Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PZC Packet 092826
A Avon jj[��'�j AVON PLANNING & ZONING COMMISSION Meeting Agenda Monday, September 28, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: https://teams.microsoft.com/meet/293694307546245?p=2erEQbglwh8eAQxuan To join meeting via phone, dial (945) 468-5504 and enter conference ID: 122 334 718# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM 2. Approval of Agenda 3. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items 4. Public Comment — Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 5. Work Session 5.1. Joint Meeting with Downtown Development Authority. Review of Sun Road Redevelopment Area Concept Plan. 6. Consent Agenda 6.1. August 10, 2026 Planning and Zoning Commission Meeting Minutes 6.2. Record of Decision: CPA26-001 Avon Community Housing Plan Recommendation 7. Future Meetings 7.1. October 12, 2026 7.2. October 26, 2026 8. Recently Approved Applications 9. Staff Updates 10. Adjourn MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. TO: Planning and Zoning Commission & Downtown Development Authority FROM: Matt Pielsticker, Community Development Director RE: Sun Road Redevelopment Area Concept Plan a Q►v0n DATE: September 23, 2026 SUMMARY: The Planning and Zoning Commission ("PZC") will host the Avon Downtown Development Authority ("DDA") for a joint meeting on September 28, 2026 to review the Sun Road Redevelopment Area Concept Plan ("Concept Plan"). The Concept Plan was developed over the past several months based on stakeholder feedback, developer feedback, and vetting a number of design alternatives. Representatives from Lionheart and Cushing Terrell have led the facilitation and design process. The team will present the Concept Plan and solicit your initial feedback at the September 28 meeting. Individual follow-up meetings with PZC and DDA will be scheduled for comments and recommendations before the Concept Plan is presented to Council for approval. BACKGROUND: Creating a subarea plan for Sun Road was identified as a priority goal by the Avon Town Council in 2024. The PZC and DDA were instrumental with the creation, and ultimate adoption of the Sun Road Redevelopment Plan ("Redevelopment Plan") in early 2025. The Redevelopment Plan sets forth the vision and goals for a redevelopment that will create an active mixed -use area that maximizes Community Housing, accommodates existing commercial tenants, and creates a strong sidewalk frontage. CONCEPT PLAN OVERVIEW: The Concept Plan ("Attachment A") builds off the Redevelopment Plan and further defines the character, design, and potential phasing of a redevelopment project. The Concept Plan provides valuable background information, highlights policy framework support, and detailed design principles. We expect that the ultimate redevelopment plan for the area may take different form. TOWN MANAGER COMMENTS: The Concept Plan is primarily for the purpose of soliciting interest from developer -investors. The intent is that a private developer -investor group would assume the lead role in designing a redevelopment project, coordinate with the landowners and tenants, securing required financing and overseeing construction. Avon would provide financial incentives through the Avon URA/Avon DDA and potentially other financial that may be available. The Concept Plan depicts a layout, phases for redevelopment, and general renderings to facilitate understanding by developer -investor groups of the goals and direction desired by Avon. Actual site design, building layout and architecture will be subject to proposals by a developer -investor with review by Avon based on criteria in the Avon Development Code and planning goals and concepts in the Sun Road Redevelopment Plan. We also expect the development will be all -electric and will incorporate the Avon Heat Recovery system for heating of the ground floor commercial space. NEXT STEPS: Avon's Chief Finance Officer has developed tax increment financing scenarios which will be presented to the DDA at their next meeting. The Concept Plan and feedback from DDA/PZC will be presented to the Avon Council in November. Staff recommends the formation of a committee composed of two PZC members, two DDA members, and two Council members in addition to Staff. The Committee would review respondants to a Request for Qualifications and then participate in interviews of a selected short list of developer -investors. The committee would continue through the design and implementation phases of a potential redevelopment project. Thank you, Matt ATTACHMENT A: Sun Road Redevelopment Area Concept Plan, September 2026 970-748-4413 matt@avon.org Ire re ML t i- ew tt• « r�+AF = Z �S �K:o�+ l .fi y� +` ei .9f r+� r I � �- � �� !S� Y: '',�• T+ �.'�R; !4' � Al S. t`�,�'•�- i <� . w•�..I A irf:+�♦ _iV/� p+ itTy�l �l(1`3 ��-j. ,Nt l�. l`• • ►__."OL [� �.. � �.` .5„{'?t'.1���• `rty'j 'K.S• •1"�`l�• e � � .•tt�'�'�".