TC Res. No. 1983-490 0
RESOLUTION NO. 83-49
SERIES OF 1983
ACCEPTANCE OF BEAVER CREEK POINT A14D WILDRIDGE ROAD EAST
BE IT RESOLVED THAT:
All necessary repairs have been satisfactorily completed on the
areas of Beaver Creek Point and Wildridge Road East which were
excluded from acceptance by the Avon Town Council in its previous
acceptance of Roads in Blocks 1,2 and 3 of Wildridge.
Therefore, the area along Beaver Creek Point extending approximately
300 feet south from Saddle Ridge Loop and the area along Wildridge
Road East extending from the intersection of Wildridge Road West
northerly to approximately Lot 8, Block 3, Wildridge are hereby
accepted by the Town of Avon.
The one year warranty period for these areas shall begin August 24,
1983 and shall extend through August 23, 1984.
INTRODUCED, PASSED, RESOLVED AND ADOPTED AND ORDERED PUBLISHED ONCE
IN FULL THIS 25TH DAY OF OCTOBER, 1983.
DATED:
ADOPTED:
October
heila R. Davis, Mayor Pr -Tem
X)2
TT T:
Patricia J. yle, Tow Clerk
• •
TO: Dick Blodgett
FROM: Norm Wood
DATE: October 19, 1983
SUBJECT: Wildridge Roads in Blocks 1,2 and 3 excluded from previous
acceptance
We have reviewed construction procedures, test results and other
data regarding the repairs to Beaver Creek Point and Wildridge Road
East in the areas which were excluded from the Town Councils
acceptance of roads in Blocks 1,2 and 3 of Wildridge. As a result
of this review the roads were to found to have been satisfactorily
repaired and it is recommended that the Town Council officially
accept these roads with a warranty period beginning August 24, 1983
and extending through August 23, 1984.
01
i
September 6, 1983
Mr. Norm Wood,
Town of Avon
P.O. Box 975
Avon, CO 81620
Town Engineer
Re: Wildridge Road East and Beaver Creek Point Roads
Dear Mr. Wood:
I would like to request that you review our field test results on the
repair work done at the distress areas located within the above
mentioned roads.
We have completed all work and at this point I feel we are entitled
to the commencement of the warranty period for these two areas as
we had agreed before. Although the guard rail was not completed in
the Wildridge Road East area due to obvious reasons, it is scheduled
for completion within the next four weeks. However, we do not feel
the guard rail has anything to do with the quality and workmanship
of the road itself.
Please let me know if we can count on your blessing to start the
warranty period of one year as of August 24, 1983, the date on which
the repairs were finished. Thank you.
Cordially yours,
A.J. Testa, Ph.D., P.E.
Vice President, Engineering
and Construction
AJT:lcb