Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PZC Packet 102626
A Avon jj[��'�j AVON PLANNING & ZONING COMMISSION Meeting Agenda Monday, October 26, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: httpsJlteams.microsoft.com/meet1240853380295912?p=HHV4SWKKx5pEP5QQic To join meeting via phone, dial and enter conference ID: 477 057 969# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM 2. Appointment of Chairperson and Vice Chairperson 3. Approval of Agenda 4. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items 5. Public Comment — Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 6. Consent Agenda 6.1. REFR26-001 Letter to Village at Avon DRB for Avondale Apartments 6.2. October 12, 2026 Planning and Zoning Commission Meeting Minutes 7. Public Hearings 7.1. SRU26-002 Les Schwab Tires Special Review Use. 147 Nottingham Road— Claire Perez, Planner II 7.2. CPA26-002 Comprehensive Plan Amendment: Water Supply Element — Jena Skinner, Planning Manager 8. Future Meetings 8.1. November 9, 2026 8.2. November 16, 2026 8.3. December 7, 2026 (potentially cancelled) 9. Commissioner Updates & Staff Updates 10. Adjourn MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. n Avon COLORADO October 21, 2026 Village (at Avon) DRB Attn: Warner Hopkins warner hopkins(o)hotmail.com Re: Town of Avon Planning and Zoning Commission Referral Lot 5, Planning Area CH2 — Avondale Apartments Dear Warner and Members of the Village at Avon Design Review Board, I hope this message finds you well. I am writing to convey the Town of Avon Planning and Zoning Commission's insights and comments regarding the proposed Avondale Apartments in the Village (at Avon) Lot 5, Planning Area CH2. The Town of Avon Planning Staff referred the project plans and designs to the Planning and Zoning Commission ("PZC") under file #REF26-001 for our meeting on October 12, 2026. The primary objective of this hearing was to present the project and gather valuable recommendations and suggestions for the Village (at Avon) Design Review Board ("DRB") to consider during your review process and the ongoing development of this area. We sincerely appreciate the opportunity to share our observations with you and hope they will be beneficial in your deliberations. General Comments/Concerns: 1. Future planning and the incorporation of a public transit stop for this project should be contemplated; and 2. Without onsite recycling, requiring residents to transport materials to a nearby drop-off may reduce recycling participation or increase contamination at the recycling center. Thank you for sharing this exciting project within the Village (at Avon) with the Town of Avon. Should you have any questions or require further clarification regarding comments, please do not hesitate to reach out to me at 970-748- 4023. Kind Regards, nA �1&0- �Jen Skinner, AICP anning Manager Town of Avon, CO Post Office Box 975 1 100 Mikaela Way I Avon, CO 81620-0975 1 970-748-4023 1 www.Avon.org A Avon jj[��I�j AVON PLANNING & ZONING COMMISSION Meeting Minutes (DRAFT) Monday, October 12, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: https://teams.m crosoft.com/meet/240853380295912?p=HHV4SWKKx5pEP5QQic To join meeting via phone, dial and enter conference ID: 477 057 969# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM Meeting commenced at 5:30 PM. A rollcall was taken, and Planning Commissioners Carly Hansen, Nicole Murad and Nancy Tashman were present. Commissioners Brad Christianson, Brian Sipes, and Elizabeth Waters were present remotely. Commissioner Rick Sudekum was absent. 2. Approval of Agenda ACTION: Commissioner Christianson made a motion to approve the agenda. Commissioner Murad seconded the motion, and the motion passed unanimously 6-0. 3. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items Commissioner Hansen disclosed that her colleague was presenting agenda item 6.2, however she is not involved with the project and can remain unbiased. Other members of the Planning and Zoning Commission agreed and had no issue, additionally this agenda item is a referral with no action taken. 4. Public Comment— Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 5. Referral 5.1. REFR26-001 Avondale Apartments 6. Work Session 6.1. Review of Sun Road Redevelopment Area Concept Plan 6.2. Planning Area B Village Park 7. Consent Agenda 7.1. September 28, 2026 Planning and Zoning Commission Meeting Minutes ACTION: Commissioner Murad noted that the minutes name "Nancy Murad" and this should be fixed to "Nancy Tashman". Commissioner Hansen abstained from the vote since she did not attend the September 28 meeting. With the edit mentioned, Commissioner Sipes made a motion to approve the consent agenda. Commissioner Murad seconded the motion, and the motion passed unanimously 5-0. MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. A Avon COLORADO 8. Future Meetings 8.1. October 26, 2026 — Brian Sipes remote, Nancy Tashman unavailable 8.2. November 9, 2026 9. Staff Updates 9.1. PZC Rules and Operating Procedures 10. Adjourn The meeting was adjourned at 7:40 PM APPROVED: is MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. TO: Planning & Zoning Commission Members FROM: Claire Perez, Planner II RE: QUASI-JUDICIAL PUBLIC HEARING SRU26-002 Special Review Use Avon LEGAL: Lot 4, Block 1, BMBC 0 0 L 0 R A D 0 ADDRESS: 147 Nottingham Road DATE: October 26, 2026 SUMMARY: This report presents a Special Review Use (SRU) application for consideration by the Planning and Zoning Commission (PZC) to allow the transition of the existing Avon Auto and Truck ("Applicant") business to a Les Schwab Tires Center. Stacey Irwin on behalf of Les Schwab Tires Center proposes to continue operating an automotive service business at the site with services including tire sales and maintenance, wheel alignments, brakes, shocks, oil changes, and battery replacements, while reducing the scope of major mechanical repairs. Avon Auto and Truck has operated at this location under an SRU since 2009, with the permit renewed in 2017. The 2017 approval included a condition requiring a new SRU application upon a change in ownership. The subject property is a 0.70-acre parcel zoned Neighborhood Commercial (NC) on the south side of Nottingham Road and contains a building with six service bays and a caretaker's unit above the office. As proposed, the scale, site design, and operational characteristics of the business are expected to remain substantially similar to the existing use, aside from extended Saturday operating hours. PROCESS: SRUs are approved by PZC and do not proceed further to Town Council. Town Council acts as an appeal body only with SRU applications STAFF PUBLIC HEARING RECORD OF ANALYSIS & DECISION REPORT 10/26/2026 10/26/2026 F - PUBLIC NOTIFICATION: Notice of the public hearing was published in the October 16, 2026, edition of the Vail Daily in accordance with Sec. 7.16.020(d) of the Avon Development Code ("ADC"), as well as in areas designated for Town notices (Town Hall, Public Library, Avon Elementary, and Avon Rec Center). Mailed notice is required for Special Review Use applications. The notice was sent to property owners within 100 feet of 147 Nottingham Road on October 13, 2026. No public comments have been received for this application. 970-748-4014 cperez@avon.org SPECIAL REVIEW USES, REVIEW CRITERIA — VEHICLE REPAIR SHOP, MINOR Avon Municipal Code includes requirements for Special Review Uses including Vehicle repair shop, minor (AMC §7.24.060(h)). Each of these uses require that: 1. Outdoor storage or repair work is not allowed. Staff Response: The applicant has stated that no vehicle repair work will occur outdoors and that no materials or inventory will be stored outside. Tires will be delivered to the site on a weekly basis and stored within the building. The applicant indicated that a scrap tire collection container will be located at the rear of the property, with weekly pickup service provided by a tire recycler. 