TC Res. No. 2006-01 REVISING FEE SCHEDULES FOR ZONING, CONSTRUCTIONTOWN OF AVON, COLORADO
RESOLUTION NO. 06-01
SERIES OF 2006
A RESOLUTION REVISING FEE SCHEDULES FOR ZONING, CONSTRUCTION
WORK WITHIN PUBLIC WAYS, SUBDIVISION AND DESIGN REVIEW
APPLICATIONS, TOWN OF AVON, EAGLE COUNTY, COLORADO
WHEREAS, the Town Council may enact and update fee schedules to accurately refelect
the cost of labor and overhead involved with all application processes as stipulated in Title 12
(Streets, Sidewalks and Public Places), Title 16 (Subdivisions) and Title 17 (Zoning) of of the
Avon Municipal Code and in the Town of Avon Residential, Commercial, and Industrial Design
Review. Guidelines; and
WHEREAS, the Town Council wishes to establish this Fee Schedule setting the fees for
such applications.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN
OF AVON, COLORADO:
The Town Council hereby adopts the following Schedule as set forth and incorporated
herein as "Exhibit A to Resolution 06-01 setting fees for review and processing of the zoning,
construction work within public ways, subdivision and design review applications.
ADOPTED THIS 10 DAY OF , 2006.
TOWN COUNCIL
~ ~
u
ATTEST: .
9~j
TO AVON,COLORADO
Mayor
Exhibit A to Resolution 06-01
Town of Avon Community Development Application Fee Schedule
Adopted January10, 2006
The required application fees below include the cost of processing and public notice posting and
shall be paid in full at the time of application submission. No fees are refundable for any
processing or partial processing of a development or design review application.
No application shall be considered or reviewed until the application fees are paid in full and the
application is deemed complete. Where multiple applications are required, multiple fees shall be
assessed (i.e. a new PUD may include a development agreement, etc). Fees are not required
for Town-initiated applications, such as revisions to the Zoning Code.
Zoning & Subdivision Fees
Pre-Application & Conceptual Reviews
Staff Review & Development Review Committee (DRC) No Charge
Community Development Committee Review (CDC) $200.00
Staff, DRC Review and CDC and/or
Planning & Zoning Commission and Town Council $500.00
Comprehensive Plan Amendments (inc. Area Plans)
Minor Amendment $1,500.00
Major Amendment $3,000.00
Zoning Code Amendments
Planning & Zoning Commission
Determination of Uses $500.00
Zoning Code Text Amendment $3,500.00
Special Review Uses
Residential Only $200.00
Commercial/Industrial $500.00
Rezoning _
To Residential District $1,000.00
To All Others $2,000.00
Planned Unit Developments (PUD)
1-4 Dwelling Unit (DU) Residential Only
5-50 DU Residential Only
50+ DU Residential Only
Mixed Use to 50 DU
Mixed Use over 50 DU
Already Approved/Existing PUD
Minor/Administrative Amendment Residential Only
Major Amendment Residential Only
Minor/Administrative Amendment Mixed Use
Major Amendment Mixed Use
$1,000.00
$2,000.00
$2,000.00 Base Fee + $15.00 per DU
$2,000.00
$2,000.00 Base Fee + $15.00 per DU
$250.00
$500.00
$500.00
$1,000.00
Resolution NO. 06-01 DR Sub Zoning Fees
Page 2 of 4
Variance from Zoning Code
All Applications
Exemption from Subdivision Code
Variance from Subdivision Code
Per Variance
Duplex & Minor Subdivision
4 or Less Lots and/or Units
Subdivision Sketch Plan
Subdivision Preliminary Plan
Land Subdivision
10 Lots or Less
Over 10 Lots
Condominium/Townhouse Subdivision
10 Units or Less
Over 10 Units
Subdivision Final Plat
Land Subdivision
10 Lots or Less
Over 10 Lots
Condom in i u m/Town house Subdivision
10 Units or Less
Over 10 Units
Timeshare Subdivision
Existing Condominium Subdivision
Unplatted Condominium Subdivision
Amended Final Plat
Technical Correction Only
Design Review Plans
Residential
1-3 Dwelling Units (DU)
4-9 DU
10-20 DU
21-40 DU
41-60 DU
61-100 DU
100 + DU
Design Review Fees
$500.00
$500.00 Plus Final Plat Fees
$500.00
Sketch Plan Fee/ Final Design Fee
$300.00/$400.00
$500.00/$600.00
$700.00/$900.00
$1,000.00/$1,300.00
$1,400.00/$1,900.00
$1,800.00/$2,700.00
$2,500.00/ $4,500.00
Mixed Use, Commercial or Industrial
Up to 1,000 Square Feet Gross Floor Area (SFGFA)
1,000-2,499 SFGFA
2,500-4,599 SFGFA
$500.00
$500.00
$500.00
$675.00
$675 Plus $20.00 per Lot and/or Parcel
$675 Plus $67.50 per Each Lot
$1,350 Plus $35.00 per Each Lot Over 10
$675 Plus $67.50 per Each Unit
$1,350.00 Plus $10.00 per Each Unit Over 10
$675 Plus $67.50 per Each Lot
$1,350 Plus $35.00 per Each Lot Over 10
$675 Plus $67.50 per Each Unit
$1,350.00 Plus $15.00 per Each Unit Over 10
