Loading...
20.09.22 PSA GSG Architecture, Inc 1 EXHIBIT B On-Call Agreement for Professional Services TASK ORDER 2-2022-01 Public Works Facility Programming and Site Planning This Task Order pertains to the On-Call Agreement by and between the Town of Avon (“TOWN”), and GSG Architecture, Inc. (“CONTRACTOR”), dated On-Call Contract Execution of September 20, 2022 (“the Agreement”). CONTRACTOR shall perform services as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Project Description: Provide Facility Programming and Site Planning for a Public Works Facility. See Attachment A Project Site: DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 2 Proposed Tasks: See Attachment A. 1. Public Works Facility Programming and Site Planning. Budget/Proposal: ____________$54,983_ _______________________________________ Completion Schedule: __Eight weeks from Notice to Proceed__________________________ This Task Order is as approved by the September 30, 2022 On-Call Agreement on the 11th day of November 2022. Town of Avon Recommended:_________________________________Public Works Director ____Date: ______________ Eva Wilson Title GSG Architecture, Inc. Approved: _______________________________________Principal_and CEO________ Date: ______________ James Holloway Title Town of Avon Approved: __________________________________________Town Manager ____Date: ______________ Eric Heil Title DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 11/11/2022 11/11/2022 11/11/2022 Town of Avon, Colorado TASK ORDER #1 - Public Works Site Analysis GSG Architecture Proposal for A & E Services November 10, 2022 Page 1 Explanation of Fees: This proposal encompasses the following phases, services and deliverables listed below: SCOPE OF SERVICES Existing Site Analysis / Programming •The GSG Team will meet with Public Works Department Employees and Town administrators to gather information about the current conditions, growth forecasts and equipment inventories. •We will review your work protocols and look for ways to increase operational efficiency. •We will work with you to establish the necessary hierarchies and adjacencies and will provide diagrammatic documentation of these elements. •Using this information, we will create an inventory of required spaces and arrive at an optimal square footage for the facility. •We will review survey data provided by the Town or another agency. •Our team will review each site with regards to topography, access, solar orientation and size (including expansion potential) relative to the requirements of the program study. •A site plan will address access points, appropriate turn radii for all vehicles, parking areas and potential for future expansion. •Massing variations will be provided for analysis. With you, we will design several iterations for review and consensus. Volume studies will be accomplished in real time with you using Google Sketchup for quick renderings and massing studies. •The Scope of Work includes mass and scale studies on two sites including cost estimates. •Probable development and reconfiguration costs will be examined. •Our team will prepare a written report detailing the site analysis findings and offering recommendations for the most efficient configuration capable of supporting a new facility. •A written opinion of probable cost will be generated based on the report and site plan. •We will lead a final presentation to the Town administrators, the Public Works Department and members of the public, (if desired). Exclusions •Geotechnical Investigations •Phase I Environmental Investigations •Title Search, Financial planning or other activities typically associated with property acquisition •Topographic site surveys •Hazardous material investigations reports, and abatement •Schematic Design, Design Development, Construction Documents phase services (to be addressed in future task orders) Attachment A DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 