2. Body work and spray painting must be confined to properly ventilate indoorbays that shall be closed from the outdoors during use. Staff Response: The applicant has stated that spray painting is not part of the proposed operation. Any body work conducted on -site will occur within properly ventilated indoor service bays that remain closed to the outdoors during use. 3. Sales of new and used motor vehicle parts are allowed as an incidental use to the repair shop; however, no outside storage of product is allowed. Staff Response: The applicant has stated that all parts, products, and inventory associated with the business will be stored indoors. No outside storage is proposed. 4. Service bay openings facing a public street or a residential zoning district shall be screened to a height of at least siz (6) feet. Staff Response: The service bays are located on the east side of the building and face west toward the adjacent property, which is also zoned Neighborhood Commercial (NC). A narrow vacant lot separates the site from the adjacent property, providing additional buffering between the service bay area and the nearest residential property. The applicant has stated that the service bay doors will remain closed except when vehicles are entering or exiting, consistent with the site's existing operations. The applicant has also indicated a willingness to provide additional screening if determined necessary to satisfy this review criterion. SRU26-002 October 26, 2026 Page 2 of 6 Creeks Stormwater Culvert Point Stormwater Culvert 0 Parcels } Town of Avon Boundary SPECIAL REVIEW USE, REVIEW CRITERIA - GENERAL PZC must consider a set of general review criteria when reviewing SRU applications. The review criteria for Special Review Uses are governed by Avon Municipal Code ("AMC") §7.16.100, Special Review Uses. Staff responses to each review criterion are provided below. (e) Review Criteria. The PZC shall use the following review criteria as the basis for a decision on an application for a special review use: (1) The proposed use is consistent with the Comprehensive Plan and all applicable provisions of this Development Code and applicable state and federal regulations. Staff Response: The subject property is located within the Gulch Area District and District 6 Gateway Area identified in the Comprehensive Plan. The Comprehensive Plan recognizes the Gulch Area District as an important contributor to Avon's overall economic health due to its mix of commercial, industrial, residential, and public service uses. The proposed Special Review Use would continue an established automotive service business at the site with no significant changes to the building, site layout, or intensity of operations. The use provides an automotive service to residents and visitors and is consistent with the Comprehensive Plan's objective to encourage commercial development that contributes to Avon's economic health and provides increased choices and services. Staff finds that the proposed use is generally consistent with the Comprehensive Plan and applicable provisions of the Development Code. (2) The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use -specific standards in the Development Code; Staff Response: The Neighborhood Commercial (NC) Zone District is intended to provide for a compatible mix of residential, neighborhood -serving commercial, and civic uses within a pedestrian -oriented environment. The district implements the mixed -use classification of the Future Land Use Plan and is intended to accommodate limited commercial uses along collector roadways. The proposed use involves the continuation of an existing automotive service business that has operated at this location since 2009. The use provides automotive services to residents, businesses, and travelers and is compatible with the commercial nature of the surrounding area. Staff finds that the proposed use is generally consistent with the purpose and intent of the NC Zone District and the applicable use -specific standards of the Development Code. (3) The proposed use is compatible with adjacent uses in terms of scale, site design and operating characteristics; Staff Response: The proposed use is compatible with surrounding uses in terms of scale, site design, and operating characteristics. Adjacent and nearby land uses include medical offices, gas stations, and Town of Avon Public Works and Transportation facilities. Residential uses are not directly adjacent to the site and are separated from the property by Nottingham Road and Buck Creek to the west. The applicant is not proposing any expansion of the existing building, site improvements, or changes to the overall scale of operations. The site layout, building footprint, and operating characteristics are expected to remain substantially similar to the existing use. SRU26-002 October 26, 2026 Page 3 of 6 (4) Any significant adverse impacts (including but not limited to hours of operation, traffic generation, lighting, noise, odor, dust and other external impacts) anticipated to result from the use will be mitigated or offset to the maximum extent practicable; Staff Response: The applicant has stated that noise associated with the operation will be minimized by keeping service bay doors closed except when vehicles are entering or exiting the building. Any body work conducted on -site will occur within enclosed indoor service bays. Tires will be delivered on a regular basis and stored indoors in compliance with applicable fire safety requirements. The applicant has also indicated that scrap tires will be collected in a designated container located at the rear of the property and removed on a routine basis by a tire recycling contractor to prevent the accumulation of tire debris. An environmental assessment of the property identified several existing conditions, including above -ground storage tanks, waste oil drums, and an interior sand trap floor drain. The applicant has stated that the above -ground storage tanks will be removed and the affected areas thoroughly cleaned. The applicant also stated that the existing interior floor drain will be removed, the area deep cleaned, and a modern drainage system installed. Based on the information provided, staff finds that potential adverse impacts associated with the proposed use can be mitigated through compliance with applicable permitting requirements and the recommended conditions of approval. (5) Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development; and Staff Response: All services are available for this property with little impact to existing systems. The use has been operational for several years and has demonstrated proper maintenance of facilities and services during its time. (6) Adequate assurances of continuing maintenance have been provided. Staff Response: The applicant has stated that they are committed to maintaining and improving the condition of the property as part of the transition to a Les Schwab Tires Center. A conceptual rendering showing updated signage and exterior building materials have been provided. Any future signage will require approval through a sign permit application, and any exterior modifications will be subject to the applicable development review process. Staff finds that adequate assurances of continuing maintenance have been provided. GENERAL REVIEW CRITERIA. Conformance with General Review Criteria in AMC §7.16.010(f)(1), General Criteria, which provides criteria that are applicable to all development applications: (1) Review Criteria. The reviewing authority shall be Director when the Director has the authority to administratively approve a development application. The reviewing authority shall be the PZC and/or Town Council for all development applications which are subject to public hearing. The reviewing authority shall review development applications for compliance with all relevant standards and criteria as set forth in the specific procedures for the particular application in this Development Code, as well as the following general criteria which shall apply to all development applications: SRU26-002 October 26, 2026 Page 4 of 6 (i) The development application is complete; (ii) The development application provides sufficient information to allow the reviewing authority to determine that the development application complies with the relevant review criteria; (iii) The development application complies with the goals and policies of the Avon Comprehensive Plan; and (iv) The demand for public services or infrastructure exceeding current capacity is mitigated by the development application. Staff Response: This SRU application is complete. Staff believes sufficient information exists to allow the PZC to review the application and the applicable review criteria for this use. It is unlikely that the proposed business operations will create demand for services that are exceeding current capacity. OPTIONS: PZC has the following options: • Approval of the application as presented, with conditions • Approval of the application with modified findings or conditions • Continue the public hearing to a specific date • Denial, with findings RECOMMENDED FINDINGS: SRU26-001, §7.16.100(e) — Special Review Use Criteria 1. The application for a vehicle repair shop qualifies as a viable use to be reviewed per §7.16.100 Special Review Use of the Avon Development Code. 2. The proposed business complies with the provisions of AMC §7.24.060(h)(1) - Special Review Uses — Commercial —Vehicles and Equipment. 