TC Council Packet 10-09-2007TOWN OF AVON, COLORADO
WORK SESSION MEETING FOR TUESDAY, OCTOBER 9, 2007
AVON MUNICIPAL BUILDING, 400 BENCHMARK ROAD
PRESIDING OFFICIALS
MAYOR RON WOLFE
MAYOR PRO TEM BRIAN SIPES
COUNCILORS RICHARD CARROLL
DAVE DANTAS
KRISTI FERRARO
AMY PHILLIPS
TAMRA NOTTINGHAM UNDERWOOD
TOWN STAFF
TOWN ATTORNEY: JOHN DUNN
TOWN MANAGER: LARRY BROOKS
TOWN CLERK: PATTY MCKENNY
THIS MEETING IS OPEN TO THE PUBLIC; COMMENTS FROM THE PUBLIC ARE WELCOME
ESTIMATED TIMES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY, SUBJECT TO CHANGE WITHOUT NOTICE
PLEASE VIEW AVON'S WEBSITE, HTTP: / /WWW.AVON.ORG, FOR MEETING AGENDAS AND COUNCIL MEETING MATERIALS
AGENDAS ARE POSTED AT AVON MUNICIPAL BUILDING AND RECREATION CENTER, ALPINE BANK, AND AVON LIBRARY
THE AVON TOWN COUNCIL MEETS ON THE SECOND AND FOURTH TUESDAYS OF EVERY MONTH
WORK SESSION AGENDA
MEETING BEGINS AT 2:30 PM
2:30 PM — 2:45 PM 1. APPROVAL OF WORK SESSION AGENDA & COUNCIL ASSIGNMENT UPDATES
a. Channel 5 Update (Amy Phillips, Councilor)
2:45 PM — 3:00 PM 2. POTENTIAL HOME RULE CHARTER AMENDMENT (Larry Brooks, Town Manager)
The proposed charter amendment would rewrite Section 18.3 to allow for sales and
exchanges of Town land if approved by the Council after making certain findings
3:00 PM — 4:00 PM 3. EAST TOWN CENTER DISTRICT PLAN (Eric Heidemann, Community Development
Director) "Review of the draft Avon East Town Center District Plan. The plan
provides guidance and planning principles related to land use, massing and form,
open space, urban design, transportation, and parking needs
4:00 PM — 5:00 PM 4. PRESENTATION BY INTERIM EAGLE COUNTY HOUSING DIRECTOR ON PROPOSED
EAGLE COUNTY HOUSING GUIDELINES (Alex Potente, Eagle County Interim
Housing Director) Staff invited Alex Potente to present their proposed Housing
Guidelines and shared lessons learned regarding the mitigation of affordable housing
on the West End Development project
5:00 PM 5. ADJOURNMENT
ATTORNEYS & COUNSELORS AT LAW
633 SEVENTEENTH STREET. SUITE 3000
DENVER, COLORADO 90202
Sherman & Howard L.L.C. TELEPHONE: (303)297-2900
FAX: (303)298.0940
OFFICES IN: COLORADO SPRINGS
PHOENIX • RENO • LAS VEGAS
MEMORANDUM
To: Avon Town Council
cc: Larry Brooks, Town Manager
John Dunn, Town Attorney
From: Randy Funk/�and Matt Gray
Date: October 2, 2007
Re: Potential Home Rule Charter Amendment
Section 18.3 of the Town of Avon Home Rule Charter (the "Charter ") states, "The Town
shall not sell or dispose of municipally -owned buildings or real property in use for public
purposes without first obtaining the approval of a majority of the electors voting thereon." This
provision is more restrictive than many charter provisions on this topic and provides little
flexibility for the Town to accomplish land exchanges or sales that would be beneficial to the
Town and its citizens. From time to time, the Town may have the opportunity to sell or
exchange lands in a way that will be helpful in implementing the Avon Comprehensive Plan;
however, under the current provision, each of these transactions would require voter approval.
