TC Res. No. 2010-12 Amending the 2010 town of avon capital projects fund budgetTOWN OF AVON, COLORADO
RESOLUTION NO. 10 -12
SERIES OF 2010
A RESOLUTION TO AMEND THE 2010 TOWN OF AVON CAPITAL
PROJECTS FUND BUDGET
A RESOLUTION SUMMARIZING EXPENDITURES AND REVENUES BY
FUND AND AMENDING THE 2010 CAPITAL PROJECTS FUND BUDGET FOR
THE TOWN OF AVON, COLORADO, FOR THE CALENDAR YEAR
BEGINNING ON THE FIRST DAY OF JANUARY, 2010 AND ENDING ON THE
LAST DAY OF DECEMBER, 2010
WHEREAS, the Town Council of the Town of Avon has previously adopted the
2010 Capital Projects Fund budget; and
WHEREAS, the Town Council reviewed the revised estimated revenues and
expenditures for 2010; and
WHEREAS, the Town Council finds it necessary to amend the 2010 Capital
Projects Fund budget to more accurately reflect the revenues and expenditures for 2010;
and
WHEREAS, the Town Council has caused to be published a notice containing
the date and time of a public hearing at which the adoption of the proposed budget
amendment will be considered and a statement that the proposed budget amendment is
available for public inspection at the office of the Town Clerk located in the Avon Town
Hall during normal business hours, and that any interested elector of the Town of Avon
may file any objection to the proposed budget amendment at any time prior to the final
adoption of the proposed budget amendment; and
WHEREAS, whatever increases may have been made in the expenditures, like
increases were added to the revenues so that the budget remains in balance as required by
law.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF
THE TOWN OF AVON, COLORADO:
Section 1. That estimated revenues and expenditures for the Capital Projects
Fund are revised as follows for 2010:
Town of Avon
Resolution No. 10 -12
Page 1 of 2
Attachments:
A — Resolution 10 -12, A Resolution to Amend the 2010 Town of Avon Capital Projects Fund Budget
B — Capital Projects Fund Budget Amendment No. 1, Pages 1 -5
• Page 3
Section 2. That the Capital Projects Fund budget, as submitted, amended, and
hereinabove summarized by fund, hereby is approved and adopted as the capital program
budget of the Town of Avon for the year stated above.
Section 3. That the Capital Projects Fund budget as hereby approved and adopted
shall be signed by the Mayor and made part of the public record of the Town.
ADOPTED this 13' day of April, 2010.
F AVON,
nald C. Wolfe, Mayor
ATTEST:
cbAO 0
Town of Avon
Resolution No. 10 -12
Page 2 of 2
Original or
Current
Previously
Proposed
Amended
Amended
2010 Budget
2010 Budget
Capital Proiects Fund
Beginning Fund Balance
$ 3,474,167
$ 5,588,319
Revenues and Other Sources
4,418,802
4,500,330
Expenditures and Other Uses
5,946,769
6,960,614
Ending Fund Balance
1,946.200
3,128,035
Section 2. That the Capital Projects Fund budget, as submitted, amended, and
hereinabove summarized by fund, hereby is approved and adopted as the capital program
budget of the Town of Avon for the year stated above.
Section 3. That the Capital Projects Fund budget as hereby approved and adopted
shall be signed by the Mayor and made part of the public record of the Town.
ADOPTED this 13' day of April, 2010.