3. The proposed use is consistent with the Comprehensive Plan. 4. The proposed use is compatible with adjacent uses in terms of scale, site design and operating characteristics. 5. There are no significant impacts to adjacent or on -site uses. 6. Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection and roads and transportation as applicable) are available to serve the subject property and will not necessitate upgrades or cause additional demand beyond existing levels of service for development; and 7. Adequate assurances of continuing maintenance are satisfactory. GENERAL CRITERIA FINDINGS §7.16.020(f)(1) — General Criteria 1. The development application is complete; SRU26-002 October 26, 2026 Page 5 of 6 2. The development application provides sufficient information to allow PZC to determine if it complies with the relevant review criteria; The development application complies with the goals and policies of the Avon Comprehensive Plan; and 4. The demand for public services or infrastructure exceeding current capacity (e.g., water, sewer, and storm drainage) does not require mitigation at this time and will be coordinating prior and during the next phase for the building permit. PROPOSED CONDITIONS: 1. No "Junk" vehicles are permitted on the property, as defined by the Avon Municipal Code. 2. Vehicle repairs are limited to "light" vehicle repairs. "Heavy" automobile maintenance activities such as engine overhauls, tire recapping, and body repainting or repair are strictly prohibited. . Hours of operations shall be limited to 7 am — 6 pm Monday through Friday, and 7 am — 5 pm on Saturday. 4. Any changes to the exterior of the building or site shall be subject to review and approval through the applicable Development Plan review process. 5. The applicant shall submit an environmental mitigation plan addressing the findings of the environmental site assessment and obtain all required permits and approvals for any associated remediation, storage tank removal, plumbing and or mechanical improvements. All approved mitigation measures shall be completed prior to commencing operations as Les Schwab Tires Center. 6. The applicant shall submit a Sign Permit application for any new signage prior to installation. RECOMMENDATION: Staff recommends approval of the application with conditions as presented. RECOMMENDED MOTION: "1 approve of SRU26-002 based on the proposed findings and conditions as proposed in the Staff Report." Thank you, Claire ATTACHMENT: A — Application Materials SRU26-002 October 26, 2026 Page 6 of 6 Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Les Schwab Tires SRU Application - Avon, CO 147 Nottingham Rd, Avon, CO 81620 Table of Contents: Appendix A: Completed application form Appendix B: Informative statements regarding business operations Appendix C: Owner's signature or an acknowledged power of attorney if the owner has authorized an agent or representative to act as the applicant; Appendix D: Legal description of the property subject to the development application; Appendix E: An electronic Title Commitment dated within sixty (60) days of the application. If the Title Commitment does not contain live document links, a copy of the Commitment submittal shall be accompanied with copies of all documents listed in the Exceptions; Appendix F: Recent Survey executed no more than three (3) years prior stamped by a surveyor licensed in the State of Colorado. The preferred survey type (minimum) includes a plat, Information Location Certificate (ILC), or Alta. Survey must reflect current conditions of the subject property. Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Appendix A TOWN OF AVON, Colorado Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Avon^ Planning application For use by Principal Authority Cloudpermit application number US-CO04110-P-2026-99 PIN 210501302002 Application submitted to Town of Avon, Colorado Description of Subject Property Address 000147 NOTTINGHAM, RD Municipality Town of Avon, Colorado PIN 210501302002 Purpose of Application Application type Special Review Use 100 Mikaela Way P.O. Box 975 Avon, CO 81620 Phone: (970) 748-4030 Applicant Last name First name Corporation or partnership Irwin Stacy Street address Unit number Lot / Con. PO BOX 5350 Municipality State ZIP code BEND OR 97708 Other phone Mobile phone +15414155586 Fax Email stacy.l.irwin@lesschwab.com Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Property owner Last name PABCO LLC First name Corporation or partnership Street address PO BOX 784 AVON CO 81620-0784 Unit number Lot / Con. Municipality State ZIP code Other phone Mobile phone Fax Email Declaration and Signatures Applicant I, Stacy Irwin (The Applicant), do hereby declare that the information contained in this application, the attached schedules and forms, the attached plans and specifications, and other attached documentation is true to the best of my knowledge. If a permit is granted, I agree to comply with Local Ordinances and the conditions of the permit. If the Applicant is a corporation or partnership, I have the authority to bind the corporation or partnership by signing off, I understand that it constitutes a legal signature confirming that I acknowledge and agree to the above declaration. G° Digitally signed on 09/30/2026, 3:17:39 PM MDT by Stacy Irwin. Project Description Please describe the proposed project Les Schwab Tire Centers submits this special use permit application to transition the existing Avon Auto & Truck facility into a Les Schwab location. Are you the owner of the property in question? Yes Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Appendix B Les Schwab Tire Centers submits this special use permit application to transition the existing Avon Auto & Truck facility into a Les Schwab location. Founded in 1952, Les Schwab operates over 600 tire centers across the western United States, with a long-standing commitment to community partnership, high aesthetic standards, and strict environmental compliance. By acquiring Avon Auto & Truck, Les Schwab will maintain essential local automotive services —such as tire sales and maintenance, wheel alignments, brakes, shocks, oil changes, and battery replacements —while narrowing the scope of major mechanical work (engine, transmission, and exhaust). Since expanding into Colorado in 2012, Les Schwab has grown to over 45 locations across the state by focusing on world -class customer service and supporting local community service. Our store teams take deep pride in directly supporting the towns they call home. Through statewide partnerships with 4H, FFA, and others like the annual Denver7 & Volunteers of America Toy Drive and The Salvation Army's Pack -A -Backpack campaigns, our Colorado stores help provide thousands of local children with holiday gifts and essential school supplies every year. Additionally, our Tires for Purpose program donates free sets of tires to local search -and -rescue teams, first responders, and mountain -area nonprofits to ensure the vehicles serving our communities stay safe and operational. We look forward to bringing that same level of active civic support to Avon. To best serve this community, Les Schwab requests