The proposed charter amendment would rewrite Section 18.3 to allow for sales and
exchanges of Town land if approved by the Council after making certain findings. This would
provide greater flexibility while also ensuring that such land transactions are completed for an
appropriate purpose after the opportunity for public review and comment. For this reason, any
sale, lease or exchange of Town property would have to be authorized by ordinance after the
public notice and hearing procedures set forth in the Charter. In addition, the Town Council
could not sell, lease or exchange Town property without finding that: (1) the transaction will
provide a public benefit for the Town; (2) the transaction will assist the Town in implementing
the Comprehensive Plan; and (3) the value of the property sold, exchanged, or leased by the
Town is substantially equal to the value of the property or purchase price received in exchange.
These safeguards should help ensure that Town lands are protected from arbitrary action by a
Town Council without handicapping the Town's ability to complete beneficial transactions more
efficiently.
We would be happy to discuss any questions you may have.
001024000\PUBF1N1732395. I
SECOND DRAFT 9 -20 -07
Town of Avon Home Rule Charter Amendment
The current Section 18.3 would be replaced in its entirety by the following:
Section 18.3 Municipally -Owned Real Property
(a) The Town may sell, exchange, lease or dispose of any interest in real property or
buildings of the Town to or from any person, firm or corporation, or other public or private
entity. Any such sale, exchange, lease or disposition shall be approved by ordinance after a
public hearing thereon.
(b) Any ordinance adopted pursuant to subsection (a) of this Section shall contain findings
by the Council that:
1. the transaction will provide a public benefit for the Town;
2. the transaction will assist the Town in implementing its comprehensive plan; and
3. the appraised value of the interest in real property or buildings or other
consideration to be conveyed by the Town is substantially equal to the appraised value of
the interest in real property or buildings or other consideration to be received by the
Town.
BUS_RE\1436554.1
Memo
To: Honorable Mayor and Town Council
Thru: Larry Brooks, Town Manager
From: Matt Pielsticker, Planner II
Eric Heidemann, Director
Date: October 2, 2007
Re: East Town Center District Plan
AVO N
C 0 L 0 R A b 0
Summary:
Design Workshop will be presenting the East Town Center District Plan at the
October 9, 2007 meeting. The draft plan reflects over a year of work with several
stakeholder meetings. The plan incorporates input from property owners, business
owners, residents, the Planning and Zoning Commission, and Town Staff.
The plan provides guidance and planning principles related to land use, massing
and form, open space, urban design, transportation, and parking needs. With these
principles in mind, the design team has created a scalable plan that could work for
individual properties that may have different redevelopment timelines.
Background:
The Comprehensive Plan acknowledges the importance of district planning, and the
redevelopment opportunities that exist in both the West and East Town Center
Districts. The East Town Center District is recognized as a fragmented area, which
lacks strong automobile and pedestrian connections. Policy C.4.1 in the
Comprehensive Plan states:
"Develop a detailed District Master Plan for the East Town Center District
identifying parcel configurations and new automobile and pedestrian
circulation alignments to increase the district's viability."
In response to Policy C.4.1, and the Implementation Matrix found in the
Comprehensive Plan, there was a joint work session conducted in April, 2006 with
the Planning and Zoning Commission, Town Council, and interested property
owners in the district. Design Workshop was contracted in June, 2006 to conduct a
planning and design charrette for this district. The charrette concept was discussed
as a `front end' discovery to a more detailed sub area plan for the area.
October 9, 2007 Town Council Meeting - 1 -
Following the charrette and the open house, which culminated the week long
charrette, Design Workshop was contracted to complete the master plan for the East
Town Center District. It became very apparent during the charrette process that
there was interest in the project continuing to the next level of detail.
The attached draft plan is a reflection of feedback received from the design charrette
last summer, individual stakeholder meetings, and more recently a meeting in
February, 2007, where the Commission reviewed the "preferred alternative."
The Planning and Zoning Commission directed staff and the design team at the
February, 2007 meeting to move forward with the alternative presented; build
flexibility into the plan to accommodate obstacles to the implementation of road
realignments; and to put together a sketch up model that includes the West Town
Center plan, East Town Center plan, and the Riverfront Village. All input has been
considered in the attached draft plan, dated September 11, 2007.
Financial Implications:
The project is currently within the budget of $164,500.
