Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PZC Packet 101226
A Avon jj[��'�j AVON PLANNING & ZONING COMMISSION Meeting Agenda Monday, October 12, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: https://teams.microsoft.com/meet/240853380295912?p=HHV4SWKKx5pEP5QQic To join meeting via phone, dial and enter conference ID: 477 057 969# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM 2. Approval of Agenda 3. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items 4. Public Comment — Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 5. Referral 5.1. REFR26-001 Avondale Apartments 6. Work Session 6.1. Review of Sun Road Redevelopment Area Concept Plan 6.2. Planning Area B Village Park 7. Consent Agenda 7.1. September 28, 2026 Planning and Zoning Commission Meeting Minutes 8. Future Meetings 8.1. October 26, 2026 8.2. November 9, 2026 9. Staff Updates 9.1. PZC Rules and Operating Procedures 10. Adjourn MEETING AGENDAS AND PACKETS ARE FOUND AT: A A AA A A ®A" f ®f MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. TO: Planning and Zoning Commission Members A FROM: Jena Skinner, AICP, Planning Manager �� O RE: REF26-001 Village (at Avon) Lot 5, Planning Area CH2 DATE: October 8, 2025 coy oHaoo SUMMARY: This report presents to Avon Planning and Zoning Commission ("PZC") a referral for the pending (Avon) Avondale Apartments for Planning Area CH2 of the Village (at Avon) ("VAA") Planned Unit Development ("PUD"). Since this is a project driven by the Town and not subject to the formal Town of Avon review process, this application is a referral where PZC may provide comments to the Village (at Avon). Staff will collect PZC comments to ensure that we capture your referral comments accordingly. The project is governed by two (2) documents: The VAA Design Review Guidelines ("Design Guidelines"), and VAA PUD Guide ("PUD Guide"). Per the Design Guidelines and PUD Guide, "The DRB shall refer to the Town of Avon's Planning and Zoning Commission, for comment only, and not for approval or disapproval, of Development proposals submitted to the DRB." The PUD Guide contains specific standards for projects in Planning Area CH2- a Community Housing designated area, which is included as part of Staff's analysis. Planning areas of the Village (at Avon) PUD on the valley floor/south of I-170 BACKGROUND: The Village (at Avon) PUD was initially annexed in 1998, which established the planning areas for this development through the approvals of the associated development plan and the adoption of the VAA PUD Guide. Since 1998, the PUD Guide has been amended several times, including a significant and recent update in 2026 that changed the previous planning area for Lot 5 from Public Facilities or PF1 (as there are two other PF sites) to CH2 Community Housing. This change clarified and removed any ambiguity for the Town to pursue the construction of the proposed Avondale Apartments. 970-748-4023 jskinner@avon.org Page 1 of 8 PROPERTY DESCRIPTION: The site is located east of the Home Depot on Yoder Ave. Lot 5 is being utilized for Public Facility use and has been for many years as storage for public works and for the Town's recycle center. The site is relatively flat then transitions to a sloped area as it transitions into open space parcels to the north and towards 1-70. This lot is the last developable lot on Yoder Avenue and faces a church located on the property to the south that is not within the town boundary. MATERIALS LEGEND _••���i`�-� �r �,� -. } yam, i _ .. e. �xnrnm x i n x.. a iuixum,. xxnxrnrtm r.rux.t�urex-xxxa Home Depot 'x \ fX. 41, �t REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 2 of 8 PROCESS SUMMARY: The VAA DRB process includes three stages of design review before construction: a Pre -Design Conference, Preliminary Design Review, and Final Design Review. Avon's consultant team submitted the plans for DRB review on October 8, 2026. Application to PZC Referral VAA DRB Review DRB Final Building Permit Review Application PLANNING ANALYSIS: The following section includes the applicable commentary and analysis for this referral. As the VAA is exempt from the majority of the Avon Municipal Code, the following analysis is based on the requirements of the VAA PUD Guide and DRB Deign Review Guidelines. Allowed Use and Density per PUD Guide: Planning Area CH2 is intended for Community Housing projects, where: (b) Uses by Right: Except as specifically identified as Special Review Uses in Section D.13(c) below, or specifically prohibited in Section D.13(d) below, the following Primary and Accessory Uses: (i) Community Housing Units, subject to the limitations set forth in Section 1.15 of the Community Housing Plan. (ii) Infrastructure. (iii) Dry Utilities. (iv) Accessory Uses and Structures customarily appurtenant to Uses by Right. (v) Planning Area CH-2, within Lot 5, Final Plat, The Village (at Avon) Filing 1 Only: (1) Public Facilities. (e)(iii) Residential Density Maximum: (1) Planning Area CH-1: Maximum of 24 Dwelling Units. (2) Planning Area CH-2- Maximum of 40 Dwelling Units. Staff Response: Avondale was being contemplated prior to the 2026 PUD Amendment where the language in this zoning code is reflective of the intentions of the project. Lot Coverage, Setback and Easements per PUD Guide: (e) Building Envelope Requirements: (i) Minimum Building Setbacks: REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 3 of 8 (1) Front: a. For Planning Area CH-1: 10 feet b. For Planning Area CH-2: 25 feet (2) Side: None (3) Rear: 10 feet (ii) Maximum Building Height: (1) Planning Area CH-1 : 35 feet (2) Planning Area CH-2: 60 feet Staff Response: Because of the shared access with the recycling center and triangular lot shape, defining which is a front vs side setback assumes that the front is where access is achieved for this project. As there is a 25' irrigation easement along Yoder Ave, 25' will also be acknowledged on the south side of the project facing Yoder Ave. This project is being designed incorporating these limitations, and as such, conforming to the PUD. Building Height per PUD Guide: (e)(ii) (2) Planning Area CH-2: 60 feet Staff Response: Although The PUD allows up to 60 feet for this site, Avondale is designed to be approximately 56' (includes roof projections above the highest floor). n n' ,� ■� a eir 19 Design Theme per DRB Guidelines: The Village Design Philosophy "Highlights". • "In order to create a unique, pedestrian friendly, vibrant, successful, and long lasting town that enriches the quality of life and maximizes/enhances and preserves the value of the Property, the design of all Development within the Village must, among other things, distinguish itself by being unique, sustainable, interesting, attractive, and must respect the mountain setting as well as complement the surrounding Development within the Village... The Overall Design Theme is to establish an attractive appearance for visitors and residents and yet be flexible enough to allow for affordable design solutions." • "The attractive appearance expected for Development consists of, among other things, innovative and attractive architecture that promotes sustainable ideas and is sensitive to the surrounding area." • "The DRB shall not accept exceptions to the Design Theme and Design Philosophy that break the pattern of unique and attractive architecture for Development at the Village, as any exceptions will REF26-001 - VAA PLANNING AREA CH2 October 12, 2025 Page 4 of 8 negatively impact the Village and will promote unattractive architecture for Development in the future." Staff Response: The project conforms with the Design Theme language and provides an appropriate mountain aesthetic. It includes cool, natural muted tones, building articulation, interactive windows, and design that is functional, and purposeful in responding to being south facing in a mountain environment. Parking: per DRB Guidelines. - "All parking lots, parking spaces, and access ways shall be in compliance with Exhibit C to the PUD Guide" Required Parking - Exhibit C: TYPE OF LAND USE MINIMUM REQUIREMENTS Residential Land Use Multifamily building and townhouses Studio 1 space One bedroom 1-112 spaces Per Short Term Rental 1 space All others 2 spaces Guest parking spaces: Multifamily and townhouses 3 - - 5 units 2 spaces 5 - - 10 units 3 spaces 11 - - 15 units 4 spaces 16 - - 20 units 5 spaces 21 - - 25 units 6 spaces Proposed Parking: 1-bedroom 32*(1.5 per unit) 48 spaces 2-bedroom 8*(2 per unit) 16 spaces Accessible (1-van) 4 spaces Guest parking 10 spaces Total parking required 78 spaces Total parking provided 78 spaces *4 EVSE installed spaces + 8 EVSE ready spaces Staff Response: Exhibit C of the VAA PUD guide (above) has very extensive parking provisions, for several scenarios and uses. The Town will ensure that there is sufficient parking for residents, with the current allocation of spaces currently in conformance. As parking is on a case -by -case approval by the DRB, Staff is confident that this review body will be careful in their analysis for parking as well. REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 5 of 8 Landscaping per DRB Guidelines: "Acceptable landscape design will, among other things; retain and promote as much healthy native vegetation as practical, encourage creativity and personalized design of the landscaping, conserve water by creating landscapes where water -wise plants predominate, minimize the use of water -heavy plants and limit water -heavy plants to specific focal areas, limit total irrigation coverage using microclimate responsive design of irrigation systems and their conscientious operation, eradicate and prevent noxious weed infestations, minimize site grading, take into consideration the location and impact on the surrounding area, and respect and enhance the design of the streetscapes." "The minimum landscaped area required is equal to 20% of the gross site area less the footprint of all approved Buildings." "Any area outside the approved area of construction disturbance is deemed a natural area and is to remain in its natural state." "Surrounding the Buildings and along the public ways (and within ROW), landscape plantings, walks, public lighting, site furnishings, and signage shall create a year-round synergetic, coherent, and environmentally friendly and festive atmosphere." "Irrigation is required in all formal landscaped areas." (perPUD Guide) Staff Response: The VAA has recently adopted very similar landscaping standards that the Town is currently using, including water budgets. Detailed landscaping plans are required as part of the Building Permit, however, the PUD guide shall govern what is being proposed. The DRB will be the initial reviewer pre -building permit application, and Staff will ensure consistency. Building Design, Building Materials and Colors per DRB Guidelines: "The proposed Development must conform to the Guidelines applicable to the Planning Area, including the Design Philosophy, and intentions with respect to, but not limited to, site design, site access, parking and loading, easements, site grading, drainage, landscaping, snow storage, lighting, sidewalks, design character, the color, quality and identity of Building materials, and architectural merit and interest." Staff Response: Staff is comfortable that the design has considerations reflecting these elements for the apartments. While the DRB Guidelines do not have a list of preferred colors or s ecificall calls out certain color families (outside - - �y.M/RAC �• G QG� I - p Y of roofing colors), it does provide considerations in choosing colors that tie in with the VAA overall. The colors chosen are in the "cool' family and consist of a grey -based scheme of materials. Scale and Massing per DRB Guidelines: "All Buildings must face the street and take suitable measures to minimize its impact on all visible facades." "Passive solar design as a component of the architectural design of individual Buildings is encouraged." Staff Response: There are no issues or concerns with the scale and massing of this project. REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 6 of 8 Windows per DRB Guidelines: "Windows create interest in Building facades and communicate the type of Building and activities that are present. Windows may act as a lantern, establishing activity and vibrancy in the evening streetscape." Staff Response: Staff is satisfied with proposed window "schedule". Staff does not have any issues with the residential building and window placements and numbers. Roof Material, Pitch and Pedestrian Protection per DRB Guidelines: "Each Building should utilize green roof technologies while creating a unique expression of quality. It is strongly recommended that all primary roofs are to be "green roofs" or "grass roofs" simple in form and skyline. Roofs may be exterior usable space or a site for photovoltaic or hydronic collectors." Staff Response: While it is impractical to have a living roof on this structure, the design has included articulation and various degrees of slope to avoid use of a flat roof. The building design, roofline, and solar access is available for solar; however, immediate plans for immediate solar installation has not been finalized for this project. Trash Storage per DRB Guidelines: "Service areas, such as loading bays, recycling areas, dumpsters, compactors, storage areas and large utility equipment (including ground mounted equipment such as power transformers and air handling equipment), must be enclosed, screened, or located such that they are not visible from the streets and adjacent land uses such as pedestrian access ways so that they do not negatively impact the Village by being in the public view." Staff Response: As a multi -family residential project, trash is an important element for quality of