�'rt♦tk` ��' - b-. � f�..Y/,� �� ��+/:� jt} ,•� a �Y'�'R• lir=,,w. •,Pt "a;� ' � K' % �� ♦ .4, � SAD � .♦ 1, ., i ♦ ° ► r `` If ...Nepi t .. N • J ' A 1Y Ai limp— fl fir- �� �'-� ��� �� - �• f • :" �' �' 4 '�t ^-�'' � *;yam vp� f, - - goal ,. 1. 4 Alk >� Avon, Colorado w-Orr-- ..r T Sun Road Redevelopment Area Concept Plan September, 2026 YLIONHEART Cushing Terrell 1. Exective Summary 3 2. Project Vision and Goals 4 3. Relevant Plans and Regulatory Frameworks 5 4. Off Site Considerations 6 5. Concept Plan 8 6. Circulation Diagram 9 7. Street Sections 10 O8. Character and Built Form 12 9. Phasing 13 10. Views 17 Appendix 11. Design Process 21 12. Code/Modeling Assumptions 22 Executive Summary This Executive Summary provides a narrative introduction and overview for prospective investors and developers. The Sun Road Redevelopment Concept Plan ("Concept Plan") describes the opportunities and community goals for redevelopment of the Sun Road Area. The Concept Plan presents basic designs for a high density, mixed -use development that is intended to support 250- 300 for -sale residential units, an optional boutique hotel, 70,000 sq.ft. of ground floor commercial and neighborhood uses, and 684 parking spaces. Traditional downtown mixed -use development built to the sidewalk is depicted. Redevelopment of the Sun Road Area is intended to complete the West Town Center area and enhance the vibrancy of Avon's high density downtown core for both residents and visitors. The Town of Avon ("Avon") goal is that 50% of the residential development will be deed restricted as workforce housing for full-time residents of Eagle County and 50% of the residential development will be free market. Avon acquired the Walgreens property in 2025, which is subject to an existing lease with 50 years remaining on the term. Avon has actively engaged with representatives of Walgreen's, PNC Bank and the United States Postal Service to understand their needs and preferences for replacement space. All three entities will need more detailed designs for proposed replacement space to advance this project further. Compensation will need to be negotiated to account for the difference in value of these properties today and the value of the proposed replacement space. The United States Postal Service has indicated that they will consider, and potentially prefer, the conveyance of employee housing units rather than monetary compensation. Redevelopment of the Sun Road Area presents unique challenges related to phasing and continuity of operations for existing uses. The Sun Road Redevelopment Area is located within the Avon Urban Renewal Authority West Town Center Investment Plan Area and the Avon Downtown Development Authority. Avon anticipates and supports pledging all property tax increment revenues generated by redevelopment to support redevelopment. Appendix A to this Concept Plan presents tax increment financing models for redevelopment with all residential and for a mix of residential with a boutique hotel. Conceptual Design Timeline Kickoff (early -to -mid November 2025) Project kickoff activity clustered around the week of November 5-10, 2025 • November 5, 2025: kickoff meetings with the consultant team, Cushing Terrell, and with the FirstBank stakeholder. • November 8, 2025: the main Sun Road Redevelopment Plan Kick-off meeting record - the project's formal in -person kickoff with Avon staff. • November 10, 2025: a consultant -side kickoff meeting covering redevelopment and transit coordination. • November 20-24, 2025: a series of stakeholder meetings with USPS (the post office is one of the three named properties in the plan area) Concept Development and First Client Presentations (December 2025 - February 2026) Design work moved from a massing study into a series of design options. • Early -to -mid December 2025: consultant planning and PMT meetings (Dec 12 and Dec 19) covering Avon Station capacity, Sun Road circulation, and transit hub configuration; a massing study was drafted and revised. • December 10, 2025: "Design Options" with the client - the first formal client presentation of concept massing/options. • Late December 2025: Options E and F massing studies refined. • January 2026: client meetings reviewing Options D—G (Jan 5-6), a Design Review and Next Steps meeting. • January 26, 2026: second formal client presentation, covering Options 1, 2, 3 and phasing diagrams. • January 29, 2026: design review meeting including transit, and a meeting on Option 4 specifically. • February 2026: Option 4 refined and sent to the client (early Feb), phasing diagrams issued (Feb 5), massing study updated (Feb 6), • February 10, 2026: a developer meeting with stakeholders, Jay Eck (Kensington), Graham Frank (Breckenridge Grand Vacations), Jim Telling (East West Partners) • February 13, 2026: a USPS-specific diagram package Refinement Toward a Preferred Option (March - July 2026) Refinement of options and stakeholder meetings with the goal