unrestricted working hours on Saturdays going forward. Saturday is a critical day for local workers, families, and visitors to address urgent vehicle safety needs —such as flat tire repairs, battery checks, and seasonal tire changes —without missing work during weekdays. Full Saturday operations will provide a vital service to local residents while maintaining minimal impact on surrounding properties. We look forward to partnering with the City of Avon to continue serving the Vail Valley. Additional Notes • Scale of operations: We do not plan to expand or add onto the building in any way. Our operation will be similar to the current operation of Avon Auto and Truck in terms of scale, site design, operating characteristics and other potentially adverse impacts such as traffic generation, lighting, noise, odor, and dust. • Hours of Operation: • Monday through Friday: 7 AM - 6 PM • Saturdays: 7 AM - 5 PM • Noise management: We plan to operate this location with our bay doors closed except when moving cars in and out. We do this in Pagosa Springs, CO and have had no complaints regarding the noise of our operation. • Upstairs Apartment: We plan to retain this as is • Outside storage or repair work: We do not do vehicle work of any kind outside, nor do we store anything outside. • Spray painting: We do not spray paint as part of our business. Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A • Body work will be confined to properly ventilate indoor bays, closed from the outdoors during use. • Tire Deliveries & Internal Storage: We will be delivering tires to this store regularly (weekly) with our own vehicles from our own facilities, and will always do so in an organized, clean manner. Tires stored inside will be done so safely and in a manner that meets or exceeds current fire safety standards. • Scrap tire collection: Similar to current operations, we will have a bin in the back corner of the property to collect scrap tires. Lakin Tire Recyclers will empty this bin weekly to ensure no build up of tire debris. • Parking lot: we do not plan to change the orientation of or striping of the parking lot. • Future Maintenance: we commit to maintaining this building and property in better condition than we find it, as we do with all of our stores across the country. • Signage: We will conduct a local survey of local business signage and existing city code before submitting our formal proposal. For now, we do not plan to add any net new signage, we will simply replace the face of the current sign with our name so customers can find us. Updated exterior front signage render Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Appendix C: Owner's signature or an acknowledged power of attorney if the owner has authorized an agent or representative to act as the applicant; Pain, 1j" 10/13/26 [Signature] [Date] Appendix D: Legal description of the property subject to the development application; Lot 4, Block 1. Benchmark at Beaver Creek Subdivision, Amendment No. 4, according to the Plat recorded September 1978 in Book 274 at Page 701, County of Eagle, State of Colorado. Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A Appendix F Survey Docusign Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A COMMERCIAL DUE DILIGENCE SERVICES 1 TITLE DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF EAGLE, STATE OF COLORADO, AND IS DESCRIBED AS FOLLOWS: LOT 4, BLOCK 1, BENCHMARK AT BEAVER CREEK SUBDIVISION, AMENDMENT NO. 4, ACCORDING TO THE PLAT RECORDED SEPTEMBER 1978 IN BOOK 274 AT PAGE 701, COUNTY OF EAGLE, STATE OF COLORADO. FOR INFORMATIONAL PURPOSES ONLY: APN: 2105-013-02-002 THE LAND SHOWN IN THIS SURVEY IS THE SAME AS THAT DESCRIBED IN FIRST AMERICAN TITLE INSURANCE COMPANY, COMMITMENT NUMBER: NCS-1317173-OR1, DATED: 08/05/2026 AT 5:00 P.M.. 211 TITLE INFORMATION THE TITLE DESCRIPTION AND THE SCHEDULE B ITEMS HEREON ARE FROM A TITLE REPORT PREPARED BY FIRST AMERICAN TITLE INSURANCE COMPANY, COMMITMENT NUMBER: NCS-1317173-OR1, COMMITMENT DATE: 08/05/2026 AT 1�11 5:00 P.M.. rj FLOOD INFORMATION BY SCALING AND GRAPHIC PLOTTING ONLY, THE SUBJECT PROPERTY LIES WITHIN ZONE "X" OF THE FLOOD INSURANCE RATE MAP FOR THE TOWN OF AVON, COLORADO, COMMUNITY -PANEL OR MAP NUMBER 08037C 0444D, BEARING AN EFFECTIVE DATE OF 12/04/2007. NO FIELD SURVEY WAS PERFORMED TO DETERMINE THIS ZONE AND AN ELEVATION CERTIFICATE MAY BE NEEDED TO VERIFY THIS DETERMINATION OR APPLY FOR A VARIANCE FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY. RELEVANT ZONES ARE DEFINED ON SAID MAP AS FOLLOWS: ZONE "X" = AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. 6 CEMETERY CU ERE WAS NO VISIBLE EVIDENCE OF CEMETERIES OR RIAL GROUNDS OBSERVED AT THE TIME THIS SURVEY AS PERFORMED &a COMMERCIAL DUE DILIGENCE SERVICES 3550 W. Robinson Street, Third Floor Norman, Oklahoma 73072 Main Office Phone No.: 405-253-2444 Cds.solutions(cDfirstam.com Copyright ©Commercial Due Diligence Services. This format and style is protected by Copyright, all rights are reserved. Any use of this format and style is strictly prohibited without prior written permission from Commercial Due Diligence Services. 3 SCHEDULE "B" ITEMS NOTES CORRESPONDING TO SCHEDULE "B" SECTION TWO EXCEPTIONS: OTHE RIGHT OF A PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES, AS RESERVED IN UNITED STATES PATENT RECORDED AUGUST 31, 1896 IN BOOK 48 AT PAGE 208. (DOES NOT AFFECT - DESCRIPTION FALLS IN SECTION 12, SUBJECT TRACT IS IN SECTION 1) 10 THE RIGHT OF A PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES, AS RESERVED IN UNITED STATES PATENT RECORDED MAY 4, 1905 IN BOOK 48 AT PAGE 272. (DOES NOT AFFECT - DESCRIPTION FALLS IN SECTION 12. SUBJECT TRACT IS IN SECTION 1) 11 EASEMENTS, NOTES, COVENANTS, RESTRICTIONS AND RIGHTS -OF -WAY AS SHOWN ON THE PLAT OF BENCHMARK AT BEAVER CREEK, RECORDED SEPTEMBER 5, 1978 AT RECEPTION NO. 129460. (DOES AFFECT - NO PLOTTABLE ITEMS. EASEMENTS REVISED BY EXCEPTION 14) 12 EASEMENTS, NOTES, COVENANTS, RESTRICTIONS AND RIGHTS -OF -WAY AS SHOWN ON THE PLAT OF BENCHMARK AT BEAVER CREEK, RECORDED DECEMBER 26, 1974 AT RECEPTION NO. 134061. (DOES AFFECT - NO PLOTTABLE ITEMS. EASEMENTS REVISED PER EXCEPTION 14) 13 RESERVATION OF RESTRICTIONS ON USE OF PROPERTY AS SET FORTH IN DEED RECORDED JANUARY 31, 1978 AT RECEPTION NO. 162724. (DOES AFFECT - NO PLOTTABLE ITEMS) 14 EASEMENTS, NOTES, COVENANTS, RESTRICTIONS AND RIGHTS -OF -WAY AS SHOWN ON THE PLAT OF BENCHMARK AT BEAVER CREEK AMENDMENT NO. 4, RECORDED SEPTEMBER 5, 1978 AT RECEPTION NO. 171107. (DOES AFFECT - SHOWN HEREON) 15 RESERVATION OF RESTRICTIONS ON USE OF PROPERTY AS SET FORTH IN DEED RECORDED FEBRUARY 1, 1979 AT RECEPTION NO. 177861. (DOES AFFECT - NO PLOTTABLE ITEMS) 16 TERMS, CONDITIONS, PROVISIONS, OBLIGATIONS AND AGREEMENTS AS SET FORTH IN THE RESOLUTION # 84-5, SERIES OF 1984 RECORDED FEBRUARY 21, 1984 AT RECEPTION NO. 275231. (DOES AFFECT - NO PLOTTABLE ITEMS) 17 LEASE BY AND BETWEEN BRUCE H. ALLEN AND CHARLES C. ALLEN TRUSTEE OF THE 1987 REVOCABLE INTER VIVOS TRUST OF CHARLES C. ALLEN AND SUSAN D. ALLEN, AS LESSOR, AND GOLDEN EAGLE SERVICE CENTER, INC., AS LESSEE, AS EVIDENCED BY ACKNOWLEDGEMENT OF AND CONSENT TO TERMS OF LEASE AGREEMENT RECORDED JUNE 30, 1994 AT RECEPTION NO. 540255. (DOES AFFECT - NO PLOTTABLE ITEMS) E ZONING INFORMATION ZONING NOT PROVIDED 11 SURVEYOR'S NOTES THIS SURVEY IS BASED ON INFORMATION SHOWN ON A TITLE REPORT PREPARED BY FIRST AMERICAN TITLE INSURANCE COMPANY COMMITMENT NO. NCS-1317173-OR1, COMMITMENT DATE 08/05/2026 AT 5:00 P.M., AND ALL SCHEDULE B EXCEPTIONS IN SAID TITLE REPORT HAVE BEEN ADDRESSED. THE SURVEYOR DID NOT ABSTRACT THIS PROPERTY AND HAS RELIED ON SAID TITLE REPORT FOR ALL MATTERS OF RECORD. 2. SUBJECT TRACT HAS DIRECT DRIVEWAY ACCESS TO NOTTINGHAM ROAD, A PUBLIC RIGHT-OF-WAY. 3. THERE IS NO OBSERVABLE EVIDENCE OF EARTH MOVING WORK, OR BUILDING CONSTRUCTION. 4. NO OBSERVABLE EVIDENCE OF ANY CHANGES IN STREET RIGHTS -OF -WAY OR RECENT STREET OR SIDEWALK CONSTRUCTION OR REPAIR. 5. ALL STATEMENTS WITHIN THE CERTIFICATION, AND OTHER REFERENCES LOCATED ELSEWHERE HEREON, RELATED TO UTILITIES, IMPROVEMENTS, STRUCTURES, BUILDINGS, PARTY WALLS, PARKING, EASEMENTS, SERVITUDES, FOUNDATIONS AND ENCROACHMENTS ARE BASED SOLELY ON ABOVE GROUND, VISIBLE EVIDENCE, UNLESS ANOTHER SOURCE OF INFORMATION IS SPECIFICALLY REFERENCED HEREON. 