23.12.04 PSA Zehren and Associates - Change Order 3 CO-1 CHANGE ORDER Order No.:____3_________________ Date: __September 27, 2024________ Agreement Date: __Dec 4, 2023_____ NAME OF PROJECT: ___Design for Eaglebend Pocket Park Expansion and Renovation ___ ______________________________________________________________________________ OWNER:_____Town of Avon ___________________________________________________ CONTRACTOR: _ Zehren and Associates _________________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS: Justification: Additional design and construction Administration and Observation. See Attachment A. Change to CONTRACT PRICE: $____23,215_______________ Original CONTRACT PRICE: $___52,448_______________ Current CONTRACT PRICE adjusted by previous CHANGE ORDER ____$60,058 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(decreased) by $____5,300__________________. The new CONTRACT PRICE including this CHANGE ORDER will be $_83,273___________. Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by ___(See below completion date) _ calendar days. The date for completion of all work will be ___Aug 30, 2025____________ (Date). APPROVALS REQUIRED: Approved by Engineer: N/A Accepted by Contractor: Pedro Campos__ Accepted and Approved by Owner: Eva Wilson____ Federal Agency Approval (where applicable): N/A 09/27/2024 Eva Wilson (Sep 27, 2024 14:40 MDT) Eva Wilson 09/27/2024 Z E H R E N A N D A S S O C I A T E S September 13, 2024 Mrs. Eva Wilson Public Works Director Town of Avon 100 Mikaela Way Avon, Colorado 81620 Email: ewilson@avon.org Phone: 970-390-2014 RE: Change Order Request #3 - Eaglebend Pocket Park Expansion and Renovation Zehren and Associates, Inc Project No: 20233064.00 Dear Eva: Zehren and Associates is submitting a Change Order for additional services provided in support of the project approvals and design revisions requested by the Town of Avon. This change order also includes fees to perform Construction Administration and Observation services for the project that were not part of the original scope of work for the project. This Change Order will be reflected in the Professional Service Agreement for Design of Eaglebend Pocket Park Expansion and Renovation project located in Avon, CO. The anticipated construction duration is approximately six months, with 2 months of construction during 2024, and an additional 4 months in 2025. The following scopes of work are proposed to be completed under this change order: Additional Services: Civil 1. 2- hours to update and clarify CDOT specs in the drawings 2. 4-hours to update drawings / details and address peer review comments 3. 2-hours for coordination and meetings Total of 8 hours = $1720 Landscape Architecture • 2-hours meetings and coordination with town staff • 4-hours updating drawings, details, and notes • 3-hours coordination meetings with consultants and drawing markups • 2-hours updating cost estimate and bid schedule • 2-hours reviewing final drawings • 9-hours coordination and meeting attendance with ERWSD for water line easement. Total of 13 hours = $3080 Total Additional Service Fees for Civil and Landscape - $4,800 Attachment A 2 Construction Administration and Observation Services Landscape Architecture Scope 1. Attend and conduct (1) pre-construction meeting with the owner and selected contractor ($300) 2. Attend a weekly 1hr OAC meeting, make periodic site visits, prepare field reports ($5,250) 3. Review product and materials Submittals for the project ($1,800) 4. Respond to Requests for Information (RFI’s) from the contractor ($2,200) 5. Prepare a Punch List at Substantial Completion of the project ($600) 6. Prepare a Punch List at Final Completion of the Project. ($600) 7. Review shop drawings for prefabricated picnic shelter ($250) 8. Coordination and management of RFI’s / Submittals for all other disciplines. ($1200) 9. Coordination with general contractor. ($800) Landscape Architecture fee - $13,000 Civil Scope 1. Review Civil related product and materials Submittals for the project. 2. Attend two site visits and produce a field report for each site visit. 3. Respond to Civil related Requests for Information (RFI’s) and contractor questions. Civil Fee - $2,025 Structural Scope 1. Attend one site visit and prepare one field report. Structural Fee - $390 Architectural Scope 1. Review product and materials Submittals for porta-potty enclosure. 2. Respond to Architecture related Requests for Information (RFI’s) and contractor questions. 3. Attend one punch walk site visit and identify items that will be included on the Final Completion punch list. Architectural Fee - $600 Irrigation Scope 1. Participate in a pre-construction conference call to answer contractor questions. 2. Review product and materials Submittals for irrigation equipment. 3. Respond to Irrigation related Requests for Information (RFI’s) and contractor questions. 4. Attend one punch walk site visit and identify items that will be included on the Final Completion punch list. Irrigation Fee - $2,400 Total Proposed Fees for Construction Administration Services - $18,415 Change in Contract Price: Previous Contract Price: $60,058 Increase of this Change Order: $23,215 New Contract Price: $83,273 3 Eva, thank you for your consideration of the change order request. Please do not hesitate to contact me should you have any questions related to this request and need additional supporting information. Very truly yours, Pedro Campos, PLA Principal, Landscape Architect Zehren and Associates, Inc. AGREED TO BY (print name): _______________________________________ SIGNATURE:____________________________________________________ DATE: _________________________________________________________ 20240513 Changer Order 3 - Additional design and construction obs $23,215 Eaglebend Park Final Audit Report 2024-09-27 Created:2024-09-27 By:Eva Wilson (ewilson@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAl3PqyXwAW-cMYFRQ84wfiLa-SFSnDOMT "20240513 Changer Order 3 - Additional design and constructio n obs $23,215 Eaglebend Park" History Document created by Eva Wilson (ewilson@avon.org) 2024-09-27 - 7:49:41 PM GMT Document emailed to pedro c (pedroc@zehren.com) for signature 2024-09-27 - 8:03:42 PM GMT Email viewed by pedro c (pedroc@zehren.com) 2024-09-27 - 8:29:09 PM GMT Document e-signed by pedro c (pedroc@zehren.com) Signature Date: 2024-09-27 - 8:29:31 PM GMT - Time Source: server Document emailed to Eva Wilson (ewilson@avon.org) for signature 2024-09-27 - 8:29:32 PM GMT Email viewed by Eva Wilson (ewilson@avon.org) 2024-09-27 - 8:40:06 PM GMT Document e-signed by Eva Wilson (ewilson@avon.org) Signature Date: 2024-09-27 - 8:40:27 PM GMT - Time Source: server Agreement completed. 2024-09-27 - 8:40:27 PM GMT