of a public-review/preferred-design goal: • March 3, 2026: meeting with PNC Bank (formerly FirstBank) • March 4, 2026: client meeting on "options to move forward" and USPS-specific diagrams - the point where the design narrows toward a preferred direction. • March 18, 2026: Walgreens-specific diagrams provided to Walgreens. • June 1, 2026: weekly client meeting covering the concept plan, stakeholder briefings, a traffic study delay, and heat recovery capacity. • July 13, 2026: coordination meeting on site planning and tenant placement. • July 21, 2026: meeting notes on "Option Final 2" - suggesting a near -final option was settled around this point. • September 1, 2026: a USPS meeting to establish the next phase of review for the project (several USPS updates along the way) * See design process on page 21 for the variety of design options and iterations considered. Sun Road Massing Study 3 Project Vision and Goals VISION To develop two to three vetted, buildable conceptual design options that seamlessly integrate Avon staff guidance with innovative design thinking, ensuring stakeholder alignment and regulatory approval while creating a compelling foundation for developer RFP solicitation. Guiding principle: a design that is engaging, high -quality, and buildable. GOALS Understand Site Conditions: Through the creation of thorough and accurate base maps that reflect the culmination of information provided. Understand Context: Through project adjacencies and development projects within the neighborhood to ensure compatibility and synergy. Develop High Quality Urban Design: Through the iterative design process, revisit and test that high quality urban design standards are met, build upon the specific standards identified in Chapter 6 of the redevelopment plan. Replacement Space: Develop relationships and satisfy the existing owners/lessees by ensuring that their feedback is heard and implemented where possible. Monthly check -ins with owners/lessees to ensure their needs are being met and they are in the loop as the design iterations evolve. Phasing Plan: Consider multiple scenarios with the end goal to deliver finished replacement space. Consider the realities of construction, schedule and anticipating inevitable delays. Financial Plan: Work with the Town of Avon financial team to understand the motivations for the existing owners/ lessees. Consider creating proformas for each private development in addition to the City for the ultimate preparation of a compelling foundation for developer RFP solicitation. C HA FIER 3: STRAlEG IC VISION INTRODUCTION Redevelopment of the Avon Sun Road Plan area has the potential to provide uses desired by the Avon community, significantly advance and enhance the character of Avon's Town Core. establish a true pedestrian and transit oriented mixed use development featuring Community Housing, increase the local economy, and implement complex climate action strategies. The vision. goals, and objectives were developed and refined by the Avon DDA and Staff, and further refined with the property owners, existing business owners and the Avon Planning &Zoning Commission. The vision, goals, and objectives served as guideposts throughout the planning process. Chapter 5. Implementation and Chapter 6. Design Standards and Expectations are intended to achieve the Al goals and objectives. Avon recognizes the necessity to maximize development of new Community Housing in the. Town Core to promote sustainable and livable workforce housing while also supporting the s of local businesses that are dependent on an available workforce and benefit from a full-time resident population. The Sun Road Plan area has the potential to increase the volume of development significantly in the Town Core and achieve urban floor area ratios (gross) of 3:1 and up to 5:1. PLANNING PRINCIPLES The following Planning Principles create the vision for redevelopment of the Sun Road Plan area: Sustainable. Deal • Achieve a mixed -use pedestrian and transit -oriented development • Require all -electric energy efficient building construction • Incorporate convenient recycling and composting in the design • Require the use of sustainable and environmentally appropriate building materials • Encourage connection to the existing Heat Recovery System for energy offset purposes • Explore use of geothermal possibilities • Locate residences within walkable distance to job centers and public transit CONCEPTUAL FRAMEWORK Consensus was established for a full-time resident neighborhood in the heart of Avon within easy walking distance to civic, recreational, retailr and entertainment. The Plan identifies community benefits that would be realized with development, including Community Housing, pedestrian activation and placing making, establishment of a new regional transit facifity, and establishing successfully ground level commercial uses. This Plan recognizes that flexibility in the mix of uses and design may be required for financial viability. Land Use Metric Existing Concept Fasdential Links 0 180-300 Accommodations Rooms 150 250 Commercial St.R 62,000 62.000-70.000 Parking Spaces 373 600+ Civic plaza Acres 0 02 Table 2: Potential Design and Development Goals PLAN PRIORITIES A series of guiding principles were developed to evaluate concepts for the Sun Road Plan. The guiding principles evolved into a series of Design Priorities as the project advanced. For example, developing a mixed income Community Housing strategy and ensuring equitable development that minimizes small business displacement in the Sub Area was deemed an important overarching principle. The following six Plan Priorities drive the concepts, goals, objectives and design standards for this Sun Road Plan: 1. Community Housing a. Increase opportunities for full-time residential occupancy in the Town Core b. Provide housing types appropriate for urban core environment c. Strive to maximize rent -capped and once capped deed restricted units that will remain affordable over time 2. Regional T2nst Hub a. Incorporate a regional transit hub into the Plan b. Increase pedestrian travel with concentrated Community Housing on the valley floor c. Improve opportunities for social interaction in creating a vibrant Town Core d. Increase convenience for workforce traveling up and down the valley to employment centers Land Use • Achieve a mix of uses that compliment and reinforce each other to create a neighborhood, including Community Housing, neighborhood and regional commercial retail and personal services, accommodations. regional transit center, and public civic spaces • Implement commercial that also supports nearby hospitality uses Pedestrian Circulation • Ensure that pedeshtans have safe, - convenient and officer- access throughout the Plan area IN • Apply pedeshtan-first design strategies which priorities the pedestrian over vehicles • Include pedestrian walkways and highly visible street crossings for convenient connection to .adjacent areas • Incorporate wayfinding, landscaping, street furniture, and public art in pedestrian corrldors Vehicular Circulation • Preserve the existing Sun Road/Avon Road intersection as a fight in, fight out vehicle access to the plan area • Incorporate design and layout that is efficient for vehicles and transit with regard to turning movements and access. Parking • Integrate a centralized shared -use parking structure and program to accommodate residents, visitors; and businesses Character • Require new development to incorporate mountain contemporary architecture that complements and advances the emerging character in Town Center • Recognize opportunities for architecture and building design to create a strong gateway first impression on the comer with Avon Road and on the Avon Road/West Beaver Creek Boulevard Corner • Ensure that ground -level commercial uses are visible, fit the area's character, and support a pedestrian friendly experience • Maximize solar exposure • Orient buildings and entries to front adjacent sidewalks and a public plaza • Incorporate high -quality landscape areas are designed to enhance gateway entries in the Town Center (Avon Road) and the Sun Road area Views • Maintain critical views to and from the Surf Road area • Provide visibility to orient people to their surroundings e. Decrease air pollution and energy consumption with more.. trips made without personal vehicles 3. Pedestrian &parlance a. Improve attractiveness, functionality and safety of pedestrian routes within the Plan area to avoid or minimize pedestrian and vehicle conflicts y. b. Maintain and or improve pedestrian connections to adjacent .,.as c. Integrate a public plaza and public art to enhance pedestrian experience and support activation and place making .. 4. Economic Development a. Support redevelopment that enhances vitality of _ existing uses b. Mitigate displacement of existing uses c. Add neighborhood commercial uses that appropriately serve existing and planned residents and visitors In and near the Plan are. 5. Avon Authenticity a. Retain existing businesses b. Provide opportunities for new unique neighborhood businesses c. Promote placing making that enhances investment interest and patronageof businesses 6. Public mace a. Create on attractive public plaza that integrates with ground floor neighborhood businesses and provides on inviting informal space for residents, visitors and regional transit users b. Incorporate public art into the public plaza to enhance the interest and attractiveness of this space c. Situate the public plaza for high visibility. maximum solar access, and easy pedestrian d. Integrate the public plaza into the building form design to provide relief and interest to a wall of buildings fronting the sidewalk 7. Urban Form a. Maximize or more fully-ufillze the development potential permitted under existing zoning b. Situate buildings with ground floor commercial to front onto the adjacent sidewalks c. Incorporate quality architecture and design, with particular attention the buildings fronting Avon Road, West Beaver Creek Boulevard and the public plaza d. Support ground level neighborhood commercial uses that are accessible to the public, such as coffee shops. restaurants, bakeries e. Take advantage of existing views in all directions Sun Road Massing Study Relevant Plans, Regulatory/Policy Framework RECENT PLANS/DOCUMENTS Sun Road Redevelopment Plan (2025): The Sun Road Redevelopment Plan serves as an introduction for potential investors, clearly outlining Avon's objectives for revitalizing this area. It includes details on the existing conditions, a strategic vision for redevelopment, insights on this opportunity, implementation strategies, and design standards and expectations for the redevelopment efforts. Downtown Development Authority Plan (2023): The DDA Plan is intended to sustain and enhance the long-term commercial health of Downtown Avon by increasing Community Housing and funding public infrastructure and facilities which promote business investment. OTHER RELEVANT PLANS/FRAMEWORKS Coordination with Existing Plans: The Sun Road Redevelopment Plan is a focused plan document for a specific, defined area within the Avon Comprehensive Plan that provides a higher level of detail specific to the defined area than what is generally found in the Comprehensive Plan. These subarea plans provide greater detail and definition of existing conditions, community goals for development and redevelopment, desired design elements, and strategies for implementation. This Plan will be adopted as an amendment to the Avon Comprehensive Plan. The following is a list of existing planning documents in Avon that also guide development for the Sun Road area and West Area: Sun Road area: • 2024 Avon Comprehensive Plan • 2023 Avon Downtown Development Plan • 2026 Avon Community Housing Plan • 2018 Multimodal Transportation and Parking Plan • 2015 Avon Urban Renewal Plan for Town Center West Area: • 2015 Walkability Report • 2009 H.A. Nottingham Park Master Plan • 2009 Transportation Plan • 2007 West Town Center Investment Plan Neighborhood Center Pilot Project (DOLA): The Department of Local Affairs (DOLA) Neighborhood Center Pilot Project provides planning and implementation support for communities pursuing compact, mixed -use neighborhood centers. The Sun Road area aligns with the goals of this pilot, and participation may offer programmatic support and potential funding to advance future planning, design refinement, and implementation efforts. Sun Road Massing Study 5 Off Site Considerations The site is centrally located, within one block of the Avon Town Hall and Pedestrian Mall and within two blocks of the Avon Recreation Center, Avon Library and Nottingham Park. Town of Avon is implementing a variety of projects and planning efforts near the site, including: n Avon Pedestrian Mall Avon has adopted a conceptual design for extending the Avon Pedestrian Mall from Lettuce Shed Plaza to Nottingham Park. Avon has budgeted $6.5 million for the Pedestrian Mall construction in 2027. © Lot B — The Summit Grand Peaks development company has submitted designs for a 111 unit key condotel with full service restaurant building on Lot B, on the south side of West Beaver Creek Boulevard and adjacent to Avon Center building that includes limited commercial. Avon is collaborating with this development to integrate (1) a public pedestrian path connection from West Beaver Creek Boulevard to Lettuce Shed Plaza, (2) plans to construct a grand Civic Plaza between the Pedestrian Mall and Avon Town Hall that will utilize the south west corner of Lot B, and (3) plans to create a 5,000 square foot commercial shell with public patio fronting the Pedestrian Mall which Avon would purchase through the Avon Urban Renewal Authority. The commercial space is roughly envisioned to include a coffee shop, public restrooms, and a community workshop space that can be used by multiple community groups, including the Art Guild at Avon, High Five Media Access, the Vail valley Theatre Company, and others. This commercial space is recognized as the last opportunity on the Pedestrian Mall to proactively promote activation and place - making. © Lot 3 Stonebridge Development Company has submitted a building permit for a 140 room condo -hotel. The condo -hotel will have a pedestrian connection to the sidewalk on the east side of the Avon Town Hall and Pedestrian Mall. DO Lot B/Lot 3 Shared Access Lot B and Lot 3 will have a shared access ramp centered on the lot line from West Beaver Creek Boulevard to the below -grade parking structures beneath both developments. This shared access is across from the Sun Road intersection with West Beaver Creek Boulevard; this access is not in proper alignment. EO Neighboring Hotel Outset (Formerly Comfort Inn) The neighboring hotel property is currently on a timeline