6. ALL MONUMENTS SET ARE 5/8" REBAR WITH A YELLOW PLASTIC CAP MARKED "D BERNARD CO LS 38517" UNLESS OTHERWISE NOTED 7. THIS SURVEY DOES NOT PROVIDE A DETERMINATION OR OPINION CONCERNING THE LOCATION OR EXISTENCE OF WETLANDS, FAULTLINES, TOXIC OR HAZARDOUS WASTE AREAS, SUBSIDENCE, SUBSURFACE AND ENVIRONMENTAL CONDITIONS OR GEOLOGICAL ISSUES. NO STATEMENT IS MADE CONCERNING THE SUITABILITY OF THE SUBJECT TRACT FOR ANY INTENDED USE, PURPOSE OR DEVELOPMENT. 8. THE POINT OF HEIGHT MEASUREMENT IS IDENTIFIED ON THE SURVEY AND WAS TAKEN FROM THE NEAREST ADJACENT GRADE AT SAID POINT. THIS POINT REPRESENTS THE HEIGHT OF THE STRUCTURE AS OBSERVED FROM GROUND LEVEL. 9. THE DIMENSIONS AND AREA OF THE BUILDING SHOWN ARE BASED ON THE BUILDING'S EXTERIOR FOOTPRINT AT GROUND LEVEL. 10. THE SURVEYOR DID NOT OBSERVE ANY EQUIPMENT OR ACTION ASSOCIATED WITH THE PROCESS OF DRILLING FOR OIL, GAS, OR ANY OTHER HYDROCARBONS ON THIS SURVEY. 11. IN REGARDS TO ALTA TABLE A ITEM 11(A), NO UNDERGROUND UTILITY PLANS AND/OR REPORTS HAVE BEEN PROVIDED BY THE CLIENT AT THE TIME THIS SURVEY WAS PERFORMED. 12. ALL RECIPROCAL EASEMENT AGREEMENTS ("REAS") THAT HAVE BEEN REPORTED BY THE TITLE REPORT PROVIDED HAVE BEEN DENOTED ON THE SURVEY AND ARE SHOWN HEREON. THE LIMITS OF ANY OFFSITE APPURTENANT EASEMENTS THAT HAVE BEEN REPORTED BY THE TITLE REPORT PROVIDED HAVE BEEN DENOTED ON THE SURVEY AND ARE SHOWN HEREON. 13. UNLESS SHOWN OTHERWISE THE SURVEYED BOUNDARY SHOWN HEREON IS CONTIGUOUS WITH THE ADJOINING PROPERTIES AND/OR RIGHTS OF WAY WITH NO APPARENT GAPS, GORES OR OVERLAPS. 14. UNLESS SHOWN OTHERWISE, NO VISIBLE EVIDENCE OF SUBSTANTIAL AREAS OF REFUSE WERE OBSERVED AT THE TIME THE FIELDWORK WAS PERFORMED. E SURVEYOR CERTIFICATION TO: FIRST AMERICAN TITLE INSURANCE COMPANY THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE 2026 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/NSPS LAND TITLE SURVEYS, JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS, AND INCLUDES ITEMS 2, 3, 4, 6(A), 6(B), 7(A), 7(B)(1), 7(C), 8, 9, 11(A), 13, 14, 16, 17, 19, 20, AND 21(A) (GRAPHICALLY DEPICT IN RELATION TO THE SUBJECT TRACT OR PROPERTY ANY OFFSITE EASEMENTS OR SERVITUDES BENEFITING THE SURVEYED PROPERTY AND DISCLOSED IN RECORD DOCUMENTS PROVIDED TO THE SURVEYOR AS PART OF THE SCHEDULE "A") OF TABLE A THEREOF. THE FIELDWORK WAS COMPLETED ON 09/15/2026. DATE OF PLAT OR MAP: PRELIMINARY, THIS DOCUMENT SHALL NOT BE RECORDED FOR ANY P° ,Amn IS FOR FXAMINATION / RFVIFW ON1_.V DARYN M.BERNARD COLORADO PROFESSIONAL LAND SURVEYOR NO. PLS.0038517 EXPIRES OCTOBER 31, 2027 KEY TO ALTA-SURVEY 111 TITLE DESCRIPTION 1211 TITLE INFORMATION 1311 SCHEDULE "B" ITEMS 4 11 SURVEYOR CERTIFICATION 1511 FLOOD INFORMATION 1611 CEMETERY 1711POSSIBLE ENCROACHMENTS 1811 ZONING INFORMATION 1911 LEGEND __) 11011 BASIS OF BEARING [171SURVEYOR'S NOTES 12 PARKING INFORMATION 11311LAND AREA —2 14 BUILDING AREA 11511BUILDING HEIGHT 11611VICINITY MAP 11711NORTH ARROW / SCALE F187cLIENT INFORMATION BOX 11911 SURVEY DRAWING 20 PROJECT ADDRESS —) Sheet 1 of 2 1611 VICINITY MAP 1$ MON ALTA/NSPS Land Title Survey This survey was made in accordance with the 2026 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys. (Effective February 23, 2026) This Work Coordinated By: COMMERCIAL DUE DILIGENCE SERVICES 3550 W. Robinson Street, Third Floor Norman, Oklahoma 73072 Main Office Phone No.: 405-253-2444 Cds.solutions@firstam.com Toll Free: 888.457.7878 Date: __ Drawn By: MLP Revision: __ Date: -- Surveyor Ref. No: 26-09-0053: Approved By: DMB Revision: Date: -- Field Date: 09/15/2026 Revision: Date: -_ Scale: 1" = 20' Revision: Prepared For: NCS No.: Client Ref. No.: Asset No: 20 PROJECT ADDRESS 147 NOTTINGHAM RD AVON, COLORADO Project Name: LES SCHWAB PORTFOLIO CDS Project Number: 26-09-0053:2 Docusion Envelope ID: 8D2DECE3-AE7E-8B8D-81DA-BOBDD909C69A TO: Planning and Zoning Commission FROM: Jena Skinner, AICP, Planning Manager �` .O RE: PUBLIC HEARING: Amendment to Comprehensive Plan: v Water Supply Element; CPA26-002 C 0 L 0 R A D DATE: October 22, 2026 SUMMARY: This report presents to the Planning and Zoning Commission ("PZC") a Comprehensive Plan Amendment ("CPA") application for the addition of a supplemental "Water Supply Element" as required by the State of Colorado. This document will be an extension of the Comprehensive Plan ("COMP PLAN or PLAN"), with anticipated inclusion upon amending the Comp Plan in its entirety. BACKGROUND: The Colorado Revised Statutes now require municipal, county, and regional Comprehensive Plans to include a water supply element, and these elements must be updated, in consultation with water providers, at least every 5 years. More specifically, Colorado's Senate Bill 24-174 requires Comprehensive Plans to include a water supply element and a strategic growth element by December 31, 2026. Comprehensive Plans are also required to have a water conservation element. Several peer jurisdictions in Colorado have also approached this Comp Plan modification and have also done a supplemental document to satisfy this mandate. Staff received Council's direction to amend the Avon Comprehensive Plan- as is required per the Avon Municipal Code, to ensure compliance with these requirements on October 6, 2026. Key Requirements: • Deadline: December 31, 2026, with updates required at least every 5 years. • Mandatory Actions: Local governments must consult and coordinate with local water providers, incorporate water conservation policies, and estimate a range of water supplies and facilities needed for future development. Funding Impact: Starting December 1, 2027, state land use and Comp Plan grants from the Department of Local Affairs (DOLA) and partner agencies will prioritize entities with compliant comprehensive plans. Read more about this action on the Department of Local Affairs ("DOLA') website via this LINK. PROCESS: Public notification for adoption of a Comprehensive Plan Amendment is subject to the Avon Development Code ("CODE") requirements. The Comp Plan is considered an extension of the "Comprehensive Plan" by definition, and subject to the notification and approval process per Code. PUBLIC NOTICE ANALYSIS & STAFF REPORT PZC PUBLIC HEARING RECOMMENDATION October 26, 2026 TOWN COUNCIL PUBLIC HEARING 1st Reading Nov. 6, 2026 2,11 Reading Nov.22, 2026 Notification of this land use application was published in the Vail Daily, as required by Code. 970-748-4023 jskinner@avon.org PLANNING ANALYSIS: The following section includes the applicable commentary and analysis for CPA26-001 (Comprehensive Plan Amendment). REVIEW CRITERIA. PZC and Council shall use the following review criteria as found in Avon Municipal Code ("AMC") §7.16.030 as the basis for recommendations and decisions on applications for the amendment of the Avon Comprehensive Plan: (1) The land use as proposed in the Plan amendment is compatible with the surrounding area; Staff Response: This Plan (amendment) does not affect any specific property. Importantly, Avon has a clear and unwavering priority for Community Housing, for which Avon's water supply and infrastructure is prioritized as an essential public benefit. (2) Transportation services and infrastructure have adequate current capacity or planned capacity, to serve potential traffic demands of the land use proposed in the plan amendment, if applicable; Staff Response: Not applicable. This Plan does not affect infrastructure; rather, it acknowledges the goals, policies, and actions needed in creating and supporting future projects and their potential impact on Avon's water supply. Specific details concerning development impacts will be subject to this analysis once a project has determination. More specifically, land use applications for potential redevelopment opportunities or expansion of Town boundaries would be reviewed on a case -by - case basis and only considered in accordance with the water availability at the time of development. Review shall be completed by the Upper Eagle River Regional Water Authority and Eagle River Water and Sanitation District. (3) Public services and facilities have adequate current capacity or planned capacity to serve the land use