Attached to this Memorandum is a Memorandum from Design Workshop (dated
September 19, 2007) outlining the cost estimates for further refinements to this draft
plan, in response to the comments received by the Planning and Zoning
Commission. The Memorandum states that additional services will cost between
$4,500 and $8,500, and may take up to three additional months to complete.
Town Manager Comments: �� ` ��� ✓��wG y�� ���, �- R�`G ✓2
1
Staff Recommendation:
Staff recommends that the Town Council review the draft plan, and after hearing a
presentation by Design Workshop, authorize Staff to return with an add service
proposal from Design Workshop for additional services. Once the modifications are
complete, staff will return for adoption by resolution.
Attachments:
Exhibit A: Memos from Design Workshop and Summary of Planning and Zoning
Commission Comments
Exhibit B: Draft District Plan (September 11, 2007)
October 9, 2007 Town Council Meeting -2-
N
Exhibit A
Design Workshop, Inc.
Landscape Architecture
Land Planning
Urban Design
Strategic Services
Memorandum
To: Avon Town Council
Via: Eric Heidemann
From: Rebecca Leonard
Date: October 2, 2007
Project Name: Avon East Town Center
Project #: 3928
Subject: Town Council Hearing
We are pleased to present a draft of the East Town Center District Plan for your approval.
Summary of the Process:
• A five -day Community Partnership Charrette kicked off the District Plan process in
July, 2006. Stakeholders, including representatives from nearly every property in the
District, were interviewed.
• Four concepts for the District were developed during the charrette week. These
concepts were unveiled for comment at the Open House at the end of the week.
• In November 2006, the Planning and Zoning Commission gave direction on how to
proceed with a refined alternative, modifying Alternative 3.
• The District Plan was informed by a Market Investigation completed on January 25,
2007 and a Financial Analysis completed on April 16, 2007.
• The refined alternative was presented at a January 2007 open house meeting. The
refined alternative illustrated the sum of input from the Planning and Zoning Commis-
sion, direction from the market investigation, and additional design details. Most of the
property owners in the District attended the meeting and supported the refined
alternative.
• Feedback regarding the District Planning Principles and refined alternative were given
by the Planning and Zoning Commission at the February 2007 meeting
• The Draft District Plan was reviewed and commented on by the Planning Commission
in four meetings from May 15, 2007 to July 31, 2007
• Design Workshop revised the Draft District Plan based on the comments summarized
in the included table of Planning Commissioner Questions /Comments.
DESIGNWORKSHOP
Asheville • Aspen • Denver • Park City • Phoenix • Santa Fe • Tahoe • Sao Paulo
120 East Main Street, Aspen, Colorado 81611 • (tel) 970 - 925 -8354 • (fax) 970 - 920 -1387
www. des ignworkshop.corn
C: \Documents and Settings \mpielsticker \Local Settings \Temporary Internet Files \OLK360 \071002 - TCmemo.doc 3
Summary of the District Plan:
Chapter 1: Introduction
District Plan Intent
Relationship to Town -Wide Plans
District Description
History
Planning Considerations
Plan Development
Charrette
Alternatives
Chapter 2: Physical Plan
Illustration
Summary of Planning Principles
Sustainable Design
Land Use
Pedestrian Circulation
Vehicular Circulation
Parking
District Character
Views
Chapter 3: Implementation
Partnership
Public Improvements
Revenues
Private Investment
Key Redevelopment Areas
Central Plaza
Realignment of Main Street
Realignment of East Beaver Creek Blvd..
Conclusion
Appendix A: Market Investigation
Appendix B: Financial Analysis
The heart of the District Plan document is the Planning Principles for each of the topics in Chapter
2: Physical Plan. In this chapter the existing conditions, Planning Principles, and proposed
changes lay out the framework for the future development of the District.
The Planning Principles are as follows:
1. Utilize green building practices.
2. Create environmentally superior development.
3. Provide a mix of uses including commercial, residential and lodging.
4. Ensure that pedestrians have safe and convenient access throughout the District.
5. Maintain two access points off Avon Road.
6. Maintain a dispersed circulation pattern through the District.
7. Create quiet residential scale pedestrian streets.
8. Provide on- street parking.
9. Minimize the impact of off - street parking lots.
10. Provide de- centralized parking garages.
11. Ensure the architectural character of the East Town Center compliments the character
emerging in the West Town Center.