that is not aligned with the Sun Road improvements. LM d Existing Driveway f — Proposed Driveway \�, p ♦ — Proposed Pedestrian Access Sun Road Massing Study 6 Views + Aspect West View North View i11 East View South View Primary view to Beaver Creek Resort from Sun Road �0 �.. P \ P�9 Solar Aspect Primary View — Site Parcel Lines Sun Road Massing Study 7 Concept Plan Scenario: Option Final Design Principles Option Final Transit Strategy Bus terminal internal and at grade, central to site (2 bus bays - internal - no transit center) Primary Activation Zone Beaver Creek Boulevard and Avon Roads - active edges with central plaza gathering Public Space Type Rooftop semi public space above parking deck Podium / Parking Extent Stand alone parking and underground parking Character & Built Form Downtown block character massing with active edges Circulation & Access At -grade east -west drive replaces Sun Road, providing access to garages, loading, transit, and fire Pedestrian Experience Perimeter block supports continuous sidewalks and defined edges Development Intensity Moderate - compact mix with downtown character Identity / Character Focus Mixed -use neighborhood core - active edge framed by residential massing X, Legend ,R%f • Retails ' • = W-. Office Plaza Will -!�A, Parking , UG Parking • Loading Area/BOH Greenspace:` Ground Floor Plan Sun Road Massing Study Assumptions Land Use Site Provided Max/Target Provided Max/Target Floor Area Ratio 2.3 2.5 Residential 328,926 350,000 Site Coverage 72% 80%p (200 Units aprx) Hotel/ Residential 55,154 50,000 Building Height 80 - 100 ft 80 - 100 ft Off lce (PNCBank) 10,000 11,576 Parking Provided Required Retail 81,962 67,442 Parking Spaces N 3 USPS 15000 Sun Road Street Parking 12 _ Walgreens 10000 Grocer 15000 Structure Parking 435 - Retail 15000 Underground Parking 237 - Cafe 2000 15% mixed -use deduction - -119 BOH 38,648 - Total 684 590 Total Sqft 514,690 479,018 e Bank/ Office Legend Residential • Retail • Office Hotel/ Residential Plaza • Parking • Loading Area Amenities Greenspace Axonometric 0 %V_11' 8 Circulation Diagram Vehicular Circulation P4' �J u C,D 414. P .�. Rt7q,4 RETq�� RpTq�� i �-► Vehicular (Two ways) — — — —► Bus (One way) .♦ Service (Partial two ways) Service Circulation �s ``eys a � to GC 9cCFs���C "I Bus Circulation �Sec�� es JQF. Q``ea``ess h�QJ� Pv 01 L� QJ QPAP N ` 0 � y,P i i Sun Road Massing Study Activation on Beaver Creek Boulevard Section A Section B \/ Legend Residential • Retail • Office Hotel/ Residential Plaza • Parking • Loading Area Amenities Greenspace Axonometric Sun Road Massing Study 10 Sun Road Street Section Section C Section D A 1-8100 Siidewalk Tra10el Lane Trevel L ne Bus s2 OOm P5.00 Si 8e0w0alk Zone 53.00 ROW 6It- srS� 1 \'40 Legend `. Residential • Retail • Office Hotel/ Residential Plaza • Parking i • Loading Area Amenities Greenspace Axonometric �7 F---, ---_ un Road Massing Study ONE M pr mAk - TAI 40 • qk io wo , lie Aim 00 ot. 00 'oe 10 4rA Al tt ft"" Phasing Diagram Phase 1 Phase 1 A: Walgreens and USPS with residential and bank above (with BOH and underground parking) and partial Sun Road alignment. Temporary parking at the bank. Phase 1 B: Demolish USPS, Bank, Walgreens and partial Sun Road realignment. Off -site location required for the bank. Phase 1C: Build parking structure and remaining Sun Road alignment. 00 r ` PH 1 B: DEMO USPS --'' 1C 1Ca ♦ 00 �IN, , 400 ' ' 1A '.. R G,,0 / D c-�ss//IjC t f PH 1A: PARTIAL SUN ROAD ALIGNMENT ♦ ; G,r 1 A �o ! ♦- 1C i PH 1A: WALGREENS AND USPS WITH RESIDENTIAL AND BANK ABOVE>, 1 A (WITH BOH AND UG PARKING) �'- •.• Z04 , PH 1A:TEMP PARKING AT BANK 4 •♦• ■ 4% It's* ■ ♦• ■ PH 1 B: DEMO BANK ` ` "• I , PH 1C: BUILD PARKING STRUCTURE AND REMAINING SUN ROAD ALIGNMENT PH 1 B: DEMO WALGREENS Legend Retail • Bank Lobby Residential above Demolish Parking/BOH f Underground Parking access Underground "" Parking - Temporary Parking • Sun Road Sun Road Massing Study 13 Phasing Diagram Phase 2 Phase 2A: Retail with residential above. Phase 2113: Build parking structure. 100 00 00 00 00 ♦ 00 � QP , , , , , , 0 W e0 2A ♦ ` e , RETq/` RFTq�� �o PH 2A: RETAIL WITH RESIDENTIAL ♦ ` 44 ABOVE H 2113: BUILD PARKING TRUCTURE I, I I I 1 1 1 1 1 1 I 1 1 1 I Legend -1 Retail Residential above Parking/130H Sun Road Massing Study 14 Phasing Diagram Phase 3 Phase 3A: Build grocery and residential above. Legend Reta i I Residential above Parking/130H Sun Road Massing Study 15 Phasing Diagram Phase 1 PH IB: DEMO USPS 1C 1C ` - -. t- 1A ♦.