proposed in the plan amendment; Staff Response: The Comp Plan itself does not provide specific or general information regarding public services, utilities, land use, or infrastructure capacity, and this amendment- while adding a water supply element, does not seek analysis of a specific development application at this time. With an active development plan application, detailed development reviews will determine any potential impacts and or mitigation to Avon's water supply and systems. (4) The proposed land use in the plan amendment will result in a better location or form of development for the Town, even if the current plan designation is still considered appropriate; Staff Response: This Comp Plan update does not propose any amendments pertaining to any specific developments, outside of projects already slated for Community Housing. Of these projects, locations have already been assessed for the appropriateness of the intended development. (5) Strict adherence to the current plan would result in a situation neither intended nor in keeping with other key elements and policies of the plan and current planning and community trends; CPA26-002 Avon Comprehensive Plan Amendment: Water Supply Element October 26, 2026 Page 2 of 5 Staff Response: This update intends to increase its relevancy in acknowledging water supply, strategic growth, and conservation at a higher level. As Avon has a recently updated Community Housing Plan, our goals and policies for future Community Housing is up to date. Staff also acknowledges that the existing Comp Plan does not provide growth strategies so specific that adding a water supply element and additional strategic growth beyond what is existing in the Comp Plan and detailed in our Community Housing Plan is not applicable like it could be for other jurisdictions that recommend specific densities and intensities. (6) The proposed plan amendment aligns or is in conformance with the applicable purposes stated in this Development Code; Staff Response: The Plan supports, compliments, and expands the Comprehensive Plan by focusing specifically on water, whereas generally, the Comprehensive Plan is more generic and captures guidance for a variety of development goals and objectives at a higher level for Avon. Updating the Comp Plan in this manner supports and allows both documents to correspond with each other, strengthening the planning process and review of pending development resulting in considering assets that Avon desires. The Plan aligns with the following AMC Purpose statements directly: • § 7.04.030 (c) Comply with the purposes stated in state and federal regulations which authorize the regulations in this Development Code; and §7.04.030(g) (g) Prevent the inefficient use of land, avoid increased demands on public services and facilities which exceed capacity or degrade the level of service for existing residents; provide for phased development of government services and facilities which maximizes efficiency and optimizes costs to taxpayers and users; and promote sufficient, economical and high -quality provision of all public services and public facilities, including but not limited to water, sewage, schools, libraries, police, parks, recreation, open space and medical facilities. (7) The proposed plan amendment will consistently promote the health, safety or welfare of the Avon Community and the general goals and policies of the Avon Comprehensive Plan. Staff Response: This amendment provides focus for current goals and policies of Avon. The Plan promotes the health, safety, and welfare of the community by appropriately anticipating the potential impacts of water systems potentially affecting Avon's future. (8) The amendment proposes a land use that offers an essential or effective public benefit; Staff Response: Not applicable. This amendment is not affiliated with a specific development project. (9) The proposed land use is more suitable in the proposed location than elsewhere in Avon. Staff Response: Not applicable. No land use is affiliated with this amendment. CPA26-002 Avon Comprehensive Plan Amendment: Water Supply Element October 26, 2026 Page 3 of 5 GENERAL REVIEW CRITERIA: Conformance with General Review Criteria in AMC §7.16.010(f)(1), General Criteria, which provides criteria that are applicable to all development applications: (1) Review Criteria. The reviewing authority shall be Director when the Director has the authority to administratively approve a development application. The reviewing authority shall be the PZC and/or Town Council for all development applications which are subject to public hearing. The reviewing authority shall review development applications for compliance with all relevant standards and criteria as set forth in the specific procedures for the particular application in this Development Code, as well as the following general criteria which shall apply to all development applications: (i) The development application is complete; (ii) The development application provides sufficient information to allow the reviewing authority to determine that the development application complies with the relevant review criteria; (iii) The development application complies with the goals and policies of the Avon Comprehensive Plan; and (iv) The demand for public services or infrastructure exceeding current capacity is mitigated by the development application. Staff Response: This Comp Plan Amendment is complete. Staff believes sufficient information exists to allow the PZC and Council to review this application with the applicable review criteria. This Comp Plan Amendment application will not create impact demands for public services or infrastructure as a recommending document but offers considerations for general land use moving forward. All impacts of redevelopment will come forward and specifically analyzed as projects develop, for those either seeking inclusion into Avon, or for general expansion on existing properties. Specific to (iv), the General Review Criteria provisions are geared towards development applications, to ensure that a new development plan will not injure or cause major disruptions for existing development, or ensure that impacts will be mitigated appropriately. RECOMMENDED FINDINGS: GENERAL CRITERIA FINDINGS: 1. The development application is complete. 2. The development application provides sufficient information to allow the reviewing authority to determine that the development applications comply with the relevant review criteria. 3. The development application complies with, and enhances the goals and policies of the Avon Comprehensive Plan; and 4. The demand for public services or infrastructure exceeding current capacity does not require mitigation at this time as there is no development application accompanying this Comprehensive Plan Amendment that results in a physical project that utilizes public services or infrastructure. CPA26-002 Avon Comprehensive Plan Amendment: Water Supply Element October 26, 2026 Page 4 of 5 COMPREHENSIVE PLAN FINDINGS: 1. The proposed Plan amendment is compatible with the goals and policies of the entirety of the Avon Comprehensive Plan while recognizing that Avon's unique Comp goals, policies, and community Comp needs have evolved, requiring this update. 