place. Tash enclosures have been incorporated into this project. Snow Removal per DRB Guidelines: "Snow piles are unsightly, are hazards to traffic that can block ingress and egress and view corridors, cause safety issues, cause potential fire hazards, and do not conform to the Design Philosophy." Staff Response: Snow storage areas are incorporated as part of this project. Exterior Lighting per DRB Guidelines: "Nighttime lighting on a site shall be designed to minimize glare, light trespass and light pollution and to conserve energy and maintain night-time safety." (per PUD Guide) Staff Response: The VAA has lighting requirements that will govern this project. A complete lighting schedule, photometric plan, and light cut sheets need to be provided, to show that light trespass is contained according to the photometric plan, and light levels are low across the site. Staff recommends that the residential aspect especially, incorporate timers or smart -sensors that ensure areas are lit only when necessary. Bicycle Facilities, Mobility and Connectivity per DRB Guidelines: "The Village will share common connectors of vehicular and pedestrian traffic. These links will be connections of similar design details, utilizing both natural and human -made design elements." "Properties must include continued paths, as they cross the landscaped property. This should include a continued theme of plantings that co -exist with existing landscapes along the walking paths. Also, to be included are benches and/or other rest areas for pedestrians, as necessary. Also to be considered are storage areas and equipment for bicycles and other alternative transportation." REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 7 of 8 "The carefully planned transition between auto and pedestrian is an important element that encourages the use of convenient parking and inviting pedestrian paths." Staff Response: Bike storage is being proposed for this project as use of bicycles is a typical norm for Avon residents. The goal is to not have residents store bicycles on balconies- especially in a multi -story building. Storage areas will be located on the lower levels of the structure. Screening per DRB Guidelines: "All roof mounted machinery, vents, fans, etc. will be screened and hidden from sight. All loading and refuse areas, mechanical or utility equipment will be screened." Staff Response: All exterior and ground mounted mechanical, electrical, and communications equipment, meters, etc. shall be treated (as allowable) and screened from view with landscape elements or integrated in the architecture of the buildings." SUMMARY: The proposed project is considered the first Community Housing project in the Village (at Avon) in many years. Avon is ensuring that this project will be of thoughtful design and construction, incorporating quality of life aspects to create a highly desirable, affordable, residential experience for our workforce. RECOMMENDED COMMENTS/TOPICS: Staff recommends that the PZC discuss the following as a basis for discussion topics and formulate recommendations accordingly: • Architectural Design: • Materials • Colors • Roofline Articulation • Massing/Scale • Site Design • Parking • Snow storage • Pedestrian movements • Trash • Landscape Design Thank you, Jena ATTACHMENTS: A. Architectural drawings Links: • Village (at Avon) PUD Guide • PUD Plannina Area Mao • Village (at Avon) Design Review Guidelines • Avon Municipal Code Title 7: Development Code REF26-001 — VAA PLANNING AREA CH2 October 12, 2025 Page 8 of 8 ATTACHMENT A Agri4N sirE ARCHITECTS Avondale Apartments Preliminary Design Review Update September 17, 2026 Project Update Narrative This submission continues the Preliminary Design Review initiated in November/December 2024. The fundamental project concept remains the same: two interconnected buildings containing 40 residential units. The current package incorporates design refinements developed in response to the DRB's previous review and subsequent Town/Owner coordination. At the December 2024 meeting, the DRB noted that the building massing was acceptable and identified several areas for continued refinement, including exterior materials and detailing, rooftop equipment screening, maintaining a clean roof silhouette, and improving the overall architectural character. The current submission builds directly from that direction rather than introducing a new project concept. Project Refinements Since the 2024 Preliminary Review Overall Massing + Building Configuration • The previously reviewed two -building / 40-unit configuration is maintained. • No changes are proposed to the building footprints, primary hardscape configuration, or amenity structures. We have mirrored the West Wing units to the East Wing to locate the more articulated roof shapes at the ends of the building. • The overall massing previously identified by the DRB as acceptable has been retained while targeted architectural refinements have been developed. Roof Forms • Roof forms have been refined with larger, connected overhangs, adjusted slopes, and increased depth/shadow to strengthen the architectural expression. • The setback parapet roof areas have been maintained to accommodate and screen rooftop mechanical equipment. • Roof refinements continue the prior DRB direction to maintain a clean roof silhouette while improving the overall building character. SITE ARCHITECTS po box 943 carbondale, co 81623 Building Base • A 1'/2-story corrugated metal base element has been introduced to provide greater durability at the lower levels and visually break down the building massing. • The base treatment adds depth and articulation without changing the previously reviewed building footprint or overall massing. Balconies + Railings • Balcony detailing has been refined to incorporate a simple open metal railing system. • Horizontal and vertical open railing options were studied, with the preferred vertical direction incorporated into the current design. Exterior Materials + Color • The exterior palette has been refined toward a more cohesive gray -toned material palette with corrugated metal and complementary wildfire compliant materials. • Material selections and material transitions respond to the DRB's previous request for additional material development and the Town's interest in strengthening the project's mountain -modern character. Items Carried Forward from Previous Review The project continues to incorporate the planning and site improvements established with the November 2024 two -building concept, including: • Improved vehicular circulation and turnaround. • On -site stormwater management. • Increased opportunities for snow storage. • Reduced excavation and retaining -wall impacts at the east end of the site. • Improved circulation around the buildings. • Relocated pavilion with improved separation from vehicular activity. These elements were established as part of the previous Preliminary Design Review package and remain generally unchanged in the current submission. Response to Remaining 2024 DRB Comments The December 2024 DRB discussion also identified a number of technical and coordination items for continued development. The design team is carrying these forward through Preliminary, Final, and Technical Review as appropriate, including: • Exterior material specifications and detailing. • Rooftop mechanical equipment screening. SITE ARCHITECTS po box 943 carbondale, co 81623 • Elevator overrun coordination. • Snow storage/removal planning. • Utility routing and screening. • Parking and EV-count coordination. • Retaining -wall information. • Fire Department coordination. • Solar study. • Lighting and signage at Final/Technical Review. The 2024 meeting notes specifically identified lighting and signage as Final/Technical Review items, with several additional items to be resolved through continued project coordination. PUD Zoning Changes Since the previous Preliminary Design Review submission, the applicable PUD zoning designation has changed from PF-1 to CH-2. Building Height • The CH-2 zoning designation establishes a 60-foot maximum building height. • The current design is within the allowable building height; refer to Sheet A-1.02 for Building Height Calculations. • Previous building -height comments associated with the former zoning standard are therefore no longer applicable to the current review. Setbacks • CH-2 establishes setbacks that were not applicable under the prior PF-1 designation. • The south property line is identified as the front yard, with a 25'-0" setback. • The north property line adjoining Lot 6 is identified as the rear yard, with a 10'-0" setback. • The design team has discussed the trash enclosure encroachment into the rear setback with Town Staff and requests the DRB advise on appropriate steps for an agreement to allow the trash enclosure to remain in the rear -setback, if acceptable. Roof Overhang / Irrigation Easement • The refined roof design extends an overhang approximately 3 feet into the 25-foot irrigation easement along the south side of the property. • Approval is requested for this architectural projection pursuant to Section D of the Village at Avon PUD Guidelines, allowing architectural projections less than 10 feet beyond the Building Envelope. SITE ARCHITECTS po box 943 carbondale, co 81623 Summary The current submission is intended to continue the Preliminary Design Review begun in 2024, incorporating the DRB's previous feedback while retaining the fundamental two -building, 40-unit project configuration and massing. The primary architectural changes presented for review are focused refinements to the roof forms, building base, balcony/railing expression, and exterior material palette. These changes are intended to strengthen architectural character, durability, and detailing while preserving the site planning and overall massing previously reviewed by the Board. SITE ARCHITECTS po box 943 carbondale, co 81623 SHEET INDEX- DRB SHEET NUMBER SHEET NAME A-0.00 COVER TOPOGRAPHIC SURVEY S1 S2 TOPOGRAPHIC SURVEY SCHEMATIC CIVIL SITE AND UTILITY PLAN FIG.1 L2.00 OVERALL LANDSCAPE PLAN LOT 5 CONTEXT PLAN A-1.00 A-1.01 SITE PLAN BUILDING HEIGHT CALCULATION OVERALL BELOW GRADE FLOOR PLAN A-1.02 A-2.00 A-2.01 ENLARGED BELOW GRADE FLOOR PLANS A-2.02 OVERALL LEVEL 1-4 FLOOR PLAN A-2.03 ENLARGED LEVEL 1-4 FLOOR PLANS A-2.04 OVERALL ROOF PLAN A-2.05 ENLARGED ROOF PLANS A-3.00 OVERALL EXTERIOR ELEVATIONS A-3.10 WEST WING ELEVATIONS EAST WING ELEVATIONS OVERALL BUILDING SECTIONS A-3.11 A-4.00 A-4.10 WEST WING SECTIONS A-4.11 EAST WING SECTIONS A-5.01 UNIT PLANS -1 BEDROOM A-5.02 UNIT PLANS - 2 BEDROOM A-7.00 AMENITY STRUCTURES CHARACTER RENDERING A-8.10 A-8.20 CHARACTER RENDERING 30 AVONDALE APARTMENTS PRELIMINARY DESIGN REVIEW SITE ARCHITECTS A-0.00 AVONDALE APARTMENTS 09/17/2026 NOTES: 1) DATE OF SURVEY: 6/20/2023. 2) SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR AMENDED PLATS, EASEMENTS OF RECORD (OTHER THAN PLATTED), ENCUMBRANCES, RESTRICTIVE COVENANTS, OWNERSHIP TITLE EVIDENCE, OR ANY OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE. 3) NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON. 4) THIS SURVEY AND THE INFORMATION CONTAINED HEREON IS THE PROPERTY OF EAGLE VALLEY SURVEYING, INC. AND IS INTENDED FOR THE SOLE USE OF THE ORIGINAL CLIENT ONLY. ANY USE OF OR TRANSFER TO OTHERS IS PROHIBITED. 5) BASIS OF PROPERTY LINE LOCATION: MONUMENTS FOUND MARKING THE NW PROPERTY LINE LOT 5, (SEE DRAWING). 6) BASIS OF ELEVATION: USGS BM NAVD 88 D-47, EL=7499.36'. 7) BUILDING SETBACK INFORMATION IS NOT PLATTED. PRIOR TO ANY DESIGN SURVEYOR'S CERTIFICATE I, Michael J. Post, a Professional Land Surveyor registered under the laws of the State of Colorado, do hereby certify that this topographic survey was made by me and under my supervision, and that the survey is accurate and correct to the best of my knowledge. Mich 'eoo''P n j g 30116 7) EV J127t2023, i ON •0000 O• qL LAN w*ft--** N 50' 13'05" E 119.52' �s s8 • RIM EL=7558.7' / ) 2.0' DIA PIPE • / INV EL=7541.2' 1.0' DIA PIPE �• INV EL=7542.9' / • RIM EL=7555.2' DIA PIPE INV INV EL=7548.548.5 h0 / OR CONSTRUCTION IMPROVEMENTS ON THIS PROPERTY, TOWN OF AVON FND PIN & CAP SHOULD BE CONTACTED FOR CORRECT BUILDING SETBACK INFORMATION. ' LS #30116 4P •/ \vl 8) 2' CONTOUR INTERVAL. 01 / C1 137'33'55" 50.00' 120.05' 128.79' 93.22' S 60'59'57" E C2 04'08'42" 5759.70' 416.68' 208.43' 416.59' S 80'08'38" E C3 00'59'38" 5759.70' 99.92' 49.96' 99.92' S 77'34'28" E C4 03'14'44" 5759.70' 326.25' 163.17' 326.21' S 75*27'17" E C5 07'50'49" 5779.70' 791.56' 396.40' 790.95' S 78'17'35" E \ EASEMENT LOT 4 7560 / O • /bro 0' 20' 40' 60' /•/ LOT 5 RIM EL=7554.2' / / •/ 0375 1.5' DIA CONC PIPE / / •/ 4.01 ACRES INV EL=7547.7' ,55a / •/ / • / i a 4 a \ RIM EL=7554.2' D4 / �' a d d INV EL=7548.0' ,� 0�1 / •� a ° d 41 A O / • d a d ad d Od Q O cd d a lob 4 �`1 GO / • ° Q d d d / / O d Q° O d - ad d Q a \ / da d 4\ O d C ° d /u a • - q-.p - - ° d b a ° ad p ° 4 4. d O d d • d d WVa B C a a d a 4 4° o d Q I O d . .. Q .d - d - G .6\ \O, . d d - 4 d a \ a / • ° d c4 -a / 4 a /�1 41 4 d d a 9 d ° art_ a d ° .6 d d ®. ._ d . a d a d / \ a d d r ° �`\ • EHH d 4 137*33�55 / d d a° 4 d R=0® ' a _ \,; `. \ I • a - d Q ° - d� / \' \ . ° Q d d a s d d aR-50 / \ a ° I L=120.05 ° 4 a a a a d\ T=128.79'1 4 ° d d d C°LEN=�9d3.2d2; » �\ 'Ss4 d d a / a \ \/ \ a. 4 BI G=S 60'59, 57 E a °4 d a a 4 d ° . ' • d as _ a a °' a Q° d.' d 4 d d af a°a a d\ \b d a d °aaY0D � AVE. _ �F.O° d d 65 s� 0 v c1—U0 40 Ul+ u _ _ — = • N 7655 5 . IN — — 34j,1j R=5759.70'. ' uTiLIT `' �- — — _ 'ssa L=842.85' EAs •�•_ ��, —.