Loading...
23.11.01 PSA Stolfus & AssociatesEXHIBIT B On-Call Agreement for Professional Services TASK ORDER 2.4 US6 Mobility Improvement Project: Preliminary Design This Task Order pertains to the On-Call Agreement by and between the Town of Avon (“TOWN”), and Stolfus and Associates (“CONTRACTOR”), dated On-Call Contract Execution of September 3, 2021 (“the Agreement”). CONTRACTOR shall perform services as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Project Description: Provide preliminary engineering and concept analysis for the US6 Multimodal Safety and Mobility Improvements project. The project received the CDOT Revitalizing Main Street Grant to slow prevailing speed on US6 and potentially install 3 pedestrian crossings as shown on the project site below. Project Site: Proposed Tasks: See Attachment A. 1. Provide two conceptual plans for the intersection of US6 and Stonebridge Rd. DocuSign Envelope ID: C8F84EED-06AD-4EC7-90C8-69348AFC41A8 Budget/Proposal: ___$2,650 new funds ($3490 existing TO, $6140 Total)______________ This Task Order is executed this __1st____ day of ___November_____, 2023. Stolfus and Associates Approved: ________________________________________President________________ Date: ______________ Name Title Town of Avon Approved: _____________________________________Public Works Director ____Date: ______________ Name Title DocuSign Envelope ID: C8F84EED-06AD-4EC7-90C8-69348AFC41A8 11/1/2023 11/1/2023 Post Office Box 975 100 Mikaela Way Avon, CO 81620 Attachment A SCOPE OF SERVICES The anticipated scope of services and deliverables for this project include: 1. Conceptual Options for the Stone Bridge Signal a. with a traffic signal and pedestrian crossings. b. with pedestrian crossings only. ELEMENTS OF THE SCOPE OF SERVICES PROJECT MANAGEMENT Stolfus will review and process invoices and provide other project administration/ management services (coordination and product review) throughout the duration of the project. Stolfus will be responsible for day- to-day management and coordination of the work elements. Schedule, budget, and project status reports will be included in the invoices. Stolfus will maintain a project design schedule. Stolfus will notify the Town when tasks are falling behind schedule. CONCEPT DESIGN PLANS Stolfus will prepare project documentation including development of exhibits for the Stone Bridge Intersection. Exhibits for the concept will be prepared on 11X17 and will be conceptual in nature, not developed for construction. DESIGN STANDARDS Drawings and designs will be in accordance with the Section 7.32 Engineering Improvement Standards of the Town’s Municipal Code, CDOT Roadway Design Guide, MUTCD, CDOT M&S Standards, CDOT Standard Specification for Road and Bridge Construction and other standards incorporated by reference. SCHEDULE Stolfus will submit a draft review of plans on November 13, 2023. Final plans to be completed by November 15, 2023. FEE Stolfus and its subconsultants will perform these engineering services for a total fee of $6,140. Town of Avon will add $2650 to the remaining funds on the current task order ($3490). DocuSign Envelope ID: C8F84EED-06AD-4EC7-90C8-69348AFC41A8