-. QPQ \ i CF�S •I,C ' PHIA: PARTIAL SUN ROAD♦� ALIGNMENT ♦•. q. �;� 1A PH 1A: WALGREENS AND USPS WITH ♦•• `♦• RESIDENTIAL AND BANK ABOVE ♦♦ (WITH BOH AND UG PARKING) PH 1C: BUILD PARKING STRUCTURE AND REMAINING SUN ROAD ALIGNMENT PH I B: DEMO WALGREENS Q' I I . J / / / 1 y1P • 1 • 1 A •'•• 1 . •1 PH tA: TEMP PARKING AT BANK � •. �1 PH 1 B: DEMO BANK Phase 1 A: Walgreens and USPS with residential and Bank above (with BOH and underground parking) and partial Sun Road alignment. -4e �G Temporary parking at the bank. Phase 1 B: Demolish USPS, Bank, Walgreens and partial Sun Road realignment. Off -site location required for the bank. Phase 1C: Build parking structure and remaining Sun Road alignment. Phase 2 PH 2A: RETAIL WITH RESIDENTIAL ABOVE Phase 2A: Retail with residential above. Phase 2113: Build parking structure. Phase 3 2C: BUILD PARKING . - ♦ 2UCTURE �- ♦♦ PH 3A: BUILD ` GROCERY AND \� `� ♦� RESIDENTIAL ABOVE ♦ I \ I 3A \ J ]A � I � 1 \ 1 ♦ 1 ♦ I ♦ I ♦ I ♦`` 2A 1 � I � I I� Phase 3A: Build grocery and residential above. Sun Road Massing Study �'!i fl i� ill {� , is ;� 1 �i� � �,oUNITED "TE — _'T S S_ TAL SERVICE OMG.Ducg PHARMACY Ile RETAIL- Ama "a 11minal oil jw. 11 P-04 amommoft— WA 7":7 ]I t-,s e: awl :Inui 1 L. I! mil !P CAFE DETAIL Alf ok AL NMI A View 2 b t� AC 34 Fm 0 lip f. - 4' wee,- - . , . .,.VIP. �� • 1 LL- j� F T D G _ L e.- ® IN on �I 01 Om WW, . _ o Sun Road Massin Stud 'All design and contextual elements are illustrative only. Surrounding context is 8 g y shown as a placeholder and does not represent accurate existing site conditions. R. .1 Amllo' �� , ....« - -,;� . ,,� ,t� � ZIT �� � + � � s' II � 11 Ai it Not I � I mom ild JLL In IP Apl NVI fill[" 'ITT ob -1266 RETAIL AM ISO- dw ago* Alpine Bank ................ .111 d. 1p ....... ........ Appendix D MR-1 imish7m, "m 4 10 A fir JI M t 1 0133 Wo 100, oe wr mol ME I I I - W-.1- L 7� ME --V ��- lp�pppplml !If 7- 77�0- ow - 'm WIN- Code/Modeling Assumptions TC - TOWN CENTER Overall Standards Overall Parameters FAR assumption Max Permitted Building Height Development Bonus* (building height) TC Block Standards Phasing/Parcel-Level Parameters Minimum Side setback/Distance Between Buildings Minimum Rear setback Front yard setback (Avon Road and Beaver Creek Boulevard) Development Bonus* (setbacks) Maximum Lot coverage Development Bonus* (max lot coverage) Minimum landscape area Development Bonus* (landscape area) TC Parking Land Use Parameters Off -Street Parking only Multifamily Parking Guest Parking for Multifamily Office Parking Commercial Parking Hospitality Parking Mixed -use parking reduction Development Bonus* (parking reduction) TC Office Building Parameters Depth Width Floorplate Square Footage Ground Floor Retail First Story Height Depth Grocery Multifamily Building Height Floor - Ceiling Height Depth (double -loaded corridor) Depth (garage wrap) Width Parking Structure (and Surface Parking) Gross square feet (SF) per Parking Space Parking Structure Depth Parking Structure Width 2.5 (including parking structure) 80' 100' 7.5' 10' 0' 80% 20% No off-street parking along W. Beaver Creek Boulevard; on -street parking may be feasible in a limited number of spaces 1 space per Studio, 1.5 spaces per 1 Bedroom (BD), 2 spaces per 1-bedroom/dwelling unit (1 BD/DU) greater than 2,500 square feet (SF) varies by number of units 3 space per 1,000 square feet (SF) floor space 4 space per 1,000 square feet (SF) General, 1 space per 60 square feet (SF) Food and Beverage 1 space per unit 15% 25%, provided ADA and electric vehicle (EV) parking spaces are not reduced 110' / 80' 220'-250' / 100-125' 20,000-30,000 SF / 8,000-10,000 SF 12' Minimum (f-f 14') 40'-70' service entrance, no loading dock, dumpster trash/recycle/compost access, grease interceptor location, and main access, retail rooftop equipment spacescreened per code 14-15' Minimum (floor -to -floor 17') (loading bay, trash compactor bay, full semi delivery - trash/recycle/compost and delivery same back -in access, grease interceptor location and main. Access, direct parking access) screened per code 80-90', some portions reaching 100' 10' Minimum (floor-to-floor12', upper 11') 70' 40' 200'-250' (30-35% amenity, management and maintenance) 400 SF 125' Minimum, increments of 60' 200' Minimum Interview Information provided by Town Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Sun Road Redevelopment Plan Avon Development Code Avon Development Code Avon Development Code Avon Development Code Avon Development Code Interview Information provided by Town Urban design rules of thumb / "Rurban" appropriate Urban design rules of thumb / "Rurban" appropriate Urban design rules of thumb / "Rurban" appropriate Avon Development Code Urban design rules of thumb Boutique Grocery standard Interview information provided by Town Interview information provided by Town Urban design rules of thumb Urban design rules of thumb Urban design rules of thumb Parking structure design standards Urban design rules of thumb Urban design rules of thumb Sun Road Massing Study 22 YL 1 0 N H E A R T A Avon jj[��I�j AVON PLANNING & ZONING COMMISSION Meeting Minutes (DRAFT) Monday, August 10, 2026 Public Meeting Begins at 5:30 PM TEAMS LINK: https://teams.microsoft.com/meet/240853380295912?p=HHV4SWKKx5pEP5QQic To join meeting via phone, dial (945) 468-5504 and enter conference ID: 477 057 969# 1. Call to Order and Roll Call (Chairperson) — 5:30 PM Meeting commenced at 5:30 PM. A rollcall was taken, and Planning Commissioners Carly Hansen, Brad Christianson, Brian Sipes, Rick Sudekum, Elizabeth Waters, Nancy Tashman and Nicole Murad were present. Also present were Planning Manager Jena Skinner, Community Development Coordinator Emily Block, Housing Planner Patti Liermann, Community Development Director Matt Pielsticker, Town Attorney Nina Williams, and Town Manager Eric Heil. 2. Approval of Agenda ACTION: Commissioner Sudekum made a motion to approve the agenda. Commissioner Hansen seconded the motion, and the motion passed unanimously 7-0. 