F AVON,
nald C. Wolfe, Mayor
ATTEST:
cbAO 0
Town of Avon
Resolution No. 10 -12
Page 2 of 2
Capital Projects Fund #41
Amendment No. 1
FUND BALANCE, Beginning of Year
Fund Summa
3,474,167
5,588,319
2,114,152
FUND BALANCE, End of Year
$ 5,588,319 $
Original or
Proposed
1,181,835
Prev. Amended
Revised
Difference
Actual
Budget
Budget
Increase
2009
2010
2010
(Decrease)
REVENUES
Taxes
$ 1,761,980
$ 2,091,798 $
2,091,798
$ -
Intergovernmental
346,860
1,500,400
1,767,608
267,208
Investment Earnings
69,273
80,104
80,104
-
Other Revenue
26,635
1,500
1,500
-
Total Operating Revenues
2,204,748
3,673,802
3,941,010
267,208
Other Sources:
Transfer In from Other Funds
548,875
745,000
559,320
(185,680)
TOTAL REVENUES
2,753,623
4,418,802
4,500,330
81,528
EXPENDITURES
Current:
Allowance for Bad Debts
49,901
-
-
-
Capital Improvements:
Facilities
647,287
675,000
700,278
25,278
Land and Land Improvements
61,015
360,000
538,985
178,985
Roads and Streets
693,460
200,000
481,665
281,665
Utilities
187,661
3,794,206
4,357,505
563,299
Recreation
-
-
-
-
Water Fund Projects
278,875
425,000
239,320
(185,680)
Communications and Technology
39,720
125,000
125,000
-
Strategic Planning
301,300
25,000
99,370
74,370
Other
3,277
25,000
25,000
-
Developer Rebates
295,659
-
75,928
75,928
Total Capital Improvements
2,558,155
5,629,206
6,643,051
1,013,845
Other Uses
Operating Transfer -Out - General Fund
308,314
317,563
317,563
-
Total Other Uses
308,314
317,563
317,563
-
TOTAL EXPENDITURES
2,866,469
5,946,769
6,960,614
1,013,845
NET SOURCE (USE) OF FUNDS
(112,846)
(1,527,967)
(2,460,284)
(932,317)
FUND BALANCE, Beginning of Year
5,701,165
3,474,167
5,588,319
2,114,152
FUND BALANCE, End of Year
$ 5,588,319 $
1,946,200 $
3,128,035 $
1,181,835
Page 1
Capital Projects Fund #41
Amendment No. 1
Page 2
Revenue Detail
Original or
Proposed
Prev. Amended
Revised
Difference
Account
Actual
Budget
Budget
Increase
Number
Description
2009
2010
2010
(Decrease)
Taxes:
51401
Real Estate Transfer Tax
$ 1,761,980
$ 2,091,798
$ 2,091,798
$ -
Intergovernmental:
Federal / State:
53199
Department of Local Affairs (DOLA) Construction Grant
22,792
1,112,000
1,327,208
215,208
53199
Department of Wildlife (DOW) FIF Grant
-
108,000
108,000
-
Local Government/ Other:
53401
ECO Cost Sharing (Transit Facilities Imp. Project)
235,360
-
-
-
53401
ERWSD Cost Sharing (Heat Recovery Project)
-
280,400
332,400
52,000
53401
Eagle County Trails Grant
11,700
-
-
-
Traer Creek Metro District:
53401
Nottingham -Puder Ditch Cost Sharing
28,110
53401
East Beaver Creek Blvd.
48,898
-
-
-
53000
Total Intergovernmental
346,860
1,500,400
1,767,608
267,208
Investment Earnings:
57101
Interest Earnings
69,273
80,104
80,104
-
Other Revenues:
58104
Fireplace Fees
-
1,500
1,500
-
58108
Finance Charges
511
-
-
-
58211
Developer Reimbursements:
58211
Vail Resorts (Red House Annexation)
21,462
-
58999
Nonclassifed
4,662
-
-
-
58000
Total Other Revenues
26,635
1,500
1,500
-
Other Sources:
59201
Transfer In from Community Enhancement Fund
-
220,000
220,000
-
59201
Transfer In from Water Fund
278,875
425,000
239,320
(185,680)
59201
Transfer In from Facilities Reserve Fund
-
100,000
100,000
59201
Transfer In from Avon Urban Renewal Authority
270,000
-
-
59000
Total Other Sources
548,875
745,000
559,320
(185,680)
50000
TOTAL REVENUES
$ 2,474,748
$ 3,673,802
$ 3,941,010
$ 267,208
Page 2
Capital Projects Fund #41
Amendment No. 1
Account
Number
Description
(1)
2008 and
Prior
Actuals
$ 100,000
CAPITAL IMPROVEMENT PROJECTS
Revised
Current
Facilities:
Estimated Total Project Budget Difference
Actual Budget
General Government Facilities
Project -to -Date Increase
11009
Town Hall Control System
$ - $
3,190,157
Transit / PW Facilities Improvement Project:
3,207,928 -
13006
Preliminary Design
409,449
14001
Transportation Center Facility
3,190,117
14003
Bus Stop Improvements
-
15002
Recreation Center Storage I Office
634,130
15004
Rec. Center CMU Block Deterioration Invest.
-
15005
Rec. Center Vapor Barrier Repair
-
15006
Rec. Center CMU Block Deterioration Mitigation
-
15007
Rec. Center Roof Repair
-
-
Land and Land Improvements:
125,000
21009
Forest Service Land Acquisition
28,796
21010
Nottingham Park Trail Maintenance and Signage
-
21011
Nottingham Park Stage
400,000 -
21012
Nottingham Park Fishing Pier
-
28,796
Roads and Streets:
1,150,000 -
60,623
Streetscape:
139,377
31010
Lighting Study and Conversion
520,509
392
Street Improvements:
199,608
32008
E. Beaver Creek Blvd. Improvements
49,901
CIP Projects Inventory
Project Expenditures
(2) (3)
(4)
(1 +2 +4)
$ 100,000
Proposed
Revised
Current
Revised
Estimated Total Project Budget Difference
Actual Budget
Budget
Project -to -Date Increase
2009 2010
2010
Expenditures Current Proposed (Decrease)
- $
100,000 $
100,000
$ 100,000
$ 100,000
$ 100,000 $ -
461,580
-
-
871,029
613,610
613,610 -
40
-
-
3,190,157
3,207,928
3,207,928 -
-
50,000
50,000
50,000
100,000
100,000 -
59,761
-
-
693,891
660,000
660,000 -
26,184
-
26,184
27,000
27,000 -
99,722
-
25,278
125,000
125,000
125,000 -
-
125,000
125,000
125,000
125,000
125,000 -
-
400,000
400,000
400,000
400,000
400,000 -
-
-
-
28,796
1,150,000
1,150,000 -
60,623
-
139,377
200,000
200,000
200,000 -
392
180,000
199,608
200,000
200,000
200,000 -
-
180,000
200,000
200,000
200,000
200,000
162,847
-
87,153
770,509
1,013,176
1,013,176 -
48,407
-
98,308
149,901
149,901 -
Page 3
Capital Projects Fund #41
Amendment No. 1
Account
Number
Description
(1)
2008 and
Prior
Actuals
166,241 - 523,759 690,000
CAPITAL IMPROVEMENT PROJECTS
Revised
Current
Annual Street Improvements:
Estimated Total Project Budget Difference
33009
2009 Paving /Road Improvements
Project -to -Date Increase
33010
2010 Paving /Road Improvements
-
166,320 (83,680)
Multi -Modal /Alternative Mobility:
- 97,794
34012
West Avon Trails and Access Improvements
31,275
34013
Recreational Trails Master Plan
18,161
Utilities:
Waste Heat Recovery Project
41001
System Study
68,659
41002
System Design
-
41003
Construction
-
41004
Main Street Piping
-
Recreation:
Water Fund Projects:
61004
Nottingham -Puder Ditch Restoration
10,621
61005
W. Beaver Creek Blvd. Drainage / 1 -70 to Railroad
42,022
61006
Metcalf Road Drainage
50,145
61007
Drainage Master Plan
-
61008
Nottingham Lake Spillway Replacement
94005
Water Rights Acquisition
-
CIP Projects Inventory
Project Expenditures
(2) (3)
(4)
(1 +2 +4)
166,241 - 523,759 690,000
Proposed
Revised
Current
Revised
Estimated Total Project Budget Difference
Actual Budget
Budget
Project -to -Date Increase
2009 2010
2010
Expenditures Current Proposed (Decrease)
478,100 - - 478,100 700,000 700,000 -
- 200,000 394,512 394,512 200,000 394,512 194,512
- - - 31,275 92,295 92,295 -
4,106 - 22,267 60,000 60,000
21,420 - - 90,079
90,000
90,000
166,241 - 523,759 690,000
690,000
690,000
- 3,524,206 3,563,746 3,563,746
3,563,746
3,563,746
- 270,000 270,000 270,000
270,000
270,000
169,679
180,300
250,621
250,621 -
- -
- 42,022
385,000
385,000 -
2,972 75,000
75,000 128,117
1,053,966
1,053,966 -
- 250,000
64,320 64,320
250,000
166,320 (83,680)
97,794 -
- 97,794
100,000
100,000 -
8,430 100,000
100,000 108,430
NA
NA
Page 4
Capital Projects Fund #41
Amendment No. 1
Communications and Technology:
81003 Records Management -
81004 VOIP Telephone System -
Other:
93009 2009 Historic Preservation -
93010 2010 Historic Preservation -
Developer Rebates and Capital Contributions
Capital Contributions:
CIP Projects Inventory
Project Expenditures
(2)
Actual
2009
21,488
3,054
140,517
136,241
39,720
3,277
(3)
(4)
(1)
NA
Proposed
2008 and
Account
Revised
Prior
Number
Description
Actuals
2010
2010
Expenditures Current Proposed (Decrease)
200,000
CAPITAL IMPROVEMENT PROJECTS
250,000
250,000
Strategic Planning:
- -
39,720
Development Analysis and Review:
50,000
71011
Vail Resorts Annexation
14,690
71012
Buck Creek PUD
-
NA
Planning and Consulting:
25,000 25,000
79010
2010 General Planning and Consulting
-
79106
Comprehensive Transportation Plan
58,030
79107
Unified Land Use Code Revision
39,389
Communications and Technology:
81003 Records Management -
81004 VOIP Telephone System -
Other:
93009 2009 Historic Preservation -
93010 2010 Historic Preservation -
Developer Rebates and Capital Contributions
Capital Contributions:
CIP Projects Inventory
Project Expenditures
(2)
Actual
2009
21,488
3,054
140,517
136,241
39,720
3,277
(3)
(4)
(1 +2 +4)
NA
Proposed
Revised
Current
Revised
Estimated Total Project Budget Difference
Budget
Budget
Project -to -Date Increase
2010
2010
Expenditures Current Proposed (Decrease)
-
36,178
NA
NA
- -
3,054
NA
NA
25,000 25,000
25,000
NA
NA
- -
198,547
200,000
200,000
- 74,370
250,000
250,000
250,000
- -
39,720
50,000
50,000
125,000 125,000
125,000
200,000
200,000
- -
3,277
NA
NA
25,000 25,000
25,000
NA
NA
92002 Westin Riverfront Resort
2,209,948
279,674
- 73,378
2,563,000
2,563,000
2,563,000
92002 Westin Riverfront Resort - Interest
233,341
15,985
- 2,550
251,876
251,876
251,876
Total Capital Improvement Projects
$ 7,609,183
$ 2,508,254
$ 5,629,206 $ 6,643,051
$ 16,760,488
$ 19,492,119
$ 19,602,951 $ 110,832
Page 5
TOWN OF AVON, COLORADO
CAPITAL PROJECTS FUND
SCHEDULE OF REVENUES, EXPENDITURES, AND CHANGES IN FUND BALANCES
BUDGET AND ACTUAL (BUDGETARY BASIS)
FOR THE YEAR ENDED DECEMBER 31, 2009
Revenues
Taxes:
Real Estate Transfer Tax
Intergovernmental
Investment Earnings
Other Revenues
Total Revenues
Expenditures
Capital Projects:
Facilities
Land and Land Improvements
Roads and Streets
Utilities
Recreation
Water Fund Projects
Strategic Planning
Communications and Technology
Other
Rebates & Capital Contributions
Total Expenditures
Excess (Deficiency) of Revenues
Over (Under) Expenditures
Other Financing Sources (Uses)
Transfers In:
Water Fund
Avon Urban Renewal Authority
Transfers Out:
General Fund
Avon Urban Renewal Authority
1,350,000
1,511,646
647,287
Variance with
1,300,000
280,791
61,015
Final Budget -
Budgeted
Amounts
Actual
Positive
Original
Final
Amounts
(Negative)
819,379
428,821
278,875
$ 3,745,098
$ 1,475,000
$ 1,761,980
$ 286,980
1,248,690
705,470
269,853
(435,617)
128,350
128,350
69,273
(59,077)
1,500
16,500
103,642
87,142
5,123,638
2,325,320
2,204,748
(120,572)
1,350,000
1,511,646
647,287
864,359
1,300,000
280,791
61,015
219,776
1,295,000
1,152,859
693,460
459,399
680,000
729,540
187,661
541,879
819,379
428,821
278,875
149,946
150,000
392,581
301,300
91,281
50,000
50,000
39,720
10,280
25,000
25,000
3,277
21,723
-
371,587
295,659
75,928
5,669,379
4,942,825
2,508,254
2,434,571
(545,741) (2,617,505) (303,506) 2,313,999
819,379 428,821 278,875 (149,946)
- 270,000 270,000 -
(308,314) - -