12. Ensure that buildings with mid -size retail uses are designed in a manner that fits the
character of the area and supports a pedestrian- friendly experience.
13. Encourage a high level of site planning and design to maximize public and semi - public
pedestrian spaces.
14. Maximize solar exposure.
15. Define the plaza and other key pedestrian areas by framing these spaces with buildings.
16. Maintain key views to and from the District to provide visibility, orient people to their
surroundings and define the character of the spaces.
17. Focus municipal involvement on actions that produce the most public benefit.
Page 2
Agenda:
Design Workshop will provide a short presentation on the contents of the plan, facilitate a
discussion with the Town Council and interested public, and lay out a course of next steps.
I. Introduction and Review of District Plan
II. Facilitated Discussion of District Plan
III. Next Steps
Page 3
Design Workshop, Inc.
Landscape Architecture
Land Planning
Urban Design
Strategic Services
Memorandum
To: Avon Town Council
Via: Eric Heidemann
From: Rebecca Leonard
Date: September 19, 2007
Project Name: Avon East Town Center
Project #: 3948
Subject: District Plan Graphics
Staff has requested a rough cost estimate for the changes to the imagery in the East District Plan
suggested by the Planning Commission. It is unclear at this point the extent to which the Planning
Commission wishes to have the illustrations /renderings revised. The total hours and cost will be
dependent on the level of detail, amount of change, and type of illustrations /renderings desired.
For this reason, a range of hours and cost has been provided.
Image and Number
Minimum
Hours
Maximum
Hours
Minimum
Cost
Maximum
Cost
Plan Illustration (1)
8
16
$ 600
$1,200
Sketchu Model (5)
8
16
$ 600
$1,200
Building Height Cross Section (1)
2
4
$ 200
$ 350
Perspective Drawings (2)
12
24
1 $1,000
1 $2,000
Diagrams hand drawn (20)
18
34
$1,600
$3,000
Roadway Cross Sections (3)
4
9
$ 500
$ 750
The estimated cost ranges from $4,500 to $8,500. Completion of these tasks may take up to two
months.
DESIGNWORKSHOP
Asheville • Aspen • Denver • Park City • Phoenix • Santa Fe • Tahoe • Sao Paulo
120 East Main Street, Aspen, Colorado 81611 • (tel) 970 - 925 -8354 • (fax) 970 - 920 -1387
www. des ignworkshop.corn
C: \Documents and Settings \eheidemann \Local Settings \Temporary Internet Files \OLK 1 DF\070919 - TCmemo (2).doc
East Town Center District Plan
Planning Commissioner Questions/ Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Tracldn :
11
Energy Efficiency and Green Building
Moved the Sustainable Principles to the beginning of the document.
Standards are a good baseline for the
Expanded upon LEED ND.
plan. LEED ND or ALA 50 steps to
sustainability need to be heavily
encouraged. Include in the front end
of the document.
12
3 -5 stories should be the preferred
Took a qualitative approach for the District Plan instead of
height, and no `Canyon Effect' is
numerical approach which can be found in the Municipal Code.
desired. Taller buildings may be
From the Comprehensive Plan: "Site buildings of varying sizes along
appropriate if designed appropriately.
the street to maximize sun exposure, protect views, and break up
building bulk."
Is Avon Road the Line of
Yes- from the Comprehensive Plan: "Limit building heights fronting
Demarcation for Taller buildings?
Avon Road to existing heights to avoid a canyon effect and to
reserve Beaver Creek views."
9 and
In reference to the massing models, is
:deed direction to determine if the illustration and sketch -up model
should be revised to reflect this comment.
44
big block massing the preferred
alternative or smaller individual
buildings on smaller pieces of
property?
Varying building heights needs to be
Need direction to determine if additional cross sections should be
created for building heights.
expressed in the plan. Cross
section(s)?
