Loading...
25.06.05 PSA Stolfus & Associates1 EXHIBIT B On-Call Agreement for Professional Services TASK ORDER 2025-32030-01 Avon Rd Rapid Rectangular Flashing Beacon: Design Services During Construction This Task Order pertains to the On-Call Agreement by and between the Town of Avon (“TOWN”), and Stolfus and Associates (“CONTRACTOR”), dated On-Call Contract Execution of September 3, 2021 (“the Agreement”). CONTRACTOR shall perform services as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Project Description: Avon Road traverses north-south through the center of Avon, CO. The CONTRACTOR and the Town have identified Nine (9) pedestrian crossings on or adjacent to Avon Road to be upgraded with flashing beacon pedestrian crossing signs. Further, these upgrades require ADA compliant curb ramps for accessibility. Six (6) of the crossings are located on CDOT maintained infrastructure, while three (3) of the crossing including ten (10) curb ramps are part of the Town of Avon infrastructure. The CONTRACTOR shall provide design support to the Construction Management team throughout construction of the project, a thorough scope of services are detailed in Attachment A. Project Site: Avon Road – Rectangular Rapid Flashing Beacons & ADA Ramp Improvement Locations 2 Proposed Tasks: See Attachment A. 1. Design Services During Construction Budget/Proposal: ___$10,000 ____________________________________ Schedule: 8 Months from the date of execution of this Task Order This Task Order shall supplement the September 3rd, 2021 Agreement. Town of Avon Recommended: ________________________________Senior Engineer____Date: ______________ Will Kearney Title Stolfus and Associates Approved: ________________________________________President________________ Date: ______________ Elizabeth Stolfus Title Town of Avon Approved: _________________________________Director of Engineering_________Date: ______________ Eva Wilson Title 6/5/25 6/5/25 6/5/25Eva Wilson (Jun 5, 2025 21:09 MDT) Proposal for Avon Road Crosswalk Improvements - Town of Avon Project No. 2024- CIP32030 - Design Services During Construction April 21, 2025 Page 3 April 21, 2025 Will Kearney Senior Town Engineer Town of Avon wkearney@avon.org Re: Proposal for Avon Road Crosswalk Improvements - Town of Avon Project No. 2024- CIP32030 - Design Services During Construction Dear Mr. Kearney, The Avon Road I-70 & US-6 Crosswalk Improvements project is located on Avon Rd in the Town of Avon. The project installs rectangular rapid flashing beacons at nine crossings along Avon Rd and reconstructs curb ramps at the associated crossings to meet ADA compliance requirements. Through a previous contract with Stolfus & Associates, Inc. (Stolfus), final design was completed at the following locations: · Beaver Creek Blvd – South Crossing – East, West, and Median Curb Ramps · Benchmark Place – South Crossing – East, West, and Median Curb Ramps · Hurd Lane – South Crossing – East and West Curb Ramps Stolfus is pleased to provide services for the Avon Road I-70 & US-6 Crosswalk Improvements construction project. The following services are included in the scope: · Design Services During Construction The following describes the proposed scope of services necessary to accomplish the above task: SCOPE OF SERVICES Project Administration/Management Stolfus will review and process invoices monthly and provide other project administration/management services (coordination and product review) throughout the duration of the project. Stolfus will be responsible for day-to-day management and coordination of the work elements. This will include coordination on Requests for Information (RFIs), plan revisions, and submittal reviews. The Stolfus project manager will be the primary point of contact throughout construction. Roadway and Traffic Design Services During Construction (Stolfus) Construction Meetings and Field Visits It is assumed that Stolfus will attend the following meetings: · Pre-construction meeting – one (1) (virtual) · Project team coordination meetings – up to two (2) (virtual) Requests for Information Stolfus will review and respond to the Contractor’s requests for information (RFIs). All RFIs must be submitted by the Contractor in writing. Stolfus will review and respond in writing within one week after receiving a written RFI. It is assumed that up to five (5) RFIs will be submitted related to roadway and traffic