,883.00
TOTAL PHASE 2 BUILDING 40,767 $5,392,054.00
AVERAGE $138.87
PARKING SCHEME 1 ‐ SURFACE LAKE
STREET NA NA $509,318.00
PARKING SCHEME 2 ‐ GARAGE LAKE
STREET 22,561 $135.51 $3,057,221
PARKING SCHEME 3 ‐ UNDER PHASE 2 29,575 $74.19 $2,194,070
2013 Cost Estimate for the same program:
Utilizing data from Engineering News‐Record, a well‐respected construction journal, shows a
construction cost increase of 70% since 1996, raising costs for the Phase 2 Building to $9,166,492.
RSMeans Online is a web‐based service that provides up‐to‐date cost information yields an estimated
cost for the Phase 2 building at $8,000,000, with site costs rounded to $1,000,000.
The Gypsum Recreation Center’s cost of construction for its building, including gymnasium, was
$12,000,000, in 2006. The building is 57,000 square feet, and also includes an indoor gymnastics
center, 26 foot climbing pinnacle, climbing grotto, gymnasium, indoor track and indoor pool.
Page 16 of 30
SECTION 4
Section 4.4: Draft Schedule of Program Development, Design, Construction, & Survey
June 25th
August 13th
June 28th
July 9th
July 16th
August 9th
August 27thLast day to pass Resolution (See Section 4.1.2)August 26th
November 5th Election Day: If Successful
November 12thBond Market Situational Analysis
Dec ‐ April, 2015
March ‐ April
May ‐ July
July ‐ OctoberPreliminary Design and Cost Estimate
Nov ‐ DecFinal Design, Draft Bid Documents
Jan ‐ MarchAdvertise for Bid and Award Bid
April, 2015
Nov‐16
Comple Construction and Ribbon
Cutting Ceremony
Development of Program Elements with Public ‐ Rec, Comm Dev, Engineering staff
Commence Construction on Phase 2 (Other Improvements will be done in Summer, 2014
Council Sub‐Committee Finalization of
Questions
Solicit and Retain Design Fi rm
Schematic Design, includes public charettes ‐ Utilize 1996 Conceptual Design Schemes as practicable
‐ Other Uses of Funds: Playground Equipment,
Restrooms/Athletic Field/ Pump House Remodels,
Ice Rink‐Summer Field
Complete Telephone Field Work
Draft Responses and Analysis
Decision to prepare for a November Ballot Issue
‐ Estimated O&M subsidy for Phase 2, if needed
‐ Estimated Phase 2 Square Footage & Cost based
upon 1996 Adjusted Estimate
Review Ballot Question: Resolution calling the
Election & Setting Forth Question to extend mill
levy for specific uses: Adopt or set meeting for
Execute Consultant Agreement for
Telephone Community Survey Work
TELEPHONE COMMUNITY PHONE SURVEY
SCHEDULE
Council Review of
Questions/Instrument Design
June 25th
August 13th
June 28th
July 9th
July 16th
August 9th
August 27thLast day to pass Resolution (See Section 4.1.2)August 26th
November 5th Election Day: If Successful
November 12thBond Market Situational Analysis
Dec ‐ April, 2015
March ‐ April
May ‐ July
July ‐ OctoberPreliminary Design and Cost Estimate
Nov ‐ DecFinal Design, Draft Bid Documents
Jan ‐ MarchAdvertise for Bid and Award Bid
April, 2015
Nov‐16
Comple Construction and Ribbon
Cutting Ceremony
Development of Program Elements with Public ‐ Rec, Comm Dev, Engineering staff
Commence Construction on Phase 2 (Other Improvements will be done in Summer, 2014
Council Sub‐Committee Finalization of
Questions
Solicit and Retain Design Fi rm
Schematic Design, includes public charettes ‐ Utilize 1996 Conceptual Design Schemes as practicable
‐ Other Uses of Funds: Playground Equipment,
Restrooms/Athletic Field/ Pump House Remodels,
Ice Rink‐Summer Field
Complete Telephone Field Work
Draft Responses and Analysis
Decision to prepare for a November Ballot Issue
‐ Estimated O&M subsidy for Phase 2, if needed
‐ Estimated Phase 2 Square Footage & Cost based
upon 1996 Adjusted Estimate
Review Ballot Question: Resolution calling the
Election & Setting Forth Question to extend mill
levy for specific uses: Adopt or set meeting for
Execute Consultant Agreement for
Telephone Community Survey Work
TELEPHONE COMMUNITY PHONE SURVEY
SCHEDULE
Council Review of
Questions/Instrument Design
Page 17 of 30
SECTION 4
Section 4.5: Ice Rink Options
Nottingham Lake is no longer considered a viable option for an ice rink due to variable winter
conditions, on‐going safety concerns, and overall higher maintenance costs. Staff is in the process of
evaluating the feasibility of using the main athletic field during winter months for an ice rink. For the
purpose of this Work Session, the reprogramming of the area in the front (west side) of the
Recreation Center was assessed in more detail.