2. This amendment complies with the Review Criteria outlined in Section §7.16.030(c) of the Development Code and offers increased support for Community Comp efforts and good planning by the Town of Avon. 3. The proposed Plan provides guidance for planned and orderly use of land and in encouraging a high quality of place for the community; and 4. The proposed amendment promotes the health, safety, and welfare of the Avon Community by supporting coordinated development using a tool like the Comp Plan for its long term vision. OPTIONS: The PZC has the following options with the Application: Recommend Approval of the Plan, as drafted Recommend Approval of the Plan, with changes Continue the Public Hearing to a specific date STAFF RECOMMENDATION: I recommend the Planning and Zoning Commission provide support for this amendment. TOWN MANAGER COMMENTS: This amendment is considered as a relatively simple housekeeping item. Avon has actively engaged in water supply planning and water conservation implementation for many years, and this will simply create water supply and water conservation sections in the Avon Comprehensive Plan that cross-reference and summarize the work Avon has already done in order to demonstrate compliance with statutory requirements. We hope to bring amendments to Avon Planning Commission and then immediately schedule first and second reading of ordinances in November before Council. RECOMMENDED MOTION: `I recommend Council approve the proposed the proposed amendment to the Avon Comprehensive Plan based on the findings presented in Staffs report." Thank you, Jena ATTACHMENTS: A. Proposed draft Water Supply Element - A supplemental document of the Avon Comprehensive Plan Links: • Avon Comprehensive Plan • Information regarding the State Mandate Department of Local Affairs (`DOLA') CPA26-002 Avon Comprehensive Plan Amendment: Water Supply Element October 26, 2026 Page 5 of 5 f TTR 0 F AT' 0 R, Comprehensive Plan 'ATER SUPPti LY ELEMENT 2026 -lot %Q.1a 4av Heart of the Valley ;� INTRODUCTION AND PURPOSE The Town of Avon is a Home Rule municipality located in Eagle County, Colorado. As of the 2020 United States census, Avon had a population of 6,072 and is part of the Edwards, CO Micropolitan Statistical Area. Avon also serves as the gateway to Beaver Creek Resort. Unlike many Colorado jurisdictions, Avon does not operate its own water system, but it is part of the Upper Eagle Regional Water Authority ("UERWA" or "Authority"). Avon owns and manages its water supply, water rights, taps, and related assets, which are considered during land use application reviews. The UERWA is a public water provider governed by an appointed board representing its six member entities including Avon and the metropolitan districts of Arrowhead, Beaver Creek, Berry Creek, Eagle -Vail, and Edwards. UERWA owns the public water system that supplies drinking water to these communities, as well as Cordillera and Bachelor Gulch. The Eagle River Water & Sanitation District ("ERWSD") is contracted to operate the system. The ERWSD is a special district responsible for regional public water and wastewater treatment systems that serve Avon. Both the UERWA and ERWSD were consulted in the development of this Water Supply Element. This document outlines Avon's water supply and its alignment with the Colorado Water Plan, local planning, statutory requirements, and regional objectives. As a supplement to the Avon Comprehensive Plan, this document fulfills the state -mandated water supply and conservation requirements of Senate Bill 24-174 (C.R.S. § 31-23-206). This Water Supply Plan was adopted by Council on November 17, 2026. RIDGE � 4 u DZ9 J Avon 'GP Traer Bachelor Gulch I ,;- Vail Eagles Nest Eagie yr ' Beaver Creek Mil Eagle River Water and Sanitation District Town Boundary m 'g Special District o xTt,N F 1?pDR B gA0U5E S� FDlhrtl NOUN iiIN Page 1 of 8 CURRENT WATER SUPPLY The Town of Avon joined the Upper Eagle River Water Authority in 1998, which is the exclusive provider of potable drinking water in the Town of Avon. Avon also has a separate raw water system that is used for irrigation of outdoor landscaping in Town of Avon parks, Town properties and rights -of -way as well as filling and maintaining Nottingham Lake. Authority Agreement. The 2015 Amended and Restated Agreement Establishing the Upper Eagle Regional Water Authority and Master Service Contract (Authority Agreement) governs the relationship between the Upper Eagle Regional Water Authority (Authority) and its six member entities: Arrowhead Metropolitan District, Beaver Creek Metropolitan District, Berry Creek Metropolitan District, Eagle -Vail Metropolitan District, Edwards Metropolitan District, and the Town of Avon. The Authority Agreement sets forth the purposes, functions, water services, powers and operations of the Authority and its Board of Directors (Directors) and officers (see Appendix 2). The Authority Agreement also defines the Allocated Water Rights, Unallocated Water Rights and the requirement of a Water Rights Report that analyzes the water rights of the Authority and its Members, with present water use, future water needs, and related water rights issues. Town of Avon Lease Agreements. In 2005, the Authority entered into a lease agreement with the Town of Avon, where Avon leased its water rights to the Authority and in exchange the Authority agreed to provide water service to 4,984 SFEs. The lease agreement was amended in 2009, 2013 and 2015, increasing the SFEs the Authority is required to serve in Avon to 5,282.45 SFEs. The lease agreement is structured around a consumptive use of 459.57 acre feet of water to fulfil the service demand for 5,282.45 single-family equivalents. Village (at Avon) Planned Unit Development. The Authority was deeded 81.5 consumptive AF of water rights in 2014, together with all associated rights, benefits, and changes of water rights decreed under the plan for augmentation and exchange in Water Court Case No. 97CW306, which includes 30 AF of Eagle Park Reservoir water. These agreements include the Amended and Restated Traer Creek Water Storage Tank Agreement and the Second Amendment to Water Service Agreement amongst the Authority, Town of Avon, Traer Creek Metropolitan District and Traer Creek LLC. In return, the Authority committed to provide potable water service to the Village at Avon property detailed therein, subject to the terms of the decree of the Water Court Case No. 97CW306, up to a maximum of 106.3 consumptive AF per year. The Village (at Avon) maintains a separate "water bank" to account for water use on a parcel by parcel basis as it develops to ensure that development does not exceed the consumptive use water rights conveyed to the Authority. WATER RIGHTS ACCOUNTING Avon closely tracks all existing and potential development on a master spreadsheet database in consultation with the Authority to verify that water supply availability and commitments match existing, zoned, entitled and planned development. The current Lease Agreement includes a commitment by UERWA to serve 5,282.45 SFEs. As of November, 2026, 4,927.8 SFEs are assigned to serve existing and zoned development, resulting in 354.65 SFEs remaining to be assigned to serve additional development. Pending, planned and foreseeable additional development which may utilize the remaining unassigned SFEs are exclusively Community Housing, and are described as follows: Page 2 of 8 • Lot 3, Sheraton Mountain Vista (67 SFEs additional) • The Summit (50.6 SFEs additional) • Slopeside (103 SFEs additional') • Sun Road redevelopment (77 SFEs additional') • 91 Beaver Creek Place (9 SFEs additional') • Wildwood Annex Condos (12 SFEs additional') • Hidden Valley Estates (47 SFEsz) • CH1 Habitat (24 SFEs3) • CH2 Avondale (40 SFEs3) • State Land Board (104 SFEs4) 1. Conceptual level planning and subject to change 2. Accounted for within existing assigned 4,927.8 SFEs 3. Separate Village (at Avon) Water Bank 4. Eagle County Water Dedication for Housing SFE —preliminarily approved Summary of Pending Development and Water Right Assignment: Unassigned = 354.65 Lot 3 + Summit + Slopeside + Sun Road + 91 Beaver Creek Place + Wildwood Annex = 318.6 REMAINING UNASSIGNED SFES = 36.05 as of November, 2026 NOTE: There are several properties in the Avon Town Core which are not fully developed to the maximum as allowed under current zoning but which are built such that redevelopment is considered unlikely (e.g. Alpine Bank and US Bank properties). Avon has a well-defined water accounting database established in close consultation with the Authority which will allow Avon to track changes and updates to the Avon Water Supply as developments occur. This Water Supply Accounting system will allow Avon to consider the availability of water supply to serve any proposed rezoning or new development which may potentially increase water supply demand before granting any such approval. AVON RAW WATER INFRASTRUCTURE Harry A. Nottingham Park and Nottingham Lake. Harry A. Nottingham Park ("HAN Park") is highly valued by the regional community as a 40 acre park in Eagle County, a venue for community -focused events, and a place to relax