— NORTH TRACK T=422.17' v • �• — — DENVER CLEN=842.10' AND RIO BRG=N 78'01'28" W 57 240— — • — t — — 1862.19—T-2023 DATE: 6/2023 DRN. BY: M. POST PAGE: 1 OF 2 T❑P❑GRAPHIC SURVEY LOT S & LOT 6 THE VILLAGE Cat AV❑N) FILING TOWN OF AV❑N, EAGLE COUNTY, 1 C❑L❑RAD❑ 41199 HIGHWAY 6 & 24, EAGLE—VAIL P.O. BOX 1230 EDWARDS, CO. 81632 (970)949-1406 WESTERN RqILROgp R.O.W. 7542 JOB No. 1862.19 7544 LEGEND UTILITY POLE GUY WIRE CAMERA POST ® UTILITY PEDESTAL FENCE POST D4 ® ELECTRIC PEDESTAL c O ELECTRIC VAULT/MANHOLE EM ELECTRIC METER EHH ELECTRIC HANDH❑LE OW WATER MANHOLE 's'va FIRE HYDRANT WATER VALVE WATER SPIGOT o 0 © TELEPHONE PEDESTAL fV CABLE TV PEDESTAL ® GAS LINE MARKER - O SANITARY SEWER MANHOLE — x — x — x — x — x SANITARY SEWER CLEAN❑UT sT STORM SEWER MANHOLE — 31 — 31 — 31 — 31 — ST❑RM SEWER INLET —�—�— CPP A=08.23'04" R= 0' L= 84242.8585' T= 422.17' CLEN=842.10' BRG=N 78.01'28" W LIGHT/LIGHT POLE SPRINKLER VALVE PVC C❑NC BULLARD BLOCK WALL ASPHALT SURFACE ROCK WALL CONCRETE SURFACE GATE WIRE FENCE WOOD FENCE SPLIT RAIL FENCE CHAIN LINK FENCE RAILR❑AD TRACKS 7546 19, oir 00 LOT 5 0375 4.01 ACRES RIM EL=7560.8' INV EL=7544.6' 7548 DENVER AND R 7/0GRANDE wCS TERN RAILROAD R. �• W. DENOTES C❑NIFEROUS TREE W/ APPR❑X, 03' TRUNK DIAMETER DENOTES CONIFER❑US TREE W/ APPROX. 0,5' TRUNK DIAMETER DENOTES CONIFER❑US TREE W/ APPROX, 1,0' TRUNK DIAMETER 7560 7550 LOT 6 0500 6.77 ACRES \ SLOPE MAINTENANCE EASEMENT 9 \\ �0 _ 9 • \/ NORTH TRACK Cl 137.33'55" 50.00' 120.05' 128.79' 93.22' S 60.59'57" E C2 04'08'42" 5759.70' 416.68' 208.43' 416.59' S 80.08'38" E C3 00.59'38" 5759.70' 99.92' 49.96' 99.92' S 77.34'28" E C4 Of14'44" 5759.70' 326.25' 163.17' 326.21' S 75'27'17" E C5 07'50'49" 5779.70' 791.56' 396.40' 790.95' S 78'17'35" E \� � �=2227'07 \R=1542.14' L=604.30 \ \T=306.08' C LEN=600.44' \ _ BRG=N 51.06'22" N66 \ spp•. 769 69 \x \x \ k \k \ x\ 7552 T❑P❑GRAPHIC SURVEY LOT S & LOT 6 THE VILLAGE Cat AV❑N) FILING 1 TOWN OF AV❑N, EAGLE COUNTY, C❑L❑RAD❑ x\ x 41199 HIGHWAY 6 & 24, EAGLE—VAIL P.O. BOX 1230 EDWARDS, CO. 81632 (970)949-1406 1862.19—T-2023 DATE: 6/2023 DRN. BY: M. POST PAGE: 2 OF 2 JOB No. 1862.19 LlLr11L.\J\7L-L! IAMI14 vm11LJL.Iv SNOW STORAGE ZONE; +/- 6,181 SF PROPOSED SWALE REVEGETATION/ NATIVE RESEEDING EV PARKING, TYP. ADA PARKING, TYP. PROPOSED DECIDUOUS TREE, TYP. MATERIALS LEGEND L_1 PERMEABLE PAVERS CONCRETE BENCHES 4; IYlll VI\lIL ILL✓ L-mvv lv ruXL-fx BOULDER SEATING o , BIKE RACK ❑ ❑ TRASH & RECYCLE RECEPTACLES IF f\%JF%lJLL/ %alJI411 Lf\VVJ I f\LL, I I F. z u)j Lu 0 AVONDALE APARTMENTS ADDRESS: PARCEL # DATE: 09.16.2026 ISSUE: PRELIMINARY DESIGN REVIEW DRAWN BY: BAJ CHECKED BY: PSR HISTORY: DATE 10.07.2024 1 1.21.2024 ISSUE SCHEMATIC CONCEPT SCHEMATIC CONCEPT STAMP PER DISCIPLINE PITKIN COUNTY STAMPS SHEET TITLE: OVERALL SITE PLAN 1. PLANTED BOULDER ERRATICS WITHIN THE MAIN DETENTION 2. NATIVE PERENNIALS AND 3. DRY RIVER BED SWALE RAIN GARDENS WITH NATIVE GRASSES 4. NATURALIZED PARKING ISLANDS AND DETENTION AREAS 0' 10, 20' 40' NORTH SCALE: 1"= 20'-0" © RAwIFr DESIGN PLANNING LLC 2026 L2,000 / / / /i / / / \ \\ate \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I `,, \ \ \ \ \ \ \ \ \ \ \ \\ \\ �&� \ \ " X"j / "S EAS LOT 4 / // / / \ ♦ \\ \\ \ \\ \\ \\ \\ \ems \ \\ \\ \\ \ \\\ \\ \\ \\ \ \\ �� \\ \\ \'�,r \\ `\ \ \ \\ \� \ `\ \ \\ \\\\ \ V'� \\ \ so \\ \\ \\ \\ \ \\ \\ \\ Lois \ \\ \\ \\ \\\ \\ \\ \ \ \\ \\ \\ \ \\ \\ \\ \\\ \\ \\ \ \\ LOT 5 \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ PE t�IUNTE"CE\ 4.01 ACRE5 \I I \ \\ \ \\ \ \\ \ EASF\MENT\\ \\ \\ \ \\ \\ \\ \ \ \\ \ \ \ \\ \\ \\ \ \ \ \\ \\\ \ \ \\ \ CI POND 1 APPROX. 4,500 CF OF AVAILABLE 1 OVERFLOW INLET ` ROUTED TO POND (TYP) \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ POND 2 SWALE ROUTED TO RAIN \ \ \\ \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \\ GARDEN \\ \\ \ \ \\ `\ \\ \ ♦♦ \\ \\ \ \\ \\ \� \ \\ \\ \ \\\ \ \ \\ \ APPROX. 2,200 CF OF AVAILABLE \ (TYP) \ \\ \\ \\ \ \ \\ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ DETENTION VOLUME41 \ DETENTION VOLUME ♦ \ \\\ \\\ \\ `\ \ \\ \\ \\ \\\ \\ \\ \\ \\ \ \ \\ \ \\ \\ `\ \ \ \\ \\ \ \ \ \\ \ \ OUTFALL STORM \ \\ \\ \ \\ \ \ \\ \ \ \\ \ \\ \ \ \\ \\ \ \ \ \\ \ \\ \\ \\ \\ 4:,, wI \� LINE FOR POND 2 ♦ `, \ \ \\ DEVELOPED \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ �Y FLOW ARROW (TYP) \\ \\ \\ \\ \ \\ \\ \\ \\ \ \\ \\ \ \ \\ \\ \ \ \\ \\ \ WATER MAIN CONNECTS TO ♦ c\ I \�\ ` \ \ \ \ \\ \\ \\ \\ \ \\ \\ `\ \\\ \ \ \\ `\ \\ \� \ \ \\\ \ EXISTING MAIN IN YODER AVE. �\\ I \ \\ \\ \\ \ \ \\ \\ \\ \\ \ \\ \\ \\ \ \ \ ♦ \\ \ \ \ \\ \ \ \ N, / A=137'33'55" L=120.05' llt \ \ \ !y \ \ \ \ \\ \ \ \\ \ \ \ \ \\ \ \ \ \ \\ \ T-128.79' \ \ ` CURB CUT \ \ \ \ \ \ \ \ ♦ \ \ \\ \\ \ C LEN=93.22' \ \ \\ \ // (TYP)\ \\ \ \ \\ \\ \\ \ ♦ \\ \ \ ` BRG=S 60'59'57" E I I \ \ A. L/ — < I I_- \ \ FIRE HYDRANT OUTFACE STORM _ \ Fill 30116 LINE FOR POND 1 L5-__--_- -\`\\ <�SSIvur-M IV, \Lox 6.7 W \ FIRE HYDRANTTRASH ENCLOSURE SANITARY SEWER CONNECTS <V - W L \ \ SLOPE A�i NTEN/�NCE \ \ \ TO EXISTING MANHOLE. �< -SS �< W- \ \ EASEPE .4;� \ \ \ \ EXPECTED INVERT MIN. KK "4i" E 3 W so �< WEST WING \ \ \ \ DEPTH: 4'6" <� / �' FFE=7563' (ARCH 100'-0") 8" SEWER MAIN EXTENSION _ f �IRR� � � � - < � ` FIRE AND TRASH 1RR--- < TRUCK TURNAROUND @0.70%MIN SLOPE _ 1 __----�IRR s - 11\L- 15 < COMBINED STORM OUTFACE Nsrl�o w! ---_-- N81-37-,�-- - 60.28 ` __IRR� �� eQ_X SS w . FOR SITE - CONNECTS TO _,` a IRR EXISTING STORM LINE- �� EAST WING 1RR �\ TRANSFORMERR=57_9.R FFE=7563'(ARCH 100'-0") T=a22.v ENyER ANDRr / CLEN-842.10'`ERR N 7� s�, 0 GRANDE WESTERN Rb4R0AD R.O.W.-BRG=N_78'0 2= W — _ _ _ _ _ _ _ _ _ _ _ ��►� .ate _ _ !rs\ — _�. __�,_ `l am_ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ ` rn \ \ \\ \\ \ \ \\ R=5759.70' - � � lg o �� `O' S 13.40'30" w / L=842.85' ��� _ Cs T-422.17' / CLEN=842.10' — BRG=N 78*01*28" W 4.57' X \ � CESS do UTIUTY \ SE DENVER R►o GR4NDE WEST ERN Rq��ROq p R o W. TFRY3�� r-ON311i E1q1'a114EE:RS JVA, Inc. 817 Colorado Avenue Suite 301 Glenwood Springs, CO 81601 970.404.3100 www.jvajva.com Boulder • Fort Collins • Winter Park Glenwood Springs • Denver DESIGNED BY: RMM DRAWN BY: RMM CHECKED BY: JLS JOB #: 260352.CIV DATE: 09/17/2026 © JVA, INC. W ry <0 a0 W(� Q 0 za 0 0 Q Q� z 0 J Q W i 0 Q 2P- W v� U)> z Q J J_ D 06 LLJ U) Q U 30 0 30 60 SCALE IN FEET SHEET NO. FIG. 1 SITE ARCHITECTS \ TRASH LOT 5 AREA SUMMARY AVONDALE APARTMENTS 103,533 SF 59.3% BUILDING ENVELOPE TRANSPORTATION YARD 48,455 SF 27.5% RECYCLING CENTER 22,627 SF 13% TOTAL LOT 5 AREA = (4.01 ACRES) 174,615 SF 100% AVONDALE APARTMENTS LOT COVERAGE BUILDING COVERAGE RATIO 7.10% (BUILDING, PAVILION, TRASH) 12,404 SF *BUILDING COVERAGE RATIO MEETS REQ'D 30% MAXIMUM SITE COVERAGE RATIO 26.2% (DRIVE AISLES, PAVING, SIDEWALKS) 38,246 SF EXISTING WALKWAY 7,437 SF TOTAL 45,683 SF *SITE COVERAGE RATIO MEETS REQ'D 50% MAXIMUM 1 LOT 5 CONTEXT PLAN 1" = 40'-0" O SCALE: 1" = 20'-0" 0' 10' 20' 40' 80' 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT wo N Q co 00 Lu m CD U O �o co Q ISSUE DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME z Q r - x Lu F— z 0 CD F— CD SHEET NUMBER A-1 .00 SCALE 1 " = 40'-0" (32) 1 BEDROOM (745 SF PER UNIT) (8) 2 BEDROOM (1,146 SF PER UNIT) (40) TOTAL UNITS + STORAGE = 37,884 SF EXTERIOR / SERVICE COMPONENTS BALCONY (40) ON -UNIT BALCONIES @ 91 SF EA = 3,640 SF CORRIDOR 1,718 SF PER LEVEL* 4 LEVELS EGRESS - (3) STAIRS & (1) ELEVATOR 599 SF PER LEVEL * 5 LEVELS MECH 65 SF PER LEVEL * 5 LEVELS TOTAL GRAND TOTAL TRANSPORTATION YARD 48,455 SF 27.5% RECYCLING CENTER 22,627 SF 13% TOTAL LOT 5 AREA = (4.01 ACRES) 174,615 SF 100% AVONDALE APARTMENTS LOT COVERAGE BUILDING COVERAGE RATIO 7.10% = 6,872 SF (BUILDING, PAVILION, TRASH) 12,404 SF *BUILDING COVERAGE RATIO MEETS REQ'D 30% MAXIMUM = 2,995 SF SITE COVERAGE RATIO 26.2% = 325 SF (DRIVE AISLES, PAVING, SIDEWALKS) 38,246 SF EXISTING WALKWAY 7,437 SF = 13,832 SF TOTAL 45,683 SF = 51,716 SF *SITE COVERAGE RATIO MEETS REQ'D 50% MAXIMUM 1-BEDROOM 32*(1.5 PER UNIT) 48 SPACES 2-BEDROOM 8*(2 PER UNIT) 16 SPACES ACCESSIBLE (1-VAN) 4 SPACES GUEST PARKING 10 SPACES TOTAL PARKING REQUIRED 78 SPACES TOTAL PARKING PROVIDED 78 SPACES *PARKING CONFORMS WITH EXHIBIT C OF THE 2026 VILLAGE (AT AVON) PUD GUIDE- PARKING REGULATIONS *4 EVSE INSTALLED SPACES + 8 EVSE READY SPACES REQUIRED EV POWER INFRASTRUCTURE MINIMUM EV INSTALLED SPACES (5% OF 78 PROVIDED SPACES) 4 SPACES MINIMUM EV READY SPACES (10% OF 78 PROVIDED SPACES) 8 SPACES MINIMUM EV CAPABLE SPACES (40% OF 78 PROVIDED SPACES) 32 SPACES *PER EAGLE COUNTY LAND USE REGULATIONS SECTION 3.12.1.2 TABLE CD 104.1 1 SITE PLAN 1" = 20'4" TN SCALE: 1" = 20'-0" 0' 10' 20' 40' 80' SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE ORB PRELIMINARY SUBMITTAL REVISIONS NAME m SHEET NUMBER A-1.01 SCALE Luc:) N Q co - 00 W im CD O }z LoO ti�> co Q DATE 09/17/2026 DATE 1 " = 20'-0" 19 BUILDING HEIGHT CALCULATION BUILDING GRADE BUILDING MARK ELEVATION ELEVATION HEIGHT 1 7610.45' 7577.00' 7559.28' 51.17' 2 7558.92' 18.08' 3 7614.45' 7558.78' 55.67' 4 7611.37' 7557.29' 54.08' 5 7612.55' 7558.05' 54.50' 6 7608.00' 7559.92' 48,08' 7 7612.59' 7560.29' 52.30' 8 7607.90' 7560.32' 47.58' 9 7614.45' 7561.78' 52.67' 10 7610.38' 7561.30' 49.08' 11 7574.07' 7561.74' 12.33' 12 7614.45' 7561.28' 53.17' 13 7607.90' 7560.07' 47.83' 114 7612.59' 7560.00' 52.59' 15 7608.00' 7561.50' 46.50' 16 7612.55' 7560.05' 52,50' 17 7612.07' 7562,90' 49.17' 18 7614.45' 7562.35' 52.10' 19 7572.15' 7561.02' 11.13' 20 7611.37' 7560.00' 51.37' 21 7575.40' 7567.90' 7.50' 22 7578.18' 7561.01' 17.17' *HIGHEST POINT OF PROJECT MAXIMUM BUILDING HEIGHT = 60'-0" PER VAA PUD CH-2 LOT DESIGNATION NO ARCHITECTURAL OR MECHANICAL ELEMENTS ARE ABOVE THIS ELEVATION J 1 1 C ARCHITECTS 4 PFA& 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 � 10 10Q� ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS =z CD O �.uj Z Q - C..0 0 Q U SHEET NUMBER 1 z0.BUILDING HEIGHT CALCULATION ,A-1.02 ,�-_0�, TN SCALE: 1" = 20'-0" SCALE 0' 10' 20' 40' 80' 1 " = 20'-0" SITE ARCHITECTS -------------------- ---------------------------- ----------------------- 1.1 1.2 WEST WING - - - �--------------------- j- i 6 - 8 I - 1.7 ------------------------ - nA-3OO OVERALL BELOW GRADE FLOOR PLAN 3/32" = 1'-01, T N 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE DRB PRELIMINARY SUBMITTAL REVISIONS NAME z or) w �C m O J O Q pC w w 0 Q O OC C3 SHEET NUMBER A-2.00 SCALE wo �> N Qco �00 wo fm U O } ti O co Q DATE 09/17/2026 DATE 3/32" = 1'-O" LADDER ACCESS TO CRAWL 0 i 0 1.1 1.2 1.3 1.4 1.5 1.6 I 1.7 1.8 1.900\�1 4 I I I I I I I I I I I I I I I I 2 WEST CRAWLSPACE FLOOR PLAN 1/8" = 1'-0" 2.1 2.2 2.3 2.4 2.5 2.6 A3.11 2.7 2.8 2.9 0 0 4 I I I I I I I I r-1 irl 0 L I Ll H I I I I I I I I I I I I I I I I I I I I I I I I i a a. 2.1 2.2 2.3 2 A-4.11 I I I I I 2 2.4 3 2.5 2.6 A3.11 2.7 2.8 A-4.11 6) e )URA MODEL 3 )0 LB. CAPACITY V X 6; 3" HOISTWAY 3 A 3.11 1 A-4.11 SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT wo �> N Q C9 00 Lu C) U O } z Loo ti�> cy')Q ISSUE DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME CJ) �z o Q 0. w m rr O Lu O Cz j rr w J 0 zQ w oC Uri) SHEET NUMBER A-2.01 SCALE 1 EAST STORAGE FLOOR PLAN 1/8" = 1'-0" 1/8" = 1'-0" SITE ARCHITECTS 11 as L. 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE ORB PRELIMINARY SUBMITTAL REVISIONS NAME Lu Lu Q DC Lu O SHEET NUMBER z Q rr O O wo �> N Q C9 00 Lu M U O } z Loo ti�> cy')Q DATE 09/17/2026 nATF 1 OVERALL LEVEL 1-4 PLAN 3/32" = V-0" ON A-2.02 SCALE 3/32" = 1'-O" 1.3 4 I I I I I I I I¢ N I I I I I I I I I I I I I I I I I I I I I --- DN I C EXTERIOR CORRIDOR I i / TT L�L O I, O UIF—i\ \ ENDURA MODEL / i 3 El=i �O 3000 LB. CAPACITY / 6'-8" X 4'-9" CAB 8'-4" X 6'-3" HOISTWAY/ I —J---- FIRER ER - J / I � �hl� �� I I � RIIIII OOML1 STORAGE ROOMS 1 BEDROOM UNIT 1 BEDROOM UNIT BEDROOM UNIT DROOM UNIT ABOVE O BUILDING F77 DISCONNECT —Q—N —/—/ RIOR DECK EXTERIOR DECK EXTERIOR DECK EXTERIOR DECK % J /I /IIIIIIII _ ` / I l i I ! � ROOF OVERHANG ABOVE 2 WEST LEVEL 1-4 FLOOR PLAN 1/8" = 1'-0" N N 2.4 71 12'-1 " 13'-0" 134" 12'-0" 12'-0" 13'-0" 12'-0" 13'-0" 12--0" 12'4- 13'4" HANG \; I ---- -- —ROOF OVER ----------- r I I I I .UPI I �.A r7n-nn-nn7n f O� \` I I I 1 1 1 f � `\; CA-7 �-------------------------------------------------------------------------------------------------------------------------- Lu \ I I I I I I �OB ` EXTERIOR CORRIDOR 23'\�-Y- - -- - --- 2.B 01 O O -- ELECTRIC EQUIPMENT J AND METERING I ACCESS HATCHBill SLAT SCREEN WALL 3 L) 2 BEDROOM UNIT 1 BEDROOM UNIT O 1 BEDROOM UNIT 1 BEDROOM UNIT 1 BEDROOM UNIT .e j A-4.11 rl F- > F OkL I 1. D j EXTERIOR DECK EXTERIOR DECK i EXTERIOR DECK EXTERIOR DECK EXTERIOR DECK I I 2.D I n _ D I I-- �-------------- — — — — — — — — — — — — — — L — — — — — — — — — — — — — — — — — — ---------L-------------+----------------------------------------------L------------ - �--------- \ ROOF OVERHANG ABOVE I _ _ — — _ �, — I - —2 2.1 2.2 2.3 A-4.11 2.4 A-4.11 SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE 0 L GG� LLJ O �> N Q C9 00 Lu C) U O } Lo O ti �> c>7 Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME 1 r w z Q LU 0 CD rw O J Q L.L z Lu SHEET NUMBER A-2.03 SCALE 1 EAST LEVEL 1-4 FLOOR PLAN 1/8" = 1'-0" 1/8" = 1'-0" SITE ARCHITECTS -------------------- ---------------------------- ----------------------- 1.1 1.2 WEST WING - - - �--------------------- �- I 8 1.7-------------- - II I I I I A-3.00 1 OVERALL ROOF PLAN 3/32" = 1'-0" ON 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT wo �> N Qr-o �00 wo M U 0 r-o �< ISSUE DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME z Q 0 0 oc Q oc Lu O SHEET NUMBER A-2.04 SCALE 3/32" = 1'-O" 1.1 1.2 I I 1'-8 1/4" CORRUGATED c � I I N � o o _ w0 T w� CRICKET o z 6'-0" PARAPET I r a o I I M' C) I I W I d I I a - - - - - - - c� CL z o FUTURE SOLAR � L I I M HEATED GUTTERS AND - - DOWN SPOUTS TYP. _ J I� zo a 0 oc W \d Z O � CORRUGATED r CORRUGATED- -CORRUGATED- 2 I I I A-4.10 1.2 1.3 A-4.10 1.4 0.6) A-3.10 1.7 1.8 4 I I I I I I I I I I I I HEATED GUTTERS AND DOWN SPOUTS TYP. I I DSI DS EPDM ROOFING I (CREAM) I � I I FUTURE SOLAR I I I I EPDM ROOFING (CREAM) 111j /�.AQA= - II EPDM ROOFING CREAM) 0 0 C) o cn 1.9�1 I I I I I I I DS I I I I I I I FUTURE SOLAR I L I METAL FASCIA (MATCH GUTTER PROFILE AT RAKE) I I I I I I 2 1.5 1.6 A-3.10 1.7 1.8 f1 1'-81/4" 1'-7 1/2" I co I I I I I I I I I o LL, r Q cs I DS I � � cD cc:0 1.A f I II I - 1.B " ' 6-0PARAPET w Lu O w o w r C ccN o z ZT� J CD CC Na ---� I I I DS f I lc---- --- J N DS DS M Av 2'-0" PARAPET I I I O I I EPDM ROOFING (CREAM) = CD9 T I - DS - ;�=- - - - . �r HEATED GUTTERS AND DOWN SPOUTS TYP. u' / I I I I I _ 2 WEST ROOF LEVEL PLAN 1/8" = 14" 2.6 A-3.11 2.7 2.8 2.90�1 4 I I I I I I I 3-21/4" 3' 2" HEATED GUTTERS AND DOWN SPOUTS TYP. O.A � � 1.6 I I I I I I I � CORRUGATED� DS.