Approximate location and dimensions of Ice Rink & Turf Activity Field
A portable ice rink wall system was priced out for a 140’ x 64’ rink, with 20’ radius corners. The
panels themselves would be 42” high x 8” wide. The panels would be constructed with molded UV
stabilized polyethylene, and secured together. Price for this type of wall system is $22,000. The cost
for artificial turf in the green highlighted area above is approximately $100,000 (based on $6/per SF).
Included some demolition work and grading, the total project cost for this area is $230,000.
Example of ProWall ™ Portable Wall System installation
Page 18 of 30
SECTION 5
Section 5.1.1: Summary & Analysis of Bonding Revenues
The Town’s Series 1999 Revenue Refunding Bonds will mature in 2014. The annual debt service on
these bonds is approximately $450,000 and is currently paid out of the Capital Projects Fund. Prior
to the recession and Village at Avon lawsuit, the debt service was paid out of the General Fund with
sales tax revenues.
Financing the possible relocation and construction of a new Town Hall comes from the idea of
continuing to utilize this current debt service payment in order to leverage the issuance of
Certificates of Participation (COPs). COPs may be authorized by the Town Council without a vote
and the bonds could be issued as early as 2014. The bonding capacity of the COP’s issue are
estimated to be $8.010 million with a total of $7.740 million in project funds available, based on
current interest rates and a thirty‐year maturity. The process for approval and issuance of COP’s is
approximately 3 months. One advantage of the COP issuance is that it can be timed around the need
of the Town and bond markets and not to a November election.
SOURCES AND USES OF FUNDS
Town of Avon, Colorado
Certificates of Participation, Series 2014
*************************************************** Preliminary
Bank Qualified A Rated Rates as of May 17, 2013
***************************************************
Dated Date 06/01/2014
Delivery Date 06/01/2014
Sources:
Bond Proceeds:
Par Amount $8,010,000
Net Premium 31,083
8,041,083
Uses:
Project Fund Deposits:
Project Fund 7,740,745
Other Fund Deposits:
Capitalized Interest Fund 150,237
Delivery Date Expenses:
Cost of Issuance 70,000
Underwriter’s Discount 80,100
$8,041,083
Page 19 of 30
SECTION 5
Section 5.1.2: Timeline for Issuance of Certificates of Participation
$8,010,000
Town of Avon, Colorado
Certificates of Participation, Series 2014
Draft Timetable, as of June 2013
MARCH 2014 APRIL 2014
S M T W T F S S M T W T F S
1 1 2 3 4 5
2 3 4 5 6 7 8 6 7 8 9 10 11 12
9 10 11 12 13 14 15 13 14 15 16 17 18 19
16 17 18 19 20 21 22 20 21 22 23 24 25 26
23 24 25 26 27 28 29 27 28 29 30
30 31
Date Event Responsibility
3/11/14 Council Update on Refunding and New Money Plan A
3/17/14 Kick‐Off Conference Call All
3/18/14 Begin Legal Document/POS Preparation BC
3/25/14 First Reading of the Ordinance A
4/2/14 First Draft of Legal Documents Distributed BC
4/7/14 First Document Review Session All
4/11/14 Revised Legal and Offering Documents Distributed BC
4/16/14 Second Document Review Session (if necessary) All
4/18/14 Send Documents to Rating Agencies BC/UW
4/25/14 Ratings Calls with Ratings Agencies (estimated) A/UW
4/29/14 Second Reading of the Ordinance A
5/2/14 Receive Ratings and Insurance Quote UW
5/6/14 Post POS BC
5/13/14 Market COPs
CPA Signed
UW
A
5/15/14 Final OS Distributed for Comments BC
5/16/14 Final OS Printed and Distributed
MAY 2014 JUNE 2014
S M T W T F S S M T W T F S
1 2 3 1 2 3 4 5 6 7
4 5 6 7 8 9 10 8 9 10 11 12 13 14
11 12 13 14 15 16 17 15 16 17 18 19 20 21
18 19 20 21 22 23 24 22 23 24 25 26 27 28
25 26 27 28 29 30 31 29 30
Page 20 of 30
SECTION 5
Date Event Responsibility
5/21/14 Closing Documents Distributed