:additional vignettes should be
Need direction to determine if perspective drawings should be
created.
provided in place of photographs
where possible (e.g. bottom of page 6,
or bottom of page 7).
9
Coversheet illustration needs to be
Need direction to determine if the illustration should be revised.
redesigned.
1
The last paragraph must be
This is restated throughout the entire document next to every
highlighted and reinforced. More
diagram. Made the entire sentence bold. No changes to statement.
than putting "not" in bold is required
to get this message across.
5
The need for "complimentary" or
Changes made as suggested.
"interesting" architecture instead of
"common." Pedestrian circulation is
confusing and needs to be
emphasized. Bullets #3 and #5 must
be reworded. Bullet #5 is confusing
as it reads "to attract full time
residents but are not of a high enough
quality to appeal to the other
markets." XMiat are we trying to say
here? Views must be emphasized and
roofline articulation. The diminished
sight corridors must be addressed in
the plan in this section.
7
Schematic diagrams were unanimously
Need direction to determine if additional perspective drawings
should be created.
eat. More are needed.
East Town Center District Plan
Planning Commissioner Questions/ Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Tracldn :
10
Captions need to be reworded and
Captions remain the same. District character is explained in the
more visible. The District Character
chapter. Design character is described in the Town Center Design
Language was questioned - should it
Guidelines.
read design character? What exactly is
being encouraged here?
10
Bullet #15 must be reviewed carefully.
Removed from the document
What does it mean to encourage
visibility from Interstate 70? The
Commission was not in agreement
with this Planning Principle. This
language also shows up on Page 41 of
the document.
13
The floor to ceiling ratio was
Reworded. Full time residency cannot be required in market rate
questioned and its meaning. The first
housing. ridded reference to the 2007 Town of Avon Attainable
bullet point needs to be reworked.
Housing Guidelines.
We need to expand and create
housing options that strengthen full
time residency.
14
Strike 'big box' language and reword
Removed all mention of "big box" and called them "significant
to 'retailers up to 15,000 sq. ft.' The
nationally -known retailers" that are located to the east of the Town
gaps in retail frontage were
Center and act as anchors.
appropriate and the plan needs to
embrace good techniques and creative
Need direction to determine if the illustrative should be revise to
show gaps in retail frontage.
solutions to enhance spaces between
buildings. The plan should encourage
porosity and create open spaces where
Change wording to "minimize large gaps in the retail frontage."
possible. Secondary pedestrian access
Added bullet point about good techniques and solutions to enhance
is of high importance.
spaces between buildings. Added bullet point about encouraging
Strike reference to Vail City Market.
pedestrian portals along the shopping path to improve accessibility
and maintain a scale appropriate for the pedestrian.
Reference to Vail City Market removed.
13 and
There needs to be a definition for
Cannot regulate full-time for market rate housing, instead we state
17
'Full-Time' residents. The preference
that the affordable housing is to be in line with 2007 Avon
should be given to units with high
Attainable Housing Guidelines and be available for
occupancy rates in the form of full
residents /employees in the town.
time residents. Does this mean all
timeshare /hotel?
21
Commercial use table: 'Convenience
Description of "Convenience Goods" is on page 20.
Goods' - what does this term mean?
Emphasize the word "recommendations" for tenant mix.
Prescribing tenant mixes might not be
appropriate for this plan.
24
The shapes of the suggested buildings
Need direction to determine if the illustrative should be revise to not
have hard edge lines and add character to the buildings and porosity
on the graphic need character. For
example, storefronts need to be
of the buildings surrounding the plaza.
illustrated and no hard edge lines
should be present. This goes for all
The plan does not depict four walls surrounding the plaza.
depicted buildings in site plan view
within the plan. The plaza should not
be surrounded by four walls.
East Town Center District Plan
Planning Commissioner Questions /Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Traddn :
25
The medical tenants and /or urgent
There is no suggestion of urgent care. The medical offices will be
care should be accessible. It was
ADA compliant just as any commercial space would be. No
questioned whether a post office in
revisions made.
East Avon is appropriate. The plaza
overlay should encourage articulated
The location of the post office was added to the walking diagram.
outdoor spaces. How about
bookstores?