elements. Construction Conflict Resolution and Plan Revisions Stolfus will prepare design plan revisions for conflicts that occur during construction, including unknown or changed conditions which require additional analysis, design, and/or plan revisions. Stolfus will provide and seal the revised plans, as necessary and requested by the Town. This scope of work includes: · Plan Revisions – up to three (3) sheets · Specification Revisions – up to three (3) specifications Exclusions The following items are excluded from this scope of work and are expected to be completed by others. · Permitting · Public Involvement · Value Engineering services · Inspection Services · Construction Management · Construction As-builts · Weekly Construction Meetings · Utility coordination, support, and inspection · SWMP support / Erosion Control Supervisor · Surveying · Schedule Reviews Schedule and Estimated Fee We are available to begin work on this project immediately upon Notice to Proceed. We will provide the services described above on a Time and Materials basis at our Standard Hourly Rates with a “Not to Exceed” limit which we will not charge beyond with prior written approval. Stolfus has estimated that the above scope of services could be completed for a “Not to Exceed” budget of $10,000. Invoices for professional services rendered and expenses incurred will be prepared monthly. Invoices will include a detailed description of meetings attended, work in progress, and tasks completed. Thank you again for the opportunity to work together on this project. Please call me if you have any questions. Best Regards, STOLFUS & ASSOCIATES, INC. Jenna Siegel, PE Project Manager Will Kearney Date:4/21/2025 Town of Avon Project No. 2024-CIP32030 DSDC By: Date Requested:4/21/2025 Anticipated Start Date Months:3 Scope Summary Column1 Principal PE-5 PE-3 PE-2 PE-1 EI3 EI1 TDA-2 Student Intern COM-3 Office Manager ACCT-2 Graphic Specialist Admin Asst. 1 TASK $280.00 $235.00 $215.00 $190.00 $175.00 $155.00 $145.00 $150.00 $85.00 $210.00 $120.00 $120.00 $110.00 $90.00 HRS Work Element Work Element 1 - Proj. Admin/Mgmt Coordination 5 5 Contract Admin/Billing 4 5 9 Subtotal Hours 9 5 14 Work Element Total $2,115.00 $600.00 Work Element 2 - Roadway/Traffic DSDC Meetings Project Team (2) (virtual), includes prep 2 2 Pre-construction (1) (virtual), includes prep 2 2 RFIs, assume 5 at 3 hours each 2 3 10 15 Plan Revisions, assumes 3 sheets at 5 hours each 2 3 10 15 Specification Revisions, assumes 3 at 2 hours each 3 3 6 Subtotal Hours 11 9 20 40 Work Element Total $2,585.00 $1,395.00 $2,900.00 Total Hours 20 9 20 5 54 Total Labor $$4,700 $1,395 $2,900 $600 $9,595 . SUBCONSULTANTS/VENDORS Budget Sub/Vendor 1 Sub/Vendor 2 Sub/Vendor 3 Sub/Vendor 4 Sub/Vendor 5 EXPENSES: expense cost Mileage 0.670 Hotel 107.00 Per Diem 59.00 Outside Reproduction TOTAL SERVICES $9,595 Add'l Service? Anticipated Duration Location: Town of Avon - Avon Road Requested by: Jenna Siegel Client PM: Project #: Client: Town of Avon Project: Avon Road Crosswalk Improvements - Town of Avon Project No. 2024-CIP32030 DSDC Base Budget? Other Type Service Provided 1 1-Task Order 2025-32030-01 - Avon Road RRFB DSDC $10,000 Final Audit Report 2025-06-06 Created:2025-06-05 By:Will Kearney (wkearney@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAphK8cAFXvPGd2eWqPcEvAsdi6A_nSdN- "1-Task Order 2025-32030-01 - Avon Road RRFB DSDC $10,00 0" History Document created by Will Kearney (wkearney@avon.org) 2025-06-05 - 8:43:07 PM GMT Document emailed to Will Kearney (wkearney@avon.org) for signature 2025-06-05 - 8:44:56 PM GMT Document e-signed by Will Kearney (wkearney@avon.org) Signature Date: 2025-06-05 - 8:45:30 PM GMT - Time Source: server Document emailed to Elizabeth Stolfus (elizabeth@stolfusandassociates.com) for signature 2025-06-05 - 8:45:32 PM GMT Email viewed by Elizabeth Stolfus (elizabeth@stolfusandassociates.com) 2025-06-05 - 10:46:26 PM GMT Document e-signed by Elizabeth Stolfus (elizabeth@stolfusandassociates.com) Signature Date: 2025-06-05 - 10:46:49 PM GMT - Time Source: server Document emailed to Eva Wilson (ewilson@avon.org) for signature 2025-06-05 - 10:46:51 PM GMT Email viewed by Eva Wilson (ewilson@avon.org) 2025-06-06 - 3:09:22 AM GMT Document e-signed by Eva Wilson (ewilson@avon.org) Signature Date: 2025-06-06 - 3:09:48 AM GMT - Time Source: server Agreement completed. 2025-06-06 - 3:09:48 AM GMT