Comments Back to Bond Counsel on OS
All
5/27/14 Final Closing Documents Distributed All
6/3/14 Closing All
A ‐ Town of Avon, Staff and Consultants
BC ‐ Bond Counsel and Disclosure Counsel (Sherman & Howard)
UW ‐ Underwriter (Piper Jaffray & Co)
Page 21 of 30
SECTION 5
Section 5.2: Town Hall Relocation, Estimate Needs and Cost of Construction
The existing Town Hall is 18,000 SF, houses approximately 45 employees including the following
Departments: Administration, Community Development, Engineering, Finance and Police. A 20,000
SF Town Hall could comfortably accommodate 55 to 60 employees, the most that Town Hall will
need to house at build‐out for the Town. Construction costs for a new Town Hall facility are
estimated to be approximately $175/per SF; therefore a 20,000 SF Town Hall (with a 20% contingency)
would cost $4,800,000.
Page 22 of 30
SECTION 6
Section 6.1.1: Summary & Analysis of URA Refinancing and New Bond Revenues
The following funding summary is based on previous discussions with Jonathan Heroux from
Piper Jaffray after reviewing the annual debt service parameters and legal documents for the
call features on the existing Vectra Bank loan.
The funding scenario on the next page refinances the current 2009 Vectra Bank variable rate
loan to a fixed rate, and adds “new money” in the amount of $1,225 million at the same time.
This would generate approximately $1.1 million for the Mall Improvements project fund. The
assumption driving the amount of new money available is that a lender will want or expect a
1.25 times debt service coverage in case future assessed values fluctuated, as they have in
recent years.
The present value savings from refunding the existing debt is projected to be approximately
$625,436 or 9.935%. The typical level for evaluating the effectiveness of a refunding is in the
3%‐5% range.
Page 23 of 30
SECTION 6
Page 24 of 30
SECTION 6
Section 6.1.2: Schedule for URA Refinancing and Additional Funding
7,665,000
Town of Avon, Colorado, Urban Renewal Authority
Fixed Rate Bank Loan Placement, Series 2013
Draft Timetable of Events ‐ As of June 2013
JULY 2013 AUGUST 2013
S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3
7 8 9 10 11 12 13 4 5 6 7 8 9 10
14 15 16 17 18 19 20 11 12 13 14 15 16 17
21 22 23 24 25 26 27 18 19 20 21 22 23 24
28 29 30 25 26 27 28 29 30 31
SEPTEMBER 2013 OCTOBER 2013
S M T W T F S S M T W T F S
1 2 3 4 5 6 7 1 2 3 4 5
8 9 10 11 12 13 14 6 7 8 9 10 11 12
15 16 17 18 19 20 21 13 14 15 16 17 18 19
22 23 24 25 26 27 28 20 21 22 23 24 25 26
29 30 27 28 29 30 31
DATE
EVENT
RESPONSIBLE
PARTY
June/July Create Term Sheet on Transaction A, PA
June/July Complete TIF Model Update FC
8/23/13 Preliminary AV Received
8/26/13 Town Directs PA to Begin Soliciting Interest in Transaction and Approves
Term Sheet
A
8/27/13 Term Sheet Distributed to Potential Investors PA
9/12/13 Receive Feedback and Level of Interest PA
9/17/13 Lender Selected PA
9/24/13 First Draft of Documents Distributed to Working Group and Lender A, BC
9/27/13 Conference Call to Review Comments on Legal Documents All
10/3/13 Revised Legal Documents Re‐Distributed to Working Group and Investor BC
10/8/13 First Reading of URA Resolution A
10/23/13 Pre‐Closing All
10/24/13 Closing and Delivery of Proceeds All
A = Town of Avon
BC = Bond Counsel (Sherman & Howard)
PA = Placement Agent (Piper Jaffray)
FC = Financial Consultant (Stan Bernstein)
Page 25 of 30
SECTION 6
Section 6.2: Program Description & Estimated Cost for Pedestrian Mall
MALL AREAS ESTIMATED COST
WYNDHAM MALL AREA
Design as a passive gathering area; limit amount of hardscape to allow time for uses to develop;
consider kid amenity here such as large rocks325,000$
Heat Recovery Snowmelt, if not allocated to Recreation Center Expansion. Funded with
Community Enhancement Funds from Hol y Cross Energy 350,000$