- Ds I DS DS 2.A ` - - - -- A2.Ao o 9 EPDM ROOFING o I / r w o_ (CREAM) o - 1.B rLj LLJ N 1 o 6'-0" PARAPET "' "' 64' PARAPET a DS cc Lu \ \ N = w \\ ¢ I ICL ---------------- --- -------------- CL DS if w FUTURE SOLAR I o A 3.11 I`n a Z or 1 � w� I a EPDM ROOFING \pS � 1 . c vJi (CREAM) z o 9 EPDM ROOFING o _ (CREAM) CL / 2-0" PARAPET 2-0" PARAPET q2' 0" PARAPET , _- � � 1•D I I IcnI I DS pp 1 C ,� C - - C LU T EPDM ROOFING uj T - CREAM 2" / 12" _ o = -" 5"� 12'' HEATED GUTTERS AND EL 0 11J (CREAM) EPDM ROOFING - + 12]� 2" r a r _ - _T DOWN SPOUTS TYP. (CREAM) r N oz I I - Oz rt - - - CORRUGATED_ Lt-_ �„ �� CORRUGATED _ CORRUGATED- - - - - - - -� CORRUGATED . D - \2� 3 9 HEATED GUTTERS AND DOWN SPOUTS TYP. _ m \ 2'� METAL FASCIA (MATCH GUTTER PROFILE AT RAKE) - _ � 2'-51/4" .1 I 2 2.1 2.2 2.3 A-4.11 2.4 A-4.11 2.5 2.62.7 2.8 SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE �> N Q C9 00 w C) U O } ti O cy') Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME z O O 0 rLu V z Lu SHEET NUMBER A-2-05 SCALE 1 EAST ROOF LEVEL PLAN 1/8" = 1'-0" 1/8" = V-0" ■I' 10 I 1= E_ -�_ �Ifl1.......................�1 M................gl.lg........!.!.!..!. Aa JI dill In01 m M1101 loin ■'1� III 110 �1■ IIII IIWl�llllllllllldlll IIIIIIIIIIIIIII� IIIIII IIII 41M ��� jll IN 1......111 .1110 III IIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIW ■.....................................111.....I................................... c�� r �J Ill c�� miimmiiNNeu�innFiiil I Wiimmuninii�imi 1111IIIIIIIIIIIIIIIIIIIIII IFIF111ill MENOMINEE I�IIII�IIII�III�IIIINN�I�IIII�IIII�I �� -------- -------------- i A11=0■: 1111� (II■11■ ! 1111 111� I■■■I III 11� ■II■11■■�_pl �= 1:.____.� 1 Iriii�lllllllq � I�IIIIii�iniWll Iliii�i�'I■III Ilil�nii� pop LiinnlllMINI LMINI 110L MEN ma MMWM1— 11 � III■W I� ■1 ri.II 111� II■■■1 Mil 11 ■II I■■� �. � 1 ��III 11 ■I I■■� �I .�� 1 him milI 110�1 �0IME ' ��I�i�������oii ���iieiii �1■�■1 iini������������m miin-nm 1111 1�� ■� IIII 11� 1■ ■1 111 11 ■I I■ � � 1 I�iiill�lll I�INI�i��Y WiiW III III IIII 11111111111110001111 111111111111MI11 -00 IIImimmills um �II�IIIIIIIII II�I�I�II�II II■I immills um I�IIIII�IIII�II�IIIIIIIII II�I�I�II�II II■I I�IIIII�IIII�II�IIIIIIIII II�I�I�II�II II■I � ........... ■1' -1i■ I �111 111111 Illllllllill n ■ ■ �IIIIIIIIIII�IIIMI�NN�II IIMINIM IIIIIIIIII�I-------------- ■MINIM I�IIIIIIIIIII�IIIIIIII�IIIIIIII I IIIII III III III NN M iiiiiiiiiiiiiiiiiii���iiiiiiiiiiiiiiii�iiiuiiiiii 77���►�� � Illlllllli�� Illiiiiii�lll I Ill 111�111 11111110100001111 Em .. c�� LO u _ _LEVEL 3� C 122,-0" C d R-1 Mrl-z _LEVEL 2� 111 I-n,, a� O co I 1 BUILDING SECTION A n BUILDING SECTION B 3/3211 = 1'-0" G3/32" = 1'-01, BUILDING SECTION NOTES 1. FOR GENERAL NOTES SEE A-0.01. 2. STRUCTURAL FRAMING AND FOOTINGS SHOWN FOR REFERENCE ONLY, RE: STRUCTURAL DWGS. 3. RE: RCP FOR CEILING HEIGHTS. 4. GRADE SHOWN FOR REFERENCE ONLY, RE: CIVIL AND LANDSCAPE DWGS FOR SITE INFORMATION. 5. RE: A-600 DWGS FOR ADDITIONAL STAIR AND ELEVATOR INFORMATION. 6. RE: A-700 DWGS FOR ADDITIONAL INTERIORS INFORMATION. 7. SHEAR WALLS AND STEEL LOCATED IN ARCH DWGS ARE FOR REFERENCE ONLY RE: STRUCT FOR LOCATIONS AND SPECIFICATIONS. ROOF LEVEE 144'-0" - LEVEL 133'-0" LEVEL 3 122'-0" _ LEVEL 2 111'-0" LEVEL 1 W 100'-0" 3T T.O. CRAWLSPAU 94'-0" F STORAGE T.O. SLAB 90'-0" CA 23 I ROOF LEVEL 144'-0" I I 2 BEDROOM UNIT = - - - - - - - - - - - - -LEVEL 4� - 133'-0" I I 2 BEDROOM UNIT = LEVEL 3W I 2 BEDROOM UNIT CL of - - - - - - - - - - - - - - - - - - - -LEVEL 2� - - W I I 111'-0" - C) o �_ �IST7NG 2 BEDROOM UNIT - _ - - - - - - - _ - � I � LEVEL 1� --- — T-i . E7cISTIniG GRADE- — - WEST T.O. CRAWLSPACE� IL 94'-0" -EtJLL 1 1 ! L-I L=::l I EAST STORAGE T.O. SL B 90'-0" SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT U) z w rr Q w Q z 0 Q ISSUE wo �> N Qr-o �00 wo C) U O } z Loo ti�> Cy')Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME U3 0 -z ZD C O — U J Q w cc Cn Lu SHEET NUMBER A-4.00 SCALE 3 BUILDING CROSS SECTION 3/32" = 1'-O" As indicated BUILDING SECTION NOTES 1. FOR GENERAL NOTES SEE A-0.01. 2. STRUCTURAL FRAMING AND FOOTINGS SHOWN FOR REFERENCE ONLY, RE: STRUCTURAL DWGS. 3. RE: RCP FOR CEILING HEIGHTS. 4. GRADE SHOWN FOR REFERENCE ONLY, RE: CIVIL AND LANDSCAPE DWGS FOR SITE INFORMATION. 5. RE: A-600 DWGS FOR ADDITIONAL STAIR AND ELEVATOR INFORMATION. 6. RE: A-700 DWGS FOR ADDITIONAL INTERIORS INFORMATION. 7. SHEAR WALLS AND STEEL LOCATED IN ARCH DWGS ARE FOR REFERENCE ONLY RE: STRUCT FOR LOCATIONS AND SPECIFICATIONS. Ir i Ir ROOF LEVEL 144'-0" Lai LEVEL 4W 133'-0" ----- --------------- ---- ----- ---- ------------- ---- .. �_ Evoll WE 'AP14 Now I hq" ♦ ♦ ♦0*40A♦• ► ♦♦♦ li =dam. • ROOF LEVEL 144'-0" _LEVEL 4� 133-0" LEVEL 3� 122'-0" LEVEL 2� 111'-0" _LEVEL 1� 100'-0" INDIVIDUAL STORAGE UNITS - EAST STORAGE T.O. SLAB 2 WEST WING SECTION 2 1/8" = T-0" RRIDOR .. , lu - LEVEL 122'-0" LEVEL 2 i 111'-0" LEVEL 1 100'-0" ROOF LEVEL 144'-0" LEVEL 4� 133'-0" LEVEL 3Wr 122'-0" _LEVEL 2W 111'-0" _LEVEL 1� 100'-0" fS = - EAST STORAGE T.O. SLAB 3 WEST WING SECTION 3 1/8" = 1'-0" SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE wo �> N Q C9 �00 wo C) U O } z Loo ti�> Cy')Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS NAME U) z 0 U Lu U) CD z SHEET NUMBER A-4.1 0 SCALE DATE As indicated ------------ !!!'� r�m■ �1! �1�Il NNEENNImmollow �l■ �'�IlI III �r i ... ROOF LEVEL 144'-0" LEVEL 13341 - - LEVEL 3 122'-0" - LEVEL 2 111'-0" LEVEL 1 1001-01, WEST T.O. CRAWLSPACE lw r 94'-0" 1/8" = 1'4" 0 ROOF LEVEL 144'-0" LEVEL 4� 133'-0" -LEVEL 3 122'-0" -LEVEL 2 111'-0" _LEVEL 1 100'-0" WEST T.O. CRAWLSPACE 94'-0" SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE 0 JG GOB 'Oo �0 W O �> N QQo �00 wo C) U O } ti O Cy') Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME U w cry z w SHEET NUMBER A-4.11 SCALE 2 EAST WING SECTION 2 1/8" = 1'-0" 3 EAST WING SECTION 3 1/8" = T-0" As indicated SITE ARCHITECTS 2 1 BEDROOM 3D VIEW 1 UNIT PLAN 1-BEDROOM 1/4" = T-0" 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT wo �> N Q C9 00 Lu M U O } z Loo ti�> cy')Q ISSUE DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME r V l) zo Qo � oc �o w — m z SHEET NUMBER A-5-01 SCALE 1/4" = 1'-0" SITE ARCHITECTS 1 2 BEDROOM 3D VIEW 2 UNIT PLAN 2-BEDROOM 1/4" = 1--0" 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT wo �> N Q C9 00 Lu M U O } z Loo ti�> cy')Q ISSUE DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME N 1 l) V zo Qo � oc �o w — m z SHEET NUMBER A-5.02 SCALE 1/4" = 1'-0" WD-1 MTL-1 R-1 p PAVILION ELEVATION NORTH u 1/8" = 1'-0" MTL-1 R-1 7 PAVILION ELEVATION SOUTH 1/8" = 1'-0" LEVEL 1 ,_W 100'-0" LEVEL 1 100'-0" R-1 MTL-1 SO. w R-1 MTL-1 IZ MTL-1 R-1 MTL-1 R-1 SD-2 MATERIAL LEGEND i' BOARD AND BATTEN SIDING LAP SIDING CEMENT BOARD SIDING JAMES HARDIE JAMES HARDIE JAMES HARDIE NIGHT GRAY MONTEREY TAUPE GRAY SLATE SD-1 SD-2 SD-3 LEVEL 100'-0" 6 PAVILION ELEVATION WEST 1/8" = 1'-0" LEVEL 1 100'-0" 5 PAVILION ELEVATION EAST 1/8" = 1'-0" I I I 1 GRADE -j - - - - - - - - - - - - - - - - - - -LEVEL 1� j 100'-0" E TRASH ELEVATION WEST 1/8" = 1'-0" SIT7777 E WALL SLOPES WITH GRADE LEVEL - 100'-0" 3 TRASH ELEVATION SOUTH BREAK METAL SLAT SCREEN CORRIGATLO ROOF EPDM ROOF CORRUGATED METAL SIDING DARK BONZE KNOTWOOD DARK BRONZE CREAM CHARCOAL WHITE ASH MTTL-1 WD-1 R-1 R-2 MTL-2 --- /_ PAVILION 1/8" = 1'-0" SLAT SCREEN WALL AROUND TRANSFORMER PROJECT TRANSFORMER SLAT SCREEN WALL STEPS DOWN TO GRADE I. — I SITE RETAINING — WALL i 4 / / I / 6X 6 YARD SLANT DUMPSTER ON ROLLERS \ COVERED TRASH \ - ENCLOSURE i \ I� \ SITE RETAINING 3 \ \ WALL I I I 1 TRASH 1/8" = 1'-0" SITE ARCHITECTS 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT ISSUE w C) �> CV Q c9 00 w C) U O } z Lo O ti �> cy') Q DATE ORB PRELIMINARY SUBMITTAL 09/17/2026 REVISIONS DATE NAME SHEET NUMBER A-7.00 SCALE 1/8" = 1'-0" M IilI _ a _ Al � \ 11111 .� �Y,r • .�r.. limp-. j _ .�. ' S A CIATilI_va l I N UI: M I CI : ■! IF I SOUTH ELEVATIO ,L, � r 4 J a i � r l �o ea�iY �• i ^� 'w r.'. , IOU—_' it IAIAI VIAIAV AT IAIPCl 1 A I J / 1 I I I / i i -4 A! I A a .- A =F t i■ IIII YI����I�INI T J1l as Imii��p 11NIi10II1011M11 1 j I � UI�II�IIIIIII0111_gl IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �x7 lilt! (IIII MIII III> nllll' llllllll�llllll II��II� � �I�� Illllllll _ -- Ilia 1(IIIIyl�l� IIIIIIIII 1YI1111Y 11111111 imill 111/1111 II 1 - " ML I= 11111111111111W low ,:��UIIIUI ulllllln�Jfllllfill�I�IIIIIIIIIIIU��������� ter:=� �.�-��� AW- Y � 111 I'' got 40 r/ ��+�.,;, xr• 7 ;'i I 1 � � f� • j '' i 1 �'f�'!!.il���i�IIIIIUI� f �' � •��-a F Y i• f .R� 67. 'Y- J► -Di141►1IMilMMTIA114!W44Wil1! 3 � J ay� a 1 Y �r 77 1 1 ftV P 1 1 TO: Planning and Zoning Commission FROM: Matt Pielsticker, Community Development Director n RE: Sun Road Redevelopment Area Concept Plan Avo n DATE: October 8, 2026 C O L O F A 0 0 SUMMARY: The Planning and Zoning Commission ("PZC") participated with the Avon Downtown Development Authority ("DDA") in a joint meeting on September 28, 2026, for an introduction to the Sun Road Redevelopment Area Concept Plan ("Concept Plan") presented by Avon's consulting team, Lionheart and Cushing Terrell ("Consultants"). The Consultants developed the Concept Plan over several months, with input from stakeholders and developers and evaluation of multiple design alternatives. The October 12, 2026, meeting will gather DDA comments and recommendations before submitting the Concept Plan to Council for approval in November. BACKGROUND: Creating a subarea plan for Sun Road was identified as a priority goal by the Avon Town Council in 2024. The PZC and DDA were instrumental with the creation, and ultimate adoption of the Sun Road Redevelopment Plan ("Plan") in early 2025. The Redevelopment Plan sets forth the vision and goals for a redevelopment that will create an active mixed -use area that maximizes Community Housing, accommodates existing commercial tenants, and creates a strong sidewalk frontage. Unlike many subarea plans, Avon's Sun Road Redevelopment Plan was designed to provide clear guidance on what the Town will support for redevelopment of this site, in partnership with private developers. While similar plans often focus on broad goals, this Plan and its supporting concept plan offer a concrete foundation for discussions with developers and investors. CONCEPT PLAN OVERVIEW: The Concept Plan ("Attachment A") expands on the Plan by further defining the character, design, and potential phasing of the redevelopment project. It offers background information, outlines policy framework support, and details design principles. We anticipate that the final redevelopment plan may differ from this concept. To encourage investor input, the Concept Plan intentionally limits architectural detail, as overly detailed designs can discourage investors from contributing their vision. TOWN MANAGER COMMENTS: The Concept Plan is primarily for the purpose of soliciting interest from developer -investors. The intent is that a private developer -investor group would assume the lead role in designing a redevelopment project, coordinate with the landowners and tenants, securing required financing and overseeing construction. Avon would provide financial incentives through the Avon URA/Avon DDA and potentially other financial that may be available. The Concept Plan depicts a layout, phases for redevelopment, and general renderings to facilitate understanding by developer -investor groups of the goals and direction desired by Avon. Actual site design, building layout and architecture will be subject to proposals by a developer -investor with review by Avon based on criteria in the Avon Development Code and planning goals and concepts in the Sun Road Redevelopment Plan. We also expect the development will be all -electric and will incorporate the Avon Heat Recovery system for heating ground floor commercial space. NEXT STEPS: The Concept Plan and feedback from PZC and the DDA will be presented to the Avon Council in November. Staff recommends the formation of a Sun Road Redevelopment committee composed of two PZC members, two DDA members, and two Council members in addition to Staff. The Committee would review respondents to a Request for Qualifications and then participate in interviews of a 970-748-4413 matt@avon.org selected short list of developer -investors. The committee would continue through the design and implementation phases of a potential redevelopment project. Thank you, Matt ATTACHMENT A: Sun Road Redevelopment Area Concept Plan, October 2026 Sun Road Redevelopment Plan Page 2 of 2 lop AL 90 .ft TT!-� +Li!•�rjiE��;�` r �y. � � � � �ti, y�f ' ,��5 ••" �: % ,4�:�'t1'�► • xr 1� pry IM OF Fp fix. r,Y..� ! ., •. �►, p V1f:' ALI OF dr ow Am ww 49 # . A — - .wrf +t • �•lx ' J rep � r, � '7 •� ��` ��,t \ - �`',�\ �. �+ r \ �►� _5- ' p" _�I�. eIL- Am Am ATTACHMENT A Avon, Colorado - �' a ;l� ."�.