Outdoor dining and bookstore added to the list.
26
Pictures need to be included to
Included charrette drawing of commercial on the second floor on
demonstrate, for example, what flex
page 21.
space in second level looks like, in
addition to diagrams.
27
First bullet should read "create a
Changes made as suggested.
strong pedestrian connection" or
"create and encourage a strong
Size of sidewalks indicated in the cross sections and description of
connection." The second bullet point
the proposed roadways.
needs to be reworded to reflect the
desire to reroute E. BC Blvd and
should not call out Christie Lodge by
name. The intent of moving the
street should be highlighted (i.e. to
move lodging closer to the core of
East Avon and for circulation
purposes). The principles should
define the size of sidewalks.
Third bullet — should read: "Enhance
and maintain strong pedestrian
connections between East Town
Center and the Eagle River." The
second to last bullet to be modified
stating "Provide comfortable and safe
spaces with adequate separation of
automobiles and pedestrians." Add
bullet "Create a safe and exploratory
environment with strong pedestrian
connections to secondary pedestrian
corridors."
28
Strike word "thereby"
Change made as suggested.
29
Avon Road Crosswalk color and /or
Changed to bolder lines.
symbol showing connections between
East and West Town Centers should
be emphasized. First sentence should
be reworded to start with "Consistent
high quality and intuitive design are
Changes made as suggested.
the driving forces....." There should
be a consistent level of visual cues
including materials, signs, and
landscaping.
Need direction to determine if the illustrative /diagrams should be
revise to look more hand - drawn.
The Photoshop drawing does not give
the right feel to the plan. The lines
appear too hard and should be broken
in some way with new hand drawn
sketches.
WPM
East Town Center District Plan
Planning Commissioner Questions/ Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Tracldn :
29
Under bullet one of principal five,
Changing this from a residential to a mixed use portion of the
replace "residential' with "mixed-
District changes the fundamental principles of this district to create a
use."
residential environment. This is a mixed use district, with most of
the District having mixed -use buildings. Changing the buildings
along this street to include commercial will require major changes to
the document, financial analysis, and approach. We would like to
keep it as is.
Change of photos.
30
The second dashed walking radius line
Change made as suggested.
does not have a leader.
31
The top photo is great, but the
Bottom photograph changed.
bottom picture is no representative of
Changes to text made as suggested.
the envisioned East Town Center
District. Under principal four, second
No changes made to "mixed use" for the same reasons as page 29.
bullet, the word "border" should be
replaced with "front." Under fourth
bullet, should read "Avoid or
minimize the impacts of traffic on
secondary streets to create a pleasant
living environment." Bullet five, "by
encouraging owners with vehicles..."
Under bullet one of principal five,
replace "residential' with "mixed
use."
32 and
The residential street should be called
Text change made as suggested.
33
"secondary" streets, and there should
Hierarchy made clearer.
be some sort of hierarchy in line
types, colors, etc. to differentiate
between through roads and secondary
roads.
34,35,
36
Residential cross section appears more
commercial than residential, and the cross
Need direction to determine if cross sections should be changed to
look softer.
sections throughout the document should
be softened in some way.
35
"Trash Bins" should be replaced with
Replaced with Trash "Receptacles" to match the Avon Commercial
"Trash Cans ". Also the first
Design Guidelines.
paragraph should read "Trees should
Reworded trees placement text.
be no more than 30 feet on center."
36
Same as previous page, trees should
Changes made as suggested.
be no more than 30 feet o.c. The
sentence in the middle of the
paragraph should read "A minimum
of six foot clear pedestrian circulation
route should be provided, however,
creative solutions to pedestrian routes
is strongly encouraged."
WE
East Town Center District Plan
Planning Commissioner Questions/ Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Tracldn :
37
Page 35: Strike 150 o mixed -use
Changes made as suggested.
reduction bullet. Strike "Casual
surveillance" bullet from principal 7.
Under principal 8, add bullet to read
"Encourage decentralized
underground parking." Last bullet to
read "Prohibit bland walls facing the
street on buildings with parking
garages. Bland walls must be
decorated with artwork, display
cases......"