Town of Avon, Colorado TASK ORDER #1 - Public Works Site Analysis GSG Architecture Proposal for A & E Services November 10, 2022 Page 2 Fixed Fee Proposal for Existing Site Analysis / Programming Services $ 52,223 (includes Civil Engineering and Cost Estimating) Anticipated Expenses (estimate only) $ 2,760 TOTAL $ 54,983 Please call to discuss at your convenience. We are always willing to discuss fee and scope to suit the best interests of the project. Sincerely, James Holloway, AIA, LEED AP CEO / Principal DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 GSGarchitecture 1 - Review of Existing Site Conditions Hours Rate Amount Principal 4.0 $225 900.00 Principal Architect 22.0 $195 4,290.00 Project Manager 22.0 $165 3,630.00 Technical Staff 22.0 $105 2,310.00 Administrative Staff 2.0 $95 190.00 1 - TOTAL 72.0 11,320.00 2 - Review of Existing Equipment / Needs Hours Rate Amount Principal 1.0 $225 225.00 Principal Architect 1.0 $195 195.00 Project Manager 2.0 $165 330.00 Technical Staff 4.0 $105 420.00 Administrative Staff 1.0 $95 95.00 2 - TOTAL 9.0 1,265.00 3 - User and Administration Meetings Hours Rate Amount Principal 0.0 $225 0.00 Principal Architect 6.0 $195 1,170.00 Project Manager 6.0 $165 990.00 Technical Staff 6.0 $105 630.00 Administrative Staff 1.0 $95 95.00 3 - TOTAL 19.0 2,885.00 4 - Site Plan Design / Final Presentation Hours Rate Amount Principal 8.0 $225 1,800.00 Principal Architect 4.0 $195 780.00 Project Manager 18.0 $165 2,970.00 Technical Staff 48.0 $105 5,040.00 Administrative Staff 2.0 $95 190.00 4 - TOTAL 80.0 10,780.00 5 - Written Report Hours Rate Amount Principal 1.0 $225 225.00 Principal Architect 16.0 $195 3,120.00 Project Manager 4.0 $165 660.00 Technical Staff 0.0 $105 0.00 Administrative Staff 8.0 $95 760.00 5 - TOTAL 29.0 4,765.00 6 - Consultant Coordination Hours Rate Amount Principal 2.0 $225 450.00 Principal Architect 4.0 $195 780.00 Project Manager 12.0 $165 1,980.00 Technical Staff 8.0 $105 840.00 Administrative Staff 2.0 $95 190.00 6 - TOTAL 28.0 4,240.00 SERVICES TOTAL 237.0 35,255.00 Site Analysis / Programming DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 JVA CIVIL ENGINEERS 1.REVIEW OF EXISTING SITE CONDITIONS Principal $220/hr. 4 hours $ 880 Senior Engineer $144/hr. 12 hours $1,728 SUBTOTAL $2,608 2.REVIEW OF EXISTING EQUIPMENT/NEEDS (No Civil Scope) 3.USER / ADMINISTRATION MEETINGS Principal $220/hr. 8 hours $1,760 SUBTOTAL $1,760 4.SITE PLAN DESIGN Principal $220/hr. 4 hours $ 880 Senior Engineer $144/hr. 30 hours $4,320 SUBTOTAL $5,200 5.WRITTEN REPORT (No Civil Scope) 6.CONSULTANT COORDINATION (No Civil Scope) SUBTOTAL $9,568 Reimbursables $ 232 TOTAL $9,800 GSG Administration $ 980 $10,780 DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 KEMP COST ESTIMATION 1.REVIEW OF EXISTING SITE CONDITIONS (no scope necessary) 2.REVIEW OF EXISTING EQUIPMENT/NEEDS (no scope necessary) 3.USER / ADMINISTRATION MEETINGS (no scope necessary) 4.SITE PLAN DESIGN Principal 10 hours $135/hr $ 1,350 Senior Project Estimator 31 hours $125/hr $ 3,875 Administrative Assistant 8 hours $ $ 50/hr $ 400 SUBTOTAL $ 5,625 5.WRITTEN REPORT (no scope necessary) 6.CONSULTANT COORDINATION (no scope necessary) GSG Administration $ 563 TOTAL $6,188 DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1 GSG REIMBURSABLES (estimate only) 1.REVIEW OF EXISTING SITE CONDITIONS Hotel Room in Avon (3 persons) $200 x 3 x 2 nights $ 1,200 6 meals in Avon (3 persons) $40 each $ 720 Mileage to/from Avon 400 miles $ 250 SUBTOTAL $ 2,170 2.REVIEW OF EXISTING EQUIPMENT/NEEDS (included in Review of Site above) 3.USER / ADMINISTRATION MEETINGS (included in Review of Site above) 4.SITE PLAN DESIGN (if necessary) Additional Site Visit Mileage to /from Avon 400 miles $ 250 Meal in Avon $40 $ 40 SUBTOTAL $ 295 5.WRITTEN REPORT Printing $ 295 6.CONSULTANT COORDINATION (no reimbursables) TOTAL $2,760 DocuSign Envelope ID: 13D8A554-D62F-4584-A40F-8EE7AA3C9EB1