•� it Sun Road Redevelopment Area Concept Plan October, 2026 LION HEART Cushing Terrell 1. Exective Summary 3 2. Project Vision and Goals 4 3. Relevant Plans and Regulatory Frameworks 5 4. Off Site Considerations 6 5. Concept Plan 8 6. Circulation Diagram 9 7. Connectivity Diagram 10 8. Walkshed Housing Analysis 11 O9. Street Sections 12 10. Character and Built Form 14 11. Phasing 15 12. Views 19 13. Appendix 14. Design Process 23 15. Code/Modeling Assumptions 24 Executive Summary This Executive Summary provides a narrative introduction and overview for prospective investors and developers. The Sun Road Redevelopment Concept Plan ("Concept Plan") describes the opportunities and community goals for redevelopment of the Sun Road Area. The Concept Plan presents basic designs for a high density, mixed -use development that is intended to support 250- 300 for -sale residential units, an optional boutique hotel, 70,000 sq.ft. of ground floor commercial and neighborhood uses, and 684 parking spaces. Traditional downtown mixed -use development built to the sidewalk is depicted. Redevelopment of the Sun Road Area is intended to complete the West Town Center area and enhance the vibrancy of Avon's high density downtown core for both residents and visitors. The Town of Avon ("Avon") goal is that 50% of the residential development will be deed restricted as workforce housing for full-time residents of Eagle County and 50% of the residential development will be free market. Avon acquired the Walgreens property in 2025, which is subject to an existing lease with 50 years remaining on the term. Avon has actively engaged with representatives of Walgreen's, PNC Bank and the United States Postal Service to understand their needs and preferences for replacement space. All three entities will need more detailed designs for proposed replacement space to advance this project further. Compensation will need to be negotiated to account for the difference in value of these properties today and the value of the proposed replacement space. The United States Postal Service has indicated that they will consider, and potentially prefer, the conveyance of employee housing units rather than monetary compensation. Redevelopment of the Sun Road Area presents unique challenges related to phasing and continuity of operations for existing uses. The Sun Road Redevelopment Area is located within the Avon Urban Renewal Authority West Town Center Investment Plan Area and the Avon Downtown Development Authority. Avon anticipates and supports pledging all property tax increment revenues generated by redevelopment to support redevelopment. Appendix A to this Concept Plan presents tax increment financing models for redevelopment with all residential and for a mix of residential with a boutique hotel. Conceptual Design Timeline Kickoff (early -to -mid November 2025) Project kickoff activity clustered around the week of November 5-10, 2025 • November 5, 2025: kickoff meetings with the consultant team, Cushing Terrell, and with the FirstBank stakeholder. • November 8, 2025: the main Sun Road Redevelopment Plan Kick-off meeting record - the project's formal in -person kickoff with Avon staff. • November 10, 2025: a consultant -side kickoff meeting covering redevelopment and transit coordination. • November 20-24, 2025: a series of stakeholder meetings with USPS (the post office is one of the three named properties in the plan area) Concept Development and First Client Presentations (December 2025 - February 2026) Design work moved from a massing study into a series of design options. • Early -to -mid December 2025: consultant planning and PMT meetings (Dec 12 and Dec 19) covering Avon Station capacity, Sun Road circulation, and transit hub configuration; a massing study was drafted and revised. • December 10, 2025: "Design Options" with the client - the first formal client presentation of concept massing/options. • Late December 2025: Options E and F massing studies refined. • January 2026: client meetings reviewing Options D—G (Jan 5-6), a Design Review and Next Steps meeting. • January 26, 2026: second formal client presentation, covering Options 1, 2, 3 and phasing diagrams. • January 29, 2026: design review meeting including transit, and a meeting on Option 4 specifically. • February 2026: Option 4 refined and sent to the client (early Feb), phasing diagrams issued (Feb 5), massing study updated (Feb 6), • February 10, 2026: a developer meeting with stakeholders, Jay Eck (Kensington), Graham Frank (Breckenridge Grand Vacations), Jim Telling (East West Partners) • February 13, 2026: a USPS-specific diagram package Refinement Toward a Preferred Option (March - July 2026) Refinement of options and stakeholder meetings with the goal of a public-review/preferred-design goal: • March 3, 2026: meeting with PNC Bank (formerly FirstBank) • March 4, 2026: client meeting on "options to move forward" and USPS-specific diagrams - the point where the design narrows toward a preferred direction. • March 18, 2026: Walgreens-specific diagrams provided to Walgreens. • June 1, 2026: weekly client meeting covering the concept plan, stakeholder briefings, a traffic study delay, and heat recovery capacity. • July 13, 2026: coordination meeting on site planning and tenant placement. • July 21, 2026: meeting notes on "Option Final 2" - suggesting a near -final option was settled around this point. • September 1, 2026: a USPS meeting to establish the next phase of review for the project (several USPS updates along the way) * See design process on page 21 for the variety of design options and iterations considered. Sun Road Massing Study 3 Project Vision and Goals VISION To develop two to three vetted, buildable conceptual design options that seamlessly integrate Avon staff guidance with innovative design thinking, ensuring stakeholder alignment and regulatory approval while creating a compelling foundation for developer RFP solicitation. Guiding principle: a design that is engaging, high -quality, and buildable. GOALS Understand Site Conditions: Through the creation of thorough and accurate base maps that reflect the culmination of information provided. Understand Context: Through project adjacencies and development projects within the neighborhood to ensure compatibility and synergy. Develop High Quality Urban Design: Through the iterative design process, revisit and test that high quality urban design standards are met, build upon the specific standards identified in Chapter 6 of the redevelopment plan. Replacement Space: Develop relationships and satisfy the existing owners/lessees by ensuring that their feedback is heard and implemented where possible. Monthly check -ins with owners/lessees to ensure their needs are being met and they are in the loop as the design iterations evolve. Phasing Plan: Consider multiple scenarios with the end goal to deliver finished replacement space. Consider the realities of construction, schedule and anticipating inevitable delays. Financial Plan: Work with the Town of Avon financial team to understand the motivations for the existing owners/ lessees. Consider creating proformas for each private development in addition to the Town of Avon for the ultimate preparation of a compelling foundation for developer RFP solicitation. C HA PTA 3: STRAlM IC VISION Redevelopment of the Avon Sun Road Pan area hasthe potential to provide usesdesired by the Avon community, significantly advance and enhance the character of Avon's Town Core, establish a true pedestrian and transit oriented mixed use development featuring Community Housing, increase the local economy, and implement comp lex climate action strategies. The vision. goals, and objectives were developed and refined by the Avon DDA and Staff, and further refined with the property owners, existing business owners and the Avon Planning & Zoning Commission. The vision, goals, and objectivesserved asguideposts throughout the planning process Chapter 5. Implementation and Chapter 6. Design Etandardsand Expectationsam intended to achieve the vision, goalsand objectives Avon recognize necessity to maximize development of new Community Housing in the Town Care to promote sustainable and livable workforce housing while also supporting the success of local businesses that are dependent on an available workforce and benefit from afull-lime read ant population. The 9m Road Nan area hasthe potential to increase the volume of development significantly in the Town Core and achieve urban floor area ratios (gross) of 3A and up to 5:1. PLANNING PRINCIPLES The following Planning Princlplessmate the vision forredevelopment ofthe Sun Road Plan area: Sustainable Design • Achieve a mixed -use pedestrian antl transt-oriented development • Require all -electric energy efficient building construction • Incorporate convenient recycling and composing in the design • Require the use of sustainable and environmentally appropnate building materials • Encourage connection to the existing Heat 'Recovery System forenergy offset purposes • Explore use ofgeothermal possibilities • Locate residenceswithin walkable distance to job centemand public transit C O N C EPTUA L FRA M EWO RK Consensus wasesta blished fora full-time resident neighborhood In the heart of Avon within easy walking distance to civic, recreational, retail, and entertainment. The Plan identifies community benefits that would be realized with development, including Community Housng, pedeanan activation and placing making, establishment of a new regional trans( facility, and establishing succ a'Iully ground level commercial uses This Plan recognizesthat flexibility in the mix of uses and design may be required for financial viability. Land Use Metric Exising Concept has"ential Units 0 180-300 Accommodations Rooms 150 250 Commercial Sq. R 62,000 62,000-70,000 Parking $,aces 373 600+ Civic Paza Acres 0 0.2 Table 2: Potential Desgn and Development Grew PLAN PRIORITIES A seriesof guiding principleswere developed to evaluate conceptsforthe Sun Road Pan. The guiding principlesevolved into a senesof Design Pnontlesasthe project advanced. For example, developing a mixed income Community Housng strategy and ensuring equitable development that minimizes small buanessdisplacement in the Sub Area was deemed an important overarching principle. The following six Pan Priontiesdrive the concepts, goal; objectivesand design standardsfor this9un Head Pan: 1. Community Housing a. Increase opportunitiesforfull-time residential cUp.mcy in the Town Core Is. Provide housing typesappropnate for urban core environment c. Snve to maximize rent -capped and once capped tl aetl restricted units that will remain affordable over time 2. Pegional Tra lHub a. Incorporate a regional transit hub into the Pan area Is. Increase pedesnan travel with concentrated Community Housing on the volley floor c. Improve opportunitiesforsocial interaction in creating a vibrant Town Core d. Increase convenience forworkforce traveling up and down the valley to employment centers Land Use • Achieve a mix of usosthat compliment and reinforce each otherto create a nelghb orhood, including Community Housing, neighborhood and regional retail and personal services, sox memod ations, regionaltmnsit center, and public civic spaces • Implement commercialthat also supports nearby hospitality uses Pedestrian Circulation • Ensure that ped a stnanshave safe, 'e nl and attractive access throughout the Nan area • Apply pedestrian -first design strategies which pdodtizesthe pedestrian over vehicles • Include pedesnan walkwaysand highly visible street crossingsfor convenient coon ec tion to adjacent areas • Incorporate wayfinding, landscaping, street furniture, and public art In pedestrian comdam Vehicular Circulation • Preserve the existing Sin Road/Avon Road intersection use right -in, right -out vehicle accessto the plan area • Incorporate design and layout that is efficient for vehicles and transit with regard to turning movementsand access Parking • Integrate a centralized ahared-use parking structure and program to accommodate re deanls, via �.re and busnasas Character • Require new development to incorporate mountain contemporary architecture that complementsand advancesthe emerging characterin Town Center • Recognize o pportunitiesforarchilecture and building reach to create a strong gateway first impression on the corner with Avon Rood and on the Avon Road/West Beaver Creek Boulevard Comer • Ensure that ground -level commercial uses are visible, fit the area's character, and sup aort a pedpe non -friendly experience • Me ximize solarexposure • Orient onildingsand entnesto front adjacent sidewalksand a public plaza • Incorporate high -quality landscape areasam designed to enhance gateway entries in the Town Center(Avon Road) and the Sun Road area View • Maintain critical views to and from the Sun Road area • Provide viability to orient people to lheirsurroundings e. Decrease air pollution and energy consumption with more trpsmade without personal vehicles 3. P,destrian Experience a. Improve a ttractive nes, func tiona lily and safety of pedestrian muteswithin the Nan area to avoid _ or minimize pedestrian and vehicle conflicts F I b. Maintain and orimprove pedestrian connections to adjacent areas c. Integrate a public plaza and public an to enhance pedestrian experience and support activation and place making r- 4. Economic Development a. Support redevelopment that enhancesvdality of existing uses b. Mitigate disalacement of existing uses c. Add neighborhood commercial uaasthat appropriately serve existing and planned read ants a nd vistorsin and nearthe Nan area 5. Avon Authenticity a. Retain existing busne as Is. Provide opportunitissfornew unique neighborhood businesses c. Promote placing making that enhances investment interest and patronage of businesses 6. Public Brace a. Create an attractive public plaza that integrates with ground floor neighborhood busnease s and providesan inviting informal apace for mall Is, votomand regional transt users IsIncorporate public an into the public plaza to enhance the