Loading...
25.05.28 PSA Stolfus & Associates TASK ORDER 4.4 20260205EXHIBIT B On-Call Agreement for Professional Services TASK ORDER 2026-31044-4 Avon Mall Final Design Amendment 2 This Task Order pertains to the On-Call Agreement by and between the Town of Avon (“TOWN”), and Stolfus and Associates (“CONTRACTOR”), dated On-Call Contract Execution of May 28, 2025 (“the Agreement”). CONTRACTOR shall perform services as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Project Description: Provide additional design scope of work: • Drainage Design: Inlets and storm system for Lake St raised cross walk • Structure Design: additional seat wall at Nottingham Park • Roadway: conceptual layout of rec center parking lot • Landscaping: Town Hall Plaza modifications and Nottingham Park / Ped Mall interface Project Site: Proposed Tasks: See Attachment A. 1. Final Design for the Avon Mall, Amendment 2 Budget/Proposal: ___$ 25,000 __________ Schedule: __Final Design due by June 30, 2026 This Task Order shall supplement the May 28, 2025 Agreement. Town of Avon Recommended: ________________________________Senior Engineer ____Date: ______________ Keith Fraser Title Stolfus and Associates Approved: ______________________________________VP Consulting________ Date: ______________ Michelle Hansen Title Town of Avon Approved: _____________________________________Engineering Director____Date: ______________ Eva Wilson Title Signature: Email: Signature: Email: Signature: Email: kfraser@avon.org michelle@stolfusandassociates.com ewilson@avon.org 5690 DTC Boulevard, Suite 330W Greenwood Village, CO 80111 phone:303-221-2330 • fax: 303-221-2331 www.stolfusandassociates.com January 23, 2026 Eva Wilson, PE, PTOE Engineering Director Town of Avon EWilson@Avon.org RE: Proposal for Avon Mall Final Design – Additional Design Services Dear Eva, The Town of Avon has identified a need to extend the Avon Main Street Mall from Lettuce Shed Ln to Nottingham Park. This task order adds the following services for final design: • Drainage design: Inlets and storm system for Lake St raised cross walk • Structure Design: additional seat wall at Nottingham Park • Roadway: conceptual layout of recreation center parking lot (Exhibit A, shared by Keith Fraser at 10/31 bi-weekly meeting) • Landscaping: Town Hall Plaza modifications and Nottingham Park / Ped Mall interface SCOPE OF WORK Work Element 1 – Project Administration / Coordination (Stolfus & Associates, Inc.) Stolfus & Associates, Inc. (Stolfus), will review/process invoices, as well as provide other project administration/ management services (coordination and product review) throughout the duration of the project. Stolfus will be responsible for day-to-day management and coordination of the work elements included in this scope of work. Stolfus will work with the Town’s project manager to modify schedule of activities for each task element, as appropriate. Additional Coordination/Meetings: • Up to 16 hours of additional coordination with Town are included (see contingency line in fee summary). • Additional coordination and other meetings will be billed on an hourly basis with written approval from the Town. Work Element 2 – Path Alignment/Grading & Roadway/Traffic/Parking Lot Design (Stolfus) Stolfus will prepare a conceptual horizontal layout of the Recreation Center Parking lot, Exhibit A shared at the 10/31 bi-weekly meeting, for Town consideration. The parking options will include designated drop zone parking spaces and provide one-way circulation. 3-D modeling is not included with the conceptual design. If the Town selects this option, the previous design amendment dated 10/15/2025 includes 3-D modeling and final design of the preferred parking lot layout option. Work Element 2 Deliverables: • Conceptual layout of Rec Center Parking Lot Work Element 3 – Urban/Landscape Design (DHM Design) Task 1 (already completed) This includes time to prepare additional civic plaza concepts (7 total) and modifications to Lake Street plazas (3). ATTACHMENT A Proposal for Avon Mall Final Design December 19, 2025 Page 2 Task 2: Additional Design/Adjustments This includes modifications to the paving pattern, sculpture area, planter and possible shade sails for civic plaza as well as adjustments to the Lake Street Plaza; sculpture areas, parallel parking configuration, park access and flagpole area with wall. Includes time for team review meeting. This proposal does not include 3D renderings. Work Element 4 – Drainage and Water Quality (RESPEC) 100% Additional Design Calculations and Plans for Lake Street RESPEC will prepare calculations and plans for the drainage improvements at the raised crossing at Lake Street. Quantities and an opinion of probable cost will be prepared. The following design elements are added: • New inlets at raised crossing on Lake St. Work Element 4 Deliverables: • Drainage Memo (abbreviated, to include additional drainage design) • 100% plans, specifications, and OPC (additional drainage at Lake Street raised crossing) Work Element 5 – Lighting and Electrical (Clanton) No additional design services. Work Element 6 – Structural Support (San Engineering) San Engineering will provide a 100% structural calculation and plans package for the following added elements: • Structure foundation: added seat wall at Nottingham Park interface (1 additional) Minor comments will be addressed at 100% for inclusion in the Contract Documents. Work Element 6 Deliverables: • 100% details and quantity calculations for miscellaneous structure: seat wall at Nottingham Park interface EXCLUSIONS Items specifically excluded or to be provided by others: • Meetings with other Town committees beyond planning commission and Council • Public Involvement support and meeting attendance • Permission to Enter • ROW plans and legal descriptions, titlework and property acquisition • Subsurface Utility Engineering • Utility relocations/adjustment designs • Cross-sections • Traffic Analysis • Construction Phasing and Traffic Control Plans • Wayfinding signage • Geotechnical investigation/design • Shade sail structural design • Environmental investigations, studies, clearances • EV charging station design and future EV readiness • Parking lot lighting design • Lighting alternatives including development design or detailing of custom luminaires Proposal for Avon Mall Final Design December 19, 2025 Page 3 • Temporary lighting, arti lighting or development of light art • Heat recovery systems design • Equipment procurement • General Conditions • Bid assistance • Design services during construction/construction management • Major design changes identified at 100% plan submittal SCHEDULE The project is anticipated to be ready for advertisement in October 2026 with design expected to be completed in June 2026. The existing project schedule will be modified upon notice to proceed. FEE As detailed below, Stolfus and its subconsultants will perform these engineering services for a total fee of $25,000. Additional Design Services Work Element 1: Project Administration / Coordination (Stolfus): $4,000 Work Element 2: Path Alignment/Grading & Roadway/Traffic Parking Lot Design (Stolfus) $3,220 Work Element 3: Urban/Landscape Design (DHM) $7,700 Work Element 4: Drainage and Water Quality (RESPEC) $3,195 Work Element 5: Lighting (Clanton) Work Element 6: Structural Support (San) $3,000 Contingency (Additional Coordination Meetings w/Town, up to 16 hours) $3,885 Total Services: $25,000 We appreciate the opportunity to work with the Town of Avon and would be happy to answer any questions you have on this Scope of Services. Sincerely, STOLFUS & ASSOCIATES, INC. Celeste Chavez Shinn, PE Project Manager Task Order 2026-31044-4-Avon Mall Final Design Amend 2 $25,000 Final Audit Report 2026-02-05 Created:2026-02-02 By:Keith Fraser (kfraser@avon.org) Status:Signed Transaction ID:CBJCHBCAABAALII0LjLAp-_dtSIBTUgwx-SzhTLl5x0b "Task Order 2026-31044-4-Avon Mall Final Design Amend 2 $25 ,000" History Document created by Keith Fraser (kfraser@avon.org) 2026-02-02 - 10:55:03 PM GMT Document emailed to Keith Fraser (kfraser@avon.org) for signature 2026-02-02 - 10:57:07 PM GMT Document emailed to Michelle Hansen (michelle@stolfusandassociates.com) for signature 2026-02-02 - 10:57:07 PM GMT Document emailed to Eva Wilson (ewilson@avon.org) for approval 2026-02-02 - 10:57:08 PM GMT Document e-signed by Keith Fraser (kfraser@avon.org) Signature Date: 2026-02-02 - 11:02:42 PM GMT - Time Source: server Email viewed by Eva Wilson (ewilson@avon.org) 2026-02-02 - 11:03:49 PM GMT Email viewed by Michelle Hansen (michelle@stolfusandassociates.com) 2026-02-03 - 10:38:24 PM GMT Document e-signed by Michelle Hansen (michelle@stolfusandassociates.com) Signature Date: 2026-02-05 - 0:46:38 AM GMT - Time Source: server Document approved by Eva Wilson (ewilson@avon.org) Approval Date: 2026-02-05 - 1:36:15 AM GMT - Time Source: server Agreement completed. 2026-02-05 - 1:36:15 AM GMT