TOTAL WYNDHAM MALL AREA 675,000$
CONNECTING SIDEWALK‐ WYNDHAM MALL TO AVON ROAD ‐ 12'125,000$
LETTUCE SHED LANE PATH INTERSECTION NODE
With added area from Wyndham building set ‐back, design as place for music & gathering, include
fire pit; work with adjoining business in partnership to expand gathering area ‐ may be more
desireable than Wyndham Mall area for events/music due to less noise and adjoining business
opportunities; place bronze and benches from Avon Rd.176,000$
LETTUCE SHED LANE
Design with slight curve in walkway to provide for at least two areas for seating or vendor.
Decide if mural is an acce ptable use for the wall/work with businesses. Snowmelt system.206,000$
SEASONS PEDESTRIAN MALL
Improve by: add landscaping along parking lots to improve defined space and block view; remove
some trees/vegetation to improve ability to see down the corridor; redesign Prater Lane Pre‐
School to eliminate interference into Mall by increasing length of play area. Add bronzes and
benches from Avon Road to create areas of interest and seating. Utilize large spaces between
landscape medians for activities, including possible vendors.400,000$
MALL TO NOTTINGHAM PARK ENTRANCE
Reduce concrete at Benchmark Lane. Complete Pedestrian walkway with Recreation Center
Expansion and finance with bond proceeds.400,000$
TOTAL ‐ 2014 IMPROVEMENTS 1,982,000$
SOURCE OF FUNDS: URA REFINANCE AND NEW NET PROCEEDS @ 1.25 X COVERAGE 1,100,000
CAPITAL PROJECTS FUND 882,000$
Page 26 of 30
SECTION 6
Section 6.3: Heat Recovery System Options
The Heat Recovery system extracts useful heat from the treated effluent leaving the Eagle River
Water and Sanitation District’s (ERWSD) Avon Wastewater Treatment Plant. The heat is pulled from
the treated effluent and distributed to the recreation center in a closed loop circulation system. The
heat provided through the Heat Recovery System is considered carbon neutral and supports the
Town’s commitment to low carbon footprint development and sustainable heating solutions. The
system costs approximately 21% more to operate than a conventional natural gas boiler, resulting in
$17,000 in additional yearly expenses. The energy costs are small compared to the $4,500,000 cost
of constructing the system. Operating the system reduces the Town’s carbon foot print by 503
tons/year, and a total carbon savings of 1,509 tons since the system became operational.
The design of the system anticipated the future expansion for snowmelt in the transit center and
Main Street. The system has a total capacity of 3.5million BTU/hour (MMBH), of which 1.2 MMBH is
being used to heat the recreation center pools, leaving 2.3 MMBH available for other uses.
Potential expansion alternatives include Town Hall HVAC, Recreation Center HVAC, Recreation
Center expansion HVAC, transit center snowmelt and mall sidewalks snowmelt. The heat demands
of these alternatives are summarized in Table 1. below:
Table 1. Heat Recovery Expansion Heat Demands
Alternative Location M Btu/Hour Heat Usage
1 Town Hall 1.0 Heat
2 Recreation Center HVAC 0.8 Heat, Water
3 Recreation Center Expansion 1.0 to 2.0 Heat
4 Transit Center Snowmelt 2.1 Snowmelt
5 Mall Area 1.6 Snowmelt
Previous discussions with Town Council revolved around expanding the system to the transit center
to snowmelt the pedestrian areas, primarily to protect the high quality materials and finishes. If the
Town does proceed with an expansion of the recreation center or construction of Town Hall,
consideration should be given using the heat recovery system for these projects rather than
extending to the transit center. A small building to house a boiler could be constructed near the
transit center to extend snowmelt for that area at a much lower capital construction cost, $50,000 ‐
$100,000; rather than $350,000.
