PZC Res. No. 1999-07J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc
TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO. 99-7
SERIES OF 1999
A RESOLUTION RECOMMENDING TO THE TOWN
COUNCIL OF THE TOWN OF AVON APPROVAL OF THE
SUITES @ AVON CENTER PUD DEVELOPMENT PLAN
ON LOT B, AVON CENTER AT BEAVER CREEK
SUBDIVISION, TOWN OF AVON, EAGLE COUNTY,
COLORADO
HEREAS, Shapiro Development Company has applied for approval of the Suites
@ Avon Center PUD Development Plan for Lot B, Avon Center at Beaver Creek
Subdivision.
HEREAS, after notices required by law, a public hearing was held by the
Planning & Zoning Commission of the Town of Avon, at which time the
applicant and the public were given an opportunity to express their opinions and present
certain information and reports regarding the proposed PUD Development Plan, and
HEREAS, pursuant to Section 17.20.110.H. of the Avon Municipal Code, the
Planning & Zoning Commission has considered the following design criteria:
1. Conformity with the Avon comprehensive plan goals and objectives;
2. Conformity and compliance with the overall design theme of the Town, the sub-area
design recommendations and design guidelines adopted by the Town;
3. Design compatibility with the immediate environment, neighborhood, and adjacent
properties relative to architectural design, scale, bulk, building height, buffer zones,
character, and orientation;
4. Uses, activity, and density which provide a compatible, efficient, and workable
relationship with surrounding uses and activity;
5. Identification and mitigation or avoidance of natural and/or geologic hazards that
affect the property upon which the PUD is proposed;
6. Site plan, building design and location and open space provisions designed to produce
a functional development responsive and sensitive to natural features, vegetation and
overall aesthetic quality of the community;
W
W
W
J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc
7. A circulation system designed for both vehicles and pedestrians addressing on and
off-site traffic circulation that is compatible with the Town transportation plan; 8.
Functional and aesthetic landscaping and open space in order to optimize and
preserve natural features, recreation, views and function;
8. Phasing plan or subdivision plan that will maintain a workable, functional and
efficient relationship throughout the development of the PUD. The phasing plan shall
clearly demonstrate that each phase can be workable, functional and efficient without
relying upon completion of future project phases;
9. Adequacy of public services such as sewer, water, schools, transportation systems,
roads, parks, and police and fire protection;
10. That the existing streets and roads are suitable and adequate to carry anticipated
traffic within the proposed PUD and in the vicinity of the proposed PUD.
OW, THEREFORE, BE IT RESOLVED, THAT the Planning & Zoning
Commission hereby recommends to the Town Council of the Town of Avon, Eagle
County, Colorado to approve the Suites @ Avon Center PUD Development Plan on Lot
B, Avon Center at Beaver Creek Subdivision, with the following conditions:
1. The applicant will enter into a Master Deed Restriction Agreement with the Town of
Avon for six on-site deed restricted affordable employee housing units.
2. The resubdivision vacating the existing property line between Lots A and B, Avon
Center at Beaver Creek Subdivision and reestablishing a new property line between
these lots in accordance with this development plan be approved by the Town of
Avon.
3. The pedestrian connection walkway between the Pedestrian Mall and West Beaver
Creek Boulevard will approved at Final Design, and be established as an easement.
4. A traffic-demand management program will be established by the owner to encourage
commuting employees to use transit and other alternative transportation modes.
5. A parking management plan will be established by the owner to limit to short term
use the surface parking area while encouraging use of the structured parking area.
6. The owner will establish a snow removal program.
7. The owner will participate, either directly or through the Metropolitan District, in the
Avon Pedestrian Mall master planning, construction, and maintenance.
8. A solar study will be provided for Final Design Review to examine shadow effects
upon public spaces, and to help determine appropriate locations for streetscape
furniture, landscaping and public spaces.
9. Appropriate language will be added to the Suites @ Avon Center Development Guide
stating that, “Development of the Suites @ Avon Center PUD shall conform to the
standards outlined above. Elements not specifically addressed in this Guide shall be
governed by Title 17 of the Avon Municipal Code.”
N
J:\Planning & Zoning Commission\Resolutions\1999\Res 99-07 Lot B ACBC PUD.doc
ADOPTED THIS 2nd DAY OF FEBRUARY, 1999
Signed:
_____________________________________ Date: ___________________
Chris Evans, Chair
Attest:
_____________________________________ Date: ___________________
Sue Railton, Secretary