interest and attractiveness of thisspace C. Situate the public plaza forhigh viability, maximum solaraccess and easy pedestrian access d. Integ ate the public playa into the building form design to provide relief and interest to a wall of build ingsfronting the sdewalk 7. Urban Form a. Maximize or more fully-utif the development potential permitted under existing ring Is. Situate buildings with ground floor commercial to front onto the adjacent sidewalks c. Incorporate quality architecture and design, with particular attention the buildings fronting Avon Road, Wes Beaver Creek Boulevard and the public plaza d. Support ground level neig hbomood commercial uses that are accessible to the public, such ascoffee shops, restaurants, bakenes I. Take advantage ofexisting views in all directions Sun Road Massing Study Relevant Plans, Regulatory/Policy Framework RECENT PLANS/DOCUMENTS Sun Road Redevelopment Plan (2025): The Sun Road Redevelopment Plan serves as an introduction for potential investors, clearly outlining Avon's objectives for revitalizing this area. It includes details on the existing conditions, a strategic vision for redevelopment, insights on this opportunity, implementation strategies, and design standards and expectations for the redevelopment efforts. Downtown Development Authority Plan (2023): The DDA Plan is intended to sustain and enhance the long-term commercial health of Downtown Avon by increasing Community Housing and funding public infrastructure and facilities which promote business investment. OTHER RELEVANT PLANS/FRAMEWORKS Coordination with Existing Plans: The Sun Road Redevelopment Plan is a focused plan document for a specific, defined area within the Avon Comprehensive Plan that provides a higher level of detail specific to the defined area than what is generally found in the Comprehensive Plan. These subarea plans provide greater detail and definition of existing conditions, community goals for development and redevelopment, desired design elements, and strategies for implementation. This Plan will be adopted as an amendment to the Avon Comprehensive Plan. The following is a list of existing planning documents in Avon that also guide development for the Sun Road area and West Area: Sun Road area: • 2024 Avon Comprehensive Plan • 2023 Avon Downtown Development Plan • 2026 Avon Community Housing Plan • 2018 Multimodal Transportation and Parking Plan • 2015 Avon Urban Renewal Plan for Town Center COLORADO Department of Local Affairs p�: West Area: • 2015 Walkability Report • 2009 H.A. Nottingham Park Master Plan • 2009 Transportation Plan • 2007 West Town Center Investment Plan Neighborhood Center Pilot Project (DOLA): The Department of Local Affairs (DOLA) Neighborhood Center Pilot Project provides planning and implementation support for communities pursuing compact, mixed -use neighborhood centers. The Sun Road area aligns with the goals of this pilot, and participation may offer programmatic support and potential funding to advance future planning, design refinement, and implementation efforts. Sun Road Massing Study 5 Off Site Considerations The site is centrally located, within one block of the Avon Town Hall and Pedestrian Mall and within two blocks of the Avon Recreation Center, Avon Library and Nottingham Park. Town of Avon is implementing a variety of projects and planning efforts near the site, including: OAvon Pedestrian Mall Avon has adopted a conceptual design for extending the Avon Pedestrian Mall from Lettuce Shed Plaza to Nottingham Park. Avon has budgeted $6.5 million for the Pedestrian Mall construction in 2027. © Lot B — The Summit Grand Peaks development company has submitted designs for a 111 unit key condotel with full service restaurant building on Lot B, on the south side of West Beaver Creek Boulevard and adjacent to Avon Center building that includes limited commercial. Avon is collaborating with this development to integrate (1) a public pedestrian path connection from West Beaver Creek Boulevard to Lettuce Shed Plaza, (2) plans to construct a grand Civic Plaza between the Pedestrian Mall and Avon Town Hall that will utilize the south west corner of Lot B, and (3) plans to create a 5,000 square foot commercial shell with public patio fronting the Pedestrian Mall which Avon would purchase through the Avon Urban Renewal Authority. The commercial space is roughly envisioned to include a coffee shop, public restrooms, and a community workshop space that can be used by multiple community groups, including the Art Guild at Avon, High Five Media Access, the Vail valley Theatre Company, and others. This commercial space is recognized as the last opportunity on the Pedestrian Mall to proactively promote activation and place - making. © Lot 3 Stonebridge Development Company has submitted a building permit for a 140 room condo -hotel. The condo -hotel will have a pedestrian connection to the sidewalk on the east side of the Avon Town Hall and Pedestrian Mall. DO Lot B/Lot 3 Shared Access Lot B and Lot 3 will have a shared access ramp centered on the lot line from West Beaver Creek Boulevard to the below -grade parking structures beneath both developments. This shared access is across from the Sun Road intersection with West Beaver Creek Boulevard; this access is not in proper alignment. EO Neighboring Hotel Outset (Formerly Comfort Inn) The neighboring hotel property is currently on a timeline that is not aligned with the Sun Road improvements. \O Proposed Pedestrian Access Sun Road Massing Study 6 Views + Aspect Site t—= West View North View - ` `►_( SiteJ- �._�:..�s � `�+ East View South View Primary view to Beaver Creek Resort from Sun Road Legend Solar Aspect Primary View r — 9 _ Site Parcel Lines +7505 493 +r4s7 I .v �aaa 17 5 +7483 f- +7491 1 O +744 > +7484 +74s6 ALPINE BANK p 50 MI mi 201 Sun Road Massing Study Concept Plan Scenario: Option Final Design Principles Option Final Transit Strategy Bus terminal internal and at grade, central to site (2 bus bays - internal - no transit center) Primary Activation Zone Beaver Creek Boulevard and Avon Roads - active edges with central plaza gathering Public Space Type Rooftop semi public space above parking deck Podium / Parking Extent Stand alone parking and underground parking Character & Built Form Downtown block character massing with active edges Circulation & Access At -grade east -west drive replaces Sun Road, providing access to garages, loading, transit, and fire Pedestrian Experience Perimeter block supports continuous sidewalks and defined edges Development Intensity Moderate - compact mix with downtown character Identity / Character Focus Mixed -use neighborhood core - active edge framed by residential massing DO '-s Legend � \ 4 Retail ` Office ' Plaza -- Parking UG Parking Loading Area/BOH -' Greenspace-A,_;�, Ground Floor Plan Sun Road Massing Study Assumptions Land Use Site Provided Max/Target Provided Max/Target Floor Area Ratio 2.3 2.5 Residential 328,926 350,000 Site Coverage 72% 80% (200Units aprx) Hotel/ Residential 55,154 50,000 Building Height 80 - 100 ft 80 - 100 ft Off lce (PNCBank) 10,000 11,576 Parking Provided Required Retail 81,962 67,442 Parking Spaces 3°3 USPS 15000 Sun Road Street Parking _ Walgreens 10000 Grocer 15000 Structure Parking ,_." - Retail 15000 Underground Parking 237 - Cafe 2000 15% mixed -use deduction - -119 BOH 38,648 - Total 684 590 Total Sqft 514,690 479,018 Legend Residential Retail _ - Office Hotel/ Residential Plaza Parking Loading Area Amenities Greenspace Axonometric Circulation Diagram Vehicular Circulation QQ se♦J♦`es F♦♦¢access S�QJ ?O Q` QPQ• . �Q� —► Vehicular (Two ways) — — — ♦ Bus (One way) Service (Partial two ways) Service Circulation 4e♦j♦`eS J01 f tea``ess6 S�QJ`� PQ Q Gc A 9crFq,F�M Bus Circulation �Sec�� eS JQF. F♦♦ea``yss S�QJG` GCA OygP 1 CFS,r��C QPQ� • 0+ I O� I ♦ 1 Sun Road Massing Study Connectivity Diagram 1 4'' t - - - -► Pedestrian Spine - - - ♦ Streetscape Improvements Pedestrian Plaza a i Bustang/ Pegasus Bus Stops Pedestrian activated 0 signal crossing r r Avon is collaborating with Lot B -The Summit development to integrate a public pedestrian path connection from West BO Beaver Creek Boulevard to Lettuce Shed Plaza. f� Avon has adopted a conceptual design for extending the Avon Pedestrian - Mall from Lettuce Shed Plaza to Nottingham Park. Avon has budgeted d +!� ' ' e $6.5 million for the Pedestrian Mall construction in 2027. Avon Station t ''r JL lit, ..� AiF F"' � L , �,� �"- � .,• � �• �" ,/ .,, , �.. Sun Road Massing Study 10 Walkshed Housing Analysis There are approximately 1,000 residential units within a 1/a mile of the Sun Road development (including pending developments like The Summit and the Slopeside). Sun Road Massing Study Activation on Beaver Creek Boulevard Section A *Alters.: configurations that separate the bike lane from vehicle traffic may be preferable. Section B *Alternate configurations that separate the bike lane from vehicle traffic may be preferable. Legend Residential • Retail • Office Hotel/ Residential Plaza • Parking • Loading Area Amenities Greenspace .N Axonometric Sun Road Massing Study 12 Sun Road Street Section Section C Section D Sidewalk 10 Travel Lane Travel Bus Parking jPlaonneZ .00 Sidewalk 8- .00 10.00Lane 12.00 -5.00 8.00 53.00 ROW Residential Retail Office Hotel/ Residential Plaza ® Parking Loading Area Amenities Greenspace Axonometric Sun Road Massing Study �' ice:' � � _�• Q �i 0 �r`rlil�lrlhl Phasing Diagram Phase 1 Phase 1 A: Walgreens and USPS with residential and bank above (with BOH and underground parking) and partial Sun Road alignment. Temporary parking at the bank. Phase 1 B: Demolish USPS, Bank, Walgreens and partial Sun Road realignment. Off -site location required for the bank. Phase 1C: Build parking structure and remaining Sun Road alignment. f" PH 1 B: DEMO USPS - VVAA 1A ♦`s PH 1A: PARTIAL SUN ROAD ALIGNMENT PH 1A: WALGREENS AND USPS WITH RESIDENTIAL AND BANK ABOVE (WITH BOH AND UG PARKING) ♦ 1C 1C ♦ 1 PH 1 A: TEMP PARKING AT BANK PH 1 B: DEMO BAN K lowC� 41 AV / y 1 �1 1 1 1 o �• 1 ■ 7 � 1 ■ Y � 44'•• ' 1 • ■ '•• 14 • I �n* , PH 1C: BUILD PARKING STRUCTURE AND REMAINING SUN ROAD ALIGNMENT PH 1 B: DEMO WALGREENS Legend Retail • Bank Lobby Residential above Demolish • Parking/BOH f Underground Parking access Underground "" Parking • Temporary Parking • Sun Road Sun Road Massing Study Phasing Diagram Phase 2 Phase 2A: Retail with residential above. Phase 2113: Build parking structure. 10*76 AW ♦ ♦ RFTq/4 , r-14,4 PH 2A: RETAIL WITH RESIDENTIAL ABOVE , J PH 213: BUILD PARKING STRUCTURE Legend • Retail Residential above • Parking/130H Sun Road Massing Study 16 Phasing Diagram Y �a Phase 3 Phase 3A: Build grocery and residential above. / l�� III ♦♦ ♦ ♦ II ♦� PH 3A: BUILD GROCERY AND RESIDENTIAL ABOVE 3A ♦ 'sr, r � ` A� ` ♦ �- 7 ' Legend �` ' ".�„ Y ♦ .` J Retail .I Residential above Parking/60H Sun Road Massing Study 17 Phasing Diagram Phase 1 PH 10: DEMO USPS 1 C -- V ♦� PH 13: DEMO WALGREENS e' 1A •.. QQO • G'. / PH 1A: PARTIAL SUN ROAD \. / ALIGNMENT \" •• / \\ 1A 1C ►► i \' ••• 1 PH tA: WALGREENS AND USPS WITH � +• •. 1 RESIDENTIAL AND BANK ABOVE ����_. 1 •�• 1 (WITH BOH AND UG PARKING) ♦ • •� ♦ '1 :1 • �1 i 1 PH 1 B: DEMO BANK • • I � PH 1 A: TEMP PARKING AT BANK Phase 1 A: Walgreens and USPS with residential and Bank above (with BOH and underground parking) and partial Sun Road alignment. Temporary parking at the bank. Phase 1 B: Demolish USPS, Bank, Walgreens and partial Sun Road realignment. Off -site location required for the bank. Phase 1 C: Build parking structure and remaining Sun Road alignment. PH 1C: BUILD PARKING STRUCTURE AND REMAINING SUN ROAD ALIGNMENT Phase 2 PH 2A: RETAIL WIT[ ABOVE Phase 2A: Retail with residential above. Phase 2113: Build parking structure. 2C: BUILD PARKING 3UCTURE Phase 3 `♦ PH 3A: BUILD \ GROCERY AND \ - ♦ RESIDENTIAL \ /a ABOVE I \ / \ 3A \\ J \\ ]A 1 \ 1 \ 1 ♦ I ♦♦ I �♦ I ♦ 1 ♦`` 2A 1 I � 1 I! Phase 3A: Build grocery and residential above. Sun Road Massing Study 18 View 1 *All design and contextual elements are conceptual and AI -assisted for illustrative purposes only. Surrounding context hown as a placeholder and does not represent accurate existing site conditions. _ •X: =.;tea 60 Sun Road Massing Study 19 77 VV�Ii i,� i .I• ;14.I r UNITED STATES ! POSTAL SERVICE I III - r I I i I �rN ' 3,t I I ff i - 7� r A IOWA. CAF I� 40 v A ^7 _ i � � liaiuYiw IF r on go d �� LZ I• _ I�h _ Lllrfll111 Ali �r lj� lillllll Alpine Ban r I , 1 / ,4w Ab, {. - A7sXd2� I� - GIs r�r.� 1. ,.,� •:> ; - �r „� E -. l �I I� Il III 11 11 �14•�:rl-•.,Itil ��<-�• �1...� 11 CIA. li_I WEI YY l YI -Akl y Ar ! s Appendix D �nx %mi 7.