Page 27 of 30
SECTION 7
Section 7: Parking Lot/Garage Space Estimates
There are two potential locations on Town‐owned land for surface/garage parking lots in the Town
Center West District: 1) Existing Town Hall site; and 2) Existing Fire Station/Library site.
The Town Hall site is 58,000 SF and can accommodate 136‐spaces/level. A two story parking
structure would cost approximately $6.7M, or $24,600/space.
The Library/Fire Station site is 90,000 SF and can accommodate 250 spaces per level. A surface lot
would cost approximately $450,000 and a 3‐story above ground garage housing 750 spaces will cost
$15.1M, or $21,000 per parking space. A one‐level underground garage at the Fire Station/Library site
would cost $6.5M, and cost $26,000 per space.
In summary, the most cost effective parking option is an above‐ground garage located at the Fire
Station/Library site. The Fire Station and Library sites could provide a 250 space surface lot, and as
mentioned would cost approximately $450,000 to construct.
Page 28 of 30
SECTION 8
Section 8.1: Planning and Zoning Commission and Public Outreach
The development concepts presented in this document are found in the adopted master plans of the
Town of Avon, with a few noted exceptions:
No plans identified a parking structure on the existing library and fire station lots; and
Co‐location of the library with Town Hall on Nottingham Lake; and
Town Hall located (or co‐located) with Recreation Center Expansion (Option 3); or
Ice rink/summer turf field in front of the Recreation Center.
Even with the strong support of adopted planning documents, the value of working closely with the
Planning and Zoning Commission (PZC) members and the community in all aspects of implementing
a final development program is well recognized. The approach and process include gaining outside
community input varies by the project(s) scope once determined by Council. With Option 2 being
used as a scenario in this document, for discussion, the following process is presented as an outline
to fully involve and consider comments from the public, other agencies, and the PZC:
I. Inform PZC, Fire District and Library District of June 25th Council meeting on
Development Concepts
II. Council determines Option 2 should be pursued as a preferred alternative, with a goal
of presenting a ballot question for the funding of the Phase 2 Recreation Center at
the November, 2013 election [See below].
III. Immediately commence all actions to complete telephone survey on Phase 2
Recreation Center Expansion, and other high priority questions
IV. Meeting outreach: Overall Development Program & Phase 2 Recreation Center
a. Develop schedule to meet with key interest groups: Nottingham Lake residents,
Recreation Center users, businesses in West Avon and Beaver Creek (parking and
special events)
b. Develop a schedule for general public information sessions to be held in three
different locations
c. Meetings with Fire District and Library District Boards
V. PZC meeting work session(s)
VI. Completed by August 26th and timed with consideration of ballot issue
If a ballot issue is offered and approved, outreach effort would be focused on:
Development of the Phase 2 Program
Schematic Plans for Program
Preliminary Plan
PZC design review
Page 29 of 30
SECTION 8
Section 8.2: 2013 Community Survey
Linda Venturoni, Venturoni Surveys and Research, was contacted to discuss the timing, scope, and
approach for a 2013 Community Survey. Linda conducted Avon’s 2008 Community Survey.
Telephone Survey
Linda recommended the Council consider a telephone for survey, if survey information is needed for
a ballot question for specific, single focus issue to a few issues, such as prioritizing expenditures. She
stated this is a cost‐effective, highly reliable method and costs less money.
Time: 8 – 10 weeks
The greatest time is usually developing the questions; and the “sample frames”, which
are the groups to be surveyed: locals, businesses, second‐homeowners, etc. It may be
best to use a smaller, representative group to complete this effort.
Avon has very good voter registration lists, which include cell phones.
$5,000 ‐ $10,000; number of questions is the determining factor
380 responses are needed; 95% confidence
Email – Mail Survey
Time: 17 weeks is a good estimate to for the entire process: survey instrument design
through analysis report
More questions can be asked, and even though the number of responses for a 95%
confidence remains the same, there is the opportunity to reach more of the population
$15,000+ number of question is the determining factor
380 responses are needed; 95% confidence
Survey Links
2008 Community Survey:
http://www.surveyco.org/avon.html
2012 Avon Recreation District Community Survey:
http://coavon2.civicplus.com/DocumentCenter/View/11062
Page 30 of 30
FINANCIAL MATTERS
June 25, 2013
______________________________________________________________________________________
1. Financial Matters Cover Memo
2. Sales and Accommodations Tax Reports – April
3. Real Estate Transfer Tax Report and Monthly Detail – May
Memo
To: Virginia Egger, Town Manager
Thru: Scott Wright, Finance Director
From: Kelly Huitt, Budget Analyst
Date: June 18, 2013
Re: Financial Matters – April 2013
Summary:
SALES TAX
• Sales tax revenue for the month of April is up $3,186.29 (1.05%) over April 2012, but down -4.20%
compared to the monthly budget. This gain includes approximately $13,700 from new businesses,
therefore -3.46% is the actual loss of revenue for the month. Year to date sales tax collections are up
$340,857.99 over 2012 and $231,157.00 over budget.
• April collections report increases from 2012 for all industries except Grocery, Specialty, and Heath,
Sporting Goods Rental/Retail, and Miscellaneous Retail. Revenue from Sporting Goods Rental/Retail
are down approximately ($6,700) for the month compared to last year, while Grocery, Specialty, and
Health businesses are down ($10,000). Sales tax from Accommodations for April is up $5,600.
ACCOMMODATIONS TAX
• Accommodations tax revenue for April is up $5,708.25 (27.46%) compared to April 2012, and up
17.89% compared to the monthly budget. Year-to-date accommodations tax collections are up
$93,750.47 over 2012 and $66,790.03 over budget. MTRiP data indicates a 41.6% increase in
occupancy year-over-year for the month of April, but a -9.4% decrease in average daily rate.
• April accommodations tax collections are up for Time Shares and Hotels, while Vacation Rentals are
down. Monthly revenue has increased in all areas of town except for West Beaver Creek, which is down
by a marginal $581.05.
REAL ESTATE TRANSFER TAX
• 2013 year-to-date real estate transfer tax collections equal $470,557.25, which is 31.37% of the current
budgeted revenues. Collections are down ($195,523.23) compared to 2012.
Town of Avon
TOWN OF AVON
SALES TAX WORKSHEET
2013 Actual vs. Budget
BudgetYTD CollectionsBudget% of change
2008 2009 2010 2011 2012 2013 2013 Variancefrom 2012
January 552,981.33$ 552,648.47$ 515,009.18$ 511,040.76$ 519,784.89$ 548,275$ 677,943.78$ 129,669.26$ 30.43%
February 574,301.20 516,349.68 504,752.59 532,903.25 533,546.48 562,790 636,702.27 73,911.89 19.33%
March 653,095.43 536,913.42 620,937.20 665,532.70 643,910.29 679,203 720,267.31 41,064.03 11.86%
April 349,061.05 319,833.51 309,937.09 305,269.73 304,220.84 320,895 307,407.13 (13,488.18) 1.05%
May 321,213.74 267,960.76 242,830.16 236,424.93 270,082.79 284,886