3. Disclosure of any Conflicts of Interest or Ex-Parte Communication Related to Agenda Items Commissioner Sipes disclosed that he and Commissioner Waters had spoken via phone regarding the Housing Plan and comments that she wanted to discuss at tonight's meeting. 4. Public Comment — Comments are Welcome on Items Not Listed on the Following Agenda Public Comments are limited to three (3) minutes. The speaker may be given one (1) additional minute subject to Planning and Zoning Commission approval. 5. Public Hearing 5.1. CPA26-001 Community Housing Plan Updates (continued from July 13 meeting) — Jena Skinner, Planning Manager ACTION: Commissioner Waters made a motion to recommend approval of CPA26-001 based on findings presented in staff's report, and as amended with edits by the Planning and Zoning Commission. Commissioner Tashman seconded the motion, and the motion passed unanimously 7-0. 6. Consent Agenda 6.1. July 13, 2026 Planning and Zoning Commission Meeting Minutes 6.2. Record of Decision: MNR26-010 Exterior Remodel at 5580 Coyote Ridge MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. A Avon C O L 0 R A D O ACTION: Commissioner Christianson made a motion to approve the consent agenda. Commissioner Sudekum seconded the motion, and the motion passed unanimously 7-0. 7. Future Meetings 7.1. August 24, 2026 — Joint PZC/DDA Meeting 7.2. September 21, 2026 — Planning and Zoning Commissioners decided to move this meeting to Tuesday, September 15th in observance of Yom Kippur on the originally scheduled date of September 21 st, 8. Recently Approved Applications 9. Staff Updates 10. Adjourn The meeting was adjourned at 7:16 PM APPROVED: M CHAIRPERSON MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG MEETING NOTICES ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, AVON ELEMENTARY AND AVON PUBLIC LIBRARY INDIVIDUALS WITH DISABILITIES ARE ENCOURAGED TO PARTICIPATE IN ALL PUBLIC MEETINGS SPONSORED BY THE TOWN OF AVON. IF YOU REQUIRE A DISABILITY ACCOMMODATION, PLEASE CONTACT THE COMMUNITY DEVELOPMENT DIRECTOR, MATT PIELSTICKER, AT (970) 748-4413 OR MATT@a AVON.ORG WITH YOUR REQUEST. REQUESTS SHOULD BE MADE AS SOON AS POSSIBLE BUT NO LATER THAN 72 HOURS BEFORE THE SCHEDULED PUBLIC EVENT. PLANNING AND ZONING COMMISSION FINDINGS OF FACT AND RECORD OF DECISION DATE OF PUBLIC HEARING TYPE OF APPLICATIONS: FILE NUMBER: APPLICANT: August 10, 2026 Comprehensive Plan Amendment CPA26-001 Town of Avon Avon C O L O R A D O This Record of Decision is made in accordance with the Avon Development Code §7.16.010(F)(1) PZC DECISION ON #CPA26-001: Recommendation for Town Council to Approve the proposed Avon Community Housing Plan update based on the findings presented in Staffs report and as amended/edited by the Planning and Zonning Commission: RECOMMENDED FINDINGS: 1. The proposed Plan amendment is compatible with the goals and policies of the entirety of the Avon Comprehensive Plan while recognizing that Avon's unique housing goals, policies, and community housing needs have evolved, requiring this update. This amendment complies with the Review Criteria outlined in Section §7.16.030(c) of the Development Code and offers increased support for Community Housing efforts and good planning by the Town of Avon. 3. The proposed Plan provides guidance for planned and orderly use of land and in encouraging a high quality of place for the community; and 4. The proposed amendment promotes the health, safety, and welfare of the Avon Community by supporting coordinated development using a tool like the Housing Plan for its long term vision. GENERAL CRITERIA FINDINGS: 1. The development application is complete. 2. The development application provides sufficient information to allow the reviewing authority to determine that the development applications comply with the relevant review criteria. 3. The development application complies with the goals and policies of the Avon Comprehensive Plan; and 4. The demand for public services or infrastructure exceeding current capacity does not require mitigation at this time as there is no development application accompanying this Comprehensive Plan Amendment that results in a physical project that utilizes public services or infrastructure. THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED: BY: DATE: PZC Chairperson PZC Record of Decision: CPA26-001