(848,271) (308,314) (308,314)
Total Other Financing Sources (Uses) (337,206) 390,507 240,561 (149,946)
Net Change in Fund Balances
Fund Balances, Beginning of Year
Fund Balances, End of Year
(882,947) (2,226,998) (62,945) 2,164,053
5,134,017 5,701,165 5,701,165 -
$ 4,251,070 $ 3,474,167 $ 5,638,220 $ 2,164,053
69
• Avon Recreation Center vapor barrier repair - $25,278;
• Nottingham Park trail maintenance and signage - $139,377;
• Nottingham Park Stage - $19,608;
• Nottingham Lake fishing pier - $20,000;
• Lighting Conversion - $87,153;
• 2010 paving program - $194,512;
• Waste Heat Recovery system design - $523,759;
• Waster Heat Recovery construction - $39,540;
• Unified Land Use Code - $74,370;
• Westin Riverfront capital contributions (RETT rebates) - $75,928
Total amounts carried forward for these projects from 2009 to 2010 total $1,199,525.
Project reductions. The following projects have been reduced in the 2010 budget:
• Drainage Master Plan - $185,680. Tasks related to the completion of this project have
been transferred to the Town's engineering staff with a corresponding reduction in the
overall cost of the project. In addition, due to the work demand of the engineering
staff this project is now scheduled to continued over for completion in 2011. A
corresponding reduction in transfers -in from the Water Fund has been reflected in this
budget amendment.
Revenues. Delays in the start-up of the Waste Heat Recovery project has resulted in the
carryover from 2009 to 2010 of billings to both the Eagle River Water and Sanitation District
($52,000) and the Department of Local Affairs ($215,208).
Financial Implications:
If adopted, the net Capital Projects Fund impacts of the above revisions will result in a revised
ending fund balance for 2010 of $3,128,035, an increase of $1,181,835 from the original 2010
budget.
Recommendation:
Staff recommends that the supplemental budget resolution for the 2010 Capital Projects Fund
be adopted.
Town Manager Comments:
• Page 2
Memo
To: Honorable Mayor and Town Council
Thru: Larry Brooks, Town Manager Initials
Legal: Eric Heil, Town Attorney
From: Scott Wright, Asst. Town Manager — Finance (it
Date: April 7, 2010
Re: Supplemental Capital Projects Fund
Budget Amendment Resolution No. 10 -12
summary:
Staff has prepared a formal supplement budget amendment to the 2010 Capital Projects Fund
budget to recognize changes occurring in the current budget year as a primary result of the
carryover of unspent appropriations from the prior year. In addition, one project is being
reduced in cost as a result of performing the project with in -house staff.
Discussion:
Closed -out projects. The following projects were closed -out in 2009 or have been closed -out
so far in 2010:
• Preliminary design and planning for the Transit / Public Works facilities improvement
project;
• Avon Recreation Center office and storage space remodel;
• Avon Recreation Center CMU block deterioration investigation project;
• Waste Heat Recovery system study;
• Nottingham -Puder Ditch restoration project;
• Nottingham Lake spillway replacement;
• Comprehensive Transportation Plan;
• Laserfiche Records Management System.
Carryover projects. Unspent appropriations have been carried over from 2009 to 2010 for the
following uncompleted projects:
Page 1