-AMUNIC 2 � I 'Ir P-w�,kova dw Mal PIMP l'i'L31 k -k . . . . . . . . . . . Code/Modeling Assumptions TC - TOWN CENTER Overall Standards Overall Parameters FAR assumption Max Permitted Building Height Development Bonus* (building height) TC Block Standards Phasing/Parcel-Level Parameters Minimum Side setback/Distance Between Buildings Minimum Rear setback Front yard setback (Avon Road and Beaver Creek Boulevard) Development Bonus* (setbacks) Maximum Lot coverage Development Bonus* (max lot coverage) Minimum landscape area Development Bonus* (landscape area) TC Parking Land Use Parameters Off -Street Parking only Multifamily Parking Guest Parking for Multifamily Office Parking Commercial Parking Hospitality Parking Mixed -use parking reduction Development Bonus* (parking reduction) TC Office Building Parameters Depth Width Floorplate Square Footage Ground Floor Retail First Story Height Depth Grocery Multifamily Building Height Floor - Ceiling Height Depth (double -loaded corridor) Depth (garage wrap) Width Parking Structure (and Surface Parking) Gross square feet (SF) per Parking Space Parking Structure Depth Parking Structure Width 2.5 (including parking structure) 80' 100' 7.5' 10' 0' 80% 20% No off-street parking along W. Beaver Creek Boulevard; on -street parking may be feasible in a limited number of spaces 1 space per Studio, 1.5 spaces per 1 Bedroom (BD), 2 spaces per 1-bedroom/dwelling unit (1 BD/DU) greater than 2,500 square feet (SF) varies by number of units 3 space per 1,000 square feet (SF) floor space 4 space per 1,000 square feet (SF) General, 1 space per 60 square feet (SF) Food and Beverage 1 space per unit 15% 25%, provided ADA and electric vehicle (EV) parking spaces are not reduced 110' / 80' 220'-250' / 100-125' 20,000-30,000 SF / 8,000-10,000 SF 12' Minimum (f-f 14') 40'-70' service entrance, no loading dock, dumpster trash/recycle/compost access, grease interceptor location, and main access, retail rooftop equipment spacescreened per code 14-15' Minimum (floor -to -floor 17') (loading bay, trash compactor bay, full semi delivery - trash/recycle/compost and delivery same back -in access, grease interceptor location and main. Access, direct parking access) screened per code 80-90', some portions reaching 100' 10' Minimum (floor-to-floor12', upper 11') 70' 40' 200'-250' (30-35% amenity, management and maintenance) 400 SF 125' Minimum, increments of 60' 200' Minimum Interview Information provided by Town Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Sun Road Redevelopment Plan Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Interview Information provided by Town Urban design rules of thumb / "Rurban" appropriate Urban design rules of thumb / "Rurban" appropriate Urban design rules of thumb / "Rurban" appropriate Avon Development Code Urban design rules of thumb Boutique Grocery standard Interview information provided by Town Interview information provided by Town Urban design rules of thumb Urban design rules of thumb Urban design rules of thumb Parking structure design standards Urban design rules of thumb Urban design rules of thumb Sun Road Massing Study 2=1 TO: Planning and Zoning Commission A FROM: Matt Pielsticker, Community Development Director Avon RE: Village (at Avon) Park Planning DATE: October 6, 2026 C o L o R A o SUMMARY: This report provides background information about park planning in the Village (at Avon) ("VAA") Planned Unit Development ("PUD") as it relates to governing documents, parkland dedication requirements, and park construction requirements. The purpose of bringing this information to the Planning and Zoning Commission ("PZC") is for general awareness, and to solicit feedback on master planned park specific elements. Review and input from Health and Recreation ("H&R") Committee and the Culture Arts and Recreation Committee ("CASE") is also in progress. Comments will be incorporated into a presentation to the Avon Town Council in November. OPERATIVE DOCUMENTS: Following are the primary regulatory documents that govern the properties. Individual excerpts are also provided below for convenience: 1. VAA PUD Master Plan : This zoning map serves to establish the PUD and represents the ongoing long-term vision to subdivide the Village (at Avon) into specific planning areas. 2. VAA PUD Guide The PUD Master Plan is supplemented by the PUD Guide ("Guide"), a detailed document that informs land use controls and development standards. The Guide dictates processes for application review and approvals, and is amended on occasion. 3. CARADA: The Consolidated, Amended, and Restated Annexation and Development Agreement ("CARADA") signed and recorded in 2014 represents the development agreement between the current, primary landowners, Traer Creek. This was amended in May 2026, however, the amendments do not impact park planning. The VAA Master Plan subdivides the PUD into Planning Areas. Each Planning Area has specific land use requirements and restrictions for development, similar to zoning controls. The VAA PUD Guide necessitates a Design Review Board ("DRB"), a small group of individuals tasked with reviewing development applications similar to the Town's Planning and Zoning Commission ("PZC") but specific to properties within the PUD. The Guide states that certain types of development projects in the VAA are only reviewed by the VAA DRB and are not subject to the Town's Development Standards and review procedures (E.g., Signage, fencing, etc.), while other types of applications employ the Town's standards and procedures (E.g., Temporary Use permits). Since the VAA PUD's inception, the Town and Traer Creek have collaborated to update its operative documents, including the VAA PUD Master Plan map, via administrative approvals and ordinances approved by Council. BACKGROUND: In 1998, the Avon Town Council agreed to annex the Village (at Avon). These actions resulted in the formation of the Village (at Avon) PUD, a 1,779-acre area primarily owned by the Traer Creek LLC ("Traer Creek") and its subsidiaries. The Town of Avon owns selected parcels in the valley floor. 970-748-4413 matt@avon.org Page 1 of 10 Village at Avon Buffalo Ridge Stluate �� Apts Piedmont - ' Am- Walmart & Springhill — N Eagle -Pail Home Depot Suites Hotel Figure 1 - VAA Map Area N/P3: Early iterations of the VAA Master Plan show (Planning) Area N —Community Park (29 acres) in the Land Use Summary. In 2003, it was determined that Swift Gulch Road should provide a continuous connection, to Avon Road and Post Blvd. Traer Creek dedicated PF2 and PF3 in connection with a 2008 PUD Amendment. In 2014, due to the bifurcated nature of the Planning Area N, and severe topographical limitations, Ordinance 12-10 renamed the area to "PY and reduced P3 to roughly thirteen (13) acres, while adding 5.8 acres to Planning Area J for commercial development due to the proximity and visibility from the freeway. Today that commercial development includes the Marriott hotels. Further, it was agreed by the Town and Traer to dedicate future parkland in the amount of 5.8 acres pursuant to the CARADA Section 3.7 (d). Section 3.7(d) allows the Master Landowner the ability to dedicate 5.8 acres of parkland within Planning Area I, J, and/or K in the Master Landowners discretion. Of note, of the sixteen (16) acres "removed" from P3, most of P3 originally was comprised of steep hillside and was more accurately zoned to Open Space. an Q10 .. w K Image 2 - Area N - 1998 VAA PUD Image 3 — Planning Area 3 - 2014 VAA PUD The Town and Traer Creek revised the PUD Guide to reflect the updated terms adopted by Council Ordinance 12-10, and this updated version now represents the current operative requirements for development of P3. Included in the PUD Guide are Provisions for Certain Amenities, which include an encumbrance for P3: Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 2 of 10 Excerpt from VAA PUD Guide - Provision of Certain Amenities. Community Park (Planning Area P3). Construction of the initial fifty percent (50%) of the community park shall be commenced prior to the date that the Town's obligation arises to issue a certificate of occupancy for the Dwelling Unit constituting the 601 st Dwelling Unit within the Property that otherwise is eligible to receive a certificate of occupancy. Construction of the second fifty percent (50%) of the community park shall be commenced prior to the date that the Town's obligation arises to issue a certificate of occupancy for the Dwelling Unit constituting the 1200th Dwelling Unit within the Property that otherwise is eligible to receive a certificate of occupancy. Once commenced, construction of the improvements contemplated in (i) and (ii) above shall be prosecuted with due diligence in accordance with sound construction practices. The Town's responsibility for commencing "construction of the initial 50% of the community park..." at the time the 601St market -rate residential unit is built and approved for use by the Town's Building Official is not defined any further than the language above. The current Bosk Apartments' project brings the total number of residential units to above 601, once certificates of occupancy are issued for the buildings. P3 Site Description. P3 is a 13 acre property (although not a unique parcel) near the center of the VAA PUD. The site's high elevation provides exceptional views of the valley floor and mountains to the south. The site is perched above the adjacent hotel, but the hotel is only visible when standing at the edge of the site. The area to the north includes hillsides of even higher elevation, with a trail that connects to the expansive trail system between Avon and Vail. The area reports wildlife including birds, snakes, deer, mountain lions, and foxes. Figure 4 - P3 Context Map Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 3 of 10 Image 5 - View from Southern Edge of P3 Looking Southeast, with Maverik and Hotel The property sits north of Swift Gulch Road and the Marriott Hotels, and northwest of the Maverik gas station. A steep dirt road leads to the property, which represents the eastern boundary of the site, and extends further north to a water tank owned by the Upper Eagle Regional Water Authority. The temporary dirt road leads to a two -acre, human -made lake on land known as Nottingham Reservoir. Conceptual permanent road plans have been reviewed by the Town's Engineering Staff at a preliminary level and planned to be finalized in the upcoming years. The road will generally follow the approved temporary road that leads up to the water tank, approved in 2014 in connection with Tank construction. Currently, the center of the P3 site is used to store natural materials (E.g., dirt, soils, gravel, etc.) for construction projects and grading, and construction equipment, such as excavators. Despite the construction element, the site is generally well cared for by the current property owners, and is restricted to the public by a large chain link fence north of the roundabout leading up to the site. Potential future uses of the site are expansive. The VAA PUD identifies P3 as Parkland, and is subject to development standards including: Uses By Right: (a) Agricultural Use (as an Interim Use only). (b) Community Facilities (subject to review and written approval of such Uses by the Design Review Board). (c) Equestrian, pedestrian and bicycle trails. (d) Landscape improvements. (e) Indoor and outdoor, sports, training and recreation facilities. (f) Lakes, ponds, reservoirs and irrigation ditches. (g) Parks, picnic facilities and temporary entertainment for special events. (h) Open Space. (i) Infrastructure. 0) Dry Utilities. Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 4 of 10 (k) Cabled Telecommunications Equipment, Cabled Television Facilities and Cabled Telecommunications Services, each of the foregoing being subject to review and written approval by the Design Review Board authorizing such Use. (1) Wireless Telecommunications Equipment (excluding antenna towers), Wireless Telecommunications Facilities (excluding antenna towers) and Wireless Telecommunications Services, each of the foregoing being subject to review and written approval by the Design Review Board authorizing such Use. Special Review Uses: (a) Rock and gravel crushing operations related to rock and gravel materials excavated within The Village (at Avon) PUD. (b) Wireless Telecommunications Equipment (antenna towers only) and Wireless Telecommunications Facilities (antenna towers only), each of the foregoing being subject to review and written approval by the Design Review Board authorizing such Use. Prohibited Uses: (a) Residential Uses. (b) Commercial Uses (except as specifically included in Sections Error! Reference source not found. or Error! Reference source not found.). (c) Industrial Uses. There are no setbacks or site coverage restrictions for buildings, and a thirty-five foot (35') building height maximum in P3. �d S Image 6 - Center of P3 Looking Southeast Staff finds that various passive recreation uses would be appropriate and would avoid complexities of building large facility structures on this site. The list of uses include dog park, picnic area, sports fields, pickle ball courts, community garden and public restrooms. Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 5 of 10 PLANNING AREA B: The Town owns the Planning Area B ("PA-B") parcel, also known as Lot 5, Filing 1. PAB was conveyed to the Town in 2014 in connection with Ordinance 12-10. PA-B currently includes the steep hillside and large depression, and the idea is that PA-B would ultimately be moved around to accommodate the master plan for Planning Area A, which is the mixed use center of the VAA pursuant to Section 3.7(b) of the CARADA. Representatives of Traer Creek have been engaged with the Town to show development plans for areas surrounding Planning Area B, and the Town is considering options for complementary design of PAB that fits within the master plan while complying with the proposed administrative replat required in Section 3.7(b). In connection with Phase I, construction of nearly all of the public infrastructure within the valley floor will be completed. Additional items such as master grading plans, master raw water irrigation plans, have all had an impact in determining the location for PAB within the master plan. PAB is an undeveloped 4.1-acre site, bound by a steep slope to the north that leads up to Interstate-70. The parcel is otherwise encompassed by land owned by Traer Creek within Planning Area A, dedicated as Village Center Mixed Use Project in the PUD Master Plan. PAB is a physically depressed parcel in an area used for construction and snow storage on the valley floor, and is eligible for reconfiguration if necessitated by a development project. The idea is for the parcel to be moved to a new location and surrounding development work will contemplate "filling" the depression. The sizing of the lake was determined in part in order to ensure that surrounding development could fill the depression to grade using excess soils. :EON94: �. W J Image 7 - PAB Looking West with Chapel Square in the Background Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 6 of 10 61 { Image 8 - PAB Looking Northwest with Avon Regional Transit Facility in Background PAB is identified as Community Facilities in the VAA PUD Guide Land Use Summary. The VAA 2018 PUD Guide includes guidelines for PAB: Uses by Right: (a) Parks and Open Space. (b) Community Facilities and related amenities, including without limitation, accessory Commercial Uses, including food and beverage concessions, as may be mutually approved by the Town and the Design Review Board. (c) Agricultural Use (as an Interim Use only). (d) Infrastructure. (e) Dry Utilities. (f) Snow storage (as an Interim Use only). (g) Water storage and water resource management facilities. Special Review Uses: (a) Outdoor entertainment facilities that include the use of amplified music. Prohibited Uses: (a) Commercial Uses. (b) Residential Uses. (c) Industrial Uses. (d) Mixed Use Projects Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 7 of 10 The PUD Guide also includes guidelines for building setbacks, building height maximum (60'), maximum allowable site coverage (20%), parking requirements and street standards, specific to Planning Area B. The site is currently contemplated for water storage. In 2026, the Town and Traer Creek are considering specific elements of development for the site in order to craft a detailed vision for comprehensive VAA development in the next 10-20 years. The VAA PUD Guide reports the conditions for the prior dedication of Planning Area B, which includes: • The Town can construct a water feature, with a limit on total surface area (0.6 acres) and a minimum 2-acre feet of water storage. • Development of the site, including public improvements, is subject to VAA DRB approval. • The Town has a right to maintain and operate the site as Open Space. • The site can be used for snow storage by the Town or Traer Creek until it is developed. The VAA includes two additional sites designated as Parkland: P1 and P2. P1 was originally contemplated as pocket parks and/or a linear path, currently undefined at the site. The Piedmont and Bosk apartment construction have respected the P1 concept, and the plans for P1 have become more focused. The Bosk construction will create a ADA accessible path to P1 that connects the Bosk apartment complex with Planning Area B. The future of P1, its look, feel and overall development, is likely subject to adjacent development projects. There are opportunities for pocket parks adjacent to existing properties. Image 13 — PAB, P1, P2, & P3 Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 8 of 10 P1 will provide a physical connection between existing residential development and future sites in and around PAB. A soft surface path is currently being constructed between Bosk Apartments and Piedmont, signifying the beginning/end point of P1. The construction of the soft surface trail was approved by Council as part of a cost -share agreement with the Bosk apartment developers. OEM ... __ ,�.Is ■ ■ °,fit '1 Nis . �.. - lKi' Image 9 - View toward P1 Area Looking Northeast with Piedmont Apartments in Background P2 is the park in between the Walmart and Home Depot buildings on Yoder Ave. The site is only accessible from the Walmart I Hope Depot parking areas, and offers seating areas throughout a nature- scape, a fountain, and a small bridge. Traer Creek Metropolitan District is responsible for maintaining the P2 park area. The Town is not anticipating development projects related to P2. CASEIHRC INPUT: The CASE and H&R committees held a joint meeting to review these plans on September 24, 2026. Overall, the committees were supportive of these master planning activities and urged the team to ensure that the park and open spaces are genuinely accessible and beneficial to the broader community and not only the immediate valley floor developments. Themes and comments included: Pedestrian Connectivity and Public Access • Consider opportunities to create a continuous walking experience around the lake perimeter. • Ensure pedestrian connections are well integrated with the existing town network and provide clear, cohesive links to surrounding neighborhoods and destinations. • Evaluate how the proposed park spaces connect to the broader community and whether they will feel accessible and welcoming to residents. Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 9 of 10 Lake, Water Management, and Environmental Concerns • Several comments focused on the lake and its long-term function, particularly during low-water periods. • Additional information is requested regarding drainage, stormwater management, and how water will be conveyed or stored on -site. • Concerns were raised regarding potential mudslide and erosion risks and how those issues will be addressed through project design. Parks and Open Space • Questions were raised regarding ownership and dedication of proposed parks and open spaces, particularly those associated with Traer Creek's development obligations. • Some attendees expressed concern that certain park areas appear peripheral to the development and may not provide sufficient community benefit. • Park locations should capitalize on views of the mountains and surrounding landscape whenever possible. Mobility and Transportation • Transit stop locations were generally viewed positively. • Additional consideration should be given to bicycle amenities, including bike parking, ski parking, valet services, and other active transportation facilities. NEXT STEPS: The timing of developing P1 and PA-B is dependent upon neighboring development. For PA-B, if master planning continues for "Phase II" of the valley floor and Planning Area A activities, a redefined PA-B would likely be created at the time of subdivision for Crescent Hill Road and/or Phase 2 parcel(s). The subdivision would establish a new location for PA-B as depicted in the overall plans. Review and approval of the subdivision occurs administratively per the Village PUD Guide. Council is required to approve the deeds to convey the existing PA-B area back to Traer Creek and receive the deed to the new location. Avon will also need to consider updates to the Development Agreement and Village (at Avon) PUD Guide to better define the timing, roles and responsibilities for P3. This should coincide with the timing of the roadway and utility extensions from Wagon Trail Road past P3 property. Changes to the PUD Guide would come back to PZC for review and recommendation to Council. Thank you, Matt ATTACHMENTS A — Jerde Master Plan Drawings B — PAB Zehren design plan drawing Village (at Avon) Park Planning October 12, 2026 PZC Meeting Page 10 of 10 ATTACHMENT LAND USE: PROGRAMMING &DISTRICTING RESIDENTIAL MIXED USE RESIDENTIAL / HOTEL HIGH DENSITY RESIDENTIAL PARK OPEN SPACE (EASEMENT) MIXED USE / HOTEL PUBLIC ROW RESIDENTIAL ; MIXED USE - r PLANNING AREA - A i RESIDENTIAL 1 1 MIXED USE I RESIDENTIAL OPEN SPACE W - / MIXED USE RESIDENTIAL MIXED USEv MIXED USE / HOTEL I ee `. � a _ PARK ��a®•—•—.—_—� -___j --- — -_— -..1 PLANNING r'�•"mt. 1 + RESIDENTIAL ` �e RESIDENTIAL / HOTEL I e ® e % e AREA - B ' • I HIGH DENSITY .y . • RESIDENTIAL HIGH DENSITY HIGH DENSITY I RESIDENTIAL Ii RESIDENTIAL PARKLAND/ SEASONAL SOFT TRAIL ' a ATTACHMENT A GREEN SPACE & RECREATION - — — -0, PRIVATE GREENBELT PATH PUBLIC GREENBELT PATH y PEDESTRIAN/MULTIMODAL FRIENDLY STREETSCAPE MULTI -USE TRAIL TREE LINED STREETSCAPE EXCLUSIVE/ 11 `MEMBERSHIPOUTDOOR _... ,,_—___—_—_ AMENITY e : • PRIVATE _ ;:, ROOF AMENITIES __— �4*4 t� • A •00 � � L •. -;: .. :.......................a ...... .....«............ ..-....-........ i c is o' PRIVATE��` •°•.+, . ♦S I•• i q\ ROOF AMENITIES "...> . .... Ai.._.._... .._... ........ _ .... ...... ........— ...... ROOF AMEId1T1€ - W �.. _.._:........._ ,. -_' DOG PARK P 1 GREENBELT MULTI -USE TRAIL In CONNECTION (TO EAST POST CiLVD) _ LAYGROUND •. P SHARED-\\ _i ;........... ,,:.. M ROOF p:„ oil _ v AMENITIES _.� ARKLAND (SEASONAL SOFT TRAIL WITH INTEGRATED RETENTION BASIN) J J J J J i POTENTIAL PEDESTRIAN CONNECTION OVER RAILROAD ATTACHMENT B \ f d.\ New Ditch �J \ Alignment - - - Sid -walk New Ditch gus $tgp� 7554 s Head gt 756_3+ T 7505 ` Mixed Use r + 0, • • Lake Fill Pipe ttingh Plaza \ / �0.0 - +' Overlook Pavilion / Puder pit h ti 0 b V r � • � � and Plaza � Hatdscape - 7528+ \ 1, Views to / Cake Edge +7513 - Water Feature Lake . •: • Supply Pipe Plaza Waterfront Plaza Recirculating 1 4 Steps and Seating 7494 ♦ Sw� �•, Water Feature / ` 0 7489+ r ces. + 03 •� 7490++7489 . 7494 ii �. ti 1 { �\ 5 r / s 7497 ����Oys; i Q- Mixed -Usc i,o • Fountains 7491 •.� -: Sedimentation Entry Plaza Forebay Pond ; • Retaining and Art Feahi e - " L. . Walls � \ Summer Dining Terraces + • & Events Lawn Fountain and LAKE Winter Fire 1.74AC Fountain - � - - — - - Winter Ice - • WATER SURFACE +7498 - / Skating Rink - 7489 RIO Lk180'x L10' __ - • --� ---- Fountain ae \ -- Terraced Plaza 7489+ 7474 7490 Lake Pavilion w/ Lake Front Naturally Vegetated 7491 Boat &Ice Skate > Lake Edge �- 7-191 I Rentals Pad / Promenade and Seating Areas- i Water Feature BOatDuck /� Lake Outlet Mult7-Use Trail - \.. ��\/ /f and Overflow \ Supply Pipe 1_ �- /to Water Structure Angular Boulder f�••,� se%ca� 1� 7489 Lake Ede Feature g ��••� " \� � \ 1 a,- 491+, � I n i - I Water Feature Intake and Pump —J Stati !�•� i Residential Residential i � \ d Z E H R E N Village At Avon Lake SCALE: 1" = so' AxN �rvnsrnri nxAllOcrvirtcr v[ E ® ,, Conceptual Framework Diagram - Rev. 2 9 ,8 sa 60 RI?8/25 Resa EN,M< Fad FGGN.aNw,�G�NNG ^ANo�EFs E GING G rNG Nraxwl IG G ,sE�GNG, ,�E.aNG, FG N,E-NI. I T.N E nREx µ E.wALL ;aEYGNG, E.GN,REF G, IT NG GNG, GF EGNG) f �NGNon GG F F on NG Fo�uN I \` `Ewa-D uxE EGGE Ea vNoros G ,nEn GNG NEN Site Section 1 Y°-11 F I i,� EYOND) Guuuwu� MIXED UE MI11 INo, G a�G Aul I NNGwu AININ��MEN. GMaON, tH WtE3{IVFAGE ulil'nN-DIIBUOCN utcFl�eouxoaav `psi xG GaAn[E eOHi GOCN oF,»E UNE F. IN FOGNiA1N.1 LIGMING Site Section 2 Z E H R E N M Village At Avon Lake SCALE: 1" = 16' AND ISnxOcNlrtcr v[ E Site Sections -Rev 1 o is• 30• ea• saai2s \k - \, — _ ,4JPPLY UNE RE � NEwHEAe Ba,E xeBE , MANRaE - _—_ - s.� EN.ATORPoxB _ � sr��q� xcnxEACE Q� I __ o ,s � .. Ran ..... �- -.._ \SS Ex sr nc SS �R -� \ PAvivax RR canox \ �\ S � cascAOE oTcn PPE SS S PAVED Puu -- - - aNaovERtcox -� \SS\ PRO - ia.sF I rk yS, BUILDING ER suREacE / on accEBS BtE PnrN ]sazo gS\ POOL FEATURE SECTION - --, --� 3 POOL SECTION S PATH PoaL WATERsuRFACE See M RwA I PROPOSED / / ` OVERLOOK WAS FEATURE BUILDING �� waus I CASCADE SECTION LONGITUDINAL -- P A --- WATER FEATURE SECTION \ 3 � WATER SURFACE �� 3 � •.... WATER SURFACE 7489 Po�o�ERE�oW A= I �I I _ i a I ` Z ER H RR E N Village At Avon Lake SCALE: 1" = 20r ANDrnA SSOCIATEHS ® , Conceptual Water Feature Plan n io• 20r aG 3/10/26 PsiesvoHm �' `s Z4. wareasuRrnoe. ^• �i T iTu— ii �EawEa S INTA. Water Feature Cascade Section AZ E HRR E N M AND ASSOCIATES . ��{?� � / reEroNm oveAwoK ,.EAsuRFA� a�os�Maro��;� .� 0 SCALE: 1" = 10' o s®o' Longitudinal Water Feature Section SCALE: 1" = 4' Water Feature Pool Section a r a' e Village At Avon Lake Conceptual Water Feature Sections SCALE: 1" = 4' o z' a' a' LIR47 A Avon C O L O R A D 0 AVON PLANNING & ZONING COMMISSION Meeting Minutes (DRAFT) Monday, September 28, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: https://teams.microsoft.com/meet/293694307546245?p=2erEQbglwh8eAQxuan To join meeting via phone, dial (945) 468-5504 and enter conference ID: 122 334 718# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM Meeting commenced at 5:34 PM. A rollcall was taken, and Planning Commissioners Rick Sudekum and Nancy Murad were present. Commissioners Brad Christianson, Brian Sipes, Elizabeth Waters, and Nicole Murad were present remotely. Commissioner Carly Hansen was absent. Also present were: Community Development Director Matt Pielsticker, Planning Manager Jena Skinner, Community Development Coordinator Emily Block, Housing Planner Patti Liermann, Town Attorney Nina Williams, Chief Finance Officer Paul Redmond and Town Manager Eric Heil. Members of the Downtown Development Authority Wayne Hanson, Marcus Lindholm, Rob Tarte, Tony Emrick, Gregg Cooper, and Lisa Mattis Laura Dougherty with Cushing Terrell, and Rebecca Leonard with Lionheart. 2. Approval of Agenda ACTION: Commissioner Tashman made a motion to approve the agenda. Commissioner Christianson seconded the motion, and the motion passed unanimously 6-0. 3. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items 4. Public Comment— Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 5. Work Session 5.1. Joint Meeting with Downtown Development Authority. Review of Sun Road Redevelopment Area Concept Plan. 6. Consent Agenda 6.1. August 10, 2026 Planning and Zoning Commission Meeting Minutes MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. A Avon C O L 0 R A D O ACTION: Commissioner Tashman made a motion to approve the meeting minutes. Commissioner Christianson seconded the motion, and the motion passed unanimously 6-0. 6.2. Record of Decision: CPA26-001 Avon Community Housing Plan Recommendation ACTION: Commissioner Tashman made a motion to approve the record of decision. Commissioner Murad seconded the motion, and the motion passed unanimously 6-0. 7. Future Meetings 7.1. October 12, 2026 — Rick Sudekum unavailable, Brad Christianson and Elizabeth Waters remote 7.2. October 26, 2026 — Nancy Tashman unavailable, Brian Sipes and Elizabeth Waters remote 8. Recently Approved Applications 9. Staff Updates 10. Adjourn The meeting was adjourned at 7:10 PM APPROVED: x CHAIRPERSON MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT.