Loading...
TC Res. No. 2005-02 RESCINDING RESOLUTION NO. 04-23,TOWN OF AVON, COLORADO RESOLUTION 05-02 Series of 2005 A RESOLUTION RESCINDING RESOLUTION NO. 04-23, SERIES OF 2004, DECLARING THE NOTTINGHAM ROAD IMPROVEMENTS (PHASE I) TO BE IN PURSUANCE OF A PUBLIC PURPOSE AND AUTHORIZING ALL STEPS NECESSARY AND PROPER FOR ACQUISITION OF ALL INTERESTS, RIGHTS-OF- WAY AND/OR EASEMENTS NEEDED TO CONSTRUCT SUCH IMPROVEMENTS WHEREAS, by Resolution No. 04-23, Series of 2004, adopted June 22, 2004, this Council declared the Nottingham Road Improvements (Phase I) ("the Project") to be in pursuance of the public interest and for a public purpose and authorized Town of Avon staff to take all actions necessary and proper for acquisition of all interests, rights-of-way and/or easements needed to perform such improvements, including, but not limited to, acquisition by negotiation or the power of eminent domain; and WHEREAS, by reason of changes in circumstances, the Town Council now finds and concludes that other capital projects of the Town ought to have a higher priority and that moneys budgeted for the Project will be more prudently spent on one or more of such other projects; NOW, THEREFORE, BE IT RESOLVED: 1. Resolution No. 04-23, Series of 2004, is hereby rescinded. 2. Town of Avon staff are directed to cease negotiations for acquisition of easements and rights-of-way for the Project and to dismiss any petitions in condemnation related to the Project, now pending in the District Court of Eagle County. 3. The approval of the contract for acquisition of an easement from Sunnyside at Avon Association, approved at the meeting of the Council on January 25, 2005, is withdrawn. ADOPTED at a regular meeting of the Town Council of the Town of Avon the 8th day of February, 2005.__ SRAM. ATTEST: P "n Tov ~ Clerk Memo To: Honorable Mayor and Town Council Thru: Larry Brooks, Town Manager From: Norman Wood, Town Engineer Date: February 2, 2005 Re: Capital Projects Update and Recommendations Summary: The attached analysis for various types and levels of Nottingham Road Improvements was prepared in response to issues and questions raised at the last two council work sessions and by various council members in the mean time. This analysis includes the project as currently designed but revises estimated costs based on actual appraised values for rights-of-way to be acquired and a revised construction cost estimate dated December 27, 2004. It also reflects an anticipated property owner contribution of $200,000 that was not included in the original project budget. This analysis also includes cost estimates for the project without a roundabout, a project with reconstruction of existing roadway sections and no widening or pedestrianlstreetscape improvements and a project with only a two-inch asphalt overlay from 1-70 to the Metcalf Road intersection. The cost of these improvements is estimated to vary from $ 1,980,000 for original project with roundabout and property owner contribution, down to $ 335,000 for two-inch asphalt overlay. You may note that the actual cost of the overlay is approximately $180,000 and the other costs are for expenses already incurred toward the original project. The overlay is expected to provide a three to five year time period to re-evaluate the Nottingham Road Project and the impacts of potential development. Other issues that have arisen within the past few weeks that have a potential significant impact on the Capital Improvements Fund Budget include the impending development of Lot 61 and the Confluence. Development of these projects necessitates implementation of the Town Center Mall Plan Implementation and the Transportation Center projects. Neither of these projects is clearly defined at this time. The 2004 Capital Projects Fund Budget included $100,000 each for planning purposes for both the Transportation Center and Town Center Mall Implementation Plan. No funds were expended for either of these projects in 2004. Subsequently, this $200,000 is carried forward and is available as an addition to the $1,900,000 for the Transportation Center and the $1,100,000 for the Town Center Mall Plan Implementation that is in the 2005 Budget. I:\Engineering\Administration\CIP Budget\2005\Memo Possible Amend.Doc 1 Based upon the currently anticipated slower rate of development on the Wildwood Resort PUD (Cottonwood) and the apparent earlier development of Lot 61 and The Confluence, we suggest the following modifications to the implementation of the Capital Improvements Fund be considered: 1. Halt Current Nottingham Road Project Immediately 2. Add 2-inch Asphalt Overlay Project on Nottingham Road from I-70 to Metcalf Road to the 2005 Street Improvement Project 3. Authorize selection of a Landscape Architect/Design Team to proceed with conceptual design for the Town Center Mall Plan Implementation, Transportation Center Layout and connections to The Confluence Site. The projected financial impacts of these changes are projected as: 1. Halt Current Nottingham Road Project Deduct $ 2,550,000 2. Add Nottingham Road Overlay Add 335.000 3. Increase Capital Projects Fund Balance $ 2,215,000 A copy of the current 2005 Capital Improvements Fund Budget is attached. This Budget projects a fund balance of $ 2,293,232 at the end of 2005. The above modifications would increase this to $ 4,508,232 with no other changes or adjustments. We anticipate changes including increased revenues and decreased project costs during 2004 will increase this balance to slightly over $ 5,000,000. We believe the $ 200,000 budgeted in 2004 for planning the Town Center Mall Project and the Transportation Center will be sufficient to develop preliminary level design details and cost estimates needed to evaluate available options and their feasibility. This in turn can be used to develop potential funding programs and mechanisms for implementation of the Town Center Mall Plan and Transportation Center through the coordinated efforts associated with development of surrounding properties and utilization of available grant funds for the Transportation Center. Recommendation: The following actions are recommended: 1. Halt the Current Nottingham Road I-70 to Buck Creek immediately. 2. Add 2-inch asphalt overly on Nottingham Road to Metcalf Road to the 2005 Street Improvement Project. 3. Authorize selection of Landscape Architect/Design Team to proceed with conceptual level design for Implementation of Town Center Mall Plan, Transportation Center Layout and connections to The Confluence. 4. Authorize preparation of Resolution to Amend the Capital Improvements Fund Budget to reflect these changes. Town Manager Comments: 1:\Engineering\Adminisn ion\CIP Budget\2005\Wlemo Possible A =d.DocO Page 2 Nottingham Road Improvements - Phase 1 I-70 to Buck Creek January 29, 2005 I. Alternate I - Project as Originally Planned: Current Project Budget (From November 8, 2004) Construction $ 1,930,000 Design & Surveying 40,000 Appraisals 15,000 Legal 30,000 R/W Acquisition 245,000 Contract Administration & Testing 60,000 Contingencies 230.000 Total Project Budget $ 2,550,000 Anticipated Property Owner Contribution -0- Current Estimate (Revised 1/29/05) $ 1,730,000 80,000 15,000 30,000 65,000 60,000 200.000 $ 2,180,000 $ 200,000 Total Anticipated Project Cost $ 2,550,000 $ 1,980,000 * Include $80,000 additional costs for miscellaneous modifications including bus stop addition and street light fixture upgrade. II. **Alternate II - Revised Project Without Roundabout: Construction Design & Surveying Appraisals Legal R/W Acquisition Contract Administration & Testing Contingencies Total Estimated Project Cost Anticipated Property Owner Contribution $ 1,410,000 120,000 15,000 30,000 65,000 50,000 190.000 $ 1,880,000 $ 180,000 Total Anticipated Project Cost $ 1,700,000 This Alternate may delay construction one year to allow time for design changes. 1AEngineering\C1P\Nottingham Rd (RA 1 To Buck Creek)\3.0 Design\3.4 Documentation\3.4.2 Cost Estimates\Project Estimates Alt- 2.Doc 3 I III. * *Alternate III - Street Reconstruction Without Widening or Pedestrian Streetscape Improvements: Construction $ 470,000 Design & Surveying 110,000 Appraisals 15,000 Legal 15,000 R/W Acquisition 30,000 Contract Administration & Testing 30,000 Contingencies 70.000 Total Estimated Project Cost $ 740,000 Anticipated Property Owner Contribution $ -0- Total Anticipated Project Cost $ 740,000 This Alternate may delay construction one year to allow time for design changes. IV. ***Alternate IV - Overlay Existing Street From Roundabout 1 to Metcalf Road Construction $ 130,000 Design & Surveying 100,000 Appraisals 15,000 Legal 15,000 R/W Acquisition 30,000 Contract Administration & Testing 15,000 Contingencies 30.000 Total Estimated Project Cost $ 335,000 Anticipated Property Owner Contribution Total Anticipated Project Cost $ -0- $ 335,000 This Alternate should extend the life of the existing road surface from 3 to 5 years and allow additional time to re-evaluate the project required to serve this area. Note: Above Cost Estimates are based on IME Construction Cost Estimate dated December 27, 2004 and R/W Acquisition Costs are based Summary of Value Conclusions from Valuation Consultants, Inc. received January 6, 2005. 1:\Engineering\CIPWottingham Rd (RA I To Buck Creek)\3.0 Design\3.4 Documentation\3.4.2 Cost Estimates\Pmject Estimates Alt- 2.Doc