Do the footprints work with parking
The on -street parking numbers will be revised to reflect what the
39
numbers? What were the
illustrated plan allows.
assumptions that went into these
1. Underground parking:
parking studies?
The underground parking was calculated by determining the square
footage of the possible building footprint- connecting footprints
where reasonable. Underground parking area was drawn in GIS
based on the CAD drawings of the potential footprints. The square
footage of this underground parking area was divided by 425 to
determine the number of spaces possible. Four hundred and thirty-
five is a conservative number to include the double -wide parking
spaces, infrastructure, aisles, and drives. Parking consultants
provided this conservative rule -of thumb number.
Underground parking was assumed to have only one floor to be
conservative with the estimate- although more than one floor is likely
to be desirable for maximum efficiency. The park plaza was the one
exception in which two floors was anticipated.
2.0n- street parking
Parallel parking was calculated as 20 feet per parking space. The
length of the parking area was measured and divided by 20.
Angled parking was calculated as 16 feet per parking space. The
length of the parking area was measured and divided by 16.
On- street parking to remain the same was counted from an aerial
map
3.Surface parking
Surface parking to remain the same was counted from an aerial map.
Surface parking is also calculated as total square footage divided by
425 a parking space. The City Market parking space is calculated to
include underground parking as well as surface parking.
42
Strike last bullet under principal 10.
Changes made as suggested. Slight modification- "still compliant
Under the second to last bullet under
with the Avon lighting requirements to minimize "over- lighting."
principal 11, should read "Provide
appropriate lighting to insure that
paths are safe at night and still
compliant with the Dark Sky
Ordinance."
East Town Center District Plan
Planning Commissioner Questions/ Comments 5 -15 -07 to 7 -31 -07
Responses and changes by Design Workshop
Underlined text indicates the need for future direction
Page:
Comment:
DW Change Tracking:
11
LEED certification was discussed at
Reworded to express an emphasis on these specific LEED points.
length and whether or not it should be
Moved from page 44 to page 11.
required in this document. Some of
the bullets may be redundant (i.e.
New image selected.
encourage the use of renewable
materials) since they are required by
LEED already. The bottom photo is
not representative of the East Avon
vision.
44
Strike entire page.
Would like to keep the Massing Models. They are a good tool to
express how the build -out may change based on this plan. It shows
the change from low density with expanses of surface parking. The
captions help to explain the purpose of the massing models.
45
Strike first bullet. Add Bellyache
Changes made as suggested
Ridge to the third bullet. Strike the
word "trees" from last bullet and this
last bullet should be reworded.
45,46,47
Strike entire page 46
Took new photos to show the great mountain ranges, not necessarily
View corridors should not be broken
from the locations indicated on page 47. Included the name of the
into primary and secondary, they
mountain range below the photo. Views diagram altered to include
should all be accepted as view
Belleyache. No prioritization for views.
corridors with no prioritization. The
narrative should go into more detail
on which views are important (i.e. call
out Bachelor's Gulch, Gypsum Cliffs,
etc again) and there should be a view
from Beaver Creek Boulevard looking
straight down.
49
The third bullet should read "Require
Town Staff requested the realignment of East Beaver Creek
the realignment of East Beaver Creek
Boulevard to be flexible.
Boulevard." Under the last bullet
"Tax Increment Financing" should be
spelled out since it is the first time it
comes up in the document.
50
Strike first sentence of first paragraph.
Change made as suggested.
51
The Chapel Square figure was
Changes made as suggested.
questioned. In the caption, the word
"will" to be replaced with "shall."
There should be a note added
indicating that the expenditures are
based on 2006 or 2007 numbers based
on assumptions.
55
The schematic drawings should show
Change made as suggested.
existing conditions next to the
proposed drawings that are shown.
58
The relationship between this plan
See page 3 and 33
and the Village at Avon was
questioned. There should be a clear
statement of intent in the conclusion.