June 427,371.70 396,066.29 377,920.42 406,828.27 430,588.57 454,189
July 458,484.39 409,956.20 421,975.98 452,873.44 472,215.40 498,098
August 428,296.71 374,965.99 361,702.25 419,977.29 455,439.86 480,403
September 466,731.86 350,585.25 359,139.22 391,546.49 424,793.75 448,077
October 365,209.05 286,412.11 288,859.84 299,193.35 341,711.43 360,441
November 338,385.19 281,696.02 284,528.70 301,407.41 336,060.63 354,480
December 794,328.16 786,701.84 818,360.74 921,815.61 852,868.64 899,615
Total 5,729,459.81$ 5,080,089.54$ 5,105,953.37$ 5,444,813.23$ 5,585,223.57$ 5,891,352$ 2,342,320.49$ 231,157.00$ 17.03%
Actual Collections
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
2009 2010 2011 2012 2013
Year
Sales Tax Collections for April
TOWN OF AVON
SALES TAX WORKSHEET
2013 Actual vs. Budget
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$1,800,000
$2,000,000
$2,200,000
$2,400,000
2009 2010 2011 2012 2013
YTD Sales Tax Collections
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
$650,000
$700,000
$750,000
Sales Tax Monthly Comparison 2010-2013
2010
2011
2012
2013
TOWN OF AVON
ACCOMMODATIONS TAX WORKSHEET
2013 Actual vs. Budget
Budget YTD CollectionsBudget% of change
2008 2009 2010 2011 2012 2013 2013 Variance2012
January 77,721.98$ 84,919.00$ 87,938.84$ 85,233.73$ 90,118.88$ 97,438$ 108,508.43$ 11,070.57$ 20.41%
February 83,157.06 83,502.22 99,336.34 114,035.90 106,016.32 114,626 137,503.61 22,877.20 29.70%
March 87,240.86 84,909.85 105,518.15 122,145.16 115,043.42 124,387 153,208.80 28,822.16 33.17%
April 22,161.73 26,821.29 26,496.88 26,214.58 20,786.24 22,474 26,494.49 4,020.10 27.46%
May 16,208.09 19,090.36 12,425.51 15,152.82 16,664.44 18,018
June 30,012.07 34,439.33 32,857.68 49,999.66 56,012.17 60,561
July 33,302.03 47,864.32 51,170.82 62,928.07 66,726.73 72,146
August 29,326.28 39,155.19 42,188.56 52,037.55 58,358.93 63,099
September 21,214.32 21,134.69 30,090.34 35,521.81 42,245.24 45,676
October 21,856.62 17,043.78 20,614.06 21,801.56 25,879.51 27,981
November 20,737.61 15,268.58 20,582.47 24,971.33 22,786.42 24,637
December 86,199.66 96,847.30 98,561.90 135,984.00 112,759.02 121,917
Total 529,138.31$ 570,995.91$ 627,781.55$ 746,026.17$ 733,397.32$ 792,960$ 425,715.33$ 66,790.03$ 28.24%
Actual Collections
-
5,000.00
10,000.00
15,000.00
20,000.00
25,000.00
30,000.00
2009 2010 2011 2012 2013
Accommodations Tax Collections for April
TOWN OF AVON
REAL ESTATE TRANSFER TAX WORKSHEET
2013 Actual vs. Budget
YTD Collections $ change % of change
2008 2009 2010 2011 2012 2013 2012 2012
January 75,552.20$ 34,468.00$ 237,133.00$ 57,540.00$ 50,204.00$ 22,535.00$ (27,669.00)$ -55.11%
February 56,655.90 95,703.38 362,719.22 230,705.50 41,750.07 55,872.69 14,122.62 33.83%
March 77,054.50 6,023.70 284,243.65 187,099.47 84,760.49 125,927.64 41,167.15 48.57%
April 69,955.12 92,238.95 210,185.30 249,482.30 219,195.80 144,437.80 (74,758.00) -34.11%
May 66,714.29 37,803.12 112,431.30 187,668.62 270,170.12 121,784.12 (148,386.00) -54.92%
June 105,872.10 365,324.28 66,271.14 49,606.58 169,040.47
July 60,194.74 208,800.24 63,509.36 46,707.37 71,057.40
August 108,981.45 87,827.30 88,823.40 106,785.21 232,505.93
September 684,005.20 159,877.84 159,861.96 140,876.56 96,389.34
October 711,661.23 205,537.52 222,575.20 64,005.33 176,889.62
November 621,085.67 131,944.57 115,654.16 98,057.44 150,549.86
