11-22-2010 Nottingham Power Plant Stabilization Project Phase I AddendumTO Town of Awn
ATTN : Matt Pielsficker
DATE. November 22, 20:10
RE- Nottingham Power: Plant Stabilization/Restoration P`r ject: PRASE I (Addmduw�
oj
Tie Torn of Avon Au4 Wrad U ai College -(C Qag,* faxeVise..A' between th
Town
,o eement b
W
00W in ;gT
N ing m -Po t(h
of Avon and CMC, dated. September 8�. .2008 to: Stabilize and R. es ore the otti � wer . PI an j o
Project) as f
PHE I PART 8
S.cope of Work CW shall furnis h all of t7 e material arid' parf
r�rm all of the Mr-k on, the Proj.*d,&t iii
accordance with the scope desdribed herein and the ter*sof :I$ AgVeemewi
L. Restore waterwheel;
o CMC will r=ove the remaining parts of the waterwheel from, thasit.elo the woodshop
oA the CMC Lead Timberlifte ca to &hablieliqstorAiion�
6 Gmc, will repair and restore :the cast .iron wheels and' axle of the watemheel.
Q. The paddles will. be:reeqnstructed:us-ing-the specified woods and fitted to the vdieel after
,completion.of the: cast .irdn repairs, and restorati
cr The: paddles will be removed in. order to - transport the wheel to- the site : when water lev
ols
allow m�. 2* 0*. ll
0 CK will have the restored waterwheel transported back, to the site,
0 CMC WiIre_=�tall the paddles : afterthe waterwhml has been placed' its reconstructed
timber. carriage.
"
-2. CMC'�§ H ist Pte V 6 o* Program will, perform the Work ft. the Project danc h Th e
�s in accor , e wi th rid 0 1
Secretary qfthe.JkI&iors Standardsforthe Trea4m4ntofRI'storic Properties,
3. Coti iA t B
q . 1woun, for PfUS.E f PART is
B.' $7
4. Copapldi6n of Work CW_ shall-have the Wheel and paddles ready .for ..fb tran ort to Avon.and to-
.
,
installation 111 coordination with the owite reeoust m. work. on or before Sept=bpr 1, 201
5: CMC Nvill invoice -the. Town of 'Avon for, and. the Town of Ayoa shall pay; 50% of the contract
amount upon completion of the restoration of the water wheel (wheel spokes re- attached to ante),
reconstruction oftbe paddles anti pre - fitting of the paddies. to the wheels, Completed work will be
verified with photographs.. The balance of the - contract sball be Invoic and paid upon teftirn ofthe
waterwheel with paddles ready for reinstallation on the. reconstructed timber framewo&
, -
Ims addendum authorizes CMC to com mience Plasie 1, Raft:
Thubatino CaWpUs.:
61.901 US HW 2-4 South ik Loo&flfe, 00: 8*0461 i 719-486,20-15
www,edt� domtn.edu
The parties signify their agreement with this Addendum. by their signatures below.,
FOR: COL=OLLEGE
BY: By
S re WRTAptlfority)
Stev!a Rqd
.01 r,40- #A�VM contracts Manager
TrME:
DATE 2-
TownseadR. Andetson, Director
Historic Preservation Program
Colorado'40untain College
901 8.14ighWay 24
Leadvillb, CO 80461
- 71.9-48642-30
tanderson@eoloradomtn...,edu,
TrrLE
DATE:
2