Loading...
23.12.04 PSA Zehren and Associates - Change Order 4 CO-1 CHANGE ORDER Order No.:____4_________________ Date: __July 25, 2025 Agreement Date: __Dec 4, 2023_____ NAME OF PROJECT: ___Design for Eaglebend Pocket Park Expansion and Renovation ___ ______________________________________________________________________________ OWNER:_____Town of Avon ___________________________________________________ CONTRACTOR: _ Zehren and Associates _________________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS: Justification: Additional design needed for drinking fountain water line and concrete mix design review. See Exhibit A. Change to CONTRACT PRICE: $____2,150_______________ Original CONTRACT PRICE: $___52,448_______________ Current CONTRACT PRICE adjusted by previous CHANGE ORDER ____$83,273 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(decreased) by $____2,150__________________. The new CONTRACT PRICE including this CHANGE ORDER will be $_85,423___________. Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by ___(See below completion date) _ calendar days. The date for completion of all work will be ___Aug 30, 2025____________ (Date). APPROVALS REQUIRED: Approved by Engineer: Will Kearney Accepted by Contractor: Pedro Campos__ Accepted and Approved by Owner: Eva Wilson____ Federal Agency Approval (where applicable): N/A Eva Wilson (Jul 25, 2025 14:49:21 MDT) 1 Z E H R E N AND ASSOCIATES July 14, 2025 Mrs. Eva Wilson Public Works Director Town of Avon 100 Mikaela Way Avon, Colorado 81620 Email: ewilson@avon.org Phone: 970-390-2014 RE: Change Order Request #4 - Eaglebend Pocket Park Expansion and Renovation Zehren and Associates, Inc Project No: 20233064.00 Dear Eva: Zehren and Associates is submitting a Change Order for additional services provided in support of the project approvals required by ERWSD for the drinking fountain flow rate calculations. This change order also includes fees for the structural engineer review of the concrete mix design. These services were not included in the original scope of work. This Change Order will be reflected in the Professional Service Agreement for Design of Eaglebend Pocket Park Expansion and Renovation project located in Avon, CO. The following scopes of work have already been completed and are retroactively being included this change order: Additional Services: MEP Engineering 1. Analysis and flow rate calculations for the drinking fountain. 2. Review of the backflow preventer submittal. 3. Diagrammatic detail of the water meter, backflow preventer, and balancing valve for drinking fountain. Total Additional design fee = $2,000 Total Additional Service Fees for MEP Engineering - $2,000 Construction Administration and Observation Services Structural Scope  Review of the concrete mix design submittals Total Additional Construction Administration fee = $150 Total Additional Construction Administration Fees - $150 2 Change in Contract Price: Previous Contract Price: $83,273 Increase of this Change Order: $2,150 New Contract Price: $85,423 Eva, thank you for your consideration of the change order request. Please do not hesitate to contact me should you have any questions related to this request and need additional supporting information. Very truly yours, Pedro Campos, PLA Principal, Landscape Architect Zehren and Associates, Inc. AGREED TO BY (print name): _______________________________________ SIGNATURE:____________________________________________________ DATE: _________________________________________________________ 20250725 Change Order 4 Flow Calcs & Add Structural Scope $2,150 Final Audit Report 2025-07-25 Created:2025-07-25 By:Will Kearney (wkearney@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAbnp9M6uk21qwIYUPuoveCfj0lvpA_XID "20250725 Change Order 4 Flow Calcs & Add Structural Scope $2,150" History Document created by Will Kearney (wkearney@avon.org) 2025-07-25 - 8:21:03 PM GMT Document e-signed by Will Kearney (wkearney@avon.org) Signature Date: 2025-07-25 - 8:22:55 PM GMT - Time Source: server Document emailed to pedro c (pedroc@zehren.com) for signature 2025-07-25 - 8:22:57 PM GMT Email viewed by pedro c (pedroc@zehren.com) 2025-07-25 - 8:34:17 PM GMT Document e-signed by pedro c (pedroc@zehren.com) Signature Date: 2025-07-25 - 8:37:27 PM GMT - Time Source: server Document emailed to Eva Wilson (ewilson@avon.org) for signature 2025-07-25 - 8:37:29 PM GMT Email viewed by Eva Wilson (ewilson@avon.org) 2025-07-25 - 8:49:05 PM GMT Document e-signed by Eva Wilson (ewilson@avon.org) Signature Date: 2025-07-25 - 8:49:21 PM GMT - Time Source: server Agreement completed. 2025-07-25 - 8:49:21 PM GMT