Loading...
2026.09.24 - FINAL - Village at Avon Park Planning - Sept 22, 2026 970-748-4413 matt@avon.org Page 1 of 9 TO: CASE Committee & Health and Recreation Committee Members FROM: Eric Heil, Town Manager Matt Pielsticker, Community Development Director RE: Village (at Avon) Park Planning DATE: September 22, 2026 SUMMARY: This report provides background information about park planning in the Village (at Avon) (“VAA”) Planned Unit Development (“PUD”) as it relates to governing documents, parkland dedication requirements, and park construction requirements. The purpose of bringing this information to CASE and Health and Recreation Committees is for general awareness, to solicit targeted feedback on master planned park specific elements, and for members of the master plan and design team to present the evolution of the valley floor planning and the associated park planning. This first meeting is primarily and introduction. Review and input from Health and Recreation Committee and the Culture Arts and Recreation Committee will be important as part of this review process. OPERATIVE DOCUMENTS: Following are the primary regulatory documents that govern the properties. Individual excerpts are also provided below for convenience: 1. VAA PUD Master Plan : This zoning map serves to establish the PUD and represents the ongoing long-term vision to subdivide the Village (at Avon) into specific planning areas. 2. VAA PUD Guide The PUD Master Plan is supplemented by the PUD Guide (“Guide”), a detailed document that informs land use controls and development standards. The Guide dictates processes for application review and approvals, and is amended on occasion. 3. CARADA: The Consolidated, Amended, and Restated Annexation and Development Agreement (“CARADA”) signed and recorded in 2014 represents the development agreement between the current, primary landowners, Traer Creek. This was amended in May 2026, however, the amendments do not impact park planning. The VAA Master Plan subdivides the PUD into Planning Areas. Each Planning Area has specific land use requirements and restrictions for development, similar to zoning controls. The VAA PUD Guide necessitates a Design Review Board (“DRB”), a small group of individuals tasked with reviewing development applications similar to the Town’s Planning and Zoning Commission (“PZC”) but specific to properties within the PUD. The Guide states that certain types of development projects in the VAA are only reviewed by the VAA DRB and are not subject to the Town’s Development Standards and review procedures (E.g., Signage, fencing, etc.), while other types of applications employ the Town’s standards and procedures (E.g., Temporary Use permits). Since the VAA PUD’s inception, the Town and Traer Creek have collaborated to update its operative documents, including the VAA PUD Master Plan map, via administrative approvals and ordinances approved by Council. BACKGROUND: In 1998, the Avon Town Council agreed to annex the Village (at Avon). These actions resulted in the formation of the Village (at Avon) PUD, a 1,779-acre area primarily owned by the Traer Creek LLC (“Traer Creek”) and its subsidiaries. The Town of Avon owns selected parcels in the valley floor. Village (at Avon) Park Planning September 22, 2026 Page 2 of 9 Image 1 - VAA Map Area N / P3: Early iterations of the VAA Master Plan show (Planning) Area N – Community Park (29 acres) in the Land Use Summary. In 2003, it was determined that Swift Gulch Road should provide a continuous connection, to Avon Road and Post Blvd. Traer Creek dedicated PF2 and PF3 in connection with a 2008 PUD Amendment. In 2014, due to the bifurcated nature of the Planning Area N, and severe topographical limitations, Ordinance 12-10 renamed the area to “P3” and reduced P3 to roughly thirteen (13) acres, while adding 5.8 acres to Planning Area J for commercial development due to the proximity and visibility from the freeway. Today that commercial development includes the Marriott hotels. Further, it was agreed by the Town and Traer to dedicate future parkland in the amount of 5.8 acres pursuant