December 455,288.84 336,431.50 236,117.45 198,448.03 145,134.57
Total 3,093,021.24$ 1,761,980.40$ 2,159,525.14$ 1,616,982.41$ 1,707,647.67$ 470,557.25$ (195,523.23)$ -29.35%
Budget 1,500,000$
Variance, Favorable (Unfavorable)(1,029,442.75)
Actual Collections
$-
$100,000.00
$200,000.00
$300,000.00
$400,000.00
$500,000.00
$600,000.00
$700,000.00
$800,000.00
$900,000.00
$1,000,000.00
$1,100,000.00
$1,200,000.00
$1,300,000.00
2009 2010 2011 2012 2013
YTD Real Estate Transfer Tax Collections
Town of Avon
Real Estate Transfer Tax
May Collections Detail
Purchaser Name Property Amount Received
Balance Forward 348,773.13$
Chicago Title Riverfront #13-21 218.00
Chicago Title Riverfront #13-20 138.00
Chicago Title/ Scott Mtn Vista #1303 wk 7 50.00
Chicago Title/ Hanson Mtn Vista #1604 wk 31 40.00
Stewart Title/1031 Exchange Experts LLC Avon Lake Villas #23 10,500.00
Land Title/ Clark Avon Lake Villas Blvd #P-3 5,450.00
Land Title/ Castro Beaver Bench #B-19 3,140.00
Servicelink/ Almanza Sunridge #E-303 3,400.00
Title Company of the Rockies Mtn Vista #13-21 2,065.70
Chicago Title/Pirkey and McHugh Mtn Vista #13-18 45.60
Chicago Title Riverfront #13-19 298.00
Chicago Title Lakeside Terrace #13-18 23.10
Title Co of the Rockies/Jones & Gates Mtn Vista Unit #1620/1618, wk 52 & #1602, wk 14 1,287.90
Title Co of the Rockies/Hoffman Lakeside Terrace C-301, wk 52 518.00
Stewart Title/ BRW Holdings LLC Lodge at the Avon Center #113 5,200.00
Gish Mtn Vista #1309 and 1311, wk 52 100.00
American Title Insurance/ Dorr Sunridge #F-102 298.00
Land Title/ Graves 2450 Saddle Ridge Lp #A 5,100.00
Chicaco Title/ Weber Mtn Vista Unit #150705, wk 9 70.00
Chicaco Title/ Weber Mtn Vista Unit #1302, wk 1 50.00
Chicaco Title/ Weber Mtn Vista Unit #1205, wk 15 50.00
Chicaco Title/ Weber Mtn Vista Unit #1312, wk 8E 25.00
Chicaco Title/ Weber Mtn Vista Unit #1312, wk 49E 25.00
Chicaco Title/ Weber Mtn Vista Unit #1206, wk 6E 25.00
Heritage Title/ Ward Family Trust Seasons at Avon #613 8,000.00
Title Co of the Rockies/ Jones Lakeside Terrace #B-201, wk 24 218.00
Title Co of the Rockies/ Echavarria & Ossa Mtn Vista #1830/1832, wk 33E & #1418/1420, wk 52 1,687.80
American Title Insurance/ Baumann Ascent #405 18,380.00
Land Title/ Ruiz & Sala Falcon Pointe Unit #513, wk 6 128.00
Land Title/ Thompson 5735 Wildridge Rd E 17,600.00
Assured Title/ bailey Metcalf Lofts #C-9 900.02
Chicago Title Riverfront #13-18 2,708.00
Chicago Title/ Carpenter Lakeside Terrace Unit #B-404, wk 14 70.00
Chicago Title/ Catalano Mtn Vista #1307, wk 34O 20.00
Chicago Title/ Smith Mtn Vista #1203, wk 35O 20.00
Chicago Title/ Howard Mtn Vista #172224, wk 48 70.00
Chicago Title/ Louis Mtn Vista #1302, wk 8O 25.00
Chicago Title/ Griffith Mtn Vista #122527, wk 35E 25.00
Chicago Title/ Gritzmaker Mtn Vista #161210, wk 8E 35.00
Chicago Title/ Pump Mtn Vista #132628, wk 36 50.00
Christie Lodge Owners Assoc./ Osborne Christie Lodge Unit #197 60.00
Title Co of the Rockies/ Alexander Mtn Avon Lake Villas #C-2 5,090.00
Heritage Title/ Dahl 2957 June Creek Trl 6,300.00
Heritage Title/ Ferenczyova Sunridge D-201 280.00
Stewart Title/ Hayasaka & Sutton 2877 Oneal Spur 22,000.00
Total April Revenue 121,784.12
Total YTD Revenue 470,557.25
Total 2013 Budget 1,500,000.00
Variance, Favorable (Unfavorable)(1,029,442.75)$