Images added or changed to cover and pages 11, 13, 21, 31, 36, 37,
41, 42, 43, 45, 46, 49, 58
12
Memo
C 0 L 0 R A 0 0
To: Honorable Mayor and Town Council
Thru: Larry Brooks, Town Manager x l
From: Eric Heidemann, Community Development Director
Date: October 5, 2007
Re: Presentation of Proposed Eagle County Housing Guidelines
Summary:
Staff has invited Alex Potente, Eagle County Acting Housing Director, to present their
proposed Housing Guidelines and share lessons learned regarding the mitigation of
affordable housing on the West End Development project. Below is an outline of the
presentation:
1) EC proposed housing guidelines (see chart attached)
a. Residential inclusionary requirement (50% or total square footage)
i. 30% "Affordable" price - capped, appreciation capped @ 105 %/115% AMI
ii. 20% "Resident- Occupied" (no price or appreciation caps)
b. Commercial mitigation (100% of all jobs created @ 100% AMI)
2) West End Deal Structure
a. Affordable housing component (30% at 115% AN with cost recovery up to 125%
AMI)
b. Explanation of cost recovery mechanism and how it might be structured in Avon
c. Sales tax infrastructural assessment for off -site road improvements
d. Road impact fee schedule
e. Other off -site improvements (pedestrian access; bus stops and shelters; preserve
landscaping)
f. Parking (drive -up vs. underground parking)
3) Other tools potentially applicable to Avon
a. Government partnerships
i. Government - financed, income - generating facilities (e.g., underground parking
structures)
ii. Tax credit rental housing (free federal money for project equity)
iii. Bank - qualified financing for rental and for -sale properties
Town Manager Comments`
fg.
Attachments:
Exhibit A: Summary of Proposed Changes to the Eagle County Housing Guidelines
Proposed Material Chances to Earle County Housing Guidelines
EC Old Housing Guidelines
EC Proposed Housing Guidelines
RESIDENTIAL INCLUSIONARY
20% of total residential units in PUD.
30% of total residential square
REQUIREMENT
footage in PUD deed restricted, price
Applies only up- zoning in unincorporated Eagle
Applies to 4 residential units or more
capped,
County
in a zoning change.
plus
20% full -time residency only (no
initial or resale price capon site
only).
Applies to 4 residential units or more.
AMI level for sales housing
30 -100% of AMI, average 80% AMI.
An average of 105% (115% if 80% or
more parking is underground).
Cost recovery plus 5% profit (plus
5% developer's fee) if proven to
County's satisfaction by independent
auditor after construction from self -
imposed assessment at developer's
election.
Fees imposed at time of sale
No broker; County facilitates sales.
Same.
2% Transfer commission paid by the
seller for county's role as broker.
Off -Site Mitigation Rate
25% of total residential units in PUD.
30% (price capped) treated as on -site
if certain criteria are met; 20% (non-
price- capped) must be onsite or
developer must meet cash -in -lieu.
In -Lieu Mitigation Rate
30% @ 80% AMI, based on square
50% @ 100% AMI ($60 sq. ft.) plus
footage ($132,000/950 sq. ft.).
15% admin. fee ($9 /sq. ft)); land in
lieu will be considered as alternative;
off -site may be treated as on -site if
objective criteria are met.
RESIDENTIAL LINKAGE
20% of housing needs generated by
Abolished.
development's employees @ 80%
On -site
AMI on site; 25% off -site; 30% in-
lieu.
In -lieu
30% (13.1% effective) @ 60% AMI
N /A.
COMMERICAL LINKAGE
Must meet commercial linkage or
inclusionary requirement; whichever
is higher plus lower AMI level for
generated requirement -- -the two are
not cumulative.
On -site
20% @ 60% AM I.
100% @ 100% AMI.
Off -site
25% @ 60% AM I.
Treated as on -site if certain criteria
are met (e.g., location inappropriate
for employee housing); otherwise in-
lieu must be satisfied.
In -lieu
30% @ 60% AMI ($172,000
100% at 100% AM1($60'sq. ft.) plus
subsidy /unit; 87 jobs x 13.1 %= 11
15% ($9'sq. ft.) administrative fee.
units x $172,000 affordability gap @
60% AMI = $1.89 million).
Deed Restriction Terms
Locals only; appreciation capped at
Same, except no min/max for wage
wages, but only 3 % -6% compound
appreciation.
interest; no income cap