and recreate. HAN Park's central feature is the 14-acre Nottingham Lake. Nottingham Lake provides a wide variety of summer and winter recreational activities. Nottingham Lake also serves as an emergency water source for the Authority. Nottingham Lake is supplied by Buck Creek and has the right to be supplied by the Metcalf Ditch and Nottingham -Puler Ditch. Avon's water rights allow Avon to maintain the level of Nottingham Lake to support a wide variety of recreational uses. Avon strives to be the leader in its focal park and management thereof, thus protecting its greatest water supply asset and beloved community amenity, and is diligent that water is used responsibly in the park. Page 3 of 8 Ditches. The Town operates two separate non - potable irrigation systems. The water system is used to provide non -potable irrigation water to portions of the original Avon town plat. The Village (at Avon) water system is comprised of Nottingham reservoir (dam), the Nottingham and Puder ditch, and one or two planned lakes which have not yet been constructed in the valley floor of the Village (at Avon). The raw water system map above shows the water sources and flow routes for our non -potable water system. The raw water system is used to irrigate Town - owned properties including Harry A. Nottingham Park, Main Street Mall, Avon Road, and portions of West and East Beaver Creek Blvd and Post Blvd. Avon operates two irrigation distribution systems, Town Center and Village (at Avon) neighborhoods, and is currently exploring creating a raw water utility for use by other entities aside from Avon. Avon tracks both ditches and irrigation systems through its in-house GIS systems. Page 4 of 8 Page 5 of 8 WATER CONSERVATION POLICIES Conservation and Land Use. Avon seeks to implement best water conservation regulations in the Avon Municipal Code ("AMC") which are in alignment with Colorado State Bill SB24-005, including requirements for water budgeting, use of native and drought -tolerant vegetation, limitations of turf (both living and artificial), and in the preservation of the riparian areas of the Eagle River. These landscaping provisions are found in AMC Title 7: Development Code, Chapter 7.28.050 Landscaping. The AMC includes criteria to consider impacts to existing infrastructure and works closely with the Authority to ensure there is no detriment to existing systems caused by new development or redevelopment. Avon is able to maintain accurate tracking of allocated SFEs (Single Family Equivalents used to measure water need), and the Authority is able to track individual water meters and use. Users also are required to use water efficiently and only for beneficial purposes to prevent waste of Avon's water supply. Combining Avon's development code with the Authority's water use and conservation programs promotes responsible and efficient use of the water supply system. Avon also works closely with local non -profits like the Beyond Lawn program of the Eagle County Conservation District ("ECCD"), as does the Authority and ERWSD. The Beyond the Lawn Program is a partnership between Eagle County Conservation District and the Eagle River Watershed Council. This program was developed to provide education and monetary support to Eagle County residents to support domestic water efficiency changes and biodiversity enhancements. MONITORING OUR WATER SUPPLY The ERWSD and UERWA, may be required to use strategic water supply reserves to ensure that water demands, and the associated augmentation requirements, are met — especially in dry or drought years. As such, the ERWSD and UERWA actively engages in water supply security planning, which includes assessments of its water supply portfolio, anticipated demand growth, conservation strategies, and contingency resources. These efforts help the plan for future water needs and ensure service reliability. As part of this planning, these entities operate with a water supply reliability standard designed to maintain "business as usual" service levels, except during a 1-in-20-year drought event (a 5% probability each year). This framework equips providers with the tools needed to predict and respond to more severe events that exceed the 1-in-20-year threshold, as snowpack is our primary water source. As it melts in spring and summer, it replenishes rivers, streams, and reservoirs. When snowfall is below normal, rivers run lower, reservoirs are stressed, and the risk of shortages rises. Understanding this connection helps the ERWSD plan and conserve water when it matters most. The ERWSD and UERWA use a Water Shortage Response Plan to carefully manage dry years by tracking five key indicators: 1. Drought severity 2. Snowpack/Snow Water Equivalent (SWE) 3. Peak streamflow 4. Low streamflow 5. Reservoir levels When one indicator is low, the system can adjust. When several show concern at once, it signals rising risk to both residents and the river. If multiple indicators suggest potential risk, it is the responsibility of ERWSD to take early, measured steps to protect the community's water supply. Additionally, if conditions continue to worsen, a declaration of a water shortage may enact further restrictions, water conservation measures, and Page 6 of 8 fines. In 2026 alone, through public engagement and outreach, water use declined by over 30% in response to conservation messaging. Reservoirs July 1 Indicator I Snow Pack How much water the snow pack will contribute to rivers and reservoirs Indicator II Peak Flow An early and/or low peak streamflow often signals reduced water availability later in the summer Indicator III Low Flow The first day when the Eagle River in Avon records a flow below 100 cfs is a strong indicator of a potential water shortage Snow Pack April 1 Peak Flow May -June Low Flow July - August AVON COMMUNITY WATER SUPPLY GOALS The following Water Supply Goals are adopted by the Town of Avon Goal 1: Plan for Anticipated Growth and Water Demand Indicator IV Reservoirs Reservoirs store water for later in the summer, when streamflows decrease and customer demand increases Indicator V Drought Severity ERWSD's service area is categorized as being in an extreme drought Image courtesy of the ERWSD Objective: Require any rezoning or other development approval which increases demand for water supply to provide additional adequate and sufficient dedicated water supply. Strategies: • Continue tracking development, potential development and projected water supply demand on a lot -by -lot basis in consultation with the Upper Eagle River Water Authority. • Maintain and seek to maximize utilization of a non -potable (or raw) water irrigation systems for parks, open spaces, public right-of-ways and private property where feasible on the valley floor area of Avon. Goal 2: Plan Coordination Objective: Align Avon plans with regional and state -level frameworks like the Colorado Water Plan. Strategies: • Consult regularly with the Upper Eagle River Water Authority during Comprehensive Plan updates. • Update this Plan's coordination section every five years to reflect evolving hydrogeologic and climate data, and/or major changes to water supply systems. Page 7 of 8 Goal 3: Increase Water Supply Conservation & Efficiency Objective: Continue implementation of best water conservation practices. Strategies: • Continue to convert Avon's landscaping on parks, town properties and rights -of -way to plantings and irrigation systems that maximize water conservation. • Continuously assist the public in converting landscaping with educational efforts and incentive programs. • Require high -efficiency water fixtures in new construction. Goal 4: Protect Water Quality and Watersheds Objective: Safeguard natural water bodies, recharge areas, and riparian corridors from the impacts of development. Strategies: • Improve water quality protection standards for local river floodways and stream buffers. • Continue protection and improvement efforts for Avon ditch and irrigation structures. • Enforce setbacks along streams, wetlands, and floodways during site planning. • Require green infrastructure for natural stormwater retention. • Coordinate with upstream districts to protect surface and groundwater intakes. Page 8 of 8