$425.00/$500.00
$500.00/$800.00
$500.00/$1,000.00
Resolution NO. 06-01 DR Sub Zoning Fees
Page 3 of 4
5,000 - 9,999 SFGFA
10,000 - 19,999 SFGFA
20,000 - 49,999 SFGFA
Over 50,000 SFGFA
Minor Modification to Final Design
Residential
Mixed Use/Other
Extension to Final Design
Sign Fees
Individual Sign from Code
Master Sign Program (MSP)
Master Sign Program Amendment
Variances from Sign Code or MSP
$500.00/$1,500.00
$1,000.00/$2,000.00
$1,500.00/$3,000.00
$2,500.00/$4,000.00
$75.00
$250.00
1/2 Final Design Fee
$100.00
$300.00
$300.00
$500.00
Right of Way Permit, Review and Inspection Fees
Base Permit Fee $250.00
Additional transverse cut or driveway installation $75.00 each
Longitudinal installation greater than fifty (50) linear feet Base plus costs
Miscellaneous Fees
Appeals (inc. Design Review)
From Administrative Decision to P&Z
From P&Z to Council
Annexation
Base Fee
(Add: Legal and Professional Fees)
After ttie Fact Applications
Zoning
Design Review/ Minor Modification
$250.00
$250.00 + $50.00 to Town Clerk
$3,500.00
3x Application Fee
3x Application Fee
Professional Consultant Fees Cost
(Legal, Planning, Financial Modeling, and others as required and agreed to by applicant and
Town; please reference Professional Consulting Review Agreementform as provided.)
Staff Hourly Rates
The following hourly rates for service are used for land use, design review and subdivision
application fees in 2006 and additional services may be billed at the hourly rate as necessary:
Community Development Director &
Town Engineer $79.00/1-lour
Senior Planner/Asst. Town Engineer $63.00/1-lour
Planner II/ Engineer II $57.00/1-lour
GIS Programmer/Planning Analyst &
Planner I/Engineer I $53.00/1-lour
Resolution NO. 06-01 DR Sub Zoning Fees
Page 4 of 4
M.e~
TO: Honorable Mayor and Town Council
Thee: Larry Brooks, Town Manager
From: Tambi Katieb, Community Development D' o
Norman Wood, Town Engineer
Date: January 1, 2006
Re: Resolution 06-01, A Resolution Relating to Fees Charged for Review of
Applications for Zoning, Subdivision, Design Review and Right-of-Way.
Permit Applications
Seemma.ry:
Staff has reviewed and prepared the attached update to all of our, development application
fees, an area that was recommended by Council to be periodically reviewed and :updated as,
needed at our 2006 Budget Retreat.
The proposed fee revision includes applications for Zoning, Subdivision, Design Review and
Right of Way permits. Staff has reviewed all categories of existing fees and the. relationship
they have to staff time required to process applications. Where possible, we have further
defined categories to better reflect the difference in staff time.necessaryto review and process
an application (i.e. Planned Unit Development applications).
Staff is also proposing several new fee categories, including fees assessed for pre application
feedback from both appointed and elected bodies. We are finding that this is a valuable tool to
applicants of large projects, and as such, would like to formalize the process and the benefit of
pre-application feedback.
Design . Review fees remain the same for . all minor applications (residential and
commercial/mixed use), with the most notable increases in the largest categories where rates
are proposed to be up to 50% higher than currently assessed This proposed increase reflects
the amount of staff time involved .with large, complex design reviews under the design
guidelines for developments that: occur in the Town core. These require several iterations of
both sketch and final design, and our current fee is not reflective of the amount of staff time
necessary to complete a major design review project. Also included are new fee categories for
Zoning Code and Comprehensive Plan amendments.
FAC mciT\MEMOS12006%m 0"1 Fee Updatm Dw 1
Recommendation: Approve Resolution No. 06-01, a resolution amending existing
fee schedules and establishing new rates for Fees Charged for Review of Zoning, Design
Review, Subdivision and Rights-of-Way Permits.Applications.
Proposed Motion: I move to approve Resolution No. 06-01, a resolution amending
existing fee schedules and establishing new. rates for Fees Charged for Review of Zoning,
Design Review, Subdivision and Rights-of-Way Permits Applications. .
Town Manager Comments:
•
Attachments:
Exhibit A: Resolution 06-01 (inc. -Exhibit A.to Resolution 06-0i)
Exhibit B: 2006 Development Review Estimates: Example Applications
Exhibit C: Personnel Hourly Rate Calculations for Cost Reimbursement
F:CounciMEMOS0006%m 06-01 Fee updatm.dm