to the CARADA Section 3.7 (d). Section 3.7(d) allows the Master Landowner the ability to dedicate 5.8 acres of parkland within Planning Area I, J, and/or K in the Master Landowners discretion. Of note, of the sixteen (16) acres “removed” from P3, most of P3 originally was comprised of steep hillside and was more accurately zoned to Open Space. Image 2 - Area N - 1998 VAA PUD Image 3 – Planning Area 3 - 2014 VAA PUD The Town and Traer Creek revised the PUD Guide to reflect the updated terms adopted by Council Ordinance 12-10, and this updated version now represents the current operative requirements for development of P3. Included in the PUD Guide are Provisions for Certain Amenities, which include an Village (at Avon) Park Planning September 22, 2026 Page 3 of 9 encumbrance for P3: Excerpt from VAA PUD Guide - Provision of Certain Amenities. Community Park (Planning Area P3). Construction of the initial fifty percent (50%) of the community park shall be commenced prior to the date that the Town’s obligation arises to issue a certificate of occupancy for the Dwelling Unit constituting the 601st Dwelling Unit within the Property that otherwise is eligible to receive a certificate of occupancy. Construction of the second fifty percent (50%) of the community park shall be commenced prior to the date that the Town’s obligation arises to issue a certificate of occupancy for the Dwelling Unit constituting the 1200th Dwelling Unit within the Property that otherwise is eligible to receive a certificate of occupancy. Once commenced, construction of the improvements contemplated in (i) and (ii) above shall be prosecuted with due diligence in accordance with sound construction practices. The Town’s responsibility for commencing “construction of the initial 50% of the community park…” at the time the 601st market-rate residential unit is built and approved for use by the Town’s Building Official is not defined any further than the language above. The current Bosk Apartments project brings the total number of residential units to above 601, once certificates of occupancy are issued for the buildings. P3 Site Description. P3 is a 13 acre property (although not a unique parcel) near the center of the VAA PUD. The site’s high elevation provides exceptional views of the valley floor and mountains to the south. The site is perched above the adjacent hotel, but the hotel is only visible when standing at the edge of the site. The area to the north includes hillsides of even higher elevation, with a trail that connects to the expansive trail system between Avon and Vail. The area reports wildlife including birds, snakes, deer, mountain lions, and foxes. Image 4 - P3 Context Map Village (at Avon) Park Planning September 22, 2026 Page 4 of 9 Image 5 - View from Southern Edge of P3 Looking Southeast, with Maverik and Hotel The property sits north of Swift Gulch Road and the Marriott Hotels, and northwest of the Maverik gas station. A steep dirt road leads to the property, which represents the eastern boundary of the site, and extends further north to a water tank owned by the Upper Eagle Regional Water Authority. The temporary dirt road leads to a two-acre, human-made lake on land known as Nottingham Reservoir. Conceptual permanent road plans have been reviewed by the Town’s Engineering Staff at a preliminary level and planned to be finalized in the upcoming years. The road will generally follow the approved temporary road that leads up to the water tank, approved in 2014 in connection with Tank construction. Currently, the center of the P3 site is used to store natural materials (E.g., dirt, soils, gravel, etc.) for construction projects and grading, and construction equipment, such as excavators. Despite the construction element, the site is generally well cared for by the current property owners, and is restricted to the public by a large chain link fence north of the roundabout leading up to the site. Potential future uses of the site are expansive. The VAA PUD identifies P3 as Parkland, and is subject to development standards including: Uses By Right: (a)Agricultural Use (as an Interim Use only).(b)Community Facilities (subject to review and written approval of such Uses by the Design Review Board).(c)Equestrian, pedestrian and bicycle trails.(d)Landscape improvements.(e)Indoor and outdoor, sports, training and recreation facilities.(f)Lakes, ponds, reservoirs and irrigation ditches.(g)Parks, picnic facilities and temporary entertainment for special events.(h)Open Space.(i)Infrastructure.(j)Dry Utilities. Village (at Avon) Park Planning September 22, 2026 Page 5 of 9 (k)Cabled Telecommunications Equipment, Cabled Television Facilities and CabledTelecommunications Services, each of the foregoing being subject to review and writtenapproval by the Design Review Board authorizing such Use.(l)Wireless Telecommunications Equipment (excluding antenna towers), WirelessTelecommunications Facilities (excluding antenna towers) and Wireless TelecommunicationsServices, each of the foregoing being subject to review and written approval by the DesignReview Board authorizing such Use. Special Review Uses: (a)Rock and gravel crushing operations related to rock and gravel materials excavated within TheVillage (at Avon) PUD.(b)Wireless Telecommunications Equipment (antenna towers only) and WirelessTelecommunications Facilities (antenna towers only), each of the foregoing being subject toreview and written approval by the Design Review Board authorizing such Use. Prohibited Uses: (a)Residential Uses.(b)Commercial Uses (except as specifically included in Sections D.10(a) or D.10(b)).(c)Industrial Uses. There are no setbacks or site coverage restrictions for buildings, and a thirty-five (35) foot building height maximum in P3. Image 6 - Center of P3 Looking Southeast Staff finds that various passive recreation uses would be appropriate and would avoid complexities of building large facility structures on this site. The list of uses include dog park, picnic area, sports fields, pickle ball courts, community garden and public restrooms. Village (at Avon) Park Planning September 22, 2026 Page 6 of 9 PLANNING AREA B: The Town owns the Planning Area B (“PA-B”) parcel, also known as Lot 5, Filing 1. PAB was conveyed to the Town in 2014 in connection with Ordinance 12-10. PA-B currently includes the steep hillside and large depression, and the idea is that PA-B would ultimately be moved around to accommodate the master plan for Planning Area A, which is the mixed use center of the VAA pursuant to Section 3.7(b) of the CARADA. Representatives of Traer Creek have been engaged with the Town to show development plans for areas surrounding Planning Area B, and the Town is considering options for complementary design of PAB that fits within the master plan while complying with the proposed administrative replat required in Section 3.7(b). In connection with Phase I, construction of nearly all of the public infrastructure within the valley floor will be completed. Additional items such as master grading plans, master raw water irrigation plans, have all had an impact in determining the location for PAB within the master plan. PAB is an undeveloped 4.1-acre site, bound by a steep slope to the north that leads up to Interstate-70. The parcel is otherwise encompassed by land owned by Traer Creek within Planning Area A, dedicated as Village Center Mixed Use Project in the PUD Master Plan. PAB is a physically depressed parcel in an area used for construction and snow storage on the valley floor, and is eligible for reconfiguration if necessitated by a development project. The idea is for the parcel to be moved to a new location and surrounding development work will contemplate “filling” the depression.The sizing of the lake was determined in part in order to ensure that surrounding development could fill the depression to grade using excess soils. Image 7 - PAB Looking West with Chapel Square in the Background Village (at Avon) Park Planning September 22, 2026 Page 7 of 9 Image 8 - PAB Looking Northwest with Avon Regional Transit Facility in Background PAB is identified as Community Facilities in the VAA PUD Guide Land Use Summary. The VAA 2018 PUD Guide includes guidelines for PAB: Uses by Right: (a)Parks and Open Space.(b)Community Facilities and related amenities, including without limitation, accessoryCommercial Uses, including food and beverage concessions, as may be mutuallyapproved by the Town and the Design Review Board.(c)Agricultural Use (as an Interim Use only).(d)Infrastructure.(e)Dry Utilities.(f)Snow storage (as an Interim Use only).(g)Water storage and water resource management facilities.Special Review Uses: (a)Outdoor entertainment facilities that include the use of amplified music.Prohibited Uses: (a)Commercial Uses.(b)Residential Uses.(c)Industrial Uses.(d)Mixed Use Projects Village (at Avon) Park Planning September 22, 2026 Page 8 of 9 The PUD Guide also includes guidelines for building setbacks, building height maximum (60 ft), maximum allowable site coverage (20%), parking requirements and street standards, specific to Planning Area B. The site is currently contemplated for water storage. In 2026, the Town and Traer Creek are considering specific elements of development for the site in order to craft a detailed vision for comprehensive VAA development in the next 10-20 years. The VAA PUD Guide reports the conditions for the prior dedication of Planning Area B, which includes: •The Town can construct a water feature, with a limit on total surface area (0.6 acres) and a minimum 2-acre feet of water storage. •Development of the site, including public improvements, is subject to VAA DRB approval. •The Town has a right to maintain and operate the site as Open Space. •The site can be used for snow storage by the Town or Traer Creek until it is developed. The VAA includes two additional sites designated as Parkland: P1 and P2. P1 was originally contemplated as pocket parks and/or a linear path, currently undefined at the site. The Piedmont and Bosk apartment construction have respected the P1 concept, and the plans for P1 have become more focused. The Bosk construction will create a ADA accessible path to P1 that connects the Bosk apartment complex with Planning Area B. The future of P1, its look, feel and overall development, is likely subject to adjacent development projects. There are opportunities for pocket parks adjacent to existing properties. Image 9– PAB, P1, P2, & P3 Village (at Avon) Park Planning September 22, 2026 Page 9 of 9 P1 will provide a physical connection between existing residential development and future sites in and around PAB. A soft surface path is currently being constructed between Bosk Apartments and Piedmont, signifying the beginning/end point of P1. The construction of the soft surface trail was approved by Council as part of a cost-share agreement with the Bosk apartment developers. Image 10 - View toward P1 Area Looking Northeast with Piedmont Apartments in Background P2 is the park in between the Walmart and Home Depot buildings on Yoder Ave. The site is only accessible from the Walmart / Hope Depot parking areas, and offers seating areas throughout a nature-scape, a fountain, and a small bridge. Traer Creek Metropolitan District is responsible for maintaining the P2 park area. The Town is not anticipating development projects related to P2. NEXT STEPS: The timing of developing P1 and PA-B is dependent upon neighboring development. For PA-B, if master planning continues for “Phase II” of the valley floor and Planning Area A activities, a redefined PA-B would likely be created at the time of subdivision for Crescent Hill Road and/or Phase 2 parcel(s). The subdivision would establish a new location for PA-B as depicted in the overall plans. Review and approval of the subdivision occurs administratively per the Village PUD Guide. Council is required to approve the deeds to convey the existing PA-B area back to Traer Creek and receive the deed to the new location. Avon will also need to consider updates to the Development Agreement and Village (at Avon) PUD Guide to better define the timing, roles and responsibilities for P3. This should coincide with the timing of the roadway and utility extensions from Wagon Trail Road past P3 property. Thank you, Matt and Eric ATTACHMENT A – Jerde Master Plan Drawings ATTACHMENT B – PAB Zehren design plan drawing LAND USE: PROGRAMMING & DISTRICTING RESIDENTIAL MIXED USE PARK RESIDENTIAL / HOTEL OPEN SPACE (EASEMENT) HIGH DENSITY RESIDENTIAL MIXED USE / HOTEL PUBLIC ROW RESIDENTIAL MIXED USE RESIDENTIAL MIXED USE RESIDENTIAL MIXED USE RESIDENTIAL MIXED USE RESIDENTIAL RESIDENTIAL / HOTEL HIGH DENSITY RESIDENTIAL HIGH DENSITY RESIDENTIAL HIGH DENSITY RESIDENTIAL OPEN SPACE PARK MIXED USE / HOTEL PLANNING AREA - A PLANNING AREA - B PARKLAND/ SEASONAL SOFT TRAIL RESIDENTIAL MIXED USE CORE RESIDENTIAL RESIDENTIAL PARK HOSPITALITY HOSPI- TALITY ATTACHMENT A RESIDENTIAL MIXED-USE PROMENADE P-1 GREENBELT CONNECTION (TO EAST POST BLVD) PRIVATE GREENBELT PATH POTENTIAL PEDESTRIAN CONNECTION OVER RAILROAD RAILROAD EASEMENT: POTENTIAL FOR LONG-TERM MULTI-MODAL RECREATIONAL PATH & CONNECTION TO SKI LIFTS PARKLAND (SEASONAL SOFT TRAIL WITH INTEGRATED RETENTION BASIN) MULTI-USE TRAIL TREE LINED STREETSCAPE GRAND STAIR PLAZA PLAZA PLAZA HIL L C L I M B PO C K E T PA R K SHARED ROOF AMENITIES SHARED ROOF AMENITIES PRIVATE ROOF AMENITIES PRIVATE ROOF AMENITIES PRIVATE ROOF AMENITIES PRIVATE ROOF AMENITIES SHARED CLUBHOUSE PLAYGROUND DOG PARK EXCLUSIVE/ MEMBERSHIP OUTDOOR AMENITY LAKE PUBLIC PARK LAKEFRONT PRO M E N A D E PUBLIC GREENBELT PATH PEDESTRIAN/MULTIMODAL FRIENDLY STREETSCAPE MULTI-USE TRAIL GREEN SPACE & RECREATION ATTACHMENT A SOUTHEAST AERIAL VIEW 1 2 3 4 5 6789 10 ATTACHMENT A DN UUPUP UPUU DNND DNDNDN UP UPUPUUUU DNDND DNDNNNUPPUP UPUDNDNDD DNNDDNN UPP UPU DNDNDDDDDD AANENE CHC APAP ELEL PLALA CECE CHC APP LEL PLALA CECE CHC APP LEL PLALA CECE CHC APAP ELE PLA CECE CHC APAP ELE PLA CECE RIPRI VATVA E DEDRRDR.DR PR IV A T E DRD . C R E S C E E N T T H I L H I L L R R O A D O A D C R E OO A D C R E OO A D A D A D WATER SURFACEWWWATWATWATERWATERATER SATER ER SUER SUR SURFAR SURFAURFAURFAURFAURFARFACERFACACEACEACEACEEE 748474747474748748748474844844848484 8687744488 489 748674867 748486 7550755075075777577577 7505 75547554 7486 7489 74907490749077499077499074974907497490 Fountain Site S e c t i o n 2 Views to Lake Views Water Feature Events Lawn Pa t h Path Path Step s Steps Waterfront Plaza Steps and Seating Plaza Plaza Mixed -Use Ste p s Winter Ice Skating Rink 180’ x 110’ Dining Terraces +7510 7553+ +7495 +7500 +7546 Overlook Pavilion and Plaza Sidewalk Bus Stop Bus Stop Recirculating Water Feature Water Feature Supply Pipe Notting h a m P u d e r D i t c h N o t t i n g h a m P u d e r D i t c h Retaining Walls P a r k A c c e s s Multi-U s e T r a i l Pot e n t i a l F u n i c u l a r Angular Boulder Lake Edge 7/31/25 Entry Plaza and Art Feature Terraced Plaza Summer Fountain and Winter Fire Lake Pavilion w/ Boat & Ice Skate Rentals Hardscape Lake Edge Playground Naturally Vegetated Lake Edge Sedimentation Forebay Pond Water Feature Intake and Pump Station Water Feature Supply Pipe Fountain Paddle Boat Dock Fountains SCALE: 1” = 30’ 030’15’60’ Village At Avon Lake Conceptual Framework Diagram&4#(6 7585+ Mixed -Use Residential Residential 75 5+ 7484+ 7484+ 7484+ B/O Lake7469 7489+ Garden Terraces +7485 New Ditch Head gate New Ditch Alignment Lake Fill Pipe 7525+ Z E H R E NAND ASSOCIATES ARCHITECTURE • PLANNING • INTERIORS LANDSCAPE ARCHITECTURE 7486+ +7484 Lake Outlet and Overflow Structure LAKE1.74 AC Multi-Use Trail Lake Front Promenade and Seating Areas h r GG 7486 0 P 77525+++ h e Pa t h 00 Step sepsps Steps 7500+75+7 0raceserra00ra 74 Views to Lake Ste p s PlaygroundP 7489+eSkeSkeSke Skatee SkSkate Skateate ate e dle le le e e PaddlePPPaddlPaddladdladdladdleaddleddle ddle dl +++++++++ 74867 dle Views Water VVVVViViVieViViewVieViewViewViewsViewsiewiewiews WiewswsWwsWws Wws Ws Was Was Wats WatWateWatWateWateWaterWaterateraterater ater ter ter ererr r FeatureFFFeFFeaFeaFeatFeatFeatFeatFeatuFeatueatureatureatureaturatureatureturetureureureureurerereeeee BoatDockBoaBoaBoat DBoat Doat Doat DatDatDatDocat DoDockDockDockDockDockDockckckckckkkkkDock 7484+77747747474874874847484484+484484+484+84+84+4+4+4+4+ BoBBBoB 8 Sit e S e c t i o n 1 ATTACHMENT B